MONTHYEARML17250B3061999-10-20020 October 1999 Proposed Tech Specs,Consisting of 1999 Changes to TS Bases ML17265A6941999-06-28028 June 1999 Proposed Tech Specs,Revising ITS Associated with RCS Leakage Detection Instrumentation,As Result of Commitment Submitted as Part of Staff Review of Application of leak-before-break Status to Protions of RHR Piping ML17265A6401999-05-12012 May 1999 Rev 11 to Technical Requirements Manual for Ginna Station. ML17265A6261999-04-18018 April 1999 Rev 10 to Technical Requirements Manual (Trm), for Ginna Station ML17311A0701999-04-14014 April 1999 Rev 10 to AP-PRZR.1, Abnormal Pressurizer Pressure. ML17309A6521999-04-14014 April 1999 Rev 14 to AP-RCS.1, Reactor Coolant Leak. ML17309A6531999-04-13013 April 1999 Rev 1 to FIG-2.0, Figure Sdm. with 990413 Ltr ML17265A6111999-03-26026 March 1999 Rev 9 to Technical Requirements Manual for Ginna Station. ML17265A5911999-03-0101 March 1999 Proposed Tech Specs Change Revising Battery Cell Parameters Limit for Specific Gravity (SR 3.8.6.3 & SR 3.8.6.6) ML17265A5571999-02-25025 February 1999 Rev 4 to Technical Requirements Manual (Trm). ML17265A5491999-02-12012 February 1999 to EOP FR-H.5, Response to SG Low Level. ML17265A5481999-02-12012 February 1999 to EOP ATT-22.0, Attachment Restoring Feed Flow. ML17265A5461999-02-12012 February 1999 0 to EOP AP-TURB.1, Turbine Trip Without Rx Trip Required. ML17309A6481999-01-25025 January 1999 Revised Ginna Station Emergency Operating Procedures. with 990125 Ltr ML17265A5151999-01-14014 January 1999 Revised Emergency Operating Procedures,Including Rev 14 to AP-SW.1,rev 3 to ATT-5.2,rev 5 to ATT-8.0,rev 1 to ATT-14.6, Rev 17 to E-1,rev 16 to ECA-1.1,rev 26 to ES-1.3,rev 4 to FR-Z.2 & Index ML17265A5081999-01-0808 January 1999 Rev 7 to Technical Requirements Manual, for Ginna Station ML17265A4961998-12-18018 December 1998 Rev 6 to Technical Requirements Manual. ML20198C0361998-12-14014 December 1998 Rev 11 to ECA-0.2, Loss of All AC Power Recovery with SI Required ML20198C0121998-12-14014 December 1998 Rev 10 to AP-RCS.2, Loss of Reactor Coolant Flow ML20198C0581998-12-14014 December 1998 Rev 5 to FR-Z.1, Response to High Containment Pressure ML20198C0411998-12-14014 December 1998 Rev 16 to FR-C.1, Response to Inadequate Core Cooling ML20198C0521998-12-14014 December 1998 Rev 13 to FR-S.1, Response to Reactor Restart/Atws ML17265A4661998-11-24024 November 1998 Proposed Tech Specs 4.2.1,revising Description of Fuel Cladding Matl & Updating List of References Provided in TS 5.6.5 for COLR ML20155G0301998-10-30030 October 1998 Rev 13 to EOP AP-CCW.1, Leakage Into Component Cooling Loop ML17265A4091998-08-24024 August 1998 Rev 13 to AP-SW.1, Svc Water Leak. W/980824 Ltr ML17265A3721998-07-16016 July 1998 Rev 14 to EOP AP-CW.1, Loss of Circ Water Pump. W/980716 Ltr ML17265A3151998-06-0404 June 1998 Proposed Tech Specs Basis Re Main Steam Isolation Setpoint ML17265A2941998-05-21021 May 1998 Tech Specs Consisting of Submittal Changes for 1998 ML17265A2861998-05-0606 May 1998 Rev 19 to EOP ECA-3.2, SGTR W/Loss of Reactor Coolant Saturated Recovery Desired & Updated ECA Index.W/980506 Ltr ML17265A2461998-04-27027 April 1998 Proposed Tech Specs Revising Requirements Associated W/Sfp to Reflect Planned Mod to Storage Racks & Temporarily Addressing Boraflex Degradation within Pool ML17265A1821998-02-20020 February 1998 Rev 1 to EWR 5111, MOV Qualification Program Plan, Calculation Assumption Verification Criteria. ML17265A1491997-12-31031 December 1997 Rev 1 to Inservice Testing Program. ML17264B0731997-10-14014 October 1997 Rev 4 to Technical Requirements Manual (TRM) for Ginna Station. ML17264B0671997-10-0808 October 1997 Proposed Tech Specs,Correcting & Clarifying Info Re RCS Pressure & Temp Limits Rept Administrative Controls Requirements ML17264B0441997-09-29029 September 1997 Proposed Tech Specs Revising Adminstrative Controls W/ Respect to Reactor Coolant Sys Pressure & Temp Limits Rept ML17264B0391997-09-29029 September 1997 Proposed Tech Specs Revising Allowable Value & Trip Setpoint for High Steam Flow Input Into LCO Table 3.3.2-1,Function 4d (Main Steam Isolation) to Address Issues Identified in Rev Revised Setpoint Analysis Study ML17265A1541997-09-16016 September 1997 Rev 1 to DA EE-92-089-21, Design Analysis Ginna Station Instrument Loop Performance Evaluation & Setpoint Verification. ML17264B0031997-08-19019 August 1997 Proposed Tech Specs Allowing Testing of Three ECCS motor- Operated Valves in Mode 4 Which Currently Requires Entry Into LCO 3.0.3 ML17264A9991997-08-19019 August 1997 Proposed Tech Specs Correcting Specified Accumulator Borated Water Volume Values in SR 3.5.1.2 to Match Associated Accumulator Percent Level Values ML17264A9791997-08-0505 August 1997 Rev 7 to AP-RCS.3, High Reactor Coolant Activity. ML17264A9781997-08-0505 August 1997 Rev 12 to AP-RCS.1, Reactor Coolant Leak. ML17264A9771997-08-0505 August 1997 Rev 11 to AP-RCP.1, RCP Seal Malfunction. ML17264A9751997-08-0505 August 1997 Rev 14 to AP-ELEC.1, Loss of 12A & 12B Busses. ML17264A9851997-08-0404 August 1997 Rev 2 to Summary Description of Compliance w/10CFR73 Amend Protection Against Malevolent Use of Vehicles at Nuclear Power Plants. ML17264A9391997-07-0707 July 1997 Rev 3 to Technical Requirements Manual for Ginna Station, Inserting New Tabs Accordingly Per Previous Transmittal for Rev ML17264A9341997-07-0101 July 1997 to Technical Requirements Manual (TRM) & inter-office Correspondence Dtd 970624 ML17264A9461997-06-20020 June 1997 to Inservice Insp (ISI) Program. ML17264A9241997-06-0303 June 1997 Proposed Tech Specs Clarifying Issues Re Low Temperature Overpressure Protection ML17311A0471997-05-22022 May 1997 Revised Eops,Including Procedures Index,Rev 5 to ATT-15.0, Rev 3 to ATT-15.2,rev 3 to AP-ELEC.3,rev 13 to ECA-0.1 & Rev 9 to ECA-0.2.W/970522 Ltr ML17264A8671997-04-24024 April 1997 Proposed Tech Specs,Revising Rcs,Pt & Administrative Control Requirements 1999-06-28
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML17265A6401999-05-12012 May 1999 Rev 11 to Technical Requirements Manual for Ginna Station. ML17265A6261999-04-18018 April 1999 Rev 10 to Technical Requirements Manual (Trm), for Ginna Station ML17309A6521999-04-14014 April 1999 Rev 14 to AP-RCS.1, Reactor Coolant Leak. ML17311A0701999-04-14014 April 1999 Rev 10 to AP-PRZR.1, Abnormal Pressurizer Pressure. ML17309A6531999-04-13013 April 1999 Rev 1 to FIG-2.0, Figure Sdm. with 990413 Ltr ML17265A6111999-03-26026 March 1999 Rev 9 to Technical Requirements Manual for Ginna Station. ML17265A5571999-02-25025 February 1999 Rev 4 to Technical Requirements Manual (Trm). ML17265A5481999-02-12012 February 1999 to EOP ATT-22.0, Attachment Restoring Feed Flow. ML17265A5491999-02-12012 February 1999 to EOP FR-H.5, Response to SG Low Level. ML17265A5461999-02-12012 February 1999 0 to EOP AP-TURB.1, Turbine Trip Without Rx Trip Required. ML17309A6481999-01-25025 January 1999 Revised Ginna Station Emergency Operating Procedures. with 990125 Ltr ML17265A5151999-01-14014 January 1999 Revised Emergency Operating Procedures,Including Rev 14 to AP-SW.1,rev 3 to ATT-5.2,rev 5 to ATT-8.0,rev 1 to ATT-14.6, Rev 17 to E-1,rev 16 to ECA-1.1,rev 26 to ES-1.3,rev 4 to FR-Z.2 & Index ML17265A5081999-01-0808 January 1999 Rev 7 to Technical Requirements Manual, for Ginna Station ML17265A4961998-12-18018 December 1998 Rev 6 to Technical Requirements Manual. ML20198C0581998-12-14014 December 1998 Rev 5 to FR-Z.1, Response to High Containment Pressure ML20198C0361998-12-14014 December 1998 Rev 11 to ECA-0.2, Loss of All AC Power Recovery with SI Required ML20198C0521998-12-14014 December 1998 Rev 13 to FR-S.1, Response to Reactor Restart/Atws ML20198C0411998-12-14014 December 1998 Rev 16 to FR-C.1, Response to Inadequate Core Cooling ML20198C0121998-12-14014 December 1998 Rev 10 to AP-RCS.2, Loss of Reactor Coolant Flow ML20155G0301998-10-30030 October 1998 Rev 13 to EOP AP-CCW.1, Leakage Into Component Cooling Loop ML17265A4091998-08-24024 August 1998 Rev 13 to AP-SW.1, Svc Water Leak. W/980824 Ltr ML17265A3721998-07-16016 July 1998 Rev 14 to EOP AP-CW.1, Loss of Circ Water Pump. W/980716 Ltr ML17265A2861998-05-0606 May 1998 Rev 19 to EOP ECA-3.2, SGTR W/Loss of Reactor Coolant Saturated Recovery Desired & Updated ECA Index.W/980506 Ltr ML17265A1821998-02-20020 February 1998 Rev 1 to EWR 5111, MOV Qualification Program Plan, Calculation Assumption Verification Criteria. ML17265A1491997-12-31031 December 1997 Rev 1 to Inservice Testing Program. ML17264B0731997-10-14014 October 1997 Rev 4 to Technical Requirements Manual (TRM) for Ginna Station. ML17265A1541997-09-16016 September 1997 Rev 1 to DA EE-92-089-21, Design Analysis Ginna Station Instrument Loop Performance Evaluation & Setpoint Verification. ML17264A9751997-08-0505 August 1997 Rev 14 to AP-ELEC.1, Loss of 12A & 12B Busses. ML17264A9771997-08-0505 August 1997 Rev 11 to AP-RCP.1, RCP Seal Malfunction. ML17264A9791997-08-0505 August 1997 Rev 7 to AP-RCS.3, High Reactor Coolant Activity. ML17264A9781997-08-0505 August 1997 Rev 12 to AP-RCS.1, Reactor Coolant Leak. ML17264A9851997-08-0404 August 1997 Rev 2 to Summary Description of Compliance w/10CFR73 Amend Protection Against Malevolent Use of Vehicles at Nuclear Power Plants. ML17264A9391997-07-0707 July 1997 Rev 3 to Technical Requirements Manual for Ginna Station, Inserting New Tabs Accordingly Per Previous Transmittal for Rev ML17264A9341997-07-0101 July 1997 to Technical Requirements Manual (TRM) & inter-office Correspondence Dtd 970624 ML17264A9461997-06-20020 June 1997 to Inservice Insp (ISI) Program. ML17311A0471997-05-22022 May 1997 Revised Eops,Including Procedures Index,Rev 5 to ATT-15.0, Rev 3 to ATT-15.2,rev 3 to AP-ELEC.3,rev 13 to ECA-0.1 & Rev 9 to ECA-0.2.W/970522 Ltr ML20140B8291997-03-24024 March 1997 Rev 3 to EOP ATT-12.0, Attachment N2 Porvs ML17264A8221997-02-0606 February 1997 Rev 15 to FR-P.1, Response to Imminent Pressurized Thermal Shock Condition. ML17264A8201997-02-0606 February 1997 Rev 7 to AP-RCC.2, Rcc/Rpi Malfunction. ML17264A8081997-01-23023 January 1997 Revised Emergency Operating Procedures,Including Rev 14 to E-1,Rev 19 to E-3,Rev 14 to ECA-2.1,Rev ECA-3.3,Rev 20 to ES-1.3,Rev 13 to FR-C.1,Rev 12 to FR-C.2 & Rev 14 to FR-P.1 ML20133N3351997-01-10010 January 1997 Rev 7 to FR-C.3, Response to Saturated Core Cooling ML17264A8881996-10-10010 October 1996 Rev 9 to ODCM for Ginna Station. ML20128N0681996-10-0303 October 1996 Revised Emergency Operating Procedures,Including Rev 5 to Att-10.0, Attachment Faulted S/G & Rev 6 to Att-16.0, Attachment Ruptured S/G ML17264A5311996-05-31031 May 1996 Revised Emergency Operating Procedures,Including Rev 10 to AP-RCP.1,Rev 12 to ECA-0.1,Rev 12 to ECA-2.1,Rev 3 to FR-H.2,Rev 3 to FR-H.4,Rev 7 to FR-I.1,Rev 12 to FR-P.1,Rev 10 to FR-S-1 & Rev 6 to FR-S.2 ML17264A5161996-05-22022 May 1996 Rev 2 to Technical Requirements Manual (TRM) ML17264A4581996-04-0808 April 1996 Rev 7 to ODCM for Ginna Station. ML17264A4371996-04-0101 April 1996 Rev 1 to Technical Requirements Manual (TRM) ML17264A4391996-04-0101 April 1996 Rev 1 to Updated Technical Requirements Manual (TRM) ML17264A4191996-02-24024 February 1996 Rev 0 to Technical Requirements Manual (Trm). ML17264A6901996-02-23023 February 1996 Rev 0 to Inservice Testing Program. 1999-05-12
[Table view] |
Text
GINNA STATION TRIVl Revision 0 TECH ICAL REQUIR MENTS MANUAL (T)R sponsible Manager Eff tive Oate N/p~Controlled Copy Ho.~~/96040101S9 960224 PDR ADOCK 05000244 P P DFt
List of Effective Pages (TAM)Pa e Rev.TOC Pa e Rev..Section 3.4 Pa e Rev.Pa e Rev~Section 1.0 TRH 1.0-1 Section 2.0 ,TRH 2.0-1 Section 3.0 TRH 3.0-1 Section 3.1 TRH 3.1-1 TRH 3.1-2 TRM 3.1-3 TRH 3.1-4 TRH 3.1-5 TRM 3.1-6 TRM 3.1-7 TRH 3.1-8 TRH 3.1-9 Section 3.2 TRH 3.2-1 Section 3.3 TRH 3.3-1 TRH 3.3-P TRH 3.3-3 TRH 3.3-4 TRM 3.3-5 TRH 3.3-6 TRM 3.4-1 TRM 3.4-2 TRM 3.4-3 TRM 3.4-4 TRH 3.4-5 TRH 3.4-6 TRM 3.4-7 Section 3.5 TRH 3.5-1 Section 3.6 TRH 3.6-1 Section 3.7 TRH 3.7-1 Section 3.8 TRH 3.8-1 TRH 3.8-'2 TRH 3.8-3 Section 3.9 TRM 3.9-1 TRH 3.9-2 TRM 3.9-3 TRH 3,9-4 0 0 0 0'0 0 0 ip 0 0 0-LEP-i
TABLE OF CONTENTS 1.0 2.0 3.0 3.0 3.1 3.1.1 3.1.2 3.1.3 3.2 3.3 3.3,1 3.3.2 3.3.3 3.4 3.4.1 3.4.2 3.5 3.6 USE ANO APPLICATION SAFETY LIHITS (SLs)LIMITING CONDITION FOR OPERATION (LCO)APPLICABILITY SURVEILLANCE RE(UIREMENT (SR)APPLICABILITY REACTIVITY CONTROL SYSTEMS.Boron Injection System-MODES 1, 2, 3, and Boron Injection System-HOOES 5 and 6 Rod Group Alignment Limits Safety Analyses Re-Evaluation POWER OISIN'IBUT'ON LIHITS 4 INSTRUMENTATION Control Room Emergency Air Treatment System (CREATS)Instrumentation Circulating Water Flood Protection Instrumentation
.Movable In-Core Instrumentation REACTOR COOLANT SYSTEH (RCS)Reactor Vessel Head Vents RCS Chemistry EMERGENCY CORE COOLING SYSTEHS (ECCS)CONTAINMENT SYSTEHS 1.0-1 2.0-1 3.0-1 3.0-1 3.1-1 3.1-1 3.1-6 3.1-8 3.2-1 3.3-1 3.3-1 3.3-3 3.3-6 3.4-1 3.4-1 3.4-3 3.5-I 3.'6-1 3.7 PLANT SYSTEMS I~~3.7-1 3.8 3.8.1 3.8.2 3~9 3,9.1 3.9.2 3,9.3 ELECTRICAL POWER SYSTEHS Offsite Power Sources Diesel Generator (OG)Load Sequencer.REFUELING OPERATIONS Fuel Storage in Spent Fuel Pool (SFP)Region Fuel Assembly Hovement in Auxiliary Building Refueling Hanipulator Crane Interlocks
,~~~2~~~3.8-1 3.8-1 3.8-2 3.9-1 3,9-1 3.9-2 3.9-4 M%%RtJKK JRR~SGinna Station TRM Revision 0
3.0 LIHITIHG
COHOITIONS FOR OPERATION (LCO)APPLICABILITY SURVE ILLAHCE REOUIREHEHT (SR)APPLICABILITY The Technical Requirements (TRs)in this manual follow the same LCO applicabi lities as the Improved Technical Specifications with the exception of LCO 3.0.6 which deals solely with ITS LCOs on support/supported system inoperabilities.
The Technical Surveillance Requirements (TSRs)in this manual follow the same SR apiplicabilities as the Improved Technical Specifications.
The TRs in this manual also-follow the same organization as the Improved Technical Specifications (e.g., Reactivity Control System requirements are contained in TR Chapter 3,1).Ginna Station TRH TRH 3.0-l" Revision 0
ACTIONS continued CONDITION REQUIRED ACTIONS COMPLETION TIHE D.Required Action and associated Completion Time of Condition C not met.D.I Be in MODE 5, 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> E.Both boron injection subsystems inoperable.
E.I Enter LCO 3'.3.Immediately Ginna Station TRH TRH 3.1-2 Revision 0 Boron injection System-MODES 5 and 6 IR 3.1.2 3.1 REACTIVITY CONTROL SYSTEMS 3.1,2 Boron Injection System-MODES 5 and 6 TR 3.1.2 One boron injection subsystem shall be OPERABLE.APPLICABILITY:
MODES 5 and 6.ACTIONS CONDITION RE(VIREO ACTIONS COMPLETION TIHE A.Required boron injection subsystem inoperable.
0*4 A.l Suspend CORE ALTERATIONS.
AND A.2 Suspend positive reactivity changes.AND~*.o A.3 Initiate action to restore required boron injection subsystem to OPERABLE st'atus.Immedi a te1 y Immediately Immediately Ginna Station TRH TRM 3.1-6 Revision 0
~I I I I~I
C REATS Toxic Ga s Instrumentation lR 3.3.1 3.3 IHSTRUHEHTATION
3.3.1 Control
Room Emergency Air Treatment System (CREATS)Toxic Gas Instrumentation TR 3.3.1 The CREATS actuation instrumentation for each toxic gas Function in Table TR 3.3.1-1 shall be OPERABLE.APPLICABILITY:
HOOES 1, 2, 3, 4, 5'and 6.ACTIONS-HOTE-CREATS air intake may be unisolated fnr up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per day for fresh air makeup to improve the working environment in the control room.COHO I T ION, RE/VIREO ACTIONS COMPLETION TINE A.One or more toxic gas functions with one channel inoperable, A.I Place CREATS in HOOE F.1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> SURVEILLANCE RE(jUIREHENTS SURVEILLANCE FRE(UEHCY TSR 3.3.1.1 Perform COT.31 days TSR 3.3.1.2 Perform CHANNEL CALIBRATION.
)8 months Ginna Station TRH 3.3-1 Revision 0
'Circulating Water Flood Protection Instrumentation TR 3.3.2 3.3 INSTRUHENTATION
3.3.2 Circulating
Water Flood Protection Instrumentation TR 3.3.2 The Circulating Water Flood Protection instrumentation for'each Function in Table TR 3.3.2-I shall he OPERABLE.APPLICABILITY:
HODES I and 2.ACTIONS-NOTE------
Separate Condition entry is allowed for each set.CONDITION REQUIRED ACTION COHPLET ION T IHE A.One or more Functions with one required channel in one or more set(s)inoperable.
Initiate action to verify that affected function set is OPERABLE.Immediately B.One or more Functions with two or more required channels per set inoperable.
B.I Restore set to OPERABLE status.7 days C.One or more Functions wl th both sets inoperable.
C.I Restore at least one set to OPERABLE" status.24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> D.Required Action and Assn~i~ted Completion Time rut met.D.l Be in MODE 3.6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Ginna Station TRH 3.3-3 Revision 0
t eactor Vessel fiead Vents TR 3.4.1 3.4 RfACTOR COOLANT SYSTEM (RCS)3.4.1 Reactor Vessel Head Vents TR 3.4.1 Two reactor vessel head vent valves, in one vent flow path, shall be OPERABLE and closed.APPL I CAB IL I TY: 'OOES 1, 2, and 3.'CT IONS CONO I T ION REQUIRED ACTIONS COMPLETION TIHE A.One or more required reactor vessel head vent valves inoperable.
OR One or more required reactor vessel head vent valves open.-------------NOTE------------
LCO 3.0.4 is not applicable.
Initiate action to close required vent valve(s).A.2 Initiate action to remove motive power I'rom each required vent valve actuator.Immediately Immediately AD 3 Restore required reactor vessel head vent valve(s)to OPfRABLE status.30 days B.Required Actions and associated Completion Time not met.B.l Be in HOOE 3.6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> B.2 Be in MOOE 4.36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Ginna Station TRH TRH 3.4-1 Revision 0
Reactor Vesse)>lead Vents TR 3.4.1 SURVEILLANCE REQUIREHENTS SURVEILLANCE FREQUENCY TSR 3.4.1.1 Verify the required reactor hea'd vent manual isolation valves are locked open.18 months TSR 3.4.1.2 Verify flow through the required reactor vessel head vent path using either liquid or gas.10 monthsGinna Station TRH TRH 3.4-2 Revision 0
3.7 PLANT
SYSTEHS There are no technical requirements associated with this Chapter.I IGinna Station...TRH 3.7-1 Revision 0 V.e l' Refueling Manip Lor Crane interlocks TR 3.9.3'l 3.9 REFUELING OPERAl I ONS 3.9.3 Refueling Manipulator Crane Interlocks TR 3.9.3 The refueling manipulator crane interlocks shall be OPERABLE.APPLICABILITY:
During use nf the refueling manipulator crane with fuel in the vessel.ACTIONS CONDITION REQUIRED ACTION COHPLETION TIHE A.Refuel ing manipul ator crane interlocks inoperable.
A.I Suspend use of refueling manipulator
--crane.Immedi~te 1 y SURVEILLANCE RE(U I REMEN TS SURVEILLANCE FREQUENCY TSR 3.9,3.1 Veri fy the refuel ing manipulator crane interlocks are OPERABLE.Once prior to refueling operations 0 Ginna Station TRH TRH 3.9-: Revision 0