ML18142A011

From kanterella
Revision as of 23:45, 2 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Rev 9 to Emergency Plan Implementing Procedure EPIP-3.01, Callout of Emergency Response Personnel.
ML18142A011
Person / Time
Site: Surry  Dominion icon.png
Issue date: 06/07/1984
From: Joshua Wilson
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML18142A010 List:
References
EPIP-3.01, NUDOCS 8407130088
Download: ML18142A011 (11)


Text

'

l .

e PUBLIC DOCUMENT ROOM COPY VIRGINIA ELECTRIC AND POWER COMPANY REVISIONS TO SURRY POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURES Enclosed are recently revised pages to the Surry Power Station Emergency Plan Implementing Procedures. Please take the following actions in order to keep your manual updated with the most recent revisions.

EPIP-3.01 CALLOUT OF EMERGENCY RESPONSE PERSONNEL Remove and Destroy Enter Entire Procedure and Entire Procedure and Attachment 1, Rev. 08 Attachment 1, Rev. 09 dated 06-07-84

- irr,; /FM1 / 19 ffi4071300lB S4070cb PDR ADOCK 050002@0 F PDR

____. e e GOV 02-54 VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIBOD.lIA 23261 W. L. STBWAJIT VJCZ PJlBl!IIDIIKT NucLBAJll 0PBlilATIOKB July 6, 1984 Mr. James P. O'Reilly Serial No. 352 Regional Administrator NO/REB/jmj:EMl-19 U.S. Nuclear Regulatory Commission Docket Nos. 50-280 Region II 50-281 101 Marietta Street, Suite 2900 License Nos. DPR-32 Atlanta, Georgia 30303 DPR-37

Dear Mr. O'Reilly:

REVISIONS TO SURRY POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURES Pursuant to 10CFR 50.54 (q) revisions to the Surry Power Station Emergency Plan Implementing Procedures are submitted.

~

W. L. Stewart J:-

Enclosures cc: Document Control Desk (2) w/o Enclosures cc: Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing Mr. D. J. Burke NRC Resident Inspector Surry Power Station

NO. 97887230 .... PUBLIC DOCUMENT ROOM ..a.

REV.A lll'v1RGINIA ELECTRIC AND POWER COMPalf SURRY POWER STATION I* EMERGENCY PLAN IMPLEMENTING PROCEDURE e NUMBER PROCEDURE TITLE REVISION 09 EPIP-3.01 CALLOUT OF EMERGENCY RESPONSE PERSONNEL PAGE (With 1 Attachment) 1 of 3 PURPOSE

1. To callout station AND corporate emergency response personnel if they are not already at tiielr normal work locations.

USER Security Team Leader OR Station Emergency Manager ENTRY CONDITIONS

1. Initiation directed by the Station Emergency Manager.

REVISION RECORD REV. 03 PAGE(S): 1 of 3 & Att.l Pg. 1 of 6, 2 of 6, 3 of 6 DATE: 03-10-83 REV. 04 PAGE(S): 1 of 3, Att. 1 Pg. 1 of 6 and 2 of 6 DATE: 03-11-83 REV. 05 PAGE(S): 1 of 3, Att. 1 Pg. 3 of 6 and 4 of 6 DATE: 04-15-83 REV. 06 PAGE(S): 1 of 3, Att. 1 Pg. 2 of 6 DATE: 06-17-83 REV. 07 PAGE(S): 1, att. 1 pg. 3, 4 DATE: 09-29-83 REV. 08 PAGE(S): 1, 3; Att. 1, pgs. 2, 4 and 5 DATE: 11-10-83 REV. 09 PAGE(S): 1 of 3 and Att. 1, pgs. 1, 3, and 4 of 6 DATE: JUN 'i APPROVED n DATE

~.s rv'--

'AN STATION NUCLEAR SAFETY JUN 'I 1984 0 OPERATING COMMITTEE

No.97887210 e e NUMBER PROCEDURE TITLE REVISION 00 EPIP-3.01 CALLOUT OF EMERGENCY RESPONSE PERSONNEL PAGE 2 of 3 STEP ....__---t ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

1. INITIATE PROCEDURE:

a) Initiated By:

Time:

Date:

2. OBTAIN EMERGENCY PERSONNEL NOTIFICATION LIST:

a) Attachment 1 of this procedure

    • 3. NOTIFY EMERGENCY RESPONSE PERSONNEL:

a) Use all available tele-

' phones and Security personnel to make the notification as rapidly as possible b) Notify, in order, the individuals listed in the Attachment until at least one individual is reached in each department c) Transmit the message indi-cated for that department, verify the message has been understood, and then move to next department d} Read messages exactly as written in Attachment 1 of this procedure

'.No. 97887210 e e

. NUMBER PROCEDURE TITLE REVISION 08 EPIP-3.01 CALLOUT OF EMERGENCY RESPONSE PERSONNEL PAGE 3 of 3 STEP - - - ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

4. RECORD TIME CALLOUT COMPLETED:

a) Callout of above departments completed at (time)

5. INFORM STATION EMERGENCY MANAGER TIME CALLOUT COMPLETED:
6. TERMINATE EPIP-3.01:

a) Close-Out

1) COMPLETED BY: _ _ _ _ __

DATE:

I b) Forward completed EPIP-3.01, forms and other applicable records to Secretary SNSOC END

No. 97887220 e

I . NUMBER ATTACHMENT TITLE REVISION e EPIP-3.01 ATTACHMENT EMERGENCY PERSONNEL NOTIFICATION LIST 09 PAGE 1 1 of 6

1. INSTRUCTIONS TO SECURITY: Use all available security personnel and telephone lines to make the following notifications as rapidly as possible. Notify, in order, the individuals listed below until at least one individual in each department has been notified. When each individual is reached, transmit the message indicated for that department, verify the message has been understood, and then move to the next department.
2. GENERAL OFFICE SECURITY (Richmond)

MESSAGE: "This is Security at Surry Power Station. An emergency has been declared at Surry Power Station. Commence the callout of the Corporate Emergency Response Team in accordance with the Corporate Emergency Response Plan."

NAME EXT. TELEPHONE NUMBER General Office Security

3. STATION MANAGEMENT MESSAGE: "This is Security at Surry Power Station. This message is to inform you that an emergency has been declared at the station."

NAME EXT. TELEPHONE NUMBER J. L. Wilson R. F. Saunders D. A. Christian D. L. Benson H. L. Miller e B.R. Parkhurst

No,97887220 e

NUMBER ATTACHMENT TITLE REVISION e EPIP-3.01 ATTACHMENT EMERGENCY PERSONNEL NOTIFICATION LIST 08 PAGE l 2 of 6

\

4. HEALTH PHYSICS DEPARTMENT MESSAGE: "This is Security at Surry Power Station. An emergency has been declared. Commence callout of emergency response personnel in your department in accordance with your departmental emergency notification list.

NAME EXT. TELEPHONE NUMBER S. P. Sarver P. P. Nottingham Barry Garber

-- 5.

Dean Densmore TECHNICAL SERVICES DEPARTMENT Message: "This is Security at Surry Power Station. An emergency has been declared. Commence callout of emergency response personnel in your department in accordance with your departmental emergency notification list."

NAME EXT. TELEPHONE NUMBER M. R. Kansler Alan Price Douglas Rickeard Larry Curfman John Horhutz George Pitonyak Rick Bailey e Tom Swindell Larry Miller I

I~

.. l No. 97887220 e e NUMBER ATTACHMENT TITLE REVISION EPIP-3.01 09 EMERGENCY PERSONNEL NOTIFICATION LIST ATTACHMENT PAGE 1 3 of 6

6. MAINTENANCE DEPARTMENT MESSAGE: "This is Security at Surry Power Station. An emergency has been declared. Commence callout of emergency response personnel in your department in *accordance with your departmental emergency notification list."

NAME EXT. TELEPHONE NUMBER H. w. Kibler Mike Haduck John Patrick Dick Mudd

7. SECURITY DEPARTMENT MESSAGE: "This is Security at Surry Power Station. This message is to inform you that an emergency has been declared at the station."

NAME EXT. TELEPHONE NUMBER Otto Wegman H. J. Van Dyke

w. D. Sweaney I

I. * ' No. 97887220 NUMBER

- ATTACHMENT TITLE e

REVISION e EPIP-3.01 ATTACHMENT EMERGENCY PERSONNEL NOTIFICATION LIST PAGE 09 1 4 of 6

8. ADMINISTRATIVE SERVICES DEPARTMENT MESSAGE: "This is Security at Surry Power Station. An emergency has been declared. Commence callout of emergency response personnel in your department in accordance with your departmental emergency notification list."

NAME EXT. TELEPHONE NUMBER W.R. Runner E. P. DeWandel Luther Farinholt B. B. McDuffie

9. QUALITY CONTROL DEPARTMENT MESSAGE: "This is Security at Surry Power Station. An emergency has been declared. Commence callout of emergency response personnel in your department in accordance with your departmental emergency notification list."

NAME EXT. TELEPHONE NUMBER Richard Driscoll Dean Grady Darvin Wagaman Don Staats e

.' No. 97887220 e e' NUMBER ATTACHMENT TITLE REVISION EPIP-3.01 08 ATTACHMENT EMERGENCY PERSONNEL NOTIFICATION LIST PAGE 1 5 of 6

10. TRAINING DEPARTMENT MESSAGE: "This is Security at Surry Power Station. An emergency has been declared. Commence callout of emergency response personnel in your department in accordance with your departmental emergency notification list."

NAME EXT. TELEPHONE NUMBER Larry Edmonds

  • o. A. Vogtsberger H. Mccallum I

L. Gardner

11. NRC MESSAGE: "This is Security at Surry Power Station. This message is to inform you that an emergency has been declared at the station."

NAME EXT. TELEPHONE NUMBER Don Burke Mike Davis

12. TERMINATE ATTACHMENT 1:

a) Close-Out

1) COMPLETED BY:

DATE: _ _ _ __

  • - TIME: _ _ _ __

No.97887220

.. e e

.: NUMBER EPIP-3.01 ATTACHMENT 1

ATTACHMENT TITLE EMERGENCY PERSONNEL NOTIFICATION LIST REVISION, 00 PAGE 6 of 6

12. (CONTINUED) /

b) Affix this Attachment to EPIP-3.01 .

END