ML003774327
ML003774327 | |
Person / Time | |
---|---|
Site: | Three Mile Island |
Issue date: | 12/01/2000 |
From: | Brown N, Whitehead J AmerGen Energy Co |
To: | Office of Nuclear Reactor Regulation |
References | |
-RFPFR EPIP-TMI-27 Revision 16 | |
Download: ML003774327 (90) | |
Text
(L {
- Backup TSCOSF-I 13
T F
.L 3lH Au
- q EPIP/TEP Instruction Memo C. Warlow
- Bureau of Rad Protection M. Vyenielo I..
- Control Rin-U/I File Copy. 0OB-1 Control RPn-U/l Shift Mgrs Station, 0OB L. Ritter L. Ritter Date ia1AX\.t( Verif - 7_
c Box No. - t TL T 2 __
- Control Rin-U/I Work Cony. OOB-I L. Ritter Please update your file with the attached listed below, destroy the superseded and post your Index Dauphin County EMA
- Dir. Work Mgmt., OSF-2 D. Fetterhoff 121t accordingly. Also, if Controlled Documents please sign the acknowledgment at the bottom of this memo and S. Epler return to Debbie Marshbank, Configuration Cntrl., Rm. 135, SOB Dir. Communications, SOB. R. DeSantis
- Document Center, NOB-2 S. Burkett
- Document Control Desk Page Delete
)OCR Numlber Regjae.
Dosimetry, Serv. Bldg. D. College l._ P,i i--77-rf_,a LDocuDIInt Number IUO CX5. 1-7 q/1 ePaus
- EP - NDB, Tmg. Bldg. #2
- Emerg. Prep. Dept.
N. D. Brown L-D. Light
- EOF, Trng. Bldg. R. Finicle
- EP Drills, Trng. Bldg. #2 N. D. Brown ESD, Tmg. Bldg.. R. Finicle Environ. Affairs-Lab, Interstate Drive D. Russ Environ. Affairs-TMI, NOB-I W. Ressler ADDITIONAL DISTRIBUTION:
- Instructor Nuclear IV, Trng. Bldg. #2 Logisitcal Support, Trng. Bldg..
R. Neff R. Finincle ft
- NRC - Onsite, NOB-I P. Saud~r 1
- NRC - Region 1, (Chief EP Section)
- PEMA - Bureau of Plans D. Fleck Theck &IeN V 1
Personnnel/Vehicle Monitor Kit Trn, Ctr.
- Plant Maint. (Library). Serv. B3ldg.
T. Berstler N. Smith 13 C-
£6"~c*? f4 C(f -I--
- Porter Consultants, Ardmore RLM, Rad Field Ops.
S. Porter T. Berstler EacP -- I_
Rad Con -RAC l.ocker Rad Field On.q S.............................. i*ut T. Berstler Rad Con -Kit I PC. Rad Field Ons. T. Berstler Rad Field Ops Rad -Kit I2 PC.
Con -Kit Rad Con PC. Rad Field Ons. T. Berstler Red Con -ICh Fnv Red Pild Ones Rad Con -Xit 3 Fnv Rad Field 0 T. Berstler Li Rad Con-Kit 4 EOF Bide Rad Field Ons T. Berstler Red Con-IC it ROt? BIde Red Iield One T. Berstler I hereby acknowledge receipt of this memo and have complied with the instructlons. Signature and returned memo I R.(')R Aldo Rad INPIA One Rad Con-Kit Rad Con-Simulator Locker.Rad Field Ons
. . I.. .. . . . r -
T. Berstler required ONLY If CONTROLLED.
- Rad Engineers-U 1, 008
- Rad Instrument, Bldg. 159 Radwaste/Chemistry, OOB-I M. Wherry J. L. Eckroth L. Ritter Um Signature Date Secondary Chem Lab-. OO3-I L. Ritter
- Security Mgr., PC V. Handley 1m Security U-I, PC R. Goodrich Info Copy Stapled, 3 Hole Punch
- Simulator Room/File Copy, Trng. D. Silar Simulator Room/Shift Supvs Office, Trng D. Silar
- Sitnulator RoomfWorking Copy, Trng. Ctrl Copy ý4Stapled, 3 Hole Punch D. Silar
- TSC - Unit 1, OSF-113 C. Warlow Ctrl Copy _ Clipped Memo Only Distribution:
- Training Dept., Trng C. Flory
- OSC, Rad Field Ops.. Central File T. Berstler Plain Copy _ Clipped (Central File)
- Unit I Operations, 001-1 L. Ritter
- Vice President - TMI, OSF-2 P. J. Chevalier
- Word Processing, OOB,No Stamp/Clip A. Houseal RECORDS MGMT S. Zimmerman
FOR INFORMATION ONLY Number TMI - Unit I
\ /
AmerGen Emergency Plan Implementing Document EPIP-TMI-.27 S* Title Revision No.
Emergency Operations Facility 16 Applicability/Scope USAGE LEVEL Effective Date TMI Division 1 DEC 1 2000 This document is within QA plan scope I .X Yes L_. No Safety Reviews Required Yes No List of Effective Pages Page Revision Page Revision Paoe Revision Paae Revision 1 16 21 16 41 16 61 16 2 16 22 16 42 16 62 16 3 16 23 16 43 16 63 16 4 16 24 16 44 16 64 16 5 16 25 16 45 16 65 16 6 16 26 16 46 16 66 16 7 16 27 16 47 16 67 16 8 16 28 16 48 16 68 16 9 16 29 16 49 16 69 16 10 16 30 16 5o 16 70 16 11 16 31 16 51 16 71 16 12 16 32 16 52 16 72 16 13 16 33 16 53 16 73 16 14 16 34 16 54 16 74 16 15 16 35 16 55 16 75 16 16 16 36 16 56 16 76 16 17' 16 37 16 57 16 77 16 18 16 38 16 58 16 78 16 19 16 39 16 59 16 79 16 20 16 40 16 60 16 80 16 Procedure Owner /s/ J. L. Whitehead 11/14/00 Approver Is/ N. Brown 11/27/00 1
FOR INFORMATION ONLY I Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 List of Effective Pages Page Revision Page Revision Page Revision Page Revision 81 16 82 16 83 16 84 16 85 16 86 16 87 16 88 16 89 16 2
Number TMI - Unit 1 Emergency Plan Imnlementina Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 1.0 PURPOSE Provide guidelines for activation and operation of the Emergency Operations Facility (EOF).
2.0 APPLICABILITY/SCOPE This procedure shall apply to all TMI personnel assigned to the EOF during a Site Area Emergency, General Emergency or when EOF activation is required by the Emergency Director.
3.0 DEFINITIONS None 4.0 RESPONSIBILITIES
- a. Emergency Support Director - Exhibit 1, 2, 3, 4, 5, 8 and 14
- b. EOF Communications Coordinator - Exhibit 23 and 24
- c. Technical Support Representative - Exhibit 15 and 15A
- d. Group Leader R & EC - Exhibit 17
- e. Group Leader Adm. Support - Exhibit 6, 7, 7A, 20, 21 and 22
- f. Public Information Rep. - Exhibit 12, 13 and 14
- g. Environmental Assessment Coord. - Exhibit 18 0 Met/Dose Coordinator- Exhibit 18A and 18B
- h. Emergency Support Director Asst. - Exhibit 10
- i. Emergency Preparedness Rep. - Exhibit 9 and 9A 5.0 PROCEDURE
- a. Personnel shall perform actions as specified in the appropriate exhibits as applicable for the level and severity of the emergency.
- b. Personnel shall respond to specific requests from the Emergency Response Organization management (e.g., ESD, Group Leaders, Coordinators)
6.0 REFERENCES
- a. TMI Emergency Plan (AP 1092)
- b. TMI Emergency Plan Implementing Documents
. 3
Number TMI - Unit 1 Emergency Plan ImDlementina Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 7.0 EXHIBITS 7.1 Exhibit 1, Emergency Support Director Checklist 7.2 Exhibit 2, Emergency Report Form - TMI 7.3 Exhibit 3, EAL descriptions for the Emergency Report Form 7.4 Exhibit 4, Emergency Director/Emergency Support Director Turnover Checklist 7.5 Exhibit 5, Emergency Support Director Emergency Briefing Sheet 7.6 Exhibit 6, EOF Access Control 7.7 Exhibit 7, TMI Access Authorization Checklist 7.7.1 Exhibit 7A, TMI Access Authorization 7.8 Exhibit 8, PAR Logic Diagram 7.9 Exhibit 9, Emergency Preparedness Representative Checklist 7.9.1 Exhibit 9A, Fitness For Duty instructions 7.10 Exhibit 10, Emergency Support Director Assistant Checklist 7.11 Exhibit 11, ESD Logkeeper Checklist 7.12 Exhibit 12, Public Information Representative - EOF Checklist 7.13 Exhibit 13, Press Release Guidance 7.14 Exhibit 14, Site Access For Media 7.15 Exhibit 15, Tech Support Representative Checklist 7.15.1 Exhibit 15A, Plant Process Computer Access Instructions 7.16 Exhibit 16, TMI I NRC Emergency Response Interface Criteria 7.17 Exhibit 17, Group Leader Radiological & Environmental Controls Checklist 7.18 Exhibit 18, Environmental Assessment Coordinator Checklist 7.18.1 Exhibit 18A, Met/Dose Coordinator Checklist 7.18.2 Exhibit 18B, Field Team Data Collection 7.19 Exhibit 19, RAC Line Communicator Checklist 7.20 Exhibit 20, Group Leader Admin Support Checklist 4
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 7.21 Exhibit 21, Emergency Shift Schedule (Watch Bill) 7.22 Exhibit 22, EOF Setup for Monitoring and Decontamination 7.23 Exhibit 23, EOF Communications Coordinator Checklist 7.24 Exhibit 24, Offsite Notifications Checklist 5
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 EXHIBIT 1 Page 1 of 10 ESD Checklist EOF ACTIVATION NOTE The following steps are presented in the sequence that is most likely to result in efficient activation of the EOF. Steps may be performed out of sequence as the situation requires. Steps that are not applicable for the present situation may be skipped but should be reconsidered as the situation changes.
Initial 1.0 Activate the EOF
- a. Obtain a turnover from the Emergency Director (ED)
- Use the Emergency Director's Line, or alternate means
- Complete Exhibit 4 to document the turnover.
- b. Use the EOF intercom to brief personnel on plant conditions using Exhibit 5.
- Include NRC and State representative(s), if available.
- Include State Representative(s), ifavailable.
- c. Verify from the EP Rep. that the EOF response positions have been manned within one hour of notification.
- d. After the above steps have been completed, assume ESD responsibilities by performing the following:
- _ Inform the Emergency Director (ED) that you have assumed the position of ESD and will take over responsibility for the following:
- a. Approving and directing information releases to the media.
6
Number TMI - Unit 1 Emergency Plan Imolementing Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 EXHIBIT 1 Page 2 of 10
- b. Approving and, if possible, personally conveying appropriate Protective Action Recommendations to the Senior Official in the State EOC (Emergency Operations Center).
- c. Brief the NRC Site Team Leader and serve as the official point of contact for TMI for receiving NRC directives. This includes interfacing with the NRC regarding deviations from license conditions or technical specifications (10 CFR 50.54).
NOTE The ED will advise the ESD when such deviations are being planned and the technical organization will be used to the fullest extent possible.
If the ED decides to transfer responsibility for "Approving and directing official notifications to offsite agencies", perform the following
- a. Log the decision in the ESD log
- b. Direct the EOF Communications Coordinator to obtain a turnover from the communicator making notifications in the ECC.
Announce on the intercom that the EOF is operational 7
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 Title Emergency Operations Facility j Revision No.
R 16 EXHIBIT I Page 3 of 10 II. EOF OPERATION NOTE The following steps are not presented in the exact sequence that they are to be performed. It is likely that some steps may be performed out of the sequence listed and that some steps will be performed concurrently.
Steps that are not applicable for the present situation may be skipped.
Other steps may need to be repeated. This exhibit should be referred to periodically to ensure that necessary actions are not missed.
- a. Personally, if possible, inform the Chief Nuclear Officer
- Status of the EOF
- Status of the Emergency
- b. The ESD is responsible for authorizing personnel to work in site facilities (EOF, EACC, JIC) during an emergency if they are not Fit for Duty (FFD).
- Fitness for Duty criteria are stated in Exhibit 9A.
- c. ESD Conferences
- ESD conferences are periodically (Typically once per hour or as conditions change) held for information exchange
- b. The ESD Assistant will interrupt the conference if a major plant change occurs.
ESD conference attendance should include the following:
- b. NRC 0 Site Team Leader
- Director Site Operations C. Group Leader R & EC 8
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 EXHIBIT I Page 4 of 10
- d. Technical Support Representative
- e. Public Information Representative - EOF
- f. Group Leader Admin Support
- g. Emergency Preparedness Representative Suggested structure for the first conference
- a. Get information from the lead personnel
- Obtain input from State Representative(s)
- Obtain input from NRC
- b. Summarize the status
- c. Discuss the prognosis of where the plant is heading
- d. Discuss mitigating activities underway, planned or needed
- e. Discuss what can go wrong and the consequences
- f. Potential PAR if General Emergency is declared.
- g. This conference constitutes the briefing of the State Representative Conference Action Items
- a. Action Items shall be logged
- b. Action Items shall be tracked
- c. Action items are to be discussed at subsequent conferences until they are resolved.
EOF Briefings
- Use Exhibit 5 to enhance briefing 9
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 EXHIBIT 1 Page 5 of 10 ESD Press Release
- a. Press Releases SHOULD be issued within one (1) hour from the time a plant event has occurred; therefore a TIMELY review is required.
The ESD must approve Press Releases that are not boilerplate
- a. The Press Release Guidance (Exhibit 13) should be followed.
- b. The Group Leader R & EC SHALL review and concur with the Press Release, before ESD approval.
- c. The Technical Support Representative SHALL review and concur with the Press Release, before ESD approval.
- d. The Security Coordinator SHALL review and concur with any Press Release containing SAFEGURADS INFORMATION, before ESD approval.
NOTE
- 1. Information Releases (e.g., Media Advisories, Emergency Reclassifications) which merely provide standard non-technical information need not have ED/ESD approval
- 2. DO NOT include the PAR in a Press Release.
- b. If MEDIA access to the site is required, refer to Exhibit 14, "Site Access Policy for Media during Emergencies."
Onsite Protective Actions
- a. Determine the status of site accountability from the Group Leader Admin Support
- Emergency Director (ED) can supply this information if the Group Leader Admin position is not staffed.
- b. Determine if site evacuation has been ordered.
- _ Ensure provisions are made for providing site employees with instructions for reporting to work for the next business day.
10
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 EXHIBIT I Page 6 of 10
- c. If any, of the TMI Emergency Response Facilities are downwind of a radioactive release.
- _ Provide for their monitoring and protection
- Evacuation orders, for the general public, do not apply to the RAA. This facility would be relocated, if needed, based on advice from the Group Leader R&EC.
Changes to Emergency Classifications
- a. Review EPIP-TMI-.01 to determine when a changein emergency classification is warranted.
- Discuss the change in Emergency Classification with the Emergency Director.
- b. If the "Approving and directing off-site notification to off-site agencies" responsibility has been transferred to the ESD, then proceed with this section, if NOT, go to step 7.0 NOTE The ESD may overrule the ED and direct that the ED declare a higher level of emergency.
- Immediately complete an Emergency Report Form.
NOTE
- b. Notifications SHOULD be started within 5 minutes of an event declaration (i.e., General Emergency) and SHALL be made within 15 minutes of the declaration.
- a. Complete page 1 and 2 of the Emergency Report Form-TMI (Refer to Exhibit 2, for a sample of the form).
- b. Use Exhibit 3 for the EAL and Event description
- The Event description must contain the following information from Exhibit 3.
- a. EAL number
- b. EAL title
- c. Additionally, include information about the plant status (e.g., Power Operations, Hot Shutdown, etc.).
11
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 EXHIBIT I Page 7 of 10 a Approve the Emergency Notification
- Direct the EOF Communications Coordinator to initiate off-site agency notification using the completed Page 1 of the Emergency Report Form-TMI.
- Inform the Emergency Director to make the appropriate plant page announcement.
- Inform the State Representative(s)
- a. Level of Emergency Declared
- b. Basis for the declaration Offsite Protective Action Recommendations (PAR)
- a. At the SITE AREA EMERGENCY a Convene an ESD conference
- a. Refer to step 2.3 of this exhibit 0 Determine what could lead to a General Emergency by reviewing the EALs in EPIP-TMI-.01
- Review the PAR Logic Diagram (Exhibit 8) and determine the most likely PAR, in preparation for a GENERAL EMERGENCY declaration a Discuss the PAR with the following:
- c. NRC representative at the EOF
- d. Emergency Director
- b. At the GENERAL EMERGENCY
- If you have assumed the "Approving and directing official notifications to off-site agencies" then complete Step 6.0.
12
Number TMI - Unit 1 Emergency Plan Imolementine Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 EXHIBIT I Page 8 of 10 Immediately convene an ESD conference to agree upon a PAR
- a. If a likely PAR was developed earlier, quickly verify that it is still appropriate
- c. Present the developed PAR to the following:
- NRC representative at the EOF NOTE ESD SHALL communicate the PAR developed by the TMI emergency organization whether or not PEMA, BRP or NRC representatives at the EOF agree with the developed PAR.
NOTE To the maximum extent possible, obtain agreement from the State and NRC on the PAR Whether or not the State and NRC agree SHALL NOT impact communication of the PAR recommendation.
Personally provide TMI's PAR to the SENIOR OFFICAL at the STATE EOC (Emergency Operations Center) within 15 minutes of the General Emergency declaration by one of the following methods:
NOTE Verify that you are speaking to the SENIOR OFFICAL at the State EOC when providing the PAR.
- a. Pennsylvania Governor (717) 651-2148
- b. State EOC (717) 651-2011
- c. PEMA Notification Line (DLM-6), PEMA, Dial 37 NOTE If the ESD cannot make the call personally, he may designate someone else to convey the PAR.
- Inform the ED of the Protective Actions implemented by the State.
13
Number TMI - Unit 1 Emergency Plan Imolementing Document EPIP-TMI-.27 Title Revision No.
Emerqency Operations Facility 16 EXHIBIT I Page 9 of 10 NRC Interface
- a. Review Exhibit 16, "TMI / NRC Emergency Response Interface".
- Ask the Senior NRC person who is the Site Team Leader and who is the Director Site Operations.
NOTE ONLY the Director Site Operations is empowered to issue directives.
- Verify that the EP Representative has briefed the NRC on the following:
- a. Status of the event
- b. Structure of the TMI organization
- Verify that the EP Representative has introduced TMI personnel to their NRC counterparts in the EOF.
Long-Term Recovery
- a. Discuss implementation of EPIP-TMI-.45, Classified Emergency Termination/Recovery
- At an ESD conference
- With the ED NOTE If a GENERAL EMERGENCY is in effect, DO NOT de-escalate to a lower level of emergency. The only option is to go into Long-Term Recovery and this transition SHALL NOT occur until ALL Offsite protective measures have been completed and the State has been notified.
14
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 EXHIBIT I Page 10 of 10 Close Out / Deactivation
- a. Upon any of the following conditions:
Emergency Close Out Deactivation of the EOF Deactivation of the EACC An inventory of the EOF is required to be performed by the end of the working day following the end of the event. The inventory is the responsibility of the Emergency Preparedness Manager, TMI. Notify the Emergency Preparedness Manager of the need to perform the inventory in accordance with TEP-ADM-1 300.01, Maintaining Emergency Preparedness.
ii. An inventory of the EACC is required to be performed by the end of the working day following the end of the event. The inventory is the responsibility of the Environmental Radioactivity Laboratory Manager. Notify the Environmental Radioactivity Laboratory Manager of the need to perform the inventory in accordance with TEP-ADM-1 300.01, Maintaining Emerciency Preparedness.
NAME TIME hours DATE Emergency Support Director 15
EPIP-TMI-.27 Revision 16 EXHIBIT 2 Page 1 of 2 ERGENCY REPORT FORM - TM I Part I of 4 S (Pins F*my andiWr. CJe.mLy) Call Out/Notfi.catIon 48.,t C LEVEL I wshift (Re*lWqfor1MUnsualfem) cnu) C LEVEL 2 InitiaI R*ponse Emergency.Organizton &Onshift (Required for Alert) 0 LEVEL 3 Emergency Support Organizaon & Initial Response Emerge*cy Orrg.lalon & Ornhlft (ReqtWrd for SE &GE)
Start Hem for Notifications Read message - slowly - clearly.
(tseq 0 This is a drill. This Is a drill. en t This NT a drill This Is NOT a drillt Compleited by Communicator This Is at TMI, my pbzone number Is (Select) 944 Name 948 Extension (asied a.) El An Unusual Event has been deciaared r0 A Site Area Emergency has been declared
[] An Alert has been declared [] A General Emergency has been declamre
[3 Tile event hot been terminated (s~ellw) This represens; El An Initial Chmstifcation Status [] An escalation In Classification Status E3 No change In Classificatioln Status El A reuton In Classifcation Status There is: 0 No abnormal radioactive D An abnormal radioactive airborne C An abnormal radioactive liquid rIlmais to the environment as a result of this emeraencv. I ons( 0] EVACUATE the S mile radius around the plant and SHELTER the 5 to 10 mile radius nound the plant
-led 02 SHELTER the 10 mile radius around the plant (Use SHELTER ONLY option when RtIs clear that EVACUATION Is NOT appropriate)
I.. . ..
4"latt) Li I MM]US'S US.S IR. EflhU11t I I-II um uunll.nl "slh a UanlL anhAui Approved - ED#ESD Distulabrllaon Geen -Call Out4loifcaton; Yallow - Corytct; White -ED copy; Pink Plant Pegs AG0iSS (12-")
16
EPIP-TMI-.27 Revision 16 EXHIBIT 2 Page 2 of 2 AIMWerGe0r0 .,,*,*o,*.,:, EMERGENCY REPORT *,,*,*,*Contaict FORM - TMI Part 2 of 4 tit.. E3 LEVEL I Onshift 0*y*[ LEVEL 2 Initial Response Emergency organization &Onshift
[] LEVEL 3 Emrl~~ecy Support Orglanization & Initial Response Emerg~ency Orgnitzation & Onshlft Start Herm for Contact Read NMesage - slowly - clearly.
3 This is a drill. This is a chill. I'-r This Is NOT a drill. This Is NOT drill.
0] An. Unusual Event has boon decla~lred "Sit [A 1e Ame Emergency has been deciared
[] An Alert has been declared [] A General Emergency has boon declared 0" The event has been terminated at hours on B nlncy M=^wa/ow Tklue. Empncy CliasmcaflonDoteP This represents: 0] An Initial Classification Status 13 An escalaton In.-ClasslfikAton Status
[] No change In Cliassifcaton Status. E[ A reducton In Classification St.,1ut
- , . . ... ..... . .:..0,5, Them Is: 5 No abnormal radloacdve [3 An abnormal radioactive alrborns 03 An abnormal radioactive liquid r-l- #n #%i. anvlrnamnns am a rammif utEAle aaman.u.1*#i Li. . -U.I L .a u ns uum- i n Approved - EDIESD Dktxtitloa Green - Call OutWotflcalfon; Yellow - Contact; White -ElD copy; PIk* - Plant Page AGO3S1412.50) 17
EPIP-TMI-.27 Revision 16 EXHIBIT 3 Page 1 of 9 EAL BRIEF TITLE EVENT DESCRITION U1.1 Radiological Effluent An Unusual event is declaredbecause an abnormalrelease of Limits Are Being radiationfrom the power plant has or will exceed 60 minutes and Exceeded could lead to very low level radiationdose rates at or beyond the outer boundary of the plant site.
U1.2 Unexpected Radiation An UnusualEvent is declared because of abnormally high Readings Inside the radiationlevels measuredinside the power plant that indicatesa Power Plant degradationin the control of radioactivematerial. No abnormal releases to the environment are occurring.
U1.3 Liquid Radioactive An Unusual Event is declared because a release of radioactive Release That Exceeds liquidthat exceeds the limits of government regulationshas lasted Limits for 60 minutes or more. This event indicates a degradationin the ability to control the release of radioactivematerials to the river.
U1.4 Low Spent Fuel Pool An Unusual Event is declaredbecause of the uncontrolled Level leakage of waterfrom the Spent FuelPool. The leakage exceeds or is expected to exceed the ability to refill the pool. No abnormal releases of radioactivityto the environment are occurring.
U1.5 Low Fuel Transfer Canal An UnusualEvent is declared because of the uncontrolled Level leakage of waterfrom the Fuel Transfer Canal. The leakage exceeds or is expected to exceed the ability to refill the canal. No abnormalreleases of radioactivityto the environment are occurring.
U1.6 Fuel Clad Damage With An UnusualEvent is declared because of indicationsthat there Increased Radiation has been damage to the metal tubes that hold the nuclearfuel pellets. Increasedradiationhas been detected in the water that flows through the nuclearreactor.No abnormalreleases of radioactivityto the environment are occurring.
U2.1 Potential Loss or Loss of An UnusualEvent is declared because of the: PotentialLoss of Containment Containmentas a FissionProduct Barrier. - OR - Loss of Containment as a FissionProduct Barrier.
U2.2 Reactor Coolant System An UnusualEvent is declared because of: an unidentfied leak or Steam Generator (locationunknown) greaterthan or equal to 10 gallons a minute Leakage from the Reactor Coolant System. - OR - an unidentifiedleak (locationunknown) greaterthan or equal to 10 gallons a minute from the Steam Generator tubes. - OR - an identifiedleak (locationknown) greaterthan or equal to 25 gallons a minute from the Reactor Coolant System.
U3.1 A Risk of Station An UnusualEvent is declaredbecause of the loss of all normal Blackout Exists - Backup electricalpower sourcesfor to the powerplantfor more than Power Is Available, -fifteenminutes. Emergency backup power is available.
U3.3 Loss of "A"or "B" Plant An UnusualEvent is declaredbecause of the loss of ALL of the DC Electricity For More DC (DirectCurrent) electricalpower supplyfor more thanfifteen than 15 Minutes during minutes.
Cold Shutdown or Refueling Shutdown.
Enter the EAL number AND the Brief Title (This is the bold information) in the Event Description area of the EMERGENCY REPORT FORM - TMI.
18
EPIP-TMI-.27 Revision 16 EXHIBIT 3 Page 2 of 9 EAL BRIEF TITLE EVENT DESCRITION U4.1 Unplanned Loss of An UnusualEvent is declaredbecause of the unplannedloss of Control Room Safety the majority of the control room's Safety Related Equipment Indicators alarms- or - indications. Although other non-alarming indicationsare available to the Control Room Operators,this situation requires increasedsurveillance of the safety related equipment and there is the risk that a degradedplant condition could go undetected U4.1.1 Unplanned Loss of Onsite An UnusualEvent is declaredbecause of the unplannedloss of all or Offsite onsite communications capabilities. - OR - all offsite Communications. communications capabilities.
U4.2 Failure to Complete a An Unusual Event is declaredbecause the requiredtime limit to Plant Shutdown or perform a plant shutdown - OR - a plant cooldown was exceeded Cooldown Within the The Technical Specificationsare the power plant'soperational Required Time Limit. guidelines. A Limiting Conditionfor Operation (LCO) sets a specific time limit that allows continuedplant operation while actions are being taken to correct the problem. If the problem cannot be correctedand the plant cannot be shut down or cooled down within the time limit, an UnusualEvent must be declared U5.1 High River Water Level. An UnusualEvent is declaredbecauseflood waters are within a few feet of the top of the stone dike that surrounds the power plant. Water is NOTflooding onto the plant site.
U5.2 High Wind Speeds Near An UnusualEvent is declaredbecause of Sustained Winds Hurricane Force greater than 70 mph recordedat TMI. These winds have the potential to damage PlantEquipment.
U5.3 Tornado Strikes An UnusualEvent is declaredbecause of a report that a tornado Protected Area. touched down inside the ProtectedArea of the power plant.
There is the potentialfordamage to structuresand equipment inside the ProtectedArea.
U5.4 Earthquake At Threshold An UnusualEvent is declaredbecause of a minor earthquake Levels. detectedat the power plant. An earthquake of this magnitude has the potentialto damage some equipment, but it is not expected to affect any safety systems. The occurrence of any detectable earthquake warrants increasedmonitoringby the operators.
U6.1 Fire In The Protected An Unusual Event is declared because of afire in the Protected Area. Area of the power plant that our site Fire Brigade could not bring under control within 15 minutes of when the fire was confirmed This fire has the potential to involve Safety Related Equipment if it spreads.
U6.3 Flammable / Toxic Gas An UnusualEvent is declaredbecause of the detection of That May Affect flammable / toxic gas that could enter the power plant site. This Operation. gas could affect the safety and health ofplantpersonneland disrupt normal operationof the power plant.
Enter the EAL number AND the Brief Title (This is the bold information) in the Event Description area of the EMERGENCY REPORT FORM - TMI.
19
EPIP-TMI-.27 Revision 16 EXHIBIT 3 Page 3 of 9 U6.4 Unexpected Explosion In An Unusual Event is declaredbecause of an unexpected explosion The Protected Area. that caused damage inside the ProtectedArea of the power plant.
This explosion was NOT causedby a bomb. The damage could affect the operation of the plant.
U6.5 Steam Turbine Damage. An Unusual Event is declaredbecause of damage to the steam turbine, includingpuncturing of the steel casing around the turbine or damage to the generatorseals. The hazard of projectilesfrom the turbine andpuncturing of the casing around it decreases the safety level of the plant andcould affect the safety and health of plantpersonnelwhich affects the operation of the power plant.
U6.6 Vehicle Crash In The An UnusualEvent is declaredbecause of a vehicle (airplane, Protected Area. train, helicopter, etc.) that accidentallycrashedinside the ProtectedArea of the power plant. There is the potentialfor damage to structures andequipment inside the ProtectedArea.
U7.1 Confirmed Security An Unusual Event is declaredbecause of a confirmed security Event. event, which couldpotentially degrade the safety level of the power plant. (This event involves: A bomb discovered inside the ProtectedArea The ProtectedArea includes major plant structures like the turbine andservice buildings that are protected by a securityfence and to which access is controlled) - OR - A Hostile Force inside the Owner ControlledArea (The Owner ControlledArea includes the area between the perimeter chain linkfence and the ProtectedArea).
U8.1 Judgment of the Shift An Unusual Event is declared by the Shift Manager/ Emergency Manager I Emergency Director. The Shift Manager/Emergency Directorhas the Director - Potential Degradation of Plant flexibility to declare an event if conditions exist that indicate a Safety potentialdecrease in the safety level of the plant. These conditions may not be specifically addressedin an emergency procedure. In this situation, the decision to declare an emergency relies on the judgment of the Shift Manager/Emergency Director.
Enter the EAL number AND the Brief Title (This is the bold information) in the Event Description area of the EMERGENCY REPORT FORM - TMI.
20
EPIP-TMI-.27 Revision 16 EXHIBIT 3 Page 4 of 9 EAL BRIEF TITLE EVENT DESCRITION A1.1 Radiological Effluent An Alert is declaredbecause an abnormalrelease of radiation Limits Are Being from the power plant has or will exceed 15 minutes and could Significantly Exceeded. lead to low level radiationdose rate at or beyond the outerfence line of the plant site.
A1.2 Unexpected Radiation An Alert is declaredbecause of abnormallyhigh radiationlevels Readings Inside the measuredinside the power plant, which indicate a serious Power Plant that Affect d the Safe Operation of the egradation in the control of radioactivematerial.
Plant.
A1.3 Liquid Radioactive An Alert is declaredbecause a release of radioactive liquid that Release That Significantly significantly exceeds the limits of government regulationshas Exceeds Limits. lastedfor 15 minutes or more.
A1.4 Low Spent Fuel Pool An Alert is declaredbecause of the uncontrolledleakage of Level With Increased waterfrom the Spent Fuel Pool with higher than normal Radiation Levels. radiationlevels in the spentfuel pool area of the plant. This condition indicatesa serious degradationin the control of radioactivematerial.
A1.5 Low Fuel Transfer Canal An Alert is declaredbecause of the uncontrolledleakage of Level With Increased waterfrom the Fuel Transfer Canalwith higher than normal Radiation Levels. radiationlevels in the reactorbuilding. This condition indicates a serious degradationin the control of radioactivematerial.
A2.1 Potential Loss or Loss of An Alert is declaredbecause ONE FissionProduct Barrier the Fuel Clad - OR - the (other than Containment) has been impacted due to the: Potential Reactor Coolant System. Loss of the Fuel CladFission ProductBarrier - OR - the Reactor Coolant System FissionProduct Barrier. - OR - Loss of the Fuel CladFission ProductBarrier- OR - the Reactor Coolant System FissionProduct Barrier.
A3.1 A Risk of Station An Alert is declaredbecause of the loss of all normal electrical Blackout Exists - Limited power sourcesfor the power plantfor more thanfifleen minutes.
Backup Power Is Only one of several sources of emergency electricalpower Available.
sources is available.
A3.2 Prolonged Station An Alert is declaredbecause of the loss of all normal electrical Blackout - Greater than power sources - AND - the loss of all emergency electricalpower 15 minutes - During Cold sourcesfor more thanfifteen minutes (a prolongedStation Shutdown or Refueling Shutdown. Blackout) during ColdShutdown or a Refueling Shutdown.
A4.1 Unplanned Loss of An Alert is declaredbecause of the unplanned loss of the Control Room Safety majority of the control room's Safety Related Equipment alarms Indicators With Transient or - indications. - AND - The loss of other non-alarming indications. - OR - A significant change in the power plant's status is in progress. This situation requires increased surveillance of the safety relatedequipment in order to safely operate the power plant and there is the risk that a degraded plant condition could go undetected Enter the EAL number AND the Brief Title (This is the bold information) in the Event Description area of the EMERGENCY REPORT FORM - TMI.
21
EPIP-TMI-.27 Revision 16 EXHIBIT 3 Page 5 of 9 EAL BRIEF TITLE EVENT DESCRITION A4.2 Failure of the Reactor to An Alert is declaredbecause the Reactor ProtectionSystem that Automatically Shutdown - is designed to automaticallyshut down (trip) the reactorfailed to AND - a Successful Manual do so. The ControlRoom Operatorshave manually shut down Reactor Shutdown was Accomplished. (tripped)the reactor, but the failure of the automatic system degrades the safety level of the power plant.
A4.3 Loss of All Means of Decay An Alert is declaredbecause the operatorsare unable to provide Heat Removal and the sufficient cooling water to the reactorfollowinga plant Nuclear fuel is Predicted to shutdown. This condition reduces the ability of the operators to be Uncovered.
keep the nuclearfuel cool anddegrades the safety level of the power plant.
A5.1 High River Water Level Near An Alert is declaredbecause offlood waters that have the Flood Level. potential to flow over the top of the stone dike that surroundsthe power plant. Portionsof the plant site may be flooded Thisflood has the potential to damage Safety RelatedEquipment.
A5.2 High Wind Speeds Greater An Alert is declaredbecause of Sustained Winds greater than 80 Than Hurricane Force. mph recordedat TMI There is the potentialfor damage to Safety Related Equipment.
A5.3 Tornado Strikes Vital Area. An Alert is declaredbecause of a report that a tornado touched down and has damaged structuresand equipment inside the Vital Area of the power plant. This damage could affect Safety Related Equipment.
A5.4 Earthquake At Operating An Alert is declaredbecause of an earthquake at the power Design. plant. An earthquake of this magnitude has the potential to damage some Safety Related Equipment that could affect the ability to protect the public's health and safety. The power plant may be shut down and increasedmonitoringwill be performed by the operators.
A6.1 Fire Affecting Safety Related An Alert is declared because of afire that has affected one of the Equipment. Safety Related Equipment systems in the Vital Area. (The Vital Area includes structures where safety related equipment is located.) - OR - A fire is in the ProtectedArea andrequires localfire company assistance. The ProtectedArea includes major plant structures like the turbine and service buildings that areprotected by a securityfence and to which access is controlled A6.2 Control Room Evacuation An Alert is declaredbecause of the order to evacuate the Initiated. ControlRoom. The absence ofpersonnel in the control room can
-affect the safe operation of the power plant.
A6.3 Flammable / Toxic Gas An Alert is declaredbecause of life threateningconcentrations Affects Plant Operation. of flammable / toxic gas within the Vital Area of the power plant.
This presence can affect the safety ofplantpersonneland the operation of Safety Related Equipment.Evacuation ofplant Ipersonnel is possible.
Enter the EAL number AND the Brief Title (This is the bold information) in the Event Description area of the EMERGENCY REPORT FORM - TMI.
22
EPIP-TMI-.27 Revision 16 EXHIBIT 3 Page 6 of 9 EAL BRIEF TITLE EVENT DESCRITION A6.4 Unexpected Explosion In An Alert is declared because of an unexpected explosion that The Vital Area. caused damage inside the Vital Area of the power plant. This explosion was NOT caused by a bomb. The damage could potentially affect the ability to protect the public's health and safety.
A6.6 Vehicle Crash In The Vital An Alert is declaredbecause of a vehicle (airplane,train, Area. helicopter, etc.) that accidentally crashedinside the Vital Area of the powerplant. The damage could affect Safety Related Equipment.
A7.1 Confirmed Security Event An Alert is declaredbecause of a confirmed security event, Potentially Affecting which degrades the safety level of the powerplant. This event Safety Related involves: A bomb discoveredinside the Vital Area. The Vital Area Equipment. includes buildings where Safety Related Equipment is located.
Damage to this equipment would reduce the ability to protect the public's health andsafety. - OR - A Hostile Force inside the ProtectedArea. The ProtectedArea includes majorplant structureslike the turbine and service buildings that are protected by a securityfence and to which access is controlled A8.1 Judgment of the Shift An Alert is declaredby the Shift Manager/Emergency Director.
Manager/ Emergency The Shift Manager/ Emergency Director has the flexibility to Director - Actual Degradation of Plant declare an event if conditions exist that indicate a potential Safety. substantialdecrease in the safety level of the plant. These conditions may not be specifically addressedin an emergency procedure. In this situation, the decision to declarean emergency relies on the judgment of the Shift Manager/ Emergency Director.
Enter the EAL number AND the Brief Title (This is the bold information) in the Event Description area of the EMERGENCY REPORT FORM - TMI.
23
EPIP-TMI-.27 Revision 16 EXHIBIT 3 Page 7 of 9 EAL BRIEF TITLE EVENT DESCRITION Sl.1 High Radiological Doses A Site Area Emergency is declared because an abnormalrelease at the Boundary of the of radiationfrom the power plant could lead to significant doses Power Plant of radiationat the boundary of the power plant.
S2.1 Potential Loss or Loss of A Site Area Emergency is declared because TWO of the Fission the Fuel Clad - AND - ProductBarriershave been impacted due to the. Loss of the Fuel Potential Loss or Loss of CladFissionProductBarrier- AND - the PotentialLoss of the the Reactor Coolant System Reactor Coolant System Fission ProductBarrier.- OR - Potential Loss of the Fuel CladFissionProductBarrier- AND - the PotentialLoss of the Reactor Coolant System Fission Product Barrier. - OR -Potential Loss of the Fuel CladFissionProduct Barrier- OR - the PotentialLoss of the Reactor Coolant System FissionProduct Barrier - AND - the Loss ofAny OtherFission ProductBarrier.
S3.1 Prolonged Station A Site Area Emergency is declared because of the loss of all Blackout - Greater than normal electricalpower sourcesfor the powerplantfor more 15 Minutes. thanfifteen minutes- AND - the loss of all emergency electrical power sourcesfor more thanfifteen minutes. This is called a Station Blackout.
S3.3 - Loss of All Plant DC A Site Area Emergency is declaredbecause of the loss of all DC Electricity For More than (DirectCurrent) electricalpowerfor more thanfifteen minutes.
15 Minutes when the plant is not in Cold Shutdown or Refueling Shutdown.
S4.1 Unplanned Loss of All A Site Area Emergency is declaredbecause of the unplanned loss Control Room Safety of all Safety Related Equipment indicationsandalarms - AND - A Indicators With Transient significantchange in the powerplant's status is in progress. The controlroom staff is unable to adequately monitor the systems necessary to safely control the power plant and insure protection of the public's health andsafety.
S4.2 Failure of the Reactor to A Site Area Emergency is declaredbecause the Reactor Automatically Shutdown ProtectionSystem that is designed to automaticallyshut down
- AND - a Manual Reactor Shutdown could not be (trip) the reactorfailed to do so AND the ControlRoom Accomplished. Operatorswere unable to manually shut down (manually trip) the reactorfrom the control room. This condition reduces the ability of the operatorsto controlthe power plant andcreates conditions that could lead to damage of the nuclearfuel or the steel reactor vessel and associatedpiping. This condition impacts the ability to protect the health and safety of the public.
Enter the EAL number AND the Brief Title (This is the bold information) in the Event Description area of the EMERGENCY REPORT FORM - TMI.
24
EPIP-TMI-.27 Revision 16 EXHIBIT 3 Page 8 of 9 EAL BRIEF TITLE EVENT DESCRITION S4.3 Loss of All Means of A Site Area Emergency is declaredbecause the operatorsare Decay Heat Removal - unable to provide sufficient cooling water to the reactorfollowing AND - Indications that the Nuclear fuel is a plant shutdown - AND - the increasedheat has caused the Uncovered. water in the reactorto boil and uncover the fuel. This condition reduces the ability of the operatorsto keep the nuclearfuel cool, degrades the safety level of the power plant and decreases the ability to protect the public'shealth and safety.
S4.4 Loss of Both Methods A Site Area Emergency is declared because of the loss of the Needed to Maintain the ability to cool the reactorafter it is shut down. This condition Nuclear Reactor in Hot reduces the ability of the operatorsto keep the nuclearfuel cool Shut Down.
and degrades the safety level of the power plant and the ability to protect the public's health and safety.
S6.2 Control Room Evacuation A Site Area Emergency is declared because of the evacuation of Completed Without the ControlRoom -AND - the inability to confirm effective Complete Plant Control cooling of the nuclearfuel within 15 minutes. The absence of personnel in the controlroom and the lack of effective cooling of the nuclearfuel can affect the operationof Safety Related Equipment and the ability to protect the public's health and safety.
S7.1 Confirmed Security Event A Site Area Emergency is declaredbecause of a confirmed Affecting Safety Related security event that degrades the safety level of the power plant Equipment. and the ability to protect the public's health andsafety. This event involves: A bomb that has exploded inside the Vital Area.
The Vital Area includes buildings where Safety Related Equipment is located Damage to this equipment would reduce the ability to protect the public'shealth andsafety. - OR - A Hostile Force inside the Vital Area.
S8.1 Judgment of the Shift A Site Area Emergency is declaredby the Shift Manager/
Manager - Emergency Emergency Director. The Shift Manager / Emergency Director DirSafetor Sytu rs. has the flexibility to declare an event if conditionsexist that indicate the likely or actual majorfailure ofplantfunctions SS needed to protect the public's health andsafety. These conditions may not be specifically addressedin an emergency procedure. In this situation, the decision to declare an emergency relies on the judgment of the Shift Manager/ Emergency Director.
Enter the EAL number AND the Brief Title (This is the bold information) in the Event Description area of the EMERGENCY REPORT FORM - TMI.
25
EPIP-TMI-.27 Revision 16 EXHIBIT 3 Page 9 of 9 EAL BRIEF TITLE EVENT DESCRITION GI.1 High Radiological Doses A GeneralEmergency is declared because an abnormal release at the Boundary of the of radiationfrom the powerplant that could lead to high doses of Power Plant that Exceed radiationat the boundary of the power plant. This condition may Protective Action Guideline (PAG) Limits. require that protective actions be implementedfor members of the public living around Three Mile Island G2.1 Loss of ANY TWO of the A GeneralEmergency is declaredbecause TWO of the Fission Fission Product Barriers ProductBarriershave been Lost and there is at least the
- AND - the Potential PotentialLoss of the third barrier.
Loss of the third.
G3.1 Prolonged Station A General Emergency is declaredbecause of the loss of all Blackout - Greater than 4 normal electricalpower sourcesfor the power plantfor more hours. thanfour hours - AND - the loss of all emergency electrical power sourcesfor more thanfour hours (a prolongedStation Blackout) - AND - the overheatingof the nuclearfuel.
G4.2 Failure of the Reactor to A General Emergency is declared, because the Reactor Automatically Shutdown - ProtectionSystem that is designed to automatically shut down AND - a Manual Reactor (trip) the reactorfailedto do so AND, the Control Room Shutdown could not be Accomplished - AND - Operatorswere unable to manually shut down (manually trip) the Operators are Unable to reactorfrom the controlroom AND, the operatorsare unable to Cool the Nuclear fuel cool the nuclearfuel.
G7.1 Confirmed Security Event A General Emergency is declaredbecause of a confirmed security Loss of Plant Control. event that prevents the operatorsfrom being able to place the power plant in Cold Shutdown. This condition seriously degrades the safety level of the power plant and the ability to protect the public'shealth and safety. This event involves. The loss of physical control of the ControlRoom. - OR - The loss of physical control of the Remote Shutdown ControlArea.
G8.1 Judgment of the Shift A General Emergency is declaredby the Shift Manager/
Manager / Emergency Emergency Director. The Shift Manager /Emergency Director Director - Safety System has theflexibility to declare an event if conditions exist that could Failures and Potential Radioactive Release. result in substantialfuel damage and a substantialuncontrolled radiationrelease. - OR - have resulted in substantialfuel 1damage and a potential uncontrolledradiationrelease.
Enter the EAL number AND the Brief Title (This is the bold information) in the Event Description area of the EMERGENCY REPORT FORM - TMI.
26
EPIP-TMI-.27 Revision 16 EXHIBIT 4 Page 1 of 5 EMERGENCY DIRECTOR I EMERGENCY SUPPORT DIRECTOR TURNOVER CHECKLIST NOTE
- a. This form is to be used for ALL turnovers.
- b. In the ECC:
The Emergency Director or the Emergency Director Assistant may complete this form.
In the EOF:
The Emergency Support Director or the Emergency Support Director Assistant may complete this form.
- c. This checklist need not be filled out in the order it is arranged.
Sections that are not applicable can be skipped and marked "N/A".
EVENT CLASSIFICATION NOTIFICATIONS COMPLETED Level of Emergency Date Time 15 minute 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> NRC 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> (Hours) Notifications Notification ERDS COMPLETE COMPLETE ACTIVATED
- YES NO YES NO YES NO UNUSUAL EVENT ALERT SITE AREA EMERGENCY GENERAL EMERGENCY (PAR required)
PRESS RELEASE INFORMATION ACTION YES NO Information given to the Duty Public Information Representative VERBALLY approved Press release DRAFT release in review PRESS release APPROVED EVENT DESCRIPTION (Include pre-event information, current information, EALs, and Actions taken/planned) 27
EPIP-TMI-.27 Revision 16 EXHIBIT 4 Page 2 of 5 INFORMATION REGARDING PARs. NOT FOR PUBLIC RELEASE PAR has been provided to the STATE YES(4) 1 1 NO(/ N/A()
If YES, PAR RECOMMENDED PROTECTIVE ACTION IMPLEMENTED BY THE STATE, IF KNOWN PLANT STATUS REACTOR STATUS POWER OPERATION o] % POWER STEADY STATE El MANUAL SHUTDOWN @ __ %/min O1 HOT STANDBY 11 HOT SHUTDOWN SHUTDOWN El REACTOR TRIP AUTOMATIC MANUAL COOLDOWN o COOLDOWN @ _ F/hr via "O FORCED CIRC with PUMPS El NATURAL CIRC with AT "O Other (Explain)
COLD SHUTDOWN "o DHR 'A' 0l DHR 'B' El LPI 'A' E LPI 'B' "O OTHER (Specify)
ELECTRICAL STATUS o System GRID "O Main Generator Emergency Diesels 0l 'A' El 'B' El SBO Battery El 'A' El 'B' "El OTHER (Specify) 28
EPIP-TMI-.27 Revision 16 EXHIBIT 4 Page 3 of 5 FISSION PRODUCT BARRIER STATUS REACTOR COOLANT SYSTEM Leak rate Leak rate INTACT POTENTIAL (gpm), (gpm),
Barrier 4 LOSS (4) / If KNOWN LOSS (4) / If KNOWN RCS (NOT OTSG) / !
OTSG 'A' / /
OTSG 'B' / /
CONTAINMENT BUILDING Barrier INTACT(4) POTENTIAL LOSS (4) LOSS (4)
Building Integrity Bypass RB (e.g., OTSG leak to atmos.)
FUEL CLAD INTEGRITY Barrier INTACT(/) POTENTIAL LOSS(4) LOSS(4)
Clad EMERGENCY SYSTEMS ACTUATED "O NONE "o EMERGENCY FEEDWATER (EFW)
"O HIGH PRESSURE INJECTION (HPI)
"O CORE FLOOD (CF)
"O LOW PRESSURE INJECTION (LPI)
"O REACTOR BUILDING SPRAY (BS)
PROBLEMS AT UNIT 2 OPEN TECHNICAL ISSUES (Provide specific details, including priority) 29
EPIP-TMI-.27 Revision 16 EXHIBIT 4 Page 4 of 5 RADIOLOGICAL CONDITIONS Is an abnormal, unplanned or uncontrolled release (monitored or unmonitored) in progress or suspected?
El YES 0l NO El NIA If YES, specify the release pathway:
If YES, describe release type:
El Airborne release El Liquid release El Unknown El Other (Specify)
Have Field Monitoring Teams (FMT) been dispatched? El YES El NO Have abnormal ON SITE or OFF SITE radiological conditions been detected by:
El Reuter Stokes El Field Monitoring Team Details:
Abnormal radiation levels IN PLANT: El YES El NO Details (Location):
HAZMAT A HAZARDOUS MATERIAL EVENT HAS OCCURRED (See 1203-44) El YES El NO HAS ENVIRONMENT AFFAIRS BEEN INFORMED? El YES El NO HAS THE HAZARDOUS MATERIAL ENTERED THE RIVER? El YES 0l NO DETAILS (Location, Chemical, actions taken, etc.)
30
EPIP-TMI-.27 Revision 16 EXHIBIT 4 Page 5 of 5 PERSONNEL STATUS PERSONNEL INJURED 0 YES HOW MANY 0] NO 0] NO INJURED & CONTAMINATED 0 YES HOW MANY 0] NO TRANSPORT OFFSITE 0 YES HOW MANY SPECIFY THE OFFSITE FACILITY PERSONNEL CONTAMINATED 0 YES HOW MANY 0 NO DETAILS:
IS ONSITE ACCOUNTABILITY REQUIRED? 0 YES 0 NO IF YES, IS IT COMPLETE? 0 YES 03 NO IS NON-ESSENTIAL PERSONNEL MUSTER REQUESTED? 03 YES 0 NO IF YES, LOCATION; HAVE NON-ESSENTIAL PERSONNEL BEEN EVACUATED? 0 YES 0 NO IF YES, LOCATION; OTHER ISSUES DETAILS (Security, 10CFR50.54(x), etc.)
FORM COMPLETED BY DATE TIME (NAME) 31
Number TMI - Unit 1 Emergency Plan Implementingi Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 EXHIBIT 5 Page 1 of 2 Emergency Support Director Briefing Sheet NOTE This checklist may be filled out in any sequence. Items that do not apply to the present situation may be skipped and marked "N/A".
1.0 Conduct a briefing periodically. (Hourly and after significant changes in plant conditions).
Briefing Time
- a. Emergency classification/emergency organization status
- b. Plant status (temperature, pressure, leak rate, equipment status etc.)
RCS Temp RCS Press RCP Status RB Sump RB Flood BWST
- c. Radiological conditions (specific release pathway, verify release duration, in plant radiological conditions, etc.)
32
Number TMI - Unit 1 Emergency Plan Implementinq Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 EXHIBIT 5 Page 2 of 2
- d. Work in progress (equipment problems, evolutions in progress, etc.)
Priority jobs to mitigate event 1) 2)
3) 4)
Other
- e. Personnel status (muster, accountability, evacuation, contamination, etc.)
- f. Security and offsite support (security conditions, required offsite support)
- g. Mitigating activities, future plans 33
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility __16 EXHIBIT 6 Page 1 of 2 EOF Access Control Checklist Initials 1.0 Upon arrival at the EOF, request Environmental Radioactivity Lab personnel to unlock the door and keep the Main Gate open.
2.0 Ensure all entrances other than the main entrance are locked or have positive access control in order to maintain access control to the EOF.
3.0 Activate the DADCO Door Monitor (located at the Main Entrance) by depressing the "Green" power button.
- a. Locate door number (1) on the alarm panel and place this door in standby mode by depressing the "black" button one time.
NOTE This will cause the indicator light to switch from solid green to amber.
- b. If an alarm is received on any other alarmed door, silence the alarm by depressing the silence button. This will terminate audible alarm.
- c. Check status of door by depressing black button corresponding to the door one time. If door is open, the amber light will flash. If closed, amber light will remain solid.
- d. If door indicator light is flashing or is solid (amber), notify Group Lead Admin. Support or E.P. Rep. to verify status of door. Request a walkthrough be conducted to verify only authorized personnel are present in the facility.
- e. If door is verified to be secure, reset door by depressing black button corresponding to door, to return indicator button to green secure mode.
_f. If door is unsecure, and must remain open, positive access control shall be determined by Group Leader Admin Support or E.P. Rep.
4.0 Obtain the EOF access list from the glass case located next to the name board and ensure all authorized personnel frisk, if necessary.
34
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 EXHIBIT 6 Page 2 of 2 NOTE Personnel requesting entry to the EOF, must produce a TMI company photo ID badge or be on the approved access list. All other personnel requesting entry must be authorized by the Group Leader Administrative Support, the Emergency Preparedness Representative or the Emergency Support Director.
NOTE Steps a, b, and c, below, may be performed in any order and may be repeated if necessary. Any of these steps that are not needed can be skipped and marked "N/A".
- a. If unauthorized personnel attempt to gain access to the EOF, the individual assigned access control should contact Dauphin County Control by dialing 911 on an outside line and request assistance from the Susquehanna Township Police.
- b. If a person frisking causes an alarm, direct the individual to remain at that location and notify Group Leader R&EC.
- c. If you are notified by an individual that they have consumed an alcoholic beverage within the past five (5) hours or believe an individual should be tested for Fitness for Duty requirements, notify the Emergency Preparedness Representative.
5.0 Forward completed checklist to the Emergency Preparedness Representative.
NAME. TIME DATE EOF Access Control 35
Number TMI - Unit 1 Emergency Plan FI::PP..TMI. 97 Title Revision No.
Emergency Operations Facility 16 EXHIBIT 7 Page 1 of 2 TMI Access Authorization Checklist NAME: COMPANY:
SSN: BADGE #:
The crteria identified by this checklist shall be completed and verified prior to authorizing access of NRC personnel during emergency conditions. Deviation from these requirements shall only be permitted at the direction of the Emergency Director, Emergency Support Director or their designee.
NOTE Complete only the applicable sections of this checklist, mark other sections "N/A" (e.g., mark Section A as N/A for non-NRC personnel).
A. NRC personnel shall be granted unfettered access upon verification of:
The representative possesses "Q" or "L" clearance, has been authorized site access by the NRC Region I Office (King of Prussia, PA) or the NRC Headquarters (Rockville, MD) and appears on the current TMI Access Roster/5 SS Screen.
The representative possesses a "Q" or "L" clearance, has been authorized access by Regional Office and/or Headquarters, but does not appear on the TMI Access Roster/5 SS terminal. In this case a letter of access authorization shall be forwarded (via telefax) to the Emergency Operations Facility.
The representative does not possess a "Q" or "L" clearance and must have an escort for entry into the protected area.
If Step 1 or 2 are complete check box 1 on Access Authorization Form, if only Step 3 is completed, check box 2 on Access Authorization Form.
Verification Signature: uate Group Leader Admin Support/Designee Date All other personnel require Emergency Director, Emergency Support Director or designee authorization and if not fully qualified for unescorted access require a qualified site staff member as an escort.
F NOTE Permission for site entry should be obtained through the ESD Assistant.
B. Rad Con (Non-RWP Access)
- _ Complete Temporary Issue Paperwork.
- Issue TLD.
Verification Signature: Date Group Leader R&EC/Designee Date 36
Number TMI - Unit 1 Emergency Plan ImDlementina Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 EXHIBIT 7 Page 2 of 2 C. Rad Con/Training (Escorted RWP Access - No Respirator Areas)
- _ Complete Step B.
- _ View G.E.T. Film.
NOTE Both 1/2 inch and 3/4 inch format tapes are stored in the EOF cabinet.
- _ Practical Factor Performance not required.
- _ Whole Body Count (waived if no facilities available).
Check Box 3 of the Access Authorization Form Verification Signature:
Group Leader R&EC/Designee Date D. Rad Con (Unescorted RWP Access - No respirator Areas)
- _ Ensure Steps B and C are complete.
- _ Complete practical factors.
Individual granted unescorted RWP Access (No Respirator Areas)
Check Box 4 of the Access Authorization Form.
Verification Signature:
Group Leader R&EC/Designee Date E. Rad Con (Unescorted RWP Access with Respirator)
_* Ensure Steps B, C and D complete.
Documentation provided by NRC of satisfactory completion of respiratory medical or receive GPU Nuclear medical.
- _ Complete TMI Respirator Training.
- _ Complete TMI Respirator Fit Test.
Individual granted unescorted RWP Access to all areas.
Check Box 5 of the Access Authorization Form.
Verification Signature:
Group Leader R&EC/Designee Date 37
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 EXHIBIT 7A Page 1 of 1 NRC TMI Access Authorization NAME: SSN:
I-! 1. Authorized unescorted TMI Site Access.
Authorized by Signature:__________________________________
01 2. Authorized escorted TMI Site Access.
Authorized by Signature:
r-I 3. Authorized non-respirator RWP Access with an escort.
Authorized by Signature:
El 4. Authorized unescorted non-respirator RWP Access.
Authorized by Signature:
D 5. Authorized to wear the following respirator(s) and unescorted RWP Access.
Respirator Type _ Size Respirator Type_ Size Authorized by Signature:
Security Badge #: Issued By: Date:
NOTE It is the individual's responsibility to maintain a copy of this form with them at all times. Failure to keep a copy of this form can result in Site/RWP Access being denied.
38
EPIP-TMI-.27 Revision 16 EXHIBIT 8 Page 1 of 1 TMI Par Logic Diagram SITE AREA EMERGENCY IS DECLARED Determine which initial PAR is appropriate if a GENERAL EMERGENCY is declared.
(1) Evacuate the 5 mile radius around the plant and shelter the 5 to 10 mile radius around the plant OR (2) Shelter the 10 mile radius around the plant Continue assessment of all available Plant and Field Monitoring information.
GENERAL EMERGENCY IS DECLARED EVACUATE THE 5 MILE RADIUS AROUND THE PLANT AND SHELTER THE 5 TO 10 MILE RADIUS AROUND THE PLANT UNLESS IT IS KNOWN THAT SHELTERING OF THE 10 MILE RADIUS AROUND THE PLANT WILL OFFER GREATER PROTECTION.
(See NOTE below)
CONTINUE ASSESSMENT BASED ON ALL AVAILABLE PLANT DATA AND FIELD MONITORING INFORMATION I
4,
=
I VALID dose assessment/measurement information indicates that areas outside the 5 Expand mile radius 1 REM TEDE or 5toREM will exceed recommendation EVACUATION the CDE (Child 10 mile Thyroid) radius around the plant if I NOTE The intent is to evacuate the 5 mile radius around the plant as an initial PAR. The decision to recommend sheltering rather than evacuation should be made ONLY when it is clear that the evacuation cannot be completed within the release time. For example, the release has already stopped, the release can be stopped simply by turning off a piece of equipment, or there is a deliberate venting of the Containment Building with more than one valve available for isolation.
SECURITY EVENT
"* When EITHER the Control Room or the Remote Shutdown area is available the initial PAR should be to SHELTER the 10 mile radius around the plant.
"* When BOTH the Control Room and the Remote Shutdown area are lost the initial PAR should be to EVACUATE the 5 mile radius and SHELTER the 5 to 10 mile radius around the plant.
39
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 EXHIBIT 9 Page 1 of 3 EP Representative Activation 1.0 Start log for your position in accordance with EPIP-TMI-.05.
NOTE Steps a through c may be completed in any sequence. Steps that do not apply to the present situation may be skipped or marked "N/A".
- a. Establish Access Control in accordance with Exhibit 6, EOF Access Control Checklist until relieved by the Group Leader Admin Support.
- _ If an individual is not available to implement Exhibit 6, proceed as follows:
- i. Insure the door is locked ii. Display a sign stating "Ring doorbell for facility access".
- b. Test ESO personnel who admit to having had a drink in the last five hours in accordance with Fitness for Duty requirements (Exhibit 9A).
- c. Determine if the EOF is 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> (from the time displayed on the pager) staffed and ready to be activated.
- Ensure that personnel properly use the EOF Name Board and are wearing tags to identify the position they are filling.
- Determine vacant positions by looking at remaining nametags
- a. Ensure that vacant positions are provided to the EOF Communications Coordinator so that personnel can be contacted to fill the positions.
- Obtain an activation status report from the following positions:
- a. ESD Assistant
- b. Group Leader - Rad and Env Controls
- c. Technical Support Rep
- d. Public Information Representative - EOF
- e. EOF Communications Coordinator
- f. RAC Line Communicator
- g. ESD Logkeeper
- h. EAC 40
Number TMI - Unit 1 Emergency Plan Imolementing Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 EXHIBIT 9 Page 2 of 3
- d. When all of the above positions are activated, report to the ESD that the EOF is 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> staffed and ready to be activated.
2.0 EP Operational Checklist NOTE The following steps are not presented in the exact sequence that they are to be performed. It is likely that some steps will have to be performed out of the sequence listed and that some steps will be performed concurrently. Steps that are not applicable for the present situation may be skipped. Other steps may need to be repeated. This exhibit should be referred to periodically to ensure that necessary actions are not missed.
- a. Determine status of the Emergency Response Facilities from the ED Assistant and report the results to the ESD Assistant.
- b. Inform the ESD that the EOF is fully staffed when the Group Leader Administrative Support and supporting staff have arrived.
- c. Advise the ESD and other Emergency Response Organization members on all Emergency Plan related matters.
- Proper interface with the State and the NRC
- Proper Emergency Classification Level
- Proper Protective Action Recommendation
- Proper use of Emergency Plan Implementing Procedures
- Offsite notifications (if that responsibility has been transferred to the EOF)
- d. Upon the arrival of the NRC and State personnel
- Provide a briefing.
- i. Status of the Event ii. Structure of TMI organization iii. Request directives in writing to the ESD NOTE Use completed Exhibit 4 and, if available, Exhibit 5 to enhance the briefings 0 Introduce them to their counterparts.
41
Number TMI - Unit 1 Emergency Plan Implementina Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 EXHIBIT 9 Page 3 of 3
- Act as the point of contact for the PEMA representative.
- e. Attend all ESD Conferences 0 Log all conference Action Items on conference room status board.
- Ensure that mitigating activities are discussed.
- Ensure the State and the NRC are given an opportunity to ask questions.
- f. Determine status of the State and Local Emergency Operations Centers from the PEMA representative and report the results to the ESD Assistant.
- g. Ensure the TMI Emergency Responders Information Brochure (located in the EOF Emergency Supplies Cabinet) are made available to responding government agencies (e.g., NRC, PEMA),
industry support groups (e.g., INPO), etc.
- h. If problems are encountered with the Emergency Telephones, contact the EOF Communications Coordinator.
Upon close out of the drill/emergency:
- Collect all completed EOF logs and forms
- Collect all EACC logs and forms
- Provide them to the Emergency Preparedness Department Name Time Date Emergency Preparedness Representative 42
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 EXHIBIT 9A Page 1 of 3 Emergency Operations Facility Fitness for Duty Determination Instructions NOTE The fitness for duty rule applies to all TMI employees (including TMI contractors and vendors) granted unescorted access to the protected area or who are required by position or name to report to the EOF. These instructions address their evaluation for utilization in an emergency only.
All "for cause" evaluations must be conducted by the Medical or Security Department.
Scope:
In accordance with 1000-ADM-2002.06, Fitness for Duty, individuals responding to an emergency who have consumed alcohol within the previous five hours but believe that they are fit for duty shall inform the Emergency Support Director and receive an evaluation. Contractor/vendor personnel shall be asked if they have consumed alcohol within the previous five hours. Ifthe answer is yes, an evaluation shall be conducted.
Instructions:
The Emergency Support Director shall direct the Emergency Preparedness Representative to administer the breath alcohol evaluation in accordance with Exhibit 9A.
NOTE Extra copies of ALCO Sensor III operational checklist are kept with the instrument.
Based on the results of the test, perform the following:
- a. BAC 0.01% or less Allow the individual to work in the facility.
- b. BAC greater than 0.01% but less than 0.04%
Allow the individual to work in the facility. Re-test the individual approximately every thirty minutes to determine the maximum BAC. If the maximum BAC is equal to or greater than 0.04%, refer to Step 3. If less than 0.04%, no further action is required.
43
Number TMI - Unit 1 Emergency Plan Imolementino Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 EXHIBIT 9A Page 2 o f 3
- c. BAC equal to or greater than 0.04%
If determined that the individual's unique knowledge or skills are required, that individual shall only be permitted to work with the permission of the Site Director (or in his/her absence, his/her designee),
Emergency Support Director, Emergency Director or Office of the President only after satisfactory assurance that the individual is capable of performing his/her duties. Remind the Emergency Support Director that if this individual is needed to work, he/she must be escorted at all times. Arrangements should be made as soon as practicable for (for cause) testing in accordance with 1000-ADM-2002.06.
NOTE Individuals not "on call" who report to their facility and test equal to or greater than 0.04 percent BAC are not subject to disciplinary action.
- d. Ensure the individual who tested equal to or greater than 0.04, if not needed, is not permitted to drive home.
Provide a place for the individual to rest or contact Group Leader - Admin Support to arrange for transportation.
- e. Be alert for any individual that exhibits aberrant behavior or the smell of alcohol. Test these individuals in accordance with this exhibit. If aberrant behavior cannot be attributed to a positive BAC reading, ask the Group Leader - Admin Support to contact the Security Department for further action.
44
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 EXHIBIT 9A Page 3 of 3 ALCO Sensor III Operational Checi Sample TEST SUBJECT NAME: DATE SOCIAL SECURITY NO: SERIA.L NO:
TIME OF TEST: TEST 1 TEST. 2 TEST RESULT (BAC): TEST 1 0. % TEST. 2 0. %
OPERATOR NAME: SIGNW ,TURE:
INSTRUCTIONS - check each box after completion of step.
NOTE The fifteen minute observation period of the subject may be waived as long as a positive test result is not received. Should a positive test result be indicated, it shall be disregarded and the alcohol breath test started anew after at least a 15 minute observation period.
A weak battery is indicated by an "8.888" in the display window. Replace battery.
- 1. 11 Check temperature window on back of unit (should read 200 to 360 C).
- 2. D Have the individual mount mouth piece on unit.
- 3. Press "READ" button and hold for 10 seconds. Check to see if .000 is constant. If not, press "Set" button and recheck in one minute. If the display reads greater than .000, remove the instrument from service and forward to the Medical Department for repair and use another instrument for testing.
- 4. II Press "SET" button.
Li
- 5. D Instruct subject to take a deep breath and blow steadily through the tube until told to stop (minimum of 4 seconds). (NO smoking within fifteen [15] minutes of test.)
- 6. D Push "READ" button during third second that the subject is blowing. (Subject MUST continue
- 7. to blow for a minimum of one [1] second after the "READ" button is depressed.)
- 7. LI Keep "READ" button depressed until reading stops climbing.
El
- 8. 11 Record reading and time of TEST 1/TEST 2. (NOTE: The two readings must agree within El +/-10% of the averages of the two measurements, if not, use another instrument).
- 9. 11 Press "SET" button to accelerate elimination of reading and electrically clean the cell surface.
El
- 10. 11 Wait a minimum of two minutes and a maximum of 10 minutes and repeat Steps 3 through 9.
45
Number TMI - Unit 1 Emergency Plan I1EIt l I mmlI E ll Implementing Document E:rir- I vn-.-r Title Revision No.
Emergency Operations Facility 16 EXHIBIT 10 Page 1 of 2 Emergency Support Director Assistant Checklist
- 1. ACTIVATION INITIAL
- Assist the ESD in the completion of Exhibit 1.
- Assist the ESD in the completion of Exhibit 4.
- b. Report your status as activated when requested by the Emergency Preparedness Representative.
II. OPERATIONS NOTE The following steps are not presented in the exact sequence that they are to be performed. It is likely that some steps will have to be performed out of the sequence listed and that some steps will be performed concurrently. Steps that are not applicable for the present situation may be skipped. Other steps may need to be repeated. This exhibit should be referred to periodically to ensure that necessary actions are not missed.
- a. Refer to EPIP-TMI-.01, "Emergency Classification and Basis", whenever major plant changes have occurred to determine if a change in emergency classification is warranted.
- b. If the ESD has assumed the responsibilities for "Approving and directing official notifications to off site agencies; then perform the following:
- Inform the EOF Communications Coordinator that the ESD has assumed responsibility for off site notifications.
- c. When the ESD leaves the main room of the EOF, assume the Person-In-Charge role until the ESD returns.
NOTE This does NOT include assuming the responsibilities that the ESD has assumed from the ED.
46
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 EXHIBIT 10 Page 2 of 2
- e. Assume the TMI, Point-Of-contact role for any inquiries from the following:
- NEI (Technical and Regulatory Division)
- f. Assist the ESD in the completion of Exhibit 5.
0 Insure each completed Exhibit 5 includes the Briefing Time.
- g. Forward the completed checklist and all logs to the Emergency Preparedness Representative at the end of the event.
Name Time Date ESD Assistant 47
Number TMI - Unit 1 Emergencv Plan Implementing Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 EXHIBIT 11 Page 1 of 1 ESD Logkeeper ACTIVATION
- a. Activate the ESD Logkeeper Position
- Maintain the ESD Log in accordance with EPIP-TMI-.05, "Communications and Record Keeping".
- Report your status as activated when asked by the Emergency Preparedness Representative.
II. ESD LOGKEEPER OPERATIONAL CHECKLIST
- a. At ESD Conferences, insure that previously generated Action Items are addressed.
- Forward the completed checklist and all ESD logs to the Emergency Preparedness Representative at the end of the event.
Name Time: Date ESD Logkeeper 48
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 EXHIBIT 12 Page 1 of 3 Public Information Representative - EOF ACTIVATION
- a. Contact the Duty PI REP to advise of your arrival at the EOF and to determine whom will be writing Press Releases and whom will be the Media Briefer.
- b. Start a log of all telephone calls in accordance with EPIP-TMI-.05.
- c. Report your status as activated when asked by the Emergency Preparedness Representative.
II. OPERATION NOTE The following steps are not presented in the exact sequence that they are to be performed. It is likely that some steps will have to be performed out of the sequence listed and that some steps will be performed concurrently. Steps that are not applicable for the present situation may be skipped. Other steps may need to be repeated. This exhibit should be referred to periodically to ensure that necessary actions are not missed.
- a. Gather information about the emergency and provide it to the Media Briefer and News Release Writer, as appropriate:
Be especially attentive to any radiological situation, whether or not a radiation release is occurring. ANY release of radiation in the context of the emergency SHOULD be reported to the Press Release Writer and Media Briefer.
Use the "Plant Emergency Information Checklist" (Refer to Exhibit 1C of the TMI Emergency Communications Response Manual) to obtain plant information.
Develop Bullets of information (e.g., RCP 'A' has been restarted) from attending ESD Conferences and obtained outside the conference.
i) Information not obtained directly from plant indications needs to have ESD Assistant review and ESD approval.
ii) ALL BULLETS must be reviewed and APPROVED by the ESD.
iii) Obtain ESD approval of bullets generated during an ESD conference before the ESD leaves the conference room.
iv) Fax the authorized information to the Media Briefer.
49
Number TMI - Unit 1 Emergency Plan Imolementina Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility R 16 EXHIBIT 12 Page 2 of 3
- Continually update the Media Briefer and the Press Release Writer using the Emergency Information Checklist.
NOTE You are also required to provide real-time information about plant conditions, without ESD approval, to the JIC staff in order to assist the Media Briefer's understanding of changing plant conditions.
Press Releases
- b. When DRAFT Press Releases are received review them for accuracy before submitting them to the ESD Assistant for processing and obtaining ESD APPROVAL. Refer to Exhibit 13, Press Release Guidance, to enhance your review.
- Depending on the change required either mark up the DRAFT and have the Press Release Writer make the corrections before the processing below:
i) Give it to the Group Leader R&EC for review and approval
- Be persistent to get it reviewed and INITIALED PROMPTLY ii) Give it to the Tec Support Rep for review and approval
- Be persistent to get it reviewed and INITIALED PROMPTLY iii) If required, have Security perform a review for SAFEGUARDS information
- Be persistent to get it reviewed and INITIALED PROMPTLY iv) Give it to the ESD Assistant for submittal to the ESD for review and approval
- Be persistent to get it reviewed and SIGNED PROMPTLY
- Press Releases announcing anything other that emergency level changes or Media advisories (e.g., JIC activated) must be approved by the Emergency Support Director.
- Fax or deliver if the JIC is at the EOF the initialed (APPROVED) DRAFT Press Release to the Press Release Writer to obtain a final Press Release.
i) Call the Press Release Writer and provide the changes verbally to expedite the Press Release process.
- Maintain copies of the Press Releases.
- Provide a copy of ALL APPROVED Press Releases to the ESD.
50
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 EXHIBIT 12 Page 3 of 3
- c. Ensure that emergency level changes and the criteria for those changes are IMMEDIATELY communicated to the Media Briefer.
Obtain a copy of the completed Emergency Report Form-TMI, if developed at the EOF, and transmit to the Media Briefer at the JIC.
- d. Upon termination of the emergency forward all logs, forms, draft Press Releases, approved Press Releases, completed checklists and other pertinent documentation to the Emergency Preparedness Rep.
Name Time: Date PI REP- EOF 51
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 116 EXHIBIT 13 Page 1 of 4 Press Release Guidance 1.0 Press releases should be issued as soon as possible, typically within one hour from the time that a major plant event has occurred. Press releases shall be written in accordance with the following guidelines:
- a. The following categories of information should be included in press releases.
Level of Emerqencv This is simply identifying which of the four emergency levels was declared.
Basis for Emergency Declaration This should be a simplified description of the plant condition which produced the emergency declaration (e.g., a leak of radioactive water within a plant building).
Operations Status of the Plant A simple description of the plant status at the time of the emergency declaration (e.g., TMI was operating at 100% power, however, the plant is currently reducing power).
Company/Government Interface This is intended to inform the public that TMI has notified and is working closely with government officials so that public confidence and company credibility can be increased, or maintained.
Corrective Actions This should be a non-technical description of what plant personnel are doing to correct the problem. It may include such language as "attempts are being made to stop the leak" or "plant personnel are investigating the cause of the leak."
Off-site Impact A statement which simply assess what impact this event may have on the environment.
This is intended to provide factual information on off-site radiological conditions (e.g., a radioactive release is in progress, however, monitoring teams have not detected any radiation levels in excess of normal background).
The initial press release should include all or part of the above information, however, at the very least, it should contain information from the parts above.
- b. In addition, the following guidance should be used in issuing press releases:
Speculation, Dose Projections and Protective Action Recommendations should not be included in press releases.
52
Number TMI - Unit I Emergency Plan Implementing Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 EXHIBIT 13 Page 2 of 4 Press Releases SHALL have the concurrence of the Emergency Support Director. Press Releases, should have engineering, radiological and as appropriate Safeguards review.
- a. Exceptions to this are limited to releases that are media advisories or releases that only contain 'boiler plate' information (e.g., level of emergency without any specific details or that the Joint Information Center is now activated).
- i. The ED/ESD should be made aware of these advisories.
- b. Original initialed copies are retained for records.
- Press releases should be reviewed promptly to support timely (< 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />) issuance.
- Press releases should avoid undefined technical terms and abbreviations (e.g., plant names, trip, etc.)
- a. Press releases should be written to be as simple as possible.
- i. Where possible, descriptions should be used instead of technical terms. For example, "back up power source" should be used in place of "diesel generators".
- b. Additional list of Technical terms and alternate words.
Technical Terms Suciqested Descriptions Accountability The process of accounting for all plant personnel Auxiliary Building Building housing support equipment for the Reactor RMG22 A monitor which detects radiation levels RMG23 inside the Reactor Building Contaminated Has loose radioactive material on it, him, her.
Contamination Loose radioactive material Containment Building Building which houses the Reactor or Reactor Containment Building Cladding A metal tube containing the nuclear fuel Control Rod A device which when inserted in a reactor stops the generation of power Critical Sustained Chain Reaction 53
Number TMI - Unit 1 Emergency Plan Imolementina Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 EXHIBIT 13 Page 3 of 4 Technical Terms Suaqested Descriotions Diesel Generator Emergency Power Unit or Back Up Power Source Fission Products Radioactive materials made from operating the Reactor Fission Products Barriers Barriers designed to contain the radioactive materials made from operating the Reactor.
Fuel Cladding Failure Damage to the metal tubes containing the nuclear fuel.
Fuel Pool Underwater Storage Area for Nuclear Fuel Grid Electrical Distribution System Hot Well Tank that collects condensed steam Loss of Off Site Power The plant has lost its connection to the Electrical Distribution system Noble Gas Radioactive Gas Penetration Opening through the wall Plume Radioactivity released in the air or water Poison A material which reduces power in the reactor PORV Pressure Relief Valve Primary System The system that circulates water through the Reactor to remove heat Protected Area Security Barrier around the plant Radionuclides Radioactive material Reactor Building Building which houses the reactor or reactor containment building Reactor Building Purge A means of exchanging air inside the Reactor Building with outside air Reactor Trip Automatic or Manual Shutdown of the Reactor 54
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 EXHIBIT 13 Page 4 of 4 Technical Terms Suggested Descriptions Reuter Stokes Off Site electronic Radiation Monitors SCRAM Immediate or Fast Shutdown of the Reactor Secondary System Non Nuclear Steam System Steam Generator Heat Exchanger where steam is made Subcritical No self sustaining chain reaction Half Life Time it takes for half of the radioactive material to decay away 55
Number TMI - Unit I Emergency Plan Implementing Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility w
16 EXHIBIT 14 Page 1 of 2 Site Access Policy for Media During Emergencies NOTE The following steps are not presented in the exact sequence that they are to be performed. It is likely that some steps will have to be performed out of the sequence listed and that some steps will be performed concurrently. Steps that are not applicable for the present situation may be skipped. Other steps may need to be repeated. This exhibit should be referred to periodically to ensure that necessary actions are not missed.
1.0 Providing site access to media personnel during a plant emergency or in the recovery from a plant emergency is in the best interest of the company and the public. However, media access to the site must not impair the response to the emergency.
2.0 Responsibility for approving site access rests with the Emergency Support Director, or, if the EOF is not activated, with the Emergency Director. Refer to Section 5 of this exhibit for responsibilities.
3.0 For purposes of media access to the site during an emergency, the same industrial safety and security standards and requirements that apply to non-essential employees will be applied to the media.
4.0 Communications Dept. Responsibilities
- a. Requests for media access will be made to the ESD or ED by the Public Information Duty Representative or the Communications Emergency Team Leader.
- b. Communications will provide the ED/ESD with the number of media to gain site access, areas to be accessed and length of time the media will be there. (Communications will decide the number of media gaining access based on conditions at the time of the emergency. An attempt will be made to gain access for, at a minimum, one representative each from radio, television and print media.)
- c. Communications will provide media transportation on and off site.
- d. Communications will have each member of the media sign a Media Access Briefing Form, indicating they were briefed about the risks as they were known at the time by Company Management.
If media access does not involve entry into a posted radiologically controlled area:
- a. The Communications staff will conduct the sign in and badging of media at TMI.
- i. Communications will notify the Security Coordinator prior to proceeding with Site Access.
- b. Communications will supervise and escort the media while on site.
C. Communications will conduct a briefing explaining the radiological and industrial conditions and risks on site.
56
Number TMI - Unit 1 Emergency Plan Imnlementina Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 EXHIBIT 14 Page 2 of 2 0 If media access involves entry into a posted radiologically controlled area:
- a. Media will be processed at the EOF, as appropriate, receiving dosimetry, training, bioassay, waivers and briefings based on established procedural requirements.
- i. Communications will notify the Security Coordinator prior to proceeding with Site Access.
- b. Communications in conjunction with Radiological Controls will supervise and escort the media while in posted radiologically controlled areas.
5.0 ED/ESD Responsibilities
- a. The ED/ESD will consult with the RAC/Group Leader R&EC, and media will be granted access if the projected dose will not exceed the 500 millirem annual limit including external and internal exposure.
For Security driven events, media access to the Site must also be approved by the Local Law Enforcement Agency/Security.
- b. Approve media access to the site if requirements are met.
57
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMk-.27 Title Revision No.
Emergency Operations Facility 16 EXHIBIT 15 Page 1 of 2 Technical Support Rep Checklist I. ACTIVATION Initials 1.0 Activate the Tech Support Rep position.
- a. Start the Technical Support Representative Log in accordance with EPIP-TMI-.05, "Communications and Record Keeping".
- b. Assign a communicator to communicate on the Technical Functions Line with the communicator in the Technical Support Center (TSC).
0 Instruct the communicator to log telephone conversations in accordance with EPIP-TMI-.05, "Communications and Record Keeping".
- c. Verify that the CRT to the Plant Process computer is being activated in accordance with Exhibit 15A instructions.
- d. Verify that the projection information System is activated.
0 Use instructions posted at the projection unit.
- e. Report your status as activated when asked by the Emergency Preparedness Representative I1. Tech Support Rep Operations NOTE The following steps are not presented in the exact sequence that they are to be performed. It is likely that some steps will have to be performed out of the sequence listed and that some steps will be performed concurrently. Steps that are not applicable for the present situation may be skipped. Other steps may need to be repeated. This exhibit should be referred to periodically to ensure that necessary actions are not missed.
- a. Contact the TSC to determine the following:
- Operational status of the plant
- Mitigating activities
- i. Completed ii. Underway iii. Planned Release information
- i. Pathway ii. Duration 58
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 EXHIBIT 15 Page 2 of 2
- c. Act as the Point-of-Contact for the BRP Engineering Representative.
- Keep the BRP Representative informed of plant status and mitigating activities.
- d. Attend ESD Conferences and be prepared to discuss technical issues
- Core Conditions
- Barrier status
- i. RCS ii. Clad iii. Containment
- Mitigating activities
- i. In progress ii. Being evaluated
- What could make the situation worse?
- e. Commence Accident assessment functions by:
- Monitoring plant parameters
- Conducting trend analysis of key parameters
- Display information on Status Boards
- i. Update information on a routine basis
- f. Review and concur on draft Press Releases Use Exhibit 13, if required.
If Press Release is acceptable from a technical point of view, endorse it by initialing the document for ESD approval.
- g. If problems are encountered with communications equipment contact the EOF Communications Coordinator for resolution.
- h. Forward the completed checklist and all other pertinent documentation to the Emergency Preparedness Representative at the end of the event.
Name Time: Date Tech Support Rep.
59
Number TMI - Unit 1 Emergency Plan Implementina Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 EXHIBIT 15A Page 1 of 2 EOF Plant Process Computer Access Instructions
- 1. To put computer on line, verify system is energized or energize by turning on the computer and monitor.
- a. If the computer and monitor are energized but there is nothing displayed on the monk or, adjust the contrast knob as needed.
NOTE This is for the dedicated line access.
- 2. Simultaneously press the following keys ("Shift" and "On Line/Off").
- a. This may not work on the first attempt - try again.
- b. If the system does not come on line, access the PPC using the modem instructions in Step 9.
- 3. If PPC access is granted, the words "Off Line" at the bottom right hand corner of the screen will disappear.
- 4. Press the key marked "GROUP" or any other function key to access the PPC.
- 5. Enter the number of the area you wish to access, and press "Execute".
- 6. From any menu screen, select the display number to be printed and then press the print button (other functions are per users guide).
- 8. To quit, 8.1 Clear the screen, press "cancel" twice.
8.2 Simultaneously press the following keys ("Shift" and "On Line/Off Line").
8.3 Reduce contrast to eliminate monitor display.
60
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 EXHIBIT 15A Page 2 of 2 Modem Access (Backup)
- 9. If the direct access fails, proceed as follows:
9.1 Press the "C" (cell) button.
9.2 Press the "Go" button.
NOTE The modem will automatically dial the following two numbers:
9-717-948-9114 9-717-948-9115 9.3 When the numbers are dialed and connected, proceed with Step 4.
- 10. If PPC access is not successful or problems are encountered with the computer, call 9-717-948 8606 for assistance.
- 11. To quit, proceed as follows:
11.1 On Aydin Keyboard press CANCEL twice.
11.2 On Aydin Keyboard press and hold down the SHIFT key (either RIGHT or LEFT) and press the On/Off Line key or xmit page key.
NOTE An OFFLINE message may briefly appear in the lower right hand corner.
11.3 On modem press the following buttons.
11.3.1 "DISC" 11.3.2 "GO", the modem will display "DISCONNECTED".
61
Number TMI - Unit I Emergency Plan Imolementina Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility j 16 EXHIBIT 16 Page 1 of 5 TMI/NRC Emergency Response Interface Criteria This is a synopsis of the NRC emergency response process as it applies to TMI.
Upon arrival of the NRC, the ED/ESD should:
- Verify who is the senior NRC person in charge
- Ask the senior NRC person to inform the ED/ESD when the position of Director Site Operations is assumed and whether the responsibility to issue directives is included.
- Request that the NRC keep TMI Management informed of all substantive information exchanges between the NRC and the state.
- Request the NRC provide all DIRECTIVES in writing.
In essence, directives from the NRC must come from the NRC Director (typically, the NRC Chairman) or from the NRC Director of Site Operations (typically, the NRC Regional Administrator). Such advice or directive can only be communicated to the Emergency Director (the Emergency Support Director once the EOF is activated). If a directive order is issued by the NRC Director or Director of Site Operations, the ED/ESD should request written confirmation which spells out the specific nature of the directive.
While NRC advice may be challenged by the ED or ESD, directives must be complied with.
With respect to protective action recommendations for the public, the NRC may either endorse the TMI's recommendation or opt to recommend a different one. The ED/ESD is encouraged to include the NRC and State representatives in the protective action recommendation discussions in order to arrive at a mutually agreeable recommendation. In the event that the NRC opts to recommend a different PAR, they will attempt to resolve their differences with the utility prior to recommendations to the State. Their recommendation, like the utility recommendation, will be considered by the State in the development of a Governor directive.
SYNOPSIS - NRC EMERGENCY RESPONSE Revision 2 to NUREG 0728, supplemented by NUREG-0845 and NUREG-1471, describes the manner in which the NRC will respond to an incident and provides criteria for making preplanned response decisions. They provide procedural guidance, describe the functions related to NRC emergency response and define procedures for responding to the following NRC modes of operation.
- 1. Normal Mode
- 2. Standby mode
- 3. Initial Activation
- 4. Expanded Activation
- 5. Deactivation 62
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 EXHIBIT 16 Page 2 of 5 Each mode defines the scope of NRC activities related to a particular level of emergency response in ascending order of degree of involvement to deactivation. The various modes are characterized as follows:
- 1. Normal mode - Normal activities designed to maintain readiness.
- 2. Standby mode - Regional Office activates the Incident Response Center (IRC) with an appropriate staff and NRC Headquarters Operations Center is staffed by a Standby Team.
- 3. Initial Activation - NRC Operations Center is staffed by a response team, the Regional IRC is fully activated and a Site Team is dispatched under the leadership of the Regional Administrator, normally designated as Director of Site Operations (DSO).
- 4. Expanded Activation - Focus of NRC response operations is shifted to the site. DSO is designated primary spokesman for the NRC and may be empowered with directive authority by the Chairman of the Nuclear Regulatory Commission.
- 5. Deactivation - Follow-up activities (e.g., reviews, investigation and recovery operations).
The particular mode assumed by the NRC will be dependent upon Licensee event classification and "independent NRC perception of relative severity of uncertainty of accident conditions".
NRC functions defined in NUREG 0728 which impact directly on the Licensee are:
- 1. Evaluate Incident and Plant Status NRC personnel at the site, the Regional Office and the Headquarters will acquire the necessary data to develop and maintain a complete and accurate overview of the evolution and status of the event.
This will involve data gathering via ERDS, ENS, HPN, and other FTS 2000 telephones as well as direct communications with the Licensee at the ERF's.
- 2. Evaluate Licensee Actions NRC personnel will evaluate Licensee actions to mitigate the consequences of the incident and provide recommendations concerning protective actions for the public.
- 3. Project Incident Consequences and Plant Status Based on information and evaluations discussed above, the NRC will develop an independent projection of the likely further course of events.
63
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 EXHIBIT 16 Page 3 of 5
- 4. Advise, Assist or Direct Licensee The NRC may offer advice or assistance to the Licensee during an emergency, or may respond to Licensee requests for advice of assistance. This may involve diagnosis of critical problems, development of proposed remedial courses of action, and proposals to implement additional precautionary measures. The NRC is also prepared to direct that certain actions be taken if, after thorough discussion with the Emergency Director (the Emergency Support Director once the EOF is activated) it is decided that such direction is required. In the event that such action is taken by the NRC Director or the NRC Director of Site Operations, the ED/ESD should request written confirmation which spells out the specific nature of the directive. Directives will be communicated directly to the ED/ESD from the NRC Director (NRC Chairman) or from the NRC Director of Site Operations (DSO), typically the Regional Administrator, once appointed and empowered to do so.
Several important concepts govern the NRC in providing advice, assistance, or direction. They are:
- a. The Licensee is at all times responsible for mitigating the consequences of the incident.
- b. Although the NRC could issue formal orders to the Licensee to take certain measures and to monitor implementation, "... licensee continues to make other key operational decisions and to operate and manage the facility...".
- c. The NRC must have a single voice when advising or directing the Licensee.
- d. The ED/ESD has the option to accept or challenge NRC advice.
At no time will advice or direction come from both the Director and the DSO and the Licensee will always be kept apprised of who is empowered to exercise authority as the NRC spokesman. All other NRC personnel in contact with Licensee personnel are responsible to make clear that discussions should not be construed as advice or direction but rather as a sharing or gathering of information.
- 5. Inform Public and Monitor Public Information During emergency situations, the NRC will formulate its own press releases based on information gathered from the Licensee and from NRC personnel. Procedures exist to ensure that press releases are approved by one person. That person may be the Regional Administrator, NRC Chairman, or DSO depending on the current NRC mode of operations. NRC draft press releases will normally be shared with the Licensee; however, this does not imply a request for approval by the Licensee. The intent is to identify issues needing clarification prior to release to avoid confusing or misleading the public.
64
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 EXHIBIT 16 Page 4 of 5
- 6. Recommend Protective Actions for the Public The NRC responsibility during an emergency, as during normal operations, is to ensure that protection of public health and safety is adequate. One aspect of this responsibility is to provide protective action recommendations or advice to offsite authorities. This may take the form of an NRC endorsement of a Licensee protective action recommendation or the NRC may opt to recommend additional protective actions. The NRC is not normally involved in the process of recommending protective actions, however they may get involved if a major problem is identified with the protective actions recommended by the licensee or protective actions undertaken by the state or local government. Additionally NRC involvement may be requested by state or local officials.
- 7. Review, Investigate and Document Response Actions The scope of this task is not preplanned by the NRC; however, it is apparent that this may require a great deal of interaction between the Licensee and the NRC after-the-fact.
SYNOPSIS - REGION I SUPPLEMENT The Region I Incident Response Supplement to NUREG 0845 restates many of the concepts of NUREG 0845 in greater detail as they apply specifically to Region I.
Section I - Concept of Operations delineates general duties and responsibilities and describes the NRC modes of operation. Relative to the authority of the DSO, it states:
"The Director of Site Operations (DSO) supervises/manages all NRC personnel and operations at the site, is the NRC spokesperson, represents the NRC in interactions with other agencies and carries out the authority delegated by the Director of the NRC Executive Team (Chairman).
Delegated authority will include one or more of the following:
(a) authority to recommend actions to the Licensee, (b) authority to direct the Licensee to take specified actions, and (c) authority to recommend actions offsite, including protective measures for the public.
The Chairman of the NRC, by memo dated 4/22/80, indicated the Chairman may delegate authority to the Regional Administrator as DSO, upon transfer of control of NRC actions and resources to the site, to issue orders to a Licensee during an emergency. It is intended that this authority be used as a last resort to mitigate the emergency conditions only if, in the judgement of the NRC, the Licensee has shown it is incapable of controlling the emergency. This authority is valid only in an emer-qency when the Regional Administrator (or other senior NRC official) is the DSO and specific authorities have been transferred to him by the Chairman or designated alternate".
Sections II and III contain detailed procedures specific to Region I and present no new concepts of interest to the Licensee.
The attachment to the synopsis is provided for your information. This attachment depicts the Site Team Organization and is an extract of the NUREG-1471. It defines the number of NRC personnel expected to operate in each facility and shows the lines of communications the NRC expects to use.
65
(
EPIP-TMI-.27 Revision 16 EXHIBIT 16 Page 5 of 5 V-V-.JP.P. 14 Dashed borderd barns h*Sks co.iau ome inium staff necssary to perfom the 111,1NRC re mpa tndkon pr@paoNy to desWanion of a Oirebar of MR.e Opemtk (060).
- i~IneA~i LMFIT ) ' le:Ih Leogian of al pulWma is dkven bv the Stgel~icnse's Emergency Repapeauidamn. 7h* Isciias UVdad Ul 1hase poai
- thep W cINaa Note 1: Either the PMCL Communicator or the PHN Communicator will be a critical position, not both.
Note 2: Either the ENS Communicator or the RSCL Communicator will be a critical position, not both.
Note 3: Safeguards/Security Assistant Coordinator is part of the Initial Site Team only in safeguards/security type events.
66
Number TMI - Unit 1 Emergency Plan Implementinci Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 EXHIBIT 17 Page 1 of 4 Group Leader - Radiological and Environmental Controls Checklist I. ACTUATION Initials 1.0 Activate the Group Leader - Radiological and Environmental Controls position.
- a. Start the Group Leader R & EC log in accordance with EPIP-TMI-.05, Communications and Record Keeping.
- b. Turn on the Group Leader R & EC computer to access the Emergency Information Network (e.g., RAC information, or dose projections).
- c. Contact the RAC to obtain a status of the situation.
Use list below as a guide, it is not all-inclusive.
- Release path(s)
- Release duration
- In plant radiological conditions
- Samples requested I
- d. Contact the Environmental Assessment Coordinator (EAC) to obtain a status of the situation.
Use list below as a guide, it is not all-inclusive.
- Field team status
- Weather forecast
- Reuter Stokes
- e. Inform the Emergency Preparedness Representative that the Group Leader R & EC position is activated.
II. OPERATION 2.0 Perform the following:
NOTE The following steps are not presented in the exact sequence that they are to be performed. It is likely that some steps will have to be performed out of the sequence listed and that some steps will be performed concurrently. Steps that are not applicable for the present situation may be skipped. Other steps may need to be repeated. This exhibit should be referred to periodically to ensure that necessary actions are not missed.
. a. Review dose projection information 67
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 EXHIBIT 17 Page 2 of 4
- b. Review field monitoring information
- c. Perform dose assessment
- Compare dose projections against field monitoring data.
- Determine if the dose projections are accurate (i.e., Field monitoring team data within a factor of 10 and less than the dose projection).
0 Review weather forecast data for impact on the dose assessment process.
- d. Keep the ESD informed on the following:
0 All radiological issues.
0 All environmental issues.
0 All industrial health issues.
- All safety issues.
- e. IMMEDIATELY inform the ESD if, after thorough dose assessment, you conclude that EPA Protective Action Guidelines (PAG's) will be exceeded anywhere offsite including OUTSIDE the 10 mile EPZ.
- f. Report any telephone problems to the EOF Communications Coordinator.
- g. Direct Access Control personnel to set up the EOF frisking station.
- If appropriate, require personnel to frisk prior to entering the EOF.
- If personnel require decontamination, refer to procedure 661 0-ADM-4330.02, Personnel Contamination Monitoring and Decontamination.
- h. Review DRAFT press releases developed for ESD approval to insure accuracy in the radiological information.
- Use Exhibit 13 for guidance to ensure the releases do not contain the following:
- a. Technical jargon
- b. Acronyms
- c. Dose Projections
- d. Protective Action Recommendations
- Correct the press release, as required.
- Endorse the correct release for ESD approval by initialing.
68
Number TMI - Unit 1 Emergency Plan Implementina Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 EXHIBIT 17 Page 3 of 4 Periodically brief the following on current radiological and environmental conditions.
- NRC
- State representative (BRP)
- a. Notify the State (BRP representative) if valid offsite dose projections are 2!25 REM thyroid dose.
- b. Inform the State (BRP representative) of any problems with the automated dose projection code.
- Insure the level of conservatism in the calculation is presented.
- j. Consider the following if, the Training Center is used as the Near-Site JIC and / or the Remote Assembly Area (RAA)
- Evacuation of these facilities should NOT occur prior to evacuation of the general public.
- Evacuation orders, for the general public, do NOT automatically apply to the RAA.
- Relocation of the RAA should be considered if, the projected dose at the facility reaches 4 REM (TEDE) or 40 REM (CDE).
- If warranted, provide radiological protection instructions to the RAA Team Leaders.
- k. As necessary, assist the Access Center Coordinator in the completion of the TMI Access Authorization Checklist for NRC personnel requiring access to the site.
- If additional dosimetry issue support is needed, request the Group Leader - Admin Support call out a Radiological Support Technician.
Forward the following to the Emergency Preparedness Representative
- Completed Group Leader R & EC checklist
- Completed Group Leader R & EC log 69
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 EXHIBIT 17 Page 4 of 4 2.1 Attend ESD conferences.
- a. Discuss dose assessment information
- Dose projections
- i. Insure the level of conservatism in the calculation is presented.
- Field monitoring team results
- Sample results
- b. Provide information concerning Protective Action Recommendations (PAR)
- Appropriate PAR in accordance with Exhibit 8
- i. Dose projections covering the 10 to 30 mile radius can be found on the Emergency Information Network.
ii. Recommend protective actions outside the 10 mile EPZ as follows:
- a. Expand the evacuation area in 5 mile increments
- b. Utilize a 360 degree approach
- c. Expand the area such that EPA PAG's are not expected to be exceeded outside the recommended radius (e.g., If PAG's are expected to be reached at 17 mile radius, the PAR would include the 20 mile radius).
- c. Inform the NRC representative of any problems with the automated dose projection code.
- Insure the level of conservatism in the calculation is presented.
Name Time: Date Group Leader - Radiological & Environmental Controls 70
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 EXHIBIT 18 Page 1 of 2 Environmental Assessment Coordinator Checklist 1.0 Activate the Environmental Assessment Coordinator Position.
- a. Start an EAC log in accordance with EPIP-TMI-.05, "Communications and Record Keeping.
- b. Ensure that the Met/Dose Coordinator position is activated.
- c. Ensure the Emergency Information Network (EIN) Computer is activated.
- d. Establish communications with the RAC.
- e. Report the EAC and Met/Dose Coordinator positions as activated when asked by the Emergency Preparedness Representative.
2.0 Operations NOTE The following steps are not presented in the exact sequence that they are to be performed. It is likely that some steps will have to be performed out of the sequence listed and that some steps will be performed concurrently. Steps that are not applicable for the present situation may be skipped. Other steps may need to be repeated. This exhibit should be referred to periodically to ensure that necessary actions are not missed.
- a. Keep the Group Leader R & EC and the RAC informed on the status of the following:
0 Field Team measurements
- Reuter Stokes readings 0 Meteorological data
- Plume Travel NOTE The items listed under "a" above are met if EIN is active and displaying proper data.
- Weather forecasts
- Environmental Monitoring sample results (if available)
- Other pertinent information 71
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 EXHIBIT 18 Page 2 of 2
- b. Interpret field team data.
- Ensure field team data is entered in the EIN (Onsite/Offsite Teams).
- Compare field team data to projections.
- Report results of comparison to the Group Leader R & EC and, as appropriate, to the RAC.
- c. Evaluate Reuter Stokes information.
- Compare Reuter Stoke information to field team data.
- Report results of comparison to the Group Leader R & EC and, as appropriate, to the RAC.
- d. Ensure weather forecast information is provided to the Group Leader R & EC and to the RAC.
NOTE Be especially sensitive to changes in dispersion at dusk and dawn.
- e. If problems are encountered with the telephones, contact the EOF Communications Coordinator.
- f. As additional personnel are available assign them to the following positions, as needed to help fulfill EAC responsibilities.
- Field Team Coordinator 0 Dose Projection Computer Operator
- Radio Communicator
- RAC Communicator
- g. Forward the completed checklist and all other pertinent documentation to the Emergency Preparedness Representative at the end of the event.
Name Time: Date Environmental Assessment Coordinator 72
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 EXHIBIT 18A Page 1 of 3 Met/Dose Coordinator 1.0 Activate the Met/Dose Coordinator position.
- a. Start a log in accordance with EPIP-TMI-.05, "Communications and Record Keeping"
- b. Energize the following, if not already done.
- EACC Computers
- EACC Printers
- EACC radio
- i. Perform radio check
- c. Deploy Field Monitoring Teams 0 Make team assignments.
0 If EOF access control has been established, inform the access center coordinator that there will be more than one access area open while field monitoring teams are being dispatched.
- Instruct the field monitoring teams to ensure that there is no unauthorized entry.
- i. Instruct the teams to secure the door upon their departure.
ii. Instruct them to inform you upon departure.
0 Instruct the team to perform field monitoring per EPIP-TMI-.1 0, "Onsite/Offsite Radiological/Environmental Monitoring".
- d. Access the Emergency Information Network (EIN).
- If the LAN connection is unavailable the EIN data will not be available and functions of the Reuter/Stokes, Midas, and the meteorology will have to be obtained by alternate means.
- e. Obtain present meteorological parameters.
- f. Report to the EAC that the Met/Dose Coordinator position is activated.
73
Number TMI - Unit I Emergency Plan Implementing Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 EXHIBIT 18A Page 2 of 3 2.0 Operations NOTE The following steps are not presented in the exact sequencie that they are to be performed. It is likely that some steps will have to be performed out of the sequence listed and that some steps will be performe .d concurrently. Steps that are not applicable for the present Esituation may be skipped. Other steps may need to be repeated. This exhibit should be referred to periodically to ensure that necessary actions are not missed.
- a. Obtain a current weather forecast by any of the following means:
From a meteorologist, if available Obtain a weather forecast if the meteorologist can provide one over the ii. telephone.
Ask the meteorologist to report to the EACC.
From National Weather Service information found on the LAN or the Internet.
From the National Weather Service directly using the telephone numbers found in EPIP-TMI-.06.
- b. Direct the Field Monitoring Efforts I When the EAC and MET/Dose Coordinator positions are activated and the field monitoring teams are operational, inform the RAC that the EACC is ready to assume responsibility for radiological and environmental monitoring.
- i. Request the RAC inform the ED assistant that the EACC is operational.
ii. Provide the following message to Field Monitoring Teams.
ATTENTION FIELD MONITORING PERSONNEL. THE ENVIRONMENTAL ASSESSMENT COMMAND CENTER IS ACTIVATED AND WILL ASSUME RESPONSIBILITY FOR ALL RADIOLOGICAL AND ENVIRONMENTAL MONITORING AS OF _ ALL TEAMS RESPOND BY CONFIRMING THIS MESSAGE.
(Time) 0 Use MIDAS plume plots and meteorological data to properly position the teams for monitoring duties while keeping their doses ALARA.
- i. Provide redundant tracking of field team accumulated doses, after field teams reports accumulate 500 mRem of thyroid dose.
74
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 EXHIBIT 18A Page 3 of 3
- Direct the Field Teams to perform monitoring activities such as but not limited to:
- i. Scan to find plume center line ii. Perform dose rate surveys iii. Obtain air samples
- Interpret field team data.
L. Ensure field team data is entered in the EIN.
ii. Compare field team data to that projected by MIDAS and the RAC dose codes.
iii. Report results of comparison to the EAC and, as appropriate, to the RAC.
- c. Based on the forecast data meteorological parameters used by the dose projection system are reasonable.
- d. Edit the MIDAS plume plots as necessary.
- e. Keep the EAC informed of changes in the meteorology.
- Verify that the meteorological information appears to be accurate (e.g., the data is not remaining exactly the same over an extended time [30 - 45 minutes], it seems consistent with forecast information).
- f. Using weather forecasts, obtained in Step 2.1, relay the expected trend in dispersion factors and wind direction.
NOTE Be especially sensitive to changes in dispersion at dusk and dawn.
- g. Enter data on the EIN
- As time permits, enter field team data (Onsite & Offsite)
- i. Field team data is collected using Exhibit 18B.
- Evaluate the data for consistency.
- h. Forward the completed checklist and all other pertinent documentation to the Emergency Preparedness Representative at the end of the event.
Name Time: Date Met/Dose Coordinator 75
Number TMI - Unit 1 Emergency Plan Implementinci Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 EXHIBIT 18B Page 1 of 1 Field Team Designation: Date:
Open Window E520 Location Time (mR/hr) Average Closed Window E520 (mR/hr) or Frisker (cpm)
Air Sampler Time Sample Type Net CPM Run Time Flow Time Iodine Particulate Smear Noble Gas Field Team Designation: Date:
Open Window E520 Location Time ] (mR/hr) Average Closed Window E520 (mR/hr) or Frisker (cpm)
Air Sampler Time Sample Type Net CPM Run Time Flow Time Iodine Particulate Smear Noble Gas 76
Number TMI - Unit I Emergency Plan Implementing Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 EXHIBIT 19 Page 1 of 1 RAC Line Communicator I. ACTIVATION 1.0 Activate the RAC Line Communicator Position.
- a. Turn on the Group Leader Radiological and Environment Controls computer and access the Emergency Information Network, if not already completed.
- b. Establish communications with the RAC by manning the Radiological Line.
0 Dial "22" on the ML-8000 System.
- c. Establish a Telephone Communications Logsheet in accordance with EPIP-TMI-.05,
"=Communications and Record Keeping".
- d. Report your status as activated when asked by the Emergency Preparedness Representative.
II. RAC LINE COMMUNICATOR OPERATIONAL CHECKLIST 2.0 Assist the Group Leader Radiological and Environmental Controls as necessary.
- a. Forward the completed checklist and all logs to the Emergency Preparedness Representative at the end of the event.
Name Time: Date RAC Line Communicator 77
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 EXHIBIT 20 Page 1 of 3 Group Leader Admin Support I. ACTIVATION Initial 1.0 Activate the Group Leader Admin Support Function
- a. Begin the Group Leader - Administrative Support Log in accordance with EPIP-TMI-.05, "Communications and Record Keeping".
- b. Report your status as activated to the Emergency Preparedness Representative.
I1. GROUP LEADER - ADMIN SUPPORT OPERATIONAL CHECKLIST NOTE The following steps are not presented in the exact sequence that they are to be performed. It is likely that some steps will have to be performed out of the sequence listed and that some steps will be performed concurrently. Steps that are not applicable for the present situation may be skipped. Other steps may need to be repeated. This exhibit should be referred to periodically to ensure that necessary actions are not missed.
2.0 Implement EOF Access Control in accordance with Exhibit 6.
- a. If an individual is not available to implement Exhibit 6, proceed as follows:
- Insure the door is locked.
- Display a sign stating "Ring doorbell for facility access".
2.1 Determine, as necessary, where the following services can be performed or obtained.
- a. General Administration
- Word processing
- Typing pool
- Reproduction
- b. Transportation Helicopter services (Refer to EPIP-TMI-.06)
- Vans
- Buses
- Automobiles
- Shuttle service 78
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27
- Title Revision No.
Emergency Operations Facility 16 EXHIBIT 20 Page 2 of 3
- c. Personnel Administration and Accommodations Personnel processing i) Registration ii) Indoctrination iii) Training iv) Security badging
- Lodging
- Food
- d. Outside Plant Support
- Trailer setup
- Janitorial Service
- Telephones
- e. If problems are encountered with the telephones, contact the EOF Communications Coordinator.
- f. Process personnel requiring site access by implementing Exhibit 7, "TMI Access Authorization".
Ensure a Radiological Support Technician is called out to activate the dosimetry issue function at the EOF.
- h. Using Exhibit 21, develop a watch-bill for the Emergency Support Organization that will support the emergency on a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> / day basis.
Determine from the ESD when he wants the first shift change to occur.
The time should be far enough in the future to give backup duty roster members time enough to get some rest before filling the second shift.
Use a 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shift rotation.
Determine from each watch station the person that is presently filling that duty roster position.
List the person in the first shift position on Exhibit 21.
Determine alternate duty roster members.
- i. Identify backup duty roster members already at the EOF.
79
Number TMI - Unit 1 Emergency Plan Imnlp~mpntinn fl~nrnmpnt FPIP-TMI.-27 Title Revision No.
Emergency Operations Facility 16 EXHIBIT 20 Page 3 of 3 ii. Using the Emergency Support Organization Duty Roster and telephone listings from the glass case next to the nametag bulletin board, call other duty roster members to determine their availability.
Fill in the second shift using the available backup duty roster members.
Pass out copies of each group's watch-bill to that group.
Have the ESD announce when the shift rotation will occur.
Call out additional personnel as required.
2.2 Contact the Emergency Director Assistant to obtain the status of Protected Area Accountability and Site Evacuation.
- a. Inform the ESD of the status.
- b. If informed by the Emergency Assembly Area Coordinator that the EOF will be used as the Remote Assembly Area.
- Prepare the EOF to receive site evacuees in accordance with Exhibit 22.
2.3 Attend ESD conferences and be prepared to discuss information concerning the following:
- NRC Incident Response Team
- Status of Accountability
- Status of Site Evacuation i) Monitoring status ii) Decontamination status
- Other Agencies
- Logistical information 2.4 Forward the completed checklist and all logs to the Emergency Preparedness Representative at the end of the event.
Name Time: Date Group Leader - Admin Support 80
Number TMI - Unit 1 Emergency Plan lmplementina Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 EXHIBIT 21 Page 1 of 1 Emergency Shift Schedule DATE:
GROUP:
Shift 1 Start hours End hours Shift 2 Start hours End hours List duty roster positions for your group including phone talkers/communicators being used.
Position # - Name - Name Home Phone Number Work Phone Number Beeper Number Position # - Name - Name Home Phone Number Work Phone Number Beeper Number Position # - Name - Name Home Phone Number Work Phone Number Beeper Number Position # - Name - Name Home Phone Number Work Phone Number Beeper Number Position # - Name - Name Home Phone Number Work Phone Number Beeper Number Position # - Name - Name Home Phone Number Work Phone Number Beeper Number Position # - Name - Name Home Phone Number Work Phone Number Beeper Number 81
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 EXHIBIT 22 Page 1 of 2 EOF Set Up for Personnel Monitoring and Decon NOTE These steps may be performed concurrently.
1.0 Obtain the signs from the decon locker and post them as follows (see Exhibit 9 of EPIP-TMI-.36):
Post a magnetic "TMI Site Evacuees Enter Here" sign on the outside of the door to the sample storage area.
Post a "Clean Personnel Exit - No Entry" sign outside the small roll-updoor to the sample storage area.
Post 2 "TMI Site Evacuees Use Garage Entrance" signs on orange safety cones and place them at the EOF gate.
Post a magnetic "Clean Personnel Exit - No Entry" sign outside the door at the front of the EOF near the NRC Conference Room.
2.0 Set up a frisking area in the sample storage areas as indicated on Exhibit 9 of EPIP-TMI-.36.
3.0 Erect radiological barriers as shown on Exhibit 9 of EPIP-TMI-.36.
4.0 Take the following personnel decon supplies from the decon locker to the men's room.
- Paper towels
- Waterless hand cleaner
- Wash basin
- Bath soap
- Shampoo
- Scrub Brushes
- Nail Clippers
- Barber scissors
- Nasal swabs
- Disposable PC's
- Masking tape
- Poly bags
- Frisker
- Step off pad
- Procedure 661 0-ADM-4330.02 82
\,
(
EPIP-TMI-.27 Revision 16 EXHIBIT 22 Page 2 of 2 83
Number TMI- Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 EXHIBIT 23 Page 1 of 2 EOF Communications Coordinator
- 1. ACTIVATION 1.0 Activate the EOF Communications Coordinator position.
- a. Synchronize the EOF clock, Admin Room clock and the ESD conference room clock with the Control Room clock.
0 Dial 8070 (2070 for drills) and ask the ED Assistant for the Control Room clock time.
- b. Activate the Rayland Public Address System Depress the black power button.
Ensure the red power indicator light is solid red.
Test the PA system by depressing the red signal button located on the = microphone. An alert tone should be heard. (Note: If the red power light or PA test does not work, verify the unit is plugged in.)
_ c. Report your status as activated when asked by the Emergency Preparedness Representative.
- 11. EOF Communications Coordinator Operational Checklist.
NOTE The following steps are not presented in the exact sequence that they are to be performed. It is likely that some steps will have to be performed out of the sequence listed and that some steps will be performed concurrently. Steps that are not applicable for the present situation may be skipped. Other steps may need to be repeated. This exhibit should be referred to periodically to ensure that necessary actions are not missed.
2.0 Maintain an EOF Status Board with the following information, as a minimum, using the overhead projector in the front of the room.
- Time when EOF is activated
- Emergency Classification Level
- Major changes in plant status
- a. Call in additional personnel if requested to do so by the Emergency Preparedness Representative.
Obtain the positions that need to be filled from the Emergency Preparedness Representative.
Use the Emergency Support Organization Duty Roster and telephone listings from the notebook at the communications table.
84
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility 16 EXHIBIT 23 Page 2 of 2
- b. If the ESD informs you that he has assumed the responsibility for "approving and directing official notifications to off-site agencies", perform the following:
Contact the ECC Communications Coordinator in the Shift Managers Office (ECC) to receive a turnover.
Use EPIP-TMI-.06, Additional Assistance and Notification to obtain phone numbers.
Make notifications to offsite agencies in accordance with Exhibit 24, Offsite Notifications, using the message designated and approved by the ESD.
- c. Coordinate the procurement of outside resources (e.g., Technical assistance, manpower, equipment, etc.) with the Group Leader Admin Support.
If requested to procure an outside resource, contact the Group Leader Admin Support for assistance.
- d. If problems are encountered with the Emergency Telephones Contact the ECC Communications Coordinator in the Shift Manager's Office (ECC).
- i. Use EPIP-TMI-.06, Additional Assistance and Notification, to obtain phone numbers.
- Provide the name of the telephone circuit and a brief description of the problem.
2.1 Forward the completed checklist and any other documentation to the Emergency Preparedness Representative at the end of the event.
Name Time: Date EOF Communications Coordinator 85
/
( (
EPIP-TMI-.27 4 Revision 16 EXHIBIT 24 Page 1 of 4 Off Site Notification Checklist Initial in the box following the action for the level of emergency declared, unless a check is requested.
UNUSA SITE AREA GENERAL CLSOU ATIO N.....
...... -- ... EVENT ALERT EMERGENCY EMERGENCY EMERGENCY Obtain an Emergency Report Form, Part 1 and 2, from the Emergency Support Director Perform 15 minute notifications -
Confirm Dial tone on Notification line Dial "91" As the agencies answer, state, "This is Three Mile Island Nuclear Station. Stand by for an emergency message."
Ask if each agency is on the line. PEMA PEMA PEMA PEMA PEMA
[PEMA, are you on the line? Dauphin County?, etc.] Dauphin Dauphin Dauphin Dauphin Dauphin Check when on line Cumberland Cumberland Cumberland Cumberland Cumberland Lancaster Lancaster Lancaster Lancaster Lancaster Lebanon Lebanon Lebanon Lebanon Lebanon York York York York York Cancel the ring tone by flashing the hook switch twice.
If one or more agencies do not answer promptly, get another person, such as the EP Representative, to perform a parallel notification using any telephone with an out side connection.
Direct this person to log the Name/Dispatcher Number of the person contacted and the Time the notification was completed.
State, "Please stay on the line after the following message to provide a name or dispatcher number and to confirm receipt."
Read Emergency Report Form, Part 1 RECORD TIME Notification completed 86
K' {
EPIP-TMI-.27 Revision 16 EXHIBIT 24 Page 2 of 4
- UNUSUAL SITE AREA GENERAL CLOSE OUT ACTiON* EVENT ALERT EMERGENCY EMERGENCY EMERGENCY Request receipt confirmation.
(NAME or DISPATCHER number)
PEMA Dauphin Cumberland Lancaster Lebanon York Flash the hook switch until a dial tone is heard before hanging up.
If not already notified in parallel by another person, Notify remaining agencies that did not receive the information by pre-set conference call.
Log receipt confirmation by recording name/dispatcher number and time.
PEMA Time Dauphin Time Cumberland Time Lancaster Time Lebanon Time York Time 87
K K'
( EPIP-TMI-.27 Revision 16 EXHIBIT 24 Page 3 of 4
- i***IiO;N A CT
- !; ! ::*:iii:*~~
i:iiiiii:*:**:*: i:*~~*iiiiiili
- !ii; i * ............. .**ii**
- *::**:ii~*::*:iii:!!::!*:*!:*:i::?*:*:!;:*:i:*::*:? :!i:!:: UNUSUAL i* :*:i:::::::::::::::::::::
IF:UI:NT T IFMFRGFINCY k.IMRiGNCY"L
.,I'4lVL
-.
II EMLEOR LLJ
-'MERGENCY IEMERGENCY
'JU I GJU I ii ACTION Contact the NRC Senior Resident Inspector Call Wayne Schmidt Site Telephone 9-948-1165 Or Ext. 8253 1-nmA Te~lenhone 9-687-8627 Read Emergency Report Form, Part 2 Record Time contacted If unable to contact the Senior Resident Inspector ntalc Call the Senior Resident Inspector pager by dialing 9-1-800-398-7853 After hearing three beeps, dial the call back number you want the inspector to call.
When the inspector calls back, read Emergency Report Form, Part 2.
If the Senior Resident Inspector does not call back within 15 minutes, page the Resident Inspector, by dialing 9-1-800-398-8135 After hearing three beeps, dial the call back number you want the inspector to call.
When the inspector calls back, read Emergency R E eReport Form, 2.Part If the Resident Inspector does not call back within 15 minutes, record the time as
'NOT CONTACTED' Contact the York Haven Power Station **
Dial 9-848-7277 or 9-266-3654 Read EegnyRprt Form, Part 2 Record the following for the person contacted Name Time 88
(
(
( EPIP-TMI-.27 Revision 16 EXHIBIT 24 Page 4 of 4 I UNUSUAL ALERT SITE AREA I GENERAL I CLOSE OUT IEVENT ZIA:=IPr-1=KICV I=FM1=0rtr* f" V I FMFR(nFNJCY ACTION Contact the GPU Energy System Dispatcher Dial 9-1-610-375-5421 I
- 4 t Read Emeroencv Report R,
Form. Part 2 "ReadI I I Record the following for the person contacted Name Time Contact ANI at 1(860) 561-3433 Read Emergency Report Form, Part 2 Provide call back number (717)
(Insert number)
Point of Contact is Emergency Support Director Assistant Inform the Emergency Support Director Assistant when all contacts have I been comDleted. I EVENT TERMINATION notifications NRC Inspector, contacted above.
Name Time York Haven Power Station, contacted above.
Name Time System Dispatcher, contacted above.
Name Time Forward this CHECKLIST and ALL associated documentation to the Emeruencv Preparedness Representative 89