ML19254E933
ML19254E933 | |
Person / Time | |
---|---|
Site: | Salem, Sequoyah |
Issue date: | 09/10/1979 |
From: | Midura H Public Service Enterprise Group |
To: | |
Shared Package | |
ML19254E917 | List: |
References | |
NUDOCS 7911050076 | |
Download: ML19254E933 (1) | |
Category:REPORTABLE OCCURRENCE REPORT (SEE ALSO AO
MONTHYEARML18106A9621998-11-16016 November 1998
[Table view]Special Rept:On 981006,train B of Reactor Vessel Level Indicating Sys Was Indicating Malfunction.Caused by Loss of Fill in Capillary Sensing Line.Extensive Troubleshooting Was Performed on Sys ML18106A8591998-08-31031 August 1998 Special Rept:On 980816,RMS Channel 1R15 Inoperable for Greater than Seven Days.Cause Is Under Investigation. Replacement of Detector Assembly W/Higher Temperature Rated Detector to Mitigate Effects to Be Completed by 981019 ML18106A1771997-11-21021 November 1997 Special Rept 97-15,on 971022,2A EDG Declared Inoperable. Caused by Moisture Build Up in Starting Air headers.2A EDG Equipment Inspected Just Subsequent to Aborted Start ML18102B6001997-09-30030 September 1997 Special Rept 97-02:on 970909,isolation of Fire Protection Water to Plant Auxiliary Bldgs & Containments Occurred Due to Closure of Valves 1PF186 & 1PF187.Valves Opened on 970916 & Locally Verified Open by Loss Prevention Personnel ML18102B4241997-06-30030 June 1997 Special Rept 97-01:on 970615,radiation Monitoring Sys Channel 1R15 Was Inoperable for More than Seven Days.Caused by Configuration of Plant.Required Operational Surveillances Will Be Completed on 2R15 & Channel Restored ML18101B3051996-03-25025 March 1996 Special Rept:On 960224,valid Failure of 1B EDG Was Identified During Surveillance Testing.Caused by Fatigue Due to Normal Machine Vibration.Replaced Threaded Nipple ML18101B1581995-12-29029 December 1995 Special Rept 95-02:on 951207,valid Failure of 1A EDG Identified Approx 23 & 1/2 H Into 24 H Endurance Surveillance Test.Caused by Lubricating Oil Leak at Threaded Piping Nipple.Threaded Nipple Replaced ML18101B1541995-12-27027 December 1995 Special Rept 95-001:on 951129,valid Failure of 1B EDG Identified During Routine Monthly Surveillance Test.Caused by Malfunction of Woodward Electronic Governor Control Unit. Unit Replaced & 1B EDG Tested Satisfactorily on 951214 ML18101A8061995-07-0303 July 1995 Special Rept:On 950607,identified That 950601 Failure of EDG 1B Potential Common Mode Failure.Util Unable to Determine Cause at Present Time.Ler Will Be Submitted to NRC ML18101A7341995-05-19019 May 1995 Special Rept:On 950506,RMS Declared Inoperable Due to Problems Encountered W/Operation of Victoreen Met Package. Caused by Met Package Inconsistencies.Appropriate Computer Software Corrections Being Researched & Will Be Implemented ML18101A5601995-02-15015 February 1995 Special Rept 95-01:on 950125,shortly After RCP Turned Off to Remove RCP from Svc,Momentary RCS Pressure Transient Occurred & Pressure Peaked 365.5 Psig Due to Pressure Equalization Through 21 RCS Loop.Procedures Will Be Changed ML18100B0421994-04-27027 April 1994 Special Rept 94-2:on 940329,valid Failure of 1A Diesel Generator Occurred.Caused by Buildup on Contacts of Breaker Position Switch 52HL,resulting in Excessive Electrical Resistance.Breaker Position Switch Replaced ML18100A8271994-01-20020 January 1994 Special Rept 94-01:on 940106,radiation Monitoring Channels 1R45B & 1R45C Declared Inoperable & Exceeded 7-day Time Frame for Restoring Inoperable Channels to Operable Status on 940113.Monitors Returned to Svc on 940118 ML18100A6211993-09-17017 September 1993 Special Rept 93-4:on 930910,radiation Monitoring Channels 2R45B & 2R45C Inoperable Greater than Seven Days.Caused by Design Deficiency.Corrected by Separating Monitors Reference & Chassis Grounds ML20046B3981993-07-28028 July 1993 Special Rept 93-13:on 930715,fire Header in Auxiliary Bldg Removed from Svc as Result of Maint Activities in Process of Repairing & Replacing Leaking Lines.Fire Watches & Backup Fire Suppression Water Sys Established ML20046A6841993-07-23023 July 1993 Special Rept 93-10:on 930619,penetration Marks 20 & 1287 Were Breached to Route Electrical Sensor Cables Into Unit 1 Annulus Area & to Route Instrument Cables Into ABGTS Room. Roving Fire Watch Established ML18100A4941993-07-21021 July 1993 Special Rept:On 930707,process Monitor - Noble Gas effluent- Condenser Exhaust Sys Was Removed from Svc Due to Observed Water in Its Sample Line.Sample Line 2R15 Drained & Dried. W/930721 Ltr ML20046A5341993-07-19019 July 1993 Special Rept 93-09 Provides Detail Re 19 Fire Protection Barriers,Detection Sys & Water Suppression Sys Being Impaired for Period Greater than TS Allowable Timeframe ML20045H9681993-07-16016 July 1993 Special Rept 93-12:on 930621,portion of Fire Header in Auxiliary Bldg Removed from Svc & Sys Not Restored to Operability within TS Required Time Period.Piping Repaired & Incident Investigation Initiated ML20045G6391993-07-0707 July 1993 Special Rept 93-11:on 930624,portion of Fire Header in Auxiliary Bldg Removed from Svc as Result of Maint Activities & Water Flooded Penetration Room.Fire Suppression Sys Declared Inoperable & LCO 3.7.11.1 Entered ML20045E6881993-06-25025 June 1993 Special Rept 93-07:on 930519,0521 & 0527,fire Doors A-146 & A-44 & A-196,respectively,were Breached Open.On 930525, Mechanical Sleeve C2/J Breached to Permit Cable Pulling. Detectors Verified Operable & Fire Watch Established ML20045C9211993-06-17017 June 1993 Special Rept 93-06:on 930511,HPFP Sys Operated W/Only One Operable HPFP Pump for Period,Exceeding TS 3.7.11.1 Allowable Timeframe Due to Maint.Dg 2A-A Returned to Svc on 930519 & EP Supply Reestablished to 2A-A HPFP Pump ML20044G5521993-05-27027 May 1993 Special Rept 93-05:on 930426,fire Barrier for Mechanical Sleeve Between 480-volt Shutdown Board Rooms 1B1 & 1B2 Breached.Caused by Unavailability of Fire Retardant Sealant.Roving Fire Watch Established ML18096B3511993-03-23023 March 1993 Special Rept 93-2:on 930310,RMS Channels 2R45B & 2R45C Removed from Svc to Functionally Test Low Flow Differential Pressure.Test Results Showed That Switch Inoperable.Caused by Design Deficiency.Design Mod Being Prepared ML18096B2571993-02-0404 February 1993 Special Rept 93-1:on 930104,fire Barrier Penetration Seal Impaired to Support Welding of RHR Sys Drain Piping.Barrier Inoperable for More than 7 Days.Cables Removed & Access Hatch Closed to Restore Penetration to Operability ML18096B2331993-01-28028 January 1993 Special Rept 93-1:on 930114,RMS Channels 1R45B & 1R45C Declared Inoperable Upon Annuciation of External Fail Alarm.Cause Not Determined.Upon Completion,Corrective Actions Will Be Taken & Channels Will Return to Svc ML18096B1701992-12-21021 December 1992 Special Rept 92-9:on 921208,chilled Water Supply Could Not Be Restored Following Completion of Rms Channel Functional Surveillance.Caused by Blow Indication Panel Circuit Fuse. New Solenoid Valve Operator Ordered ML18096B1601992-12-18018 December 1992 Special Rept 92-9:on 921112,fire Barrier Impairment Initiated to Support Svc Water Sys Design Changes & Penetration Inoperable for More than 7 Days Through 921119. Penetrations Will Be Sealed Upon Completion of Work ML18096B1171992-11-23023 November 1992 Special Rept 92-8:on 921116,RMS Channels Declared Inoperable & Removed from Svc for More than 7 Days.Caused by Bad Ground Wire Connection on Three Wire Power Cable.Connector Repaired & post-maint Testing Successfully Completed ML18096B0861992-11-0505 November 1992 Special Rept 92-7:on 921008,discovered Door Misaligned & Would Not Close & Latch.Caused by Equipment Failure.Fire Door Declared Functional Upon Completion of Repairs & Testing ML18096B0731992-10-30030 October 1992 Special Rept 92-8:on 920924,fire Barrier Penetrations Impaired to Support Design Change Work.On 921001, Penetrations Exceeded seven-day Limit,Per TS 3.7.11.a. Impaired Penetrations Resealed & Inspected ML18096B0591992-10-23023 October 1992 Special Rept 92-6:on 920924,valid Failure,Involving DG 2B, Occurred During Monthly Surveillance Testing & Exhaust Smoke Observed Rising from Around Turbocharger.Caused by Loose Pipe Fasteners.Fasteners Torqued Appropriately ML18096B0021992-09-24024 September 1992 Special Rept 92-7:on 920826,auxiliary Bldg 100-ft Elevation Corridor Fire Door Found Impaired & Not Returned to Operability within 7 Days.Caused by Broken Internal Hinge Plate Welds.Damaged Door Will Be Replaced ML18096A9151992-08-21021 August 1992 Special Rept 92-6:on 920814,radiation Monitoring Channels 1R45B & 1R45C Declared Inoperable for More than 7 Days. Caused by Degradation on Impellers of Two Sample Pumps. Preventive Maint Applicability Review Will Be Performed ML18096A8841992-08-0707 August 1992 Special Rept 92-4-1:on 920430,fire Pump 1 Started Knocking 10 Minutes Into half-hour Run.Caused by sheared-off Follower Guide Pin.On 920514,fire Pump Developed Severe Oil Leak.Caused by Piston Failing to Contact Cylinder Head ML18096A8261992-07-0909 July 1992 Special Rept 92-5:on 920623,actuation Capability of 78-ft Lower Electrical Penetration CO2 Fire Protection Sys Inoperable for More than 14 Days.Caused by Required Maint Work.Sys Returned to Svc on 920702 ML18096A7431992-05-22022 May 1992 Special Rept 92-4:on 920430 & 0514,fire Pumps 1 & 2, Respectively,Inoperable for More than 7 Days.Caused by Sheared Cam Follower Pin & Severe Oil Leak.Fire Protection Sys cross-tie Valve Opened to Provide Backup Protection ML18096A7281992-05-22022 May 1992 Special Rept 92-3,on 920422,discovered That CO2 Sys Was Inoperable.Caused by Maint Work Activities.Upon Completion of Maint Diesel Generator Area CO2 Sys Will Be Returned to Svc ML18096A7351992-05-15015 May 1992 Ro:On 920423,fire Pump 1 Declared Inoperable & Remains Inoperable Due to Broken Crankshaft.Both Fire Suppression Sys Inoperable.On 920515,fire Pump 2 Declared Inoperable Due to Severe Oil Leak.Written Rept to Be Provided in 14 Days ML18096A7021992-05-11011 May 1992 Special Rept 92-2-1:on 920324,0414,15 & 25,fire Barriers Impaired for More than 7 Days to Support Planned Work in SW Sys,Sw Project Support & SW Pipe Replacement.Hourly Fire Watch Will Continue Until All Concerns Resolved ML18096A6501992-04-23023 April 1992 Special Rept 92-2:on 920324,0414 & 15,fire Barriers Impaired for Greater than Seven Days in Support of Planned Work. Hourly Fire Watch Will Continue Until Fire Protection Concerns Associated W/Areas Resolved ML18096A6491992-04-23023 April 1992 Special Rept 92-4:on 920318,two Fire Barrier Penetrations Were Impaired to Support Turbine/Generator Design Change Work for Greater than Seven Days.Caused by Outage Related Activities.Penetrations Were Resealed on 920326 ML18096A6051992-03-26026 March 1992 Special Rept 92-3:on 920302,jacket Water Leakage Developed After Loading DG 2A.On 920305,DG 2A Tripped on Low Lube Oil Pressure.Both Events Caused by Equipment Failure.Tube Connector Compression Fitting Replaced & Diesel Retested ML18096A5891992-03-23023 March 1992 Special Rept 92-2:on 920302 & 21,fire Barriers Impaired for More than 7 Days to Support Design Changes & outage-related Activities.Hourly Fire Watch Established & Fire Penetrations Will Be Sealed ML18096A5671992-03-12012 March 1992 Special Rept 92-1:on 920223,fire Barriers Found Impaired for Greater than Seven Days.Caused by Equipment Failure.Fire Door Will Be Replaced Upon Receipt of New Door ML18096A5101992-02-0606 February 1992 Special Rept 92-1 on 920104,06 & 25,fire Barriers Impaired for Greater than Seven Days in Support of Outage Related Activities Due to Time Required to Complete Work.Hourly Fire Watch Will Continue Until Concerns Re Areas Are Resolved ML18096A4231992-01-0909 January 1992 Special Rept 91-3,on 911210,26 & 27:fire Barriers Found Impaired for Greater than 7 Days.Cause of Occurrence Due to Support Outage Related Activities.Penetrations Will Be Sealed ML18096A4001991-12-23023 December 1991 Special Rept 91-4 Re Valid Failure of Diesel Generator 2B on 911122.Cause Unknown.Surveillance Procedure SP(O)4.8.1.1.2 Performed Satisfactorily ML18096A2301991-08-22022 August 1991 Special Rept 91-02:on 910725,reactor Trip Breaker Failure Occurred Duing Surveillance Testing of Reactor Trip Bypass Breaker.Detailed Investigation Rept Being Prepared & Breaker Being Replaced ML18096A0841991-06-20020 June 1991 Special Rept:On 910523 & 910525,valid Failure Re 2B Diesel Generator Occurred When pre-lube Pump Heater Circuit de-energized & non-valid Failure Occurred on 910525 Re Jacket Water Leak 1998-08-31 Category:LER) MONTHYEARML18106A9621998-11-16016 November 1998
[Table view]Special Rept:On 981006,train B of Reactor Vessel Level Indicating Sys Was Indicating Malfunction.Caused by Loss of Fill in Capillary Sensing Line.Extensive Troubleshooting Was Performed on Sys ML18106A8591998-08-31031 August 1998 Special Rept:On 980816,RMS Channel 1R15 Inoperable for Greater than Seven Days.Cause Is Under Investigation. Replacement of Detector Assembly W/Higher Temperature Rated Detector to Mitigate Effects to Be Completed by 981019 ML18106A1771997-11-21021 November 1997 Special Rept 97-15,on 971022,2A EDG Declared Inoperable. Caused by Moisture Build Up in Starting Air headers.2A EDG Equipment Inspected Just Subsequent to Aborted Start ML18102B6001997-09-30030 September 1997 Special Rept 97-02:on 970909,isolation of Fire Protection Water to Plant Auxiliary Bldgs & Containments Occurred Due to Closure of Valves 1PF186 & 1PF187.Valves Opened on 970916 & Locally Verified Open by Loss Prevention Personnel ML18102B4241997-06-30030 June 1997 Special Rept 97-01:on 970615,radiation Monitoring Sys Channel 1R15 Was Inoperable for More than Seven Days.Caused by Configuration of Plant.Required Operational Surveillances Will Be Completed on 2R15 & Channel Restored ML18101B3051996-03-25025 March 1996 Special Rept:On 960224,valid Failure of 1B EDG Was Identified During Surveillance Testing.Caused by Fatigue Due to Normal Machine Vibration.Replaced Threaded Nipple ML18101B1581995-12-29029 December 1995 Special Rept 95-02:on 951207,valid Failure of 1A EDG Identified Approx 23 & 1/2 H Into 24 H Endurance Surveillance Test.Caused by Lubricating Oil Leak at Threaded Piping Nipple.Threaded Nipple Replaced ML18101B1541995-12-27027 December 1995 Special Rept 95-001:on 951129,valid Failure of 1B EDG Identified During Routine Monthly Surveillance Test.Caused by Malfunction of Woodward Electronic Governor Control Unit. Unit Replaced & 1B EDG Tested Satisfactorily on 951214 ML18101A8061995-07-0303 July 1995 Special Rept:On 950607,identified That 950601 Failure of EDG 1B Potential Common Mode Failure.Util Unable to Determine Cause at Present Time.Ler Will Be Submitted to NRC ML18101A7341995-05-19019 May 1995 Special Rept:On 950506,RMS Declared Inoperable Due to Problems Encountered W/Operation of Victoreen Met Package. Caused by Met Package Inconsistencies.Appropriate Computer Software Corrections Being Researched & Will Be Implemented ML18101A5601995-02-15015 February 1995 Special Rept 95-01:on 950125,shortly After RCP Turned Off to Remove RCP from Svc,Momentary RCS Pressure Transient Occurred & Pressure Peaked 365.5 Psig Due to Pressure Equalization Through 21 RCS Loop.Procedures Will Be Changed ML18100B0421994-04-27027 April 1994 Special Rept 94-2:on 940329,valid Failure of 1A Diesel Generator Occurred.Caused by Buildup on Contacts of Breaker Position Switch 52HL,resulting in Excessive Electrical Resistance.Breaker Position Switch Replaced ML18100A8271994-01-20020 January 1994 Special Rept 94-01:on 940106,radiation Monitoring Channels 1R45B & 1R45C Declared Inoperable & Exceeded 7-day Time Frame for Restoring Inoperable Channels to Operable Status on 940113.Monitors Returned to Svc on 940118 ML18100A6211993-09-17017 September 1993 Special Rept 93-4:on 930910,radiation Monitoring Channels 2R45B & 2R45C Inoperable Greater than Seven Days.Caused by Design Deficiency.Corrected by Separating Monitors Reference & Chassis Grounds ML20046B3981993-07-28028 July 1993 Special Rept 93-13:on 930715,fire Header in Auxiliary Bldg Removed from Svc as Result of Maint Activities in Process of Repairing & Replacing Leaking Lines.Fire Watches & Backup Fire Suppression Water Sys Established ML20046A6841993-07-23023 July 1993 Special Rept 93-10:on 930619,penetration Marks 20 & 1287 Were Breached to Route Electrical Sensor Cables Into Unit 1 Annulus Area & to Route Instrument Cables Into ABGTS Room. Roving Fire Watch Established ML18100A4941993-07-21021 July 1993 Special Rept:On 930707,process Monitor - Noble Gas effluent- Condenser Exhaust Sys Was Removed from Svc Due to Observed Water in Its Sample Line.Sample Line 2R15 Drained & Dried. W/930721 Ltr ML20046A5341993-07-19019 July 1993 Special Rept 93-09 Provides Detail Re 19 Fire Protection Barriers,Detection Sys & Water Suppression Sys Being Impaired for Period Greater than TS Allowable Timeframe ML20045H9681993-07-16016 July 1993 Special Rept 93-12:on 930621,portion of Fire Header in Auxiliary Bldg Removed from Svc & Sys Not Restored to Operability within TS Required Time Period.Piping Repaired & Incident Investigation Initiated ML20045G6391993-07-0707 July 1993 Special Rept 93-11:on 930624,portion of Fire Header in Auxiliary Bldg Removed from Svc as Result of Maint Activities & Water Flooded Penetration Room.Fire Suppression Sys Declared Inoperable & LCO 3.7.11.1 Entered ML20045E6881993-06-25025 June 1993 Special Rept 93-07:on 930519,0521 & 0527,fire Doors A-146 & A-44 & A-196,respectively,were Breached Open.On 930525, Mechanical Sleeve C2/J Breached to Permit Cable Pulling. Detectors Verified Operable & Fire Watch Established ML20045C9211993-06-17017 June 1993 Special Rept 93-06:on 930511,HPFP Sys Operated W/Only One Operable HPFP Pump for Period,Exceeding TS 3.7.11.1 Allowable Timeframe Due to Maint.Dg 2A-A Returned to Svc on 930519 & EP Supply Reestablished to 2A-A HPFP Pump ML20044G5521993-05-27027 May 1993 Special Rept 93-05:on 930426,fire Barrier for Mechanical Sleeve Between 480-volt Shutdown Board Rooms 1B1 & 1B2 Breached.Caused by Unavailability of Fire Retardant Sealant.Roving Fire Watch Established ML18096B3511993-03-23023 March 1993 Special Rept 93-2:on 930310,RMS Channels 2R45B & 2R45C Removed from Svc to Functionally Test Low Flow Differential Pressure.Test Results Showed That Switch Inoperable.Caused by Design Deficiency.Design Mod Being Prepared ML18096B2571993-02-0404 February 1993 Special Rept 93-1:on 930104,fire Barrier Penetration Seal Impaired to Support Welding of RHR Sys Drain Piping.Barrier Inoperable for More than 7 Days.Cables Removed & Access Hatch Closed to Restore Penetration to Operability ML18096B2331993-01-28028 January 1993 Special Rept 93-1:on 930114,RMS Channels 1R45B & 1R45C Declared Inoperable Upon Annuciation of External Fail Alarm.Cause Not Determined.Upon Completion,Corrective Actions Will Be Taken & Channels Will Return to Svc ML18096B1701992-12-21021 December 1992 Special Rept 92-9:on 921208,chilled Water Supply Could Not Be Restored Following Completion of Rms Channel Functional Surveillance.Caused by Blow Indication Panel Circuit Fuse. New Solenoid Valve Operator Ordered ML18096B1601992-12-18018 December 1992 Special Rept 92-9:on 921112,fire Barrier Impairment Initiated to Support Svc Water Sys Design Changes & Penetration Inoperable for More than 7 Days Through 921119. Penetrations Will Be Sealed Upon Completion of Work ML18096B1171992-11-23023 November 1992 Special Rept 92-8:on 921116,RMS Channels Declared Inoperable & Removed from Svc for More than 7 Days.Caused by Bad Ground Wire Connection on Three Wire Power Cable.Connector Repaired & post-maint Testing Successfully Completed ML18096B0861992-11-0505 November 1992 Special Rept 92-7:on 921008,discovered Door Misaligned & Would Not Close & Latch.Caused by Equipment Failure.Fire Door Declared Functional Upon Completion of Repairs & Testing ML18096B0731992-10-30030 October 1992 Special Rept 92-8:on 920924,fire Barrier Penetrations Impaired to Support Design Change Work.On 921001, Penetrations Exceeded seven-day Limit,Per TS 3.7.11.a. Impaired Penetrations Resealed & Inspected ML18096B0591992-10-23023 October 1992 Special Rept 92-6:on 920924,valid Failure,Involving DG 2B, Occurred During Monthly Surveillance Testing & Exhaust Smoke Observed Rising from Around Turbocharger.Caused by Loose Pipe Fasteners.Fasteners Torqued Appropriately ML18096B0021992-09-24024 September 1992 Special Rept 92-7:on 920826,auxiliary Bldg 100-ft Elevation Corridor Fire Door Found Impaired & Not Returned to Operability within 7 Days.Caused by Broken Internal Hinge Plate Welds.Damaged Door Will Be Replaced ML18096A9151992-08-21021 August 1992 Special Rept 92-6:on 920814,radiation Monitoring Channels 1R45B & 1R45C Declared Inoperable for More than 7 Days. Caused by Degradation on Impellers of Two Sample Pumps. Preventive Maint Applicability Review Will Be Performed ML18096A8841992-08-0707 August 1992 Special Rept 92-4-1:on 920430,fire Pump 1 Started Knocking 10 Minutes Into half-hour Run.Caused by sheared-off Follower Guide Pin.On 920514,fire Pump Developed Severe Oil Leak.Caused by Piston Failing to Contact Cylinder Head ML18096A8261992-07-0909 July 1992 Special Rept 92-5:on 920623,actuation Capability of 78-ft Lower Electrical Penetration CO2 Fire Protection Sys Inoperable for More than 14 Days.Caused by Required Maint Work.Sys Returned to Svc on 920702 ML18096A7431992-05-22022 May 1992 Special Rept 92-4:on 920430 & 0514,fire Pumps 1 & 2, Respectively,Inoperable for More than 7 Days.Caused by Sheared Cam Follower Pin & Severe Oil Leak.Fire Protection Sys cross-tie Valve Opened to Provide Backup Protection ML18096A7281992-05-22022 May 1992 Special Rept 92-3,on 920422,discovered That CO2 Sys Was Inoperable.Caused by Maint Work Activities.Upon Completion of Maint Diesel Generator Area CO2 Sys Will Be Returned to Svc ML18096A7351992-05-15015 May 1992 Ro:On 920423,fire Pump 1 Declared Inoperable & Remains Inoperable Due to Broken Crankshaft.Both Fire Suppression Sys Inoperable.On 920515,fire Pump 2 Declared Inoperable Due to Severe Oil Leak.Written Rept to Be Provided in 14 Days ML18096A7021992-05-11011 May 1992 Special Rept 92-2-1:on 920324,0414,15 & 25,fire Barriers Impaired for More than 7 Days to Support Planned Work in SW Sys,Sw Project Support & SW Pipe Replacement.Hourly Fire Watch Will Continue Until All Concerns Resolved ML18096A6501992-04-23023 April 1992 Special Rept 92-2:on 920324,0414 & 15,fire Barriers Impaired for Greater than Seven Days in Support of Planned Work. Hourly Fire Watch Will Continue Until Fire Protection Concerns Associated W/Areas Resolved ML18096A6491992-04-23023 April 1992 Special Rept 92-4:on 920318,two Fire Barrier Penetrations Were Impaired to Support Turbine/Generator Design Change Work for Greater than Seven Days.Caused by Outage Related Activities.Penetrations Were Resealed on 920326 ML18096A6051992-03-26026 March 1992 Special Rept 92-3:on 920302,jacket Water Leakage Developed After Loading DG 2A.On 920305,DG 2A Tripped on Low Lube Oil Pressure.Both Events Caused by Equipment Failure.Tube Connector Compression Fitting Replaced & Diesel Retested ML18096A5891992-03-23023 March 1992 Special Rept 92-2:on 920302 & 21,fire Barriers Impaired for More than 7 Days to Support Design Changes & outage-related Activities.Hourly Fire Watch Established & Fire Penetrations Will Be Sealed ML18096A5671992-03-12012 March 1992 Special Rept 92-1:on 920223,fire Barriers Found Impaired for Greater than Seven Days.Caused by Equipment Failure.Fire Door Will Be Replaced Upon Receipt of New Door ML18096A5101992-02-0606 February 1992 Special Rept 92-1 on 920104,06 & 25,fire Barriers Impaired for Greater than Seven Days in Support of Outage Related Activities Due to Time Required to Complete Work.Hourly Fire Watch Will Continue Until Concerns Re Areas Are Resolved ML18096A4231992-01-0909 January 1992 Special Rept 91-3,on 911210,26 & 27:fire Barriers Found Impaired for Greater than 7 Days.Cause of Occurrence Due to Support Outage Related Activities.Penetrations Will Be Sealed ML18096A4001991-12-23023 December 1991 Special Rept 91-4 Re Valid Failure of Diesel Generator 2B on 911122.Cause Unknown.Surveillance Procedure SP(O)4.8.1.1.2 Performed Satisfactorily ML18096A2301991-08-22022 August 1991 Special Rept 91-02:on 910725,reactor Trip Breaker Failure Occurred Duing Surveillance Testing of Reactor Trip Bypass Breaker.Detailed Investigation Rept Being Prepared & Breaker Being Replaced ML18096A0841991-06-20020 June 1991 Special Rept:On 910523 & 910525,valid Failure Re 2B Diesel Generator Occurred When pre-lube Pump Heater Circuit de-energized & non-valid Failure Occurred on 910525 Re Jacket Water Leak 1998-08-31 Category:TEXT-SAFETY REPORT MONTHYEARML20212J6311999-10-0101 October 1999
[Table view]SER Accepting Request for Relief from ASME Boiler & Pressure Vessel Code,Section Xi,Requirements for Certain Inservice Insp at Plant,Unit 1 ML20217G3721999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Sequoyah Nuclear Plant.With ML18107A5571999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Salem,Unit 1.With 991014 Ltr ML18107A5581999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Salem,Unit 2.With 991014 Ltr ML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data ML20212F4761999-09-23023 September 1999 Safety Evaluation Supporting Amends 246 & 237 to Licenses DPR-77 & DPR-79,respectively ML20212F0831999-09-23023 September 1999 Safety Evaluation Granting Relief from Certain Weld Insp at Sequoyah Nuclear Plant,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(ii) for Second 10-year ISI Interval ML20212C4761999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Sequoyah Nuclear Plant.With ML18107A5301999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Salem,Unit 2.With 990913 Ltr ML18107A5311999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Salem,Unit 1.With 990913 ML18107A5031999-08-26026 August 1999 LER 99-006-00:on 990729,determined That SG Blowdown RMs Setpoint Was non-conservative.Caused by Inadequate ACs for Incorporating Original Plant Licensing Data Into Plant Procedures.Blowdown Will Be Restricted.With 990826 Ltr ML18107A5201999-08-12012 August 1999 Rev 0 to Sgs Unit 2 ISI RFO Exam Results (S2RFO#9) Second Interval,Second Period, First Outage (96RF). ML20210L4361999-08-0202 August 1999 Cycle 9 12-Month SG Insp Rept ML20216E3781999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20210L4451999-07-31031 July 1999 Unit-2 Cycle 10 Voltage-Based Repair Criteria 90-Day Rept ML18107A4821999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Salem,Unit 2.With 990813 Ltr ML18107A4811999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Salem,Unit 1.With 990813 Ltr ML18107A4691999-07-28028 July 1999 LER 99-008-00:on 990714,determined That Limit Switch Cables Were Subject to Multiple Hot Shorts in Same Fire Area.Caused by Inadequate Original Post Fire Safe Shutdown Analysis.All Limit Switch Cables for MOVs Were Reviewed.With 990728 Ltr ML20210G6631999-07-28028 July 1999 Cycle 9 90-Day ISI Summary Rept ML18107A4441999-07-0606 July 1999 LER 99-007-00:on 990605,surveillance for Quadrant Power Tilt Ratio (QPTR) Was Missed.Caused by Human Error.Qptr Calculation Was Performed & Personnel Involved Have Been Held Accountable IAW Pse&G Policies.With 990706 Ltr ML18107A4211999-07-0202 July 1999 LER 99-005-00:on 990605,11 Containment Declared Inoperable. Caused by Valves 11SW72 & 11SW223 Both Leaking.Procedure S1.OP-ST.SW-0010(Q) Was Enhanced to Provide Specific Instructions to Ensure Proper Sequencing.With 990702 Ltr ML18107A5211999-07-0101 July 1999 Rev 0 to Sgs Unit 2 ISI RFO Exam Results (S2RFO#10) Second Interval,Second Period,Second Outage (99RF). ML18107A4321999-07-0101 July 1999 LER 99-006-01:on 990501,determined That There Was No Flow in One of Four Injection Legs.Caused by Sticking of Valve in Safety Injection Discharge Line to 21 Cold Leg.Valve Was Cut Out of Sys & Replaced.With 990701 Ltr ML18107A4331999-07-0101 July 1999 LER 99-002-01:on 990405,determined That 2SA118 Failed as Found Leakrate Test.Caused by Foreign Matl Found in 2SA118 valve.2SA118 Valve Was Cycled Several Times & Seat Area Was Air Blown in Order to Displace Foreign Matl.With 990701 Ltr ML18107A4341999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Salem,Unit 2.With 990713 Ltr ML18107A4351999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Salem,Unit 1.With 990713 Ltr ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML20211F9031999-06-30030 June 1999 Cycle 9 Refueling Outage ML20209H3831999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Sequoyah Nuclear Plant.With ML20196J8521999-06-28028 June 1999 Safety Evaluation Authorizing Proposed Alternative to Use Iqis for Radiography Examinations as Provided for in ASME Section III,1992 Edition with 1993 Addenda,Pursuant to 10CFR50.55a(a)(3)(i) ML18107A3951999-06-17017 June 1999 LER 99-004-00:on 990520,reactor Tripped from 100% Power,Due to Negative Flux Trip Signal from Nuclear Instrumentation. Cause Has Not Been Determined.Discoloration Was Identified on One of Penetrations.With 990617 Ltr ML18107A3661999-06-0909 June 1999 LER 99-003-00:on 990513,unplanned Entry Into TS 3.0.3 Was Made.Caused by Human error.Re-positioned Creacs Supply Fan Selector Switches & Revised Procedures S1 & S2.OP-ST.SSP-0001(Q).With 990609 Ltr ML18107A3551999-06-0202 June 1999 LER 99-005-00:on 990504,failure to Meet TS Action Statement Requirements for High Oxygen Concentration in Waste Gas Holdup Sys Occurred.Caused by Inability of Operators. Existing Procedures Will Be Evaluated.With 990602 Ltr ML18107A3441999-06-0101 June 1999 Interim Part 21 Rept Re Premature Over Voltage Protection Actuation in Circuit Specific Application in Dc Power Supply.Testing & Evaluation Activities Will Be Completed on 990716 ML18107A3541999-06-0101 June 1999 LER 99-006-00:on 990501,HHSI Flow Balance Discrepancy Was Noted During Surveillance.Caused by Sticking of Check Valve in SI Discharge Line to 21 Cold Leg.Valve 21SJ17,was Cut Out of Sys & Replaced.With 990601 Ltr ML18107A3681999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Salem Generating Station,Unit 1.With 990611 Ltr ML20195K2951999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With ML18107A3721999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Salem Generating Station,Unit 2.With 990611 Ltr ML18107A2931999-05-12012 May 1999 LER 99-002-00:on 990413,determined That Number 12 Auxiliary Bldg Exhaust Fan Was Rotating Backwards.Caused by mis-wiring of Motor Due to Human Error by Maint technician.Mis-wiring Was Corrected & Fan Was Returned to Svc.With 990512 Ltr ML18107A2781999-05-10010 May 1999 LER 99-004-00:on 990411,automatic Actuation of ESF Occurred During Reactor Vessel Head Removal in Support of Refueling Operations.Caused by High Radiation Condition.Containment Atmosphere Was Monitored.With 990505 Ltr ML20206Q8951999-05-0505 May 1999 Rev 0 to L36 990415 802, COLR for Sequoyah Unit 2 Cycle 10 ML18107A2791999-05-0404 May 1999 LER 99-003-00:on 990406,all Salem Unit 2 Chillers Rendered Inoperable.Caused by Human Error.Lessons Learned from Event Were Communicated to All Operators by Including Them in Night Orders.With 990504 Ltr ML18107A2741999-05-0303 May 1999 LER 99-002-00:on 990405,determined That Containment Isolation Valve Failed as Found Leakrate Test.Caused by Foreign Matl Blocking Valves from Closing.Check Valve Mechanically Agitated.With 990504 Ltr ML18107A2971999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Salem Unit 2.With 990514 Ltr ML18107A2991999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Salem Unit 1.With 990514 Ltr ML18107A3151999-04-30030 April 1999 Submittal-Only Screening Review of Salem Generating Station Individual Plant Exam for External Events (Seismic Portion), Rev 1 ML18107A3711999-04-30030 April 1999 Corrected Monthly Operating Rept for Apr 1999 for Salem Generating Station,Unit 1 ML20206R5031999-04-30030 April 1999 Monthly Operating Repts for April 1999 for Sequoyah Units 1 & 2.With ML18107A2351999-04-23023 April 1999 LER 99-001-00:on 990330,MSSV Failed Lift Set Test.Caused by Setpoint Variance Which Is Result of Aging.Valves Were Adjusted & Retested to Ensure TS Tolerance.With 990423 Ltr ML18107A2881999-04-0707 April 1999 Rev 0 to NFS-0174, COLR for Salem Unit 2 Cycle 11. 1999-09-30 |
Text
, .-
' ~
ENCLOSURE 3 REI' INT
, PUBLIC SERVICE ELECTRIC AN^ GAS CC.'9ANY
.. Salem Nuclear Generating &c..icn P. O. Box 55
, Hancocks Bridge, '!ew Jersey CS038 September 10, 1979 Mr. Boyce H. Grier .
- Director of USNRC Office of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, Pennsylvania 19406
Dear Sir:
REPORTABLE OCCURRENCE 79-58/OlP SALEM N0. 1 UNIT LER This letter will serve to confirn our telephone report to f'r. Gary Schneider of the Regional NRC office on Friday, Septe*ber 6,1979, advising of a potential reportable occurrence in accordance with Technical Specification 6.9.1.8.
We have been noti'fied by our Engineering Department trat a Westing-house conducted review of the environmental qualificaticns of Westinghouse supplied NSSS equipment has identified that conditions associated with high energy line breaks inside or outside containment and their impact on non-safety control systems may constitute an unreviewed safety question. The control systens concerned are steam generator power operated relief valve control, pressurizer power operated relief valve control, main feedwater control and automatic rod control systems.
A detailed report will be submitted in the time period specified by the Technical Specifications.
Very truly yours,
, Origir 31 Signed By
- H. J. Midura Manager - Salem Generating Station AWK:jds CC: General Manager - Electric Production Manager - Quality Assurance ,