Category:Letter
MONTHYEARIR 05000282/20244032024-10-25025 October 2024 – Security Baseline Inspection Report 05000282/2024403 and 05000306/2024403 05000282/LER-2024-001-01, Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies2024-10-22022 October 2024 Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies L-PI-24-044, Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-10-21021 October 2024 Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program ML24277A1012024-10-0303 October 2024 Closure of Interim Report of a Potential Deviation or Failure to Comply Associated with Bentley Systems Incorporated Autopipe Software ML24221A3622024-09-27027 September 2024 Issuance of Amendment Nos. 245 and 233 Revise Technical Specification 3.8.1, AC Sources-Operating, Surveillance Requirement 3.8.1.2, Note 3 ML24241A1682024-09-23023 September 2024 Transmittal Letter Amendment No. 13 to Materials License No. Special Nuclear Material-2506 for the Prairie Island Independent Spent Fuel Storage Installation 05000282/LER-2024-001, Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies2024-09-16016 September 2024 Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies IR 05000282/20243012024-09-13013 September 2024 NRC Initial License Examination Report 05000282/2024301 and 05000306/2024301 IR 05000282/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Prairie Island Nuclear Generating Plant, Units 1 and 2 (Report 05000282/2024005 and 05000306/2024005) L-PI-24-040, Post-Submittal Package Letter2024-08-23023 August 2024 Post-Submittal Package Letter IR 05000282/20245012024-08-0505 August 2024 Emergency Preparedness Inspection Report 05000282/2024501 and 05000306/2024501 ML24213A1592024-07-31031 July 2024 Operator Licensing Examination Approval - Prairie Island Nuclear Generating Plant IR 05000282/20240022024-07-30030 July 2024 Integrated Inspection Report 05000282/2024002 and 05000306/2024002 ML24208A1502024-07-26026 July 2024 Independent Spent Fuel Storage Installation - Submittal of Quality Assurance Topical Report (NSPM-1) ML24197A2012024-07-15015 July 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000282/2024004 IR 05000282/20240102024-06-28028 June 2024 Comprehensive Engineering Team Inspection Report 05000282/2024010 and 05000306/2024010 L-PI-24-036, – Preparation and Scheduling of Operator Licensing Examinations2024-06-28028 June 2024 – Preparation and Scheduling of Operator Licensing Examinations ML24158A5912024-06-0606 June 2024 CFR 50.46 LOCA Annual Report L-PI-24-031, Independent Spent Fuel Storage Installation, Supplement to License Amendment Request to Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2)2024-06-0505 June 2024 Independent Spent Fuel Storage Installation, Supplement to License Amendment Request to Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2) L-PI-24-014, License Amendment Request to Revise the Technical Specification Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumption2024-06-0303 June 2024 License Amendment Request to Revise the Technical Specification Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumption ML24155A1922024-05-31031 May 2024 Refueling Outage Unit 2 R33 Owners Activity Report for Class 1, 2, 3 and Mc Inservice Inspections 05000306/LER-2024-001-01, Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump2024-05-31031 May 2024 Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump ML24149A3712024-05-29029 May 2024 (Ping) - Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection ML24262A1992024-05-29029 May 2024 L-PI-24-018 PINGP 75 Day Letter L-PI-24-030, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.12024-05-22022 May 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.1 ML24141A1292024-05-22022 May 2024 Northern States Power Company - Use of Encryption Software for Electronic Transmission of Safeguards Information ML24141A0452024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML24128A2572024-05-16016 May 2024 ISFSI A13 Acceptance Letter IR 05000282/20240012024-05-15015 May 2024 Integrated Inspection Report 05000282/2024001 and 05000306/2024001 ML24130A2362024-05-0909 May 2024 Independent Spent Fuel Storage Installation - 2023 Annual Radiological Environmental Monitoring Program Report ML24130A2392024-05-0909 May 2024 2023 Annual Radioactive Effluent Report ML24071A1162024-05-0101 May 2024 Issuance of Amendment Nos. 244 and 232 Revise TS 3.7.8, Cooling Water (Cl) System ML24128A0882024-04-30030 April 2024 Submittal of Updated Safety Analysis Report (Usar), Revision 38 ML24089A2382024-04-29029 April 2024 Summary of Nuclear Property Insurance 05000306/LER-2024-001, Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump2024-04-29029 April 2024 Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump IR 05000282/20244012024-04-25025 April 2024 – Security Baseline Inspection Report 05000282/2024401 and 05000306/2024401 ML24100A8042024-04-24024 April 2024 – Alternative Request RR-09 for Safety Injection and Volume Control System Category C Check Valve Inservice Testing ML24114A0882024-04-23023 April 2024 Annual Report of Individual Monitoring for the Prairie Island Nuclear Generating Plant (PINGP) ML24113A1182024-04-12012 April 2024 NRC Letter Re NRC Office of Investigations Report No. 3-2023-004 ML24100A1212024-04-0909 April 2024 Submittal of Revised Pressure and Temperature Limits Report ML24093A2832024-04-0202 April 2024 Nuclear Material Transaction Report L-PI-24-012, Independent Spent Fuel Storage Installation - License Amendment Request: Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2)2024-04-0202 April 2024 Independent Spent Fuel Storage Installation - License Amendment Request: Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2) ML24089A2402024-03-29029 March 2024 Guarantee of Payment of Deferred Premiums ML24060A1232024-03-27027 March 2024 to Request 1-RR-5-10 and 2-RR-5-10 Regarding Reactor Pressure Vessel Welds and Nozzle Welds ML24081A1532024-03-21021 March 2024 Reactor Trip, Auxiliary Feedwater and Emergency Service Water System Actuation Due to Electrical Transient in DC Control Power Cables ML24262A1512024-03-15015 March 2024 L-PI-24-011 150 Day Letter 2024 PINGP ILT NRC Exam ML24010A0582024-03-0505 March 2024 Amendment No. 12 to Materials License No. Special Nuclear Material-2506 for the Prairie Island Independent Spent Fuel Storage Installation L-PI-24-004, Independent Spent Fuel Storage Installation - Annual Effluent Report, January Through December 20232024-02-29029 February 2024 Independent Spent Fuel Storage Installation - Annual Effluent Report, January Through December 2023 IR 05000282/20230062024-02-28028 February 2024 Annual Assessment Letter for Prairie Island Nuclear Generating Plant, Units 1 and 2 (Report 05000282/2023006 and 05000306/2023006) ML24088A1102024-02-25025 February 2024 Fairbanks Morse (Fm) Part 21 Notification Report Number 23-01 Re Asco Stainless Steel Solenoid Valves 2024-09-27
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24197A2012024-07-15015 July 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000282/2024004 ML24149A3712024-05-29029 May 2024 (Ping) - Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection ML24141A0452024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML24116A2532024-04-25025 April 2024 Final Request for Additional Information for LAR to Revise SR 3.8.1.2 Note 3 (EPID: L- 2023-LLA-0135) ML24045A0862024-02-12012 February 2024 Final RAI for Alternative RR-09 ML23335A1152023-12-0101 December 2023 NRR E-mail Capture - Prairie Island Units 1 and 2 - Request for Additional Information LAR to Revise TS 3.7.8 Required Actions ML23248A3462023-09-0505 September 2023 NRR E-mail Capture - Request for Additional Information for Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant - Decommissioning Funding Status Reports ML23214A2032023-08-0202 August 2023 Request for Information for an NRC Quadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000282/2024010; 05000306/2024010 ML23199A0922023-07-18018 July 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000306/2023004 ML23096A3082023-04-0707 April 2023 Notification of Inspection an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23055B0562023-02-27027 February 2023 Request for Information for NRC Commercial Grade Dedication Inspection Inspection Report 05000282/2023010 and 05000306/2023010 ML23053A1432023-02-22022 February 2023 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Prairie Island Nuclear Generating Plant ML22166A4112022-06-15015 June 2022 NRR E-mail Capture - Request for Additional Information Prairie Island Nuclear Generating Plant, Unit 2, Alternative RR-08, PIV Leakage ML22160A6022022-06-0909 June 2022 NRR E-mail Capture - Draft Request for Additional Information Prairie Island Nuclear Generating Plant, Units 1 and 2, 24-Month Operating Cycle Amendment ML22145A4152022-05-25025 May 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000282/2022402 05000306/2022402 ML22131A2652022-05-11011 May 2022 NRR E-mail Capture - Request for Additional Information Xcel Energy Amendment Request to Create a Common Eplan and EOF for Monticello and Prairie Island ML22130A5792022-05-11011 May 2022 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML21321A0452021-11-10010 November 2021 Request for Additional Information: Prairie Island 24-Month Cycle Amendment Request ML21305A0102021-10-29029 October 2021 NRR E-mail Capture - Request for Additional Information Prairie Island Cooling Water Amendment ML21252A0122021-08-30030 August 2021 NRR E-mail Capture - Request for Additional Information Amendment Request to Adopt TSTF-471 and 517-T for Prairie Island ML21147A5232021-06-0303 June 2021 Prarie Island Nuclear Generating Plant, Units 1 and 2 - Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML21131A0752021-05-10010 May 2021 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000282/2021004; 05000306/2021004 ML21099A0972021-04-0909 April 2021 Information Request to Support Upcoming Temporary Instruction 2515/194 Inspection; Inspection Report 05000282/2021012 and 05000306/2021012 ML21062A0532021-03-0202 March 2021 Information Request to Support Upcomng Problem Identification and Resolution (Pi&R) Inspection at the Prairie Island Nuclear Generating Plant ML21033A6112021-02-0101 February 2021 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team); Inspection Report 05000282/2021010 and 05000306/2021010 ML20343A1292020-12-0808 December 2020 NRR E-mail Capture - Request for Additional Information ML20192A1442020-07-0707 July 2020 NRR E-mail Capture - Request for Additional Information Prairie Island License Amendment Request to Adopt TSTF-505 ML20189A1782020-07-0606 July 2020 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000282/2020004; 05000306/2020004 ML20133K0692020-05-14014 May 2020 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML20077K6242020-04-13013 April 2020 License Amendment Request - Request for Additional Information ML20052F4102020-02-21021 February 2020 Notification of Nrc Design Bases Assurance Inspection (Programs) (05000282/202010; 05000306/202010) and Initial Request for Information ML20035F1552020-02-0404 February 2020 NRR E-mail Capture - Request for Additional Information Monticello and Prairie Island Alternative Requests to Adopt Code Cases N-786-3 and N-789-3 (Epids: L-2019-LLR-0078 and L-2019-LLR-0079) ML19233A0032019-08-14014 August 2019 NRR E-mail Capture - Request for Additional Information Prairie Island Relief Requests 1-RR-10 and 2-RR-10 ML19057A1652019-02-26026 February 2019 NRR E-mail Capture - Request for Additional Information Prairie Island 50.69 Amendment Request ML18313A0832018-11-0707 November 2018 NRR E-mail Capture - Request for Additional Information Prairie Island NFPA-805 License Condition Modification Amendment Request ML18264A1912018-09-19019 September 2018 NRC Information Request (9/19/2018); Part B Items (Onsite) IP 71111.08 - E-Mailed 09/19/18 (DRS-M.Holmberg) ML18235A2982018-08-23023 August 2018 NRR E-mail Capture - Request for Additional Information Prairie Island TSTF-425 License Amendment Request ML18169A4202018-06-25025 June 2018 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment to Modify Renewed Facility Operating License Paragraph 2.C(4)(c) ML18025C0152018-01-24024 January 2018 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team): Inspection Report 05000282/2018011; 05000306/2018011 (DRS-A.Dunlop) ML17277B3332017-10-0404 October 2017 NRR E-mail Capture - Request for Additional Information Prairie Island Special Heavy Lifting Devices LAR ML17249A9232017-09-0606 September 2017 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000282/2017004; 05000306/2017004 (Exf) ML17235A9982017-08-23023 August 2017 NRR E-mail Capture - Request for Additional Information Prairie Island EAL Scheme Change ML17221A3892017-08-0909 August 2017 NRR E-mail Capture - Request for Additional Information for Prairie Island Nuclear Generating Plant License Amendment Request Dated February 23, 2017 Emergency Response Organization ML17219A0762017-08-0707 August 2017 NRR E-mail Capture - Request for Additional Information for Prairie Island Nuclear Generating Plant License Amendment Request Dated February 23, 2017 Emergency Response Organization ML17038A5132017-02-0707 February 2017 NRR E-mail Capture - Prairie Island NFPA 805 LAR, PRA RAI 21.01 ML17018A4272017-01-18018 January 2017 NRR E-mail Capture - Request for Additional Information: Prairie Island License Amendment Request to Revise Technical Specification 3.8.7 to Remove Non-Conservative Required Action ML16326A3532016-11-18018 November 2016 NRR E-mail Capture - Draft Request for Information Related to Prairie Island NFPA-805 License Amendment ML16265A1652016-09-20020 September 2016 Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information; Inspection Report 05000282/2016004; 05000306/2016004 (Gfo) ML16189A2052016-07-0707 July 2016 Notification of NRC Inspection and Request for Information ML16113A1612016-04-21021 April 2016 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Prairie Island Nuclear Generating Plant, Units 1 and 2 2024-07-15
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352
January 3, 2013
Mr. Jim Lynch Site Vice President Prairie Island Nuclear Generating Plant Northern States Power Company, Minnesota 1717 Wakonade Drive East Welch, MN 55089
SUBJECT:
PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 - NOTIFICATION OF NRC INSPECTION AND REQUEST FOR INFORMATION
Dear Mr. Lynch:
On February 25, 2013, the U.S. Nuclear Regulatory Commission (NRC) will begin the Temporary Instruction (TI) inspection, "Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks," (TI 2515-182) at your Prairie Island Station Units 1 and 2. This on-site inspection is scheduled to be performed February 25 through March 1, 2013.
In order to minimize the impact to your on-site resources, and to ensure a productive inspection for both sides, we have enclosed a list of documents pertinent to our inspection. The documents requested for this inspection include all relevant documents that will allow the inspector(s) to adequately complete Phase II of this inspection. It is important that all
documents are up-to-date, and complete, in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection. We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mr. F. Sienczak, of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector Mr. T. Bilik at (630) 829-9744. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
J. Lynch In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electr onically for public inspection in the NRC Public Document Room or from the Publicly Available Records Systems (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/ David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket No. 50-282; 50-306 License No. NPR-42; NPR-60
Enclosure:
DOCUMENT REQUEST FOR TEMPORARY INSTRUCTION (TI 2515-182)
INSPECTION cc w/encl: Distribution via ListServŽ TEMPORARY INSTRUCTION 2515-182 PHASE II INSPECTION DOCUMENT REQUEST 1 Enclosure Inspection Dates: February 25 - March 1, 2013 Inspection Procedures: Temporary Instruction (TI 2515-182), "Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks" Inspector:
Tom Bilik (630) 829-9744 tom.bilik@nrc.gov A. Information Requested for the In-Office Preparation Week The following documents listed below are requested (electronic copy CD ROM if possible) by February 19, 2013, to facilitate the preparation for the on-site inspection week. The inspector may select specific items from the information requested for the preparation week and request follow-up documents during the on-site inspection week. 1. Organization list of site individuals responsible for the site's underground piping and tanks program. 2. Copy of Site Underground Piping and Tanks Program. 3. Please review the enclosure "Questions" list and provide the response and/or document requests. The questions identified with the word "Prep" (highlighted in bold) are the items to be provided in advance of the inspection to support preparation for on-site week. 4. Schedule for completion of the following NEI 09-14 Revision 1 attributes:
Buried Piping
- Procedures and Oversight;
- Asset Management Plan. Underground Piping and Tanks
- Procedures and Oversight;
- Condition Assessment Plan; TEMPORARY INSTRUCTION 2515-182 PHASE II INSPECTION DOCUMENT REQUEST 2 Enclosure
- Asset Management Plan. B. Information to be Provided On-Site to the Inspectors Following the Entrance Meeting 1. Location maps of buried and underground piping and tanks identified by the inspector from the information requested for the preparation week. 2. Copy of EPRI document, "Recommendations for an Effective Program to Control the Degradation of Buried Pipe." 3. Self or third party assessments of the Underground Piping and Tanks Program (if any have been performed). 4. Please review the enclosure "Questions" list and provide response and/or document requests. The questions identified with the word "On-Site" (highlighted in bold) are the items to be provided to the inspector on-site at the entrance meeting. 5. For any of the NEI 09-14 Revision 1 attributes identified below which have been completed prior to the NRC's on-site inspection, provide written records that demonstrate that the program attribute is complete.
Buried Piping
- Procedures and Oversight;
- Asset Management Plan. Underground Piping and Tanks
- Procedures and Oversight;
- Condition Assessment Plan;
TEMPORARY INSTRUCTION 2515-182 PHASE II INSPECTION DOCUMENT REQUEST 3 Enclosure Questions Response Prep week/ On-site week Initiative Consistency Prep Has the licensee taken any deviations to either of the initiatives?
Yes/No On-site If so, what deviations have been taken and what is (are) the basis for these deviations? Provide documentation of deviations and any associated corrective action reports. Prep Does the licensee have an on-site buried piping program manager (owner) and, potentially, a staff?
Yes/No On-site How many buried piping program owners have there been since January 1, 2010? Provide documentation identifying individuals responsible for the site buried piping program since January 1, 2010. On-site How many other site programs are assigned to the buried piping program
owner? List all site programs that are under the direct responsibility of the site's buried piping program owner. On-site Does the licensee have requirements to capture program performance, such as system health reports and performance indicators?
Yes/No Provide copies of most recent systems health
reports if applicable Prep Are these requirements periodic or event driven? Periodic/Event Driven/None On-site Are there examples where these requirements have been successfully used to upgrade piping systems or to
avert piping or tank leaks?
Yes/No Provide documentation related to examples if applicable Prep Does the licensee have a program or procedure to confirm that as-built location of buried and underground piping and tanks at the plant?
Yes/No TEMPORARY INSTRUCTION 2515-182 PHASE II INSPECTION DOCUMENT REQUEST 4 Enclosure Prep Has the licensee used this program? Yes/No Prep/ On-site For a sample of buried pipe and underground piping and tanks (sample size at least 1 high and 1 low risk/priority pipe or tank), did the risk ranking and/or prioritization process utilized by the licensee produce results in accordance
with the initiative guidelines, i.e., which emphasize the importance of components which have a high likelihood and consequence of failure and deemphasize
the importance of components which have a low likelihood and consequence of failure? Yes/No Sample size examined _____
Prep: Provide copy of site's risk ranking documents including documents pertaining to the actual risk rankings and methodology
used. Prep: Provide documents/drawings and/or list which identifies the risk ranking for each pipe segment or tank in each system within the
scope of these programs.
On-site: Provide the documents which record/describe how the risk-methodology was applied to determine the risk of pipe segments or tanks as selected by the inspector during the preparation week.
Prep As part of its risk-ranking process did the licensee estimate/determine the total length of buried/underground piping included in the initiatives?
Yes/No Prep As part of its risk-ranking process did the licensee estimate/determine the total length of high risk buried/underground piping included in the initiatives?
Yes/No Preventive Actions/System Maintenance
TEMPORARY INSTRUCTION 2515-182 PHASE II INSPECTION DOCUMENT REQUEST 5 Enclosure Prep For buried steel, copper, or aluminum piping or tanks which are not cathodically protected, has the licensee developed a technical basis for concluding that structural (e.g., ASME Code minimum wall, if applicable) and leak-tight integrity of buried piping can be maintained? Yes/No/Not Applicable (no buried steel, copper, or aluminum piping which is not cathodically protected)
On-site Is the technical basis provided as justification by the licensee consistent with the initiative (including its reference documents) or industry standards (e.g.,
NACE SP0169)
Yes/No Provide documented technical basis including referencing documents. Prep For uncoated steel piping, has the licensee developed a technical basis for concluding that structural (e.g., ASME Code minimum wall, if applicable) and leak-tight integrity of buried piping can be
maintained? Yes/No/Not Applicable (no uncoated buried steel pipe) On-site Is the technical basis provided as justification by the licensee consistent with the initiative (including its reference documents) or industry standards (e.g., NACE SP0169)?
Yes/No Provide documented technical basis including referencing documents.
Prep For licensees with cathodic protection systems, does the licensee have procedures for the maintenance, monitoring and surveys of this
equipment? Yes/No/Not Applicable (no cathodic protection systems)
On-site Are the licensee procedures consistent with the initiative (including its reference documents) or industry standards (e.g., NACE SP0169)?
Yes/No Provide copy of procedures if applicable.
TEMPORARY INSTRUCTION 2515-182 PHASE II INSPECTION DOCUMENT REQUEST 6 Enclosure On-site Is the cathodic protection system, including the evaluation of test data, being operated and maintained by personnel knowledgeable of, or trained in, such activities?
Yes/No Provide documentation of training or qualification records of personnel. On-site Is there a program to ensure chase and vault areas which contain piping or tanks subject to the underground piping and tanks initiative are monitored for, or protected against, accumulation of leakage from these pipes or tanks? Yes/No/N/A (No piping in chases or vaults)
Provide copy of program. Inspection Activities/Corrective Actions Prep Has the licensee prepared an inspection plan for its buried piping and underground piping and tanks?
Yes/No On-site Does the plan specify dates and locations where inspections are planned?
Yes/No Provide copy of inspection plan and associated implementation procedures.
Prep Have inspections, for which the planned dates have passed, occurred as scheduled or have a substantial number of inspections been deferred? Occurred as scheduled/Deferred Prep Has the licensee experienced leaks and/or significant degradation in safety-related piping or piping carrying licensed material since January 1, 2009? Leaks Yes/No Degradation Yes/No
Prep If leakage or significant degradation did occur, did the licensee determine the cause of the leakage or degradation?
Yes/No
TEMPORARY INSTRUCTION 2515-182 PHASE II INSPECTION DOCUMENT REQUEST 7 Enclosure On-site Based on a review of a sample of root cause analyses for leaks from buried piping or underground piping and tanks
which are safety-related or contain licensed material, did the licensee's corrective action taken as a result of the incident include addressing the cause of the degradation? Yes/No/N/A (no leaks)
Provide root cause analyses of identified leaks if applicable.
On-site Did the corrective action include an evaluation of extent of condition of the piping or tanks and possible expansion of scope of inspections? (Preference should be given to high risk piping and "significant" leaks where more information is likely to be available). Yes/No/N/A (no leaks)
Provide corrective action documents concerning leaks if applicable.
Prep Based on a review of a sample of NDE activities which were either directly observed or for which records were reviewed, were the inspections conducted using a predetermined set of licensee/contractor procedures?
Yes/No Provide list of scheduled NDE activities scheduled during on-site week and list of NDE activities that have already been conducted. On-site Were these procedures sufficiently described and recorded such that the inspection could be reproduced at a later date? Yes/No Provide copies of NDE procedures for the various NDE activities that have occurred or
are scheduled to occur.
Prep Were the procedures appropriate to detect the targeted degradation
mechanism?
Yes/No Prep For quantitative inspections, were the procedures used adequate to collect quantitative information?
Yes/No TEMPORARY INSTRUCTION 2515-182 PHASE II INSPECTION DOCUMENT REQUEST 8 Enclosure
On-site Did the licensee disposition direct or indirect NDE results in accordance with their procedural requirements?
Yes/No Provide sample of direct and/or indirect NDE results and the subsequent evaluations of these NDE results.
J. Lynch In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electr onically for public inspection in the NRC Public Document Room or from the Publicly Available Records Systems (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely, /RA/
David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket No. 50-282; 50-306 License No. NPR-42; NPR-60
Enclosure:
DOCUMENT REQUEST FOR TEMPORARY INSTRUCTION (TI 2515-182)
INSPECTION cc w/encl: Distribution via ListServŽ DISTRIBUTION
- Cayetano Santos
RidsNrrPMPrairieIsland Resource
RidsNrrDorlLpl3-1 Resource
RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Jared Heck
Allan Barker Christine Lipa Carole Ariano Linda Linn DRPIII DRSIII Tammy Tomczak
DOCUMENT NAME:
G:\DRSIII\DRS\Work in Progress\-Ltr 12____12 Prairie Island Phase 2 RFI TXB.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME TBilik:ls DHills DATE 1/3/13 1/3/13 OFFICIAL RECORD COPY