ML16309A401

From kanterella
Jump to navigation Jump to search
7 to Technical Specification Bases, Table of Contents
ML16309A401
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 10/24/2016
From:
Exelon Generation Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16309A376 List:
References
NMP2L 2633
Download: ML16309A401 (3)


Text

TABLE OF CONTENTS NMP2 B i Revision 0, 9 (A109) 22, 24 (A123),

33 (A135)

B 2.0 SAFETY LIMITS (SLs)

B 2.1.1 Reactor Core SLs.....................................................................B 2.0-1 B 2.1.2 Reactor Coolant System (RCS) Pressure SL............................B 2.0-6 B 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY......B 3.0-1 B 3.0 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY....................B 3.0-16 B 3.1 REACTIVITY CONTROL SYSTEMS B 3.1.1 SHUTDOWN MARGIN (SDM)..................................................B 3.1.1-1 B 3.1.2 Reactivity Anomalies................................................................B 3.1.2-1 B 3.1.3 Control Rod OPERABILITY......................................................B 3.1.3-1 B 3.1.4 Control Rod Scram Times........................................................B 3.1.4-1 B 3.1.5 Control Rod Scram Accumulators.............................................B 3.1.5-1 B 3.1.6 Rod Pattern Control..................................................................B 3.1.6-1 B 3.1.7 Standby Liquid Control (SLC) System......................................B 3.1.7-1 B 3.1.8 Scram Discharge Volume (SDV) Vent and Drain Valves.............................................................................B 3.1.8-1 B 3.2 POWER DISTRIBUTION LIMITS B 3.2.1 AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR).......................................................................B 3.2.1-1 B 3.2.2 MINIMUM CRITICAL POWER RATIO (MCPR)........................B 3.2.2-1 B 3.2.3 LINEAR HEAT GENERATION RATE (LHGR)..........................B 3.2.3-1 B 3.3 INSTRUMENTATION B 3.3.1.1 Reactor Protection System (RPS)

Instrumentation................................................................B 3.3.1.1-1 B 3.3.1.2 Source Range Monitor (SRM) Instrumentation.........................B 3.3.1.2-1 B 3.3.2.1 Control Rod Block Instrumentation...........................................B 3.3.2.1-1 B 3.3.2.2 Feedwater System and Main Turbine High Water Level Trip Instrumentation...............................................B 3.3.2.2-1 B 3.3.3.1 Post Accident Monitoring (PAM)

Instrumentation................................................................B 3.3.3.1-1 B 3.3.3.2 Remote Shutdown System.......................................................B 3.3.3.2-1 B 3.3.4.1 End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation............................................B 3.3.4.1-1 B 3.3.4.2 Anticipated Transient Without Scram Recirculation Pump Trip (ATWS-RPT)

Instrumentation................................................................B 3.3.4.2-1 B 3.3.5.1 Emergency Core Cooling System (ECCS)

Instrumentation................................................................B 3.3.5.1-1 B 3.3.5.2 Reactor Core Isolation Cooling (RCIC)

System Instrumentation...................................................B 3.3.5.2-1 B 3.3.6.1 Primary Containment Isolation Instrumentation................................................................B 3.3.6.1-1 B 3.3.6.2 Secondary Containment Isolation Instrumentation................................................................B 3.3.6.2-1 (continued)

TABLE OF CONTENTS NMP2 B ii Revision 0, 25 (A124)

B 3.3 INSTRUMENTATION (continued)

B 3.3.7.1 Control Room Envelope Filtration (CREF) System Instrumentation................................................................B 3.3.7.1-1 B.3.3.7.2 Mechanical Vacuum Pump Isolation Instrumentation................................................................B 3.3.7.2-1 B 3.3.8.1 Loss of Power (LOP) Instrumentation.......................................B 3.3.8.1-1 B 3.3.8.2 Reactor Protection System (RPS) Electric Power Monitoring Logic...............................................B 3.3.8.2-1 B 3.3.8.3 Reactor Protection System (RPS) Electric Power Monitoring Scram Solenoids.............................B 3.3.8.3-1 B 3.4 REACTOR COOLANT SYSTEM (RCS)

B 3.4.1 Recirculation Loops Operating..................................................B 3.4.1-1 B 3.4.2 Flow Control Valves (FCVs)......................................................B 3.4.2-1 B 3.4.3 Jet Pumps................................................................................B 3.4.3-1 B 3.4.4 Safety/Relief Valves (S/RVs)....................................................B 3.4.4-1 B 3.4.5 RCS Operational LEAKAGE.....................................................B 3.4.5-1 B 3.4.6 RCS Pressure Isolation Valve (PIV) Leakage...........................B 3.4.6-1 B 3.4.7 RCS Leakage Detection Instrumentation..................................B 3.4.7-1 B 3.4.8 RCS Specific Activity................................................................B 3.4.8-1 B 3.4.9 Residual Heat Removal (RHR) Shutdown Cooling System Hot Shutdown.................................................B 3.4.9-1 B 3.4.10 Residual Heat Removal (RHR) Shutdown Cooling System Cold Shutdown...............................................B 3.4.10-1 B 3.4.11 RCS Pressure and Temperature (P/T) Limits...........................B 3.4.11-1 B 3.4.12 Reactor Steam Dome Pressure................................................B 3.4.12-1 B 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM B 3.5.1 ECCS Operating...................................................................B 3.5.1-1 B 3.5.2 ECCS Shutdown...................................................................B 3.5.2-1 B 3.5.3 RCIC System............................................................................B 3.5.3-1 B 3.6 CONTAINMENT SYSTEMS B 3.6.1.1 Primary Containment................................................................B 3.6.1.1-1 B 3.6.1.2 Primary Containment Air Locks................................................B 3.6.1.2-1 B 3.6.1.3 Primary Containment Isolation Valves (PCIVs).........................B 3.6.1.3-1 B 3.6.1.4 Drywell and Suppression Chamber Pressure...........................B 3.6.1.4-1 B 3.6.1.5 Drywell Air Temperature...........................................................B 3.6.1.5-1 B 3.6.1.6 Residual Heat Removal (RHR) Drywell Spray..........................B 3.6.1.6-1 B 3.6.1.7 Suppression Chamber-to-Drywell Vacuum Breakers................B 3.6.1.7-1 B 3.6.2.1 Suppression Pool Average Temperature..................................B 3.6.2.1-1 B 3.6.2.2 Suppression Pool Water Level..................................................B 3.6.2.2-1 B 3.6.2.3 Residual Heat Removal (RHR) Suppression Pool Cooling............................................................................B 3.6.2.3-1 B 3.6.2.4 Residual Heat Removal (RHR) Suppression Pool Spray...............................................................................B 3.6.2.4-1 B 3.6.3.1 Deleted.....................................................................................B 3.6.3.1-1 B 3.6.3.2 Primary Containment Oxygen Concentration............................B 3.6.3.2-1 (continued)

RCS Pressure SL B 2.1.2 NMP2 B iii Revision 0 B 3.6 CONTAINMENT SYSTEMS (continued)

B 3.6.4.1 Secondary Containment................................................................B 3.6.4.1-1 B 3.6.4.2 Secondary Containment Isolation Valves (SCIVs).........................B 3.6.4.2-1 B 3.6.4.3 Standby Gas Treatment (SGT) System.........................................B 3.6.4.3-1 B 3.7 PLANT SYSTEMS B 3.7.1 Service Water (SW) System and Ultimate Heat Sink (UHS)......................................................................B 3.7.1-1 B 3.7.2 Control Room Envelope Filtration (CREF) System...................B 3.7.2-1 B 3.7.3 Control Room Envelope Air Conditioning (AC)

System............................................................................B 3.7.3-1 B 3.7.4 Main Condenser Offgas............................................................B 3.7.4-1 B 3.7.5 Main Turbine Bypass System...................................................B 3.7.5-1 B 3.7.6 Spent Fuel Storage Pool Water Level.......................................B 3.7.6-1 B 3.8 ELECTRICAL POWER SYSTEMS B 3.8.1 AC Sources Operating..........................................................B 3.8.1-1 B 3.8.2 AC Sources Shutdown..........................................................B 3.8.2-1 B 3.8.3 Diesel Fuel Oil, Lube Oil, and Starting Air.................................B 3.8.3-1 B 3.8.4 DC Sources Operating..........................................................B 3.8.4-1 B 3.8.5 DC Sources Shutdown.........................................................B 3.8.5-1 B 3.8.6 Battery Cell Parameters............................................................B 3.8.6-1 B 3.8.7 Inverters Operating...............................................................B 3.8.7-1 B 3.8.8 Distribution Systems Operating.............................................B 3.8.8-1 B 3.8.9 Distribution Systems Shutdown............................................B 3.8.9-1 B 3.9 REFUELING OPERATIONS B 3.9.1 Refueling Equipment Interlocks................................................B 3.9.1-1 B 3.9.2 Refuel Position One-Rod-Out Interlock.....................................B 3.9.2-1 B 3.9.3 Control Rod Position.................................................................B 3.9.3-1 B 3.9.4 Control Rod Position Indication.................................................B 3.9.4-1 B 3.9.5 Control Rod OPERABILITY Refueling..................................B 3.9.5-1 B 3.9.6 Reactor Pressure Vessel (RPV) Water Level Irradiated Fuel....................................................B 3.9.6-1 B 3.9.7 Reactor Pressure Vessel (RPV) Water Level New Fuel or Control Rods..................................B 3.9.7-1 B 3.9.8 Residual Heat Removal (RHR) High Water Level.................B 3.9.8-1 B 3.9.9 Residual Heat Removal (RHR) Low Water Level..................B 3.9.9-1 B 3.10 SPECIAL OPERATIONS B 3.10.1 System Leakage and Hydrostatic Testing Operation................B 3.10.1-1 B 3.10.2 Reactor Mode Switch Interlock Testing.....................................B 3.10.2-1 B 3.10.3 Single Control Rod Withdrawal Hot Shutdown......................B 3.10.3-1 B 3.10.4 Single Control Rod Withdrawal Cold Shutdown....................B 3.10.4-1 B 3.10.5 Single Control Rod Drive (CRD) Removal Refueling.............B 3.10.5-1 B 3.10.6 Multiple Control Rod Withdrawal Refueling...........................B 3.10.6-1 B 3.10.7 Control Rod Testing Operating.............................................B 3.10.7-1 B 3.10.8 SHUTDOWN MARGIN (SDM) Test Refueling......................B 3.10.8-1