Letter Sequence Meeting |
---|
|
|
MONTHYEARML12249A2702012-09-11011 September 2012 Notice of Forthcoming Pre-Application Meeting with Xcel Energy, Inc. Concerning Prairie Island Nuclear Generating Plant Project stage: Meeting ML12275A3782012-09-27027 September 2012 Xcel Energy Prairie Island Nuclear Generating Plant Meeting Presentation, Diesel Generator Voltage and Frequency Limits. Project stage: Meeting ML12275A4652012-09-27027 September 2012 Meeting September 27, 2012 - Handouts Project stage: Meeting ML12292A4202012-11-0707 November 2012 September 27, 2012 - Summary of Pre-Application Meeting to Discuss the Diesel Generator Voltage and Frequency Limits License Amendment Request Project stage: Meeting 2012-09-11
[Table View] |
|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24127A2402024-05-0707 May 2024 Presentation Slides for Prairie Island 2023 End-of-Cycle Meeting ML24029A0382024-01-31031 January 2024 January 31, 2024, Pre-application Meeting Presentation - Prairie Island ISFSI License Amendment Request to Add Grace to License Conditions ML23168A0032023-06-20020 June 2023 Handout for 6/23/2023 Pre-Application Public Meeting with Prairie Island Nuclear Generating Plant to Revise ISFSI TS 4.4 for TN-40HT Casks ML23156A2602023-06-0505 June 2023 2022 Prairie Island End-of-Cycle Meeting Presentation ML23102A1752023-04-14014 April 2023 April 14, 2023 TS 3.7.8 LAR Pre-Submittal Meeting Slides ML22130A5852022-05-10010 May 2022 2021 Monticello and Prairie Island Nuclear Generating Plant End-of-Cycle Meeting Presentation ML22048B1812022-02-18018 February 2022 Pre-Application Meeting for Prairie Island TS 5.6.6, PTLR, LAR ML21221A0202021-08-11011 August 2021 Nis Pr Bypass Test Panel License Amendment Request ML21166A3792021-06-15015 June 2021 Units 1 and 2 2020 End-of-Cycle Meeting Presentation ML21032A2632021-02-0303 February 2021 Slides for Public Meeting with Xcel Energy to Discuss a Planned Amendment to Combine the Emergency Plans and Create a Common Emergency Offsite Facility for Monticello and Prairie Island ML19347B0722019-12-12012 December 2019 TVA and Xcel Energy Slides for Joint Presubmittal Meeting to License Amendment Requests to Adopt WCAP-17661, Revision 1 ML19268A0422019-09-26026 September 2019 Pre-Application Meeting License Amendment Request Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML19210D4512019-07-22022 July 2019 Abeyance Seal Preapplication Meeting Slides ML18051A1752018-02-20020 February 2018 Pre-Application Meeting License Amendment for TSTF-425 Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program Xcel Energy 2/20/2018 ML17240A3382017-08-30030 August 2017 Non-Safety Related Digital Feedwater and Amsac/Dss Control Systems Replacement Project Presentation ML17198A2632017-07-17017 July 2017 Pre-Application Meeting ML17066A3732017-03-0909 March 2017 Spent Fuel Pool Criticality Technical Specification Changes Round 2 Request for Additional Information Public Meeting: March 9, 2017 ML17037D1172017-02-0707 February 2017 License Amendment Requests for Change in Emergency Plan Staff Augmentation Response Times Pre-Submittal Meeting for Prairie Island Nuclear Generating Plant Monticello Nuclear Generating Plant: February 7, 2017 ML17023A0652017-01-24024 January 2017 Pre-Submittal Call Regarding License Amendment Requests for Prairie Island Nuclear Generating Plant, Units 1 and 2 and Monticello Nuclear Generating Plant Emergency Action Level Scheme Changes ML15140A3342015-05-13013 May 2015 Public Meeting 05132015 Licensee Slides Only ML15105A0372015-04-14014 April 2015 Xcel Energy Slide Presentation to Support Pre-Application Meeting on April 14, 2015, to Discuss Nuclear Fuel Design Transition to Include Integral Fuel Burnable Absorber (Ifba) at the Prairie Island Nuclear Generating Plant ML14323B0222014-11-19019 November 2014 Regcon, November 19-20, 2014: 03-Info-Session-2 Ronald Johnson - Tribal Perspective on Continued Storage ML14153A0242014-05-16016 May 2014 Xcel Energy'S Presentation Slides Supporting a May 16, 2014, Public Meeting to Discuss the Flood Hazard Reevaluation Schedule for the Monticello and Prairie Island Nuclear Generating Plants ML14058A1732014-02-19019 February 2014 Diesel Generator Steady State Voltage and Frequency Limits - Prairie Island Nuclear Generating Plant Meeting February 19, 2014 ML13210A2012013-07-29029 July 2013 2012 End-of-Cycle Slides - Licensee ML13210A2002013-07-11011 July 2013 2012 End-of-Cycle Slides ML13056A0262013-02-25025 February 2013 Regulatory Conference Slide Presentation ML12340A5402012-12-0606 December 2012 Reactor Core Cooling & Heat Removal FLEX Strategy - Phase 1 ML12326A9712012-11-21021 November 2012 Encl 3 (Handouts - Public) to Summary of October 24, 2012, Meeting with the Northern States Power Company, D/B/A Excel Energy Regarding Security Requirements and Changes Pertaining to Prairie Island TAC L24689 ML12277A1762012-10-0404 October 2012 Steam Generator Replacement Presentation ML12275A4652012-09-27027 September 2012 Meeting September 27, 2012 - Handouts ML12275A3782012-09-27027 September 2012 Xcel Energy Prairie Island Nuclear Generating Plant Meeting Presentation, Diesel Generator Voltage and Frequency Limits. ML12205A2172012-07-23023 July 2012 NRC 2011 End-of-Cycle Slides ML12205A2202012-07-17017 July 2012 Licensee 2012 End-of-Cycle Slides ML12115A3112012-04-24024 April 2012 Meeting Slides: 04/24/2012 Meeting with Xcel Energy NFPA 805 Presubmittal - Prairie Island Nuclear Generating Plant ML1207904792012-03-14014 March 2012 March 14, 2012 Telecon Slides ML1122803892011-08-18018 August 2011 Pre-Application Meeting for Prairie Island Nuclear Generating Plant (Ping) Extended Power Uprate (EPU) ML1119903462011-07-28028 July 2011 Meeting Presentation, Prairie Island Nuclear Generating Plant - Failure to Maintain the Train a and B Direct Current Electrical Power Subsystems Operable ML1117804242011-06-22022 June 2011 June 22, 2011, Meeting Handout #1 - NRC Meeting Diesel Fuel Oil LAR for Prairie Island Ngp ML1120701572011-06-22022 June 2011 June 22, 2011, Meeting Handout #2 - Proposed Technical Specification Changes for Prairie Island Ngp Diesel Fuel Oil LAR ML1106600792011-03-0303 March 2011 March 3, 2011 Meeting Handouts - Revise Footnote in TS 3.8.1, Prairie Island Nuclear Generating Plant ML1034701142010-12-14014 December 2010 Excel Energy Slides for Public Meeting 12/14/2010 to Discuss Human Performance Issues ML1027802642010-10-0404 October 2010 Session 4 - Heather Westra Presentation at October 4, 2010, Public Meeting on Groundwater Protection ML1023805712010-08-25025 August 2010 Meeting Presentation Alternative Source Term Steam Generator Tube Rupture Margin to Overfill Evaluation - Prairie Island Nuclear Generating Plant ML1014502432010-05-26026 May 2010 Responses to Questions from the Prairie Island Indian Community Concerning Issues Related to Prairie Island Nuclear Generating Plant ML1012604192010-05-20020 May 2010 Meeting Presentation Prairie Island Annual Assessment Meeting - Reactor Oversight Program - 2009 ML1012503422010-05-0505 May 2010 Regulatory Conference Slides ML1015801072010-04-28028 April 2010 2R26 Outage, SG Tube Inspection Telecon Slides ML1010604782010-04-15015 April 2010 April 15, 2010, Meeting Slides - Pre-Application Meeting for Prairie Island Ngp Extended Power Uprate ML0932901282009-12-0101 December 2009 Licensee Slides for Public Meeting 2024-05-07
[Table view] |
Text
3.8.1 AC Sources-Operating SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.1 Verify correct breaker alignment and indicated power availability for each required path. 7 days SR 3.8.1.2 ----------------------------1. Performance of SR 3.8.1.6 satisfies this SR. 2. All DG starts may be preceded by an engine prelube period and followed by a warmup period prior to loading. 3. A modified DG start involving idling and gradual acceleration to synchronous speed may be used for this SR in consideration of manufacturer's recommendations. When modified start procedures are not used, the time, voltage, and frequency tolerances of SR 3.8.1.6 must be met. Verify each DG starts from standby conditions and achieves steady state voltage V and V, and frequency 59.5§%;& Hz and 31 days Prairie Island Unit 1 -Amendment No. -l-§.& Units 1 and 2 3.8.1-6 Unit 2 -Amendment No. -l49 3.8.1 AC Sources-Operating SURVEILLANCE REQUIREMENTS (continued) SURVEILLANCE FREQUENCY SR 3.8.1.6 All DG starts may be preceded by an engine prelube peliod. Verify each DG starts from standby condition and achieves: a. In 10 seconds, voltage 3740 V and frequency 58.8 Hz; and b. Steady state voltage 4021J.+4G V and V, and frequency Hz and 60.5&J..d. Hz. 184 days SR 3.8.1.7 Verify each DG does not trip during and following a load rejection of: 1. Unit 1 650 kW; and 2. Unit 2 860 kW. 24 months SR 3.8.1.8 Verify each DG's automatic trips are bypassed on an actual or simulated safety injection signal except: a. Engine overspeed; b. Generator differential current; and c. Ground fault (Unit 1 only). SR 3.0.2 interval extension (1.25 times the interval) applies to this SR 24 months Prairie Island Unit 1 -Amendment No. -l-§.& Units 1 and 2 3.8.1-8 Unit 2 -Amendment No. -l49 3.8.1 AC Sources-Operating SURVEILLANCE REQUIREMENTS (continued) SR 3.8.1.9 ----------------------------N Momentary transients outside the load and power factor ranges do not invalidate this test. If performed with DG synchronized with offsite power, it shall be performed at a power factor 0.85. However, if grid conditions do not permit, the power factor limit is not required to be met. Under this condition the power factor shall be maintained as close to the limit as practicable. Verify each DG operates for 2:: 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s: For 2:: 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> loaded: Unit 1 2:: 2832 kW, and < 3000 kW Unit 2 2:: 5400 kW, and 5940 kW; and For the remaining hours of the test loaded: Unit 1 2:: 2500 kW, and Unit 2 2:: 4860 kW; and Achieves steady state voltage 2:: 4.Q21 f4.0 V and 4400#8Q V; and frequency 2:: 59.5.§.8.:.8. Hz and 60.5e-I:4 Hz. 24 months Prairie Island Unit 1 -Amendment No. 15S Units 1 and 2 3.8.1-9 Unit 2 -Amendment No. 149 178