Forwards Amend 8 to Updated FSAR for Browns Ferry Nuclear Plant.Fsar Verification Program Complete Except for App C Re Structural Qualification of Subsystems & Components Which Will Be Labeled as Historical & Included in Amend 9
ML18036A305
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 07/17/1991
From: Medford M
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18036A307 List:
References
NUDOCS 9107230281
Download: ML18036A305 (7)


Text

ACCELERATED ISTRIBUTION DEMO TION SYSTEM ie REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9107230281 DOC.DATE: 91/07/17 NOTARIZED:

NO DOCKET FACIL:50-259 Browns Ferry Nuclear Power Station, Unit 1, Tennessee 05000259 50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 05000260 50-296 Browns Ferry Nuclear Power Station, Unit 3, Tennessee 05000296 AUTH.NAME AUTHOR AFFILIATION MEDFORD,M.O.

Tennessee Valley Authority Py~ai R RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards Amend 8 to Updated FSAR for Browns Ferry Nuclear Plant.DISTRIBUTION CODE: A053D COPIES RECEIVED:LTR 2 ENCL 2 SIZE: TITLE: OR Submittal:

Updated FSAR (50.71)and Amendments NOTES/)/~S s RECIPIENT ID CODE/NAME KREBS,M.ROSS,T.INTERNAL: ACRS NRR/DST 8E2 RGN2 EXTERNAL: IHS NSIC COPIES LTTR ENCL 1 0 1 1 2 2 1 0 1 1 1 1 1 1 RECIPIENT ID CODE/NAME HEBDON,F WILLIAMS,J.

AEO~DDOA/IRB 01 NRC PDR SAIC LINERiR COPIES LTTR ENCL 1 0 1 1 1 1 1 1 1 1 1 1 D D D NOTE TO ALL"RIDS" RECIPIENTS:

D D PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION

" LINIS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 11 ls Tennessee Valley Authority, 1101 Market Street.Chattanooga.

Tennessee 37402 Mark O.Medford Vice President, Nuclear Assurance, Licensing and Fuels'JUL 17 1991 U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.20555 Gentlemen:

Xn the Matter of Tennessee Valley Authori.ty Docket Nos.50-259 50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN)-UPDATED FINAL SAFETY ANALYSIS REPORT (FSAR), AMENDMENT 8 As required by 10 CFR 50.71, enclosed is one signed original and ten copies of Amendment 8 of the updated BFN FSAR.A list of commi.tments is also enclosed.Amendment 8 is a one year update from Amendment, 7 submi.tted in 1990.Significant clarity and readabi.lity have been achi.eved in the drawings, figures, and tables.Appendix G, Plant Nuclear Safety Operational Analysis figures have been administratively enhanced for better readability.

The FSAR verificati.on pr.ogram has been completed.

However, not all of the results of the program have been included in Amendment 8 due to the cut-off for the annual FSAR update year.The remainder of the FSAR verification program results will be included in Amendment 9.This will include Appendix C, Structural Qualification of Subsystems and Components which wi.ll be labeled as"historical".

The figures contained in Amendment 8 were updated consistent with TVA's configurati.on control process.However, the logic diagram figures originally planned for Amendment 8 will now be included in Amendment 9.910723028i 9107i7 PDR'.'ADOCK'05000259 K PDR ,~9 6 It 2~~U.S.Nuclear Regulatory Commission JgP<"I 1991 I certify that, I am a duly authorized officer of TVA, and that, to the best of my knowledge and belief, the information contained herein accurately presents changes made since the previous submittal, necessary to reflect information and analysis submitted to the Commission or prepared pursuant to Commission requirement.

If there are any questions, please telephone Patrick P.Carier, BFN Licensing Manager, at, (205)729-3566.Very truly yours, TENNESSEE VALLEY AUTHORITY Mark 0.Medford cc (Enclosures):

Ms.S.C.Black, Deputy Director Project Directorate II-4 U.S.Nuclear Regulatory Commission One Mhite Flint, North 11555 Rockville Pike Rockville, Maryland 20852 NRC Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama 35609-2000 Mr.Thierry M.Ross, Project Manager U.S.Nuclear Regulatory Commission One Mhite Flint, North 11555 Rockville Pike Rockville, Maryland 20852 Mr.B.A.Milson, Project Chief U.S.Nuclear Regulatory Commission Region II 101 Marietta Street, NM, Suite 2900 Atlanta, Georgia 30323

~~t It II m tt dt t it I'lt ,.II III

~1 ENCLOSURE I LIST OF COMMITMENTS 1.TVA will include the remainder of the Final Safety Analysis Report (FSAR)verification program results in Amendment 9.2.TVA will label the Updated Final Safety Analysis Report Appendix C, Structural Qualification of Subsystems and Components as"historical".

3.TVA will review the FSAR logic diagrams, update as necessary, and submit to NRC under Amendment.