MONTHYEARML0515302672005-06-0303 June 2005 6/3/05, Beaver Valley, RAI, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors Project stage: RAI L-05-123, Response to Request for Additional Information on Generic Letter 2004-022005-07-22022 July 2005 Response to Request for Additional Information on Generic Letter 2004-02 Project stage: Response to RAI ML0603803422006-02-0909 February 2006 Request for Additional Information Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-Water Reactors TAC Nos. MC4665 and MC4666 Project stage: RAI ML0613802732006-05-18018 May 2006 Request for Scheduler Extension from Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors (TAC No. MC46666) Project stage: Other L-08-054, Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors - Request for Extension of Completion Date for Corrective Actions2008-02-14014 February 2008 Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors - Request for Extension of Completion Date for Corrective Actions Project stage: Request L-08-035, Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized - Water Reactors2008-02-29029 February 2008 Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized - Water Reactors Project stage: Supplement ML0812301162008-02-29029 February 2008 Extension Request Approval Letter Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors,... Project stage: Other L-08-257, Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors, Request for Extension of Completion Date for Corrective Actions2008-08-28028 August 2008 Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors, Request for Extension of Completion Date for Corrective Actions Project stage: Request ML0827402412008-09-30030 September 2008 Extension Request Approval Letter Generic Letter 2004--02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors. Project stage: Other L-08-321, Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors2008-10-29029 October 2008 Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors Project stage: Supplement L-09-056, Downstream Effects for Recirculation Spray System Pumps and Low Head Safety Injection System Pumps2009-03-11011 March 2009 Downstream Effects for Recirculation Spray System Pumps and Low Head Safety Injection System Pumps Project stage: Other ML0909001932009-03-31031 March 2009 Extension Request Approval Letter Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors, Project stage: Other ML0910501002009-04-21021 April 2009 Correction Letter Extension Request Approval to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors Project stage: Other L-09-131, Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors - Request for Extension of Completion Date for Additional Corrective Actions2009-04-30030 April 2009 Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors - Request for Extension of Completion Date for Additional Corrective Actions Project stage: Request ML0912400302009-05-0505 May 2009 Extension Request Approval Letter Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors. Project stage: Other L-09-152, Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors.2009-06-30030 June 2009 Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. Project stage: Supplement ML1002903182010-02-18018 February 2010 RAI, Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors Project stage: RAI ML1008407562010-03-31031 March 2010 Notice of Teleconference Meeting with Firstenergy Nuclear Operating Company Regarding Mutual Understanding of NRR Staff'S Request for Additional Information and to Discuss Generic Letter 2004-02 Project stage: RAI ML1013206652010-05-18018 May 2010 Summary of Category 1 Teleconference with Firstenergy Nuclear Operating Company to Discuss NRC Request for Additional Information Regarding Generic Letter 2004-02 Project stage: RAI L-13-176, Generic Safety Issue 191 Resolution Plan2013-05-16016 May 2013 Generic Safety Issue 191 Resolution Plan Project stage: Other 2009-03-11
[Table View] |
|
---|
Category:Letter type:L
MONTHYEARL-23-267, Submittal of Discharge Monitoring Report (Npdes), Permit No. PA00256152023-12-18018 December 2023 Submittal of Discharge Monitoring Report (Npdes), Permit No. PA0025615 L-23-229, Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports2023-11-29029 November 2023 Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports L-23-247, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-11-17017 November 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-227, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 20232023-10-20020 October 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 2023 L-23-208, Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA00256152023-09-14014 September 2023 Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA0025615 L-23-167, Twenty-Third Refueling Outage Inservice Inspection Summary Report2023-09-13013 September 2023 Twenty-Third Refueling Outage Inservice Inspection Summary Report L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-179, Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA00256152023-07-18018 July 2023 Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA0025615 L-23-165, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-06-26026 June 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-139, Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report2023-06-13013 June 2023 Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report L-23-055, Submittal of the Updated Final Safety Analysis Report, Revision 342023-05-23023 May 2023 Submittal of the Updated Final Safety Analysis Report, Revision 34 L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report L-23-137, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-05-18018 May 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-125, Cycle 24 Core Operating Limits Report2023-05-17017 May 2023 Cycle 24 Core Operating Limits Report L-23-132, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-10010 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations L-23-129, Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations2023-05-0505 May 2023 Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations L-23-115, Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological2023-04-27027 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological L-23-126, Discharge Monitoring Report (Npdes), Permit No. PA00256152023-04-22022 April 2023 Discharge Monitoring Report (Npdes), Permit No. PA0025615 L-23-053, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-04-14014 April 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-061, Submittal of the Decommissioning Funding Status Reports2023-03-31031 March 2023 Submittal of the Decommissioning Funding Status Reports L-23-058, 180-Day Steam Generator Tube Inspection Report2023-03-27027 March 2023 180-Day Steam Generator Tube Inspection Report L-23-066, Annual Notification of Property Insurance Coverage2023-03-21021 March 2023 Annual Notification of Property Insurance Coverage L-23-036, Report of Facility Changes, Tests and Experiments2023-03-13013 March 2023 Report of Facility Changes, Tests and Experiments L-23-086, Response to Request for Additional Information for Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair2023-03-0404 March 2023 Response to Request for Additional Information for Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair L-23-087, Supplement to Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair (L-2023-LLA-0027)2023-03-0404 March 2023 Supplement to Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair (L-2023-LLA-0027) L-23-073, Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair2023-03-0101 March 2023 Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair L-23-016, Twenty-Eighth Refueling Outage Inservice Inspection Summary Report2023-02-21021 February 2023 Twenty-Eighth Refueling Outage Inservice Inspection Summary Report L-23-064, Discharge Monitoring Report, (NPDES) Permit No. PA00256152023-02-21021 February 2023 Discharge Monitoring Report, (NPDES) Permit No. PA0025615 L-23-057, Energy Harbor Nuclear Corp Retrospective Premium Guarantee2023-02-20020 February 2023 Energy Harbor Nuclear Corp Retrospective Premium Guarantee L-22-193, Request for Exemption from Specific Provisions in 10 CFR 50 Appendix H2023-02-14014 February 2023 Request for Exemption from Specific Provisions in 10 CFR 50 Appendix H L-22-286, Supplement to Request for an Amendment to Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time2023-02-14014 February 2023 Supplement to Request for an Amendment to Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time L-23-032, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Second Half of 20222023-01-23023 January 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Second Half of 2022 L-22-281, Discharge Monitoring Report (NPDES) Permit No. PA00256152022-12-16016 December 2022 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-22-246, Response to Request for Additional Information Regarding a Request to Consolidate Fuel Decay Time Technical Specifications to New LCO2022-12-0707 December 2022 Response to Request for Additional Information Regarding a Request to Consolidate Fuel Decay Time Technical Specifications to New LCO L-22-217, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152022-11-21021 November 2022 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-22-226, Emergency Preparedness Plan2022-11-0404 November 2022 Emergency Preparedness Plan L-22-222, Cycle 29-1 Core Operating Limits Report2022-10-31031 October 2022 Cycle 29-1 Core Operating Limits Report L-22-228, Independent Spent Fuel Storage Installation Changes, Tests, and Experiments2022-10-26026 October 2022 Independent Spent Fuel Storage Installation Changes, Tests, and Experiments L-22-200, Response to Request for Additional Information Regarding a 180-Day Steam Generator Tube Inspection Report Fall 2021 Refueling Outage2022-10-21021 October 2022 Response to Request for Additional Information Regarding a 180-Day Steam Generator Tube Inspection Report Fall 2021 Refueling Outage L-22-232, Withdrawal of a License Amendment Request Associated with Fire Protection Program Changes2022-10-21021 October 2022 Withdrawal of a License Amendment Request Associated with Fire Protection Program Changes L-22-238, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152022-10-20020 October 2022 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-22-227, Revised August 2022 Outfall 003 & 004 NPDES Discharge Monitoring Report (Dmr), Revised Daily Effluent Monitoring Report Forms for Outfalls 003 & 004 and Corrective Action Letter from Eurofins2022-10-0303 October 2022 Revised August 2022 Outfall 003 & 004 NPDES Discharge Monitoring Report (Dmr), Revised Daily Effluent Monitoring Report Forms for Outfalls 003 & 004 and Corrective Action Letter from Eurofins L-22-219, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152022-09-26026 September 2022 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-22-204, Submittal of Evacuation Time Estimates2022-09-0707 September 2022 Submittal of Evacuation Time Estimates L-22-137, Request for Fire Protection Program Changes2022-09-0606 September 2022 Request for Fire Protection Program Changes L-21-238, License Amendment Request for Addition of Analytical Methodology to the Core Operating Limits Report for a Full Spectrum Loss of Coolant Accident2022-08-31031 August 2022 License Amendment Request for Addition of Analytical Methodology to the Core Operating Limits Report for a Full Spectrum Loss of Coolant Accident L-22-188, Response to Request for Additional Information Regarding Steam Generator Inspection Report- Fall 2021 Refueling Outage2022-08-22022 August 2022 Response to Request for Additional Information Regarding Steam Generator Inspection Report- Fall 2021 Refueling Outage L-22-191, Spent Fuel Storage Cask Registration2022-08-17017 August 2022 Spent Fuel Storage Cask Registration 2023-09-14
[Table view] |
Text
FENOC Beaver Valley Power Station fP.O. Box 4 FirstEnergy Nuclear Operating Company Shippingport, PA 15077 Peter P. Sena III 724-682-5234 Site Vice President Fax: 724-643-8069 April 30, 2009 L-09-131 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
Beaver Valley Power Station, Unit No. 1 BV-1 Docket No. 50-334, License No. DPR-66 Generic Letter 2004-02, "Potential Impact of Debris Blockage on Emergency Recirculation During Desi.gn Basis Accidents at Pressurized-Water Reactors" -Request for Extension of Completion Date for Additional Corrective Actions (TAC Nos. MC4665)By letter dated February 14, 2008 (ADAMS Accession Number ML080510246), the FirstEnergy Nuclear Operating Company (FENOC) requested extension of completion dates for corrective actions related to Generic Letter (GL) 2004-02 for Beaver Valley Power Station Unit No. 1 (BVPS-1).
By letter dated February 29, 2008 (ADAMS Accession Number ML081230116), the Nuclear Regulatory Commission (NRC)approved the extension for completion of BVPS-1 corrective actions to September 30, 2008.By letter dated August 28, 2008 (ADAMS Accession Number ML082480045), FENOC requested approval of an additional extension for completion of certain sump blockage corrective actions until startup following the spring 2009 refueling outage (1 R1 9). The NRC approved the additional extension for BVPS-1 in a letter dated September 30, 2008 (ADAMS Accession Number ML082740241).
The subject corrective actions included modification of certain Temp-Mat fibrous and calcium-silicate insulation.
Temp-Matinsulation installed within the reactor cavity penetrations as a transition between vessel nozzles and reflective metal insulation (RMI) on the reactor coolant system piping (hot and cold leg) are being replaced with RMI. All of the above modifications are being implemented during 1 R1 9, currently in progress.
Entry into Mode 4 (Hot Shutdown) is currently scheduled for May 5, 2009.SECY-06-0078, STATUS OF RESOLUTION OF GSI-191, "ASSESSMENT OF[EFFECT OF] DEBRIS ACCUMULATION ON PWR SUMP PERFORMANCE," provided criteria for the evaluation of delays in implementation of hardware changes beyond the original schedule for completion proposed in GL 2004-02. The mitigative measures put into place, as described in the August 28, 2008 FENOC letter, as further supplemented Beaver Valley Power Station, Unit No. 1 L-09-131 Page 2 of 3 by letter dated October 29, 2008 (ADAMS Accession Number ML083080094), addressed these criteria, and continue to remain in effect.During 1 R19, however, fibrous insulating material was identified on the six reactor vessel inlet and outlet nozzles. The resulting additional fibrous loading is not bounded by Reactor Coolant System (RCS) nozzle break scenario assumptions for strainer testing and analysis performed in response to GL 2004-02, as discussed in the FENOC October 29, 2008 supplemental response.The three (3) inlet nozzles (cold legs) are 55.5 inches in outside diameter at the reactor vessel wall face and taper down to a diameter of 34.0 inches. The three outlet nozzles (hot legs) are 51.1 inches at the vessel wall and taper down to 35.5 inches. The dissimilar metal welds are carbon steel (nozzle) buttered with stainless steel to stainless steel (loop piping) using stainless steel weld filler metal. These connections do not utilize Alloy 600 material.FENOC has a high confidence in the structural integrity of the nozzles, including the welds associated with the nozzle to piping safe-end.
The 10-year in-service inspection (ISI) program examination of all six of the nozzle to piping safe-end connections was performed during the previous refueling outage in October 2007. This examination entailed ultrasonic examination from the inside of the wall, supplemented with eddy current examination.
No indications were identified.
Additionally, postulated breaks in the reactor coolant loop piping have been evaluated for BVPS-1 by application of leak-before-break (LBB) technology previously approved by the NRC. While LBB is not being used to establish the design basis debris load, the use of LBB results in a substantial reduction in the zone of influence, and a corresponding reduction in postulated debris generation.
Probabilistic risk assessments (PRA) addressing plant-specific debris generation and transport for BVPS-1 are discussed in the August 28, 2008 FENOC correspondence.
In lieu of re-evaluating the PRA assessment, a high confidence in the integrity of the RCS nozzle connections is established by the robust design of the RCS, application of LBB considerations and recent ISI examination results. Previously implemented mitigative measures remain in effect to address GL 2004-02 concerns.Removal of this material will require substantial planning time, and involves significant radiation exposure and personnel safety concerns.
Accordingly, alternative approaches to resolution of GL 2004-02 are under consideration, including insulation removal, a retest of the strainer, replacement of the existing buffer and modification to provide additional strainer surface area.Mitigation of the additional fibrous insulation material will be accomplished through removal, replacement, analysis or design modification prior to startup from the next refueling outage (1 R20), scheduled to be completed in the fourth quarter of 2010. A Beaver Valley Power Station, Unit No. I L-09-131 Page 3 of 3 description of the proposed mitigation activities will be provided as a supplemental response to GL 2004-02 prior to the start of 1 R20.Accordingly, FENOC hereby requests NRC approval of an additional schedule extension to allow completion of final GL 2004-02 corrective actions prior to startup following the BVPS-1 refueling outage scheduled to begin in the fall of 2010. NRC approval would constitute closure of previous commitments to complete these actions in 1 R1 9. Because of the immediate impact of this approval on the completion of 1 R1 9 outage activities, FENOC additionally requests NRC response prior to May 5, 2009.A list of regulatory commitments made in this submittal is attached.
If there are any questions, or if additional information is required, please contact Mr. Thomas A. Lentz, Manager- FENOC Fleet Licensing, at 330-761-6071.
I declare under penalty of perjury that the foregoing is true and correct. Executed on April 30 , 2009.Sincerely, Peter P. Sena III
Attachment:
Regulatory Commitment List cc: NRC Region I Administrator NRC Senior Resident Inspector NRR Project Manager Director BRPJDEP Site BRP/DEP Representative ATTACHMENT L-09-131 Regulatory Commitment List Page 1 of 1 The following list identifies those actions committed to by FirstEnergy Nuclear Operating Company (FENOC) for Beaver Valley Power Station Unit No. 1 (BVPS-1) in this document.
Any other actions discussed in the submittal represent intended or planned actions by FENOC. They are described only as information and are not Regulatory Commitments.
Please notify Mr. Thomas A. Lentz, Manager -Licensing, at (330) 761-6071 of any questions regarding this document or associated Regulatory Commitments.
Reciulatory Commitment
- 1. Mitigation of the additional fibrous insulation will be accomplished through removal, replacement, analysis or design modification prior to startup from the next refueling outage (1 R20), scheduled to be completed in the fourth quarter of 2010.2. A description of the proposed mitigation activities will be provided as a supplemental response to GL 2004-02 prior to the start of 1R20.Due Date 1. Prior to startup from the next refueling outage (1R20)2. Prior to the start of 1 R20.