Category:Deficiency Correspondence (per 10CFR50.55e and Part 21)
MONTHYEARML20296A2762020-10-0606 October 2020 Lake Engineering Co. - Third Interim Notification Per 10 CFR Part 21 - Degraded Snubber SF1154 Hydraulic Fluid Batch No. 17BLVS293 ML19008A0432019-01-0404 January 2019 Third Interim Notification Per 10 CFR Part 21 Degraded Snubber SF1154 Hydraulic Fluid Batch No. 11KLVS146 ML18159A0392018-06-0606 June 2018 National Technical Systems (Nts) - Potential Part 21 on Dedicated Items Not Available for Pmi Testing (NUPIC) ML17355A1392017-12-0505 December 2017 Potentially Degraded Snubber SF1154 Hydraulic Fluid Batch 14ELVS145 Final Report Per 10 CFR Part 21 ML17250A1572017-08-31031 August 2017 Commitments for Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues ML17101A3662017-04-0606 April 2017 Part 21 Notification - Failure of Vishay Diodes ML17096A2692017-04-0303 April 2017 Part 21 Notification - Failure of Vishay Diodes ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML16328A3102016-11-18018 November 2016 Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML16252A2742016-08-29029 August 2016 Azz/Nli - Part 21 Report - Potential Allen Bradley Timing Relay ML15303A0142015-10-26026 October 2015 Part 21 Report Regarding Pressure Seal Valve Noncompliance, Per Millstone ML15224A5432015-08-10010 August 2015 Part 21 Interim Report - Notification of Pressure Seal Valve Yoke Material Compliance ML15134A0162015-05-0101 May 2015 Part 21 Report Regarding Potentially Unqualified Component in Certain Allen Bradley Timing Relays ML14204A7072014-07-23023 July 2014 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Unseating of Valve Spring on SSPV ML14210A0102014-07-23023 July 2014 Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13044A0752013-02-0808 February 2013 Part 21 - Completed Evaluation for Potential Error in Main Steam Line High Flow Calculational Methodology ML12347A3082012-12-12012 December 2012 Part 21 60-Day Interim Report Notification: Error in Main Steam Line High Flow Calculational Methodology ML12283A2462012-09-28028 September 2012 Part 21 - Fairbanks Morse Opposed Piston EDG Oil Pump Leak ML12158A4472012-06-0606 June 2012 Part 21 60-Day Interim Report Notification - Closufailure of CRD Collet Retainer Tube/Outer Tube Weld ML12094A3712012-04-0202 April 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML12097A3162012-03-0202 March 2012 Part 21 Report - Rosemont Pressure Tranmitters Out of Tolerance Condition ML12066A1182012-03-0202 March 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML0907611882009-03-11011 March 2009 Part 21 Notification - Defective Hk and K-Line Circuit Breaker Tension Springs 2020-10-06
[Table view] Category:Deficiency Report (per 10CFR50.55e and Part 21)
MONTHYEARML23066A2212023-03-0707 March 2023 Velan, Inc. - Revised Part 21 Notification Re Butterfly Valves Found to Have a Number of Fasteners Loose ML21260A0072021-09-0909 September 2021 Ametek Solidstate Controls, Notification of Potential Defect - 10CFR Part 21 Report Re Omron Timer Relay ML21225A0812021-08-0404 August 2021 Lake Engineering Co., Final Report Per 10 CFR Part 21 Degraded Snubber SF1154 Hydraulic Fluid Batch No. 17BLVS293 ML21126A1722021-04-29029 April 2021 Paragon Energy Solutions Failures of Size 1 and 2 Freedom Series Full Voltage Reversing Starters ML21014A2342020-12-0707 December 2020 Fourth Interim Notification Per 10 CFR Part 21 Re Degraded Snubber SF1154 Hydraulic Fluid Batch No. 17BLVS293 ML20304A1612020-10-14014 October 2020 Lake Engineering Co., Degraded Snubber SF1154 Hydraulic Fluid Batch No. 16DLVS852 Final Report Per 10 CFR Part 21 ML20097B6912020-03-20020 March 2020 Second Interim Notification Per 10 CFR Part 21: Degraded Snubber SF1154 Hydraulic Fluid Batch No. 16DLVS852 ML20042E2522020-01-31031 January 2020 EN 54485 Target Rock Redacted Update to Part 21 Report on Defect of Modification of Valve Component and Main Disc Lift Misadjustment ML20029D1612020-01-21021 January 2020 10 CFR Part 21 Report, Notification of a Defect Modification of a Valve Component and Main Disc Lift Misadjustment ML19347A4262019-12-10010 December 2019 General Atomics - Reportable Occurrence Under 10CFR21: Reported Failure in Analog High Range Radiation Monitor (RP-2C) ML19072A0632019-03-0606 March 2019 10 CFR Part 21 Report Notification of a Defect with Target Rock Modulating Valve Positioner; Model 810000-X ML19071A1122019-03-0101 March 2019 Lake Engineering Co., Corrected Potentially Degraded Snubber SF1154 Hydraulic Fluid Batch 11KLVS146 Final Report, Per 10 CFR Part 21 ML18295A1992018-09-24024 September 2018 Lake Engineering - Second Interim Notification Per 10 CFR Part 21: Degraded Snubber SF1154 Hydraulic Fluid Batch No. 11KLVS146 ML18078A5362018-01-31031 January 2018 Crane Nuclear, Inc. - Interim Report for 10 CFR Part 21 Investigation Report Notification of Xomox Plug Valve High Torsional Stress in Stem (Update) ML17313A4712017-11-0303 November 2017 Part 21 - Potentially Degraded Snubber SF1154 Hydraulic Fluid Batch 14ELVS145 Interim Report ML17243A1362017-08-28028 August 2017 Fisher Information Notice, (FIN) 2017-04 - Erroneous Rotary Seating Torque Calculation in Flowscanner Software ML17212A6282017-07-24024 July 2017 Lake Engineering Co. - Potentially Degraded Snubber SF1154 Hydraulic Fluid Second - Interim Notification Per 10 CFR Part 21 ML17194A8252017-07-11011 July 2017 Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections ML17101A3662017-04-0606 April 2017 Part 21 Notification - Failure of Vishay Diodes ML17096A2692017-04-0303 April 2017 Part 21 Notification - Failure of Vishay Diodes ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML17026A4142017-01-20020 January 2017 C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling ML16328A3102016-11-18018 November 2016 Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML16252A2742016-08-29029 August 2016 Azz/Nli - Part 21 Report - Potential Allen Bradley Timing Relay ML16243A4742016-08-26026 August 2016 Potential Part 21 Unqualified Component in Certain Allen Bradley Timing Relays ML16238A1862016-08-15015 August 2016 Update - Report of Potential l0CFR Part 21, Allen Bradley Timing Relay Model 700RTC-NRC Event Number 51030, Accession Number ML15134A016 ML16232A6042016-08-15015 August 2016 Potentially Unqualified Component in Certain Allen Bradley Timing Relays ML16188A3742016-06-30030 June 2016 Part 21 - Inadequate Swaging and Adherence of Silicone O-Ring and Silicone PAD Soft Seat Main Disc and Pilot Disc Assemblies ML16162A6832016-06-0606 June 2016 Notification of Potential Defect- 10CFR Part 21 - Not Approved Current Transformers Installed in Safety Related Equipment ML16162A6802016-06-0303 June 2016 Part 21 - Not Approved Current Transformers Installed in Safety Related Equipment ML16154A2072016-05-26026 May 2016 Part 21, Azz/Nli Nuclear Logistics, Inc., Potentially Unqualified Component in Certain Allen Bradley Timing Relays Model 700RTC ML16194A1992016-05-25025 May 2016 Azz/Nli - Update - Report of Potential 10CFR Part 21, Allen Bradley Timing Relay Model 700RTC ML16111A4202016-04-0808 April 2016 Part 21 Report No. P21-04302015, Rev. 1 Regarding Potentially Unqualified Component in Certain Allen Bradley Timing Relays, Per Browns Ferry, Ginna, Millstone, Nine Mile Point, North Anna, Ft. Calhoun, Perry, River Bend, South Texas Project ML15134A0162015-05-0101 May 2015 Part 21 Report Regarding Potentially Unqualified Component in Certain Allen Bradley Timing Relays ML15159A5682015-04-30030 April 2015 Report of Potential 10CFR Part 21, Allen Bradley Timing Relay Model 700RTC ML15079A3982015-03-13013 March 2015 10 CFR Part 21 Report of Binding in Abb K-Line Breaker Secondary Close Latches (Part Number 716610K01) ML15058A7172015-02-25025 February 2015 Notification of Potential Part 21 Report Re Abb K-Line Circuit Breaker Secondary Close Latch Binding ML15049A4582015-02-0606 February 2015 Thermo Gamma-Metrics, LLC - Part 21 Report Regarding Shutdown Margin Monitor Environmental Qualification Noncompliance ML14274A0522014-09-22022 September 2014 Final Report 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries, Revision 1 - Original Letter Did Not Include the List of Affected Utilities ML14204A7072014-07-23023 July 2014 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Unseating of Valve Spring on SSPV ML14204A7082014-07-23023 July 2014 Enclosure 2, Description of Closure Evaluation, Non-Proprietary Information - Class I (Public) ML14210A0102014-07-23023 July 2014 Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve ML14113A3982014-04-17017 April 2014 Part 21 - Bearing Defect ML14303A5262014-03-28028 March 2014 Interim Part 21 Report - Misaligned Separators in LCR-25 Standby Batteries ML14079A3532014-03-17017 March 2014 Notification of Part 21 Re Bearing Defect ML13238A2532013-08-21021 August 2013 Notification of Potential Part 21 Report - Foxboro Power Supply Potential Failures Due to Defective the Wraps and Holders ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13165A0222013-05-17017 May 2013 Crane Nuclear - 10CFR21 Notification on Potential Valve Body Leakage- 2 Valve Assembly ML13102A3032013-04-10010 April 2013 Part 21 Involving a Potential Weld Defect ML13093A1532013-04-0202 April 2013 Part 21 Report - Foxboro Power Supply Potential Failures Due to Defective Tie Wraps and Holders 2023-03-07
[Table view] |
Text
0410612017 U.S. NuClear Regulatory Commission Operations Center Event Report *Part 21 (PAR) Event# Rep Org: AMETEK *Notification Date I Time: 04/03/2017 09:28 Supplier:
VISHAY/INTERNATIONAL Event Date I Time: 06/01/2016
-Last Modification:
04/06/2017 Region: 3 Docket#: City: COLUMBUS Agreement State: Yes County: License#:
State: *OH NRC Notified by: ETHAN SALSBURY Notifications:
MICHAEL KUNOWSKI HQ Ops Officer: HOWIE CROUCH CHRISTOPHER CAHILL Emergency Class: NON EMERGENCY, PART 21/50.55 REACTORS 10 CFRSection:
EUGENE GUTHRIE 21.21 (d)(3)(i)
DEFECTS AND NONCOMPLIANCE MICHAEL VASQUEZ / PART 21 NOTIFICATION
-FAILURE OF VISHAY DIODES The following information is the summary letter was received from Ametek via email: "Product:
Vishay/ International Rectifier Clamp, Diodes 600 V, 250A, forward and reverse bias. Ametek part numbers 07-600254-00 and 07-600255-00.:
Pagel 52657 (EDT) (EDT) R3DO R1DO EMAIL R2DO R4DO "Ametek Solidstate Controls is submitting the following Report of a Potential Defect in accordance with the requirements of 1 OCFR21. This notification is applicable to equipment model number 85-VC0250-29 provided to 'Dominion Nuclear at Millstone Power Station. Serial numbers affected by this potential defect are: C901880111 C901880211
C901880221
,-"AMETEK SOLIDSTATE CONTROLS CORRECTIVE ACTION: If you wish to replace the diodes, Ametek Solidstate Controls will work.with you to arrange replacements.
Please contact Mr. Mark of our Client Services group at 1-800-222-9079 or 1-614-846-7500 ext. 6332. mark.shreve@ametek.com" "Please contact us at telephone:
614-846-7500; 1-800-635-7300 or e-mail: ethan.salsbury@ametek.com, if there . are any questions.
- ***UPDATE ON 4/6/17 AT 0839 EDT FROM ETHAN SALSBURY TO BETHANY CECERE***
0410612017 U.S. Nuclear Regulatory Commission Operations Center Event Report "The original notification for this report contained a typo on the last serial number of the equipment affected." Instead of serial number C901880244, the correct serial number is C901880241.
Notified R1 DO (Cahill), R2DO (Nease), R3DO (Skokowski), R4DO (Vasquez), and Part 21 Reactors group by email. Page2 ***********************************************************************************************************************************
Hoc, HOO X From: Sent: Ethan Salsbury <ethan.salsbury@ametek.com>
Thursday, April 06, 2017 8:39 AM To: Hoc, HOO X
Subject:
Attachments:
[External_Sender]
RE: Ametek Solidstate Controls Part 21-Reporting of Potential Defect Diode NRC Part 21 Notification r.2.pdf The original notification for this report contained a typo on the last serial number of the equipment affected.
I have attached the revised notification.
I apologize for any inconvenience.
Thanks, Ethan Salsbury Quality Manager AMETEK SOLIDSTATE CONTROLS 875
Dearborn Drive I Columbus,
OH 43085 I www.solidstatecontrolsinc.com D: +1614410 62931 C:+1419206 12831 ethan.salsburv@ametek.com.
Ii filj a From: Hoc, HOO X [1]
Sent: Monday, April 3, 2017 9:43 AM To: Ethan Salsbury <ethan.salsbury@ametek.com>
Subject:
RE: Ametek Solidstate Controls Part 21-Reporting of Potential Defect Received.
EN #52657 will be assigned to this report. Regards, Howie Crouch Headquarters Operations Officer U.S. Nuclear Regulatory Commission Phone: 301-816-5100 Fax: 301-816-5151 email: hoo.hoc@nrc.gov secure email: hool@nrc.sgov.gov From: Ethan Salsbury [2]
Sent: Monday, April 03, 2017 9:28 AM To: Hoc, HOO X <HOO.Hoc@nrc.gov>
Subject:
[External_Sender]
Ametek Solidstate Controls Part 21-Reporting of Potential Defect Good morning, Ametek Solidstate Controls is submitting the attached report as notification of a potential defect in compliance with 10CFR21. A copy will also be provided to the affected licensee, Dominion Millstone.
Please confirm receipt and feel free to contact me with any additional questions.
1 Regards, Ethan Salsbury Quality Manager .\Ml!IEK SOLIDSTATE CONTROLS 875
Dearborn Drive I Columbus,
OH 43085 I www.solidstatecontrolsinc.com D: +1614410 62931 C:+1419206 12831 ethan.salsburv@ametek.com Ii ffil a 2 A__l__l_J_J_'
SOLIDSTATE CONTROLS Quality Assurance 875
Dearborn Drive,
Columbus, OH 43085 U.S.A. Telephone:
614-846-7500; 1-800-635-7300 E-mail: ethan.salsbury@ametek.com April 3, 2017 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Attention:
Document Control Desk
Subject:
Notification of Potential Defect -1 OCFR Part 21 .\ IETE Product: Vishay/ International Rectifier Clamp, Diodes 600 V, 250A, forward and reverse bias. Ametek part numbers 07-600254-00 a.nd 07-600255-00.
Ametek Solidstate Controls is submitting the following Report of a Potential Defect in accordance with the requirements of 1 OCFR21. This notification is applicable to equipment model number 85-VC0250-29 provided to Dominion Nuclear at Millstone Power Station. Serial numbers affected by this potential defect are: C901880111 C901880211 C901880221 C901880231 C901880241 The attached document provides details on the potential problem, cause and effect, and actions required.
Please contact us at the phone number or email provided above if there are any questions.
Ethan Salsbury Quality Manager Ametek Solidstate Controls A_l_l_l_J_'
COMPONENT DESCRIPTION:
600 V, 250 A clamp diodes with Vishay/International Rectifier part numbers 300U60 and 300UR60 and Ametek part numbers 07-600254-00 and 07-600255-00, respectively.
Diodes were installed in 25kVA Inverter Ametek p/n 85-VC0250-29 with serial numbers C901880111, C901880211, C901880221, C901880231, and C901880241.
PROBLEM YOU COULD SEE: A diode failure appears to occur approximately 8-9*years in the operating life of the device. There are no conclusive warning signs that a failure is imminent, or detection method for predicting an approaching failure. Failures resulted in loss of output voltage, transfer of the static switch, blown fuses, .and unexpected alarms. CAUSE: The actual cause has not been determined.
Two diode failures occurred in two separate 85-VC0250-29 Inverters at Millstone Power Station. Diode failure analysis performed by Vishay in June of 2016 (1160153) suggested failure due to" electrical overstress and the remaining diode !?hawed signs of increased leakage current. Exelon Generation Failure Report DOM-72097 completed in September of 2016, indicated one diode was shorted and two others exhibited high leakage current. Neither evaluation identified a specific cause of the failure. The failed diodes were manufactured in India in 2006 and one in 2007. EFFECT ON SYSTEM PERFORMANCE:
Failures described above could result in loss of output voltage and transfer of the static switch to the bypass source which could result in potential loss of load. ACTION REQUIRED:
Ametek Solidstate Controls recommends that each facility evaluate the potential risk and performs replacement as determined necessary.
Recent evaluations have been unable to pinpoint a failure mode and history of these diodes provides no evidence of widespread failures.
Only two known failures have surfaced and the failure rate has been low. AMETEK SOLIDSTATE CONTROLS CORRECTIVE ACTION: If you wish to replace the diodes, Ametek Solidstate Controls will work with you to arrange replacements.
Please contact Mr. Mark Shreve of our Client Services group at 1-800-222-9079 or 1-614-846-7500 ext. 6332. mark.shreve@ametek.com