ML23066A221 | 7 March 2023 | Velan, Inc. - Revised Part 21 Notification Re Butterfly Valves Found to Have a Number of Fasteners Loose | |
ML21260A007 | 9 September 2021 | Ametek Solidstate Controls, Notification of Potential Defect - 10CFR Part 21 Report Re Omron Timer Relay | |
ML21225A081 | 4 August 2021 | Lake Engineering Co., Final Report Per 10 CFR Part 21 Degraded Snubber SF1154 Hydraulic Fluid Batch No. 17BLVS293 | |
ML21126A172 | 29 April 2021 | Paragon Energy Solutions Failures of Size 1 and 2 Freedom Series Full Voltage Reversing Starters | |
ML21014A234 | 7 December 2020 | Fourth Interim Notification Per 10 CFR Part 21 Re Degraded Snubber SF1154 Hydraulic Fluid Batch No. 17BLVS293 | |
ML20304A161 | 14 October 2020 | Lake Engineering Co., Degraded Snubber SF1154 Hydraulic Fluid Batch No. 16DLVS852 Final Report Per 10 CFR Part 21 | |
ML20097B691 | 20 March 2020 | Second Interim Notification Per 10 CFR Part 21: Degraded Snubber SF1154 Hydraulic Fluid Batch No. 16DLVS852 | |
ML20042E252 | 31 January 2020 | EN 54485 Target Rock Redacted Update to Part 21 Report on Defect of Modification of Valve Component and Main Disc Lift Misadjustment | |
ML20029D161 | 21 January 2020 | 10 CFR Part 21 Report, Notification of a Defect Modification of a Valve Component and Main Disc Lift Misadjustment | |
ML19347A426 | 10 December 2019 | General Atomics - Reportable Occurrence Under 10CFR21: Reported Failure in Analog High Range Radiation Monitor (RP-2C) | Post Accident Monitoring |
ML19072A063 | 6 March 2019 | 10 CFR Part 21 Report Notification of a Defect with Target Rock Modulating Valve Positioner; Model 810000-X | |
ML19071A112 | 1 March 2019 | Lake Engineering Co., Corrected Potentially Degraded Snubber SF1154 Hydraulic Fluid Batch 11KLVS146 Final Report, Per 10 CFR Part 21 | |
ML18295A199 | 24 September 2018 | Lake Engineering - Second Interim Notification Per 10 CFR Part 21: Degraded Snubber SF1154 Hydraulic Fluid Batch No. 11KLVS146 | |
ML18078A536 | 31 January 2018 | Crane Nuclear, Inc. - Interim Report for 10 CFR Part 21 Investigation Report Notification of Xomox Plug Valve High Torsional Stress in Stem (Update) | |
ML17313A471 | 3 November 2017 | Part 21 - Potentially Degraded Snubber SF1154 Hydraulic Fluid Batch 14ELVS145 Interim Report | |
ML17243A136 | 28 August 2017 | Fisher Information Notice, (FIN) 2017-04 - Erroneous Rotary Seating Torque Calculation in Flowscanner Software | |
ML17212A628 | 24 July 2017 | Lake Engineering Co. - Potentially Degraded Snubber SF1154 Hydraulic Fluid Second - Interim Notification Per 10 CFR Part 21 | |
ML17194A825 | 11 July 2017 | Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections | Anchor Darling |
ML17101A366 | 6 April 2017 | Part 21 Notification - Failure of Vishay Diodes | |
ML17096A269 | 3 April 2017 | Part 21 Notification - Failure of Vishay Diodes | |
ML17081A453 | 20 March 2017 | Part 21 - Plastic Jar Dedication Sampling | |
ML17026A414 | 20 January 2017 | C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling | |
ML16328A310 | 18 November 2016 | Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 | Foreign Material Exclusion |
ML16252A274 | 29 August 2016 | Azz/Nli - Part 21 Report - Potential Allen Bradley Timing Relay | |
ML16243A474 | 26 August 2016 | Potential Part 21 Unqualified Component in Certain Allen Bradley Timing Relays | |
ML16238A186 | 15 August 2016 | Update - Report of Potential l0CFR Part 21, Allen Bradley Timing Relay Model 700RTC-NRC Event Number 51030, Accession Number ML15134A016 | |
ML16232A604 | 15 August 2016 | Potentially Unqualified Component in Certain Allen Bradley Timing Relays | |
ML16188A374 | 30 June 2016 | Part 21 - Inadequate Swaging and Adherence of Silicone O-Ring and Silicone PAD Soft Seat Main Disc and Pilot Disc Assemblies | |
ML16162A683 | 6 June 2016 | Notification of Potential Defect- 10CFR Part 21 - Not Approved Current Transformers Installed in Safety Related Equipment | |
ML16162A680 | 3 June 2016 | Part 21 - Not Approved Current Transformers Installed in Safety Related Equipment | |
ML16154A207 | 26 May 2016 | Part 21, Azz/Nli Nuclear Logistics, Inc., Potentially Unqualified Component in Certain Allen Bradley Timing Relays Model 700RTC | |
ML16194A199 | 25 May 2016 | Azz/Nli - Update - Report of Potential 10CFR Part 21, Allen Bradley Timing Relay Model 700RTC | |
ML16111A420 | 8 April 2016 | Part 21 Report No. P21-04302015, Rev. 1 Regarding Potentially Unqualified Component in Certain Allen Bradley Timing Relays, Per Browns Ferry, Ginna, Millstone, Nine Mile Point, North Anna, Ft. Calhoun, Perry, River Bend, South Texas Project | |
ML15134A016 | 1 May 2015 | Part 21 Report Regarding Potentially Unqualified Component in Certain Allen Bradley Timing Relays | |
ML15159A568 | 30 April 2015 | Report of Potential 10CFR Part 21, Allen Bradley Timing Relay Model 700RTC | |
ML15079A398 | 13 March 2015 | 10 CFR Part 21 Report of Binding in Abb K-Line Breaker Secondary Close Latches (Part Number 716610K01) | |
ML15058A717 | 25 February 2015 | Notification of Potential Part 21 Report Re Abb K-Line Circuit Breaker Secondary Close Latch Binding | |
ML15049A458 | 6 February 2015 | Thermo Gamma-Metrics, LLC - Part 21 Report Regarding Shutdown Margin Monitor Environmental Qualification Noncompliance | Shutdown Margin |
ML14274A052 | 22 September 2014 | Final Report 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries, Revision 1 - Original Letter Did Not Include the List of Affected Utilities | |
ML14204A707 | 23 July 2014 | Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Unseating of Valve Spring on SSPV | |
ML14204A708 | 23 July 2014 | Enclosure 2, Description of Closure Evaluation, Non-Proprietary Information - Class I (Public) | Safe Shutdown Shutdown Margin Scram Discharge Volume |
ML14210A010 | 23 July 2014 | Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve | Safe Shutdown Shutdown Margin Scram Discharge Volume |
ML14113A398 | 17 April 2014 | Part 21 - Bearing Defect | |
ML14303A526 | 28 March 2014 | Interim Part 21 Report - Misaligned Separators in LCR-25 Standby Batteries | |
ML14079A353 | 17 March 2014 | Notification of Part 21 Re Bearing Defect | |
ML13238A253 | 21 August 2013 | Notification of Potential Part 21 Report - Foxboro Power Supply Potential Failures Due to Defective the Wraps and Holders | |
ML13165A342 | 12 June 2013 | 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers | |
ML13165A022 | 17 May 2013 | Crane Nuclear - 10CFR21 Notification on Potential Valve Body Leakage- 2 Valve Assembly | Hydrostatic |
ML13102A303 | 10 April 2013 | Part 21 Involving a Potential Weld Defect | Hydrostatic |
ML13093A153 | 2 April 2013 | Part 21 Report - Foxboro Power Supply Potential Failures Due to Defective Tie Wraps and Holders |