Pilgrim Nuclear Power Station - NRC Security Inspection Report 05000293/2017201
ML17306B201
Person / Time
Site: Pilgrim
Issue date: 11/21/2017
From: Johnson R C
Security Performance Evaluation Branch
To: Brian Sullivan
Entergy Nuclear Operations
Patrick Coughlin
References
IR 2017201
Download: ML17306B201 (3)


Text

November 21, 2017

Mr. Brian R. Sullivan, Site Vice President Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508

SUBJECT: PILGRIM NUCLEAR POWER STATION - NRC SECURITY INSPECTION REPORT 05000293/2017201

Dear Mr. Sullivan:

On November 8, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Pilgrim Nuclear Power Station. NRC inspectors discussed results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed inspection report.

The NRC inspectors did not identify any findings or violations of more than minor significance.

This letter will be available for public inspection at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Request for Withholding." The enclosed report contains Safeguards Information as defined by 10 CFR 73.21, "Protection of Safeguards Information: Performance Requirements," and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended.

Therefore, the material in the enclosed report will not be made publicly available. If you choose to provide a response that contains Safeguards Information, please provide the level of protection described in 10 CFR 73.21. Otherwise, if you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information - Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,/RA E. Byre for/

Robert C. Johnson, Chief Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response Docket No. 50-293 License No. DPR-35 Nonpublic

Enclosure:

Inspection Report 05000293/2017201

w/Attachment:

Supplemental Information cc w/o enclosure: Everett Perkins, Jr., Manager Regulatory Assurance; Jeanne Cho, Senior Counsel; Chairman, Duxbury Board of Selectmen, John Giarrusso, Jr., Massachusetts Emergency Management.

cc w/ enclosure: Phillip Beabout, Security Manager.

ML17306B201 Entire Report: SUNSI Review Complete By: Non-Sensitive Sensitive Publicly Available Non-Publicly Available Cover Letter Only: SUNSI Review Complete By: Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE NSIR/DSO/SPEB NSIR/DSO/SPEB NSIR/DSO/SPEB RI NSIR/DSO/SPEB NAME P. COUGHLIN J. CLARK J. WILLIS R. McKinley C. JOHNSON SIGNATURE Via email EByre for DATE 11/02/2017 11/6/17 11/06/17 11/21/17 11/17/21