Letter Sequence Request |
---|
|
|
MONTHYEARRA-18-0048, Corrected Technical Specification Pages for TSTF-425 License Amendment Request2018-09-25025 September 2018 Corrected Technical Specification Pages for TSTF-425 License Amendment Request Project stage: Request ML18274A2632018-09-28028 September 2018 NRR E-mail Capture - Robinson Draft RAIs - LAR to Allow Implementation of the Provisions 10 CFR 50.69 (EPID L 2018-LLA-0095) and LAR to Adopt TSTF-425 Project stage: Draft RAI ML18288A0192018-10-12012 October 2018 NRR E-mail Capture - Robinson RAIs - LAR to Allow Implementation of the Provisions 10 CFR 50.69 (EPID L 2018-LLA-0095) and LAR to Adopt TSTF-425 Project stage: RAI RA-18-0194, Response to NRC Request for Additional Information (RAI) Regarding Application to Adopt TSTF-425, Revision 32018-11-13013 November 2018 Response to NRC Request for Additional Information (RAI) Regarding Application to Adopt TSTF-425, Revision 3 Project stage: Response to RAI RA-19-0308, Clean Technical Specifications Pages Regarding Application to Adopt TSTF-425, Revision 32019-07-16016 July 2019 Clean Technical Specifications Pages Regarding Application to Adopt TSTF-425, Revision 3 Project stage: Request ML19158A3072019-08-15015 August 2019 Issuance of Amendment No. 265, Regarding Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b Project stage: Approval 2018-09-25
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000261/20230042024-01-31031 January 2024 Integrated Inspection Report 05000261/2023004 ML24009A2432024-01-25025 January 2024 Unit, No. 2 - Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0047 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24009A2712024-01-24024 January 2024 Revision to Reactor Vessel Material Surveillance Capsule Withdrawal Schedule ML23354A0052024-01-0808 January 2024 Request for Withholding Information from Public Disclosure, H. B. Robinson Steam Electric Plant, Unit No. 2 ML23342A0902023-12-0808 December 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000261/20234202023-11-30030 November 2023 Security Baseline Inspection Report 05000261/2023420 (Cover Letter with Report) IR 05000261/20230102023-11-28028 November 2023 Fire Protection Team Inspection Report 05000261/2023010 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000261/20230032023-11-0707 November 2023 Integrated Inspection Report 05000261 2023003 and 07200060 2023001 ML23226A0862023-10-12012 October 2023 Issuance of Amendment No. 277 Regarding Revision of TSs to Add High-High Steam Generator Level Function to Table 3.3.2-1 and Remove Obsolete Content from TSs 2.1.1.1 and 5.6.5.b ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML23235A0552023-08-23023 August 2023 Notification of an Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000261/2023010) and Request for Information (RFI) IR 05000261/20230052023-08-21021 August 2023 Updated Inspection Plan for H.B. Robinson Steam Electric Plant (Report 05000261/2023005) IR 05000261/20230022023-08-0707 August 2023 Integrated Inspection Report 05000261/2023002 IR 05000261/20234022023-05-30030 May 2023 Cyber Security Inspection Report 05000261/2023402 ML23145A1602023-05-25025 May 2023 Submittal of Updated Final Safety Analysis Report (Revision No. 30), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 28), Technical Specifications Bases Revisions, Quality IR 05000261/20230012023-05-0202 May 2023 Integrated Inspection Report 05000261/2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000261/20220062023-03-0101 March 2023 Annual Assessment Letter for H.B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2022006) ML23047A4512023-02-21021 February 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000261/2023402 ML23041A2272023-02-13013 February 2023 2022 Q4 Robinson_Workflow Final ML22329A2982023-01-19019 January 2023 Issuance of Amendment No. 274 Regarding Revision of Technical Specification 3.8.1 Surveillance Requirement 3.8.1.16 ML22294A0922022-12-15015 December 2022 Issuance of Amendment No. 273 Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML22339A1362022-12-0101 December 2022 2023 Requalification Program Inspection - H.B. Robinson Nuclear Plant ML22322A1322022-11-18018 November 2022 301, NRC Operator License Examination Report & Cover Letter Merged ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000261/20220032022-11-0303 November 2022 Integrated Inspection Report 05000261 2022003 IR 05000261/20224022022-10-19019 October 2022 Security Baseline Inspection Report 05000261/2022402 IR 05000261/20220102022-09-26026 September 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000261/2022010 IR 05000261/20223012022-09-23023 September 2022 301 Operator License Exam Approval Letter (05000261/2022301) ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports IR 05000261/20220052022-08-26026 August 2022 Updated Inspection Plan for the H.B Robinson Steam Electric Plant - Report 05000261/2022005-Final IR 05000261/20214042022-08-10010 August 2022 Reissue - H.B. Robinson Steam Electric Plant Security Baseline Inspection Report 05000261/2021404 IR 05000261/20220022022-08-0909 August 2022 Integrated Inspection Report 05000261 2022002, 07200060 2022001 and Exercise of Enforcement Discretion ML22213A0682022-08-0505 August 2022 Request for Withholding Information from Public Disclosure for H. B. Robinson Steam Electric Plant, Unit 2 ML22193A2122022-08-0404 August 2022 Request of Alternatives to ASME Code Section XI Subsection IWE Requirements for Containment Inspections ML22159A2952022-08-0303 August 2022 Issuance of Amendment No. 271 Regarding Correction to Non-Conservative Technical Specifications Figure 3.4.3-2, Pressure/Temperature Limit Cooldown Curves IR 05000261/20220112022-07-19019 July 2022 Biennial Problem Identification and Resolution Inspection Report 05000261/2022011 ML22167A1702022-07-14014 July 2022 Closeout of Generic Letter 2004 02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML22046A0222022-06-14014 June 2022 Issuance of Amendments to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML22125A1942022-05-12012 May 2022 Request for Withholding Information from Public Disclosure for H.B. Robinson Steam Electric Plant, Unit 2 IR 05000261/20220012022-05-0202 May 2022 Integrated Inspection Report 05000261/2022001 IR 05000261/20224012022-04-19019 April 2022 Security Baseline Inspection Report 05000261/2022401 ML22098A2262022-04-11011 April 2022 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML22083A0032022-03-29029 March 2022 Closeout of Bulletin 2012 01, Design Vulnerability in Electric Power System IR 05000261/20210062022-03-0202 March 2022 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 (Report No. 05000261/2021006) 2024-01-08
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARRA-23-0121, License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area2023-10-0505 October 2023 License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area RA-22-0290, License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology2023-08-30030 August 2023 License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies2023-02-0101 February 2023 License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies RA-22-0280, Supplement to License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-10-0404 October 2022 Supplement to License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections RA-22-0153, License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 and Update the List of Analytical Methods Used in the Determination of Core.2022-09-21021 September 2022 License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 and Update the List of Analytical Methods Used in the Determination of Core. RA-21-0183, Remove 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 (Automatic Transfer Capability from Unit Auxiliary Transformer to Startup Transformer)2022-04-28028 April 2022 Remove 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 (Automatic Transfer Capability from Unit Auxiliary Transformer to Startup Transformer) RA-20-0107, Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-01-18018 January 2022 Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position RA-22-0017, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-01-0606 January 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections RA-21-0197, William, Units 1 and 2, License Amendment Request to Relocate the Duke Energy Emergency Operations Facility2021-12-14014 December 2021 William, Units 1 and 2, License Amendment Request to Relocate the Duke Energy Emergency Operations Facility RA-21-0254, Correction to Non-Conservative Technical Specifications Figure 3.4.3-2, Pressure/ Temperature Limit Cooldown Curves2021-12-0909 December 2021 Correction to Non-Conservative Technical Specifications Figure 3.4.3-2, Pressure/ Temperature Limit Cooldown Curves RA-21-0076, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-12-0909 December 2021 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections RA-19-0043, Duke Energy - Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO2021-06-0909 June 2021 Duke Energy - Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML20093J0982020-08-21021 August 2020 Issuance of Amendment No. 269 Regarding Technical Specification Change Incorporating Three New Feedwater Bypass Isolation Valves RA-20-0007, Request to Correct Administrative Renewed Facility Operating License Error2020-01-21021 January 2020 Request to Correct Administrative Renewed Facility Operating License Error RA-19-0183, License Amendment Request to Add New Feedwater Bypass Valves to Technical Specification 3.7.32019-07-29029 July 2019 License Amendment Request to Add New Feedwater Bypass Valves to Technical Specification 3.7.3 RA-19-0006, License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description2019-07-0808 July 2019 License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description RA-18-0206, Supplement for License Amendment Request to Self-Perform Core Reload Design and Safety Analyses2018-11-0606 November 2018 Supplement for License Amendment Request to Self-Perform Core Reload Design and Safety Analyses RA-18-0048, Corrected Technical Specification Pages for TSTF-425 License Amendment Request2018-09-25025 September 2018 Corrected Technical Specification Pages for TSTF-425 License Amendment Request ML18130A8072018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications RA-18-000, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications2018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications RNP-RA/18-0015, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequently Requirements to a Licensee Controlled Program2018-04-16016 April 2018 Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequently Requirements to a Licensee Controlled Program ML18099A1302018-04-0505 April 2018 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors. ML18038B2892018-02-0707 February 2018 License Amendment Request Proposing to Revise Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) Limits RA-17-0005, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing2017-11-0707 November 2017 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing ML17205A2332017-09-29029 September 2017 Issuance of Amendment Regarding Request to Modify the Licensing Basis Alternate Source Term RNP-RA/17-0037, License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specifications 3.8.1, AC Sources-Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers2017-09-27027 September 2017 License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specifications 3.8.1, AC Sources-Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers RA-17-0001, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules2017-07-18018 July 2017 Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules RNP-RA/17-0014, Resubmittal of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2017-04-0303 April 2017 Resubmittal of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RA-16-0019, Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Proces2016-09-27027 September 2016 Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Process RNP-RA/16-0044, Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2016-09-16016 September 2016 Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/16-0057, License Amendment Request to Modify the Licensing Basis Alternate Source Term2016-09-14014 September 2016 License Amendment Request to Modify the Licensing Basis Alternate Source Term ML16116A0332016-04-24024 April 2016 Application for Technical Specification Change to Adopt Technical Specifications Task Force (TSTF)-339, Relocate TS Parameters to the COLR Consistent with WCAP-14483, Revision 2 RA-16-0003, Application to Revise Technical Specifications to Adopt Methodology Reports DPC-NF-2010, Revision 3, Nuclear Physics Methodology for Reload Design, and DPC-NE-2011-P, Revision 2, Nuclear Design Methodology Report...2016-02-0303 February 2016 Application to Revise Technical Specifications to Adopt Methodology Reports DPC-NF-2010, Revision 3, Nuclear Physics Methodology for Reload Design, and DPC-NE-2011-P, Revision 2, Nuclear Design Methodology Report... RA-15-0040, License Amendment Request, Change in Corporate Form of Duke Energy Progress2016-02-0101 February 2016 License Amendment Request, Change in Corporate Form of Duke Energy Progress RNP-RA/15-0117, Supplement to Request for Technical Specification Change to Reactor Coolant System Pressure and Temperature Limits2015-12-22022 December 2015 Supplement to Request for Technical Specification Change to Reactor Coolant System Pressure and Temperature Limits RNP-RA/15-0090, Proposed Amendment to Technical Specification 5.5.16 for the Adoption of Option B of 10 CFR 50, Appendix J for Type B and Type C Testing and the Permanent Change in 10 CFR 50, Appendix J, Integrated Leak Rate Test Interval And..2015-11-19019 November 2015 Proposed Amendment to Technical Specification 5.5.16 for the Adoption of Option B of 10 CFR 50, Appendix J for Type B and Type C Testing and the Permanent Change in 10 CFR 50, Appendix J, Integrated Leak Rate Test Interval And.. RA-15-0031, Application to Revise Technical Specifications for Methodology Report DPC-NE-1008-P, Revision 0, Nuclear Design Methodology Using CASMO-5/Simulate-3 for Westinghouse Reactors.2015-08-19019 August 2015 Application to Revise Technical Specifications for Methodology Report DPC-NE-1008-P, Revision 0, Nuclear Design Methodology Using CASMO-5/Simulate-3 for Westinghouse Reactors. RNP-RA/13-0117, License Amendment Request to Modify Technical Specification 3.3.1, Reactor Protection System (RPS) Instrumentation2014-02-10010 February 2014 License Amendment Request to Modify Technical Specification 3.3.1, Reactor Protection System (RPS) Instrumentation RA-13-1001, License Amendment Request - Cyber Security Plan Implementation Schedule Milestone 82013-12-19019 December 2013 License Amendment Request - Cyber Security Plan Implementation Schedule Milestone 8 RNP-RA/13-0002, License Amendment Request to Modify Technical Specification 3.1.7 to Delete the Monthly Rod Position Indication Surveillance Requirements2013-06-0707 June 2013 License Amendment Request to Modify Technical Specification 3.1.7 to Delete the Monthly Rod Position Indication Surveillance Requirements BSEP 13-0013, License Amendment Request to Facility Operating Licenses for Change of Licensee Name2013-04-20020 April 2013 License Amendment Request to Facility Operating Licenses for Change of Licensee Name RA-12-031, Carolina Power & Light Company and Florida Power Corporation'S License Amendment Request - Cyber Security Plan Implementation Schedule Milestones2012-09-12012 September 2012 Carolina Power & Light Company and Florida Power Corporation'S License Amendment Request - Cyber Security Plan Implementation Schedule Milestones ML12263A4242012-09-0606 September 2012 License Amendment Request to Delete Technical Specification Reactor Protection System Trip on Steam Generator Water Level Low Coincident with Steam Flow/Feedwater Flow Mismatch RNP-RA/12-0057, License Amendment Request for Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection and Application of Permanent Alternate Repair Criteria (H*)2012-08-29029 August 2012 License Amendment Request for Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection and Application of Permanent Alternate Repair Criteria (H*) RNP-RA/12-0033, Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process2012-08-0606 August 2012 Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process RNP-RA/12-0028, Request for Technical Specification Changes Regarding TS 3.1.4 Rod Group Alignment Limits and TS 3.1.7 Rod Position Indication2012-06-0808 June 2012 Request for Technical Specification Changes Regarding TS 3.1.4 Rod Group Alignment Limits and TS 3.1.7 Rod Position Indication RA-11-010, Progress Energy Carolinas, Inc., & Progress Energy Florida, Inc., Submittal of Application for Approval of Indirect Transfers of Control of License Pursuant to 10 CFR 50.80 and 10 CFR ,72.502011-03-30030 March 2011 Progress Energy Carolinas, Inc., & Progress Energy Florida, Inc., Submittal of Application for Approval of Indirect Transfers of Control of License Pursuant to 10 CFR 50.80 and 10 CFR ,72.50 RNP-RA/10-0117, Request for Technical Specification Changes to Section 3.8.3, Diesel Fuel Oil and Starting Air, and Section 3.8.5, DC Sources - Shutdown2011-01-20020 January 2011 Request for Technical Specification Changes to Section 3.8.3, Diesel Fuel Oil and Starting Air, and Section 3.8.5, DC Sources - Shutdown RA-10-011, Request for Approval of the Carolina Power & Light Company and Florida Power Corporation Cyber Security Plan2010-07-0808 July 2010 Request for Approval of the Carolina Power & Light Company and Florida Power Corporation Cyber Security Plan 2023-08-30
[Table view] |
Text
(-, DUKE ENERGY Serial: RA-18-0048 SEP 2.5. io18 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261 / RENEWED LICENSE NO. DPR-23 Ernest J. Kapopoulos, Jr. H. B. Robinson Steam Electric Plant Unit 2 Site Vice Presidenl Duke Energy 3581 West Entrance Roaa Hartsville, SC 29550 0: 843-951-1701 F: 843-951-1319 Emie.Kapopoulos@duke-energy
.com 10 CFR 50.90
SUBJECT:
CORRECTED TECHNICAL SPECIFICATION PAGES FOR TSTF-425 LICENSE AMENDMENT REQUEST
REFERENCES:
- 1. Duke Energy letter, Application For Technical Specifications Change Regarding Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425 , Revision 3), dated April 16, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 18117 A006) Ladies and Gentlemen:
In Reference 1, Duke Energy Progress, LLC (Duke Energy) submitted a request for an amendment to the Technical Specifications (TS) for H.B. Robinson Steam Electric Plant, Unit No. 2 (HBRSEP).
The proposed amendment would modify HBRSEP's TS by relocating specific Surveillance Frequencies to a licensee-controlled program. Per subsequent discussion with the NRG Project Manager regarding the Reference 1 submittal, a subset of the proposed TS page changes have been revised and are provided in Attachment
- 1. These proposed TS page changes supersede the respective TS pages in Attachment 3 of Reference
- 1. No new commitments have been made in this submittal.
If you have additional questions, please contact Mr. Kevin Ellis, Manager -Regulatory Affairs, at 843-951-1329.
I declare under penalty of perjury that the foregoing is true and correct. Executed on 2 < Sff~6f~o18. Sincere!~~ Ernest J. Kapopoulos, Jr. Site Vice President U.S. Nuclear Regulatory Commission RA-18-0048 Page2 EJK/jbd Attachments:
cc: 1. Revision of Proposed Technical Specification Page Changes C. Haney, Regional Administrator USNRC Region II J. Rotton, USNRC Senior Resident Inspector
-RNP D. J. Galvin, NRR Project Manager -RNP L. Garner, Manager, Radioactive and Infectious Waste Management Section (SC) A Wilson, Attorney General (SC) S. E. Jenkins, Chief, Bureau of Radiological Health (SC)
U.S. Nuclear Regulatory Commission RA-18-0048 Page3 bee: Chris Nolan Art Zaremba Kate Nolan David Cummings File: (Corporate)
Electronic Licensing Library (ELL) Kevin Ellis Christine Caudell (For RNP Licensing/Nuclear Records Files)
Attachment 1 RA-18-0048 Attachment 1 Revision of Proposed Technical Specification Page Changes
- 1. 1 Definitions SHUTDOWN MARGIN ( confi nued) SLAVE RELAY TEST THERMAL POWER Definitions 1.1 a. Al.1 .rod cluster .cont~ol assemblies
.CRCCAs} are fully inserted except for the single RCCA of highest reactivity worth. which is assumed to be fully withdrawn.
With any RCCA not capable -0f being fully inserted.
the reactivity worth of the RCCA llllst be accounted for in the determination of SOM: and b. In MODES 1 and 2. the fuel and moderator temperatures are changed to 547°F. A SLAVE RELAY TEST shall -consist of energizing each slave relay and verifying the OPERABILITY of each slave relay. The SLAVE RELAY TEST shall include, as a minimum. a continuity check of associated testa~le actuation devices. THERMAL POWER shall be the*total reactor core heat transfer rate to the reactor coolant. * .... TRIP-ACTUATING-DEVICE--*---A -TAOOTshall
-consisY of operating the trip . OPERATIONAL TEST actuating device and verifying the OPERABILITY
- of (TAD0T) required alarm. interlock.
display, and trip . functions.
The TADOT shall include adjustment.
as necessary.
of the trip a'ctuating device so that it actuates at the required setpoint within the required accuracy.
HBRSEP Unit No. 2 1.1-5 Amendment No.~
Rod Group Alignment Limits 3.1.4 SURVEILLANCE REQUIREMENTS (continued}
SR 3.1.4.2 SR 3.1.4.3 SURVEILLANCE Verify rod freedom of movement (trippability) by moving each rod not fully inserted in the core~ 10 steps in either direction.
Verify rod drop time of each rod, from the fully withdrawn position, is~ 1.8 seconds from the beginning of decay of stationary gripper coil voltage to dashpot entry, with: a. Tavo 540°F; and b. All reactor coolant pumps operating.
HBRSEP Unit No. 2 3.1-9 FREQUENCY 92 days l1N~T1 I Prior to reactor criticality after each removal of the reactor head Amendment No. m
~URVEILLANCE REQUIREMENTS RPS Instrumentation 3.3.1 *******-**--------**********-***-**~-NOTE-*--*-*******-********************-**
Refer to Table 3.3.1-1 to determine which SRs apply for each RPS Function.
SURVEILLANCE SR 3.3.1.1 Perform CHANNEL CHECK. SR 3.3.1.2 *-**--*---*-***----NOTES---*---*---*--*----
SR 3.3.1.3 1. Adjust NIS channel if absolute difference is> 2X. 2. Not required to be.performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after THERMAL POWER is 2: lSt RTP. Compare results of calorimetric heat balance calculation to Nuclear Instrumentation System CNIS) channel output. -*------------*---*NOTES--------*----------
- 1. Adjust NIS channel if absolute difference is 2: 3t. 2. Not required to be performed until 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> after THERMAL POWER is 2:: 15.t RTP. Compare results of the incore detector measurements to NIS AFD. HBRSEP Unit No. 2 3.3-8 FREQUENCY 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> tjlNSERT 1 I 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> PN~T 1 I l1N,RT1 j 31 effecti -.,e full power days CEFPD) (continued)
Amendment No. 116 u u RCS Loops -MOOE 4 3.4.6 Ar~TTONS < cont i n1 ,Pn) -CONDITION REQUIRED ACTION B. One required loop B.1 Be in MODE 5. or train inoperable.
MID One required RHR train OPERABLE.
C. Two required loops or C.1 Suspend operations trains inoperable.
that would cause introduction into the OR RCS. coolant with boron concentration Required loop or train less than required to not in operation.
meet SDM of LCO 3.1.1. MID C.2 Initiate action to restore one loop or train to OPERABLE status and operation.
SURVEILLJI.NCE SR 3.4.6.1 Verify one RHR train or RCS loop is in operation.
SR 3.4.6.2 Verify SG secondary side water levels are 16t for required RCS loops. SR 3.4.6.3 Verify correct breaker alignment and indicated power are available to the required pump that is not in operation.
COMPLETION TIME 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Immediately Immediately FREQUENCY 12 ho1:1rs tjlNSERT 1 I 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> tjlNSERT 1 I 7 days tjlNSERT 1 I HBRSEP Unit No. 2 3.4-15 Amendment No. 176,199 f .~AR 1 2G01 CONDITION REQUIRED ACTION D. Required Action and D.1 Bein MODE 3. associated Completion Time of Condition B or C AND. not met. D.2 Bein MODE4. SURVEILLANCE REQUIREMENTS SR 3.4.9.1 SR 3.4.9.2 SR 3.4.9.3 SURVEILLANCE Verify pressurizer water level is within limits. Verify capacity of required pressurizer heaters is i:!: 125 kW. Verify required pressurizer heaters are capable of being powered from an emergency power supply. HBRSEP Unit No. 2 3.4-22 Pressurizer
3.4.9 COMPLETION
TIME 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 12 hours FREQUENCY
~fS ~INSERT 1 I 24 moAths I 24 months ~---' YINSERT 1 j Amendment No. 268 V ,\CTIONS CONDITION REQUIRED ACTION F. (continued)
F.2 Restore one block valve to OPERABLE status. AND F.3 Restore remaining block valve to OPERABLE status. G. Required Action and G.1 Be in MODE 3. associated Completion Time of Condition F AND not met. G.2 Be in MODE 4. SURVEILLANCE REQUIREMENTS SR 3.4.11.1 SURVEILLANCE
---*-*****--*-**-**NOTE--******************
Not required to be met with block valve closed in accordance with the Required Action of Condition*e or E. Perform a complete cycle of each block valve. HBRSEP Unit No. 2 3.4*27 Pressurizer PORVs 3.4.11 COMPLETION TIME 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 72 hours 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 12 hours FREQUENCY 92 days (continued)
Amendment No. m
-. ---u u ACTIONS (continued)
CONDITION C. Required Action and C.1 associated Completion Time of Condition A not met. nB. DOSE EQUIVALENT I-131 > 60 µCi/gm. SURVEILLANCE REQUIREMENTS SURVEILLANCE REQUIRED ACTION Be in MODE 3 with T*yg < 500°F. SR 3.4.16.1 Verify reactor coolant gross specific activity s 100~ µCi/gm. RCS Specific Activity 3.4.16 COMPLETION TIME 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> FREQUENCY 7 days tjlNSERT 1 I SR 3.4.16.2 *******************NOTE-***-*--**--*-----*-
-* Only required to be performed in MODE 1. Verify reactor coolant DOSE EQUIVALENT 1-131 specific activity~
0.25 µCi/gm. HBRSEP Unit No. 2 3.4-46 14 days Ml[} Between 2" and . 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> after a THERJ-La.L POWER change of :i!: 15.\' RTP within a 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> period (continued)
Amendment No. m. 201 SURVEILLANCE REQUIREMENTS (continued)
SR 3.5.2.7 SR 3.5.2.8 SURVEILLANCE Verify the following valves in the listed position:
- Number FCV-605 HCV-758 Position Function Closed/Motive RHR Air Isolated Closed/Motive RHR Air Isolated Verify the following manual valve is locked in the listed position Number RHR-764 Position Locked Open Function LHSI HBRSEP Unit No. 2 3.5-7 ECCS-Operati ng 3.5.2 FREQUENCY 31 daY' 92 da.ve Amendment No. m AC Sources-Operating
3.8.1 3URVEILLANCE
REQUIREMENTS SURVEILLANCE SR 3.8.1.1 Verify correct breaker alignment and indicated power availability for the offsite circuit. SR 3.8.1.2 ****************-**NOTES*******************
- 1. Performance of SR 3.8.1.7 satisfies this SR. 2. All DG starts may be preceded by an engine prelube period and followed by a warmup period prior to loading. 3. A modified DG start involving idling and gradual acceleration to synchronous speed may be used for this SR as recommended by the manufacturer.
When modified start procedures are not used, the time. voltage, and frequency tolerances of SR 3.8.1.7 must be met. Verify each DG starts from standby conditions and achieves steady state voltage~ 467 V ands 493 V, and frequency 58.8 Hz and~ 61.2 Hz. HBRSEP Unit No. 2 3.8-4 FREQUENCY 7 days :n .days (continued). Amendment No. 176 u AC Sources -Operating
3.8.1 SURVEILLANCE
REQUIREMENTS
{continued)
SR 3.8.1.3 SR 3.8.1.4 SR 3.8.1.5 SURVEILLANCE
- **-**-~----**-*****NOTES*******************
- 1. 0G loadings may include gradual loading as recommended by the manufacturer.
- 2. Momentary transients outside the load range do not invalidate this test. 3. This Surveillance shall be conducted on only one DG at a time: 4. This SR shall be preceded by and immediately follow without shutdown a s~ccessful performance of SR 3.8.1.2 or SR 3.8.1.7.
- 5. During periods when a diesel generator is being operated for testing purposes, its protective trips need not be bypassed after the diesel generator has properly assumed the load on its bus. Verify each DG is synchronized and loaded and operates for~ 60 minutes at a load 2350 kW and~ 2500 kW. Verify each day tank contains~
140 gallons of fuel oil. Check for and remove accumulated water.from each day tank. HBRSEP Unit No. 2 3.8-5 FREQUENCY 31 days 31 day.s 31 days {continued)
Amendment No. µ6 V 3.8 ELECTRICAL POWER SYSTEMS 3. 8. 4 DC Sources -Operating DC Sources -Operating 3.8.4 LCO 3.8.4 The Train A and Train B DC electrical power*subsystems shall be OPERABLE.
APPLICABILITY:
MODES 1, 2, 3, and 4. ACTIONS CONDITION REQUIRED ACTION A. One DC electrical A.l Restore DC electrical power subsystem inoperable.
power subsystem to OPERABLE status. B. Required Action and 8.1 Be in MODE 3. Associated Completion Time not met. AND B.2 Be in MODE 5. SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.8.4.1 Verify battery terminal voltage is 125.7 Von float charge. HBRSEP Unit No. 2
- 3.8-19 COMPLETION TIME 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 6 hours 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> FREQUENCY 7 days (continued)
Amendment No. m AC Instrument Bus Sources -Operating
3.8.7 SURVEILLANCE
REQUIREMENTS SR 3.8.7.1 SR 3.8.7.2 SURVEILLANCE Verify correct inverter voltage. frequency.
and alignment to required AC instrument buses .. Verify voltage availability and correct CVT alignment to required AC instrument buses. HBRSEP Unit No. 2 3.8-29 FREQUENCY 7 days 7 days Amendment No. 176