MONTHYEARML0725500632007-08-30030 August 2007 NFPA 805 Transition Pilot Plant FAQ 06-0019, Revision 2 Project stage: Request ML0730605502007-09-0707 September 2007 NFPA 805 Transition Pilot Plant FAQ 07-0040 Project stage: Request ML0727402482007-09-20020 September 2007 NFPA-805 Transition Pilot Plant FAQ 06-0011, Revision 2 Project stage: Request ML0727402622007-09-20020 September 2007 NFPA-805 Transition Pilot Plant FAQ 07-0038 Project stage: Request ML0727402682007-09-20020 September 2007 NFPA-805 Transition Pilot Plant FAQ 07-0039 Project stage: Request ML0727402552007-09-28028 September 2007 NFPA-805 Transition Pilot Plant FAQ 06-0019, Revision 3 Project stage: Request ML0728200152007-10-0808 October 2007 NFPA-805 Transition Pilot Plant FAQ 06-0005, Revision 2 - Definition of a Fire Protection Program (FPP) Change for Harris Project stage: Request ML0735100822007-11-12012 November 2007 NFPA 805 Transition Pilot Plant FAQ 06-0025, Revision 3 (Corrected Version) Project stage: Request ML0735500232007-11-12012 November 2007 NFPA 805 Transition Pilot Plant FAQ 07-0033, Revision 1 Project stage: Request ML0733200282007-11-26026 November 2007 NFPA 805 Transition Pilot Plant FAQ 06-0012, Revision 5, Determining Manual Actions That Require a Change Evaluation During Transition Project stage: Request ML0733700252007-12-0303 December 2007 NFPA 805 Transition Pilot Plant FAQ 06-0008, Revision 8, Alternative Method for Fire Protection Engineering Analyses Project stage: Request ML0734001472007-12-0606 December 2007 NFPA 805 Transition Pilot Plant FAQ 06-0025, Revision 3 Project stage: Request ML0735500252007-12-20020 December 2007 NFPA 805 Transition Pilot Plant FAQ 07-0036, Revision 1 Project stage: Request ML0807004112008-03-10010 March 2008 NFPA 805 Transition Pilot Plant FAQ 07-0032, Revision 1, Clarification of 10 CFR 50.48(c), 50.48(a), and GDC 3 Project stage: Request ML0809101362008-03-28028 March 2008 NFPA 805 Transition Pilot Plant FAQ 07-0039, Revision 1, Lessons Learned - NEI 04-02 B-2 and B-3 Tables Project stage: Request ML0813006972008-05-0909 May 2008 NFPA 805 Transition Pilot Plant FAQ 07-0032, Revision 2 Project stage: Request ML0814300412008-05-22022 May 2008 NFPA 805 Transition Pilot Plant FAQ 07-0040, Revision 2 Project stage: Request ML0815606412008-05-29029 May 2008 Request for License Amendment to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) Project stage: Request HNP-08-061, Redacted Public Version of Transition Report NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition2008-05-29029 May 2008 Redacted Public Version of Transition Report NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition Project stage: Request ML0820410142008-05-30030 May 2008 Public Version of Enclosures 2 Through 6 of License Amendment Request to Adopt NFPA-805 Project stage: Request ML0816901212008-06-17017 June 2008 Forthcoming Closed Meeting with Progress Energy Carolinas, Inc., to Discuss the May 29, 2008, License Amendment Request (LAR) to Transition the Shearon Harris Nuclear Plant, Unit 1 (Harris) to National Fire Protection Association (Nfpa) Project stage: Meeting ML0818406962008-07-0707 July 2008 Meeting with Progress Energy Carolinas, Inc. and Duke Energy Carolinas, LLC, to Discuss the 05/29&30/2008, License Amendment Requests to Transition Shearon Harris, Unit 1, and Oconee, Units 1, 2, & 3 to NFPA Standard 805 Project stage: Meeting ML0818905292008-07-11011 July 2008 Summary of Closed Meeting with Progress Energy Carolinas Regarding May 29, 2008, License Amendment Request to Transition the Shearon Harris Nuclear Plant Unit 1, to National Fire Protection Association Standard 805, Performance-Based.. Project stage: Meeting ML0820703912008-07-17017 July 2008 Meeting Handouts from 7/17/08 Public Meeting on the Harris and Oconee LARs to Transition to NFPA-805 Project stage: Meeting ML0820605362008-08-0707 August 2008 Summary of Mtg. with Progress Energy Carolinas, and Duke Energy Carolinas to Discuss the LARs to Transition the Shearon Harris and Oconee Nuclear Plants to National Fire Protection Association Standard NFPA-805 Project stage: Approval ML0824202652008-09-0808 September 2008 Summary of Conference Call with Progress Energy Re License Amendment Request HNP-08-061 for Shearon Harris Project stage: Other ML0826007362008-09-17017 September 2008 Notice of Meeting with Progress Energy Carolinas, Inc. (Pec), to Discuss the Shearon Harris Nuclear Plant, Unit 1 (HNP) National Fire Protection Association (NFPA) Standard 805 License Amendment Request (LAR) Project stage: Meeting ML0827011582008-09-26026 September 2008 Acceptance Review Regarding the License Amendment Request to Transition to NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Acceptance Review ML0828700162008-09-26026 September 2008 Nc Warns Response to Board Notification - Enclosure P-1 - Shearon Harris Nuclear Power Plant, Unit 1 - Acceptance Review NFPA-805 License Amendment Request, September 26, 2008 Project stage: Request ML0830900742008-11-12012 November 2008 Summary of Category 2 Public Meeting Held to Discuss National Fire Protection Association Standard 805 Pilot Plant Process: Current Lessons Learned from the Pilot License Amendment Request Reviews (TAC Nos. MD8807, MD8832, MD8833, & MD8834) Project stage: Meeting HNP-08-113, Supplement to Request for License Amendment, to Adopt NFPA 805 Performance-Based Standards for Fire Protection for Light Water Reactor Generating Plants (2001 Edition)2008-11-14014 November 2008 Supplement to Request for License Amendment, to Adopt NFPA 805 Performance-Based Standards for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) Project stage: Supplement ML0829601532008-11-17017 November 2008 Summary of Meeting with Progress Energy Carolinas, Inc., to Discuss Shearon Harris Unit 1 National Fire Protection Association Standard 805 License Amendment Request Project stage: Meeting HNP-08-121, To Request for License Amendment to Adopt NFPA 805 Performance-based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition)2008-12-11011 December 2008 To Request for License Amendment to Adopt NFPA 805 Performance-based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) Project stage: Request ML0903000302009-01-30030 January 2009 Acceptance Review Regarding Amendment to Adopt National Fire Protection Association 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition Project stage: Acceptance Review ML0902903272009-03-10010 March 2009 Regulatory Audit in Support of the License Amendment Request to Implement a Risk-Informed, Performance-Based Fire Protection Program as Allowed by Title 10 of the Code of Federal Regulations, Paragraph 50.48(c) Fire Protection Project stage: Other ML0909900182009-04-10010 April 2009 04/21-22/2009, Notice of Meeting with Progress Energy Carolinas, Inc., and Duke Energy Carolinas, LLC, to Discuss Topics Involving the License Amendment Requests to Transition the Shearon, Unit 1 and the Oconee, Units 1, 2 and 3 Project stage: Meeting ML0916002812009-06-11011 June 2009 Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for a Hearing Project stage: Other ML0921707152009-08-0606 August 2009 Request for Additional Information Regarding Amendment to Adopt National Fire Protection Association Standard 805 (NFPA 805), Performance-Based Standard for Fire Protection for Light Water Reactor . Project stage: RAI HNP-09-076, 90-Day Inservice Inspection (ISI) Summary Report2009-08-0606 August 2009 90-Day Inservice Inspection (ISI) Summary Report Project stage: Request HNP-09-084, Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-based Standard for Fire Protection for Light Water Generating Plants2009-08-13013 August 2009 Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-based Standard for Fire Protection for Light Water Generating Plants Project stage: Response to RAI HNP-09-086, Second Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-based Standard for Fire Protection for Light Water Reactor.2009-08-28028 August 2009 Second Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-based Standard for Fire Protection for Light Water Reactor. Project stage: Response to RAI HNP-09-094, Third Response to Request for Additional Information License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor..2009-10-0909 October 2009 Third Response to Request for Additional Information License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor.. Project stage: Response to RAI HNP-09-096, Additional Information Re License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2009-12-16016 December 2009 Additional Information Re License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Request ML1001302542010-01-14014 January 2010 Second Request for Additional Information Regarding the License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plant Project stage: RAI 05000400/LER-2010-002, Manual Actuation of the Reactor Protection System Due to Hydrogen Seal Oil Leak2010-01-14014 January 2010 Manual Actuation of the Reactor Protection System Due to Hydrogen Seal Oil Leak Project stage: Request HNP-10-008, Response to Second Request for Additional Information Regarding License Amendment Request to Anfp Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2010-02-0404 February 2010 Response to Second Request for Additional Information Regarding License Amendment Request to Anfp Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Request ML1006009872010-03-0909 March 2010 Discussion of Clarification Questions Related to the License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance - Based Standard for Fire Protection for Light . Project stage: Approval HNP-10-040, Response to 3rd Round of RAI License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2010-04-0505 April 2010 Response to 3rd Round of RAI License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Request HNP-10-064, Additional Items Related to License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for LWR Generating Plants2010-06-0909 June 2010 Additional Items Related to License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for LWR Generating Plants Project stage: Request ML1017506022010-06-28028 June 2010 Issuance of Amendment Regarding Adoption of National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants Project stage: Approval 2008-07-11
[Table View] |
Text
ENCLOSURE 3 TO THIS LETTER CONTAINS SENSITIVE INFORMATION SUBMITTED UNDER 10 CFR 2.390(d)(1).
Robert J. Duncan, 11 Progress EnergyVice President Harris Nuclear Plant Progress Energy Carolinas, Inc.
Serial: HNP-08-061 MAY 2 9 2008 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, D.C. 20555-0001 DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT TO ADOPT NFPA 805 PERFORMANCE-BASED STANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR GENERATING PLANTS (2001 EDITION)
Ladies and Gentlemen:
In accordance with the Code of Federal Regulations, Title 10, Part 50.90, "Application of License or Construction Permit," Carolina Power & Light Company (CP&L) doing business as Progress Energy Carolinas Inc. (PEC), requests an amendment to Facility Operating License No. NPF-63 for Shearon Harris Nuclear Power Plant, Unit No. 1 (HNP). Implementation of the regulatory actions presented in the attachments to this License Amendment Request (LAR) will enable HNP to adopt a new fire protection licensing basis which complies with the requirements in 10 CFR 50.48(a) and (c) and the guidance in Revision 0 of Regulatory Guide (RG) 1.205.
As documented in this request, HNP has met all of the NRC's regulatory requirements for the transition of its fire protection licensing basis. In addition, the license amendment does not present a significant hazards consideration and the criteria have been met for a categorical exclusion from the need for an environmental assessment.
Information associated with HNP's transition is provided in the enclosed HNP Transition Report, including the technical and regulatory justifications required to support this LAR. contains the Regulatory Commitments associated with this submittal. contains a listing of the Transition Report sections for which HNP requests specific NRC approval. to this letter provides HNP's Transition Report. Major topics in this Transition Report are presented as Attachments A through V, summarized as follows:
" Attachment A - NEI 04-02 Table B Transition of Fundamental FP Program and Design Elements (NFPA 805 Chapter 3) - Security Related Information
" Attachment B - NEI 04-02 Table B Nuclear Safety Capability Assessment -
Methodology Review Attachment C - NEI 04-02 Table B Fire Area Transition - Security Related Information P.O. Box 165 oc New Hill, NC 27562 T> 919.362.2502 F> 919.362.2095
ENCLOSURE 3 TO THIS LETTER CONTAINS SENSITIVE INFORMATION SUBMITTED UNDER 10 CFR 2.390(d)(1).
Serial: HNP-08-061 Page 2
" Attachment D - NEI 04-02 Table F-1 Non-Power Operational Modes Transition-Security Related Information
" Attachment E - NEI 04-02 Table G Radioactive Release Transition Attachment F - Fire-Induced Multiple Spurious Operations - Resolution Methodology
" Attachment G - Operator Manual Actions - Transition to Recovery Actions
" Attachment H - NEI 04-02 Frequently Asked Question - Summary Table
" Attachment I - Definition of Power Block
" Attachment J - Existing Engineering Equivalency Evaluation Transition-Security Related Information Attachment K - Existing Licensing Action Transition-Security Related Information
- Attachment L - NFPA 805 Chapter 3 Requirements for Approval
" Attachment M - License Condition Changes
" Attachment N - Technical Specification Changes
" Attachment 0 - Orders and Exemptions
" Attachment P - Performance-Based Methods - NFPA 805 Chapter 3 - 10 CFR 50.48.(c)(2)(vii)
" Attachment Q - Risk-Informed, Performance-Based Alternatives to NFPA 805 -- 10 CFR 50.48(c)(4)
" Attachment R - FSAR Changes Attachment S - Plant Modifications
" Attachment T - Clarification of Prior NRC Approvals
" Attachment U - No Significant Hazards Consideration Attachment V - Environmental Consideration In accordance with the guidance in Regulatory Position C.2.2 of Regulatory Guide 1.205, Revision 0, the total risk change associated with pre-transition fire protection program variances meeting the NFPA 805 performance-based approach (via the change evaluation process) were evaluated.
Upon completion of the plant modifications, as referenced in the Transition Report section 4.8.3, the total change in risk associated with HNP's transition to NFPA 805 will be consistent with the acceptance guidelines in Regulatory Guide 1.174.
ENCLOSURE 3 TO THIS LETTER CONTAINS SENSITIVE INFORMATION SUBMITTED UNDER 10 CFR 2.390(d)(1).
Serial: HNP-08-061 Page 3 The Transition Report provided in section 5.4 contains HNP's proposed implementation schedule for transitioning HNP to the new fire protection licensing basis. Based on this, HNP requests approval of this license amendment in accordance with the NRC's current schedule, with implementation to occur within 180 days of approval.
In accordance with 10 CFR 50.91(b), HNP is providing the state of North Carolina with a copy of the proposed license amendment.
Please refer any questions regarding this submittal to Mr. Dave Corlett at (919) 362-3137.
I declare, under penalty of perjury, that the attached information is true and correct (Executed on WAY 2 9 2008
).
Si
- ely, R.J.D an, I Vice President Harris Nuclear Plant RJD/kI
Enclosures:
- 1. HNP Regulatory Commitments
- 2. Specific Approval Requested in SER
- 3. HNP Transition Report, containing Attachments A through V Cc (via CD-ROM):
Ms. B. 0. Hall, N. C. DENR Section Chief Mr. P. B. O'Bryan, NRC Sr. Resident Inspector Mr. L. A. Reyes, NRC Regional Administrator, Region II Ms. M. G. Vaaler, NRC Project Manager to SERIAL: HNP-08-061 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT TO ADOPT NFPA 805 PERFORMANCE-BASED STANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR GENERATING PLANTS (2001 EDITION)
REGULATORY COMMITMENTS Commitment(s)
Scheduled Completion Date
- 1. HNP will complete modifications necessary to The end of Refueling Outage 16 currently support the new licensing basis.
scheduled for November 5, 2010 Page Al-1 of I to SERIAL: HNP-08-061 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT TO ADOPT NFPA 805 PERFORMANCE-BASED STANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR GENERATING PLANTS (2001 EDITION)
SECTIONS REQUESTED FOR SPECIFIC APPROVAL IN LAR In accordance with 10 CFR 50.48(c)(3)(i), Harris Nuclear Plant (HNP), is submitting this License Amendment Request (LAR) to allow HNP to maintain a fire protection program that complies with NFPA 805 as an alternative to the current HNP fire protection license condition. The information provided in the Transition Report contains the information required for submittal, as well as information to facilitate the Nuclear Regulatory Commission (NRC) review and approval of the license amendment.
As stated in Regulatory Position C.2.2 of Regulatory Guide 1.205, HNP requests that certain portions of the Transition Report be reviewed for explicit approval in the HNP 10 CFR 50.48(c) License Amendment/associated Safety Evaluation Report. HNP believes this review and approval will help provide clarity to the new fire protection licensing basis and facilitate future program maintenance and NRC inspection activity.
The following table provides a listing of Transition Report Sections, the Topic, applicable NEI and NRC requirements and guidance, and whether specific approval by the NRC is requested in the License Amendment/associated Safety Evaluation Report.
Specific LAR/TR Topic Requirement/Guidance Approval Reference Requested in SER Section 4.1.2.1 B-i Table RG 1.205 (C.2.4), NEI 04-02(2.3, 4.3.1, B.1),
Yes Attachment A FAQ 07-0036 Nuclear Safety Capability Section 4.2.1.2 Assessment - Methodology (B-NEI 04-02 (4.3.2, B.2), FAQ 07-0039 Yes 2 Table)
Section 4.2.2.3, Nuclear Safety Capability Assessment - Fire Area - by -
NEI 04-02 (4.3.2, B.2), FAQ 07-0039 Yes (1)
Fire Area Review Nuclear Safety Capability Attachment C Assessment - Fire Area - by -
NEI 04-02 (4.3.2, B.2), FAQ 07-0039 No Fire Area Review (B-3 Table)
Section 4.3
'Non Power Operations (F-1 NE 04-02 (4.3.3, F), FAQ 07-0040 Yes Attachment D Table)
Section 4.4 Radioactive Release (G-1 Table)
NEI 04-02 (4.3.4, G)
Yes Attachment E Section 4.5 Change Evaluations NFPA 805, RG 1.205 (C.3.2), NEI 04-02 Yes (2)
(5.3, App I)
Section 4.8.2.1 Fire-Induced Multiple Spurious RG 1.205 (C.3.3), NEI 04-02 (B.2), FAQ 07-Operations resolution Yes Attachment F mtolgy0038 methodology Section 4.8.2.2 Operator Manual Actions -
RG 1.205 (C.2.2), NEI 04-02 (B.2), FAQ 06-Yes Attachment G Transition to Recovery Actions 0012, FAQ 07-0030 Ye Page A2-1 of 3 to SERIAL: HNP-08-061 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT TO ADOPT NFPA 805 PERFORMANCE-BASED STANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR GENERATING PLANTS (2001 EDITION)
SECTIONS REQUESTED FOR SPECIFIC APPROVAL IN LAR Specific LAR/TR Topic Requirement/Guidance Approval Reference Requested in SER Section 3.4 FAQ Summary Table. (info 10 CFR 50.71(e), NEI 04-02 (4.6.1)
No Attachment H only)
Section 4.1.3 Atthn 4
Definition of Power Block NFPA 805, FAQ 06-0019 Yes Attachment I Section Existing Engineering 4.2.2.2.1 Equivalency Evaluations RG 1.205 (C.2.3), FAQ 07-0033 Yes SectionyEvlutin Attachment J Section NEI 04-02 (4.3.2, B.2), RG 1.205 (C.2.4),
4.2.2.2.2 Licensin Action Transition 07-0039 Attachment K NFPA 805 Chapter 3 Section 4.1.2.2 NEI 04-02 (2.3, 4.3.1), RG 1.205 (C.2.4),
Attachment L Requirements to be included in FAQ 07-0036 Yes the LAR Section 5.2.1 License Condition Changes 10 CFR 50.48(c)(3)(i), 10 CFR 50.90, RG Yes Attachment M i
1.205 (C.3.1), NEI 04-02 (4.6.1)
Section 5.2.2 10 CFR 50.48(c)(3)(i), 10 CFR 50.90, RG Attachment N Technical Specification Changes 1.205 (C.2.2), NEI 04-02 (4.6.1)
Yes Section 5.2.3 10 CFR 50.48(c)(3)(i), 10 CFR 50.90, RG 1.205 (C.2.2), NEI 04-02 (4.6.1)
Attachment P Performance Based Methods 10 CFR 50.48(c)(2)(vii), RG 1.205 (C.2.2, Yes C.3.2.3), NEI 04-02 (2.3, 2.4), FAQ 06-0008 Attachment Q Risk-Informed, Performance 10 CFR 50.48(c)(4), RG 1.205 (C.2.2, Yes Based Alternatives to NFPA 805 C.3.2.3), NEI 04-02 (2.3, 4.6.1)
Attachment R FSAR Changes (Governed by 10 RG 1.205 (C.2.2), NEI 04-02 (4.6.1)
Yes (3)
CFR 50.71(e))
Section 4.8.3 Atthn 4
Plant Modifications RG 1.205 (C.2.2), NEI 04-02 (4.6.1)
No Attachment S Attachment T Clarification of Prior NRC NEI 04-02 (2.3, B.2), RG 1.205 (C.2.2)
Yes Approval Section 5.3.1 No Significant Hazards 10 CFR 50.91, NEI 04-02 (4.6.1, H)
Yes Attachment U Consideration Section 5.3.2 Environmental Consideration 10 CFR 51.22(b), NEI 04-02 (H)
Yes Attachment V Fire PRA Peer Review High Section 4.5.1 RG 1.205 (C.4.3)
Yes Level Findings Section 5.4 Transition Schedule RG 1.205 (C.2.2), NEI 04-02 (4.6.1)
Yes Page A2-2 of 3 to SERIAL: HNP-08-061 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT TO ADOPT NFPA 805 PERFORMANCE-BASED STANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR GENERATING PLANTS (2001 EDITION)
SECTIONS REQUESTED FOR SPECIFIC APPROVAL IN LAR Note 1: Request NRC acceptance of the NSCA results based on the Methodology described in Attachment 2. Acceptance does not preclude self approval of future Fire Protection changes per the FP license condition that is provided in this LAR.
Note 2: Request NRC acceptance of the Change Evaluation results. Acceptance does not preclude self approval of future Fire Protection changes per the FP license condition that is provided in this LAR.
Note 3: Request NRC to approve in concept the level of detail proposed for the FSAR.
Page A2-3 of 3