Annual Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2014001 and 05000446/2014001)
ML15063A575
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 03/04/2015
From: Webb Patricia Walker
NRC/RGN-IV/DRP/RPB-A
To: Flores R
Luminant Generation Co
R. Alexander
References
IR 2014001
Download: ML15063A575 (4)


Text

rch 4, 2015

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 (REPORT 05000 445/2014 001 and 05000 446/2014001)

Dear Mr. Flores:

On February 17, 2015, the Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Comanche Peak Nuclear Power Plant, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2014 , through December 31, 2014. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections.

The NRC determined that overall, Comanche Peak Nuclear Power Plant, Units 1 and 2, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Comanche Peak Nuclear Power Plant, Units 1 and 2, during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant

. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.

Additionally, an NRC audit of licensee efforts towards compliance with Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events," and Order EA-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation" is ongoing. This audit includes an onsite component in order for the NRC to evaluate mitigating strategies as described in licensee submittals, and to receive and review information relative to associated open items. This onsite activity will occur in the months prior to the first unit at each site achieving compliance with the Orders, and will aid staff in development of a Safety Evaluation for the site. The onsite component at your site has been scheduled for the week of April 27, 2015.

A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations.

In accordance with 10 CFR 2.390 of the NRC's

"Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (817) 200-1148 with any questions you have regarding this letter.

Sincerely,

/RA/ Wayne C. Walker

, Chief Project Branch A Division of Reactor Projects

Docket: 50-445 and 50-446 License: NPF-87 and NPF-89 Enclosure:

Inspection Plan

Page 1 of 2 02/26/2015 19:45:48 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site Comanche PeakInspection / Activity Plan 03/01/2015-06/30/2016EXAMS-INITIAL OPERATOR EXAM 5 1 INITIAL EXAM CP UNIT 1(6/2015)

X02552 05/04/2015 05/08/2015 2 INITIAL EXAM CP UNIT 2 (6/2015)

X02553 05/04/2015 05/08/2015 1 INITIAL EXAM CP UNIT 1(6/2015)

X02552 06/01/2015 06/15/2015 2 INITIAL EXAM CP UNIT 2 (6/2015)

X02553 06/01/2015 06/15/2015 ISFSI-ROUTINE LOADING INSPECTION 1 1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 04/27/2015 05/01/2015 EB1-21T-CP COMPONENT DESIGN BASIS INSPECTION 6 1, 2 IP Component Design Bases Inspection7111121 06/01/2015 07/02/2015 EP-2-HAB EXERCISE INSPECTION 5 1, 2 IP Emergency Action Level and Emergency Plan Changes7111404 06/08/2015 06/12/2015 1, 2 IP Exercise Evaluation - Hostile Action (HA) Event7111407 06/08/2015 06/12/2015 EP-3-EP PERFORMANCE INDICATORS 2 1, 2 IP Drill/Exercise Performance71151-EP01 06/08/2015 06/12/2015 1, 2 IP ERO Readiness71151-EP02 06/08/2015 06/12/2015 1, 2 IP A lert & Notification System Reliability71151-EP03 06/08/2015 06/12/2015TSB 52B-BIENNIAL PI&R INSPECTION 4 1, 2 IP Problem Identification and Resolution71152B 08/31/2015 09/04/2015 1, 2 IP Problem Identification and Resolution71152B 09/14/2015 09/18/2015 RS 13 PI-RADIATION SAFETY 2 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 10/12/2015 10/16/2015 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 10/12/2015 10/16/2015 1, 2 IP Occupational Exposure Control Effectiveness71151-OR01 10/12/2015 10/16/2015 1, 2 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01 10/12/2015 10/16/201571111.08-INSERVICE INSPECTION 2R15 1 2 IP Inservice Inspection Activities - PWR7111108P 10/12/2015 10/23/2015EXAMS-INITIAL OPERATOR EXAM 4 1 INITIAL EXAM COMANCHE PEAK UNIT 1 (06/2016)

X02572 05/16/2016 05/20/2016 2 INITIAL EXAM COMANCHE PEAK UNIT 2 (06/2016)

X02573 05/16/2016 05/20/2016 1 INITIAL EXAM COMANCHE PEAK UNIT 1 (06/2016)

X02572 06/13/2016 06/17/2016 2 INITIAL EXAM COMANCHE PEAK UNIT 2 (06/2016)

X02573 06/13/2016 06/17/2016 RS 5678-RADIATION SAFETY - TEAM 4 1, 2 IP Radiation Monitoring Instrumentation71124.05 02/08/2016 02/12/2016 1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 02/08/2016 02/12/2016 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Page 2 of 2 02/26/2015 19:45:48 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site Comanche PeakInspection / Activity Plan 03/01/2015-06/30/2016 RS 5678-RADIATION SAFETY - TEAM 4 1, 2 IP Radiological Environmental Monitoring Program71124.07 02/08/2016 02/12/2016 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 02/08/2016 02/12/2016 EP-1-BIENNIAL EP PROGRAM INSPECTION 1 1, 2 IP A lert and Notification System Testing7111402 02/22/2016 02/26/2016 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 02/22/2016 02/26/2016 1, 2 IP Emergency Action Level and Emergency Plan Changes7111404 02/22/2016 02/26/2016 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 02/22/2016 02/26/2016 EP-2-EP PERFORMANCE INDICATORS 1 1, 2 IP Drill/Exercise Performance71151-EP01 02/22/2016 02/26/2016 1, 2 IP ERO Readiness71151-EP02 02/22/2016 02/26/2016 1, 2 IP A lert & Notification System Reliability71151-EP03 02/22/2016 02/26/2016 RS 12 PI-RADIATION SAFETY 2 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.0104/11/2016 04/15/2016 1, 2 IP Occupational ALARA Planning and Controls71124.0204/11/2016 04/15/2016 1, 2 IP Occupational Exposure Control Effectiveness71151-OR0104/11/2016 04/15/2016 1, 2 IP RETS/ODCM Radiological Effluent Occurrences71151-PR0104/11/2016 04/15/201671111.08-INSERVICE INSPECTION 1RF18 1 1 IP Inservice Inspection Activities - PWR7111108P04/11/2016 04/22/2016 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.