Person / Time | |
---|---|
Site: | Farley |
Issue date: | 03/19/2013 |
From: | Westberry C Southern Co, Southern Nuclear Operating Co |
To: | Division of Operating Reactor Licensing |
Brown E | |
Shared Package | |
ML13078A284 | List: |
References | |
Download: ML13078A251 (7) | |
Similar Documents at Farley | |
---|---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24260A0792024-09-23023 September 2024
[Table view]9/23/2024 Pre-Submittal Meeting - Joseph M. Farley Nuclear Plant, Units 1 and 2, LAR to Change UFSAR for Exception to RG 1.183, Revision 0, Table 3 - Footnote 11 (EPID L-2024-LRM-0108) - Meeting Slides ML24192A2262024-07-11011 July 2024 Mtg to Exchange Technical Information Regarding Farley, Units 1 & 2, Proposed License Amendment Request to Increase TS 3.6.5 Containment Temperature Limit Completion Using Risk-Informed Process for Evaluation (EPID L-2024-LRM-0086) - Slides ML24190A1082024-07-0808 July 2024 NRC Slides-07/11/2024 Mtg to Exchange Technical Information Regarding Joseph M. Farley Nuclear Plant, Units 1 & 2, Proposed License Amendment Request to Increase TS 3.6.5 Containment Temperature Limit Completion Using Risk-Informed Process ML24134A1062024-05-13013 May 2024 2023 Annual Assessment Meeting Presentation Slides ML24088A1662024-04-0303 April 2024 SNC Slides - Pre-Submittal Meeting on April 3, 2024 - Farley LAR Changing TS 3.6.5 Containment Air Temperature Using RIPE ML23361A0812024-01-0808 January 2024 SNC Slides - Pre-Submittal Public Meeting on January 8, 2024 Related to Fleet QATR ML23139A2462023-05-19019 May 2023 Annual Assessment Public Meeting Slides (May 23, 2023) ML22080A0192022-03-18018 March 2022 Annual Assessment Meeting Presentation ML21306A0242021-11-30030 November 2021 SNC Pre-Submittal Meeting for LAR to Relocate Augmented Piping Inspection Program Details from TSs to a Licensee Controlled Document for Farley Nuclear Plant, Units 1 & 2; and Vogtle Electric Generating Plant, Units 1 & 2 (EPID L-2021-LRM-0 ML21280A0012021-10-31031 October 2021 Pre-Submittal Meeting Presentation from SNC to Discuss a Future LAR Regarding Change TS to Increase Containment Peak Pressure to Address Several NSALs ML21173A0632021-06-24024 June 2021 Pre-Application SNC Presentation Slides - Removal of Encapsulations from Recirculation Suction Valves ML21057A0182021-02-26026 February 2021 Pre-Submittal Meeting Revise Technical Specification 3.2.1 Heat Flux Hot Channel Factor (Fq(Z)) (EPID L-2021-LRM-0023) (Slides) ML21036A1172021-02-0505 February 2021 SNC Slides - Pre-Submittal Meeting on February 16, 2021 - Beacon LAR ML20318A1032020-11-12012 November 2020 SNC ERO Staffing LAR RAI Responses ML20217L4312020-08-13013 August 2020 Edwin I Hatch, Units 1 and 2; and Vogtle Electric Plant, Units 1, 2, 3, and 4 - Meeting Slides a License Amendment Request for the Emergency Plan (EPID Nos L-2020-LLA-0150 and L-2020-LLA-051 ML20101K6582020-04-10010 April 2020 Annual Assessment ML20022A0262020-01-22022 January 2020 NEI Presentation Status Update for Ropte Short Term Action Plan: Removed Planned Unavailability for Mitigating Systems Performance Index ML19149A4222019-05-29029 May 2019 Summary of Public Meeting Concerning Annual Assessment of the Farley Nuclear Plant, Units 1 and 2, Docket Nos. 05000348 and 05000361 ML19057A4762019-03-0707 March 2019 Presentation Slides Related to Pre-Application Public Meeting Regarding to Technical Specification 3.3.1 and 3.3.2 (L-2019-LRM-0010) ML19025A0242019-01-25025 January 2019 SNC License Amendment Request for Proposed Changes to Emergency Response Organization Staffing and Augmentation NL-18-1412, Presentation Material for the Measurement Uncertainty Recovery and Spent Fuel Pool Criticality Analysis Pre-Submittal Meeting2018-11-0808 November 2018 Presentation Material for the Measurement Uncertainty Recovery and Spent Fuel Pool Criticality Analysis Pre-Submittal Meeting ML18311A1822018-11-0707 November 2018 November 13, 2018, Joseph M. Farley Nuclear Power Plant, Public Meeting Slides Regarding Spent Fuel Pool Criticality Analyses and Measurement Uncertainty Recovery (Mur) Pre-Application Meeting ML18290B0942018-10-16016 October 2018 October 16, 2018, Public Meeting Presentation Slides Related to July 27, 2018, License Amendment Request to Implement NEI 06-09, Revision 0-A, Risk-Informed Technical Specifications Initiative 4b. ML18234A4712018-08-23023 August 2018 NRC-Pre Submittal Meeting TSTF-51 for Hatch and TSTF-51 and -471 for Farley - August 23, 2018 ML18136A8902018-05-16016 May 2018 May 21, 2018 Slides for Public Teleconference Regarding Changes to Hatch, Farley, and Vogtle TS 5.2.2.g ML18065A0202018-03-12012 March 2018 March 12, 2018, Public Meeting Presentation ML18065A0222018-03-0606 March 2018 March 12, 2018, Public Meeting - Draft 4b Application ML18065A0252018-03-0606 March 2018 Joseph M Farley March 12, 2018, Public Meeting - Draft 4b Application Enclosures NL-16-0388, September 22, 2016, Public Meeting Presentation Slides2016-09-22022 September 2016 September 22, 2016, Public Meeting Presentation Slides ML16260A1162016-09-22022 September 2016 September 22, 2016, Public Meeting Presentation Slides ML15106A2042015-04-22022 April 2015 April 22, 2015, Meeting with Southern Nuclear Company, Slide Presentation ML14115A4052014-04-25025 April 2014 2013 End of Cycle Farley Public Meeting Summary Memo ML14108A0052014-04-23023 April 2014 April 23, 2014, Public Meeting Presentation Slides, Southern Nuclear Company, SNC Degraded Grid Design Criteria. ML14120A2252014-04-23023 April 2014 April 23, 2014, Category 1 Public Meeting, J.M. Farley Presentation Slides, Residual Heat Removal Autoclosure Interlock Deletion. ML14135A1732014-02-26026 February 2014 May 16, 2014, J.M. Farley Category 1 Meeting Handout, Duration for Completion of the Flood Hazard Re-evaluation. ML13079A1502013-03-20020 March 2013 Summary of Public Meeting with Joseph M. Farley ML13078A2472013-03-19019 March 2013 03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 2 (3/20) ML13078A2552013-03-19019 March 2013 03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 10 ML13078A2542013-03-19019 March 2013 03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 9 ML13078A2532013-03-19019 March 2013 03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 8 ML13078A2522013-03-19019 March 2013 03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 6 ML13078A2512013-03-19019 March 2013 03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 5 (3/19) ML13078A2502013-03-19019 March 2013 03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 4 ML13078A2482013-03-19019 March 2013 03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 3 (3/19) ML13078A2462013-03-19019 March 2013 03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 2 (3/19) ML13078A2452013-03-19019 March 2013 03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 1 (3/19) ML1016705482010-06-0808 June 2010 Farley Nuclear Plant, NRC Screening Criteria Response ML1009805922010-04-0808 April 2010 Summary of Public Meeting to Discuss Nrc'S Reactor Oversight Process and Nrc'S Annual Assessment of Plant Safety Performance for Period of January 1, 2009 - December 31, 2009 - Joseph M. Farley Nuclear Plant ML0909210352009-03-19019 March 2009 Annual Assessment Meeting Presentation ML0814900902008-05-22022 May 2008 List of Attendees - Joseph M. Farley Nuclear Plant, Annual Public Assessment Meeting 2024-09-23 Category:Slides and Viewgraphs MONTHYEARML24260A0792024-09-23023 September 2024
[Table view]9/23/2024 Pre-Submittal Meeting - Joseph M. Farley Nuclear Plant, Units 1 and 2, LAR to Change UFSAR for Exception to RG 1.183, Revision 0, Table 3 - Footnote 11 (EPID L-2024-LRM-0108) - Meeting Slides ML24192A2262024-07-11011 July 2024 Mtg to Exchange Technical Information Regarding Farley, Units 1 & 2, Proposed License Amendment Request to Increase TS 3.6.5 Containment Temperature Limit Completion Using Risk-Informed Process for Evaluation (EPID L-2024-LRM-0086) - Slides ML24190A1082024-07-0808 July 2024 NRC Slides-07/11/2024 Mtg to Exchange Technical Information Regarding Joseph M. Farley Nuclear Plant, Units 1 & 2, Proposed License Amendment Request to Increase TS 3.6.5 Containment Temperature Limit Completion Using Risk-Informed Process ML24134A1062024-05-13013 May 2024 2023 Annual Assessment Meeting Presentation Slides ML24088A1662024-04-0303 April 2024 SNC Slides - Pre-Submittal Meeting on April 3, 2024 - Farley LAR Changing TS 3.6.5 Containment Air Temperature Using RIPE ML23361A0812024-01-0808 January 2024 SNC Slides - Pre-Submittal Public Meeting on January 8, 2024 Related to Fleet QATR ML23139A2462023-05-19019 May 2023 Annual Assessment Public Meeting Slides (May 23, 2023) ML22080A0192022-03-18018 March 2022 Annual Assessment Meeting Presentation ML21306A0242021-11-30030 November 2021 SNC Pre-Submittal Meeting for LAR to Relocate Augmented Piping Inspection Program Details from TSs to a Licensee Controlled Document for Farley Nuclear Plant, Units 1 & 2; and Vogtle Electric Generating Plant, Units 1 & 2 (EPID L-2021-LRM-0 ML21280A0012021-10-31031 October 2021 Pre-Submittal Meeting Presentation from SNC to Discuss a Future LAR Regarding Change TS to Increase Containment Peak Pressure to Address Several NSALs ML21173A0632021-06-24024 June 2021 Pre-Application SNC Presentation Slides - Removal of Encapsulations from Recirculation Suction Valves ML21083A2872021-03-24024 March 2021 Pre-Submittal Meeting - Quality Assurance Topical Report Revision to Allow Application of Remote Assessment Techniques During Exigent Conditions ML21057A0182021-02-26026 February 2021 Pre-Submittal Meeting Revise Technical Specification 3.2.1 Heat Flux Hot Channel Factor (Fq(Z)) (EPID L-2021-LRM-0023) (Slides) ML21036A1172021-02-0505 February 2021 SNC Slides - Pre-Submittal Meeting on February 16, 2021 - Beacon LAR ML20318A1032020-11-12012 November 2020 SNC ERO Staffing LAR RAI Responses ML20101K6582020-04-10010 April 2020 Annual Assessment ML20022A0262020-01-22022 January 2020 NEI Presentation Status Update for Ropte Short Term Action Plan: Removed Planned Unavailability for Mitigating Systems Performance Index ML19149A4222019-05-29029 May 2019 Summary of Public Meeting Concerning Annual Assessment of the Farley Nuclear Plant, Units 1 and 2, Docket Nos. 05000348 and 05000361 ML19057A4762019-03-0707 March 2019 Presentation Slides Related to Pre-Application Public Meeting Regarding to Technical Specification 3.3.1 and 3.3.2 (L-2019-LRM-0010) ML19025A0242019-01-25025 January 2019 SNC License Amendment Request for Proposed Changes to Emergency Response Organization Staffing and Augmentation NL-18-1412, Presentation Material for the Measurement Uncertainty Recovery and Spent Fuel Pool Criticality Analysis Pre-Submittal Meeting2018-11-0808 November 2018 Presentation Material for the Measurement Uncertainty Recovery and Spent Fuel Pool Criticality Analysis Pre-Submittal Meeting ML18290B0942018-10-16016 October 2018 October 16, 2018, Public Meeting Presentation Slides Related to July 27, 2018, License Amendment Request to Implement NEI 06-09, Revision 0-A, Risk-Informed Technical Specifications Initiative 4b. ML18065A0202018-03-12012 March 2018 March 12, 2018, Public Meeting Presentation ML18065A0252018-03-0606 March 2018 Joseph M Farley March 12, 2018, Public Meeting - Draft 4b Application Enclosures ML18065A0222018-03-0606 March 2018 March 12, 2018, Public Meeting - Draft 4b Application ML16260A1162016-09-22022 September 2016 September 22, 2016, Public Meeting Presentation Slides NL-16-0388, September 22, 2016, Public Meeting Presentation Slides2016-09-22022 September 2016 September 22, 2016, Public Meeting Presentation Slides ML15106A2042015-04-22022 April 2015 April 22, 2015, Meeting with Southern Nuclear Company, Slide Presentation ML14115A4052014-04-25025 April 2014 2013 End of Cycle Farley Public Meeting Summary Memo ML14108A0052014-04-23023 April 2014 April 23, 2014, Public Meeting Presentation Slides, Southern Nuclear Company, SNC Degraded Grid Design Criteria. ML14120A2252014-04-23023 April 2014 April 23, 2014, Category 1 Public Meeting, J.M. Farley Presentation Slides, Residual Heat Removal Autoclosure Interlock Deletion. ML14108A0042014-04-18018 April 2014 April 23, 2014, Category 1 Public Meeting, J.M. Farley Presentation Slides, Residual Heat Removal Autoclosure Interlock Deletion ML13079A1502013-03-20020 March 2013 Summary of Public Meeting with Joseph M. Farley ML13078A2462013-03-19019 March 2013 03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 2 (3/19) ML13078A2552013-03-19019 March 2013 03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 10 ML13078A2542013-03-19019 March 2013 03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 9 ML13078A2532013-03-19019 March 2013 03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 8 ML13078A2522013-03-19019 March 2013 03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 6 ML13078A2512013-03-19019 March 2013 03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 5 (3/19) ML13078A2502013-03-19019 March 2013 03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 4 ML13078A2482013-03-19019 March 2013 03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 3 (3/19) ML13078A2452013-03-19019 March 2013 03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 1 (3/19) ML13078A2472013-03-19019 March 2013 03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 2 (3/20) IR 05000348/20110122011-07-15015 July 2011 Summary of Public Meeting with Joseph M. Farley Nuclear Plant, to Discuss Safety Significance of Preliminary White Finding Associated with One Apparent Violation Documented in NRC Inspection Report 05000348-11-012 and 05000364-11-012 ML1016705482010-06-0808 June 2010 Farley Nuclear Plant, NRC Screening Criteria Response ML1009805922010-04-0808 April 2010 Summary of Public Meeting to Discuss Nrc'S Reactor Oversight Process and Nrc'S Annual Assessment of Plant Safety Performance for Period of January 1, 2009 - December 31, 2009 - Joseph M. Farley Nuclear Plant ML0909210352009-03-19019 March 2009 Annual Assessment Meeting Presentation ML0819603642008-07-10010 July 2008 07/102008-Joseph M. Farley Regulatory Performance Meeting, Results of the NRC 95002 Supplemental Inspection ML0814901062008-05-22022 May 2008 Slides - Joseph M. Farley Nuclear Plant, Annual Public Assessment Meeting, ML0729806702007-10-24024 October 2007 Meeting Presentation on GEH Chemical Effects Testing Update 2024-09-23 |
Text
FNP LAR AUDIT PRESENTATION March 19, 2013 Session 5 - Monitoring Chip Westberry
Monitoring Overview
- Provides means to ensure Assumptions remain Valid
- Process Defined in FAQ 10-059
- Scoping
- Screening
- Big Bi M
- Little m
- Target Value Determination
- Monitoring Implementation Slide 2
Monitoring Scoping Per FAQ 59, we are scoping 6 categories of SSCs:
- NSCA
- FPRA
- NPO
- Rad. Release
- FP Systems and features
- Programmatic Elements Slide 3
Monitoring Screening
- Risk Criteria
- RAW > 2.0 20 AND
- CDF> 1E-6 1E 6 OR LERF > 1E 1E-7 7
- Screened in gets Big M treatment using a monitoring program p g meeting g the requirements q of section 2.6 of NFPA 805.
- Screened out gets Little m treatment using existing system and program health processes.
- Corrective Action Program is used to document issues and issue resolution.
resolution Slide 4
Monitoring Targets
- Uses IPE and FPRA reliability and availability data
- Surveillance Optimization is being committed to in Attachment S as implementation item 1.
Slide 5
Monitoring Commitments
- Attachment S commitments for Monitoring:
- The monitoring program will be implemented after the safety evaluation issuance as part of the fire protection program transition to NFPA 805. A Monitoring Program Engineering Evaluation will be developed during implementation.