ML030970103
ML030970103 | |
Person / Time | |
---|---|
Site: | Three Mile Island |
Issue date: | 03/28/2003 |
From: | Marshbank D AmerGen Energy Co |
To: | Document Control Desk, Office of Nuclear Security and Incident Response |
References | |
Download: ML030970103 (12) | |
Text
INFO CTRL EPIP/TEP-ADM Instruction Memo
- Backup TSC,NOB-3 B. Siebler 1
- Bureau of Rad Protection Central File M. Vyenielo D. Marshbank Plain 1 Date 3 488 Verif: ( Lt Box No. _ TI T2 Copy
- Control Rm-U/I File Copy. OOB-I S. Van Ormer 1 Please update your file with the attached listed below, destroy the superseded/cancelled document(s). Also, if Control Rm - Shift Mgrs Office. OOB S. Van Ormer Controlled Documents please sign the acknowledgment at the bottom of this memo and return to Debbie
- Control Rm - CRS Workstation, OOB-l S. Van Ormer 1 Marshbank, Configuration Cntrl., Rm. 135, SOB Coatesville EOF, Kennett Square R. Rogers 1
- Document Center, NOB-2 IKON 1 TC Page TC/PROC
- Document Control Desk,-Label NRC -INo Document Number Rev NUMBER Replac. Entire Cid Level EACC, EOF IKON
- Emerg. Prep. Dept. D. Light 1 E P7/ P T - 301
- EP Drills, Trng. Bldg.
IKON R. Brady L1 ___ 07a4J& 6£4 EP Rep, EOF IKON ESD, EOF IKON ESD Asst., EOF IKON ADDITIONAL DISTRIBUTION:
Environ. Affairs-TMI, NOB-1 W. Ressler I 3H C 3H GLRE&C, EOF IKON I Kennett EOF, Kennet Square R. Rogers 1 Logisitcal Support, EOF IKON
- NRC - Onsite, Service Bldg.
- NRC - Region 1, (Chief EP Section)
P. Sauder N. McNama
_L1 2
- PEMA - Bureau of Plans D. Fleck 1 PI Rep, EOF IKON Personnnel/Vehicle Monitor Kit Trre Ctr. T. Berstler
- Plant Maint. (Library). Serv. Bldg. J. Eckroth 1 RLM. Rad Field Ops. T. Berstler Rad Con -RAC Locker. Rad Field Ops. T. Berstler Rad Con -Kit I PC. Rad Field Ops. T. Berstler Rad Con -Kit 2 PC. Rad Field Ops. T. Berstler I hereby acknowledge receipt of this memo and have complied with the instructions. Signature and returned memo Rad Con-Kit 3 EOF Bldg Rad Field Ops required ONLY if CONTROLLED.
T. Berstler Rad Con-Kit 4 EOF Bldg Rad Field Ops. T. Berstler Signature Date Rad Con-Kit 5 EOF Bldg Rad Field Ops. T. Berstler Rad Con-Simulator Locker.Rad Field Ops T. Berstler Procedure Distribution:
- Rad Engineers-Ul, OOB T. Griffith 1
- Rad Instrument, Bldg. 159 Secondary Chem Lab-. OOB-l T. Griffith S. Van Ormer 1.
Info Copy _ Stapled, 3 Hole Punch co DistributioZ>D
- Security Mgr., PC M. Bruecks Ctrl Copy _ Stapled, 3 Hole Punch 3s! Copies Security U-1, PC M. Bruecks
- Simulator Rmi/File Copy IKON 1 Simulator RPm - Shift Mgrs Office IKON Plain Copy -fstapled (Central File & Record Box) 1
Tech Support Rep 1
- TSC - Unit 1, NOB-3 B. Siebler 1 _ Plain Copies Stapled, 3-hole punch
- Training Dept. Library, Trng C. Flory 1
- OSC. Rad Field Ops.. T. Berstler Plain Copy Stapled, 3-hole punch for Central File (if TC is original)
Record Box, SOB + History Package S. Zimmerman Plain COpy 12/02/02
INFO CTRL EPIPTP-ADM Instruction Memo 90
- Backup TSC,NOB-3
- Bureau of Rad Protection B. Siebler M. Vyenielo 1
1 Date J Ma/3 Verif: 7, Box No. _ TI _ T2 _
Central File D. Marshbank Plain CopY
- Control Rm-U/I File ConY. OOB-l S. Van Ormer 1 Please update your file with the attached listed below, destroy the superseded/cancelled document(s). Also, if Control Rm - Shift Mgrs Office, OOB S. Van Ormer Controlled Documents please sign the acknowledgment at the bottom of this memo and return to Debbie
- Control Rm - CRS Workstation. OOB-1 S. Van Ormer Marshbank, Configuration Cntrl., Rm. 135, SOB Coatesville EOF, Kennett Square R. Rogers 1
- Document Center, NOB-2 IKON 1 TC Page TC/PROC
- Document Control Desk, Label NRC- _LL_ Document Number Rev NUMBER Replac. Entire Cid Level EACC, EOF IKON
- Emerg. Prep. Dept. D. Light 1 eP /FPa7,--. On3- oL(
- EP Drills, Tmg. Bldg. R. Brady -
EP Rep, EOF IKON ESD, EOF MON ESD Asst., EOF IKON ADDITIONAL DISTRIBUTION:
Environ. Affairs-TMI, NOB-I W. Ressler 1 311 C 311 GLRE&C, EOF MON Kennett EOF, Kennet Square R. Rogers 1 Logisitcal Support, EOF RKON
- NRC - Onsite, Service Bldg. P. Sauder 1 l*NRC - Region 1, (Chief EP Section) N. McNama 2
- PEMA - Bureau of Plans D. Fleck 1 PI Rep, EOF MON Personnnel/Vehicle Monitor Kit Trng Ctr. T. Berstler
- Plant Maint. (Library). Serv. Bldg. J. Eckroth 1 RLM. Rad Field Ops. T. Berstler Rad Con -RAC Locker, Rad Field Ops. T. Berstler Rad Con -Kit I PC. Rad Field Ops. T. Berstler I hereby acknowledge receipt of this memo and have complied with the Instructions. Signature and returned memo Rad Con -Kit 2 PC. Rad Field Ops. T. Berstler required ONLY if CONTROLLED.
Rad Con-Kit 3 EOF Bldg Rad Field Ons T. Berstler Rad Con-Kit 4 EOF Bldg Rad Field Ops. T. Berstler Signature Date Rad Con-Kit 5 EOF Bld%Rad Field Ops. T. Berstler Rad Con-Simulator Locker.Rad Field Ops T. Berstler Procedure Distribution:
- Rad Engineers-Ul, OOB T. Griffith 1
- Rad Instrument, Bldg. 159 T. Griffith 1 Info Copy _ Stapled, 3 Hole Punch Memo Costi Secondary Chem Lab-. OOB-I S. Van Ormer ____ Copies
- Security Mgr., PC M. Bruecks 1 Ctrl Copy _ Stapled, 3 Hole Punch Security U-l, PC M. Bruecks
- Simulator Rm/File Copy IKON 1 I Plain Copy *Stapled (Central File & Record Box)
Simulator Rm - Shift Mgrs Office IKON
Tech Support Rep IKON
- TSC - Unit 1, NOB-3 B. Siebler 1 _ Plain Copies Stapled, 3-hole punch
- Training Dept. Library, Trng C. Flory 1
- OSC. Rad Field Ops.. T. Berstler IOP Plain Copy Stapled, 3-hole punch for Central File (if TC is original)
Record Box, SOB + History Package S. Zimmerman Plain 12/02/02
- F INFO CTRL EPIP/TEP-ADM Instruction Memo V0
- Backup TSC,NOB-3 B. Siebler 1
- Bureau of Rad Protection Central File M. Vyenielo D. Marshbank Plain I Date dkAk-e3 Verif: L Box No. - TI T2 __
Copv
- Control Rm-U/I File CoDy. OOB-1 S. Van Ormer 1 Please update your file with the attached listed below, destroy the superseded/cancelled document(s). Also, if Control Rm - Shift Mjrs Office, OOB S. Van Ormer Controlled Documents please sign the acknowledgment at the bottom of this memo and return to Debbie
- Control Rm - CRS Workstation. OOB-1 S. Van Ormer 1 Marshbank, Configuration Cntrl., Rm. 135, SOB Coatesville EOF, Kennett Square R. Rogers 1
- Document Center, NOB-2 IKON I TC Page TC/PROC
- Document Control Desk, Label NRC 1 Document Number Rev NUMBER Replac. Entire Cid Level EACC, EOF IMON
- Emerg. Prep. Dept.
- EOF D. Light IKON 1
1 PPfj, 9'- -f7T- a 0* I:I A'ii EOF Communicator, EOF IKON =< - 554~~AS AVY -041Xt )
EOF (PEMA Area), EOF IKON 6Eds
- EP Drills, Trng. Bldg. R. Brady EP Rep, EOF IKON ESD, EOF IKON ESD Asst., EOF IKON ADDITIONAL DISTRIBUTION:
Environ. Affairs-TMI, NOB-I W. Ressler 1 3H C 3H GLRE&C, EOF IKON _
Kennett EOF, Kennet Square R. Rogers 1 Logisitcal Support, EOF IKON
- NRC - Onsite, Service Bldg. P. Sauder 1
- NRC - Region 1, (Chief EP Section) N. McNama 2 _ _
Personnnel/Vehicle Monitor Kit Trne Ctr. T. Berstler
- Plant Maint. (Library). Serv. Bldg. J. Eckroth 1 . _
RLM, Rad Field Ops. T. Berstler Rad Con -RAC Locker. Rad Field Ovs. T. Berstler T Rad Con -Kit I PC. Rad Field Ops. T. Berstler Rad Con -Kit 2 PC. Rad Field Ops. T. Berstler I hereby acknowledge receipt of this memo and have complied with the instructions. Signature and returned memo Rad Con-Kit 3 EOF Bldg Rad Field OIs T. Berstler required ONLY If CONTROLLED.
Rad Con-Kit 4 EOF Bldg Rad Field Ops. T. Berstler Signature Date Rad Con-Kit 5 EOF Bldg Rad Field Ops. T. Berstler Rad Con-Simulator Locker.Rad Field Ops T. Berstler Procedure Distribution:
- Rad Engineers-Ul, OO0 T. Griffith
- Rad Instrument, Bldg. 159 T. Griffith Info Copy _ Stapled, 3 Hole Punch *c a isriution:
Secondary Chem Lab-. OOB-I S. Van Ormer
- Security Mgr., PC M. Bruecks 1 Copies Security U-i, PC M. Bruecks Ctrl Copy _ Stapled, 3 Hole Punch
- Simulator Rm/File Copy IMON 1 Simulator Rm - Shift Mgrs Office IKON Plain Copy 7ZStapled (Central File & Record Box)
- Simulator Rm - CRS Workstation
+/-
IKON 1 Tech Support Rep IMON TC Distribution:
- TSC - Unit 1, NOB-3 B. Siebler 1
- Training Dept. Library, Trng C. Flory 1
_ Plain Copies Stapled, 3-hole punch
- OSC. Rad Field Ons.. T. Berstler 1 Record Box, SOB + History Package S. Zimmerman Plain _ Plain Copy Stapled, 3-hole punch for Central File (if TC is original)
Copy
_____ L J. II12 /02/02 9IA9IA
INFO CTRL hA _ AEPIP/TEP-ADM Instruction Memo 9o
- Backup TSC,NOB-3
- Bureau of Rad Protection Central File B. Siebler M. Vyenielo D. Marshbank Plain 1
1 CODY Date 0 "t7Aff iVerif: 0$ Box No. _ Tl _ T2 _
- Control Rm-U/I1 File Cons, OOB-l S. Van Ormer 1 Please update your file with the attached listed below, destroy the superseded/cancelled document(s). Also, if Control Rm - Shift Mprs Office. OOB S. Van Ormer _L Controlled Documents please sign the acknowledgment at the bottom of this memo and return to Debbie
- Control Rm - CRS Workstation, OOB-l S. Van Ormer Marshbank, Configuration Cntrl., Rm. 135, SOB Coatesville EOF, Kennett Square R. Rogers 1
- Document Center, NOB-2 IKON 1 TC Page TC/PROC
- Document Control Desk, Label NRC _ _Pl Document Number Rev NUMBER Replac. Entire Cid Level EACC, EOF IKON
- Emerg. Prep. Dept. D. Light tirwf- 2~2r.27 Jc-_
- EP Drills, Trng. Bldg. R. Brady N.4 EP Rep, EOF 2 IKON ESD, EOF IKON ESD Asst., EOF IKON ADDITIONAL DISTRIBUTION:
Environ. Affairs-TMI, NOB-I GLRE&C, EOF W. Ressler IKON
_ I 3H C 311 Kennett EOF, Kennet Square R. Rogers 1 Logisitcal Support, EOF IKON
- NRC - Onsite, Service Bldg.
- NRC - Region 1, (Chief EP Section)
P. Sauder N. McNama
- PEMA - Bureau of Plans D. Fleck 1 PI Rep, EOF IKON Personnnel/Vehicle Monitor Kit Tirn Ctr. T. Berstler
- Plant Maint. (Library). Serv. Bldg. J. Eckroth RLM. Rad Field Ops. T. Berstler Rad Con -RAC Locker. Rad Field Ops. T. Berstler _
Rad Con -Kit I PC. Rad Field Ops.
Rad Con -Kit 2 PC. Rad Field Ops.
T. Berstler T. Berstler 1 I hereby acknowledge receipt of this memo and have complied with the Instructions. Signature and returned memo required ONLY If CONTROLLED.
Rad Con-Kit 3 EOF Bldg Rad Field Ons T. Berstler 1 Rad Con-Kit 4 EOF Bldg Rad Field Ops. T. Berstler Signature Date Rad Con-Kit 5 EOF Bldg Rad Field Ops. T. Berstler Rad Con-Simulator Locker.Rad Field OPs T. Berstler Procedure Distribution:
- Rad Engineers-Ul, OOB T. Griffith 1
- Rad Instrument, Bldg. 159 T. Griffith Info Copy _ Stapled, 3 Hole Punch Memo Distriuin Secondary Chem Lab-. OOB-1 S. Van Ormer
- Security Mgr., PC M. Bruecks 1
Ctrl Copy - Stapled, 3 Hole Punch JL Copies Security U-i, PC M. Bruecks I
- Simulator Rm/File Copy IKON IKON Plain Copy -/ Stapled (Central File & Record Box)
Simulator Rm - Shift Mgrs Office 1
Tech Support Rep IKON
- TSC - Unit 1, NOB-3 B. Siebler 1
_ Plain Copies Stapled, 3-hole punch
- Training Dept. Library, Trng C. Flory
- OSC. Rad Field Oys.. T. Berstler Plain Copy Stapled, 3-hole punch for Central File (if TC is original)
Record Box, SOB + History Package S. Zimmerman Plain CoDY 12/02/02
I INFO CTRL EPIP/TEP-ADM Instruction Memo 7a
- Backup TSC,NOB-3
- Bureau of Rad Protection Central File B. Siebler M. Vyenielo D. Marshbank Plain 1
1 Copy Date 0 A hO Verif: ( Box No. _ TI T2 _
- Control Rm-U/I File Copy, OOB-1 S. Van Ormer 1 Please update your file with the attached listed below, destroy the superseded/cancelled document(s). Also, if Control Rm - Shift Mgrs Office, OOB S. Van Ormer Controlled Documents please sign the acknowledgment at the bottom of this memo and return to Debbie
- Control Rm - CRS Workstation. OOB-i S. Van Ormer Marshbank, Configuration Cntrl., Rm. 135, SOB Coatesville EOF, Kennett Square R. Rogers 1
- Document Center, NOB-2 IKON 1 TC Page TC/PROC
- Document Control Desk, Label NRC 1-la Document Number Rev NUMBER Replac. Entire CId Level EACC, EOF
- Emerg. Prep. Dept.
IKON -T D. Light pP- -- mn-w. /0 /S
- EP Drills, Trng. Bldg. 01 R. Brady - CCOz EP Rep, EOF IKON ESD, EOF IKON ESD Asst., EOF IKON 1 ADDITIONAL DISTRIBUTION:
Environ. Affairs-TMI, NOB-I W. Ressler 1 311 C 3H GLRE&C, EOF IKON Kennett EOF, Kennet Square R. Rogers Logisitcal Support, EOF MON
- NRC - Onsite, Service Bldg. P. Sauder 1
- NRC - Region 1, (Chief EP Section) N. McNama 2
T. Berstler
- Plant Maint. (Library). Serv. Bldg. J. Eckroth 1 RLM, Rad Field Ops.
T. Berstler Rad Con -RAC Locker. Rad Field Ops. T. Berstler T Rad Con -Kit I PC. Rad Field Ops. T. Berstler Rad Con -Kit 2 PC. Rad Field Ops. T. Berstler I hereby acknowledge receipt or this memo and have complied with the Instructions. Signature and returned memo Rad Con-Kit 3 EOF Bldg Rad Field Ons T. Berstler required ONLY ir CONTROLLED.
Rad Con-Kit 4 EOF Bide Rad Field Ops. T. Berstler I- Signature Date Rad Con-Kit 5 EOF Bldg Rad Field Ops. T. Berstler Rad Con-Simulator LockerRad Field Ops T. Berstler Procedure Distribution:
- Rad Engineers-UI, OOB T. Griffith 1
- Rad Instrument, Bldg. 159 T. Griffith 1 Info Copy Stapled, 3 Hole Punch Secondarv Chem Lab-. OOB-I S. Van Ormer
- Security Mgr., PC M. Bruecks 1 Security U-i, PC M. Bruecks Ctrl Copy _ Stapled, 3 Hole Punch
- Simulator Rm/File Copy ION 1 Simulator Rm - Shift Mgrs Office IKON Plain Copy -"Stapled (Central File & Record Box)
- TSC - Unit 1, NOB-3 B. Siebler
- Training Dept. Library, Trng C. Flory 1 _ Plain Copies Stapled, 3-hole punch
- OSC, Rad Field OPs.. T. Berstler 1 Record Box, SOB + History Package Plain Copy Stapled, 3-hole punch for Central File (if TC is original)
S. Zimmerman Plain Copy 12/02/02
V I I
- Bureau of Rad Protection M. Vyenielo 1 Date 09-a -i6 - Veri : Box No. - TI T2 _
Central File D. Marshbank Plain Copy
- Control Rm-U/l File Copy. 0013-1 S. Van Ormer 1 Please update your file with the attached listed below, destroy the superseded/cancelled document(s). Also, if Control Rm - Shift Mgrs Office, OOB S. Van Ormer Controlled Documents please sign the acknowledgment at the bottom of this memo and return to Debbie
- Control Rm - CRS Workstation, OOB-1 S. Van Ormer 1 Marshbank, Configuration Cntrl., Rm. 135, SOB Coatesville EOF, Kennett Square R. Rogers 1
- Document Center, NOB-2 IKON 1 TC Page TC/PROC
- Document Control Desk, Label NRC _ 1 Document Number Rev NUMBER Replac. Entire Cld Level EACC, EOF IKON
- Emerg. Prep. Dept. D. Light 1 721
- EOF IKON I Xy): .
EOF Communicator, EOF EOF (PEMA Area), EOF IKON IKON T1 kE:
- EP Drills, Trng. Bldg. R. Brady I EP Rep. EOF IKON ESD, EOF ION ESD Asst., EOF IKON ADDITIONAL DISTRIBUTION:
Environ. Affairs-TMI, NOB-1 GLRE&C, EOF W. Ressler -7 1 311 C 3H MON Kennett EOF, Kennet Square R. Rogers 1 Logisitcal Support, EOF IKON
- NRC - Onsite, Service Bldg. P. Sauder 1
- NRC - Region 1, (Chief EP Section) N. McNama
- PEMA - Bureau of Plans D. Fleck 1 PI Rep, EOF RON PersonnnellVehicle Monitor Kit Tmg Ctr. T. Berstler _
- Plant Maint. (Library). Serv. Bldg. J. Eckroth 1 _
RLM. Rad Field Ops. T. Berstler Rad Con -RAC Locker. Rad Field Ops. T. Berstler Rad Con -Kit 1 PC. Rad Field Ons. T. Berstler Rad Con -Kit 2 PC. Rad Field Ops. T. Berstler I I hereby acknowledge receipt of this memo and have compiled with the Instructions. Signature and returned memo Rad Con-Kit 3 EOF Bldz Rad Field Ops T. Berstler required ONLY if CONTROLLED.
I Rad Con-Kit 4 EOF Bldg Rad Field Ops. T. Berstler Signature Date Rad Con-Kit 5 EOF Bldg Rad Field Ops. T. Berstler Rad Con-Simulator Locker.Rad Field OPs T. Berstler Procedure Distribution:
- Rad Engineers-U I, OOB T. Griffith
- Rad Instrument, Bldg. 159 T. Griffith Info Copy _ Stapled, 3 Hole Punch Secondary Chem Lab-. OOB-1 1 S. Van Ormer
- Security Mgr., PC M. Bruecks 1 Security U-l, PC M. Bruecks Ctrl Copy _ Stapled, 3 Hole Punch
- Simulator Rm/File Copy IKON Simulator Rm - Shift Mgrs Office IKON Plain Copy _zStapled (Central File & Record Box)
Tech Support Rep IKON I
- TSC - Unit 1, NOB-3 B. Siebler 1
- Training Dept. Library, Trng _ Plain Copies Stapled, 3-hole punch C. Flory 1
- OSC. Rad Field Ops.. T. Berstler 1 Plain Copy Stapled, 3-hole punch for Central File (if TC is original)
Record Box, SOB + History Package S. Zimmerman Plain COPY 12/02/02
I INFO CTRL EPIPITEP-ADM Instruction Memo 70
- Backup TSC,NOB-3 B. Siebler 1
- Bureau of Rad Protection M. Vyenielo 1 Date m -M -7o Verif: f Box No. Ti T2 _
Central File D. Marshbank Plain CoPY
- Control Rm-U/l File Copy. OOB-1 S. Van Ormer 1 Please update your file with the attached listed below, destroy the superseded/cancelled document(s). Also, if Control Rm - Shift Mgrs Office, OOB S. Van Ormer Controlled Documents please sign the acknowledgment at the bottom of this memo and return to Debbie
- Control Rm - CRS Workstation. OOB-l S. Van Ormer 1 Marshbank, Configuration Cntrl., Rm. 135, SOB Coatesville EOF, Kennett Square R. Rogers 1
- Document Center, NOB-2 IKON 1 TC Page TCIPROC
- *_ I I W16__ - -
Document Number Rev NUMBER RepLac. Entire Cid Level EACC, EOF IKON 1
- Emerg. Prep. Dept.
- EOF D. Light IKON I 1 /
EOF (PEMA Area), EOF IKON 3H C 3HwV*-4.4 1
- EP Drills, Trng. Bldg. R. Brady EP Rep, EOF IKON ESD, EOF IKON ESD Asst., EOF ION -i1 ADDITIONAL DISTRIBUTION:
Environ. Affairs-TMI, NOB-I W. Ressler 311 C 3H GLRE&C, EOF IKON Kennett EOF, Kennet Square R. Rogers Logisitcal Support, EOF MON
- NRC - Onsite, Service Bldg. P. Sauder 1
- NRC - Region 1, (Chief EP Section) N. McNama 2
- PEMA - Bureau of Plans D. Fleck 1 PI Rep, EOF MON PersonnnelfVehicle Monitor Kit Trmg Ctr. T. Berstler
- Plant Maint. (Library). Serv. Bldg. J. Eckroth 1 RLM, Rad Field Ops. T. Berstler Rad Con -RAC Locker. Rad Field Ops. T. Berstler Rad Con -Kit I PC. Rad Field Ovs. T. Berstler Rad Con -Kit 2 PC. Rad Field Ops. T. Berstler I hereby acknowledge receipt of this memo and have complied with the Instructions. Signature and returned memo required ONLY if CONTROLLED.
Rad Con-Kit 3 EOF Bldg Rad Field Ops T. Berstler Rad Con-Kit 4 EOF Bldg Rad Field Ops. T. Berstler Signature Date Rad Con-Kit 5 EOF Bldg Rad Field Ops. T. Berstler Rad Con-Simulator Locker.Rad Field Ops T. Berstler Procedure Distribution:
1
- Rad Engineers-U1, OOB T. Griffith
- Rad Instrument, Bldg. 159 T. Griffith 1 Info Copy _ Stapled, 3 Hole Punch Secondary Chem Lab-, OOB-l S. Van Ormer
- Security Mgr., PC M. Bruecks 1 6 Copies Ctrl Copy _ Stapled, 3 Hole Punch Security U-1, PC M. Bruecks
- Simulator Rm/File Copy IKON 1 Plain Copy _A1 Stapled (Central File & Record Box)
Simulator Rm - Shift Mgrs Office ION
Tech Support Rep
- TSC - Unit 1, NOB-3 B. Siebler T
_ Plain Copies Stapled, 3-hole punch
- Training Dept. Library, Trng C. Flory 1
- OSC. Rad Field Ops.. T. Berstler 1 Plain Copy Stapled, 3-hole punch for Central File (if TC is original)
Record Box, SOB + History Package S. Zimmerman Plain copy 12/02/02
I I INFO CTRL EPIP/TEP-ADM Instruction Memo 7 C.
- Backup TSC,NOB-3 B. Siebler
- Bureau of Rad Protection M. Vyenielo 1 Date 11.2)0/5 Verif: Box No. _ Ti T2 _
Central File D. Marshbank Plain Copv
- Control Rm-U/l File Copy. OOB-l S. Van Ormer 1 Please update your file with the attached listed below, destroy the superseded/cancelled document(s). Also, if Control Rm - Shift Mgrs Office. OOB S. Van Ormer Controlled Documents please sign the acknowledgment at the bottom of this memo and return to Debbie
- Control Rm - CRS Workstation, OOB-1 S. Van Ormer Marshbank, Configuration Cntrl., Rm. 135, SOB Coatesville EOF, Kennett Square R. Rogers 1
- Document Center, NOB-2 MON 1 TC Page TC/PROC
- DocumentControl-DeslczLabel 7NRC~a ml Document Number Rev NUMBER Replac Entire Cid Level EACC, EOF IKON
- Emerg. Prep. Dept. D. Light 1
X4-
- EP Drills, Trng. Bldg. R. Brady 1 =X -1.AA A.0 EP Rep, EOF MON ESD, EOF IKON ESD Asst., EOF ION ADDITIONAL DISTRIBUTION:
Environ. Affairs-TMI, NOB-I W. Ressler I 3H C 311 GLRE&C, EOF MON Kennett EOF, Kennet Square w . . _
R. Rogers Logisitcal Support, EOF MON
- NRC - Onsite, Service Bldg. P. Sauder 1
- NRC - Region 1, (Chief EP Section) N. McNama 2 _
PersonnnellVehicle Monitor Kit Trng Ctr. T. Berstler
- Plant Maint. (Library). Serv. Bldg. J. Eckroth 1 _ _
RLM. Rad Field Ops. T. Berstler Rad Con -RAC Locker, Rad Field Ops. T. Berstler T Rad Con -Kit I PC. Rad Field Ops. T. Berstler Rad Con -Kit 2 PC. Rad Field Ops. T. Berstler I hereby acknowledge receipt of this memo and have complied with the Instructions. Signature and returned memo Rad Con-Kit 3 EOF Bldg Rad Field Ons T. Berstler required ONLY if CONTROLLED.
Rad Con-Kit 4 EOF Bldg Rad Field Ops. T. Berstler Signature Date Rad Con-Kit 5 EOF Bldg Rad Field Ops. T. Berstler Rad Con-Simulator Locker.Rad Field Ops T. Berstler Procedure Distribution:
- Rad Engineers-UI, OOB T. Griffith 1
- Rad Instrument, Bldg. 159 T. Griffith 1 Info Copy _ Stapled, 3 Hole Punch Secondary Chem Lab-, OOB-1 S. Van Ormer
- Security Mgr., PC M. Bruecks 1 4 Copies Security U-I, PC M. Bruecks Ctrl Copy Stapled, 3 Hole Punch
- Sinulator Rm/File Copy RON 1 Simulator Rrn - Shift Mgrs Office ION Plain Copy _,< Stapled (Central File & Record Box)
- TSC - Unit 1, NOB-3 B. Siebler 1
- Training Dept. Library, Trng C. Flory _ Plain Copies Stapled, 3-hole punch 1
- OSC, Rad Field Ops.. T. Berstler 1 Record Box, SOB + History Package S. Zimmerman Plain Copy Stapled, 3-hole punch for Central File (if TC is original)
Plain CLop 12/02/02
- Backup TSC,NOB-3
- Bureau of Rad Protection Central File
- Control Rm-UI1 File Copy, OOB-1 B. Siebler M. Vyenielo D. Marshbank S. Van Ormer INFO Plain CTRL 1
1 Copv 1
Date 6S -Af16 i Verif:
EPIP/TEP-ADM Instruction Memo r Box No. Ti T2_
90 Please update your file with the attached listed below, destroy the superseded/cancelled document(s). Also, if Control Rm - Shift Mgrs Office. OOB S. Van Ormer Controlled Documents please sign the acknowledgment at the bottom of this memo and return to Debbie
- Control Rm - CRS Workstation, 0013-1 S. Van Ormer 1 Marshbank, Configuration Cntrl., Rm. 135, SOB Coatesville EOF, Kennett Square R. Rogers 1
- Document Center, NOB-2 IKON 1 TC Page TC/PROC
- DocumnenrContro1 Desk-,L-ab-e -NRC= Document Number Rev NUMBER Replac. Entire Cid Level EACC, EOF IKON 1b
- Emerg. Prep. Dept. D. Light i -&-p I P- -FbIT- - 3 (.
- EP Drills, Trng. Bldg. R. Brady EP Rep, EOF MON ESD, EOF IKON ESD Asst., EOF IKON ADDITIONAL DISTRIBUTION:
Environ. Affairs-TMI, NOB-I W. Ressler GLRE&C, EOF IKON d Ot,, - C-of bLcr 7.rsTer_- ,- 13 11 Kennett EOF, Kennet Square R. Rogers Logisitcal Support, EOF
- NRC - Onsite, Service Bldg.
IKON P. Sauder 1
~@Lfo ~L cre.-3 AV-J-77mp'/
- NRC - Region 1, (Chief EP Section) N. McNama 2 7 0cL Cv.,1 &-)A Se /L c 76e,-J k,,e -
- Plant Maint. (Library). Serv. Bldg.
T. Berstler 1 J. Eckroth 1 RLM. Rad Field Ops. T. Berstler Rad Con -RAC Locker, Rad Field Ops. T. Berstler Rad Con -Kit I PC. Rad Field Ons. T. Berstler Rad Con -Kit 2 PC. Rad Field Ovs. T. Berstler I hereby acknowledge receipt of this memo and have complied with the instructions. Signature and returned memo Rad Con-Kit 3 EOF Bldg Rad Field Ops T. Berstler required ONLY If CONTROLLED.
Rad Con-Kit 4 EOF Bldg Rad Field Ops. T. Berstler Signature, Date Rad Con-Kit 5 EOF Bldg Rad Field Ons. T. Berstler Rad Con-Simulator Locker.Rad Field Ops T. Berstler IL Procedure Distribution:
- Rad Engineers-U1, OOB T. Griffith 1
- Rad Instrument, Bldg. 159 T. Griffith 1 Info Copy _ Stapled, 3 Hole Punch o Cistpies Secondary Chem Lab-. OOB-I S. Van Ormer
- Security Mgr., PC M. Bruecks 1 qZ~9 copies Security U-I, PC M. Bruecks Ctrl Copy _ Stapled, 3 Hole Punch
- Simulator Rmn/File Copy IKON 1 Simulator Rm - Shift Mgrs Office ION Plain Copy _apItapled (Central File & Record Box)
- TSC - Unit 1, NOB-3 B. Siebler 1
- Training Dept. Library, Trng _ Plain Copies Stapled, 3-hole punch C. Flory 1
- OSC. Rad Field Ops.. T. Berstler 1 Plain Copy Stapled, 3-hole punch for Central File (if TC is original)
Record Box, SOB + History Package S. Zimmerman Plain CONy 12/02/02
INFO CTRL EPIP/TEP-ADM Instruction Memo t
- Backup TSCNOB-3 B. Siebler 1
- Bureau of Rad Protection M. Vyenielo 1 Date 2Ii L Verif:. -Box_ No. '_ _ TI _ T2 _
Central File D. Marshbank Plain Cony
- Control Rm-U/1 File Copy, OOB-1 S. Van Ormer 1 Please update your file with the attached listed below, destroy the superseded/cancelled document(s). Also, if Control Rm - Shift Mgrs Office. OOB S. Van Ormer Controlled Documents please sign the acknowledgment at the bottom of this memo and return to Debbie
- Control Rm - CRS Workstation, OOB-1 S. Van Ormer 1 Marshbank, Configuration Cntrl., Rm. 135, SOB Coatesville EOF, Kennett Square R. Rogers 1
- Document Center, NOB-2 IKON 1 TC Page TC/PROC l^*D-c-ne-nf-Co~ntrol-Deks-ILabeI TNRC Document Number Rev NUMBER Replac. Entire Cld Level EACC, EOF IKON
- Emerg. Prep. Dept. D. Light 1 &PIP'- A)t-. IS 3
?0, EOF (PEMA Area), EOF MON __ $W9c&
- IKON 21 MON ADDITIONAL DISTRIBUTION:
Environ. Affairs-TMI, NOB-I W. Ressler I 3H C 3H GLRE&C, EOF IKON Kennett EOF, Kennet Square R. Rogers 1 Logisitcal Support, EOF IKON
- NRC - Onsite, Service Bldg. P. Sauder 1
- NRC - Region 1, (Chief EP Section) N. McNama 2
- PEMA - Bureau of Plans D. Fleck 1 PI Rep, EOF RON Personnnel/Vehicle Monitor Kit Trng Ctr. T. Berstler
- Plant Maint. (Library). Serv. Bldg. J. Eckroth 1 RLM. Rad Field Ops. T. Berstler Rad Con -RAC Locker. Rad Field Ops. T. Berstler Rad Con -Kit I PC. Rad Field Ops. T. Berstler Rad Con -Kit 2 PC. Rad Field Ops. T. Berstler I hereby acknowledge receipt of this memo and have complied with the Instructions. Signature and returned memo Rad Con-Kit 3 EOF Bldg Rad Field Ops T. Berstler required ONLY If CONTROLLED.
Rad Con-Kit 4 EOF Bldg Rad Field Ops. T. Berstler Signature_ Date Rad Con-Kit 5 EOF Bldg Rad Field Ops. T. Berstler Rad Con-Simulator Locker.Rad Field Ops T. Berstler Procedure Distribution:
- Rad Engineers-U1, OOB T. Griffith 1
- Rad Instrument, Bldg. 159 T. Griffith 1 Info Copy Stapled, 3 Hole Punch itDbstribu:
Secondary Chem Lab-. OOB-1 S. Van Ormer
- Security Mgr., PC M. Bruecks a 7copies Security U-i, PC M. Bruecks Ctrl Copy _ Stapled, 3 Hole Punch 1
- Simulator Rm/File Copy RKON Simulator Rm - Shift Mgrs Office Plain Copy 4*Stapled (Central File & Record Box)
RON 1
Tech Support Rep 1
- TSC - Unit 1, NOB-3 B. Siebler
_ Plain Copies Stapled, 3-hole punch
- Training Dept. Library, Trng C. Flory 1
- OSC. Rad Field Ops.. T. Berstler 1 Plain Copy Stapled, 3-hole punch for Central File (if TC is original)
Record Box, SOB + History Package S. Zimmerman Plain CopY 12/02/02
___ ______ ___ ___ ___ ___ ___ 3. ___ ___ ___ __ ___ __ ____.3.___ ___ ___ ___ ___ ___ ____ ___ ___ ___ ___ ___ ___ ___ ____ ___ ___ ___ ___ ___ ___ __I
l
.on EPIP/TEP-ADM Instruction Memo l
l l INFO CTRL t
- Backup TSC,NOB-3
- Bureau of Rad Protection B. Siebler M. Vyenielo Plain 1
1 CopY Date 610/ dVerif: I Box No. Ti _ T2 _
Central File D. Marshbank
- Control Rm-U/1 File Copy. OOB-1 S. Van Ormer - Please update your file with the attached listed below, destroy the superseded/cancelled document(s). Also, if Control Rm - Shift Mars Office, OOB S. Van Ormer I Controlled Documents please sign the acknowledgment at the bottom of this memo and return to Debbie
- Control Rm - CRS Workstation. OOB-1 S. Van Ormer Marshbank, Configuration Cntrl., Rm. 135, SOB R. Rogers 1 Coatesville EOF, Kennett Square IKON 1 TC Page TC/PROC
- Document Center, NOB-2 Document Number Rev NUMBER Reolac. Entire Cid Level
-*DocumentContro l-Dek -e -NRC-EACC, EOF IKON Y.~Žd L
- Emerg. Prep. Dept. D. Light 1 -"L IKON 1
- EP Drills, Trng. Bldg. R. Brady = Xzz7.
EP Rep, EOF IKON ESD, EOF IKON ESD Asst., EOF IKON ADDITIONAL DISTRIBUTION:
W. Ressler I 3H C 3H Environ. Affairs-TMI, NOB-I GLRE&C, EOF MON R. Rogers 1 Kennett EOF, Kennet Square Logisitcal Support, EOF IKON _ -
- NRC - Onsite, Service Bldg. P. Sauder 1
- NRC - Region 1, (Chief EP Section) N. McNama 2
- PEMA - Bureau of Plans D. Fleck 1 PI Rep, EOF IKON Personnnel/Vehicle Monitor Kit Tmng Ctr. T. Berstler
- Plant Maint. (Library). Serv. Bldg. J. Eckroth 1 RLM. Rad Field Ops. T. Berstler Rad Con -RAC Locker. Rad Field Ops. T. Berstler Rad Con -Kit I PC. Rad Field Ops. T. Berstler T. Berstler I hereby acknowledge receipt of this memo and have compiled with the instructions. Signature and returned memo Rad Con -Kit 2 PC. Rad Field Ops. required ONLY if CONTROLLED.
Rad Con-Kit 3 EOF Bldg Rad Field Ons T. Berstler Rad Con-Kit 4 EOF Bldg Rad Field Oos. T. Berstler Signature Date Rad Con-Kit 5 EOF Bldg Rad Field Ops. T. Berstler Rad Con-Simulator Locker.Rad Field Ops T. Berstler Procedure Distribution:
- Rad Engineers-UI, OOB T. Griffith 1
- Rad Instrument, Bldg. 159 T. Griffith 1 Info Copy _ Stapled, 3 Hole Punch Memo Distribu Secondan Chem Lab-. OOB-1 S. Van Ormer C146 Copies
- Security Mgr., PC M. Bruecks Ctrl Copy _ Stapled, 3 Hole Punch Security U-1, PC M. Bruecks I
- Simulator Rm/File Copy IKON Plain Copy 2 Stapled (Central File & Record Box)
Simulator Rm - Shift Mgrs Office IKON 1
Tech Support Rep IKON 1
- TSC - Unit 1, NOB-3 B. Siebler 1 _ Plain Copies Stapled, 3-hole punch
- Training Dept. Library, Ting C. Flory 1
- OSC, Rad Field Ops.. T. Berstler Plain Copy Stapled, 3-hole punch for Central File (if TC is original)
Record Box, SOB + History Package S. Zimmerman Plain Copy 12/02/02 1 _______I_________________________________________________
TMI IMC INSTRUCTION MEMO
( ly MANUAL: Thhroew. RVtLP JISLARD Y PLAs DATE LC36 4L' CORRECT NAME AND ADDRESS IF NECESSARY 4DOCUMENT CONTROL DESK- - -
DOCUMENT CONTROL DESK OFFICE OF NUCLEAR REACTOR REGULATION U S NUCLEAR REGULATORY COMMISSION RETURN TO: AMERGEN ENERGY COMPANY LLC WASHINGTON, DC 20555 THREE MILE ISLAND UNIT I 1 INFO ATTENTION: DEBBIE MARSHBANK RT. 441 PO BOX 480 ROOM 135, SOB MIDDLETOWN, PA 17057 PLEASE UPDATE YOUR MANUAL WITH THE ATTACHMENTS AS INSTRUCTED BELOW AND DESTROY THE SUPERSEDED PAGES/PROCEDURES(S). ALSO PLEASE SIGN THE ACKNOWLEDGEMENT AT THE BOTTOM OF THIS MEMO AND RETURN TO THE ADDRESS SHOWN ABOVE.
DOCUMENT NUMBER REV LEVEL
___ __ ___ __ 7z 4 -' '7z3 t^ 9 e~-dv-
[ UPDATED INDEXITABLE OF CONTENTS ATTACHED.
I HEREBY ACKNOWLEGE RECEIPT OF THIS MEMO AND HAVE COMPLIED WITH THE INSTRUCTIONS. SIGNATURE AND RETURNED MEMO REQUIRED ONLY IF CONTROLLED.
(SIGNATURE) - (EXTENSION) (DATE)