  • Backup TSC,NOB-3
  • Bureau of Rad Protection
  • Control Rm-U/1 File Copy. OOB-I Control Rm-TJ/l Shift Mrrs Station. OOB
  • Control Rm-U/1 Work CoDv. OOB-1 Coatesville EOF, Kennett Square
  • Document Center, NOB-2
  • Document Control Desk,-Label--'

Dosimetry, Serv. Bldg EACC

  • EP - NDB, Trng. Bldg. #2
  • Emerg. Prep. Dept.
  • EOF EOF Communicator, Trng. Bldg.

EOF (PEMA Area), Trng Bldg.

  • EP Drills, Trng Bldg.

EP Rep ESD, Trng. Bldg.

ESD Asst.

Environ. Affairs-TMI, NOB-I GLRE&C Kennett EOF, Kennet Square Logisitcal Support, Trng. Bldg..

  • NRC - Onsite, Service Bldg.
  • NRC-Region 1, (Chief EP Section)
  • PEMA - Bureau of Plans PI Rep PersonnnellVehicle Monitor Kit Tme Ctr.
  • Plant Maint (Library), Serv. Bldg RLM, Rad Field Ops Pan Con -P AC lToeker Rad Field O3ns.

Rad Con -Kit 1 PC. Rad Field Ons Rad Con -Kit 2 PC. Rad Field Ops.

Rad Con-Kit 3 EOF Bldg Rad Field Ops Rad Con-Kit 4 EOF Bldg Rad Field Ops.

Rad Con-Kit 5 EOF Bldg Rad Field Ops Rad Con-Simulator Locker.Rad Field Ops

  • Rad Engineers-U1, OOB
  • Rad Instrument, Bldg. 159 Secondary Chem Lab-. OOB-1
  • Security Mgr., PC Secunty U-I, PC
  • Simulator Room/File Copy, Tmg Simulator Room/Shift Supvs Office, Tmg
  • Simulator Room/Working Copy, Trng.

Tech Support Rep

  • TSC - Unit 1, NOB-3
  • Training Dept Library, Trng
  • OSC, Rad Field Ops.

Record Box, SOB + History Package r

I TII S. Zimmerman Control Rm-U/1 Shift Mgrs Station OOB Plain Copv EPIP/TEP Instruction Memo Verif: (2.QBox No.

_Ti I&

T2 B. Siebler M. Vyenielo S. Van Ormer S. Van Ormer S. Van Ormer R. Rogers IKON

  • NRC*

D. College N. D. Brown N. D. Brown D. Light IKON N. D. Brown N. D. Brown N. D. Brown N. D. Brown N. D. Brown N. D. Brown W. Ressler N. D. Brown R. Rogers N. D. Brown P. Sauder N. McNama D. Fleck N. D Brown T. Berstler J. Eckroth T. Berstler T. Berstler T Berstler T. Berstler T. Berstler T. Berstler T. Berstler T. Berstler T. Griffith T. Griffith S. Van Ormer M. Bruecks M. Bruecks IKON IKON IKON N D. Brown B. Siebler C. Flory T. Berstler INFO nI__

CTR__L 1_

_21

_!1 1_

1 1_

1_

1 1

1 1.!

1_

1_

1_

_21 TC Page Rev NUMBER Replac.

2X1 Entire ADDITIONAL DISTRIBUTION:

TCIPROC Cid Level

-7 I 3H C 3H I hereby acknowledge receipt of this memo'and have complied with the instructions.

required ONLY if CONTROLLED.

Procedure Distribution:

Info Copy A Stapled, 3 Hole Punch Ctrl Copy 013 Stapled, 3 Hole Punch Signature and returned memo Date Memo Distribution:

I Copies Plain Copy.2 Stapled (Central File & Record Box)

TC Distribution:

___ Plain Copies Stapled, 3-hole punch

-Plain Copy Stapled, 3-hole punch for Central File (if TC is original) i ______

j ___

05/14/02 Date Vf1-Please update your file with the attached listed below, destroy the superseded/cancelled document(s). Also, if Controlled Documents please sign the acknowledgment at the bottom of this memo and return to Debbie Marshbank, Configuration Cntrl., Rm. 135, SOB Document Number

.Z:P-JTm7--.Y Ra Con..

-R.C..

o..

e....

F. el.....

.r-

FOR INFORMATION ONLY TMI Emergency Plan ImDlementing Procedure Number AmerGen Title Revision No Activation of the Technical Support Center 13 Applicability/Scope USAGE LEVEL Effective Date TMI Division 1

08128102 This document is within QA plan scope JX Yes L

No 50.59 ApplicableI X IYes L No List of Effective Pages Revision Page Revision Page Revision Pac~ e Revision 13 13 13 13 13 13 13 13 13 13 13 1

EPIP-TMI-.28 Pacie 1

2 3

4 5

6 7

8 9

10 11

TMI Emergency Plan Implementina Procedure Number EPIP-TMI-.28 Title Revision No Activation of the Technical Support Center 13 1.0 PURPOSE The purpose of this Procedure is to provide guidelines for the Technical Support Center (TSC) personnel to activate the TSC (Elev. 355', Control Tower) and/or backup TSC (Elev. 322', Control Tower).

2.0 APPLICABILITYISCOPE

a.

This procedure is to be initiated upon declaration of any of the following:

Alert Site Area Emergenci General Emergency As directed by the Emergency Director As needed by Engineering 3.0 DEFINITIONS None 4.0 RESPONSIBILITIES The Technical Support Center Coordinator is responsible for activating the TSC.

5.0 PROCEDURE NOTE The following steps are provided in an order likely to result in the most efficient response However, due to the dynamic and unpredictable nature of emergencies associated with a nuclear power facility, the order of performing the steps may be modified to cope with existing conditions.

Modifying the specific order of performance of these steps will have no adverse consequences.

a.

The Technical Support Center Coordinator shall ensure all applicable steps of Exhibit 1 are completed.

Based on observations of plant data, make recommendations to the ECC that will aid in plant control and minimize any releases of radioactive material.

a)

Use "TSC Engineering Calculations Guide" as needed to assist in developing recommendations Provide informationlassistance to emergency repair teams as requested by the OSC.

b.

The Engineering Line Communicator shall ensure all applicable steps of Exhibit 2 are completed.

2

TMI Emergency Plan Number Implementing Procedure EPIP-TMI-.28 Title Revision No Activation of the Technical Support Center 13 3

c.

The Technical Support Center Data Collection and Analysis personnel shall ensure the applicable steps of Exhibit 3 are completed.

d.

At the completion of the event (or other use of the TSC), the TSC Coordinator shall notify the Manager, System Engineering or designee to perform an inventory in accordance with TEP-ADM-1 300.01 by the end of the working day following the end of the event.

6.0 REFERENCES

a.

EPIP-TMI-.05, Communications and Record Keeping

b.

TSC Engineering Calculations Guide 7.0 EXHIBITS

1.

Exhibit 1, Technical Support Center Coordinator's Checklist

2.

Exhibit 2, Engineering Line Communicator Checklist

3.

Exhibit 3, Technical Support Center Data Collection and Analysis Checklist

4.

Exhibit 4, Back-up TSC Activation Instructions

TMI Emergency Plan Number Implementing Procedure EPIP-TMI-.28 Title Revision No.

Activation of the Technical Support Center 13 EXHIBIT 1 Page 1 of 2 NOTE Steps not currently applicable or not required should be left blank in case those steps become applicable as the emergency evolves.

Technical Support Center Coordinator's Checklist WHEN the minimum staffing is present, record names as follows:

Engineer 1 Engineer 2 Engineer 3 Engineer 4 TSC Coordinator IF anyone reporting for duty is suspected of NOT being Fit for Duty.

THEN inform the Emergency Director Assistant that the TSC is operational, using the Operations Line, or equivalent THEN contact Security to perform Fitness for Duty Testing.

If desired, assign a phone talker to the Operations Line to log emergency related communications sent to and received by the TSC using the copies of the Telephone Communication Log Sheet (Exhibit 2 of EPIP-TMI-.05, Communications and Record Keeping).

4 NOTE The following steps are provided in an order likely to result in the most efficient response. However, due to the dynamic and unpredictable nature of emergencies associated with a nuclear power facility, the order of performing the steps may be modified to cope with existing conditions.

Modifying the specific order of performance of these steps will have no adverse consequences.

a.
b.

C.

NOTE

1. One person in the TSC SHALL be qualified as a Severe Accident Management Evaluator.
2.

Additionally, one of the four (4) TSC engineers SHALL be qualified to perform Core Damage Assessment. Typically a Nuclear or Chemistry engineer meets this criterion.

NOTE In minimum staffing situations, collateral assignments may include:

Operations Line Phone Talker Engineering Line Phone Talker Major Equipment and Plant Status Board Maintenance Plant Process Computer Accesser.

I I

Number TMI Emergency Plan ImDlementina Procedure EPIP-TMI-.28 Title Revision No.

Activation of the Technical Support Center 13 5

EXHIBIT I Page 2 of 2

d.

If desired, assign a phone talker to the Engineering Line to log emergency related communications sent to and received by the TSC using the copies of the Telephone Communication Log Sheet (Exhibit 2 of EPIP-TMI-.05, Communications and Record Keeping).

e.

If necessary, assign an individual to access the Plant Process Computer in accordance with Exhibit 3, Technical Support Center Data Collection and Analysis Checklist

f.

If necessary, assign an individual to be responsible for maintaining the status boards.

g.

IF evacuation of the TSC is required THEN relocate to the Back-up TSC, in accordance with Exhibit 4.

h.

WHEN Protected Area Accountability is required (e.g., at the declaration of a Site Area Emergency or General Emergency or when ordered by the Emergency Director) perform the following:

Announce to all TSC personnel that Protected Area Accountability has been ordered.

Assign someone to collect the key cards of ALL TSC personnel and process them at the Accountability Card Reader in the Control Room.

a)

Place each key card against the face of the Accountability Card Reader. The GREEN light will flash to acknowledge accountability. If a RED light flashes notify Security at extension 8039 and provide the number of the key card causing the problem.

TMI Emergency Plan Irnnlementina Procedure Number Title Revision No Activation of the Technical Support Center 13 EXHIBIT 2 Page 1 of 2 NOTE Steps not currently applicable or not required should be left blank in case those steps become applicable as the emergency evolves.

Engineering Line Communicator Checklist

1.

Establish and maintain communications with the ECC on the Engineering Line.

Log emergency related communications sent to and received by the TSC using copies of the Telephone Communication Log Sheet (Exhibit 2 of EPIP-TMI-.05, Communications and Record Keeping) located in the TSC.

2.

If requested by the TSC Coordinator contact Framatome (FANP) for a Site Area Emergency, General Emergency or at the discretion of the TSC Coordinator.

0 Contact (Brendon Brooks) a.

Framatome Supervisor Plant Operations Group Use a MERIDIAN telephone and dial one of the following numbers:

Work: 9-1-434-832-3219 or Home 9-1-434-384-6598 If unsuccessful use the "B & W" Phone" and dial 9-1-434-832-2874.

b.

Provide the following message, if appropriate:

This is calling from Three Mile Island.

(Name)

We have declared a

[A General Emergency 1 at hours.

IA Site Area Emergency I IAn Alert LAn Unusual Event

/

(Select One)

c.

Answer Framatome questions concerning the emergency using information from the status boards andlor PPC.

6 NOTE The following steps are provided in an order likely to result in the most efficient response. However, due to the dynamic and unpredictable nature of emergencies associated with a nuclear power facility, the order of performing the steps may be modified to cope with existing conditions.

Modifying the specific order of performance of these steps will have no adverse consequences.

I EPIP-TMI-.28

TMI Emergency Plan Number Implementing Procedure EPIP-TMI-.28 Title Revision No.

Activation of the Technical Support Center 13 EXHIBIT 2

3.

Ensure that the Engineering Line is established between the following, as appropriate:

ECC Technical Support Center EOF Technical Staff

4.

IF a telephone problem occurs, perform the following:

Page 2 of 2 Contact the ECC Communications Coordinator at extension 8778 and provide the following information:

a)

Name of person reporting the trouble.

b)

The location (facility) where the trouble is occurring.

c)

The name of the circuit in trouble.

(i.e., Operations Line) d)

A brief description of the trouble you are encountering.

5.

When the emergency is closed out, perform the following:

As applicable, notify Framatome (FANP)

Collect all applicable TSC documentation (i.e., logs, used procedures, computer printouts, etc).

a)

Send to the Emergency Preparedness Group, TMI Training Building 2.

Ensure that the TSC is returned to the proper readiness condition. An inventory of the TSC is required to be performed by the end of the working day following the end of the event. Notify the Manager, System Engineering or designee of the need to perform the inventory in accordance with TEP-ADM-1300.01.

7 NOTE All telephone trouble calls are to be reported to the ECC Communications Coordinator at the TMI-1 Control Room (ECC) The ECC Communications Coordinator is located in the Shift Managers Office.

Number TMI Emergency Plan Implementing Procedure EPIP-TMI-.28 Title Revision No.

Activation of the Technical Support Center 13 CAUTION Do not plug in the Laser Jet Printer.

Plug the following loads into the power strip as needed:

CPU for PPC/PC Monitor for PPCIPC HP Plotter OMNIMUX IBM Mainframe Modem Any other PC and Monitor Turn on the power strip and attached loads.

8 EXHIBIT3 Page 1 of 2 NOTE The following steps are provided in an order likely to result in the most efficient response. However, due to the dynamic and unpredictable nature of emergencies associated with a nuclear power facility, the order of performing the steps may be modified to cope with existing conditions.

Modifying the specific order of performance of these steps will have no adverse consequences.

Technical Support Center Data Collection and Analysis Checklist

1.

Use the "TSC Engineering Calculations Guide" as necessary to assist in developing recommendations.

2.

IF the Unit has experienced a Loss-of-Offsite-Power, proceed as follows; if not, proceed with Step 3:

Obtain a "French" style adapter plug from the ED/SM in the Control Room. The plugs are located in the left-hand cabinet of the Control Room Supervisor's desk.

Place the adapter plug in the receptacle in the Northwest corner of the TSC. This plug is fed from breaker #10 of ATB.

Remove all loads from the power strip under the PPC monitor desk and plug the power strip into the adapter plug.

Number TMI Emergency Plan ImDlementinq Procedure EPIP-TMI-.28 Title Revision No Activation of the Technical Support Center 13 EXHIBIT 3 Page 2 of 2

3.

Activate the computer terminal and commence performing accident assessment functions by monitoring present plant parameters and conducting trend analysis of key parameters.

4.

Notify the TSC Coordinator that the TSC Data Collection and Analysis functions are operational.

0 Inform the TSC Coordinator of any exceptions.

9

TMI Emergency Plan Imnlementina Procedure Number EPIP-TMI-.28 Title Revision No Activation of the Technical Support Center

__13 EXHIBIT 4 Page 1 of 2 NOTE Steps not currently applicable or not required should be left blank in case those steps become applicable as the emergency evolves.

Backup TSC Activation

1.

If the Unit has experienced a Loss-of-Offsite-Power, proceed as follows; if not, proceed with Step 2:

Obtain two (2) "French" style adapter plugs from the ED/SM in the Control Room. The plugs are located in the left-hand cabinet of the Control Room Supervisor's desk.

Place the adapter plug in the receptacle in the Southwest corner of the B/U TSC. These plugs are fed from breaker #14 of ATB.

Remove all loads from the power strip under the PPC monitor desk and plug the power strip into the adapter plug.

CAUTION Do not plug in the Laser Jet Printer.

Plug the following loads into the power strip as needed:

CPU for PPC/PC Monitor for PPC/PC a

HP Plotter OMNIMUX IBM Mainframe Modem Any other PC and Monitor 0

Turn on the power strip and attached loads.

10 NOTE The following steps are provided in an order likely to result in the most efficient response. However, due to the dynamic and unpredictable nature of emergencies associated with a nuclear power facility, the order of performing the steps may be modified to cope with existing conditions.

Modifying the specific order of performance of these steps will have no adverse consequences.

Number TMI Emergency Plan Implementinq Procedure EPIP-TMI-.28 Title Revision No.

Activation of the Technical Support Center 1

13 11 EXHIBIT 4 Page 2 of 2

2.

Actuate the Zetron (Radio) by selecting TSC (Position B) 2nd floor.

3.

Direct the Engineering Communicator to contact Framatome (FANP) in accordance with Exhibit 2, Engineerinq Line Communicator Checklist if requested on Exhibit 2.

4 Assign an individual to access the Plant Process Computer in accordance with Exhibit 3, Technical Support Center Data Collection and Analysis Checklist.

5.

When Protected Area Accountability is required, (i.e., at the declaration of a Site Area Emergency or General Emergency or when ordered by the Emergency Director) perform the following:

0 Announce to all TSC personnel that Protected Area Accountability has been ordered.

Direct TSC personnel to go to the Accountability Card Reader on the Northeast wall of the Back-up TSC to perform the accountability.

An individual may be assigned to collect all of the key cards and process them at the Accountability Card Reader.

0 Place each key card against the face of the Accountability Card Reader. The GREEN light will flash to acknowledge accountability. If a RED light flashes, notify Security at extension 8039 and provide the number of the key card causing the problem.

6.

When the emergency is closed out follow the instructions in Exhibit 2, Engineering Line Communicator Checklist, Step 5.