Letter Sequence Request |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance, Acceptance
- Supplement, Supplement
|
MONTHYEARML0725500632007-08-30030 August 2007 NFPA 805 Transition Pilot Plant FAQ 06-0019, Revision 2 Project stage: Request ML0730605502007-09-0707 September 2007 NFPA 805 Transition Pilot Plant FAQ 07-0040 Project stage: Request ML0727402622007-09-20020 September 2007 NFPA-805 Transition Pilot Plant FAQ 07-0038 Project stage: Request ML0727402682007-09-20020 September 2007 NFPA-805 Transition Pilot Plant FAQ 07-0039 Project stage: Request ML0727402482007-09-20020 September 2007 NFPA-805 Transition Pilot Plant FAQ 06-0011, Revision 2 Project stage: Request ML0726104552007-09-24024 September 2007 NFPA 805 Observation Visit Trip Report Project stage: Request ML0727402552007-09-28028 September 2007 NFPA-805 Transition Pilot Plant FAQ 06-0019, Revision 3 Project stage: Request ML0735500232007-11-12012 November 2007 NFPA 805 Transition Pilot Plant FAQ 07-0033, Revision 1 Project stage: Request ML0735100822007-11-12012 November 2007 NFPA 805 Transition Pilot Plant FAQ 06-0025, Revision 3 (Corrected Version) Project stage: Request ML0733200282007-11-26026 November 2007 NFPA 805 Transition Pilot Plant FAQ 06-0012, Revision 5, Determining Manual Actions That Require a Change Evaluation During Transition. Project stage: Request ML0733700252007-12-0303 December 2007 NFPA 805 Transition Pilot Plant FAQ 06-0008, Revision 8, Alternative Method for Fire Protection Engineering Analyses Project stage: Request ML0734001472007-12-0606 December 2007 NFPA 805 Transition Pilot Plant FAQ 06-0025, Revision 3 Project stage: Request ML0735402622007-12-20020 December 2007 Afpb Staff Response to NFPA 805 Transition Pilot Plant FAQ 07-0035, Revision 0 Project stage: Request ML0735500252007-12-20020 December 2007 NFPA 805 Transition Pilot Plant FAQ 07-0036, Revision 1 Project stage: Request ML0807004112008-03-10010 March 2008 NFPA 805 Transition Pilot Plant FAQ 07-0032, Revision 1, Clarification of 10 CFR 50.48(c), 50.48(a), and GDC 3. Project stage: Request ML0809101362008-03-28028 March 2008 NFPA 805 Transition Pilot Plant FAQ 07-0039, Revision 1, Lessons Learned - NEI 04-02 B-2 and B-3 Tables Project stage: Request ML0813006972008-05-0909 May 2008 NFPA 805 Transition Pilot Plant FAQ 07-0032, Revision 2 Project stage: Request ML0814300412008-05-22022 May 2008 NFPA 805 Transition Pilot Plant FAQ 07-0040, Revision 2 Project stage: Request HNP-08-061, Request for License Amendment to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition)2008-05-29029 May 2008 Request for License Amendment to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) Project stage: Request ML0820410142008-05-30030 May 2008 Public Version of Enclosures 2 Through 6 of License Amendment Request to Adopt NFPA-805 Project stage: Request ML0816504752008-05-30030 May 2008 License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition). License Amendment Request (LAR) No. 2008-01 Project stage: Request ML0816901212008-06-17017 June 2008 Forthcoming Closed Meeting with Progress Energy Carolinas, Inc., to Discuss the May 29, 2008, License Amendment Request (LAR) to Transition the Shearon Harris Nuclear Plant, Unit 1 (Harris) to National Fire Protection Association (Nfpa).. Project stage: Meeting ML0818901932008-06-30030 June 2008 Completion Schedule for Part 2 of License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001) Edition, License Amendment Request No. 2008-01 Project stage: Request ML0818406962008-07-0707 July 2008 Meeting with Progress Energy Carolinas, Inc. and Duke Energy Carolinas, LLC, to Discuss the 05/29&30/2008, License Amendment Requests to Transition Shearon Harris, Unit 1, and Oconee, Units 1, 2, & 3 to NFPA Standard 805 Project stage: Meeting ML0818905292008-07-11011 July 2008 Summary of Closed Meeting with Progress Energy Carolinas Regarding May 29, 2008, License Amendment Request to Transition the Shearon Harris Nuclear Plant Unit 1, to National Fire Protection Association Standard 805, Performance-Based.... Project stage: Meeting ML0820703912008-07-17017 July 2008 Meeting Handouts from 7/17/08 Public Meeting on the Harris and Oconee LARs to Transition to NFPA-805 Project stage: Meeting ML0820605362008-08-0707 August 2008 Summary of Mtg. with Progress Energy Carolinas, and Duke Energy Carolinas to Discuss the LARs to Transition the Shearon Harris and Oconee Nuclear Plants to National Fire Protection Association Standard NFPA-805 Project stage: Acceptance Review ML0827011582008-09-26026 September 2008 Acceptance Review Regarding the License Amendment Request to Transition to NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants. Project stage: Acceptance Review ML0828700162008-09-26026 September 2008 Nc Warn'S Response to Board Notification - Enclosure P-1 - Shearon Harris Nuclear Power Plant, Unit 1 - Acceptance Review NFPA-805 License Amendment Request, September 26, 2008 Project stage: Request ML0828804552008-09-30030 September 2008 Preliminary Oconee LAR Acceptance Review Matrix Project stage: Acceptance Review ML0828902592008-10-16016 October 2008 and 10/08/2008 - Summary of Conference Calls with Duke Energy Carolinas to Discuss the Acceptance Review of the May 30, 2008, License Amendment Request (LAR) to Adopt National Fire Protection Association (NFPA) 805 for Oconee Project stage: Acceptance Review ML0830900742008-11-12012 November 2008 Summary of Category 2 Public Meeting Held to Discuss National Fire Protection Association Standard 805 Pilot Plant Process: Current Lessons Learned from the Pilot License Amendment Request Reviews (TAC Nos. MD8807, MD8832, MD8833, & MD8834) Project stage: Meeting HNP-08-113, Supplement to Request for License Amendment, to Adopt NFPA 805 Performance-Based Standards for Fire Protection for Light Water Reactor Generating Plants (2001 Edition)2008-11-14014 November 2008 Supplement to Request for License Amendment, to Adopt NFPA 805 Performance-Based Standards for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) Project stage: Supplement ML0829601532008-11-17017 November 2008 Summary of Meeting with Progress Energy Carolinas, Inc., to Discuss Shearon Harris Unit 1 National Fire Protection Association Standard 805 License Amendment Request Project stage: Meeting HNP-08-121, Supplement 2 to Request for License Amendment to Adopt NFPA 805 Performance-based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition)2008-12-11011 December 2008 Supplement 2 to Request for License Amendment to Adopt NFPA 805 Performance-based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) Project stage: Supplement ML0903000302009-01-30030 January 2009 Acceptance Review Regarding Amendment to Adopt National Fire Protection Association 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition Project stage: Acceptance Review ML0903304962009-02-0202 February 2009 Acceptance Review of License Amendment Request to Adopt the National Fire Protection Association Standard No. 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants,.. Project stage: Acceptance Review ML0902903272009-03-10010 March 2009 Regulatory Audit in Support of the License Amendment Request to Implement a Risk-Informed, Performance-Based Fire Protection Program as Allowed by Title 10 of the Code of Federal Regulations, Paragraph 50.48(c) Fire Protection Project stage: Other ML0909900182009-04-10010 April 2009 04/21-22/2009, Notice of Meeting with Progress Energy Carolinas, Inc., and Duke Energy Carolinas, LLC, to Discuss Topics Involving the License Amendment Requests to Transition the Shearon, Unit 1 and the Oconee, Units 1, 2 and 3 Project stage: Meeting ML0916002812009-06-11011 June 2009 Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for a Hearing Project stage: Other ML0921707152009-08-0606 August 2009 Request for Additional Information Regarding Amendment to Adopt National Fire Protection Association Standard 805 (NFPA 805), Performance-Based Standard for Fire Protection for Light Water Reactor ... Project stage: RAI HNP-09-084, Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-based Standard for Fire Protection for Light Water Generating Plants.2009-08-13013 August 2009 Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-based Standard for Fire Protection for Light Water Generating Plants. Project stage: Response to RAI HNP-09-086, Second Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-based Standard for Fire Protection for Light Water Reactor...2009-08-28028 August 2009 Second Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-based Standard for Fire Protection for Light Water Reactor... Project stage: Response to RAI HNP-09-094, Third Response to Request for Additional Information License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor....2009-10-0909 October 2009 Third Response to Request for Additional Information License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor.... Project stage: Response to RAI HNP-09-096, Additional Information Re License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2009-12-16016 December 2009 Additional Information Re License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Request ML1001302542010-01-14014 January 2010 Second Request for Additional Information Regarding the License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plant Project stage: RAI HNP-10-008, Response to Second Request for Additional Information Regarding License Amendment Request to Anfp Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants.2010-02-0404 February 2010 Response to Second Request for Additional Information Regarding License Amendment Request to Anfp Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants. Project stage: Request ML1006009872010-03-0909 March 2010 Discussion of Clarification Questions Related to the License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance - Based Standard for Fire Protection for Light ... Project stage: Other HNP-10-040, Response to 3rd Round of RAI License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants.2010-04-0505 April 2010 Response to 3rd Round of RAI License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants. Project stage: Request HNP-10-064, Additional Items Related to License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for LWR Generating Plants.2010-06-0909 June 2010 Additional Items Related to License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for LWR Generating Plants. Project stage: Request 2008-06-17
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000400/20240112024-09-10010 September 2024 NRC Inspection Report 05000400/2024011 IR 05000400/20240052024-08-26026 August 2024 Updated Inspection Plan for Shearon Harris Nuclear Power Plant, Unit 1 (Report 05000400-2024005) Rev 1 ML24059A4252024-08-14014 August 2024 Issuance of Amendment No. 202 Regarding Alignment of Certain Technical Specifications with Improved Standard Technical Specifications ML24213A0522024-08-0202 August 2024 Issuance of Amendment No. 201 to Extend Completion Time of Inoperable Reactor Coolant System Accumulator Using Consolidated Line Item Improvement Process ML24212A3412024-07-31031 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000400/20240022024-07-29029 July 2024 – Integrated Inspection Report 05000400/2024002 ML24170A7312024-07-29029 July 2024 – Exemption from the Requirements of 10 CFR 50.55a(H)(2) Using the Risk-Informed Process for Evaluations Letter ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 IR 05000400/20243022024-06-27027 June 2024 – NRC Operator Licensing Examination Approval 05000400/2024302 IR 05000400/20244012024-06-25025 June 2024 – Security Baseline Inspection Report05000400/2024401 ML24162A1372024-06-24024 June 2024 – Regulatory Audit Summary Related to the Review of Exemption Request from Certain Requirements in 10 CFR 50.55a(h)(2)(EPID L-2024-LLE-00040) ML24136A1382024-05-20020 May 2024 – Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000400/2024011) and Request for Information (RFI) ML24116A2592024-05-14014 May 2024 Staff Evaluation Related to Aging Management Plan and Inspection Plan for Reactor Vessel Internals ML24127A1592024-05-0808 May 2024 – Notification of Licensed Operator Initial Examination 05000400/2024302 IR 05000400/20240012024-05-0505 May 2024 Integrated Inspection Report 05000400/2024001 ML24100A0912024-04-10010 April 2024 Operator License Examination Report ML24058A2462024-03-18018 March 2024 – Supplemental Information Needed for Using the Risk-Informed Process for Evaluations for the Request for Exemption from Certain Requirements in 10 CFR 50.55a(h)(2) IR 05000400/20230062024-02-28028 February 2024 Annual Assessment Letter for Shearon Harris Nuclear Power Plant - NRC Inspection Report 05000400/2023006 ML24032A2632024-02-23023 February 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0044 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000400/20243012024-02-21021 February 2024 – NRC Operator Licensing Examination Approval 05000400/2024301 IR 05000400/20230042024-01-30030 January 2024 Integrated Inspection Report 05000400/2023004 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000400/20230032023-11-0909 November 2023 Integrated Inspection Report 05000400/2023003 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23234A1702023-10-0303 October 2023 Issuance of Amendment No. 199 Regarding Administrative Changes to the Renewed Facility Operating License and Technical Specifications ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000400/20230052023-08-23023 August 2023 Updated Inspection Plan for Shearon Harris Nuclear Power Plant, Unit 1 (Report 05000400/2023005) ML23234A2542023-08-22022 August 2023 RQ Inspection Notification Letter IR 05000400/20234022023-07-26026 July 2023 Security Baseline Inspection Report 05000400/2023402 IR 05000400/20230022023-07-24024 July 2023 Integrated Inspection Report 05000400/2023002 IR 05000400/20234402023-07-17017 July 2023 Special Inspection Report 05000400/2023440 and Preliminary Greater than Green Finding and Apparent Violation Cover Letter IR 05000400/20230012023-05-10010 May 2023 Integrated Inspection Report 05000400 2023001 IR 05000400/20234042023-05-0404 May 2023 Cyber Security Inspection Report 05000400/2023404 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23118A1392023-04-28028 April 2023 Submittal of Updated Final Safety Analysis Report (Amendment 65), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes IR 05000400/20234032023-04-0505 April 2023 Security Baseline Inspection Report 05000400/2023403 IR 05000400/20230102023-03-15015 March 2023 Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000400/2023010 ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000400/20220062023-03-0101 March 2023 Annual Assessment Letter for Shearon Harris Nuclear Power Plant - NRC Inspection Report 05000400/2022006 ML23033A5272023-02-0808 February 2023 Correction of Typographical Errors Incurred During Issuance of License Amendment No. 196 IR 05000400/20220042023-02-0707 February 2023 Integrated Inspection Report 05000400/2022004 ML23020A1252023-01-23023 January 2023 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000400/2023403) ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000400/20220032022-11-10010 November 2022 Integrated Inspection Report 05000400/2022003 IR 05000400/20223012022-11-0202 November 2022 NRC Operator License Examination Report 05000400/2022301 ML22271A6202022-09-29029 September 2022 Notification of Shearon Harris Nuclear Power Plant Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000400/2023010 ML22258A1262022-09-14014 September 2022 NRC Operator Licensing Examination Approval 05000400/2022301 ML22242A0022022-09-12012 September 2022 Issuance of Amendments to Adopt TSTF 569, Revision 2, Revise Response Time Testing Definition 2024-09-10
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARRA-23-0028, Application to Revise Technical Specifications to Adopt TSTF-234-A, Revision 1, Add Action for More than One (D)Rpi Inoperable2024-05-23023 May 2024 Application to Revise Technical Specifications to Adopt TSTF-234-A, Revision 1, Add Action for More than One (D)Rpi Inoperable RA-23-0244, Application for Technical Specification Improvement to Extend a Completion Time of Technical Specification 3/4.5.1, Accumulators, Using the Consolidated Line Item Improvement Process2024-03-20020 March 2024 Application for Technical Specification Improvement to Extend a Completion Time of Technical Specification 3/4.5.1, Accumulators, Using the Consolidated Line Item Improvement Process RA-23-0005, License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specifications2023-05-31031 May 2023 License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specifications RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-22-0081, License Amendment Request to Address Administrative Changes to the Operating License and Technical Specifications2023-02-0707 February 2023 License Amendment Request to Address Administrative Changes to the Operating License and Technical Specifications RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies2023-02-0101 February 2023 License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies ML22020A0072022-03-10010 March 2022 Issuance of Amendment No. 192 Regarding Removal of Extraneous Content and Requirements from the Renewed Facility Operating License and Technical Specifications RA-21-0302, Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition2022-02-24024 February 2022 Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition RA-20-0107, Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-01-18018 January 2022 Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position RA-21-0197, William, Units 1 and 2, License Amendment Request to Relocate the Duke Energy Emergency Operations Facility2021-12-14014 December 2021 William, Units 1 and 2, License Amendment Request to Relocate the Duke Energy Emergency Operations Facility RA-21-0213, License Amendment Request to Remove Limitation to Perform Certain Surveillance Requirements During Shutdown2021-09-23023 September 2021 License Amendment Request to Remove Limitation to Perform Certain Surveillance Requirements During Shutdown RA-21-0162, Supplement to License Amendment Request to Revise the 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process to Reflect an Alternative2021-06-0808 June 2021 Supplement to License Amendment Request to Revise the 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process to Reflect an Alternative RA-21-0112, License Amendment Request Regarding Administrative Change to Reflect Development of a Technical Requirements Manual2021-06-0707 June 2021 License Amendment Request Regarding Administrative Change to Reflect Development of a Technical Requirements Manual RA-21-0052, License Amendment Request Regarding Change to Containment Spray Nozzle Test Frequency2021-03-24024 March 2021 License Amendment Request Regarding Change to Containment Spray Nozzle Test Frequency RA-21-0073, Notification of Permit Application for Industrial Stormwater Activities2021-02-24024 February 2021 Notification of Permit Application for Industrial Stormwater Activities RA-21-0061, Notification of NPDES Permit Renewal Application2021-02-24024 February 2021 Notification of NPDES Permit Renewal Application RA-20-0252, License Amendment Request to Remove Extraneous Content and Requirements from the Operating License and Technical Specifications2021-02-24024 February 2021 License Amendment Request to Remove Extraneous Content and Requirements from the Operating License and Technical Specifications RA-20-0311, License Amendment Request to Revise the 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process.2021-01-14014 January 2021 License Amendment Request to Revise the 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process. RA-20-0223, Supplement to Application to Revise Harris Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2020-07-27027 July 2020 Supplement to Application to Revise Harris Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RA-20-0148, Supplement to License Amendment Request to Eliminate Certain Technical Specification Requirements in Alignment with Improved Standard Technical Specifications2020-05-27027 May 2020 Supplement to License Amendment Request to Eliminate Certain Technical Specification Requirements in Alignment with Improved Standard Technical Specifications RA-19-0359, License Amendment Request to Correct Non-Conservative Technical Specification 3/4.4.9, Pressure/Temperature Limits - Reactor Coolant System2020-05-12012 May 2020 License Amendment Request to Correct Non-Conservative Technical Specification 3/4.4.9, Pressure/Temperature Limits - Reactor Coolant System RA-20-0012, License Amendment Request to Revise Technical Specifications Related to Accident Monitoring Instrumentation, Refueling Operations Instrumentation, and Electrical Equipment Protective Devices2020-03-12012 March 2020 License Amendment Request to Revise Technical Specifications Related to Accident Monitoring Instrumentation, Refueling Operations Instrumentation, and Electrical Equipment Protective Devices RA-20-0032, License Amendment Request to Reduce the Minimum Required Reactor Coolant System Flow Rate and Update the List of Analytical Methods Used in the Determination of Core Operating Limits2020-03-0606 March 2020 License Amendment Request to Reduce the Minimum Required Reactor Coolant System Flow Rate and Update the List of Analytical Methods Used in the Determination of Core Operating Limits RA-20-0011, Application for Technical Specifications Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process2020-02-0606 February 2020 Application for Technical Specifications Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process RA-19-0067, License Amendment Request to Revise Technical Specifications for the Adoption of 10 CFR 50, Appendix J, Option B for Type B and C Testing and for Permanent Extension of Type a, B and C Leak Rate Test Frequencies2019-11-0808 November 2019 License Amendment Request to Revise Technical Specifications for the Adoption of 10 CFR 50, Appendix J, Option B for Type B and C Testing and for Permanent Extension of Type a, B and C Leak Rate Test Frequencies RA-19-0001, License Amendment Request to Revise Technical Specifications to Adopt Risk- Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2019-10-0707 October 2019 License Amendment Request to Revise Technical Specifications to Adopt Risk- Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RA-19-0123, License Amendment Request to Eliminate Certain Technical Specification Requirements in Alignment with Improved Standard Technical Specifications2019-07-25025 July 2019 License Amendment Request to Eliminate Certain Technical Specification Requirements in Alignment with Improved Standard Technical Specifications RA-19-0006, License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description2019-07-0808 July 2019 License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description RA-19-0252, Supplemental Information for License Amendment Request to Modify Departure from Nucleate Boiling Ratio Safety Limit to Address Transition to New Fuel Type2019-06-0606 June 2019 Supplemental Information for License Amendment Request to Modify Departure from Nucleate Boiling Ratio Safety Limit to Address Transition to New Fuel Type RA-19-0017, License Amendment Request to Modify the Departure from Nucleate Boiling Ratio Safety Limit to Address Transition to New Fuel Type2019-04-10010 April 2019 License Amendment Request to Modify the Departure from Nucleate Boiling Ratio Safety Limit to Address Transition to New Fuel Type RA-19-0007, License Amendment Request for Extension of the Essential Services Chilled Water System Allowed Outage Time and Removal of an Expired Note from Technical Specifications2019-02-18018 February 2019 License Amendment Request for Extension of the Essential Services Chilled Water System Allowed Outage Time and Removal of an Expired Note from Technical Specifications RA-18-0206, Supplement for License Amendment Request to Self-Perform Core Reload Design and Safety Analyses2018-11-0606 November 2018 Supplement for License Amendment Request to Self-Perform Core Reload Design and Safety Analyses ML18230A8042018-08-18018 August 2018 Amendment No. 40 to Application for Construction Permit and Operating License RA-18-0072, License Amendment Request to Modify Reactor Trip System and Engineered Safety Features Actuation System Instrumentation Trip Setpoints2018-07-30030 July 2018 License Amendment Request to Modify Reactor Trip System and Engineered Safety Features Actuation System Instrumentation Trip Setpoints RA-18-000, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications2018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications ML18130A8072018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications HNP-18-001, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors.2018-02-0101 February 2018 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors. HNP-17-093, Supplement to License Amendment Request Proposing a New Set of Fission Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 32017-11-29029 November 2017 Supplement to License Amendment Request Proposing a New Set of Fission Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3 RA-17-0005, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing2017-11-0707 November 2017 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing HNP-17-072, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis2017-10-19019 October 2017 License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis HNP-17-077, License Amendment Request Regarding Rod Control Movable Assemblies Technical Specifications2017-10-10010 October 2017 License Amendment Request Regarding Rod Control Movable Assemblies Technical Specifications RA-17-0001, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules2017-07-18018 July 2017 Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules HNP-17-008, License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses2017-06-28028 June 2017 License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses HNP-17-003, License Amendment Request for Emergency Diesel Generator Surveillance Requirements Regarding Voltage and Frequency Limits and the Voltage Limit for Emergency Diesel Generator Load Rejection2017-06-0505 June 2017 License Amendment Request for Emergency Diesel Generator Surveillance Requirements Regarding Voltage and Frequency Limits and the Voltage Limit for Emergency Diesel Generator Load Rejection HNP-17-033, License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3, Footnote 112017-05-22022 May 2017 License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3, Footnote 11 HNP-16-066, License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report2016-12-0202 December 2016 License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report ML16272A4152016-09-28028 September 2016 NPDES Permit Renewal and Prior Amendment RA-16-0019, Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Proces2016-09-27027 September 2016 Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Process HNP-16-076, Supplement to the License Amendment Request for Temporary Changes to Technical Specifications for the 'A' Emergency Service Water Pump Replacement2016-09-16016 September 2016 Supplement to the License Amendment Request for Temporary Changes to Technical Specifications for the 'A' Emergency Service Water Pump Replacement HNP-16-068, Supplement to the License Amendment Request for Temporary Changes to Technical Specifications for the 'A' Emergency Service Water Pump Replacement2016-08-26026 August 2016 Supplement to the License Amendment Request for Temporary Changes to Technical Specifications for the 'A' Emergency Service Water Pump Replacement 2024-05-23
[Table view] |
Text
ENCLOSURE 3 TO THIS LETTER CONTAINS SENSITIVE INFORMATION SUBMITTED UNDER 10 CFR 2.390(d)(1).
Robert J. Duncan, 11 Progress EnergyVice President Harris Nuclear Plant Progress Energy Carolinas, Inc.Serial: HNP-08-061 MAY 2 9 2008 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTENTION:
Document Control Desk Washington, D.C. 20555-0001 DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT TO ADOPT NFPA 805 PERFORMANCE-BASED STANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR GENERATING PLANTS (2001 EDITION)Ladies and Gentlemen:
In accordance with the Code of Federal Regulations, Title 10, Part 50.90, "Application of License or Construction Permit," Carolina Power & Light Company (CP&L) doing business as Progress Energy Carolinas Inc. (PEC), requests an amendment to Facility Operating License No. NPF-63 for Shearon Harris Nuclear Power Plant, Unit No. 1 (HNP). Implementation of the regulatory actions presented in the attachments to this License Amendment Request (LAR) will enable HNP to adopt a new fire protection licensing basis which complies with the requirements in 10 CFR 50.48(a) and (c) and the guidance in Revision 0 of Regulatory Guide (RG) 1.205.As documented in this request, HNP has met all of the NRC's regulatory requirements for the transition of its fire protection licensing basis. In addition, the license amendment does not present a significant hazards consideration and the criteria have been met for a categorical exclusion from the need for an environmental assessment.
Information associated with HNP's transition is provided in the enclosed HNP Transition Report, including the technical and regulatory justifications required to support this LAR.Enclosure 1 contains the Regulatory Commitments associated with this submittal.
Enclosure 2 contains a listing of the Transition Report sections for which HNP requests specific NRC approval.Enclosure 3 to this letter provides HNP's Transition Report. Major topics in this Transition Report are presented as Attachments A through V, summarized as follows: " Attachment A -NEI 04-02 Table B-1 -Transition of Fundamental FP Program and Design Elements (NFPA 805 Chapter 3) -Security Related Information" Attachment B -NEI 04-02 Table B-2 -Nuclear Safety Capability Assessment
-Methodology Review* Attachment C -NEI 04-02 Table B-3 -Fire Area Transition
-Security Related Information P.O. Box 165 oc New Hill, NC 27562 T> 919.362.2502 F> 919.362.2095 ENCLOSURE 3 TO THIS LETTER CONTAINS SENSITIVE INFORMATION SUBMITTED UNDER 10 CFR 2.390(d)(1).
Serial: HNP-08-061 Page 2" Attachment D -NEI 04-02 Table F-1 Non-Power Operational Modes Transition-Security Related Information" Attachment E -NEI 04-02 Table G-1 -Radioactive Release Transition
-Resolution Methodology" Attachment G -Operator Manual Actions -Transition to Recovery Actions" Attachment H -NEI 04-02 Frequently Asked Question -Summary Table" Attachment I -Definition of Power Block" Attachment J -Existing Engineering Equivalency Evaluation Transition-Security Related Information
- Attachment K -Existing Licensing Action Transition-Security Related Information
- Attachment L -NFPA 805 Chapter 3 Requirements for Approval" Attachment M -License Condition Changes" Attachment N -Technical Specification Changes" Attachment 0 -Orders and Exemptions" Attachment P -Performance-Based Methods -NFPA 805 Chapter 3 -10 CFR 50.48.(c)(2)(vii)" Attachment Q -Risk-Informed, Performance-Based Alternatives to NFPA 805 --10 CFR 50.48(c)(4)" Attachment R -FSAR Changes* Attachment S -Plant Modifications" Attachment T -Clarification of Prior NRC Approvals" Attachment U -No Significant Hazards Consideration
- Attachment V -Environmental Consideration In accordance with the guidance in Regulatory Position C.2.2 of Regulatory Guide 1.205, Revision 0, the total risk change associated with pre-transition fire protection program variances meeting the NFPA 805 performance-based approach (via the change evaluation process) were evaluated.
Upon completion of the plant modifications, as referenced in the Transition Report section 4.8.3, the total change in risk associated with HNP's transition to NFPA 805 will be consistent with the acceptance guidelines in Regulatory Guide 1.174.
ENCLOSURE 3 TO THIS LETTER CONTAINS SENSITIVE INFORMATION SUBMITTED UNDER 10 CFR 2.390(d)(1).
Serial: HNP-08-061 Page 3 The Transition Report provided in section 5.4 contains HNP's proposed implementation schedule for transitioning HNP to the new fire protection licensing basis. Based on this, HNP requests approval of this license amendment in accordance with the NRC's current schedule, with implementation to occur within 180 days of approval.In accordance with 10 CFR 50.91(b), HNP is providing the state of North Carolina with a copy of the proposed license amendment.
Please refer any questions regarding this submittal to Mr. Dave Corlett at (919) 362-3137.I declare, under penalty of perjury, that the attached information is true and correct (Executed on WAY 2 9 2008 ).Si ely, R.J.D an, I Vice President Harris Nuclear Plant RJD/kI
Enclosures:
- 1. HNP Regulatory Commitments
- 2. Specific Approval Requested in SER 3. HNP Transition Report, containing Attachments A through V Cc (via CD-ROM): Ms. B. 0. Hall, N. C. DENR Section Chief Mr. P. B. O'Bryan, NRC Sr. Resident Inspector Mr. L. A. Reyes, NRC Regional Administrator, Region II Ms. M. G. Vaaler, NRC Project Manager Enclosure 1 to SERIAL: HNP-08-061 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT TO ADOPT NFPA 805 PERFORMANCE-BASED STANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR GENERATING PLANTS (2001 EDITION)REGULATORY COMMITMENTS Commitment(s)
Scheduled Completion Date 1. HNP will complete modifications necessary to The end of Refueling Outage 16 currently support the new licensing basis. scheduled for November 5, 2010 Page Al-1 of I Enclosure 2 to SERIAL: HNP-08-061 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT TO ADOPT NFPA 805 PERFORMANCE-BASED STANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR GENERATING PLANTS (2001 EDITION)SECTIONS REQUESTED FOR SPECIFIC APPROVAL IN LAR In accordance with 10 CFR 50.48(c)(3)(i), Harris Nuclear Plant (HNP), is submitting this License Amendment Request (LAR) to allow HNP to maintain a fire protection program that complies with NFPA 805 as an alternative to the current HNP fire protection license condition.
The information provided in the Transition Report contains the information required for submittal, as well as information to facilitate the Nuclear Regulatory Commission (NRC) review and approval of the license amendment.
As stated in Regulatory Position C.2.2 of Regulatory Guide 1.205, HNP requests that certain portions of the Transition Report be reviewed for explicit approval in the HNP 10 CFR 50.48(c) License Amendment/associated Safety Evaluation Report. HNP believes this review and approval will help provide clarity to the new fire protection licensing basis and facilitate future program maintenance and NRC inspection activity.The following table provides a listing of Transition Report Sections, the Topic, applicable NEI and NRC requirements and guidance, and whether specific approval by the NRC is requested in the License Amendment/associated Safety Evaluation Report.Specific LAR/TR Topic Requirement/Guidance Approval Reference Requested in SER Section 4.1.2.1 B-i Table RG 1.205 (C.2.4), NEI 04-02(2.3, 4.3.1, B.1), Yes Attachment A FAQ 07-0036 Nuclear Safety Capability Section 4.2.1.2 Assessment
-Methodology (B- NEI 04-02 (4.3.2, B.2), FAQ 07-0039 Yes 2 Table)Section 4.2.2.3, Nuclear Safety Capability Assessment
-Fire Area -by -NEI 04-02 (4.3.2, B.2), FAQ 07-0039 Yes (1)Fire Area Review Nuclear Safety Capability Attachment C Assessment
-Fire Area -by -NEI 04-02 (4.3.2, B.2), FAQ 07-0039 No Fire Area Review (B-3 Table)Section 4.3 'Non Power Operations (F-1 NE 04-02 (4.3.3, F), FAQ 07-0040 Yes Attachment D Table)Section 4.4 Radioactive Release (G-1 Table) NEI 04-02 (4.3.4, G) Yes Attachment E Section 4.5 Change Evaluations NFPA 805, RG 1.205 (C.3.2), NEI 04-02 Yes (2)(5.3, App I)Section 4.8.2.1 Fire-Induced Multiple Spurious RG 1.205 (C.3.3), NEI 04-02 (B.2), FAQ 07-Operations resolution Yes Attachment F mtolgy0038 methodology Section 4.8.2.2 Operator Manual Actions -RG 1.205 (C.2.2), NEI 04-02 (B.2), FAQ 06- Yes Attachment G Transition to Recovery Actions 0012, FAQ 07-0030 Ye Page A2-1 of 3 Enclosure 2 to SERIAL: HNP-08-061 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT TO ADOPT NFPA 805 PERFORMANCE-BASED STANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR GENERATING PLANTS (2001 EDITION)SECTIONS REQUESTED FOR SPECIFIC APPROVAL IN LAR Specific LAR/TR Topic Requirement/Guidance Approval Reference Requested in SER Section 3.4 FAQ Summary Table. (info 10 CFR 50.71(e), NEI 04-02 (4.6.1) No Attachment H only)Section 4.1.3 Atthn 4 Definition of Power Block NFPA 805, FAQ 06-0019 Yes Attachment I Section Existing Engineering 4.2.2.2.1 Equivalency Evaluations RG 1.205 (C.2.3), FAQ 07-0033 Yes SectionyEvlutin Attachment J Section NEI 04-02 (4.3.2, B.2), RG 1.205 (C.2.4), 4.2.2.2.2 Licensin Action Transition 07-0039 Attachment K NFPA 805 Chapter 3 Section 4.1.2.2 NEI 04-02 (2.3, 4.3.1), RG 1.205 (C.2.4), Attachment L Requirements to be included in FAQ 07-0036 Yes the LAR Section 5.2.1 License Condition Changes 10 CFR 50.48(c)(3)(i), 10 CFR 50.90, RG Yes Attachment M i 1.205 (C.3.1), NEI 04-02 (4.6.1)Section 5.2.2 10 CFR 50.48(c)(3)(i), 10 CFR 50.90, RG Attachment N Technical Specification Changes 1.205 (C.2.2), NEI 04-02 (4.6.1) Yes Section 5.2.3 10 CFR 50.48(c)(3)(i), 10 CFR 50.90, RG Attachment 0 1.205 (C.2.2), NEI 04-02 (4.6.1)Attachment P Performance Based Methods 10 CFR 50.48(c)(2)(vii), RG 1.205 (C.2.2, Yes C.3.2.3), NEI 04-02 (2.3, 2.4), FAQ 06-0008 Attachment Q Risk-Informed, Performance 10 CFR 50.48(c)(4), RG 1.205 (C.2.2, Yes Based Alternatives to NFPA 805 C.3.2.3), NEI 04-02 (2.3, 4.6.1)Attachment R FSAR Changes (Governed by 10 RG 1.205 (C.2.2), NEI 04-02 (4.6.1) Yes (3)CFR 50.71(e))Section 4.8.3 Atthn 4 Plant Modifications RG 1.205 (C.2.2), NEI 04-02 (4.6.1) No Attachment S Attachment T Clarification of Prior NRC NEI 04-02 (2.3, B.2), RG 1.205 (C.2.2) Yes Approval Section 5.3.1 No Significant Hazards 10 CFR 50.91, NEI 04-02 (4.6.1, H) Yes Attachment U Consideration Section 5.3.2 Environmental Consideration 10 CFR 51.22(b), NEI 04-02 (H) Yes Attachment V Fire PRA Peer Review High Section 4.5.1 RG 1.205 (C.4.3) Yes Level Findings Section 5.4 Transition Schedule RG 1.205 (C.2.2), NEI 04-02 (4.6.1) Yes Page A2-2 of 3 Enclosure 2 to SERIAL: HNP-08-061 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT TO ADOPT NFPA 805 PERFORMANCE-BASED STANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR GENERATING PLANTS (2001 EDITION)SECTIONS REQUESTED FOR SPECIFIC APPROVAL IN LAR Note 1: Request NRC acceptance of the NSCA results based on the Methodology described in Attachment
- 2. Acceptance does not preclude self approval of future Fire Protection changes per the FP license condition that is provided in this LAR.Note 2: Request NRC acceptance of the Change Evaluation results. Acceptance does not preclude self approval of future Fire Protection changes per the FP license condition that is provided in this LAR.Note 3: Request NRC to approve in concept the level of detail proposed for the FSAR.Page A2-3 of 3