Forwards SE Accepting Licensee 980619 Submittal of Proposed Changes to PT Limits to Provide New Limits Valid to 28 EFPYs
ML20154D821
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 10/05/1998
From: Wichman K
NRC (Affiliation Not Assigned)
To: Bajwa S
NRC (Affiliation Not Assigned)
Shared Package
ML20154D825 List:
References
TAC-MA1413, NUDOCS 9810070354
Download: ML20154D821 (2)


Text

- - . - - - . - .-

October 5, 1998 MEMORANDUM TO: Singh S. Bajwa, Director Project Directorate 1-1 Division of Reactor Projects,I/II FROM: Keit .

c$rnan,Mef Section A Materials and Chemical Engineering Branch Division of Engineering

SUBJECT:

PRESSURE TEMPERATURE LIMITS EVALUATION FOR NINE MILE POINT 1 (TAC NO.: MA1413)

By letter dated June 19,1998, Niagara Mohawk Power Corporation, the licensee, submitted changes related to the pressure-temperature (P-T) limits in the Nine Mile Point Unli 1 Technical Specifications (TS). The licensee revised the P-T limits to provide new limits that are valid to 28 effective full power years (EFPY).

Based on our evaluation of the submittal, we conclude that the proposed P-T limits for heatup and cooldown for non-critical operations; heatup and cooldown for critical operations; and non-critical leakage /hydrotest are acceptable to 28 EFPY, and may be incorporated in the Nine Mile Point Unit 1 TS.

Our evaluation is submitted as Attachment 1 and our SALP input is submitted as Attachment 2.

This completes our efforts for TAC NO. MA1413.

Docket No.: 50-220 Attachments: As stated i

CONTACT: A D. Lee, NRR 415-2735 DISTRIBUTION:

File conter;, DHood LLois PUBLIC JCushing SSheng EMCB RF ESullivan MMayfield G:\ LEE \NMP1__PT.WPD To receive a copy of this document, indicate in the box C= Copy w/o attachment /e osure E= Copy with attachment / enclosure N = No copy

_ f l OFFICE DE:EMCB b DE:EMCB DE;EhQkl b #

k lNAME Aleeh0L BElliot h K n lDATE 10/k98 10/5/98 10598 D\

~

9810070354 981005 PDR ADOCK 05000220 hk hh

. >RTQV .

6  % UNITED STATES T

g j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 30666 0001 o$ p ( y V /

o.g # October 5, 1998 MEMORANDUM TO: Singh S. Bajwa, Director Project Directorate 1-1 Division of Reactor Projects,1/11 l

FROM: N Keith R. Wichman, Chief J

i h Section A Materials and Chemical Engineering Branch Division of Engineering

SUBJECT:

PRESSURE TEMPERATURE LIMITS EVALUATION FOR NINE MILE

POINT 1 (TAC NO.: MA1413)

By letter dated June 19,1998, Niagara Mohawk Power Corporation, the licensee, submitted changes related to the pressure temperature (P-T) limits in the Nine Mile Point Unit 1 Technical Specifications (TS). The licensee revised the P-T limits to provide new limits that are valid to 28 effective full power years (EFPY).

Based on our evaluation of the submittal, we conclude that the proposed P-T limits for heatup and cooldown for non-critical operations; heatup and cooldown for critical operations; and non-critical leakage /hydrotest are acceptable to 28 EFPY, and may be incorporated in the Nine Mile Point Unit 1 TS.

Our evaluation is submitted as Attachment 1 and our SALP input is submitted as Attachment 2.

This completes our efforts for TAC NO. MA1413.

Docket No.: 50-220 Attachments: As stated CONTACT: A.D. Lee, NRR 415-2735 i