ML20064K211
From kanterella
ML20064K211 | |
Person / Time | |
---|---|
Site: | North Anna |
Issue date: | 09/22/1980 |
From: | STONE & WEBSTER ENGINEERING CORP. |
To: | |
Shared Package | |
ML20027A620 | List: |
References | |
NUDOCS 8010160594 | |
Download: ML20064K211 (43) | |
Similar Documents at North Anna | |
---|---|
Category:GENERAL EXTERNAL TECHNICAL REPORTS
MONTHYEARML18152A2811999-10-12012 October 1999
[Table view]Technical Basis for Elimination of Nozzle Inner Radius Insps (for Nozzles Other than Reactor Vessel),Technical Basis for ASME Section XI Code Case N-619. ML20249C0011997-11-30030 November 1997 Reactor Vessel Fluence Analysis Methodology ML20148E7091997-05-31031 May 1997 Vols 1 & 2 to Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Ors,Usi A-46, Per GL 87-02 ML18151A7101996-09-30030 September 1996 Supplemental Info for VA Power Nomad Code & Model. ML20249C4051996-05-16016 May 1996 Rev 0 to CE-0082, Review of Augmented ISI Frequency for Pressurizer Spray Lines ML20249C4031996-04-23023 April 1996 Rev 0 to CE-0081, Review of Augmented ISI Frequency for Reactor Coolant Bypass Lines ML20092A2611995-08-31031 August 1995 EDG Preventive Maint Insp Outage Probabilistic Safety Assessment for August 1995 ML20078P9261994-09-26026 September 1994 Service Water System Operational Performance Assessment 940711-29 ML18153B4221993-07-31031 July 1993 Rev 11 to Engineering Evaluation 25, Evaluation of Existing Fire Enclosure Around Ventilation Duct,North Anna Power Station. ML18153B4211993-07-31031 July 1993 Rev 11 to Engineering Evaluation 24, Evaluation of Radiant Energy Shields,North Anna Power Station. ML20046D1581993-02-28028 February 1993 Virginia Power Sys Transient Analysis Using Version 1 of North Anna Retran Model. ML18152A0711993-02-0101 February 1993 NFPA Heat & Flame Evaluation of MSA Custom 4500 SCBA Using Enriched O2 Breathing Air for VA Power,Final Rept. ML20116A2901992-09-23023 September 1992 Conceptual Engineering Final Rept NP-2653, RG 1.97 Isolation Devices Type 2,North Anna Power Station. W/One Oversize Encl ML20101B0331992-04-30030 April 1992 Suppl to Update of Settlement Monitoring Points & Graphs NAPS - Supplement to Technical Rept CE-0019,North Anna Settlement Data Oct 1989 - Apr 1992 ML20077A6601991-05-0707 May 1991 Summary Rept on Exam of Steam Generator Tube R11-C14,North Anna Power Station,Unit 1 ML18153C3111990-07-26026 July 1990 Decommisioning Financial Assurance Certification Rept for Surry Power Station & North Anna Power Station. ML20011F6221990-02-26026 February 1990 Analysis of Small Steamline Break Performance W/O Low Pressurizer Pressure Safety Injection North Anna Units 1 & 2. ML20248E8641989-09-19019 September 1989 Rev 0 to Evaluation of Settlement Monitoring Program for Main Plant Structures in Support of Proposed Changes to Tech Spec 3/4.7.12. W/One Oversize Figure ML20246J1391989-08-17017 August 1989 Rev 0 to Safety Sys Outage Mod Insp,Nrc Finding EP-2 ML20246J1581989-08-0909 August 1989 Rev 0 to Safety Sys Outage Mod Insp,Nrc Finding MC-1 ML20246J1261989-07-20020 July 1989 Rev 0 to Coordination of Load Ctr Circuit Breakers,EP-1 ML20246J1191989-07-20020 July 1989 Rev 0 to Response to SSOMI Item IC-8 of NRC ML20246J0991989-07-18018 July 1989 Rev 0 to Response to NRC Ltr of 890626,Serial 89-485,App C, Finding IC-2 ML20246J1071989-07-18018 July 1989 Rev 0 to Response to NRC Ltr of 890626,Serial 89-485,App C, Finding IC-7 ML20246J1481989-06-30030 June 1989 RCS Leakage Detection Sys ML20246K3461989-05-0505 May 1989 Technical Evaluation & Safety Analysis:Solid State Protection Sys Slave Relay Testing REA-88-51 ML20245K7311989-04-26026 April 1989 Rev 0 to 890225 Steam Generator Leak Event Rept ML20056A0341989-04-18018 April 1989 Nonqualified Nuclear Decommissioning Trust Amended & Restated Trust Agreement ML18151A9661989-04-18018 April 1989 Nuclear Decommissioning Trust Agreement. ML20245A5311988-09-13013 September 1988 Simulator Certification Submittal ML20148J6311988-03-16016 March 1988 Generator Tube Fatigue Evaluation & Remedial Actions Rept ML20147F5621988-03-0202 March 1988 Safety Evaluation in Support of Containment Temp Increase for North Anna Power Station ML20196J2901988-02-24024 February 1988 Rev 1 to Civil Engineering Technical Rept 0005, Differential Settlement Between Svc Bldg & Unit 2 Main Steam Valve House ML20148J6401988-02-12012 February 1988 Rev 2 to North Anna Unit 1 870715 Steam Generator Tube Rupture Event Rept ML20091L7041987-10-19019 October 1987 Generator Row 9 Column 51 Tube Failure Analysis ML20235G2441987-09-25025 September 1987 Steam Generator Downcomer Mods Safety Evaluation for North Anna Units 1 & 2 ML20238F6161987-09-15015 September 1987 Rev 1 to North Anna Unit 1 870715 Steam Generator Tube Rupture Event Rept ML18151A1351987-08-28028 August 1987 Rev 1 to SPDS SAR for VEPCO NUREG-0696 Computer Project, North Anna & Surry Nuclear Power Stations. ML20235U6701987-08-0707 August 1987 Loss of Inventory Event 870617-21 ML20235Q0661987-08-0505 August 1987 Metallurgical Svcs Rept FAL-00050 ML20237G9791987-07-29029 July 1987 Rev 0 to North Anna Unit 1 870715 Steam Generator Tube Rupture Event Rept. W/Pages from Facility Updated FSAR ML20235U3431987-07-20020 July 1987 Rev 0 to Chronology Steam Generator Tube Rupture Event North Anna Power Station Unit 1 870715. Related Info Encl ML20238E1611987-07-15015 July 1987 Rept of Emergency Preparedness Events Re Unit 1 Steam Generator Tube Rupture ML20215G5471987-06-17017 June 1987 Safety Evaluation for Change in Methodology & Supporting Analyses ML20235Q0551987-05-21021 May 1987 Investigation Rept FAL-00024, Emergency Diesel Generator Floating Busing Failure ML20206D6721987-03-31031 March 1987 Engineering Analysis Svc & Maint North Anna Power Station Fairbanks-Morse 38 TD8-1/8 Diesel Engines Phase II ML20207B5231986-11-30030 November 1986 Reactor Vessel Fluence & Rt/Pts Evaluations Suppl to WCAP 11016 ML20213D7771986-10-31031 October 1986 RCS Leakage Detection Assessment for Elimination of RCS Main Loop Pipe Break Protective Devices ML20213D7601986-10-31031 October 1986 RCS Loads & Component Support Margins Evaluation for Elimination of Rcs,Main Loop Pipe Break Protective Devices ML20210F6821986-10-17017 October 1986 Reactor Protection Sys Trip Setpoint Drift Characterization 1999-10-12 Category:TEXT-SAFETY REPORT MONTHYEARML20217N9281999-10-20020 October 1999
[Table view]Special Rept:On 991003,PZR PORV Actuation Mitigated RCS low- Temp Overpressure Transient.Caused by a RCP Facilitating Sweeping of Entrained Air Out of RCS Loops.Operating Procedure 2-OP-5.1 Will Be Revised ML20217H3631999-10-14014 October 1999 Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su ML18152A2811999-10-12012 October 1999 Technical Basis for Elimination of Nozzle Inner Radius Insps (for Nozzles Other than Reactor Vessel),Technical Basis for ASME Section XI Code Case N-619. ML20212J9251999-10-0101 October 1999 Safety Evaluation Accepting Licensee Relief Request IWE-3 for Second 10-year ISI for Plant ML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20211N2611999-09-0808 September 1999 Safety Evaluation Concluding That Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit & Clarification of Terminology with Respect to Reconstituted Fuel Assemblies Acceptable ML20211J2561999-08-31031 August 1999 Safety Evaluation Accepting Elimination of Augmented ISI Program for Pressurizer Spray Lines at North Anna Unit 2 ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20211J2421999-08-31031 August 1999 Safety Evaluation Supporting Removal of Augmented Insp Program on RCS Bypass Lines from Licensing Basis of North Anna,Units 1 & 2 ML20210T0791999-08-13013 August 1999 Safety Evaluation Concluding That Revised Withdrawal Schedules for North Anna Units 1 & 2 Satisfy Requirements of App H to 10CFR50 & Therefore Acceptable ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20210Q9931999-07-31031 July 1999 Rev 1 to COLR for North Anna Power Station,Unit 2 Cycle 13 Pattern Ud ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206L4831999-05-10010 May 1999 SER Accepting Request to Delay Submitting Plant,Unit 1 Class 1 Piping ISI Program for Third Insp Interval Until 010430, to Permit Development of Risk Informed ISI Program for Class 1 Piping ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205S0391999-04-21021 April 1999 SER Accepting Request for Relief IWE5,per 10CFR50.55a(a)(3) & Proposed Alternatives for IWE2,IWE4,IWE6 & IWL2 Authorized Per 10CFR50.55a(a)(3)(ii) ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20207E1731999-02-18018 February 1999 Informs Commission of Status of Preparations of IAEA Osart Mission to North Anna Nuclear Power Plant Early Next Year ML20205A0241998-12-31031 December 1998 Summary of Facility Changes,Tests & Experiments,Including Summary of SEs Implemented at Plant During 1998,per 10CFR50.59(b)(2).With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20198H9541998-12-0303 December 1998 Safety Evaluation Authorizing Proposed Alternative for Remainder of Second 10-yr Insp Interval for Plant ML20198J5561998-12-0303 December 1998 ISI Summary Rept for North Anna Power Station,Unit 1 1998 Refueling Outage Owner Rept for Inservice Insps ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20196G1381998-11-0303 November 1998 Safety Evaluation Authorizing Rev to Relief Request NDE-32 for Remainder of Second 10-yr Insp Interval for Each Unit ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154L0691998-10-14014 October 1998 COLR for North Anna Power Station Unit 1 Cycle 14 Pattern Xy ML20155J6911998-10-0909 October 1998 Staff Response to Tasking Memorandum & Stakeholder Concerns ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151X8011998-09-10010 September 1998 Special Rept:On 980622,groundwater Level at Piezometer P-22 Was Again Noted to Be Above Max Water Level by 0.71 Feet. Increased Frequency of Piezometer Monitoring & Installed Addl Piezometers at Toe of Slope Along Southwest Section ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236V1251998-07-14014 July 1998 ISI Summary Rept for Naps,Unit 2,1998 Refueling Outage Owners Rept of Isis ML20236K5531998-07-0707 July 1998 SER Accepting Request for Change in ISI Commitment on Protection Against Pipe Breaks Outside Containment ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20248C8831998-05-29029 May 1998 SER Accepting Alternatives Proposed by Licensee for Use of Code Case N-535,pursuant to 10CFRa(a)(3)(i) in ASME Section XI Inservice Insp Program ML20247K9281998-05-15015 May 1998 Special Rept:On 980428,letdown PCV Exhibited Slow Response When C RCP Was Started.Cause to Be Determined.Review of Operating Procedure Will Be Performed to Determine If Enhancements Are Necessary ML20216A8971998-05-0606 May 1998 Rev 0 to Cycle 13 Pattern Ud COLR for North Anna Unit 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20217B5321998-04-20020 April 1998 Safety Evaluation Supporting Proposed Alternative to ASME Code for Surface Exam of Seal Welds on Threaded Caps for Plant Reactor Vessel Head Penetrations for part-length CRDMs ML20217H9611998-04-0707 April 1998 Special Rept:On 980216,groundwater Level at Piezometer P-22, Again Noted to Be Above Max Water Level by 0.41 Feet.Design Package for Installation of Addl Standpipe Piezometers at Toe of Slope Southeast Section,Developed ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E8801998-03-0606 March 1998 Safety Evaluation Authorizing Licensee Request for Relief from ASME Code Requirements,Paragraph IWA-2400(c) (Summer Edition W/Summer 1983 Addenda),For Upcoming Naps,Unit 1 Outage,Per 10CFR50.55a(a)(3)(ii) ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20199J6431998-02-0202 February 1998 Safety Evaluation Approving Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Code Class 3 SW Piping for North Anna,Unit 1,as Submitted in ISI Relief Request NDE-46 on 971218 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198S7571998-01-15015 January 1998 Safety Evaluation Accepting Licensee Request for Approval to Repair Flaws IAW GL-90-05 for ASME Code Class 3 Svc Water Piping ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 1999-09-08 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20064K211&oldid=2727015"