ML16158A132

From kanterella
Revision as of 02:41, 20 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search

Transmittal Letter Individual Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for Hearing (CAC No. MF6251) and Enclosure (Fr Notice)
ML16158A132
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/06/2016
From: Richard Guzman
Plant Licensing Branch 1
To: Heacock D
Dominion Nuclear Connecticut
Guzman R
References
CAC MF6251
Download: ML16158A132 (19)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Nuclear Connecticut, Inc. Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 June 6, 2016

SUBJECT:

MILLSTONE POWER STATION, UNIT NO. 3 -INDIVIDUAL NOTICE OF CONSIDERATION OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE AND OPPORTUNITY FOR HEARING (CAC NO. MF6251)

Dear Mr. Heacock:

The U.S. Nuclear Regulatory Commission (NRC) has forwarded the enclosed, "Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for a Hearing," to the Office of the Federal Register for publication.

This notice relates to your application dated May 8, 2015, as supplemented by letters dated January 28, February 25, May 23, March 29, and May 2, 2016, in which you request to modify the Millstone Power Station, Unit No. 3 (MPS3), Technical Specifications (TSs) to (1) allow the use of Dominion nuclear safety and reload core design methods; (2) allow the use of applicable departure from nucleate boiling ratio design limits for VIPRE-D; (3) update the approved reference methodologies cited in TS 6.9.1.6.b; (4) remove the base load mode of operation that is not a feature of the Dominion Relaxed Power Distribution Control power distribution control methodology; and (5) address the issues identified in Westinghouse Nuclear Safety Advisory Letter (NSAL-09-5), Rev. 1, NSAL-15-1, and Westinghouse Communication 06-IC-03.

Additionally, the proposed changes would involve, in part, the relocation of certain equations, supporting descriptions and surveillance requirements from the TSs to licensee-controlled documents.

The NRC staff previously made a proposed determination that the amendment request dated May 8, 2015, involves no significant hazards consideration (NSHC) (80 FR 52804, September 1, 2015). This notice supersedes the previous notice and is intended to include the added clarification that the proposed changes involve the relocation of TS information either to the TS Bases or the Core Operating Limits Report which are both licensee-controlled documents.

There are no changes to the staff's proposed NSHC determination as originally noticed.

D. Heacock If you have any questions, please contact me at 301-415-1030 or Richard.Guzman@nrc.gov.

Docket No. 50-423

Enclosure:

Notice of Consideration cc w/enclosure:

Distribution via Listserv Sincerely, Richard V. Guzman, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation ENCLOSURE FEDERAL REGISTER NOTICE NUCLEAR REGULATORY COMMISSION

[Docket No. 50-423; NRC-2016-0109]

[7590-01-P]

Dominion Nuclear Connecticut, Inc., et al.; Millstone Power Station, Unit No. 3 AGENCY: Nuclear Regulatory Commission.

ACTION: License amendment application; opportunity to comment, request a hearing, and petition for leave to intervene.

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of an amendment to Facility Operating License No. NPF-49, issued to Dominion Nuclear Connecticut, Inc., et al. (the licensee), for operation of the Millstone Power Station, Unit No. 3 (MPS3). The proposed amendment would revise the Technical Specifications (TSs) to enable the use of Dominion nuclear safety and reload core design methods for MPS3, address the issues identified in three Westinghouse communication documents, and update approved reference methodologies in the TSs. The amendment would also relocate certain equations, supporting descriptions, and surveillance requirements from the TSs to licensee-controlled documents.

DATES: Submit comments by [INSERT DATE 30 DAYS AFTER DATE OF PUBLICATION IN THE FEDERAL REGISTER].

A request for a hearing or petition for leave to intervene must be filed by [INSERT DATE 60 DAYS AFTER DATE OF PUBLICATION IN THE FEDERAL REGISTER].

ADDRESSES:

You may submit comments by any of the following methods (unless this document describes a different method for submitting comments on a specific subject):

Address questions about NRC dockets to Carol Gallagher; telephone:

301-415-3463; e-mail: Carol.Gallaqher@nrc.gov.

For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document.

  • Mail comments to: Cindy Bladey, Office of Administration, Mail Stop: OWFN-12-HOB, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.

For additional direction on obtaining information and submitting comments, see "Obtaining Information and Submitting Comments" in the SUPPLEMENTARY INFORMATION section of this document.

FOR FURTHER INFORMATION CONTACT: Richard V. Guzman, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone:

301-415-1030; e-mail: Richard.Guzman@nrc.gov.

SUPPLEMENTARY INFORMATION:

I. Obtaining Information and Submitting Comments A. Obtaining Information Please refer to Docket ID NRC-2016-0109 when contacting the NRC about the availability of information for this action. You may obtain publicly-available information related to this action by any of the following methods:

To begin the search, select "ADAMS Public Documents" and then select "Begin Web-based ADAMS Search." For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by e-mail to pdr.resource@nrc.gov.

The application for amendment, dated May 8, 2015, as supplemented by letters dated January 28, February 25, March 23, March 29, and May 2, 2016, are available in ADAMS under Accession Nos. ML15134A244, ML16034A216, ML16057A812, ML16088A140, ML16095A233 and ML16130A563, respectively.

  • NRC's PDR: You may examine and purchase copies of public documents at the NRC's PDR, Room 01-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. B. Submitting Comments Please include Docket ID NRC-2016-0109 in your comment submission.

The NRC cautions you not to include identifying or contact information that you do not want to be publicly disclosed in your comment submission.

The NRC posts all comment submissions at http://www.regulations.gov as well as entering the comment submissions into ADAMS. The NRC does not routinely edit comment submissions to remove identifying or contact information.

If you are requesting or aggregating comments from other persons for submission to the NRC, then you should inform those persons not to include identifying or contact information that they do not want to be publicly disclosed in their comment submission.

Your request should state that the NRC does not routinely edit comment submissions to remove such information before making the comment submissions available to the public or entering the comment submissions into ADAMS. II. Introduction The NRC is considering issuance of an amendment to Facility Operating License No. NPF-49, issued to Dominion Nuclear Connecticut, Inc. for operation of MPS3 located in New London County, Connecticut.

The proposed license amendment, initially submitted by application dated May 8, 2015 (ADAMS Accession No. ML15134A244), would modify the MPS3 TSs to (1) allow the use of Dominion nuclear safety and reload core design methods; (2) allow the use of applicable departure from nucleate boiling ratio design limits for VIPRE-D; (3) update the approved reference methodologies cited in TS 6.9.1.6.b; (4) remove the base load mode of operation that is not a feature of the Dominion Relaxed Power Distribution Control power distribution control methodology; and (5) address the issues identified in Westinghouse Nuclear Safety Advisory Letter (NSAL-09-5), Rev. 1, NSAL-15-1, and Westinghouse Communication 06-IC-03.

Additionally, the proposed changes would involve, in part, the relocation of certain equations, supporting descriptions and surveillance requirements from the TSs to licensee-controlled documents.

The NRC staff previously made a proposed determination that the amendment request dated May 8, 2015, involves no significant hazards consideration (80 FR 52804; September 1, 2015). This notice supersedes the previous notice and is intended to include the added clarification that the proposed changes involve the relocation of TS information either to the TS Bases or the Core Operating Limits Report which are both licensee-controlled documents.

There are no changes to the staff's proposed no significant hazards consideration determination as originally noticed. Before issuance of the proposed license amendment, the Commission will have made findings required by the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations.

The NRC has made a proposed determination that the amendment request involves no significant hazards consideration.

Under the NRC's regulations in section 50.92 of title 1 O of the Code of Federal Regulations (10 CFR), this means that operation of the facility in accordance with the proposed amendment would not (1) involve a significant increase in the probability or consequences of an accident previously evaluated; or (2) create the possibility of a new or different kind of accident from any accident previously evaluated; or (3) involve a significant reduction in a margin of safety. As required by 1 O CFR 50.91 (a), the licensee has provided its analysis of the issue of no significant hazards consideration, which is presented below: 1. Does the proposed [amendment]

involve a significant increase in the probability or consequences of any accident previously evaluated?

Response:

No. The Dominion analysis methods do not make any contribution to the potential accident initiators and thus do not increase the probability of any accident previously evaluated.

The use of the approved Dominion analysis methods will not increase the probability of an accident because plant systems, structures, and components (SSC) will not be affected or operated in a different manner, and system interfaces will not change. Since the applicable safety analysis and nuclear core design acceptance criteria will be satisfied when the Dominion analysis methods are applied to MPS3, the use of the approved Dominion analysis methods does not increase the potential consequences of any accident previously evaluated.

The use of the approved Dominion methods will not result in a significant impact on normal operating plant releases, and will not increase the predicted radiological consequences of postulated accidents described in the FSAR [final safety analysis report]. The proposed resolution of Westinghouse notification documents NSAL-09-5, Rev. 1, 06-1 C-03 and NSAL-15-1 is intended to address deficiencies identified within the existing MPS3 Technical Specifications to return them to their as designed function and does not result in actions that would increase the probability of any accident previously evaluated.

Therefore, the proposed amendment does not involve a significant increase in the probability or the consequences of any accident previously evaluated.

2. Does the proposed [amendment]

create the possibility of a new or different kind of accident from any previously evaluated?

Response:

No. The use of Dominion analysis methods and the Dominion statistical design limit (SOL) for fuel departure from nucleate boiling ratio (DNBR) and fuel critical heat flux (CHF) does not impact any of the applicable core design criteria.

All pertinent licensing basis limits and acceptance criteria will continue to be met. Demonstrated adherence to these limits and acceptance criteria precludes new challenges to SSCs that might introduce a new type of accident.

All design and performance criteria will continue to be met and no new single failure mechanisms will be created. The use of the Dominion methods does not involve any alteration to plant equipment or procedures that might introduce any new or unique operational modes or accident precursors.

The proposed resolution of Westinghouse notification documents NSAL-09-5, Rev. 1, 06-IC-03 and NSAL-15-1 does not involve the alteration of plant equipment or introduce unique operational modes or accident precursors.

Therefore, the proposed amendment does not create [the possibility of] a new or different kind of accident from any accident previously evaluated.

3. Does the proposed [amendment]

involve a significant reduction in the margin of safety? Response:

No. Nuclear core design and safety analysis acceptance criteria will continue to be satisfied with the application of Dominion methods. Meeting the analysis acceptance criteria and limits ensure that the margin of safety is not significantly reduced. Nuclear core design and safety analysis acceptance criteria will continue to be satisfied with the application of Dominion methods. In particular, use of [the model] VIPRE-D with the proposed safety limits provides at least a 95% probability at a 95% confidence level that DNBR will not occur (the 95/95 DNBR criterion).

The required DNBR margin of safety for MPS3, which is the margin between the 95/95 DNBR criterion and clad failure, is therefore not reduced. The proposed resolution of Westinghouse notification documents NSAL-09-5, Rev. 1, 06-IC-03 and NSAL-15-1 does not propose actions that would result in a significant reduction in margin to safety. Therefore, the proposed amendment does not involve a significant reduction in [the] margin of safety. The NRC staff has reviewed the licensee's analysis and, based on this review, it appears that the three standards of 10 CFR 50.92(c) are satisfied.

Therefore, the NRC staff proposes to determine that the amendment request involves a No Significant Hazards Consideration.

The NRC is seeking public comments on this proposed determination that the license amendment request involves no significant hazards consideration.

Any comments received within 30 days after the date of publication of this notice will be considered in making any final determination.

Normally, the Commission will not issue the amendment until the expiration of 60 days after the date of publication of this notice. The Commission may issue the license amendment before expiration of the 60-day notice period provided if the Commission concludes the amendment involves no significant hazards consideration.

In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility.

Should the Commission take action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.

Should the Commission make a final No Significant Hazards Consideration Determination, any hearing will take place after issuance.

The Commission expects that the need to take this action will occur very infrequently. Ill. Opportunity to Request a Hearing and Petition for Leave to Intervene Within 60 days after the date of publication of this notice, any person(s) whose interest may be affected by this action may file a request for a hearing and a petition to intervene with respect to issuance of the amendment to the subject facility operating license or combined license. Requests for a hearing and a petition for leave to intervene shall be filed in accordance with the Commission's "Agency Rules of Practice and Procedure" in 1 O CFR part 2. Interested person(s) should consult a current copy of 10 CFR 2.309, which is available at the NRC's PDR, located at One White Flint North, Room 01-F21, 11555 Rockville Pike (first floor), Rockville, Maryland 20852. The NRC's regulations are accessible electronically from the NRG Library on the NRC's Web site at http://www.nrc.gov/reading-rm/doc-collections/cfr/.

If a request for a hearing or petition for leave to intervene is filed within 60 days, the Commission or a presiding officer designated by the Commission or by the Chief Administrative Judge of the Atomic Safety and Licensing Board Panel, will rule on the request and/or petition; and the Secretary or the Chief Administrative Judge of the Atomic Safety and Licensing Board will issue a notice of a hearing or an appropriate order. As required by 1 O CFR 2.309, a petition for leave to intervene shall set forth with particularity the interest of the petitioner in the proceeding, and how that interest may be affected by the results of the proceeding.

The petition should specifically explain the reasons why intervention should be permitted with particular reference to the following general requirements:

(1) the name, address, and telephone number of the requester or petitioner; (2) the nature of the requester's/petitioner's right under the Act to be made a party to the proceeding; (3) the nature and extent of the requester's/petitioner's property, financial, or other interest in the proceeding; and (4) the possible effect of any decision or order which may be entered in the proceeding on the requestor's/petitioner's interest.

The petition must also set forth the specific contentions which the requestor/petitioner seeks to have litigated at the proceeding.

Each contention must consist of a specific statement of the issue of law or fact to be raised or controverted.

In addition, the requestor/petitioner shall provide a brief explanation of the bases tor the contention and a concise statement of the alleged facts or expert opinion which support the contention and on which the requestor/petitioner intends to rely in proving the contention at the hearing. The requestor/petitioner must also provide references to those specific sources and documents of which the petitioner is aware and on which the requestor/petitioner intends to rely to establish those facts or expert opinion. The petition must include sufficient information to show that a genuine dispute exists with the applicant on a material issue of law or fact. Contentions shall be limited to matters within the scope of the amendment under consideration.

The contention must be one which, if proven, would entitle the requestor/petitioner to relief. A requestor/petitioner who fails to satisfy these requirements with respect to at least one contention will not be permitted to participate as a party. Those permitted to intervene become parties to the proceeding, subject to any limitations in the order granting leave to intervene, and have the opportunity to participate fully in the conduct of the hearing with respect to resolution of that person's admitted contentions, including the opportunity to present evidence and to submit a cross-examination plan for examination of witnesses, consistent with NRC regulations, policies and procedures.

Petitions tor leave to intervene must be filed no later than 60 days from the date of publication of this notice. Requests for hearing, petitions tor leave to intervene, and motions for leave to file new or amended contentions that are filed after the 60-day deadline will not be entertained absent a determination by the presiding officer that the filing demonstrates good cause by satisfying the three factors in 1 O CFR 2.309(c)(1

)(i)-(iii).

If a hearing is requested, and the Commission has not made a final determination on the issue of no significant hazards consideration, the Commission will make a final determination on the issue of no significant hazards consideration.

The final determination will serve to decide when the hearing is held. If the final determination is that the amendment request involves no significant hazards consideration, the Commission may issue the amendment and make it immediately effective, notwithstanding the request for a hearing. Any hearing held would take place after issuance of the amendment.

If the final determination is that the amendment request involves a significant hazards consideration, then any hearing held would take place before the issuance of any amendment unless the Commission finds an imminent danger to the health or safety of the public, in which case it will issue an appropriate order or rule under 1 O CFR part 2. A State, local governmental body, Federally-recognized Indian Tribe, or agency thereof, may submit a petition to the Commission to participate as a party under 1 O CFR 2.309(h)(1

). The petition should state the nature and extent of the petitioner's interest in the proceeding.

The petition should be submitted to the Commission by [INSERT DATE 60 DAYS AFTER DATE OF PUBLICATION IN THE FEDERAL REGISTER].

The petition must be filed in accordance with the filing instructions in the "Electronic Submissions (E-Filing)" section of this document, and should meet the requirements for petitions for leave to intervene set forth in this section, except that under§ 2.309(h)(2) a State, local governmental body, or recognized Indian Tribe, or agency thereof does not need to address the standing requirements in 1 O CFR 2.309(d) if the facility is located within its boundaries.

A State, local governmental body, Federally-recognized Indian Tribe, or agency thereof may also have the opportunity to participate under 1 O CFR 2.315(c). If a hearing is granted, any person who does not wish, or is not qualified, to become a party to the proceeding may, in the discretion of the presiding officer, be permitted to make a limited appearance pursuant to the provisions of 10 CFR 2.31 S(a). A person making a limited appearance may make an oral or written statement of position on the issues, but may not otherwise participate in the proceeding.

A limited appearance may be made at any session of the hearing or at any prehearing conference, subject to the limits and conditions as may be imposed by the presiding officer. Persons desiring to make a limited appearance are requested to inform the Secretary of the Commission by [INSERT DATE 60 DAYS AFTER DATE OF PUBLICATION IN THE FEDERAL REGISTER].

IV. Electronic Submissions (E-Filing)

All documents filed in NRC adjudicatory proceedings, including a request for hearing, a petition for leave to intervene, any motion or other document filed in the proceeding prior to the submission of a request for hearing or petition to intervene, and documents filed by interested governmental entities participating under 1 O CFR 2.31 S(c), must be filed in accordance with the NRC's E-Filing rule (72 FR 49139; August 28, 2007). The E-Filing process requires participants to submit and serve all adjudicatory documents over the internet, or in some cases to mail copies on electronic storage media. Participants may not submit paper copies of their filings unless they seek an exemption in accordance with the procedures described below. To comply with the procedural requirements of E-Filing, at least 10 days prior to the filing deadline, the participant should contact the Office of the Secretary by e-mail at hearing.docket@nrc.gov, or by telephone at 301-415-1677, to request (1) a digital identification (ID) certificate, which allows the participant (or its counsel or representative) to digitally sign documents and access the E-Submittal server for any proceeding in which it is participating; and (2) advise the Secretary that the participant will be submitting a request or petition for hearing (even in instances in which the participant, or its counsel or representative, already holds an NRG-issued digital ID certificate).

Based upon this information, the Secretary will establish an electronic docket for the hearing in this proceeding if the Secretary has not already established an electronic docket. Information about applying for a digital ID certificate is available on the NRC's public Web site at http://www.nrc.gov/site-he/ple-submittals/getting-started.html.

System requirements for accessing the E-Submittal server are detailed in the NRC's "Guidance for Electronic Submission," which is available on the NRC's public Web site at submittals.html.

Participants may attempt to use other software not listed on the Web site, but should note that the NRC's E-Filing system does not support unlisted software, and the NRC Meta System Help Desk will not be able to offer assistance in using unlisted software.

If a participant is electronically submitting a document to the NRC in accordance with the E-Filing rule, the participant must file the document using the NRC's online, Web-based submission form. In order to serve documents through the Electronic Information Exchange System, users will be required to install a Web browser plug-in from the NRC's Web site. Further information on the Web-based submission form, including the installation of the Web browser plug-in, is available on the NRC's public Web site at submittals.html.

Once a participant has obtained a digital ID certificate and a docket has been created, the participant can then submit a request for hearing or petition for leave to intervene.

Submissions should be in Portable Document Format (PDF) in accordance with NRC guidance available on the NRC's public Web site at http://www.nrc.gov/site-help/e-submittals.html.

A filing is considered complete at the time the documents are submitted through the NRC's E-Filing system. To be timely, an electronic filing must be submitted to the E-Filing system no later than 11 :59 p.m. Eastern Time on the due date. Upon receipt of a transmission, the E-Filing system time-stamps the document and sends the submitter an e-mail notice confirming receipt of the document.

The E-Filing system also distributes an e-mail notice that provides access to the document to the NRC's Office of the General Counsel and any others who have advised the Office of the Secretary that they wish to participate in the proceeding, so that the filer need not serve the documents on those participants separately.

Therefore, applicants and other participants (or their counsel or representative) must apply for and receive a digital ID certificate before a hearing requesVpetition to intervene is filed so that they can obtain access to the document via the E-Filing system. A person filing electronically using the NRC's adjudicatory E-Filing system may seek assistance by contacting the NRC Meta System Help Desk through the "Contact Us" link located on the NRC's public Web site at http://www.nrc.gov/site-help/e-submittals.html, by e-mail to MSHD.Resource@nrc.gov, or by a toll-free call to 1-866-672-7640.

The NRC Meta System Help Desk is available between 8 a.m. and 8 p.m., Eastern Time, Monday through Friday, excluding government holidays.

Participants who believe that they have a good cause for not submitting documents electronically must file an exemption request, in accordance with 1 O CFR 2.302(g), with their initial paper filing requesting authorization to continue to submit documents in paper format. Such filings must be submitted by: (1) first class mail addressed to the Office of the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention:

Rulemaking and Adjudications Staff; or (2) courier, express mail, or expedited delivery service to the Office of the Secretary, Sixteenth Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland, 20852, Attention:

Rulemaking and Adjudications Staff. Participants filing a document in this manner are responsible for serving the document on all other participants.

Filing is considered complete by first-class mail as of the time of deposit in the mail, or by courier, express mail, or expedited delivery service upon depositing the document with the provider of the service. A presiding officer, having granted an exemption request from using E-Filing, may require a participant or party to use E-Filing if the presiding officer subsequently determines that the reason for granting the exemption from use of E-Filing no longer exists. Documents submitted in adjudicatory proceedings will appear in NRC's electronic hearing docket which is available to the public at http://ehd1.nrc.gov/ehd/, unless excluded pursuant to an order of the Commission, or the presiding officer. Participants are requested not to include personal privacy information, such as social security numbers, home addresses, or home phone numbers in their filings, unless an NRG regulation or other law requires submission of such information.

However, in some instances, a request to intervene will require including information on local residence in order to demonstrate a proximity assertion of interest in the proceeding.

With respect to copyrighted works, except for limited excerpts that serve the purpose of the adjudicatory filings and would constitute a Fair Use application, participants are requested not to include copyrighted materials in their submission.

Petitions for leave to intervene must be filed no later than 60 days from the date of publication of this notice. Requests for hearing, petitions for leave to intervene, and motions for leave to file new or amended contentions that are filed after the 60-day deadline will not be entertained absent a determination by the presiding officer that the filing demonstrates good cause by satisfying the three factors in 1 O CFR 2.309(c)(1

)(i)-(iii). For further details with respect to this action, see the application for amendment, dated May 8, 2015, as supplemented by letters dated January 28, February 25, March 23, March 29, and May 2, 2016, in ADAMS. Attorney for licensee:

Lillian M. Cuoco, Senior Counsel, Dominion Resources Services, Inc., 120 Tredegar Street, RS-2, Richmond, VA 23219. NRC Branch Chief: Travis L. Tate. Dated at Rockville, Maryland, this 6 1 h day of June 2016. For the Nuclear Regulatory Commission.

IRA/ Richard V. Guzman, Senior Project Manager, Plant Licensing Branch 1-1, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation.

D. Heacock If you have any questions, please contact me at 301-415-1030 or Richard.Guzman@nrc.gov.

Docket No. 50-423

Enclosure:

Notice of Consideration Sincerely, IRA/ Richard V. Guzman, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation cc w/enclosure:

Distribution via Listserv DISTRIBUTION:

PUBLIC LPL 1-1 R/F RidsACRS_MailCTR Resource RidsNrrDorlDpr Resource RidsNrrDorlLpl1-1 Resource RidsNrrLAKGoldstein Resource RidsNrrPMMillstone Resource RidsRgn1 MailCenter Resource ADAMS Accession Nos.: LTR ML16158A132 FRN ML16148A251 OFFICE NRR/DORL/LP1-1/PM NRR/DORL/LPL 1-1/LA NRR/DORL/LPL 1-1/BC NAME RGuzman KGoldstein TT ate DATE 06/06/16 06/06/16 06/06/16 OFFICIAL RECORD COPY NRR/DORL/LPL 1-1/PM RGuzman 06/06/16