Letter Sequence Other |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement, Supplement, Supplement, Supplement
Results
Other: L-09-056, Downstream Effects for Recirculation Spray System Pumps and Low Head Safety Injection System Pumps, L-13-176, Generic Safety Issue 191 Resolution Plan, ML061380273, ML080220343, ML081230116, ML082740241, ML090750619, ML090900193, ML091050100, ML091240030
|
MONTHYEARL-05-034, Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors.2005-03-0404 March 2005 Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. Project stage: Request ML0515302672005-06-0303 June 2005 6/3/05, Beaver Valley, RAI, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors Project stage: RAI ML0520801672005-07-22022 July 2005 Response to Request for Additional Information on Generic Letter 2004-02 Project stage: Response to RAI L-05-123, Response to Request for Additional Information on Generic Letter 2004-022005-07-22022 July 2005 Response to Request for Additional Information on Generic Letter 2004-02 Project stage: Response to RAI L-05-151, August 24, 2005 Extended Power Uprate Meeting Presentation Material2005-09-0101 September 2005 August 24, 2005 Extended Power Uprate Meeting Presentation Material Project stage: Request L-05-140, Response to a Request for Additional Information (RAI Dtd August 2, 2005) in Support of License Amendment Request Nos. 302 and 173, Extended Power Uprate2005-09-0606 September 2005 Response to a Request for Additional Information (RAI Dtd August 2, 2005) in Support of License Amendment Request Nos. 302 and 173, Extended Power Uprate Project stage: Response to RAI ML0603803422006-02-0909 February 2006 Request for Additional Information Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-Water Reactors TAC Nos. MC4665 and MC4666 Project stage: RAI ML0609604422006-04-0303 April 2006 Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request ML0613802732006-05-18018 May 2006 Request for Scheduler Extension from Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors (TAC No. MC46666) Project stage: Other ML0731005762007-11-0808 November 2007 Notice of Meeting to Discuss the Safety Review Process and Environmental Scoping Process for Beaver Valley Power Station, Units 1 and 2, License Renewal Application Review Project stage: Meeting ML0802203432008-01-14014 January 2008 Letter from George Dudash III, Comment Regarding the Beaver Valley Power Station Unit 1 and 2 License Renewal Project stage: Other ML0805102462008-02-14014 February 2008 Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors - Request for Extension of Completion Date for Corrective Actions Project stage: Request L-08-054, Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors - Request for Extension of Completion Date for Corrective Actions2008-02-14014 February 2008 Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors - Request for Extension of Completion Date for Corrective Actions Project stage: Request L-08-035, Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized - Water Reactors2008-02-29029 February 2008 Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized - Water Reactors Project stage: Supplement ML0806605972008-02-29029 February 2008 Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized - Water Reactors Project stage: Supplement ML0812301162008-02-29029 February 2008 Extension Request Approval Letter Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors,. Project stage: Other ML0807301162008-03-21021 March 2008 Summary of Conference Call Between Us Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company, Concerning the Impact of Table 8.0-1 Error on the Beaver Valley Severe Accident Mitigation Alternatives Request for Additional in Project stage: Request ML0807403922008-03-26026 March 2008 Summary of Telephone Conference Between NRC and Firstenergy Nuclear Operating Company, Concerning Clarification of Severe Accident Mitigation Alternatives Request for Additional Information Pertaining to Beaver Valley Units 1 & 2 Project stage: RAI ML0812304992008-06-0303 June 2008 Teleconf Held 4/30/08 Between NRC and Firstenergy Concerning the RAI Pertaining to the Refurbishment Activities at Beaver, Units 1 and 2, LRA Project stage: Request ML0824800452008-08-28028 August 2008 Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors, Request for Extension of Completion Date for Corrective Actions Project stage: Request L-08-257, Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors, Request for Extension of Completion Date for Corrective Actions2008-08-28028 August 2008 Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors, Request for Extension of Completion Date for Corrective Actions Project stage: Request ML0827402412008-09-30030 September 2008 Extension Request Approval Letter Generic Letter 2004--02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors Project stage: Other ML0826001472008-09-30030 September 2008 NUREG-1437 Supp 36, Dfc, Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Beaver Valley Power Station, Units 1 & 2 (Draft for Comment) Project stage: Draft Other ML0830800942008-10-29029 October 2008 Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors Project stage: Supplement L-08-321, Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors2008-10-29029 October 2008 Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors Project stage: Supplement L-09-056, Downstream Effects for Recirculation Spray System Pumps and Low Head Safety Injection System Pumps2009-03-11011 March 2009 Downstream Effects for Recirculation Spray System Pumps and Low Head Safety Injection System Pumps Project stage: Other ML0907506192009-03-11011 March 2009 Downstream Effects for Recirculation Spray System Pumps and Low Head Safety Injection System Pumps Project stage: Other ML0909001932009-03-31031 March 2009 Extension Request Approval Letter Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors, Project stage: Other ML0910501002009-04-21021 April 2009 Correction Letter Extension Request Approval to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors Project stage: Other ML0912501802009-04-30030 April 2009 Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors - Request for Extension of Completion Date for Additional Corrective Actions Project stage: Request L-09-131, Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors - Request for Extension of Completion Date for Additional Corrective Actions2009-04-30030 April 2009 Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors - Request for Extension of Completion Date for Additional Corrective Actions Project stage: Request ML0912400302009-05-0505 May 2009 Extension Request Approval Letter Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors Project stage: Other L-09-152, Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors2009-06-30030 June 2009 Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Supplement ML1002903182010-02-18018 February 2010 RAI, Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors Project stage: RAI ML1008407562010-03-31031 March 2010 Notice of Teleconference Meeting with Firstenergy Nuclear Operating Company Regarding Mutual Understanding of NRR Staffs Request for Additional Information and to Discuss Generic Letter 2004-02 Project stage: RAI ML1013206652010-05-18018 May 2010 Summary of Category 1 Teleconference with Firstenergy Nuclear Operating Company to Discuss NRC Request for Additional Information Regarding Generic Letter 2004-02 Project stage: RAI L-13-176, Generic Safety Issue 191 Resolution Plan2013-05-16016 May 2013 Generic Safety Issue 191 Resolution Plan Project stage: Other 2008-03-21
[Table View] |
Text
~p.~ REGU(
UNITED STATES
~(,"
..q~
~.
0'1' NUCLEAR REGULATORY COMMISSION f3
~.
.L 0
WASHINGTON, D.C. 20555-0001
<I:
0 i!:
<Jl i!:
ca.
?;
May 5, 2009
~;;
of' 1-1)
~O Mr. Peter P. Sena III Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-SEB1 P.O. Box 4, Route 168 Shippingport, PA 15077 SUB~IECT:
BEAVER VALLEY POWER STATION, UNIT NO.1 - EXTENSION REQUEST APPROVAL LETTER RE: GENERIC LETTER 2004-02, "POTENTIAL IMPACT OF DEBRIS BLOCKAGE ON EMERGENCY RECIRCULATION DURING DESIGN BASIS ACCIDENTS AT PRESSURIZED WATER REACTORS," (TAC NO. MC4665)
Dear Mr. Sena:
Generic Letter (GL) 2004-02 identified potential susceptibility of pressurized-water reactor recirculation sump screens to debris blockage during design-basis accidents requiring recirculation operation of emergency core cooling systems (ECCS) or containment spray systems (CSS), and on the potential for additional adverse effects due to debris blockage of flowpaths necessary for ECCS and CSS recirculation and containment drainage. The GL requested that all corrective activities be completed no later than December 31,2007.
By letter dated December 20,2007, you requested an extension for certain activities associated with your response to GL 2004-02. The Nuclear Regulatory Commission (NRC) staff evaluated the information provided in your letter and concluded that for Beaver Valley Power Station, Unit Nos. 1 and 2 (BVPS-1 and 2), it was acceptable to extend the due date for completion of corrective actions until February 29, 2008.
By letter dated February 14, 2008, you requested an extension for certain sump blockage corrective actions associated with your response to GL 2004-02. The NRC staff evaluated the information provided in your letter and concluded that for BVPS-1, it was acceptable to extend the due date for completion of corrective actions until September 30, 2008.
By letter dated August 28,2008, you requested an extension for certain sump blockage corrective actions associated with your response to GL 2004-02. The NRC staff evaluated the information provided in your letter and concluded that for BVPS-1, it was acceptable to extend the due date for completion of GL 2004-02 corrective actions until startup following the spring 2009 refueling outage.
By letter dated April 30, 2009, you requested an extension for certain sump blockage corrective actions associated with your response to GL 2004-02. The NRC staff evaluated the information provided in your letter and concluded that for BVPS-1, as described in the enclosed NRC staffs evaluation, it is acceptable to extend the due date for completion of GL 2004-02 corrective actions until startup following the fall 2010 refueling outage.
P.Sena
- 2 Please contact me at 301-415-1016, if you have any questions on this matter.
Sincerely, adiyah S. Morgan, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-334
Enclosure:
As stated cc w/encl: Distribution via Listserv
EXTENSION REQUEST APPROVAL RELATED TO GL 2004-02 CORRECTIVE ACTIONS FIRSTENERGY NUCLEAR OPERATING COMPANY FIRSTENERGY NUCLEAR GENERATION CORP.
BEAVER VALLEY POWER STATION, UNIT NO.1 DOCKET NO. 50-334 By letter dated April 30, 2009, FirstEnergy Nuclear Operating Company (licensee), requested an extension to the corrective action due date as stated in Nuclear Regulatory Commission (NRC)
Generic Letter (GL) 2004-02, "Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors," (GL 2004-02), for the Beaver Valley Power Station, Unit No.1 (BVPS-1). The stated intent of requesting this extension was to allow additional time for mitigation of additional fibrous insulation material identified during the spring 2009 refueling outage (RFO), on the six reactor vessel (RV) inlet and outlet nozzles. The resulting additional fibrous loading is not bounded by the Reactor Coolant System (RCS) nozzle break scenario assumptions for strainer testing and analysis performed in response to GL 2004
- 02. The licensee requested an extension until startup following the fall 2010 RFO for BVPS-1.
Previously, by letter dated September 30, 2008 (Agencywide Documents Access and Management System (ADAMS) Accession No.ML082740241), the NRC staff had determined that it was acceptable to extend the BVPS-1 GL 2004-02 corrective actions due date until the restart from the spring 2009 RFO. This extension would allow the licensee to complete replacement of certain Temp-Mat fibrous and calcium silicate insulation installed within the reactor cavity penetrations as a transition between vessel nozzles and reflective metal insulation on the RCS piping (hot and cold leg). The licensee stated, in its April 30, 2009, letter, that the above modification was being implemented during the spring 2009 RFO.
The NRC staff has based its review of extension requests for the due date for completion of GL 2004-02 corrective actions on criteria stated in SECY-06-0078. Specifically, an extension may be granted if:
- the licensee has a plant-specific technical/experimental plan with milestones and schedule to address outstanding technical issues with enough margin to account for uncertainties,
- the licensee identifies mitjgative measures to be put in place prior to December 31, 2007, and adequately describes how these mitigative measures will minimize the risk of degraded emergency core cooling system (ECCS) and containment spray system (CSS) functions during the extension period, and For proposed extensions beyond sENeral months, a licensee's request will more likely be accepted if the proposed mitigative measures include temporary physical Enclosure
- 2 improvements to the ECCS sump or materials inside containment to better ensure a high level of ECCS sump performance.
With regard to the first extension criterion, the licensee has provided a plant-specific technical/experimental plan, with milestones and schedules, to complete the GL 2004-02 corrective actions as described in the licensee's letter dated August 28, 2008 (ADAMS Accession No. ML082480045), as supplemented by letter dated October 29, 2008 (ADAMS Accession No. ML083080094). That plan was further modified in the April 30,2009, letter to address the discovery of additional fibrous insulation on the RV nozzles.
With regard to the second extension criterion, the NRC staff considers that, based on the information provided in the licensee's letter dated August 28, 2008, as supplemented by letter dated October 29, 2008, the modifications, mitigation measures, and compensatory measures in effect at BVPS-1 minimize the risk of degraded ECCS and CSS functions during the extension period. The licensee stated in its April 30, 2009, letter that the mitigation measures described in the August 28, 2008, and October 29, 2008, letters remain in effect.
The significant modifications discussed in the licensee's August 28,2008, extension request, in particular the installation of large replacement strainers in both units, satisfies the third extension criterion.
Additionally, based on the information provided by the licensee in its letter dated April 30, 2009, the NRC staff has not identified any issues with the BVPS-1 piping welds connecting the RCS piping to the RV inlet and outlet nozzles, which are associated with the insulation for which the extension is being requested. The piping welds connect the stainless steel RCS loop piping to the RV nozzles, which are carbon steel with stainless steel buttering. The welds were examined in accordance with the licensee's American Society of Mechanical Engineers Boiler and Pressure Vessel Code,Section XI, Inservice Inspection Program during the October 2007 RFO. The examinations included ultrasonic examinations from the piping inner diameter supplemented with eddy current examination. Based on the material composition of these welds and the recent examination history, the NRC staff has no reason to suspect that these welds contain structural integrity issues that might negatively affect the insulation subject to the BVPS-1 extension request.
The NRC staff believes that the licensee has a reasonable plan for BVPS-1 that should result in the completion of final GL 2004-02 corrective actions that provide acceptable strainer function with adequate margin for uncertainties. Furthermore, the NRC staff has concluded that the licensee has put mitigation measures in place at BVPS-1 to adequately reduce risk for the approved extension period discussed below. The NRC staff has high confidence that the associated risk for the new extension period remains low.
Based on the licensee having satisfactorily addressed the NRC GL 2004-02 due date extension criteria as discussed above, the NRC staff finds it is acceptable to extend the completion date for corrective actions associated with the BVPS-1 insulation mitigation, to be accomplished through removal, replacement, analysis or design modification, until startup following the fall 2010 RFO. The licensee has committed to providing a description of the proposed mitigation activities associated with GL 2004-02 to the NRC as a supplemental response prior to the start of the fall 2010 RFO for BVPS-1.
ML091240030
- See memo dated May 1, 2009
- Concurred via email OFFICE LPLI-1/PM LPLI-1/LA DSS/SSIB/BC (A)
DORULPLI-1/BC (A)
NAME NMorgan SLittle**
SBailey*
JBoska DATE 5/5/2009 5/5/2009 5/1/2009 5/5/2009