04/01/2008 Meeting Slides for the Kewaunee End-of-Cycle Public Meeting, Reactor Oversight Program - 2007
ML080940530
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 04/01/2008
From:
NRC/RGN-III
To:
References
Download: ML080940530 (31)


Text

Kewaunee Power Station Annual Assessment MeetingReactor Oversight Program -2007Nuclear Regulatory Commission -Region III Lisle, IL April 1, 2008 2 Purpose of Today

's Meeting*A public forum to discuss Kewaunee performance in 2007

  • NRC will address the performance issues identified in the ann ual assessment letter
  • Licensee will be given the opportunity to respond and inform the NRC of new or existing programs to maintain or improve performance 3 Agenda*Introduction
  • Review of Reactor Oversight Process
  • National Summary of Plant Performance
  • Discussion of Plant Performance Results
  • Licensee Response and Remarks
  • NRC Closing Remarks
  • Break*NRC available to address public questions 4 Region III OrganizationJames CaldwellRegional AdministratorMark SatoriusDeputy Regional AdministratorCynthia PedersonDirector Division of Reactor ProjectsGary ShearDeputy DirectorSteven West Director Division of Reactor SafetyAnne BolandDeputy DirectorMichael KunowskiBranch ChiefRegional Specialists KPSResident InspectorsSteve BurtonPatrick HigginsProject EngineerJohn Jandovitz 5 Our Mission
  • To license and regulate the nation's civilian use of byproduct, source, and special nuclear materials to ensure adequate protection of public health and safety, promote the common defense and security, and protect the environment.

6 Some Nuclear Facts

  • More than 100 nuclear power plants supply about 20 percent of the electricity in the U.S.
  • Nuclear materials are used in medicine for diagnosis and cancer treatment.
  • Nuclear materials are widely used in industry, such as in density gauges, flow measurement devices, radiography devices, and irradiators.

7 The NRC Regulates

  • Nuclear reactors-commercial power reactors, research and test reactors, new reactor designs
  • Nuclear materials-nuclear reactor fuel, radioactive materials for medical, industrial, and academic use
  • Nuclear waste

-transportation, storage and disposal of nuclear material and waste, decommissioning of nuclear facilities

  • Nuclear security

-physical security of nuclear facilities and materials from sabotage or attacks 8 What We Don

't Do*Regulate nuclear weapons, military reactors, or space vehicle reactors

  • Own or operate nuclear power plants
  • Regulate some radioactive materials, such as X-rays and naturally occurring radon 9 How We Regulate
  • Establish rules and regulations
  • Issue licenses
  • Provide oversight through inspection, enforcement, and evalua tion of operational experience
  • Conduct research to provide support for regulatory decisions
  • Respond to events and emergencies 10 Assurance of Plant Safety
  • Require "defense-in-depth

"*Require long-term main tenance of equipment

  • Require continual training of operators
  • Verify compliance with regulations 11 What We Do

-Nuclear Waste

  • The NRC regulates:

-Storage of spent reactor fuel in fuel pools or dry storage casks, and

-A national spent fuel storage site--Yucca Mountain.

12 What We Do

-Nuclear Security

  • NRC Requires:

-Well-armed and well-trained security forces,-Surveillance and perimeter patrols,-State-of-the-art site access equipment and controls,-Physical barriers and detection zones, and

-Intrusion detection systems and alarm stations.

13NRC Performance Goals

  • Safety: Ensure adequate protection of public health and safety and the environment.
  • Security: Ensure adequate protection in the secure use and manage ment of radioactive materials.

14 Reactor Oversight ProcessSafetyCornerstonesBaseline Inspection ResultsSignificance ThresholdAction MatrixSignificance ThresholdPerformance IndicatorResultsRegulatory ResponseStrategicPerformance AreasSafetyCornerstonesBaseline Inspection ResultsSignificance ThresholdAction MatrixSignificance ThresholdPerformance IndicatorResultsRegulatory ResponseStrategicPerformance Areas 15 Examples of Baseline Inspections

  • Equipment Alignment ~80 hrs/yr
  • Triennial Fire Protection ~250 hrs every 3 yrs
  • Operator Response ~125 hrs/yr
  • Emergency Preparedness ~80 hrs/yr
  • Rad Release Controls ~110 hrs every 2 yrs
  • Worker Radiation Protection ~95 hrs/yr
  • Corrective Action Program ~250 hrs every 2 yrs
  • Corrective Action Case Reviews ~60 hrs/yr 16 Significance ThresholdPerformance Indicators Green:Only Baseline Inspection White:May increase NRC oversight Yellow:Requires more NRC oversight Red:Requires more NRC oversight Inspection Findings Green:Very low safety issue White:Low to moderate safety issue Yellow:Substantial safety issue Red:High safety issue 17 Action Matrix ConceptIncreasing Safety SignificanceIncreasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory ActionsLicenseeResponseRegulatoryResponseDegradedCornerstoneMultiple/Rep.DegradedCornerstoneUnacceptablePerformance 18National Summary of Plant Performance Status at End of 2007Licensee Response 87Regulatory Response 8Degraded Cornerstone 8Multiple/Repetitive Degraded Cornerstone1Unacceptable 0Total104 19 National Summary
  • Performance Indicator Results (for 2007)

-Green 1942-White8-Yellow 1-Red 0*Total Inspection Findings (for 2007)

-Green 759-White9-Yellow 2-Red 0 20 Kewaunee Assessment Results(January 1 -December 31, 2007)

  • Plant performance for the most recent quarter was within the Degraded Cornerstone column of the NRC

's Action Matrix based on one Yellow inspecti on finding. Additionally, the Unplanned Scrams Performance Indicator was White for the first three quarters of the assessment period.

  • A 95002 inspection was performed in November and December of 2007, to review the actions taken to address the Yellow Finding and White Scrams PI.

21 Safety Significant Findings or PIs

  • On April 3, 2007, a Notice of Violation was issued for a fuel leak on the "A" emergency diesel generator that was not appropriately evaluated and repaired from June 28 to August 17, 2006. In late 2007, the NRC performed an inspection to review this issue

and concluded that the planned corrective

actions were adequate.

22 Inspection Activities(January 1 -December 31, 2007)

  • The inspections were performed by the Resident Inspectors and Regional Inspectors, includi ng specialists in engineering, security, emergency preparedne ss, and radiation protection
  • 1 Yellow and 39 Green inspection findings in 2007
  • No refueling outage in 2007

-one started last week and the previous one was in the fall of 2006 23 Kewaunee Inspection Activities(January 1 -December 31, 2007)

  • Major team inspections included the biennial Problem Identificatio n and Resolution inspection and Compon ent Design Bases inspection.

24 Annual Assessment Summary(January 1 -December 31, 2007)

  • Dominion Energy Kewaunee, Inc operated Kewaunee in a manner that preserved public health and safety
  • All cornerstone objectives were met with one Yellow finding and one White PI 25 Annual Assessment Summary(January 1 -December 31, 2007)
  • Substantive cross-cutting issues

-one in problem identification and resolution and one in human performance

  • NRC plans baseline inspections at Kewaunee for 2008 26 Licensee Response and Remarks Mr. Steve Scace Site Vice-President Kewaunee Power Station 27 Open to the Public
  • The NRC places a high pr iority on keeping the public and stakeholders informed of its activities.
  • At www.nrc.gov, you can:

-Find public meeting da tes and transcripts;

-Read NRC testimony, speeches, press releases, and policy decisions; and

-Access the agency

's Electronic Reading Room to find NRC publications and documents.

28 Contacting the NRC

  • Report an emergency

-(301) 816-5100 (call collect)

  • Report a safety concern

-(800) 695-7403

-Allegation@nrc.gov

  • General information or questions

-www.nrc.gov

-Select "What We Do "for Public Affairs 29 NRC Representatives

  • Cynthia Pederson, Director, Division of Reactor Projects

-(630) 829-9600

  • Gary Shear, Deputy Division Director, DRP

-(630) 829-9601

  • Margaret Chernoff, Project Manager, NRR

-(301) 415-4041

  • Steve Burton, Senior Resident Inspector -Kewaunee

-(920) 388-3156

  • Patrick Higgins, Resident Inspector -Kewaunee

-(920) 388-3156

  • John Jandovitz, Senior Project Engineer

-(630) 829-9763

  • Michael Kunowski, Branch Chief

-(630) 829-9618 30 NRC Representatives

  • Patrick Louden, Chief, Decommissioning Branch (ISFSI)

-(630) 829-9627

  • ViktoriaMitlyng, Public Affairs Officer

-(630) 829-9662

  • PremaChandrathil, Public Affairs Officer

-(630) 829-9663

  • Rob Krsek, Senior Resident Inspector

-Point Beach

-(920) 755-2309

  • Rob Ruiz, Resident Inspector

-Point Beach

-(920) 755-2309

  • NRC Region III Office Switchboard

-(630) 829-9500 (800) 522-3025 31 Reference Sources

  • Reactor Oversight Process

-http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html*Public Electronic Reading Room

-http://www.nrc.gov/reading-rm.html

  • Public Document Room 800-397-4209 (Toll Free)