Completion Schedule for Part 2 of License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001) Edition, License Amendment Request No. 2008-01
ML081890193
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 06/30/2008
From: Baxter D
Duke Energy Carolinas, Duke Energy Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LAR-08-01, RG-1.205
Download: ML081890193 (3)


Text

Duke DAVE BAXTER Ener Vice President nergy. Oconee Nuclear Station Duke Energy Corporation ONO 1 VP/7800 Rochester Highway Seneca, SC 29672 864-885-4460 864-885-4208 fax dabaxter@dukeenergy.com June 30, 2008 U.S. Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, D.C. 20555

Subject:

Duke Energy Carolinas, LLC Oconee Nuclear Site Units 1, 2, and 3 Docket Numbers 50-269, 50-270 and 50-287 Completion Schedule for Part 2 of License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition).

License Amendment Request (LAR) No. 2008-01 On May 30, 2008, Duke Energy Carolinas, LLC (Duke) submitted part 1 of a LAR requesting Nuclear Regulatory Commission (NRC) review and approval for adoption of a new fire protection licensing basis that complies with the requirements in 10 CFR 50.48(a), 10 CFR 50.48(c), and the guidance in Regulatory Guide (RG) 1.205. of the submittal contained a commitment to provide a project milestone schedule for the following activities by June 30, 2008:

M The Multiple Spurious Operation treatment, Change Evaluations and the determination of the additional risk presented by the use of recovery actions as a compliance strategy.

0 The Unit 1 Fire Probabilistic Risk Assessment (PRA) screening analysis.

0 The Unit 2 Fire PRA.

0 The modifications necessary to support the new Licensing Basis (LB).

5 An Updated Final Safety Analysis Report example.

0 The Non-Power Operations Modes transition evaluation.

E A schedule for the completion of the transition to the new fire protection LB The activities listed above will be completed and submitted by October 31, 2008. Any interim activities completed prior to October 31, 2008 will be submitted to facilitate the NRC's review of the submittal.

www. duke-energy. cornm 9~P

Nuclear Regulatory Commission June 30, 2008 Page 2 of 4 Please refer any questions regarding this submittal to Reene' Gambrell at (864) 885-3364.

Sincerely, Da e Baxter, Vice President Oconee Nuclear Site

U. S. Nuclear Regulatory Commission June 30, 2008 Page 3 of 4 cc w/enclosures:

Mr. Luis Reyes, Regional Administrator U. S. Nuclear Regulatory Commission - Region II Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303 Mr. Lenny Olshan, Project Manager Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 0-14 H25 Washington, D. C. 20555 Mr. Paul Lain Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 0-11 Al 1 Washington, D. C. 20555 Mr. Andy Hutto, Senior Resident Inspector Oconee Nuclear Site Ms. Susan Jenkins, Manager, Infectious and Radioactive Waste Management Section 2600 Bull Street Columbia, SC 29201