Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling25 May 2023Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown CoolingHydrostatic
Surveillance Frequency Control Program
NMP1L3482, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b15 December 2022License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4bHot Short
Safe Shutdown
High winds
Reactor Vessel Water Level
Mission time
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Operating Basis Earthquake
Operator Manual Action
Zebra Mussel
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Seismically rugged
Surveillance Frequency Control Program
Scram Discharge Volume
Large early release frequency
Excess Flow Check Valve
Flooding Focused Evaluation
Earthquake
Turbine Missile
Offsite Circuit
Seismic Walkdown Report
ML22298A01125 October 2022License Amendment Request to Adopt Technical Specification Task Force TSTF-295-A, Modify Note 2 to Actions of (Post-Accident Monitoring) PAM Table To.Reactor Vessel Water Level
Post Accident Monitoring
ML22292A1315 October 20225 to Updated Final Safety Analysis Report, Technical Specification Bases, Rev. 69
RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration3 October 2022Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the PenetrationReactor Vessel Water Level
NMP1L3477, License Amendment Request - Application to Partially Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, to Revise.12 August 2022License Amendment Request - Application to Partially Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, to Revise.Surveillance Frequency Control Program
NMP2L2780, Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements30 September 2021Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) EnhancementsReactor Vessel Water Level
Ultimate heat sink
Stroke time
Water Inventory Control
Operating Basis Earthquake
Surveillance Frequency Control Program
Control of Heavy Loads
Power Operated Valves
Fuel cladding
Offsite Circuit
Scaffolding
NMP2L2762, License Amendment Request Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control26 May 2021License Amendment Request Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee ControlSafe Shutdown
Anticipated operational occurrence
Surveillance Frequency Control Program
Offsite Circuit
JAFP-20-0049, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability22 June 2020Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System OperabilityTime of Discovery
NMP2L2718, Supplemental Information No.1 for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, Revision 212 December 2019Supplemental Information No.1 for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2Surveillance Frequency Control Program
JAFP-19-0067, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability27 June 2019Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System OperabilityFire Barrier
Tornado Missile
Internal Flooding
Incorporated by reference
Turbine Missile
RS-19-039, Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls26 June 2019Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative ControlsHigh Radiation Area
Locked High Radiation Area
Process Control Program
Deep Dose Equivalent
NMP2L2693, Technical Specification Bases, Rev. 5724 October 2018Technical Specification Bases, Rev. 57
NMP2L2664, Supplemental Information No. 2 for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 212 January 2018Supplemental Information No. 2 for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2Water Inventory Control
NMP2L2652, License Amendment Request - Revise Surveillance Requirement 3.5.1.2 to Remove Note22 August 2017License Amendment Request - Revise Surveillance Requirement 3.5.1.2 to Remove Note
NMP2L2640, License Amendment Request - Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 228 February 2017License Amendment Request - Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Stroke time
Water Inventory Control
Post Accident Monitoring
Operating Basis Earthquake
Surveillance Frequency Control Program
Scram Discharge Volume
Power Operated Valves
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Offsite Circuit
Scaffolding
ML16309A40024 October 2016Revision 47 to Technical Specification Bases, List of Effective Pages
ML16309A40224 October 2016Revision 47 to Technical Specification Bases, Section B2.0, Safety Limits (Sls)Reactor Vessel Water Level
Anticipated operational occurrence
Hydrostatic
Fuel cladding
ML16309A40324 October 2016Revision 47 to Technical Specification Bases, Section B3.0, Limiting Condition for Operation (LCO) ApplicabilityFire Barrier
Internal Flooding
Tornado Generated Missile
Missed surveillance
Turbine Missile
Offsite Circuit
ML16309A40124 October 2016Revision 47 to Technical Specification Bases, Table of ContentsShutdown Margin
Ultimate heat sink
Post Accident Monitoring
Hydrostatic
Scram Discharge Volume
ML16309A40824 October 2016Revision 47 to Technical Specification Bases, Section B3.5, Emergency Core Cooling Systems (ECCS) and Reactor Core Isolation Cooling (RCIC) SystemReactor Vessel Water Level
Ultimate heat sink
Stroke time
Surveillance Frequency Control Program
ML16309A41324 October 2016Revision 47 to Technical Specification Bases, Section B3.9, Refueling OperationsShutdown Margin
Ultimate heat sink
Surveillance Frequency Control Program
ML16309A40524 October 2016Revision 47 to Technical Specification Bases, Section B3.2, Power Distribution LimitsAnticipated operational occurrence
Surveillance Frequency Control Program
Feedwater Controller Failure
Fuel cladding
ML16209A21826 July 2016Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing.Shutdown Margin
Reactor Vessel Water Level
Packing leak
High Radiation Area
Stroke time
Hydrostatic
Squib
Incorporated by reference
Missed surveillance
Surveillance Frequency Control Program
Excess Flow Check Valve
Power Operated Valves
Pressure Boundary Leakage
Recently irradiated fuel
Power change
Unidentified leakage
NMP1L3070, License Amendment Request - Reactivity Anomalies Surveillance18 March 2016License Amendment Request - Reactivity Anomalies SurveillanceShutdown Margin
Anticipated operational occurrence
NMP2L2592, Supplemental Information Regarding TSTF-425 License Amendment Request24 September 2015Supplemental Information Regarding TSTF-425 License Amendment RequestShutdown Margin
Ultimate heat sink
Squib
Surveillance Frequency Control Program
Scram Discharge Volume
Offsite Circuit
NMP1L3027, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3)12 May 2015Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3)
ML15089A23126 March 2015Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3)High winds
Stroke time
Hydrostatic
Probabilistic Risk Assessment
Squib
Multiple Spurious Operation
Incorporated by reference
Surveillance Frequency Control Program
Foreign Material Exclusion
Scram Discharge Volume
Excess Flow Check Valve
Overtravel
Power-Operated Valves
Recently irradiated fuel
Fire Protection Program
Unidentified leakage
NMP1L3010, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3)26 March 2015Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3)Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Squib
Surveillance Frequency Control Program
Scram Discharge Volume
Excess Flow Check Valve
Recently irradiated fuel
Offsite Circuit
NMP2L2576, License Amendment Request - Relocation of Secondary Containment Bypass Leakage Paths Table from Technical Specifications to the Technical Requirements Manual23 March 2015License Amendment Request - Relocation of Secondary Containment Bypass Leakage Paths Table from Technical Specifications to the Technical Requirements ManualStroke time
Squib
NMP2L2563, License Amendment Request - Primary Containment Isolation Instrumentation Technical Specification Allowable Value Change17 November 2014License Amendment Request - Primary Containment Isolation Instrumentation Technical Specification Allowable Value ChangeAnticipated operational occurrence
ML14191A25510 July 2014Nine Mile Point and Ginna, Unit 1 - Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement ProcessUnanalyzed Condition
Boric Acid
Reactor Vessel Water Level
Ultimate heat sink
Stroke time
Time to boil
Fuel cladding
ML12156A3631 June 2012Emergency License Amendment Request Pursuant to 10 CFR 50.90: Revision of the Main Steam Isolation Valve Allowable Leakage Rate LimitStroke time
Excess Flow Check Valve
Liquid penetrant
Power Uprate
ML11306A29827 October 2011Submittal of Revision 22 to the Final Safety Analysis Report (Updated), 10 CFR 50.59 Evaluation Summary Report, Technical Specifications Bases Changes, and Report Consistent with 10 CFR 54.37(b)Anticipated operational occurrence
Hydrostatic
Aging Management
Missed surveillance
Pressure and Temperature Limits Report
Foreign Material Exclusion
ML11214A21425 July 2011License Amendment Request, Extension of the Completion Time for Inoperable Diesel Generator - Response to NRC Request for Additional InformationHigh winds
Mission time
Probabilistic Risk Assessment
ML11096028330 March 2011License Amendment Request Pursuant to 10 CFR 50.90: Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage ...Grab sample
ML0935000909 December 2009License Amendment Request to Remove Operating Mode Restrictions for Performing Surveillance Testing of the Division 3 Battery - Technical Specification 3.8.4, DC Sources - OperatingSafe Shutdown
Fuel cladding
ML09316025726 October 2009Submittal of Revision 21 to the Final Safety Analysis Report (Updated), 10 CFR 50.59 Evaluation Summary Report, Technical Specifications Bases Changes, and Report Consistent with 10 CFR 54.37(b)Hydrostatic
Overtravel
ML0907802509 March 2009Submittal of Amendment Request for Technical Specification Improvement to Revise Control Rod Scram Time Testing FrequencyIncorporated by reference
ML0906403013 March 2009License Amendment Request Pursuant to 10 CFR 50.90: Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits ReportShutdown Margin
Anticipated operational occurrence
Hydrostatic
Pressure and Temperature Limits Report
Recently irradiated fuel
ML08275029929 September 2008Technical Specifications
ML08025016224 January 2008Response to NRC Request for Additional Information Regarding Nine Mile Point Nuclear Station, Unit No. 1, Revision of Rod Worth Minimizer Limiting Condition for Operation During Startup
ML07264010319 September 2007License Amendment Request for Adoption of TSTF-484, Revision 0, Use of TS 3.10.1 for Scram Time Testing Activities.Hydrostatic
Incorporated by reference
ML07219060530 July 2007Application for Technical Specification Change TSTF-477, Rev. 3, Add Action for Two Inoperable Control Room AC Subsystems to the Technical Specifications Using Consolidated Line Item Improvement ProcessIncorporated by reference
ML07212059223 July 2007Application for Technical Specification Improvement to Adopt TSTF-476, Revison 1, Improved BPWS Control Rod Insertion Process (NEDO-33091), Using the Consolidated Line Item ImprovementIncorporated by reference
ML07212058723 July 2007License Amendment Request Pursuant to 10 CFR 50.90: Revision of Rod Worth Minimizer Limiting Condition for Operation During Startup - Technical Specification Section 3.1.1.b
ML07205042312 July 2007Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement ProcessSafe Shutdown
Incorporated by reference
ML07205047412 July 2007Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement ProcessSafe Shutdown
Offsite Dose Calculation Manual
Incorporated by reference
Annual Radiological Environmental Operating Report
ML07078005915 March 2007Technical Specification 4.1.1 Regarding Control Rod System Surveillance Requirements
ML06304060219 October 2006License Amendment Request Pursuant to 10 CFR 50.90: Revision to Control Rod System Surveillance Requirements - Technical Specification 4.1.1Anticipated operational occurrence