ML13267A317
ML13267A317 | |
Person / Time | |
---|---|
Site: | Cook |
Issue date: | 09/12/2013 |
From: | Stoeva N Stevenson & Associates |
To: | American Electric Power, Indiana Michigan Power Co, Office of Nuclear Reactor Regulation |
References | |
AEP-NRC-2013-74 SD-121023-001, Rev 1 | |
Download: ML13267A317 (98) | |
Text
DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13CSeismic Walkdown Checklists (SWCs)Table C-1 Summary of Seismic Walkdown Checklists for DCCNP1 Online Walkdowns COMPONENT ID DESCRIPTION Anchorage PAGEVerification Confirmed UNIT 1 & UNIT 2 CONDENSATE STORAGE C-5TANKS CROSSTIE12-HE-16N Spent Fuel Pit Heat Exchanger (Note: This is y C-8the only SWEL2 Component included) 12-HV-ACCP-3 COMPONENT COOLING WATER PUMPS N C-10VENTILATION SOUTH12-HV-ESW-5 UNIT 1 WEST ESW PP ROOM SUPPLY y C-13VENTILATION FAN1-ABD-A 600VAC MOTOR CONTROL CENTER ABD- y C-19A1-ABD-B 600VAC MOTOR CONTROL CENTER ABD- N C-28B1-ACRA-2 CONTROL ROOM AIR HANDLING Y C-37SUBPANEL
- 21-AM-A 600VAC MOTOR CONTROL CENTER AM-A Y C-441-BATT-AB PLANT BATTERY AB Y C-491-BC-AB PLANT BATTERY BATT-AB CONTROL Y C-54PANEL1-BC-AB1 PLANT BATTERY BATT-AB BATTERY Y C-59CHARGER #11-BC-AB2 PLANT BATTERY BATT-AB CHARGER #2 N C-651-BCTC-AB(1)
PLANT BATTERY CHARGERS BC-AB1 AND Y C-71BC-AB2 TRANSFER1-BLI-130 STEAM GENERATOR OME-3-3 WIDE y C-75RANGE LEVEL INDICATOR TRANSMITTER 1-BLP-132 STEAM GENERATOR OME-3-1 CHANNEL N C-79III REACTOR1-CCV-AB 250VDC TRAIN 'B' CRITICAL SOLENOID N C-83VALVES1-CCW COMPONENT COOLING WATER CONTROL N C-87PANEL1-CFI-420 COMPONENT COOLING WATER TO WEST y C-91COMPONENT COOLING1-CFI-429 WEST RHR HEAT EXCHANGER HE-17W N C-95COMPONENT COOLING1-CLI-114 CONDENSATE STORAGE TANK TK-32 Y C-99LEVEL INDICATOR 1-CMO-420 WEST CCW HEAT EXCHANGER CCW N C-103OUTLET SHUTOFF VALVE IKAKC-1 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Table C-1 Summary of Seismic Walkdown Checklists for DCCNP1 Online Walkdowns COMPONENT ID DESCRIPTION Anchorage PAGEVerification Confirmed 1-CRID-3 120VAC CONTROL ROOM INSTRUMENT y C-107DISTRIBUTION 1-CRID-4-INV 120VAC CONTROL ROOM INSTRUMENT y C-111DISTRIBUTION SYSTEM1-DGAB AB EMERGENCY DIESEL GENERATOR Y C-115OME-150-AB CONTROL1-DGAB-INV AB EMERGENCY DIESEL GENERATOR N C-126OME-150-AB INVERTER1-ESW ESSENTIAL SERVICE WATER CONTROL N C-132PANEL1-EZC-A 600VAC MOTOR CONTROL CENTER EZC- Y C-137A1-EZC-A1 600VAC MOTOR CONTROL CENTER EZC- N C-143Al1-EZC-B 600VAC MOTOR CONTROL CENTER EZC- Y C-147B1-EZC-B1 600VAC MOTOR CONTROL CENTER EZC- N C-153B11-FFI-240 AUX FEEDWATER TO SG OME-3-4 FLOW y C-157INDICATOR TRANSMITTER 1-HE-15W WEST COMPONENT COOLING WATER N C-161HEAT EXCHANGER 1-HE-17W WEST RESIDUAL HEAT REMOVAL HEAT Y C-166EXCHANGER 1-HE-18W WEST CONTAINMENT SPRAY HEAT Y C-170EXCHANGER 1-HV-ACRA-2 CONTROL ROOM VENTILATION SOUTH N C-177AIR CONDITIONING 1-HV-ACRF-2 CONTROL ROOM N C-180PRESSURIZATION/CLEANUP FILTER UNIT1-HV-AES-2 AUXILIARY BUILDING VENTILATION Y C-184ENGINEERED SAFETY1-HV-CEQ-1 CONTAINMENT HYDROGEN SKIMMER N C-190VENTILATION FAN #11-HV-CEQ-2 CONTAINMENT HYDROGEN SKIMMER Y C-194VENTILATION FAN #21-HV-DGX-1 AB EMERGENCY DIESEL GENERATOR Y C-199ROOM VENTILATION 1-HV-SGRS-8 4KV ROOM 600V SWITCHGEAR Y C-203TRANSFORMERS TR1 1A AND1-IFI-53 BORON INJECTION TO REACTOR N C-207COOLANT LOOP #3 FLOW1-IMO-222 WEST CONTAINMENT SPRAY PUMP N C-210DISCHARGE TO1-IMO-225 REFUELING WATER STORAGE TANK TO N C-213WEST CONTAINMENT C-2 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Table C-1 Summary of Seismic Walkdown Checklists for DCCNP1 Online Walkdowns COMPONENT ID DESCRIPTION Anchorage PAGEVerification Confirmed 1-IMO-320 WEST RESIDUAL HEAT REMOVAL PUMP N C-216PP-35W SUCTION1-IMO-331 WEST RHR TO UPPER CONTAINMENT N C-219SPRAY SHUTOFF VALVE1-IMO-350 WEST RHR HEAT EXCHANGER OUTLET N C-223TO SAFETY INJECTION 1-IMO-52 BORON INJECTION TO REACTOR N C-227COOLANT LOOP #2 SHUTOFF1-IMO-911 REFUELING WATER STORAGE TANK TO N C-232CVCS CHARGING1-MCAB(1) 250VDC DISTRIBUTION PANEL MCAB Y C-236I-MCM-221 MAIN STEAM LEAD #2 TO AUXILIARY N C-240FEED PUMP TURBINE1-MRV-230 STEAM GENERATOR OME-3-3 STOP N C-243VALVE1-MRV-243 STEAM GENERATOR OME-3-4 POWER N C-247OPERATED RELIEF1-NLP-153 PRESSURIZER OME-4 PROTECTION Y C-250CHANNEL 3 LEVEL1-NPS-111 REACTOR VESSEL TRAIN 'B' WIDE RANGE Y C-253PRESSURE1-OME-150-AB AB EMERGENCY DIESEL GENERATOR Y C-2581-PP-10W WEST COMPONENT COOLING WATER N C-264PUMP1-PP-26S SOUTH SAFETY INJECTION PUMP N C-2671-PP-35W WEST RESIDUAL HEAT REMOVAL PUMP N C-2721-PP-3W WEST MOTOR DRIVEN AUXILIARY Y C-276FEEDWATER PUMP1-PP-4 TURBINE DRIVEN AUXILIARY FEED PUMP N C-2811-PP-50W WEST CENTRIFUGAL CHARGING PUMP Y C-2861-PP-7W WEST ESSENTIAL SERVICE WATER PUMP Y C-2901-PP-9W WEST CONTAINMENT SPRAY PUMP Y C-2971-PS-A 600VAC MOTOR CONTROL CENTER PS-A N C-3011-QT-106-AB1 AB EMERGENCY DIESEL FUEL OIL Y C-307TRANSFER PUMP #1l-QT-107-AB AB EMERGENCY DIESEL FUEL OIL DAY Y C-312TANK1-QT-130-AB2 AB EMERGENCY DIESEL JACKET WATER Y C-317PUMP #21-QT-141-AB1 AB EMERGENCY DIESEL STARTING AIR N C-320RECEIVER
- 11-QT-142-AB1 AB EMERGENCY DIESEL STARTING AIR Y C-325COMPRESSOR
- 11-QT-506 TURBINE DRIVEN AUX FEED PUMP PP-4 N C-330TRIP AND THROTTLE VALVEIAC-3 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Table C-1 Summary of Seismic Walkdown Checklists for DCCNP1 Online Walkdowns COMPONENT ID DESCRIPTION Anchorage PAGEVerification Confirmed 1-RC REACTOR CONTROL RODS CONTROL N C-333PANEL1-RPS-B REACTOR PROTECTION AND Y C-336SAFEGUARD ACTUATION 1-RPST-B REACTOR PROTECTION AND N C-341SAFEGUARD ACTUATION 1-RPSX-B REACTOR PROTECTION AND N C-346SAFEGUARD ACTUATION 1-SG STEAM GENERATOR AND AUXILIARY Y C-350FEED PUMP CONTROL1-SIS SAFETY INJECTION CONTROL PANEL Y C-3541-SPY CONTAINMENT SPRAY CONTROL PANEL N C-3601-TDAB(1) 250VDC TRAIN 'B' TRANSFER CABINET N C-3641-TR11A 600VAC BUS 11A SUPPLY TRANSFORMER N C-3681-TR-AFWX 120/208VAC AUXILIARY FEEDWATER Y C-372DISTRIBUTION PANEL1-WMO-702 WEST ESSENTIAL SERVICE WTR PUMP N C-378PP-7W DISCH S/O VA1-WMO-715 WEST CONTAINMENT SPRAY HEAT N C-381EXCHANGER 1-HE-18W1-WMO-717 WEST CONTAINMENT SPRAY HEAT N C-384EXCHANGER ESSENTIAL 1-WMO-744 ESSENTIAL SERVICE WATER TO WEST N C-387MOTOR DRIVEN1-WMO-753 ESSENTIAL SERVICE WATER TO TURBINE N C-390DRIVEN1-WPA-702 WEST ESW PUMP PP-7W DISCH LOW N C-393PRES ALARM XMTR1-XPC-21 AB EMER DIESEL STARTING AIR C-397RECEIVER QT-141-ABI PRESSURE XMTRNotes: 1) Partial walkdowns performed on these Components because they could not be opened. Thesecomponents were walked down again during the outage walkdowns and new checklists weredeveloped and completed under Table C-3.IAC-4 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:12-CRV-51 Equipment Class: (7) Fluid-Operated ValvesEquipment
==
Description:==
UNIT 1 & UNIT 2 CONDENSATE STORAGE TANKS CROSSTIEProject:
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
TB1, 591.00 ft, 83Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one ofthe 50% of SWEL items requiring such verification)?
No2. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
- 4. Is the anchorage free of visible cracks in the concrete near theanchors?5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable Not Applicable
- 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
YesC-5 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y-] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:12-CRV-51 Equipment Class: (7) Fluid-Operated ValvesEcuiroment
==
Description:==
UNIT 1 & UNIT 2 CONDENSATE STORAGE TANKS CROSSTIEInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
Fire extinguishers on short hooks cannot impact valve and therefore this was acceptable for this component.
-AR 2012-11669 was issued.8. Are overhead equipment, distribution
- systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
YesAYes9. Do attached lines have adequate flexibility to avoid damage?Yes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
CommentsEvaluated by: " George G Thomas Date: 08/15/2013 Neda Stoeva 08/15/2013 PhotosC-6 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class:Dment Descrintion:
12-CRV-51 (7) Fluid-Operated ValvesAH~FýI UVU4C-7 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F N USeismic Walkdown Checklist (SWC)Equipment ID No.: 12-HE-16N Equipment Class: (21) Tanks and Heat Exchangers Equipment
==
Description:==
Spent Fuel Pit Heat Exchanger Project:
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB2, 609.00 ft, 96Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?
SQUG 12-HE-16N REVO2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?
PAINTED4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?5. Is the anchorage configuration consistent with plant documentation?
Yes(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?
C-8 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FY N USeismic Walkdown Checklist (SWC)Equipment ID No.:12-HE-1 6NEquipment Class: (21) Tanks and Heat Exchangers Equipment
==
Description:==
Spent Fuel Pit Heat Exchanger Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
12-SF-119N chain can swing into 12-HE-16N but is not damaging8. Are overhead equipment, distribution
- systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesYesYesYesOther Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
CommentsEvaluated by: -George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-9 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F-Y NUSeismic Walkdown Checklist (SWC)Equipment ID No.:12-HV-ACCP-3 Equipment Class: (9) FansEquipment
==
Description:==
COMPONENT COOLING WATER PUMPS VENTILATION SOUTHProject:
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB2, 633.00 ft, 633Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one ofthe 50% of SWEL items requiring such verification)?
No2. Is the anchorage free of bent, broken, missing or loose hardware?
Insulated component attached inline with HVAC vents3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
- 4. Is the anchorage free of visible cracks in the concrete near theanchors?5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable Not Applicable
- 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
YesC-10 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: r-7 N USeismic Walkdown Checklist (SWC)Equipment ID No.:12-HV-ACCP-3 Equipment Class: (9) FansEquipment
==
Description:==
COMPONENT COOLING WATER PUMPS VENTILATION SOUTHInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
Yes8. Are overhead equipment, distribution
- systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Nothing above fan -inline with vent and at ceiling level9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?Not Applicable YesYesOther Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
CommentsEvaluated by: __ George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-11 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 12-HV-ACCP-3 Equipment Class: (9) FansEquipment
==
Description:==
COMPONENT COOLING WATER PUMPS VENTILATION SOUTHC-12 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 12-HV-ESW-5 Equipment Class: (9) FansEquipment
==
Description:==
UNIT 1 WEST ESW PP ROOM SUPPLY VENTILATION FANProject:
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
SH1, 591.00 ft, 136Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?
DWG 12-5682 REVIO2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?5. Is the anchorage configuration consistent with plant documentation?
Yes(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?
C-13 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1. 09/12/13Status: [] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:12-HV-ESW-5 Equipment Class: (9) FansEauiDment
==
Description:==
UNIT 1 WEST ESW PP ROOM SUPPLY VENTILATION FANInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
- 8. Are overhead equipment, distribution
- systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesYesYesYesOther Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
CommentsEvaluated by: -- George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-14 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: L-1 N USeismic Walkdown Checklist (SWC)Equipment ID No.: 12-HV-ESW-5 Equipment Class: (9) Fansr--_ -~~~~ ... .-L ý .. .I l' .4 1 I---'l r-r" .Ir --.r- ---, Ir"f'l& I ý r- 1-klrl A"rl kl Ir'A .IWV-P9090026 P9090027P9090028P9090029C-15 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y-] N USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class:EauiDment
==
Description:==
12-HV-ESW-5 (9) FansUNIT 1 WEST ESW PP RCC-16 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 12-HV-ESW-5 Equipment Class: (9) FansVPPP9090036 P9090037C-17 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 12-HV-ESW-5 Equipment Class: (9) FansPP R(C-18 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y WIN USeismic Walkdown Checklist (SWC)Equipment ID No.:I -ABD-AEquipment Class: (1) Motor Control CentersEquipment
==
Description:==
600VAC MOTOR CONTROL CENTER ABD-AProject:
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB1, 587.00 ft, 121Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one ofthe 50% of SWEL items requiring such verification)?
SQUG 1-ABD-A REVO2. Is the anchorage free of bent, broken, missing or loose hardware?
YesYes3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
Yes4. Is the anchorage free of visible cracks in the concrete near theanchors?Concrete only in front of MCC5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
YesYes6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
YesC-19 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y j-] USeismic Walkdown Checklist (SWC)Equipment ID No.:1 -ABD-AEquipment Class: (1) Motor Control CentersEquipment
==
Description:==
600VAC MOTOR CONTROL CENTER ABD-AInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
Fire extinguishers on short hooks -AR 2012-11669 was issued.8. Are overhead equipment, distribution
- systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
C02 fire protection
- 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?NoYesYesNoOther Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
CommentsEvaluated by: --George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-20 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y ¶N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-ABD-AEquipment Class: (1) Motor Control CentersE ui ment
Description:
600VAC MOTOR CONTROL CENTER ABD-AP9130194 P9130195P9130196C-21 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y N-] USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-ABD-AEquipment Class: (1) Motor Control CentersEncinment Descrintion:
600VAC MOTOR CONTROL CENTER ABD-AC-22 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y F-] USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class:nmant rlnaQrrintinn*
1-ABD-A(1) Motor Control Centers600VAC MOTOR CONTROL CEN1P9130203C-23 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y N-] USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-ABD-AEquipment Class: (1) Motor Control CentersEquipment
==
Description:==
600VAC MOTOR CONTROL CENTER ABD-AC-24 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y FJ] USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-ABD-AEquipment Class: (1) Motor Control Centers600VAC MOTOR CONIC-25 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y EN USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-ABD-AEquipment Class: (1) Motor Control CentersE ui ment Descri tion: 600VAC MOTOR CONTROL CENTER ABD-AP9130208 P9130209P9130210 P9130211C-26 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y r-NE USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-ABD-AEquipment Class: (1) Motor Control CentersEculment DescriDtion:
600VAC MOTOR CONTROL CENTER ABD-AC-27 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y jN USeismic Walkdown Checklist (SWC)Equipment ID No.: I -ABD-BEquipment Class: (1) Motor Control CentersEquipment
==
Description:==
600VAC MOTOR CONTROL CENTER ABD-BProject:
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB1, 587.00 ft, 121Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?
SQUG 1-ABD-A REVO2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?Concrete only in front of MCC5. Is the anchorage configuration consistent with plant documentation?
Yes(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?
C-28 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y F-] USeismic Walkdown Checklist (SWC)Equipment ID No.:I -ABD-BEquipment Class: (1) Motor Control CentersEauiDment
==
Description:==
600VAC MOTOR CONTROL CENTER ABD-BInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
Fire extinguishers on short hooks -AR 2012-11669 was issued.8. Are overhead equipment, distribution
- systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
C02 fire protection
- 9. Do attached lines have adequate flexibility to avoid damage?NoYesYes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?NoOther Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
CommentsEvaluated by: George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-29 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y N USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class:I-ABD-B(1) Motor Control CentersCONTC-30 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y -N--] USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-ABD-BEquipment Class: (1) Motor Control Centers-OR CONTROLC-31 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y EN] USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-ABD-BEquipment Class: (1) Motor Control CentersC-32 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y FN-] USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-ABD-BEquipment Class: (1) Motor Control CentersOTOR CON-_C-33 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y L] USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-ABD-BEquipment Class: (1) Motor Control CentersCONTFC-34 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y N-] USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-ABD-BEquipment Class: (1) Motor Control Centers)ment
Description:
600VAC MOTOR CONTRC-35 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y N-] USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-ABD-BEquipment Class: (1) Motor Control CentersEclui"ment Descrigtion:
600VAC MOTOR CONTROL CENTER ABD-BC-36 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-ACRA-2Equipment Class: (20) Instrumentation and Control Panels and CabinetsEquipment
==
Description:==
CONTROL ROOM AIR HANDLING SUBPANEL
- 2Project:
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB1, 650.00 ft, 129Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?
DWG 12-3366 REV52. Is the anchorage free of bent, broken, missing or loose hardware?
Yes3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?5. Is the anchorage configuration consistent with plant documentation?
Yes(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?
Welds at all 4 comers. I bolt has lack of thread engagement
-evaluated in SQUG -OKC-37 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1. 09/12/13Status: [] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:I -ACRA-2Equipment Class: (20) Instrumentation and Control Panels and CabinetsEquipment
==
Description:==
CONTROL ROOM AIR HANDLING SUBPANEL
- 2Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
Yes8. Are overhead equipment, distribution
- systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Block Wall -retrofitted (adjacent to panel) -OK per DWG 12-403 1,Wall W-19. Do attached lines have adequate flexibility to avoid damage?YesYes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
CommentsEvaluated by: George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-38 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: E-] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class:1 -ACRA-2(20) Instrumentation and Control Panels and CabinetsE Cment Descri t CONTROL ROOOP9100111A AIR HANDLING SUBPANEL
- 2C-39 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y-- N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-ACRA-2Eauinment Class: (20) Instrumentation and Control Panels and CabinetsEauiDment DescriDtion:
AIR HANDLC-40 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [Y N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-ACRA-2Equipment Class: (20) Instrumentation and Control Panels and CabinetsE ui ment
Description:
CONTROL ROOM AIR HANDLING SUBPANEL
- 2P9100115 P9100116C-41 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FY-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: I-ACRA-2Equipment Class: (20) Instrumentation and Control Panels and CabinetsCONTROL ROOM AIR HAl'I MI fI-C-42 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-ACRA-2Equipment Class: (20) Instrumentation and Control Panels and CabinetsAIR1 17 1 %Jj I I ýUI,-rI uuIlzIC-43 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y `-] USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-AM-AEquipment Class: (1) Motor Control CentersEquipment
==
Description:==
600VAC MOTOR CONTROL CENTER AM-AProject:
DC Cook 1 SWELLocation (BIdg, Elev,Room/Area):
AB1, 633.00 ft, 633Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?
SQUG 1-AM-A REVO2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes2 J Bolts in comers on both sides (front and back) 4 Red Heads infront & 4 Red Heads in back3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?5. Is the anchorage configuration consistent with plant documentation?
Yes(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?
C-44 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y F] USeismic Walkdown Checklist (SWC)Equipment ID No.:1 -AM-AEquipment Class: (1) Motor Control CentersEquipment
==
Description:==
600VAC MOTOR CONTROL CENTER AM-AInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
Fire extinguishers on short hooks -AR 2012-11669 was issued.8. Are overhead equipment, distribution
- systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
NoYes9. Do attached lines have adequate flexibility to avoid damage?Yes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?NoOther Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
CommentsEvaluated by: CA George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-45 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y F--] USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-AM-AEquipment Class: (1) Motor Control CentersEquipment
==
Description:==
600VAC MOTOR CONTROL CENTER AM-AC-46 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y ¶1 USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-AM-AEquipment Class: (1) Motor Control CentersEquipment
==
Description:==
600VAC MOTOR CONTROL CENTER AM-AP9181081C-47 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y EN USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-AM-AEquipment Class: (1) Motor Control CentersEquipment
==
Description:==
600VAC MOTOR CONTROL CENTER AM-AC-48 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: 7Y N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-BATT-AB Equipment Class: (15) Batteries on RacksEquipment
==
Description:==
PLANT BATTERY ABProject:
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB1, 609.00 ft, 200Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?
SQUG 1-BA TT-AB REVO2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?
Very minor oxidation on base plate of front plate on right side batteries
- 4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?5. Is the anchorage configuration consistent with plant documentation?
Yes(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?
C-49 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FY N USeismic Walkdown Checklist (SWC)Equipment ID No.:I -BATT-ABEquipment Class: (15) Batteries on RacksEquipment
==
Description:==
PLANT BATTERY ABInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
- 8. Are overhead equipment, distribution
- systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesYesYesYesOther Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
CommentsEvaluated by: c George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-50 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-BATT-AB Equipment Class: (15) Batteries on RacksY ABC-51 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y--] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-BATEquipment Class: (15) Batteries on RacksEquipment
==
Description:==
PLANT BATTERY ABT-ABC-52 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FY N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-BATT-AB Equipment Class: (15) Batteries on Racks,TTERY ABC-53 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-BC-ABEquipment Class: (20) Instrumentation and Control Panels and CabinetsEquipment
==
Description:==
PLANT BATTERY BATT-AB CONTROL PANELProject:
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB1, 613.00 ft, 205Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?
DWG-PSI-91031-0
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?5. Is the anchorage configuration consistent with plant documentation?
Yes(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?
C-54 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FY NUSeismic Walkdown Checklist (SWC)Equipment ID No.:I -BC-ABEquipment Class: (20) Instrumentation and Control Panels and CabinetsEquipment
==
Description:==
PLANT BATTERY BATT-AB CONTROL PANELInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
YesYes8. Are overhead equipment, distribution
- systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?Yes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
CommentsEvaluated by: -George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-55 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y-] N USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class:1 -BC-AB(20) Instrumentation and Control Panels and Cabinets*TERY BATT-C-56 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-BC-ABEquipment Class: (20) Instrumentation and Control Panels and CabinetsTTERY BATTC-57 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FY-] N USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class:IDment Descriotion:
I -BC-AB(20) Instrumentation and Control Panels and CabinetsPLANT BATTERY BATT-AB CONTROL PANELI-": IC-58 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-BC-ABIEquipment Class: (16) Inverters Equipment
==
Description:==
PLANT BATTERY BATT-AB BATTERY CHARGER #1Project:
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB1, 613.00 ft, 205Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?
SQUG 1-BC-ABI REVO2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?
Painted4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?5. Is the anchorage configuration consistent with plant documentation?
Yes(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?
C-59 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FY NUSeismic Walkdown Checklist (SWC)Equipment ID No.:I -BC-AB1Equipment Class: (16) Inverters Equipment
==
Description:==
PLANT BATTERY BATT-AB BATTERY CHARGER #1Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
Yes8. Are overhead equipment, distribution
- systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Yes9. Do attached lines have adequate flexibility to avoid damage?Yes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
CommentsEvaluated by: George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-60 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-BC-ABIEquipment Class: (16) Inverters Y BATTP9190384C-61 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FY] N USeismic Walkdown Checklist (SWC)Equipment ID No.: I-BC-ABIEquipment Class: (16) Inverters Equipment
==
Description:==
PLANT BATTERY BATT-AB BATTERY CHARGER #1P9170630C-62 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: EF] N USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class: (16) In\I -BC-ABIverters,TTERY BATTP9170636 P9170637C-63 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-BC-AB1Equipment Class: (16) Inverters EauiDment Descriotion:
PLANT BATTERY BATT-AB BATTERY CHARGER #1C-64 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y F7J USeismic Walkdown Checklist (SWC)Equipment ID No.:1 -BC-AB2Equipment Class: (16) Inverters Equipment
==
Description:==
PLANT BATTERY BATT-AB CHARGER #2Project:
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
ABI, 613.00 ft, 205Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one ofthe 50% of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
NoYesYes3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
- 4. Is the anchorage free of visible cracks in the concrete near theanchors?Yes5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Not Applicable
- 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
YesC-65 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y jN USeismic Walkdown Checklist (SWC)Equipment ID No.:1 -BC-AB2Equipment Class: (16) Inverters Equipment
==
Description:==
PLANT BATTERY BATT-AB CHARGER #2Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
- 8. Are overhead equipment, distribution
- systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Fire extinguishers on short hooks -AR 2012- 11669 was issued.9. Do attached lines have adequate flexibility to avoid damage?YesNoYes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?NoOther Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
CommentsEvaluated by: -- George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-66 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y Nj USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-BC-AB2Equipment Class: (16) Inverters Equipment
==
Description:==
PLANT BATTERY BATT-AB CHARGER #2C-67 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y F-N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-BC-AB2Equipment Class: (16) Inverters Equipment
==
Description:==
PLANT BATTERY BATT-AB CHARGER #2C-68 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y EPI USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-BC-AB2Equipment Class: (16) Inverters Equipment
==
Description:==
PLANT BATTERY BATT-AB CHARGER #2P9170648C-69 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-BC-AB2Equipment Class: (16) Inverters Equipment
==
Description:==
PLANT BATTERY BATT-AB CHARGER #2C-70 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y N j-uSeismic Walkdown Checklist (SWC)Equipment ID No.: I-BCTC-AB Equipment Class: (14) Distribution PanelsEquipment
==
Description:==
PLANT BATTERY CHARGERS BC-AB1 AND BC-AB2 TRANSFERProject:
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
ABI, 613.00 ft, 205Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?
COULD NOT OPEN -SQUG 1-BCTC-AB REVO2. Is the anchorage free of bent, broken, missing or loose hardware?
UnknownCannot open -cannot see anchorage
- 3. Is the anchorage free of corrosion that is more than mild surface Unknownoxidation?
Cannot open -cannot see anchorage
- 4. Is the anchorage free of visible cracks in the concrete near the Unknownanchors?Cannot open -cannot see anchorage
- 5. Is the anchorage configuration consistent with plant documentation?
Unknown(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Cannot open -cannot see anchorage
- 6. Based on the above anchorage evaluations, is the anchorage free of Unknownpotentially adverse seismic conditions?
C-71 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y N i-U-1Seismic Walkdown Checklist (SWC)Equipment ID No.:1 -BCTC-ABEquipment Class: (14) Distribution PanelsEquipment
==
Description:==
PLANT BATTERY CHARGERS BC-AB1 AND BC-AB2 TRANSFERInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
YesNo8. Are overhead equipment, distribution
- systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Fire extinguishers on short hooks -AR 2012- 11669 was issued.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesNoOther Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions thatcould adversely affect the safety functions of the equipment?
Could not open due to safety concerns during online walkdown.
Completed inspection during DCCNPI Unit I Outage Walkdown.
Checklist included in report following Table C-3.UnknownACommentsEvaluated by: '--- George G Thomas Date: 08/15/2013 Neda Stoeva 08/15/2013 PhotosC-72 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y N -Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-BCTC-AB Equipment Class: (14) Distribution PanelsTTERY (C-73 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y N ESeismic Walkdown Checklist (SWC)Equipment ID No.: 1-BC'Equipment Class: (14) Distribution PanelsEquipment
==
Description:==
PLANT BATTERY CHAIrC-ABC-74 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-BL1-130 Equipment Class: (18) Instruments on RacksSTEAM GENERATOR OME-3-3 WIDE RANGE LEVEL INDICATOR Equipment
==
Description:==
TRANSMITTER Project:
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
CON1, 612.00 ft, 73Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?
Dwg. 1-5570P.
A2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?5. Is the anchorage configuration consistent with plant documentation?
Yes(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?
C-75 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FY NUSeismic Walkdown Checklist (SWC)Equipment ID No.:1 -BLI-1 30Equipment Class: (18) Instruments on RacksSTEAM GENERATOR OME-3-3 WIDE RANGE LEVEL INDICATOR Equipment
==
Description:==
TRANSMITTER Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
YesYes8. Are overhead equipment, distribution
- systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?Yes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
CommentsEvaluated by: -George G Thomas Date: 08/15/2013 Neda Stoeva 08/15/2013 PhotosC-76 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-BLI-130 Equipment Class: (18) Instruments on RacksSTEAM GENERATOR OME-3-3 WIDE RANGE LEVEL INDICATOR C-77 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-BLI-130 Equipment Class: (18) Instruments on RacksSTEAM GENERATOR OME-3-3 WIDE RANGE LEVEL INDICATOR T7 A II RA I TTIIC-78 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FY-] N USeismic Walkdown Checklist (SWC)Equipment ID No.:1 -BLP-1 32Equipment Class: (18) Instruments on RacksEauinment
==
Description:==
STEAM GENERATOR OME-3-1 CHANNEL III REACTORProject:
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
CON1, 612.00 ft, 72Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one ofthe 50% of SWEL items requiring such verification)?
No2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
Yes4. Is the anchorage free of visible cracks in the concrete near theanchors?Yes5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Not Applicable
- 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
YesC-79 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [-ý N USeismic Walkdown Checklist (SWC)Equipment ID No.:1 -BLP-1 32Equipment Class: (18) Instruments on RacksEquipment Descri)tion:
STEAM GENERATOR OME-3-1 CHANNEL III REACTORInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
- 8. Are overhead equipment, distribution
- systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesYesYesYesOther Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
CommentsEvaluated by: -George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-80 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FY] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-BLP-132 Equipment Class: (18) Instruments on RacksOipment
Description:
STEAM GENERATOR OME-3-1 CHANNEL III REACTORC-81 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: EY] N USeismic Walkdown Checklist (SWC)Equipment ID No.: I-BLP-132 Equipment Class: (18) Instruments on RacksEquipment
==
Description:==
STEAM GENERATOR OME-3-1 CHANNEL III REACTORI,& -I -I ulilinC-82 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y-] N USeismic Walkdown Checklist (SWC)Equipment ID No.:1 -CCV-ABEquipment Class: (14) Distribution PanelsEauiDment
==
Description:==
250VDC TRAIN 'B' CRITICAL SOLENOID VALVESProject:
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB1, 633.00 ft, 123Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one ofthe 50% of SWEL items requiring such verification)?
No2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
Yes4. Is the anchorage free of visible cracks in the concrete near theanchors?Unistrut mounted5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
Not Applicable Not Applicable YesC-83 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.:1-CCV-ABEquipment Class: (14) Distribution PanelsEquipment
==
Description:==
250VDC TRAIN 'B' CRITICAL SOLENOID VALVESInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
Yes8. Are overhead equipment, distribution
- systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Check celing tiles -OK -clipped per DWG 12-40709. Do attached lines have adequate flexibility to avoid damage?YesYes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
CommentsEvaluated by: c" George G Thomas Date: 10/18/12tl -Neda Stoeva 10/18/12PhotosC-84 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-CCV-ABEquipment Class: (14) Distribution PanelsEquipment
==
Description:==
250VDC TRAIN 'B' CRITICAL SOLENOID VALVES11141Wis.J1 11 111 Iý III I IP9191257forit! fill 1:1-4 111 T IIL16.It it 6,ft, ofP9191258C-85 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: 7Y N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-CCV-ABEquipment Class: (14) Distribution PanelsEquipment
==
Description:==
250VDC TRAIN 'B' CRITICAL SOLENOID VALVESC-86 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.:1-CCWEquipment Class: (20) Instrumentation and Control Panels and CabinetsEauipment
==
Description:==
COMPONENT COOLING WATER CONTROL PANELProject:
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB1, 633.00 ft, 123Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of Nothe 50% of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable Panel CCW does not have its own anchorage plate3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
Mounted through the rest of the panels around it4. Is the anchorage free of visible cracks in the concrete near theanchors?5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
Not Applicable Not Applicable Not Applicable YesC-87 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: jYj NUSeismic Walkdown Checklist (SWC)Equipment ID No.:1-CCWEquipment Class: (20) Instrumentation and Control Panels and CabinetsEquipment
==
Description:==
COMPONENT COOLING WATER CONTROL PANELInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
YesYes8. Are overhead equipment, distribution
- systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Check ceiling tiles -OK -clipped per DWG 12-40709. Do attached lines have adequate flexibility to avoid damage?Yes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
CommentsEvaluated by: -- George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-88 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F NUSeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class:rinmnt I-merrinfinn-1-CCw(20) Instrumentation and Control Panels and CabinetsCOMPONENT COOLING WATER CONTROL PANELP9191227C-89 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F-] N USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class:1-CCw(20) Instrumentation and Control Panels and CabinetsT COOLING WATI1V1IZUC-90 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: EiY N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-CFI-420 Equipment Class: (18) Instruments on RacksEquipment
==
Description:==
COMPONENT COOLING WATER TO WEST COMPONENT COOLINGProject:
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB2, 609.00 ft, 609Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?
VTD-ITBA-0131, Figure 6-1. Outline Dimensional Drawing 0224.0901.3 Model224 DPU, Yoke or Wall Mounting A2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?Mounted on rack with 4 bolts on the corners5. Is the anchorage configuration consistent with plant documentation?
Yes(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?
C-91 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [-Y NUSeismic Walkdown Checklist (SWC)Equipment ID No.:I -CFI-420Equipment Class: (18) Instruments on RacksEauipment
==
Description:==
COMPONENT COOLING WATER TO WEST COMPONENT COOLINGInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
YesYes8. Are overhead equipment, distribution
- systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?Yes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
CommentsFire piping well supported, joints welded.Evaluated by:" George G Thomas Date: 08/15/2013
-" Neda Stoeva 08/15/2013 PhotosC-92 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class:I -CFI-420(18) Instruments on Racks4iT COOLINGC-93 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-CFI-420 Equipment Class: (18) Instruments on RacksEquipment
==
Description:==
COMPONENT COOLING WATER TO WEST COMPONENT COOLINGC-94 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y NUSeismic Walkdown Checklist (SWC)Equipment ID No.:1 -CFI-429Equipment Class: (18) Instruments on RacksEquipment
==
Description:==
WEST RHR HEAT EXCHANGER HE-17W COMPONENT COOLINGProject:
DC Cook 1 SWELLocation (Bldg, Elev,Room/Area):
AB1, 633.00 ft, 633Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one ofthe 50% of SWEL items requiring such verification)?
No2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
Yes4. Is the anchorage free of visible cracks in the concrete near theanchors?Yes5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Not Applicable
- 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
YesC-95 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F] N USeismic Walkdown Checklist (SWC)Equipment ID No.:1 -CFI-429Equipment Class: (18) Instruments on RacksEauilpment DescriDtion:
WEST RHR HEAT EXCHANGER HE-17W COMPONENT COOLINGInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
YesYes8. Are overhead equipment, distribution
- systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?Yes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
CommentsEvaluated by: -- George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-96 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [7 N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-CFI-429 Equipment Class: (18) Instruments on RacksAT EX(r-ZI IUU IL IC-97 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FT- N USeismic Walkdown Checklist (SWC)Equipment ID No.: 1-CFI-429 Equipment Class: (18) Instruments on Racksin: WEST RHR HEAT EXCHANGER HE-17W COMPONENT COOLINGP9100122FW1uu1Izj C-98