ML020730599

From kanterella
Jump to navigation Jump to search

Technical Specifications, Issuance of Amendment Safety Limit Minimum Critical Power Ratio (Tac No. MB3327)
ML020730599
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 03/13/2002
From: Tam P
NRC/NRR/DLPM/LPD1
To: Conway J
Niagara Mohawk Power Corp
Tam P
Shared Package
ML020770158 List:
References
TAC MB3327
Download: ML020730599 (2)


Text

SLs 2.0 2.0 SAFETY LIMITS (SLs) 2.1 SLs 2.1.1 Reactor Core SLs 2.1.1.1 With the reactor steam dome pressure < 785 psig or core flow < 10% rated core flow:

THERMAL POWER shall be < 25% RTP.

2.1.1.2 With the reactor steam dome pressure Ž_785 psig and core flow _>10% rated core flow:

MCPR shall be Ž_1.06 for two recirculation loop operation or >_1.07 for single recirculation loop operation.

2.1.1.3 Reactor vessel water level shall be greater than the top of active irradiated fuel.

2.1.2 Reactor Coolant System Pressure SL Reactor steam dome pressure shall be _ 1325 psig.

2.2 SL Violations With any SL violation, the following actions shall be completed within 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />s:

2.2.1 Restore compliance with all SLs; and 2.2.2 Insert all insertable control rods.

NMP2 2.0-1 Amendment 91-, 105

Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.5 CORE OPERATING LIMITS REPORT (COLR) (continued)

1. The APLHGR for Specification 3.2.1.
2. The MCPR for Specification 3.2.2.
3. The LHGR for Specification 3.2.3.
4. Reactor Protection System Instrumentation Setpoint for the OPRM - Upscale Function Allowable Value for Specification 3.3.1.1.
5. Control Rod Block Instrumentation Setpoint for the Rod Block Monitor - Upscale Function Allowable Value for Specification 3.3.2.1.
b. The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC, specifically those described in the following documents:
1. NEDE-2401 1-P-A-US, "General Electric Standard Application for Reactor Fuel," U.S. Supplement, (NRC approved version specified in the COLR).
c. The core operating limits shall be determined such that all applicable limits (e.g., fuel thermal mechanical limits, core thermal hydraulic limits, Emergency Core Cooling Systems (ECCS) limits, nuclear limits such as SDM, transient analysis limits, and accident analysis limits) of the safety analysis are met.
d. The COLR, including any midcycle revisions or supplements, shall be provided upon issuance for each reload cycle to the NRC.

(continued) 5.6-3 Amendment WK 105 NMP2