March 20, 2017, Summary of Annual Assessment Meeting with Beaver Valley, Units 1 and 2
ML17082A184
Person / Time
Site: Beaver Valley
Issue date: 03/28/2017
From: Silas Kennedy
NRC/RGN-I/DRP/PB6
To:
Kennedy S
Shared Package
ML17075A019 List:
References
MN-17-005
Download: ML17082A184 (3)


Text

0 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD.

KING OF PRUSSIA, PA 19406

-2713 MN-17-005 March 28, 2017 MEETING

SUMMARY

LICENSEE: First Energy Nuclear Operating Company (FENOC)

FACILITY: Beaver Valley Power Station, Units 1 and 2

SUBJECT:

Annual Assessment Meeting Summary On March 20, 2017

, from 5:00 p.m. to 6:30 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a public open house at the Shippingport Community and Municipal Building in Shippingport, PA. The NRC conducted the open house to discuss its assessment of the safety performance at Beaver Valley Power Station, Units 1 and 2, for 2016.

A notice of the open house was issued on March 7, 2017, and was posted on the NRC's external (public) Website. The meeting notice can be found in the NRC

's Agencywide Documents Access and Management System (ADAMS) with Accession No. ML17061A207. ADAMS is accessible from the NRC's Website at http://www.nrc.gov/reading

-rm/adams.html. The NRC displayed poster boards and was available to discuss its assessment of the safety performance of the Beaver Valley Power Station for the period of January 1 through December 31, 2016, as documented in our Annual Assessment Letter dated March 1, 2017 (ADAMS Accession No. ML17058A277). The NRC poster boards included background information on the Reactor Oversight Process (ROP) and plant

-specific performance. Additional information relative to the NRC's Annual Assessment Process and the safety performance of Beaver Valley Power Station can be found on the NRC's website at https://www.nrc.gov/reactors/operating/oversight.html

. Members of the public attended the open house and were offered the opportunity to question the NRC regarding Beaver Valley's performance and the role of the agency in ensuring safe plant operations.

______/RA________________

Silas R. Kennedy, Chie f Projects Branch 6 Division of Reactor Projects

Enclosure:

Attendance List (ADAMS No. ML17075A019)

2

SUBJECT:

(Public Meeting Notice) FIRST ENERGY NUCLEAR OP ERATING COMPANY, BEAVER VALLEY POWER STATION, UNITS 1 AND 2 DATED MARCH 28, 2017 Distribution: (via e-mail) DDorman, RA DLew, DRA MScott, DRP DPelton, DRP RLorson, DRS JYerokun, DRS SHorvitz, DRP SKennedy, DRP SShaffer, DRP MHenrion, DRP JKrafty, DRP, SRI CBozlinski, DRP, ROAA JBowen, RI, OEDO RidsNrrPMBeaverValley Resource RidsNrrDorlLpl1

-2 Resource ROPreports Resource DOCUMENT NAME: G:\DRP\BRANCH6\Communications

\Public Meetings

\Annual Assessment Meetings\2017\Beaver Valley

\BV Annual Assessment Meeting Summary 2017.docx ADAMS PKG No. ML17075A019 Accession No. ML17082A184 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME MHenrion/MH SKennedy/SK DATE 03/28/1 7 03/28/1 7 OFFICIAL RECORD COPY