Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables
ML080360631
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 02/26/2008
From: Ellen Brown
NRC/NRR/ADRO/DORL/LPLII-2
To: Campbell W
Tennessee Valley Authority
Brown Eva, NRR/DORL, 415-2315
Shared Package
ML080280463 List:
References
TAC MD6415
Download: ML080360631 (5)


Text

UNITED STATES 0 °NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001February 26, 2008 Mr. William R. Campbell, Jr.Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

SUBJECT:

BROWNS FERRY NUCLEAR PLANT UNITS 1,2 AND 3 -DISTRIBUTION OF REVISION 2 OF THE NRC'S SIGNIFICANCE DETERMINATION PROCESS RISK-INFORMED INSPECTION NOTEBOOKS, AND ACCOMPANYING PHASE 2 PRE-SOLVED TABLES (TAC NO. MD6415)

Dear Mr. Campbell:

In 2004, the U.S. Nuclear Regulatory Commission (NRC) requested information from licensees to support the Significance Determination Process (SDP) Risk-Informed Inspection Notebook (notebook) enhancement/standardization effort. The NRC has completed this effort and has issued Revision 2 of the notebook for Browns Ferry Nuclear Plant (BFN), Units 2 and 3. It should be noted that the SDP notebook does not include Unit 1. Any findings for Unit 1 will be screened in accordance with the Reactor Oversight Process using the Unit 2 notebook with any needed plant-specific adjustments handled through the Region II senior risk analysts.The NRC developed these notebooks to facilitate Phase 2 of the NRC inspection finding SDP detailed in Inspection Manual Chapter 0609, "Significance Determination Process," Appendix A,"Determining the Significance of Reactor Inspection Findings for At-Power Situations." SECY-99-007A, "Recommendations for Reactor Oversight Process Improvements," sets forth this process and additional details are included in the NRC Inspection Manual Chapter 0308,"Reactor Oversight Process Basis Document." NRC inspectors and risk analysts, who have extensive understanding of plant-specific design features and operation, are expected to use these notebooks.

The notebooks will be updated on a case-by-case basis as needed to reflect changes to the facilities.

Revision 2 of the notebooks is accompanied by the Site Specific Pre-Solved Spreadsheet (the Spreadsheet).

The NRC added the Spreadsheet to help reduce the time it takes to process inspection findings.

The NRC benchmarked the notebooks against licensee Probability Risk Assessments and plant configurations.

The enclosed compact disk (CD) containing the above documents is provided for your use to facilitate your understanding of the SDP in Inspection Manual Chapter 0609.The enclosure transmitted herewith contains Security-Related information.

When separated from enclosure, this document is decontrolled.

pr.a =..*r f. 1----k ----" -----.-__ _ ---1W W. Campbell, Jr.-2-The information on the enclosed CD is designated exempt from public disclosure pursuant to Section 2.390(d)(1) of Title 10 of the Code of Federal Regulations since it contains security-related information.

If you have any questions, please contact me at (301) 415-2315.Sincerely, IRN Eva A. Brown, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-259, 50-260, and 50-296

Enclosure:

CD w/BFN Units 2 and 3 SDP Rev. 2 and Site Specific Pre-Solved Spreadsheet Official Use Only -Security Related Information cc w/o encl: See next page Tennessee Valley Authority cc: w/o enclosures BROWNS FERRY NUCLEAR PLANT Mr. Ashok S. Bhatnagar Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. James R. Douet, Vice President Nuclear Support Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. H. Rick Rogers, Vice President Nuclear Engineering

& Technical Services Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Michael D. Skaggs, Site Vice President Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609 General Counsel Tennessee Valley Authority 6A West Tower 400 West Summit Hill Drive Knoxville, TN 37902 Mr. John C. Fornicola, General Manager Nuclear Assurance Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. Steven M. Douglas, General Manager Browns Ferry Site Operations Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609 Ms. Beth A. Wetzel, Manager Corporate Nuclear Licensing and Industry Affairs Tennessee Valley Authority 4X Blue Ridge 1101 Market Street Chattanooga, TN 37402-2801 Mr. James E. Emens, Jr., Interim Manager Licensing and Industry Affairs Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609 James B. Baptist Browns Ferry Senior Project Engineer Division of Reactor Projects, Branch 6 U.S. Nuclear Regulatory Commission 61 Forsyth Street, SW.Suite 24T85 Atlanta, GA 30303-8931 Tomy A. Nazario Browns Ferry Project Engineer Division of Reactor Projects, Branch 6 U.S. Nuclear Regulatory Commission 61 Forsyth Street, SW.Suite 24T85 Atlanta, GA 30303-8931 Senior Resident Inspector U.S. Nuclear Regulatory Commission Browns Ferry Nuclear Plant 10833 Shaw Road Athens, AL 35611-6970 Page 2 of 2 State Health Officer Alabama Dept. of Public Health RSA Tower -Administration Suite 1552 P.O.. Box 303017 Montgomery, AL 36130-3017 Chairman Limestone County Commission 310 West Washington Street Athens, AL 35611 Mr. Michael A. Purcell Senior Licensing Manager Nuclear Power Group Tennessee Valley Authority 4X Blue Ridge 1101 Market Street Chattanooga, TN 37402-2801 Mr. D. Tony Langley, Manager Licensing and Industry Affairs Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609 Mr. Larry E. Nicholson, General Manager Performance Improvement Tennessee Valley Authority 3R Blue Ridge 1101 Market Street Chattanooga, TN 37402-2801 February 26, 2008 W. Campbell, Jr. .The information on the enclosed CD is designated exempt from public disclosure pursuant to Section 2.390(d)(1) of Title 10 of the Code of Federal Regulations since it contains security-related information.

If you have any questions, please contact me at (301) 415-2315.Sincerely,/RA/Eva A. Brown, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-259, 50-260, and 50-296

Enclosure:

CD w/BFN Units 2 and 3 SDP Rev. 2 and Site Specific Pre-Solved Spreadsheet Official Use Only -Security Related Information cc w/o encl: See next page Distribution: (w/o enclosures)

NON-PUBLIC RidsNrrDorlLpl2-2 RidsNrrDraApob LPL2-2 R/F RidsNrrLABClayton (Hard copy)RidsNrrPMJWiebe RidsNrrPMEBrown RPerch ADAMS Accession Nos. BFN Spreadsheet:

ML071700052 BFN Notebook:

ML071700050 Public letter: ML080360631 Non-Public LTR:ML080290026 PKG. ML080280463 N8 =o A//&-,OG OFFICE LPL2-2/PM "P 2-2/LA f-ýýPL2-2/BC NAME EBrownmZA I A ('layton 'Boyce DATE /oI /08 .- / /08 '/Ir/08 OFFICIAL RECORD COPY