|
---|
Category:Letter
MONTHYEARML24268A3382024-10-16016 October 2024 Issuance of Amendment No. 253 Regarding the Modification of TS Surveillance Requirement 4.3.6.a Related to Adoption of TSTF-425, Revision 3 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests NMP2L2890, Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6)2024-10-0404 October 2024 Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6) ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing IR 05000220/20243022024-10-0303 October 2024 Initial Operator Licensing Examination Report 05000220/2024302 ML24190A0012024-09-26026 September 2024 Issuance of Amendment Nos. 252 and 197 Regarding the Revision to Technical Specification Design Features Section to Remove Nine Mile Point Unit 3 Project Designation NMP1L3608, Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-09-20020 September 2024 Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000220/20240052024-08-29029 August 2024 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2024005 and 05000410/2024005) IR 05000220/20240102024-08-22022 August 2024 Age-Related Degradation Inspection Report 05000220/2024010 and 05000410/2024010 NMP1L3603, Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan2024-08-20020 August 2024 Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000220/20240022024-08-0505 August 2024 Integrated Inspection Report 05000220/2024002 and 05000410/2024002 ML24215A3002024-08-0202 August 2024 Operator Licensing Examination Approval NMP1L3601, Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-07-31031 July 2024 Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation ML24213A1412024-07-31031 July 2024 Requalification Program Inspection NMP2L2883, Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations2024-07-24024 July 2024 Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations ML24198A0852024-07-16016 July 2024 Senior Reactor and Reactor Operator Initial License Examinations RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations NMP1L3584, License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2024-06-13013 June 2024 License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling IR 05000220/20244012024-05-30030 May 2024 Security Baseline Inspection Report 05000220/2024401 and 05000410/2024401(Cover Letter Only) ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 NMP1L3591, Response to Ny State Pollutant Discharge Elimination System (SPDES) Permit Request for Information & Modification Request2024-05-18018 May 2024 Response to Ny State Pollutant Discharge Elimination System (SPDES) Permit Request for Information & Modification Request NMP1L3589, Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable2024-05-16016 May 2024 Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable NMP1L3582, 2023 Annual Radioactive Environmental Operating Report for Nine Mile Point Units 1 and 22024-05-15015 May 2024 2023 Annual Radioactive Environmental Operating Report for Nine Mile Point Units 1 and 2 ML24158A2052024-05-15015 May 2024 Annual Radioactive Environmental Operating Report IR 05000220/20240012024-05-10010 May 2024 Integrated Inspection Report 05000220/2024001 and 05000410/2024001 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds NMP2L2880, Automatic Reactor Scram on Turbine Trip Due to Low Condenser Vacuum2024-05-0101 May 2024 Automatic Reactor Scram on Turbine Trip Due to Low Condenser Vacuum RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests NMP1L3581, Independent Spent Fuel Storage Installation (ISFSI) - 2023 Radioactive Effluent Release Report2024-04-30030 April 2024 Independent Spent Fuel Storage Installation (ISFSI) - 2023 Radioactive Effluent Release Report NMP2L2877, 2023 Annual Environmental Operating Report2024-04-19019 April 2024 2023 Annual Environmental Operating Report NMP2L2878, Core Operating Limits Report2024-04-16016 April 2024 Core Operating Limits Report ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24092A3352024-04-0101 April 2024 NRC Office of Investigations Case No. 1-2023-002 RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24074A2812024-03-14014 March 2024 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000220/2024010 and 05000410/2024010 NMP1L3577, Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable2024-03-13013 March 2024 Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable IR 05000220/20230062024-02-28028 February 2024 Annual Assessment Letter for Nine Mile Point Nuclear Station, Units 1 and 2, (Reports 05000220/2023006 and 05000410/2023006) NMP1L3570, Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-02-0101 February 2024 Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation IR 05000220/20230042024-02-0101 February 2024 Integrated Inspection Report 05000220/2023004 and 05000410/2023004 05000410/LER-2023-001, Supplement to LER 2023-001-00, Automatic Reactor Scram on Low Level Due to Partial Loss of Feedwater2024-01-30030 January 2024 Supplement to LER 2023-001-00, Automatic Reactor Scram on Low Level Due to Partial Loss of Feedwater NMP1L3569, CFR 50.46 Annual Report2024-01-26026 January 2024 CFR 50.46 Annual Report ML24004A2122024-01-0808 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML23354A0012024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0059 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines NMP1L3566, Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station2023-12-14014 December 2023 Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station 2024-09-04
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARML24190A0012024-09-26026 September 2024 Issuance of Amendment Nos. 252 and 197 Regarding the Revision to Technical Specification Design Features Section to Remove Nine Mile Point Unit 3 Project Designation NMP1L3584, License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2024-06-13013 June 2024 License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML23151A3472023-08-21021 August 2023 Issuance of Amendments to Adopt TSTF-295-A, Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration NMP1L3534, License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2023-08-18018 August 2023 License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling NMP1L3484, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Reatment of Structures, Systems and Components for Nuclear Power Reactors2022-12-15015 December 2022 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Reatment of Structures, Systems and Components for Nuclear Power Reactors NMP1L3482, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2022-12-15015 December 2022 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML22298A0112022-10-25025 October 2022 License Amendment Request to Adopt Technical Specification Task Force TSTF-295-A, Modify Note 2 to Actions of (Post-Accident Monitoring) PAM Table To. RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration NMP1L3477, License Amendment Request - Application to Partially Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, to Revise.2022-08-12012 August 2022 License Amendment Request - Application to Partially Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, to Revise. NMP1L3467, License Amendment Request - Revision to Alternative Source Term Calculation for Main Steam Isolation Valve (MSIV) Leakage and Non-MSIV Leakage2022-06-29029 June 2022 License Amendment Request - Revision to Alternative Source Term Calculation for Main Steam Isolation Valve (MSIV) Leakage and Non-MSIV Leakage NMP2L2799, License Amendment Request - Revise Surveillance Requirements to Reduce Excessive Fast Starting of Emergency Diesel Generators2022-05-24024 May 2022 License Amendment Request - Revise Surveillance Requirements to Reduce Excessive Fast Starting of Emergency Diesel Generators RS-22-004, Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-01-0404 January 2022 Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements ML21277A1932021-11-16016 November 2021 Enclosure 2, Draft Conforming License Amendments NMP2L2780, Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2021-09-30030 September 2021 Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2021-09-27027 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position NMP2L2762, License Amendment Request Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control2021-05-26026 May 2021 License Amendment Request Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control RS-21-039, Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments2021-03-25025 March 2021 Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments ML21057A2732021-02-25025 February 2021 Application for Order Approving License Transfers and Proposed Conforming License Amendments NMP1L3369, Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0 Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2020-12-18018 December 2020 Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0 Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements RS-20-031, License Amendment Request - Application to Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2 .5 and TS 3.6 .3.2, Using the Consolidated Line Item Improvement Process2020-04-30030 April 2020 License Amendment Request - Application to Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2 .5 and TS 3.6 .3.2, Using the Consolidated Line Item Improvement Process NMP2L2716, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2019-12-26026 December 2019 Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors NMP2L2706, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b.2019-10-31031 October 2019 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b. RS-19-044, License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions2019-08-28028 August 2019 License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions JAFP-19-0067, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2019-06-27027 June 2019 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability NMP1L3278, License Amendment Request - Administrative Changes to the Technical Specifications2019-06-26026 June 2019 License Amendment Request - Administrative Changes to the Technical Specifications RS-19-040, Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2019-06-25025 June 2019 Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program NMP2L2699, License Amendment Request to Revise Technical Specifications Main Steam Isolation Valve Leak Rate2019-05-31031 May 2019 License Amendment Request to Revise Technical Specifications Main Steam Isolation Valve Leak Rate RS-19-003, Application to Adopt TSTF-564, Safety Limit Mcpr.2019-02-0101 February 2019 Application to Adopt TSTF-564, Safety Limit Mcpr. NMP2L2694, Emergency License Amendment Request: One Time Extension to the High Pressure Core Spray Completion Time and Associated Surveillances2018-12-0606 December 2018 Emergency License Amendment Request: One Time Extension to the High Pressure Core Spray Completion Time and Associated Surveillances NMP1L3192, License Amendment Request - Revise Technical Specification 3.3.1 for Primary Containment Oxygen Concentration2018-06-26026 June 2018 License Amendment Request - Revise Technical Specification 3.3.1 for Primary Containment Oxygen Concentration RS-18-020, Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement2018-06-15015 June 2018 Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement RS-17-161, Fleet License Amendment Request to Relocate Technical Specification Unit/Facility/Plant Staff Qualification ANSI N18.1-1971 and ANSl/ANS-3.1-1978 Requirements to the Exelon Quality Assurance Topical Report (QATR)2018-03-0101 March 2018 Fleet License Amendment Request to Relocate Technical Specification Unit/Facility/Plant Staff Qualification ANSI N18.1-1971 and ANSl/ANS-3.1-1978 Requirements to the Exelon Quality Assurance Topical Report (QATR) NMP1L3188, License Amendment Request - Proposed Change to Remove Boraflex Credit from Spent Fuel Racks2018-02-0909 February 2018 License Amendment Request - Proposed Change to Remove Boraflex Credit from Spent Fuel Racks NMP1L3142, License Amendment Request - Revise Technical Specifications to Apply TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 22017-12-15015 December 2017 License Amendment Request - Revise Technical Specifications to Apply TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 RS-17-137, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2017-11-0808 November 2017 Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements NMP2L2660, License Amendment Request - Safety Limit Minimum Critical Power Ratio Change2017-11-0303 November 2017 License Amendment Request - Safety Limit Minimum Critical Power Ratio Change NMP2L2652, License Amendment Request - Revise Surveillance Requirement 3.5.1.2 to Remove Note2017-08-22022 August 2017 License Amendment Request - Revise Surveillance Requirement 3.5.1.2 to Remove Note ML17164A1542017-05-31031 May 2017 Enclosure 4C - EAL Basis Document for Nine Mile Point Nuclear Station, Unit 1 ML17164A1552017-05-31031 May 2017 Enclosure 4D - EAL Front Matter for Nine Mile Point Nuclear Station, Unit 1 NMP2L2641, License Amendment Request - Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Revision 02017-05-31031 May 2017 License Amendment Request - Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Revision 0 ML17164A1532017-05-31031 May 2017 Enclosure 4B - EAL Red-Line Basis Document for Nine Mile Point Nuclear Station, Unit 1 NMP1L3158, Enclosure 4E - Procedure Matrix for Nine Mile Point Nuclear Station, Unit 12017-05-31031 May 2017 Enclosure 4E - Procedure Matrix for Nine Mile Point Nuclear Station, Unit 1 JAFP-17-0050, Exigent License Amendment Request to Revise Emergency Action Level HU1.52017-05-19019 May 2017 Exigent License Amendment Request to Revise Emergency Action Level HU1.5 ML17037C4192017-05-11011 May 2017 Amendment to Operating License/Change to Appendix a of Technical Specification Concerning Certain Repairs at Facility and Concomitantly to Allow a Continuation of a Slightly Lower Water Level in the Reactor... NMP2L2643, License Amendment Request-Adoption of TSTF-283-A, Revision 3, Modify Section 3.8 Mode Restriction Notes2017-04-0505 April 2017 License Amendment Request-Adoption of TSTF-283-A, Revision 3, Modify Section 3.8 Mode Restriction Notes RS-17-049, Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement Process2017-03-28028 March 2017 Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement Process NMP2L2640, License Amendment Request - Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 22017-02-28028 February 2017 License Amendment Request - Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 NMP2L2639, Supplement to License Amendment Request - Proposed Revision to Technical Specification in Response to GE Energy- Nuclear 10 CFR Part 21 Safety Communication SC05-032017-02-17017 February 2017 Supplement to License Amendment Request - Proposed Revision to Technical Specification in Response to GE Energy- Nuclear 10 CFR Part 21 Safety Communication SC05-03 2024-09-26
[Table view] Category:Technical Specification
MONTHYEARNMP2L2890, Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6)2024-10-0404 October 2024 Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6) NMP1L3601, Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-07-31031 July 2024 Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling NMP1L3482, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2022-12-15015 December 2022 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML22298A0112022-10-25025 October 2022 License Amendment Request to Adopt Technical Specification Task Force TSTF-295-A, Modify Note 2 to Actions of (Post-Accident Monitoring) PAM Table To. ML22292A1312022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Technical Specification Bases, Rev. 69 RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration NMP1L3477, License Amendment Request - Application to Partially Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, to Revise.2022-08-12012 August 2022 License Amendment Request - Application to Partially Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, to Revise. NMP2L2780, Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2021-09-30030 September 2021 Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements NMP2L2762, License Amendment Request Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control2021-05-26026 May 2021 License Amendment Request Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control JAFP-20-0049, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2020-06-22022 June 2020 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability NMP2L2718, Supplemental Information No.1 for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, Revision 22019-12-12012 December 2019 Supplemental Information No.1 for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 JAFP-19-0067, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2019-06-27027 June 2019 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability RS-19-039, Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls2019-06-26026 June 2019 Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls NMP2L2693, Technical Specification Bases, Rev. 572018-10-24024 October 2018 Technical Specification Bases, Rev. 57 NMP2L2664, Supplemental Information No. 2 for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 22018-01-12012 January 2018 Supplemental Information No. 2 for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 NMP2L2652, License Amendment Request - Revise Surveillance Requirement 3.5.1.2 to Remove Note2017-08-22022 August 2017 License Amendment Request - Revise Surveillance Requirement 3.5.1.2 to Remove Note NMP2L2640, License Amendment Request - Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 22017-02-28028 February 2017 License Amendment Request - Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 ML16309A4002016-10-24024 October 2016 Revision 47 to Technical Specification Bases, List of Effective Pages ML16309A4022016-10-24024 October 2016 Revision 47 to Technical Specification Bases, Section B2.0, Safety Limits (Sls) ML16309A4032016-10-24024 October 2016 Revision 47 to Technical Specification Bases, Section B3.0, Limiting Condition for Operation (LCO) Applicability ML16309A4052016-10-24024 October 2016 Revision 47 to Technical Specification Bases, Section B3.2, Power Distribution Limits ML16309A4012016-10-24024 October 2016 Revision 47 to Technical Specification Bases, Table of Contents ML16309A4132016-10-24024 October 2016 Revision 47 to Technical Specification Bases, Section B3.9, Refueling Operations ML16309A4082016-10-24024 October 2016 Revision 47 to Technical Specification Bases, Section B3.5, Emergency Core Cooling Systems (ECCS) and Reactor Core Isolation Cooling (RCIC) System ML16209A2182016-07-26026 July 2016 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing. NMP1L3070, License Amendment Request - Reactivity Anomalies Surveillance2016-03-18018 March 2016 License Amendment Request - Reactivity Anomalies Surveillance NMP2L2592, Supplemental Information Regarding TSTF-425 License Amendment Request2015-09-24024 September 2015 Supplemental Information Regarding TSTF-425 License Amendment Request NMP1L3027, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3)2015-05-12012 May 2015 Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3) ML15089A2312015-03-26026 March 2015 Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3) NMP1L3010, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3)2015-03-26026 March 2015 Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3) NMP2L2576, License Amendment Request - Relocation of Secondary Containment Bypass Leakage Paths Table from Technical Specifications to the Technical Requirements Manual2015-03-23023 March 2015 License Amendment Request - Relocation of Secondary Containment Bypass Leakage Paths Table from Technical Specifications to the Technical Requirements Manual NMP2L2563, License Amendment Request - Primary Containment Isolation Instrumentation Technical Specification Allowable Value Change2014-11-17017 November 2014 License Amendment Request - Primary Containment Isolation Instrumentation Technical Specification Allowable Value Change ML14191A2552014-07-10010 July 2014 Nine Mile Point and Ginna, Unit 1 - Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process ML12156A3632012-06-0101 June 2012 Emergency License Amendment Request Pursuant to 10 CFR 50.90: Revision of the Main Steam Isolation Valve Allowable Leakage Rate Limit ML11306A2982011-10-27027 October 2011 Submittal of Revision 22 to the Final Safety Analysis Report (Updated), 10 CFR 50.59 Evaluation Summary Report, Technical Specifications Bases Changes, and Report Consistent with 10 CFR 54.37(b) ML11214A2142011-07-25025 July 2011 License Amendment Request, Extension of the Completion Time for Inoperable Diesel Generator - Response to NRC Request for Additional Information ML1109602832011-03-30030 March 2011 License Amendment Request Pursuant to 10 CFR 50.90: Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage ... ML0935000902009-12-0909 December 2009 License Amendment Request to Remove Operating Mode Restrictions for Performing Surveillance Testing of the Division 3 Battery - Technical Specification 3.8.4, DC Sources - Operating ML0931602572009-10-26026 October 2009 Submittal of Revision 21 to the Final Safety Analysis Report (Updated), 10 CFR 50.59 Evaluation Summary Report, Technical Specifications Bases Changes, and Report Consistent with 10 CFR 54.37(b) ML0907802502009-03-0909 March 2009 Submittal of Amendment Request for Technical Specification Improvement to Revise Control Rod Scram Time Testing Frequency ML0906403012009-03-0303 March 2009 License Amendment Request Pursuant to 10 CFR 50.90: Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report ML0827502992008-09-29029 September 2008 Technical Specifications ML0802501622008-01-24024 January 2008 Response to NRC Request for Additional Information Regarding Nine Mile Point Nuclear Station, Unit No. 1, Revision of Rod Worth Minimizer Limiting Condition for Operation During Startup ML0726401032007-09-19019 September 2007 License Amendment Request for Adoption of TSTF-484, Revision 0, Use of TS 3.10.1 for Scram Time Testing Activities. ML0721906052007-07-30030 July 2007 Application for Technical Specification Change TSTF-477, Rev. 3, Add Action for Two Inoperable Control Room AC Subsystems to the Technical Specifications Using Consolidated Line Item Improvement Process ML0721205922007-07-23023 July 2007 Application for Technical Specification Improvement to Adopt TSTF-476, Revison 1, Improved BPWS Control Rod Insertion Process (NEDO-33091), Using the Consolidated Line Item Improvement ML0721205872007-07-23023 July 2007 License Amendment Request Pursuant to 10 CFR 50.90: Revision of Rod Worth Minimizer Limiting Condition for Operation During Startup - Technical Specification Section 3.1.1.b ML0720504232007-07-12012 July 2007 Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process 2024-07-31
[Table view] Category:Amendment
MONTHYEARML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling NMP1L3482, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2022-12-15015 December 2022 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML22298A0112022-10-25025 October 2022 License Amendment Request to Adopt Technical Specification Task Force TSTF-295-A, Modify Note 2 to Actions of (Post-Accident Monitoring) PAM Table To. RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration NMP2L2780, Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2021-09-30030 September 2021 Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements JAFP-20-0049, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2020-06-22022 June 2020 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability NMP2L2718, Supplemental Information No.1 for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, Revision 22019-12-12012 December 2019 Supplemental Information No.1 for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 RS-19-039, Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls2019-06-26026 June 2019 Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls NMP2L2664, Supplemental Information No. 2 for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 22018-01-12012 January 2018 Supplemental Information No. 2 for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 NMP2L2652, License Amendment Request - Revise Surveillance Requirement 3.5.1.2 to Remove Note2017-08-22022 August 2017 License Amendment Request - Revise Surveillance Requirement 3.5.1.2 to Remove Note NMP2L2640, License Amendment Request - Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 22017-02-28028 February 2017 License Amendment Request - Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 NMP1L3027, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3)2015-05-12012 May 2015 Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3) NMP2L2576, License Amendment Request - Relocation of Secondary Containment Bypass Leakage Paths Table from Technical Specifications to the Technical Requirements Manual2015-03-23023 March 2015 License Amendment Request - Relocation of Secondary Containment Bypass Leakage Paths Table from Technical Specifications to the Technical Requirements Manual NMP2L2563, License Amendment Request - Primary Containment Isolation Instrumentation Technical Specification Allowable Value Change2014-11-17017 November 2014 License Amendment Request - Primary Containment Isolation Instrumentation Technical Specification Allowable Value Change ML14191A2552014-07-10010 July 2014 Nine Mile Point and Ginna, Unit 1 - Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process ML1109602832011-03-30030 March 2011 License Amendment Request Pursuant to 10 CFR 50.90: Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage ... ML0935000902009-12-0909 December 2009 License Amendment Request to Remove Operating Mode Restrictions for Performing Surveillance Testing of the Division 3 Battery - Technical Specification 3.8.4, DC Sources - Operating ML0907802502009-03-0909 March 2009 Submittal of Amendment Request for Technical Specification Improvement to Revise Control Rod Scram Time Testing Frequency ML0906403012009-03-0303 March 2009 License Amendment Request Pursuant to 10 CFR 50.90: Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report ML0827502992008-09-29029 September 2008 Technical Specifications ML0720504742007-07-12012 July 2007 Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process ML0707800592007-03-15015 March 2007 Technical Specification 4.1.1 Regarding Control Rod System Surveillance Requirements ML0536202882005-12-16016 December 2005 License Amendment Request: Proposed Changes to Technical Specification 4.1.4 Regarding Core Spray Instrumentation ML0511100732005-04-19019 April 2005 Tech Spec Pages for Amendment 115 and 188 Reporting Requirements for Annual Radiological Environmental Operating Report ML0510204002005-04-0101 April 2005 License Amendment Request Pursuant to 1O CFR 50.90: Request for Amendment to Extend Completion Time for Emergency Uninterruptible Power Supply Inverters ML0503304712005-01-24024 January 2005 Application for Technical Specification Improvement to Eliminate Requirements to Provide Monthly Operating Reports and Occupational Radiation Exposure Reports ML0424003162004-08-17017 August 2004 Unit I, License Amendment Request Pursuant to 10 CFR 50.90: Addition of 24 Hours for Restoration of Primary Containment Oxygen Concentration ML0421103812004-07-16016 July 2004 License Amendment Request Pursuant to 10 CFR 50.90: Revision of Intermediate Range Monitor Surveillance Frequency and Relocation of Selected Instrumentation Requirements to a License-Controlled Document ML0403302112004-01-27027 January 2004 TS Amendment Pages for License No. NPF-069 ML0330305992003-10-27027 October 2003 TS Pages Amendment 183 ML0324608472003-08-15015 August 2003 License Amendment Request Pursuant to 10 CFR 50.90: Revision of Reactor Pressure Vessel Pressure-Temperature Limits ML0233807302002-11-22022 November 2002 Facility Operating License DPR-63, License Amendment Request: Technical Specifications Section 6.0, Administrative Controls - Response to RA Information TAC No. MB2441 ML0229603382002-10-0707 October 2002 Application for Technical Specification Change Regarding Missed Surveillances Using the Consolidated Line Item Improvement Process ML0217101682002-06-0707 June 2002 Application for Technical Specification Improvement to Eliminate the Requirements for the Post Accident Sampling System Using the Consolidated Line Item Improvement Process ML0207305992002-03-13013 March 2002 Technical Specifications, Issuance of Amendment Safety Limit Minimum Critical Power Ratio (Tac No. MB3327) ML0206302682002-03-0101 March 2002 Technical Specifications for Amendment No. 103 ML0204301512002-02-11011 February 2002 Issuance of Amendment Ventilation Requirements During Irradiated Fuel Handling ML18018B0461978-03-22022 March 1978 Letter Transmitting an Application for Amendment to Appendix a of the Operating License ML17037C4331977-08-0808 August 1977 Letter Regarding Surveillance Requirements and Limiting Conditions for Operations and Requesting an Application for Amendment to the Operating License That Will Change the Technical Specifications ML17037C4131977-07-22022 July 1977 Letter Enclosing Application for Amendment to Operating License and Proposed Changes to Technical Specifications Concerning Changes in Management and Organization ML17037C4141977-07-18018 July 1977 Letter Enclosing an Application for Amendment to Operating License and Proposed Changes to the Technical Specifications to Provide for More Flexible Operation and Concerning Load Line Limit Analysis ML17037C4161977-07-14014 July 1977 Application for Amendment to Operating License and Proposed Change to Technical Specification Concerning the Emergency Cooling System ML17037C4181977-05-19019 May 1977 Letter Enclosing an Application to Amend Operating License and a Requested Change in the Technical Specifications Relating to Instrumentation Used to Monitor Drywell Suppression Chamber Differential Pressure and Suppression .. ML17037C4341977-03-0404 March 1977 Letter Regarding a Preliminary Review of the December 7, 1976 Request for Technical Specification Changes to Reactor Operating Limits After Reload for Cycle 5 Operation and Requesting Additional Information to Complete Review ML17037C4391976-09-30030 September 1976 Letter Requesting Submittal of an Application for License Amendment to Incorporate the Requirements of the Model Technical Specifications ML17037C4531976-01-19019 January 1976 Letter Transmitting an Application for Amendment to Operating License and a Proposed Change to Technical Specifications (Appendix a) to Clarify Cloride and Oxygen Levels ML17037C1771975-12-19019 December 1975 Letter Enclosing a Corrected Attachment to License Amendment No. 11 Change No. 27 to the Technical Specifications Provisional Operating License No. DPR-16 ML17037C1831975-11-0303 November 1975 Letter Regarding Application for Amendment to Technical Specifications and an Inadvertent Error Not Made on the Persons Listed in the Certificate of Service ML17037C4681975-09-23023 September 1975 Letter Regarding a Stress Assisted Corrosion Problem and an Enclosed Safety Evaluation by the Office of NRR - Supporting Amendment to License No. DPR-63 and Changes to the Technical Specifications Inoperable Control Rod .. 2024-04-12
[Table view] |
Text
Thomas A. Lynch P.O. Box 63 Plant General Manager Lycoming, New York 13093 315.349.5200 315.349.1321 Fax CENG a joint venture of Constellation
<j-eDF Ene"" gz Nine Mile Point Nuclear Station December 9, 2009 U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTENTION:
Document Control Desk
SUBJECT:
Nine Mile Point Nuclear Station Unit No. 2; Docket No. 50-410 License Amendment Request Pursuant to 10 CFR 50.90: Removal of Operating Mode Restrictions for Performing Surveillance Testing of the Division 3 Battery -Technical Specification 3.8.4, DC Sources -Operating Pursuant to 10 CFR 50.90, Nine Mile Point Nuclear Station, LLC (NMPNS) hereby requests an amendment to the Nine Mile Point Unit 2 (NMP2) Renewed Facility Operating License NPF-69. The proposed amendment would revise Technical Specification (TS) 3.8.4, "DC Sources -Operating," by removing the Mode restrictions for performance of TS Surveillance Requirements (SRs) 3.8.4.7 and 3.8.4.8 for the Division 3 direct current (DC) electrical power subsystem battery. The Division 3 DC electrical power subsystem feeds emergency DC loads associated with the High Pressure Core Spray (HPCS) system. These surveillances verify that the battery capacity is adequate for the battery to perform its required functions.
The proposed amendment would remove these Mode restrictions for the Division 3 battery, thereby allowing performance of SR 3.8.4.7 and SR 3.8.4.8 for the Division 3 battery during Mode 1, 2, or 3 in conjunction with scheduled HPCS system outages. Eliminating the requirement to perform SR 3.8.4.7 and SR 3.8.4.8 during Mode 4 or 5 (cold shutdown or refueling conditions) will provide greater flexibility in scheduling Division 3 battery testing activities by allowing the testing to be performed during non-outage times.The Enclosure provides a description and technical bases for the proposed changes and existing TS pages marked up to show the proposed changes. NMPNS has concluded that the activities associated with the proposed amendment represent no significant hazards consideration under the standards set forth in 10 CFR 50.92. The enclosed submittal contains no regulatory commitments.
NMPNS requests approval of this license amendment request by December 15, 2010, with implementation within 90 days of receipt of the approved amendment.
Document Control Desk December 9, 2009 Page 2 Pursuant to 10 CFR 50.91(b)(1), NMPNS has provided a copy of this license amendment request, with Enclosure, to the appropriate state representative.
Should you have any questions regarding the information in this submittal, please contact T. F. Syrell, Licensing Director, at (315) 349-5219.Very truly yours, STATE OF NEW YORK TO WIT: COUNTY OF OSWEGO I, Thomas A. Lynch, being duly sworn, state that I am the Nine Mile Point Plant General Manager, and that I am duly authorized to execute and file this license amendment request on behalf of Nine Mile Point Nuclear Station, LLC. To the best of my knowledge and belief, the statements contained in this document are true and correct. To the extent that these statements are not based on my personal knowledge, they are based upon information provided by other Nine Mile Point employees and/or consultants.
Such information has been reviewed in accordance with company practice and I believe it to be reliable.Subscribed and sworn before me, a Notary Public in and for the State of New York and County of On 0 n , this day of )e ,- ,2009.WITNESS my Hand and Notarial Seal: _____"__Not
__Public-DENNIS E. VANDEPUTTE Notary Public, State of New York No. 01 VA6183401 My Commission Expires: Qualified in Onondaga County Certificate Filed in Oswego ount Commission Expires Date TAL/DEV
Enclosure:
Evaluation of the Proposed Change cc: S. J. Collins, NRC R. V. Guzman, NRC Resident Inspector, NRC A. L. Peterson, NYSERDA ENCLOSURE EVALUATION OF THE PROPOSED CHANGE TABLE OF CONTENTS 1.0
SUMMARY
DESCRIPTION
2.0 DETAILED
DESCRIPTION 2.1 ' Description of the Proposed Change 2.2 Background
3.0 TECHNICAL
EVALUATION
4.0 REGULATORY EVALUATION
4.1 Applicable
Regulatory Requirements/Criteria
4.2 Precedent
4.3 Significant Hazards Consideration
4.4 Conclusions
5.0 ENVIRONMENTAL CONSIDERATION ATTACHMENTS
- 1. Nine Mile Point Unit 2 -Proposed Technical Specification Changes (Mark-up)2. Nine Mile Point Unit 2 -Changes to Technical Specification Bases (Mark-up)Nine Mile Point Nuclear Station, LLC December 9, 2009 ENCLOSURE EVALUATION OF THE PROPOSED CHANGE 1.0
SUMMARY
DESCRIPTION This evaluation supports a request to amend Renewed Facility Operating License NPF-69 for Nine Mile Point Unit 2 (NMP2).The proposed amendment would revise Technical Specification (TS) 3.8.4, "DC Sources -Operating," by removing the Mode restrictions for performance of TS Surveillance Requirements (SRs) 3.8.4.7 and 3.8.4.8 for the Division 3 direct current (DC) electrical power subsystem battery. The Division 3 DC electrical power subsystem feeds emergency DC loads associated with the High Pressure Core Spray (HPCS) system. These surveillances verify that the battery capacity is adequate for the battery to perform its required functions.
The proposed amendment would remove these Mode restrictions for the Division 3 battery, thereby allowing performance of SR 3.8.4.7 and SR 3.8.4.8 for the Division 3 battery during Mode 1, 2, or 3 in conjunction with scheduled HPCS system outages. Eliminating the requirement to perform SR 3.8.4.7 and SR 3.8.4.8 during Mode 4 or 5 (cold shutdown or refueling conditions) will provide greater flexibility in scheduling Division 3 battery testing activities by allowing the testing to be performed during non-outage times.2.0 DETAILED DESCRIPTION
2.1 Description
of the Proposed Change TS 3.8.4, "DC Sources -Operating," specifies requirements for the Division 1, Division 2, and Division 3 DC electrical power subsystems.
The three DC electrical power subsystems are required to be operable in plant Modes 1 (Power Operation), 2 (Startup), and 3 (Hot Shutdown).
Currently, SR 3.8.4.7 and SR 3.8.4.8 contain notes which prohibit performance of the surveillance during Modes 1, 2 or 3. The proposed changes would modify the notes associated with these SRs to remove the Mode restrictions for the Division 3 battery.Specifically, NOTE 2 for SR 3.8.4.7 and the NOTE for SR 3.8.4.8 currently state: "This Surveillance shall not be performed in MODE 1, 2, or 3. However, credit may be taken for unplanned events that satisfy this SR." Each of these notes would be revised to state: "This Surveillance shall not be performed in MODE 1, 2, or 3 (not applicable to Division 3).However, credit may be taken for unplanned events that satisfy this SR." Attachment 1 provides the existing TS pages marked-up to show the proposed changes. Marked-up pages showing associated changes to the TS Bases are provided in Attachment 2 for information only. The TS Bases changes will beprocessed in accordance with the NMP2 TS Bases Control Program (TS 5.5.10).2.2 Background The NMP2 DC electrical power system, described in Section 8.3.2 of the NMP2 Updated Safety Analysis Report (USAR), provides the alternating current (AC) emergency power system with' control power and provides both motive and control power to selected safety-related equipment.
The emergency 125 VDC electrical power system consists of three independent Class 1E DC electrical power subsystems, Divisions 1, 2, and 3. Each subsystem consists of a battery, associated battery chargers, and all the 1 of 7 ENCLOSURE EVALUATION OF THE PROPOSED CHANGE associated control equipment and interconnecting cabling. As required by 10 CFR 50, Appendix A, General Design Criteria (GDC) 17, the DC electrical power system is designed to have sufficient independence, redundancy, and testability to perform its safety functions, assuming a single failure. The emergency 125 VDC electrical power system is illustrated on USAR Figure 8.3-10.During normal operation, the DC loads are powered from the battery chargers with the batteries floating on the system. In case of loss of normal power to the battery charger, the DC loads are automatically powered from the associated battery. Each DC battery subsystem is separately housed in a ventilated room apart from its charger and distribution centers. Each subsystem is located in an area separated physically and electrically from the other subsystems to ensure that a single failure in one subsystem does not cause a failure in a redundant subsystem.
There is no sharing between the redundant Class 1E subsystems such as batteries, battery chargers, or distribution panels. The independence of the three divisions of the emergency DC system is maintained throughout the distribution system and the DC loads.The function of the Division 3 DC electrical power subsystem is to provide a reliable, continuous 125 VDC power source for the emergency DC loads associated with the HPCS system. Those loads include the Division 3 diesel generator (DG) field flashing control logic, the control and switching function of the 4.16 kV Division 3 breakers, and control and motive power for the HPCS system logic, HPCS DG control and protection, and all Division 3 related controls.
The Division 3 DC electrical power subsystem is classified as Class 1E. As noted above, the Division 3 battery and battery chargers are physically separated from and electrically independent of all other divisional batteries and battery chargers.USAR Table 8.3-10 outlines the Division 3 battery load profile, including both the load magnitudes and durations.
The Division 3 battery has adequate storage to carry the required load continuously for at least 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. Each of the two 100-percent capacity Division 3 DC electrical power subsystem battery chargers has sufficient capacity to restore the battery bank from the design minimum charge to its fully charged state within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> while supplying normal steady state loads.The TS require that periodic service tests (SR 3.8.4.7) and performance discharge tests (SR 3.8.4.8) be performed for each of the Division 1, 2, and 3 batteries.
The battery service test verifies the battery's capability to satisfy the design requirements (battery duty cycle) of the DC electrical power system. The discharge rate and test length (2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for Division 3) correspond to the design duty cycle requirements as specified in the USAR. The battery performance test is a test of constant current capacity of the battery to detect any change in capacity.
The performance discharge test is intended to determine overall battery degradation due to age and usage. The TS-required frequencies for performing these surveillance tests are not being changed by the proposed license amendment.
3.0 TECHNICAL
EVALUATION The Bases for TS 3.8.4 currently state that the reason for the Mode restriction notes for SR 3.8.4.7 and SR 3.8.4.8 is that removing a required DC electrical power subsystem from service would perturb the electrical distribution system and challenge safety systems. However, the noted concern is not warranted with respect to the Division 3 DC electrical power subsystem.
As discussed in USAR Sections 6.3.1.1.3, 8.3.1.4, and 8.3.2, the HPCS system is a stand-alone system with a dedicated DG and independent distribution system; thus, there is minimal opportunity for the performance of these SRs to have any impact on other safety related plant equipment.
The Division 3 battery and battery chargers are physically separated from and electrically independent of all other divisional batteries and battery chargers, and interconnection with the battery and battery chargers or the emergency DC load groups of any other division is not permitted under any conditions of plant operation.
The Division 3 battery is disconnected 2 of 7 ENCLOSURE EVALUATION OF THE PROPOSED CHANGE from the battery chargers during the surveillance tests and has no connection with any other equipment that is required to be operable.
Therefore, performance of the required testing during plant operation would not result in a challenge to any other plant safety system.Currently, the HPCS system is removed from service to perform scheduled maintenance while in Mode 1, 2, or 3 as allowed by the TS. The proposed changes to SR 3.8.4.7 and SR 3.8.4.8 are desired to allow the Division 3 battery tests to be performed in conjunction with these scheduled HPCS system outages. The changes will allow the Division 3 battery service test required by SR 3.8.4.7 and the Division 3 battery performance discharge test required by SR 3.8.4.8 to be performed in Modes 1, 2, or 3 in conjunction with a HPCS system outage or for unplanned events. The TS allow the HPCS system to be inoperable for up to 14 days if the Reactor Core Isolation Cooling system is operable.
This provides ample time for the performance of the battery SRs.The time needed to perform the battery testing is approximately 38 hours4.398148e-4 days <br />0.0106 hours <br />6.283069e-5 weeks <br />1.4459e-5 months <br />. Thus, the Division 3 battery is expected to be unavailable to support the HPCS system for approximately 38 hours4.398148e-4 days <br />0.0106 hours <br />6.283069e-5 weeks <br />1.4459e-5 months <br />. This testing period is within the period of time that the HPCS system will already be out of service for a planned system outage. Therefore, the battery testing does not increase unavailability of the supported system or represent any change in risk above the current practice of planned HPCS system maintenance outages.Regarding risk management, the testing of the Division 3 battery will be enveloped by the risk management of the HPCS system outage. Risk management of the system outage is addressed in several ways. First, in addition to the TS limitations that apply to inoperable HPCS system equipment, the Safety Function Determination Program described in NMP2 TS 5.5.11 and required by TS LCO 3.0.6 is utilized to protect against a loss of safety function.
Second, the NMP2 approach to performing maintenance uses a protected division concept. This means that, without special considerations, work is performed on only one division of equipment at a time. Additionally, access to areas of the plant containing protected equipment is restricted.
These administrative controls provide additional assurance that work is performed on only one division at a time.Nine Mile Point Nuclear Station, LLC (NMPNS) has integrated risk management procedures in place that address the requirements of 10 CFR 50.65, "Requirements for monitoring the effectiveness of maintenance at nuclear power plants." The procedures provide assurance that risk-significant plant equipment configurations are precluded or minimized when plant equipment is removed from service.Additionally, the HPCS system reliability and availability are monitored and evaluated in relationship to Maintenance Rule goals to ensure that total outage times do not degrade operational safety over time.
4.0 REGULATORY EVALUATION
4.1 Applicable
Regulatory Requirements/Criteria The proposed changes have been evaluated to determine whether applicable regulations and requirements continue to be met.10 CFR 50, Appendix A, GDC 17, "Electric power systems," requires, in part, that nuclear power plants have onsite and offsite electric power systems to permit the functioning of structures, systems, and components that are important to safety. The onsite system is required to have sufficient independence, redundancy, and testability to perform its safety function, assuming a single failure. In addition, this criterion requires provisions to minimize the probability of losing electric power from the remaining electric power supplies as a result of loss of power from the unit, the offsite transmission network, or the 3 of 7 ENCLOSURE EVALUATION OF THE PROPOSED CHANGE onsite power supplies.
The Division 3 battery and battery chargers are physically separated from and electrically independent of all other divisional batteries and battery chargers, and interconnection with the battery and battery chargers or the emergency DC load groups of any other division is not permitted under any conditions of plant operation:
The proposed TS changes affect only the operating conditions during which certain Division 3 battery testing can be performed; the design or function of the emergency DC electrical power system is not affected.
Thus, the emergency DC electrical power system continues to comply with the requirements of GDC 17.GDC 18, "Inspection and testing of electric power systems," requires that electric power systems that are important to safety be designed to permit appropriate periodic inspection and testing. The emergency DC electrical power system is divided into three separate and independent divisions feeding redundant safety-related electrical load groups, thereby permitting the inspection and testing of any division while the other divisions are feeding their connected loads. The proposed TS changes do not alter this inspection and testing capability.
NRC Regulatory Guide (RG) 1.129, "Maintenance, Testing, and Replacement of Large Lead Storage Batteries for Nuclear Power Plants," Revision 1, February 1978, describes a method acceptable to the NRC for performing maintenance, testing, and replacement of large lead storage batteries at nuclear power plants. The RG states that the battery service test should be performed during refueling operations or at some other outage. As indicated in NMP2 USAR Table 1.8-1 and USAR Section 8.3.2.1.2, the battery service tests are performed in accordance with the TS requirements.
This license amendment request would allow the periodic Division 3 battery service tests and performance discharge tests to be performed on-line.4.2 Precedent The NRC has approved similar license amendments to remove mode restrictions for surveillance testing of the Division 3 battery. Examples include: " River Bend Station, Unit 1 (License Amendment No. 141 issued by NRC letter dated August 12, 2004 -ADAMS Accession No. ML042300415).
- Grand Gulf Nuclear Station, Unit 1 (License Amendment No. 159 issued by NRC letter dated October 27, 2003 -ADAMS Accession No. ML033030330).
4.3 Significant
Hazards Consideration Nine Mile Point Nuclear Station, LLC (NMPNS) is requesting an amendment to Renewed Facility Operating License NPF-69 for Nine Mile Point Unit 2 (NMP2). The proposed amendment would modify Technical Specification (TS) 3.8.4, "DC Sources -Operating," by revising two Surveillance Requirements (SRs) pertaining to the Division 3 direct current (DC) electrical power subsystem battery.The Division 3 DC electrical power subsystem feeds emergency DC loads associated with the High Pressure Core Spray (HPCS) system. The SRs currently prohibit performing the DC electrical power subsystem battery service test and the battery performance discharge test in Mode 1, 2, or 3. The proposed amendment would remove these Mode restrictions for the Division 3 battery, thereby allowing these two TS-required battery tests to be performed during Mode 1, 2, or 3 in conjunction with scheduled HPCS system outages.4 of 7 ENCLOSURE EVALUATION OF THE PROPOSED CHANGE NMPNS has evaluated whether or not a significant hazards consideration is involved with the proposed amendment by focusing on the three standards set forth in 10 CFR 50.92, "Issuance of Amendment," as discussed below: I1. Does the proposed amendment involve a significant increase in the probability or consequences of an accident previously evaluated?
Response:
No.The Division 3 (HPCS) DC electrical power subsystem and its associated emergency loads are accident mitigating features, not accident initiators.
Therefore, the proposed TS changes to allow performance of Division 3 battery surveillance testing (service test and the battery performance discharge test) in any plant operating mode will not significantly impact the probability of any previously evaluated accident.The design and function of plant equipment is not being modified by the proposed amendment.
Neither the battery test frequency nor the time that the TSs allow the HPCS system to be inoperable are being revised. Battery testing in accordance with the proposed TS changes will continue to verify that the Division 3 DC electrical power subsystem is capable of performing its required function of providing DC power to HPCS system equipment, consistent with the plant , safety analyses.
The battery testing period is within the period of time that the HPCS system will already be out of service for a planned system outage. The battery testing does not increase unavailability of the supported HPCS system or represent any change in risk above the current practice of planned system maintenance outages. Any risk associated with the testing of the Division 3 battery will be enveloped by the risk management of the HPCS system outage. In addition, the HPCS system reliability and availability are monitored and evaluated in relationship to Maintenance Rule goals to ensure that total outage times do not degrade operational safety over time.Testing is limited to only one electrical division of equipment at a time to ensure that design basis requirements are met. Should a fault occur while testing the Division 3 battery, there would be no significant impact on any accident consequences since the other two divisional DC electrical power subsystems and their associated emergency loads would be available to provide the minimum safety functions necessary to shut down the unit and maintain it in a safe shutdown condition.
Therefore, the proposed amendment does not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. Does the proposed amendment create the possibility of a new or different kind of accident from any accident previously evaluated?
Response:
No.No changes are being made to the plant that would introduce any new accident causal mechanisms.
Equipment will be operated in the same configuration with the exception of the plant operating mode in which the Division 3 battery surveillance testing is conducted.
Performance of these surveillance tests while online will continue to verify operability of the Division 3 battery. The proposed license amendment does not impact any plant systems that are accident initiators and does not adversely impact any accident mitigating systems, since the 5 of 7 ENCLOSURE EVALUATION OF THE PROPOSED CHANGE HPCS system will already be out of service. The battery testing will not increase the out-of-service time for the HPCS system.Therefore, the proposed amendment does not create the possibility of a new or different kind of accident from any accident previously evaluated.
- 3. Does the proposed amendment involve a significant reduction in a margin of safety?Response:
No.Margin of safety is related to confidence in the ability of the fission product barriers (fuel cladding, reactor coolant system, and primary containment) to perform their design functions during and following postulated accidents.
The proposed changes to the TS surveillance testing requirements for the Division 3 battery do not affect the operability requirements for the battery, as verification of such operability will continue to be performed as required.
Continued verification of operability supports the capability of the Division 3 DC electrical power subsystem to perform its required function of providing DC power to HPCS system equipment, consistent with the plant safety analyses.
Consequently, the performance of the fission product barriers will not be adversely impacted by implementation of the proposed amendment.
In addition, the proposed changes do not alter setpoints or limits established or assumed by the accident analysis.The battery testing will be performed when the HPCS system is already out of service for a planned system outage. The battery testing does not increase unavailability of the supported HPCS system or represent any change in risk above the current practice of planned system maintenance outages, as currently allowed by the TS.Therefore, the proposed amendment does not involve a significant reduction in a margin of safety.Based on the above, NMPNS concludes that the proposed amendment does not involve a significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and, accordingly, a finding of "no significant hazards consideration" is justified.
4.4 Conclusions
In conclusion, based on the considerations discussed above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.5.0 ENVIRONMENTAL CONSIDERATION A review has determined that the proposed amendments would change a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR 20, or would change an inspection or surveillance requirement.
However, the proposed amendments do not involve: (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in individual or 6 of 7 ENCLOSURE EVALUATION OF THE PROPOSED CHANGE cumulative occupational radiation exposure.
Accordingly, the proposed amendments meet the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9).
Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendments.
7 of 7 ATTACHMENT 1 NINE MILE POINT UNIT 2 PROPOSED TECHNICAL SPECIFICATION CHANGES (MARK-UP)The current versions of Technical Specification Pages 3.8.4-3 and 3.8.4-4 have been marked-up by hand to reflect the proposed changes.Nine Mile Point Nuclear Station, LLC December 9, 2009 DC Sources--Operating
3.8.4 SURVEILLANCE
REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.8.4.6 Verify each required Division 1 and 2 24 months battery charger supplies > 300 amps and the required Division 3 battery charger supplies 40 amps at > 130 V for> 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.SR 3.8.4.7--------------------
NOTES----------------
- 1. The modified performance discharge test in SR 3.8.4.8 may be performed in lieu of the service test in SR 3.8.4.7 provided the modified performance discharge test completely envelops the service test.2. This Surveillance shall not be performed in MODE 1, 2, or 3 However, credit may be taken for unplanned events that satisfy this SR.Verify battery capacity is adequate to supply, and maintain in OPERABLE status, the required emergency loads for the design duty cycle when subjected to a battery service test.24 months (continued)
NMP2 3.8.4-3 Amendment 9+/-,
DC Sources-Operating
3.8.4 SURVEILLANCE
REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.8.4.8-------------------
NOTE-----------------
This Surveillance shall not be performed in MODE 1, 2, or 3k However, credit may be taken for unplanned events that satisfy this SR.Verify battery capacity is 80% of the manufacturer's rating when subjected to a performance discharge test or a modified performance discharge test.60 months AND 12 months when battery shows degradation or has reached 85%of expected life with capacity< 100% of manufacturer's rating AND 24 months when battery has reached 85% of the expected life with capacity 100% of manufacturer's rating I NMP2 3.8.4-4 Amendment 9-)
ATTACHMENT 2 NINE MILE POINT UNIT 2 CHANGES TO TECHNICAL SPECIFICATION BASES (MARK-UP)The current versions of Technical Specifications Bases pages B 3.8.4-7 and B 3.8.4-9 have been marked-up by hand to reflect the proposed changes. These Bases pages are provided for information only and do not require NRC approval.Nine Mile Point Nuclear Station, LLC December 9, 2009 DC Sources-Operating B 3.8.4 BASES SURVEILLANCE SR 3.8.4.6 (continued)
REQUIREMENTS is required to be based on the largest combined demands of the various steady state loads and the charging capacity to restore the battery from the design minimum charge state to the fully charged state, irrespective of the status of the unit during these demand occurrences.
The minimum required amperes and duration*
ensure that these requirements can be satisfied.
The Surveillance Frequency is acceptable given the administrative controls existing to ensure adequate charger performance during these 24 month intervals.
In addition, this Frequency is intended to be consistent with expected fuel cycle lengths.SR 3.8.4.7 A battery service test is a special test of the battery's capability, as found, to satisfy the design requirements (battery duty cycle) of the DC electrical power system. The discharge rate and test length correspond to the design duty cycle requirements as specified in Reference 4.The Surveillance Frequency of 24 months is acceptable, given unit conditions required to perform the test and the other requirements existing to ensure adequate battery performance during these 24 month intervals.
In addition, this Frequency is intended to be consistent with expected fuel cycle lengths.This SR is modified by two Notes. Note I allows the e-43 performance.of a modified performance discharge test in lieu of a service test provided the modified performancepdischarge test completely envelops the service test. This-substitution is acceptable because a modified performance discharge test represents a more severe test of battery capacity than SR 3.8.4.7. The reason for Note 2 is that rLL performing the Surveillance would remove a required_ DC electrical power subsystem from service, perturb the electrical distribution system, and challenge safety systems.ACredit may be taken for unplanned events that satisfy the Surveillance.(continued)
NMP2 B 3.8.4-7 Revision-Q-,
DC Sources-Operating B 3.8.4 BASES SURVEILLANCE SR 3.8.4.8 (continued) in the battery.size calculation.
A capacity of 80% shows that the battery is getting old and capacity will decrease more rapidly, even if there is ample capacity to meet the load requirements.
The Surveillance Frequency for this test is normally 60 months. If the battery shows degradation, or if the battery has reached 85% of its expected life and capacity is< 100% of the manufacturers rating, the Surveillance Frequency is reduced to 12 months. However, if the battery shows no degradation but has reached 85% of its expected life, the Surveillance Frequency is only reduced to 24 months for batteries that retain capacity > 100% of the manufacturers rating. Degradation is indicated, consistent with IEEE-450 (Ref. 9), when the battery capacity drops by more than 10% of rated capacity in the previous 72 months or when it is below 90% of the manufacturers rating. The 12 month and 60 month Frequencies are consistent with the recommendations in IEEE-450 (Ref. 9). The 24 month Frequency is derived from the recommendations of IEEE-450 (Ref. 9).( -nxe.. ~&~ov~ 3 +e~S+/-yfl~ b~- ee4c~-~'eA6PFJI1, l> r 3 This SR is modified by a Note. The reason for the Note is In W£A that performing the Surveillance would remove a required , wc~sS4-LZ o , DC electrical power subsystem from service, perturb the electrical distribution system, and challenge safety systems. Credit may be taken for unplanned events that satisfy he Surveillance.
REFERENCES
- 1. 10 CFR 50, Appendix A, GDC 17.2. Regulatory Guide 1.6, Revision 0, March 10, 1971.3. IEEE Standard 308, 1974.4. USAR, Section 8.3.2.5. USAR, Chapter 6.6. USAR, Chapter 15 and Appendix A.7. 10 CFR 50.36(c)(2)(ii).(continued)
NMP2 B 3.8.4-9 Revision ./