MONTHYEARML0725500632007-08-30030 August 2007 NFPA 805 Transition Pilot Plant FAQ 06-0019, Revision 2 Project stage: Request ML0730605502007-09-0707 September 2007 NFPA 805 Transition Pilot Plant FAQ 07-0040 Project stage: Request ML0727402622007-09-20020 September 2007 NFPA-805 Transition Pilot Plant FAQ 07-0038 Project stage: Request ML0727402482007-09-20020 September 2007 NFPA-805 Transition Pilot Plant FAQ 06-0011, Revision 2 Project stage: Request ML0727402682007-09-20020 September 2007 NFPA-805 Transition Pilot Plant FAQ 07-0039 Project stage: Request ML0727402552007-09-28028 September 2007 NFPA-805 Transition Pilot Plant FAQ 06-0019, Revision 3 Project stage: Request ML0728200152007-10-0808 October 2007 NFPA-805 Transition Pilot Plant FAQ 06-0005, Revision 2 - Definition of a Fire Protection Program (FPP) Change for Harris Project stage: Request ML0735100822007-11-12012 November 2007 NFPA 805 Transition Pilot Plant FAQ 06-0025, Revision 3 (Corrected Version) Project stage: Request ML0735500232007-11-12012 November 2007 NFPA 805 Transition Pilot Plant FAQ 07-0033, Revision 1 Project stage: Request ML0733200282007-11-26026 November 2007 NFPA 805 Transition Pilot Plant FAQ 06-0012, Revision 5, Determining Manual Actions That Require a Change Evaluation During Transition Project stage: Request ML0733700252007-12-0303 December 2007 NFPA 805 Transition Pilot Plant FAQ 06-0008, Revision 8, Alternative Method for Fire Protection Engineering Analyses Project stage: Request ML0734001472007-12-0606 December 2007 NFPA 805 Transition Pilot Plant FAQ 06-0025, Revision 3 Project stage: Request ML0735500252007-12-20020 December 2007 NFPA 805 Transition Pilot Plant FAQ 07-0036, Revision 1 Project stage: Request ML0807004112008-03-10010 March 2008 NFPA 805 Transition Pilot Plant FAQ 07-0032, Revision 1, Clarification of 10 CFR 50.48(c), 50.48(a), and GDC 3 Project stage: Request ML0809101362008-03-28028 March 2008 NFPA 805 Transition Pilot Plant FAQ 07-0039, Revision 1, Lessons Learned - NEI 04-02 B-2 and B-3 Tables Project stage: Request ML0813006972008-05-0909 May 2008 NFPA 805 Transition Pilot Plant FAQ 07-0032, Revision 2 Project stage: Request ML0814300412008-05-22022 May 2008 NFPA 805 Transition Pilot Plant FAQ 07-0040, Revision 2 Project stage: Request ML0815606412008-05-29029 May 2008 Request for License Amendment to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) Project stage: Request HNP-08-061, Redacted Public Version of Transition Report NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition2008-05-29029 May 2008 Redacted Public Version of Transition Report NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition Project stage: Request ML0816504752008-05-30030 May 2008 License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition). License Amendment Request (LAR) No. 2008-01 Project stage: Request ML0820410142008-05-30030 May 2008 Public Version of Enclosures 2 Through 6 of License Amendment Request to Adopt NFPA-805 Project stage: Request ML0816901212008-06-17017 June 2008 Forthcoming Closed Meeting with Progress Energy Carolinas, Inc., to Discuss the May 29, 2008, License Amendment Request (LAR) to Transition the Shearon Harris Nuclear Plant, Unit 1 (Harris) to National Fire Protection Association (Nfpa) Project stage: Meeting ML0818901932008-06-30030 June 2008 Completion Schedule for Part 2 of License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001) Edition, License Amendment Request No. 2008-01 Project stage: Request ML0818401392008-06-30030 June 2008 Submittal of 10 CFR 50.59 Annual Report Project stage: Request ML0818406962008-07-0707 July 2008 Meeting with Progress Energy Carolinas, Inc. and Duke Energy Carolinas, LLC, to Discuss the 05/29&30/2008, License Amendment Requests to Transition Shearon Harris, Unit 1, and Oconee, Units 1, 2, & 3 to NFPA Standard 805 Project stage: Meeting ML0818905292008-07-11011 July 2008 Summary of Closed Meeting with Progress Energy Carolinas Regarding May 29, 2008, License Amendment Request to Transition the Shearon Harris Nuclear Plant Unit 1, to National Fire Protection Association Standard 805, Performance-Based.. Project stage: Meeting ML0820703912008-07-17017 July 2008 Meeting Handouts from 7/17/08 Public Meeting on the Harris and Oconee LARs to Transition to NFPA-805 Project stage: Meeting ML0820605362008-08-0707 August 2008 Summary of Mtg. with Progress Energy Carolinas, and Duke Energy Carolinas to Discuss the LARs to Transition the Shearon Harris and Oconee Nuclear Plants to National Fire Protection Association Standard NFPA-805 Project stage: Approval ML0824202652008-09-0808 September 2008 Summary of Conference Call with Progress Energy Re License Amendment Request HNP-08-061 for Shearon Harris Project stage: Other ML0826007362008-09-17017 September 2008 Notice of Meeting with Progress Energy Carolinas, Inc. (Pec), to Discuss the Shearon Harris Nuclear Plant, Unit 1 (HNP) National Fire Protection Association (NFPA) Standard 805 License Amendment Request (LAR) Project stage: Meeting ML0827011582008-09-26026 September 2008 Acceptance Review Regarding the License Amendment Request to Transition to NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Acceptance Review ML0828700162008-09-26026 September 2008 Nc Warns Response to Board Notification - Enclosure P-1 - Shearon Harris Nuclear Power Plant, Unit 1 - Acceptance Review NFPA-805 License Amendment Request, September 26, 2008 Project stage: Request ML0828804552008-09-30030 September 2008 Preliminary Oconee LAR Acceptance Review Matrix Project stage: Acceptance Review ML0828902592008-10-16016 October 2008 And 10/08/2008 - Summary of Conference Calls with Duke Energy Carolinas to Discuss the Acceptance Review of the May 30, 2008, License Amendment Request (LAR) to Adopt National Fire Protection Association (NFPA) 805 for Oconee Project stage: Acceptance Review ML0830900742008-11-12012 November 2008 Summary of Category 2 Public Meeting Held to Discuss National Fire Protection Association Standard 805 Pilot Plant Process: Current Lessons Learned from the Pilot License Amendment Request Reviews (TAC Nos. MD8807, MD8832, MD8833, & MD8834) Project stage: Meeting HNP-08-113, Supplement to Request for License Amendment, to Adopt NFPA 805 Performance-Based Standards for Fire Protection for Light Water Reactor Generating Plants (2001 Edition)2008-11-14014 November 2008 Supplement to Request for License Amendment, to Adopt NFPA 805 Performance-Based Standards for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) Project stage: Supplement ML0829601532008-11-17017 November 2008 Summary of Meeting with Progress Energy Carolinas, Inc., to Discuss Shearon Harris Unit 1 National Fire Protection Association Standard 805 License Amendment Request Project stage: Meeting HNP-08-121, To Request for License Amendment to Adopt NFPA 805 Performance-based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition)2008-12-11011 December 2008 To Request for License Amendment to Adopt NFPA 805 Performance-based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) Project stage: Request ML0903000302009-01-30030 January 2009 Acceptance Review Regarding Amendment to Adopt National Fire Protection Association 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition Project stage: Acceptance Review ML0903304962009-02-0202 February 2009 Acceptance Review of License Amendment Request to Adopt the National Fire Protection Association Standard No. 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, Project stage: Acceptance Review ML0902903272009-03-10010 March 2009 Regulatory Audit in Support of the License Amendment Request to Implement a Risk-Informed, Performance-Based Fire Protection Program as Allowed by Title 10 of the Code of Federal Regulations, Paragraph 50.48(c) Fire Protection Project stage: Other ML0909900182009-04-10010 April 2009 04/21-22/2009, Notice of Meeting with Progress Energy Carolinas, Inc., and Duke Energy Carolinas, LLC, to Discuss Topics Involving the License Amendment Requests to Transition the Shearon, Unit 1 and the Oconee, Units 1, 2 and 3 Project stage: Meeting ML0916002812009-06-11011 June 2009 Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for a Hearing Project stage: Other ML0921707152009-08-0606 August 2009 Request for Additional Information Regarding Amendment to Adopt National Fire Protection Association Standard 805 (NFPA 805), Performance-Based Standard for Fire Protection for Light Water Reactor . Project stage: RAI HNP-09-076, 90-Day Inservice Inspection (ISI) Summary Report2009-08-0606 August 2009 90-Day Inservice Inspection (ISI) Summary Report Project stage: Request HNP-09-084, Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-based Standard for Fire Protection for Light Water Generating Plants2009-08-13013 August 2009 Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-based Standard for Fire Protection for Light Water Generating Plants Project stage: Response to RAI HNP-09-086, Second Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-based Standard for Fire Protection for Light Water Reactor.2009-08-28028 August 2009 Second Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-based Standard for Fire Protection for Light Water Reactor. Project stage: Response to RAI HNP-09-094, Third Response to Request for Additional Information License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor..2009-10-0909 October 2009 Third Response to Request for Additional Information License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor.. Project stage: Response to RAI HNP-09-096, Additional Information Re License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2009-12-16016 December 2009 Additional Information Re License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Request 05000400/LER-2010-002, Manual Actuation of the Reactor Protection System Due to Hydrogen Seal Oil Leak2010-01-14014 January 2010 Manual Actuation of the Reactor Protection System Due to Hydrogen Seal Oil Leak Project stage: Request 2008-05-09
[Table View] |
Text
FAQ Number 06-0019 FAQ Revision 3
FAQ Title Definition of Power Block and Plant Page 1 of 2 Plant: Harris Nuclear Plan (HNP)
Date:
09-28-07
Contact:
Alan Holder Phone:
919-546-3372 Email:
alan.holder@pgnmail.com Distribution: (NEI Internal Use) 805 TF FPWG FPRATF Purpose of FAQ:
Provide specific clarification within NEI 04-02 as to the definition of power block and plant used in NFPA 805, such that the terms are applied to Structures, Systems and Components associated with Nuclear Safety Performance Criteria.
Is this Interpretation of guidance?
Yes / No Proposed new guidance not in NEI 04-02? Yes / No Details:
NEI 04-02 guidance needing interpretation (include section, paragraph, and line numbers as applicable):
NEI 04-02, Section 4.3.1, Fundamental Fire Protection Program and Design Elements Transition Review, Table B-1 uses NFPA 805 chapter 3 as part of the transition review. Specific clarification is requested for certain terms and phrases found in NFPA 805.
Circumstances requiring guidance interpretation or new guidance:
Interpretive guidance is needed to clarify the meaning and application of the term power block as found in, NFPA-805, Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition), Chapter 3, Section 3.3.1.2 Control of Combustibles, Section 3.5 Water Supply, Section 3.6 Standpipes and Hose Stations and Section 3.11.1 Building Separation.
Specifically, the definition of Power Block and Plant and how these will be applied when reviewing Chapter 3 transition.
FAQ Number 06-0019 FAQ Revision 3
FAQ Title Definition of Power Block and Plant Page 2 of 2 Detail contentious points if licensee and NRC have not reached consensus on the facts and circumstances:
NA Potentially relevant existing FAQ numbers:
FAQ #06-0007 Response Section:
Proposed resolution of FAQ and the basis for the proposal:
This FAQ provides interpretive guidance to clarify the term Power Block where used in NFPA 805, Chapter 3. NFPA 805, Section 1.6.46 defines Power Block as Structures that have equipment required for nuclear plant operations. Although not endorsed by Regulatory Guide 1.205, NFPA 805, Section A.1.6.46 further describes the term Power Block as, Containment, auxiliary building, service building, control building, fuel building, rad waste, water treatment, turbine building and intake structure are examples of power block structures.
If appropriate, provide proposed rewording of guidance for inclusion in the next Revision:
As follows; Clarification of NFPA 805 specific sections as applied under NEI 04-02, to be included in (New) Appendix K, to NEI 04-02 upon approval of specific clarification (final formatting to be provided by NEI).
Where used in Chapter 3, power block and plant refer to structures that have equipment required for nuclear plant operations, such as Containment, auxiliary building, service building, control building, fuel building, rad waste, water treatment, turbine building, and intake structure, or structures that are identified in the facilitys current license basis (CLB). The scope of equipment required for plant operations is defined by components and cables selected per NFPA 805 2.4.2. Applicable structures will be identified in the 10CFR50.48(c) License Amendment Request as submitted for transition Formatted: Space Before: 0 pt, After: 0 pt Deleted: Specific clarification to NFPA Chapter 3, from FAQ 06-0019,¶ Where used in Chapter 3, power block and plant refer to structures that have equipment required for nuclear plant operations, such as Containment, auxiliary building, service building, control building, fuel building, rad waste, water treatment, turbine building, and intake structure, or structures that are identified in the facilitys current license basis (CLB). The scope of equipment required for plant operations is defined by components and cables selected per NFPA 805 2.4.2.
Deleted: Absent of, or in lieu of the above, the power block are those Deleted: Applicable structures will be identified in the 10CFR50.48(c) License Amendment Request as submitted for transition.