ML20009C893

From kanterella
Revision as of 11:45, 17 February 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Advises That Review of Plant Design Rept & Amends for Barge Mounted Floating Nuclear Plant Has Been Completed.Final Approval Will Depend on Successful Plan Review,Insp During Const & Approval by Officer in Charge
ML20009C893
Person / Time
Site: Atlantic Nuclear Power Plant PSEG icon.png
Issue date: 07/22/1981
From: Card J
U.S. COAST GUARD, TRANSPORTATION, DEPT. OF
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
16715-13-8, NUDOCS 8107220107
Download: ML20009C893 (1)


Text

- -

DEPARTMENT OF TRANSPORTATION

/ MAILING ADDRESS:

UNITED STATES COAST GUARD u.S. COAST GUARo (G-MMP4)

WASHINGTON, D.C. 20593 enoNE: (202) 426-2197 i

,16715/13-8

,Mr. Darrell G. Eisenhut, Director Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Eisenhut:

-~

References:

(a) Memorandum of Understanding for Regulation of Floating Nuclear Power Plants, dated 4 January 1974 (b) Safety Evaluation Report by the Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, in the matter of Offshore Power Systems, Floating Nuclear Plants (1-8), Docket NO. STN 50-437 The United States Coast Guard pursuant to the provisions of reference (a) has completed a review of the Plant Design Report and its amendments for the barge mounted Floating Nuclear Plant proposed by Offshore Power Systers. This review considered matters related to the safe design and construction of the barge, to maritime safety and to the protection of the marine environment. Specifically, the review focused on the preliminary design information submitted by Offshore Power Systems which addressed the review areas listed in Appendix "A", Column 2 and appendix "B", Column 1 of reference (a). Reference (b) and its supplements reflect the detailed results of the Coast Guard review.

The Coast Guard hereby accepts the concept set forth in the Plant Design Report and its amendments for the Floating Nuclear Plant, as con sistent with Coast Guard regulations. Final approval will depend on sucee ;sful plan review, inspection during construction and approval by the Officer in Charge, Marine Insp2ction for the zone where the barge will b-constructed.

Sincerely, Am u' ., h '$du( Q f 4 8107220107 810722

//o PDR ADOCK 05000A37 A PDR