ML033240363

From kanterella
Jump to navigation Jump to search

Emergency Plan Implementing Procedure - EPIP.TMI-.06, Rev 43 Cancelled
ML033240363
Person / Time
Site: Crane 
(DPR-050)
Issue date: 11/03/2003
From:
AmerGen Energy Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML033240363 (2)


Text

I t

=

  • Central File
  • Control Rm-U/Il
vop.

OOB-1

  • Doeument Control Des)k, ULIbl
  • EP Mgr, NOB-2.
  • NRC - Onsite, Service Bldg.
  • NRC - Region 1, (Chief EP Section)
  • Simulator Rm/File Copy
  • TSC, NOB-2
  • Training Dept. Library, Tmg
  • OSC. Rad Field Ops..

Record Box, SOB + History Package

  • Also receives index which is typed by Word Processing for rev 0, cancelled procedures or procedure title changes.

D. Marshbank M. Mixon

-NRC-B. Brady P. Sauder N. McNammara IWON B. Brady C. Flory T. Berstler S. Zimmerman INFO Plain Plain CTRL Copy 1

1 2

1 1

1 1

CoPY EPIP Instruction Memo C

l3;;; L.

Date Ulo ei:

Box No.

3Z0031 TI C-lZ Please update your file with the attached listed below, destroy the superseded/cancelled document(s). Alsots please sign the acknowledgment at the bottom of this memo and return to Debbie Marshbank, Rm. 135, SOB TMI.

TC Page I/PROC Document Number Rev NUMBER Reolac. Entire Cid ADDITIONAL DISTRIBUTION:

Level 1 3H C 3H Please notify Records Mgmt. of any name or address changes immediately.

I hereby acknowledge receipt of this memo and have complied with the Instructions.

Signature Procedure Distribution:

Date Info Copy _

Stapled, 3 Hole Punch Memo Distribution:

3rqjo{

I I Copies Ctrl Copy Stapled, 3 Hole Punch Plain Copy 2 Stapled (Central File & Record Box)

TC Distribution:

Plain Copies Stapled, 3-hole punch Plain Copy Stapled, 3-hole punch for Central File (if TC is original) 04/08103

Emergency Plan

-implementing Document Admin. Procedures 2

-Procedure No.

Title EPIP-TMI-.16 EPIP-TMI-.19 Contaminated Injuries Emergency Dosimetry/Security Badge Issuance Page 1 of 1