ML16145A339

From kanterella
Revision as of 19:42, 30 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
NRC Supplemental Inspection Procedure 95003 (Report - 05000313/2016007, and 05000368/2016007) List of Documents Reviewed
ML16145A339
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 05/24/2016
From: John Dixon
NRC/RGN-IV/DRP/RPB-E
To:
John Dixon
References
IR 2016007
Download: ML16145A339 (31)


See also: IR 05000313/2016007

Text

ML16145A339

x SUNSI Review ADAMS x Publicly Available x Non-Sensitive

By: JLDixon x Yes No Non-Publicly Available Sensitive

OFFICE RIV/DRP RIV/DRP

NAME JDIXON NOKEEFE

SIGNATURE /RA/ /RA/

DATE 5/13/16 5/13/16

DOCUMENTS REVIEWED

AREA ACTION PLANS

Title

Corporate Oversight

Corrective Action Program

Decision Making and Risk Management

Design and Licensing Basis

Flood Protection Program

Leadership Fundamentals

Lift Rig and Vendor Oversight

Nuclear Fundamentals

Nuclear Safety Culture

Organizational Capacity

Plant Health

Preventative Maintenance

Procedure and Work Instruction Quality

Training

ROOT CAUSE EVALUATIONS (RCE)

Number Title Revision/Date

CR-ANO-C-2013-0888 Unit-1 Main Turbine Generator Stator 0

NOV Stator Lift Assembly Collapse, EN-MA-

CR-ANO-C-2014-2318 1-4

119 Non-Compliance

CR-ANO-C-2015-1240 Corrective Action Program Implementation 0-1

CR-ANO-C-2015-2829 Leadership Fundamentals 0-1

CR-ANO-C-2015-2831 Organizational Capacity 0-1

CR-ANO-C-2015-2833 Design and Licensing Basis 0-1

CR-ANO-C-2015-2834 Preventative Maintenance 0-1

CR-ANO-C-2015-2836 Corporate and Independent Oversight 0-1

CR-ANO-C-2015-2838 Vendor Oversight 0

CR-ANO-C-2015-4647 Procedure Use and Adherence 0

Unit Auxiliary Transformer 2X-02 Bus Faults

CR-ANO-2-2013-2242 0

and 2X-02 Explosion/Fire

CR-ANO-C-2013-1304 Degraded Flood Barrier 0

ANO-2 Trip from 100% Power While Aligned to

CR-ANO-2-2014-0707 0

Offsite Power (Startup 3 Transformer-2X-03)

-1- Enclosure

ROOT CAUSE EVALUATIONS (RCE)

Number Title Revision/Date

CR-ANO-2-2015-0362 Unplanned Reactor Scrams 0

CR-ANO-C-2014-1142 Flood Protection Issues 0-3

CR-ANO-C-2015-2832 Decision Making and Risk Management 0-1

CR-ANO-C-2015-4626 Training to Improve Organization Performance 0

RECOVERY PROCEDURES (RC)

Number Title Revision/Date

EN-LI-123-B2, IACPD ANO Allocation of Resources Assessment 0

EN-LI-123-A6 Recovery Project Review Boards 0

EN-LI-123-B5 Nuclear Safety Culture Assessment 0

EN-LI-123-B4 Assessment of Performance in the Reactor 0

Safety Strategic Performance Area (IP 95003)

EN-LI-123-B3 Historical Data Review 0

EN-DC-115-ANO-RC Entergy Nuclear Management Manual - 0

Engineering Change Process

EN-LI-123-A2 Recovery Team Assessments 0

EN-LI-123-A1 Recovery Project Administrative Controls 0

EN-LI-118-ANO-RC Root Cause Evaluation Process 2

EN-LI-123-12-ANO-RC Comprehensive Recovery Plan and 0-1

Performance Metrics

EN-LI-123-B7 Collective Evaluation and Action Plan 0

Development

EN-LI-123-B8 Comprehensive Recovery Plan and 0

Performance Metrics

EN-LI-123-04-ANO-RC Recovery Project Administrative Controls 0

EN-LI-123-05-ANO-RC Recovery Team Assessments 0

KAR - Configuration Control Assessment 0

KAR - Design Assessment 3

-2- Enclosure

RECOVERY PROCEDURES (RC)

Number Title Revision/Date

EN-FAP-PM-003 Project Implementation - Segment 1 and 2 3

EN-LI-123-B4-FA-001, Air Operated Valve (AOV) Program Focused December 1,

KAR Assessment 2015

EN-LI-123-B2-FA-002, ANO PM Technical Basis and Program

0

IACPD Assessment

EN-QV-136-ANO-RC Nuclear Safety Culture Monitoring 0

Identification, Assessment and Correction of

EN-LI-123-07-ANO-RC

Performance Deficiencies (IACDP) Review

Collective Evaluation and Action Plan

EN-LI-123-11-ANO-RC

Development

Assessment of Performance in the Reactor

EN-LI-123-09-ANO-RC

Safety Strategic Performance Area (IP 95003)

EN-LI-123-10-ANO-RC Nuclear Safety Culture Assessment

EN-LI-123-08-ANO-RC Historical Data Review 0

EN-LI-102-ANO-RC Corrective Action Program 0-2

PROCEDURES

Number Title Revision/Date

EN-HU-105 Human Performance - Managed Defenses 15

EN-LI-118-ANO Root Cause Analysis Process 7

EN-LI-104 Self-Assessment and Benchmark Process 11

Corrective Action Review Board (CARB)

EN-FAP-LI-003 17

Process

EN-FAP-PM-004 Project Implementation - Segment 3 and 4 3

EN-FAP-OM-020 Comprehensive Recovery Plans 1

Procedure and Work Instruction Use and

EN-HU-106 3

Adherence

EN-OM-123 Fatigue Management Program 12

Shutdown Safety Management Program

EN-OU-108 8

(SSMP)

EN-QV-125 Major Project Oversight 6

EN-WM-104 On Line Risk Assessment 12

EN-FAP-LI-002 Project Review Boards 0

-3- Enclosure

PROCEDURES

Number Title Revision/Date

EN-FAP-LI-005 Recovery Project Admin Controls 0

Corrective Action Program Performance

EN-FAP-LI-004 3

Indicators

Performance Management Processes and

EN-FAP-OM-016 6

Practices

EN-FAP-OM-005 Nuclear Performance Indicator Program 2-3

EN-FAP-LI-001 Condition Review Group (CRG) 5

EN-LI-102 Corrective Action Program 24

EN-LI-121 Trending and Performance Review Process 18

EN-LI-121-01 Trend Codes 7

EN-LI-121-02 Trend Analysis 1

EN-DC-336 Plant Health Committee 8

Operational Decision Making Issue (ODMI)

EN-OP-111 11-12

Process

Asset Management Plan Development, Tracking

EN-FAP-PM-001 2

and Control

EN-DC-143 Engineering Health Reports 18

System and Component Health Report

EN-DC-143-01 12

Supplemental Guidance

Processing Obsolete Items Identified During the

EN-FAP-MP-008 1

Procurement Process

EN-OE-100 Operating Experience Program 24

IER Level 1 and Level 2 Evaluations and

EN-OE-100-01 1

Effectiveness Reviews

EN-OE-100-02 Operating Experience Evaluations 1

EN-OP-105 Conduct of Operations 16

EN-OP-115 Conduct of Operations 16

Inspection and Maintenance of Respiratory

EN-RP-502 9

Protection Equipment

EN-WM-105 Planning 16

EN-TQ-201-04 SAT - Implementation Phase 6

EN-TQ-212 Conduct of Training and Qualification 14

Differing Professional Opinion Resolution

EN-EC-101 0

Process

EN-AD-101 Procedure Process 26

-4- Enclosure

PROCEDURES

Number Title Revision/Date

EN-LI-123-2 Safety Culture Review 4

EN-QV-134 Employee Survey Response Protocol 2

EN-QV-136 Nuclear Safety Culture Monitoring 4-6

EN-PL-190 Maintaining a Strong Safety Culture 0-4

Safety Conscious Work Environment (SCWE)

EN-PL-187 0-2

Policy

FQC-PI-ACE Apparent Cause Evaluator 0

FQC-PI-RCE Root Cause Evaluator 0

EN-PL-155 Entergy Nuclear Change Management 9

EN-TQ-130 Project Management Training Program 0

1015.004A,

ANO Operations Concerns Program 9

COPD-020

Unit 1 Relay Calibration for DG1 and DG2

1403.151 9

Generator

Work Request (WR) Generation, Screening and

EN-WM-100 12

Classification

FFAM-PM-001 Project Management Job Familiarization Guide 0

EN-FAP-OM-011 Corporate Oversight Model 12

EN-OP-104 Operability Determination Process 10

EN-OP-115-03 Shift Turnover and Relief 2

1903.010 Emergency Action Level Classification 52

EN-FAP-OM-002 Management Review Meetings 4

Operator Aggregate Impact Index Performance

EN-FAP-OP-006 2

Indicator

EN-OP-115-01 Operator Rounds 0

Operational Decision-Making Issue Precursor

EN-OP-122 0

Process

Engineering Support Personnel Training

EN-TQ-104 19

Program

5000.025 ANO Coatings Assessment Program 1

1005.002 Control of Heavy Loads 28

-5- Enclosure

PROCEDURES

Number Title Revision/Date

Condition Reporting Immediate Reportability

1015.047 6

Determination

1015.036 Containment Building Closeout 44

1015.001 Conduct of Operations 110

1015.003A Unit 1 Operations Logs 92

Battery and Switchgear Emergency Cooling

1104.027 48

System

1104.020 Clean Waste System Operation 59

1202.011 HPI Cooldown 7

1203.001 ICS Abnormal Operation 13

1203.023 Small Steam Generator Tube Leaks 22

1203.024 Loss of Instrument Air

1203.045 Rapid Plant Shutdown 17

1203.012N Annunciator K16 Corrective Action 47

1405.016 Unit 1 Penetration Fire Barrier Visual Inspection 20

Preventative Maintenance of Limitorque

1412.001 48

SB/SMB Motor Operators

Unit 1 Reactor Protection System Channel A

1304.037 70

Test

1304.063 Unit 1 P-7A Speed Control Calibration 26

1403.179 Molded Case Circuit Breaker Testing 28

2106.006 Emergency Feedwater System Operations 90

2202.004 Steam Generator Tube Rupture 14

2202.005 Excess Steam Demand 15

2203.21 Loss of Instrument Air 17

2203.038 Primary to Secondary Leakage 15

2203.053 Rapid Power Reduction 3

COPD-013 Operations Maintenance Interface Standards

52

and Expectations

EN-OP-102 Protective and Caution Tagging 18

Protective and Caution Tagging Forms and

EN-OP-102-01 10

Checklist

-6- Enclosure

PROCEDURES

Number Title Revision/Date

EN-HU-102 Human Performance Traps & Tools 14

COPD-024 Risk Assessment Guidelines 58

EN-DC-151 PRA Maintenance and Update 5

EN-FAP-OM-021 Critical Decision Procedure 1

EN-FAP-WM-002 Critical Evolutions 3

EN-MA-119 Material Handling Program 24

Control, Storage, and Inspection of Lifting

EN-MA-119-01 7

Equipment

EN-DC-319 Boric Acid Control Program (BACCP) 11

EN-DC-344 Large Motor Program 4

EN-MA-123 Identification and Trending of Rework 8

EN-TQ-119 Maintenance Training Program 9

EN-TQ-119-02 Mechanical Maintenance Training Program 1

EN-TQ-119-03 Electrical Maintenance Training Program 2

Vendor Manuals and the Vendor Re-Contact

EN-DC-148 5

Process

EN-MA-101 Conduct of Maintenance 18

EN-WM-101 On-line Work Management Process 12

EN-WM-102 Work Implementation and Closeout 9

EN-FAP-WM-011 Work Planning Standard 4

EN-FAP-WM-012 Work Management Process Indicators 3

EN-DC-324 Preventive Maintenance Program 15

Preventive Maintenance Component

EN-DC-153 12

Classification

EN-DC-310 Predictive Maintenance Program 7

Emergency Planning 10 CFR 50.54(q) Review

EN-EP-305 1-3

Program

EN-EP-306 Drills and Exercises 7

-7- Enclosure

PROCEDURES

Number Title Revision/Date

EN-EP-308 Emergency Planning Critiques 3

EN-TQ-110 Emergency Response Organization Training 12

EN-TQ-110-01 Fleet E-Plan Training Course Summary 3

EP-002 EP Desk Guide: Early Warning System 12

EP Desk Guide: OSC Emergency Response

EP-003 19

Facility Walkthrough

EP Desk Guide: Drill/Exercise Manual

EP-006 11-12

Addendum

EP Desk Guide: AEOF Emergency Response

EP-017 13

Facility Walkthrough

EP Desk Guide: EOF Emergency Response

EP-008 34

Facility Walkthrough

1203.0121 Annunciator K10 Corrective Action 54

Assignment of Personnel to the Emergency

1903.003 21

Response Organization (ERO)

Administration and Maintenance of the

1903.004 31

Emergency Plan and Implementing Procedures

1903.10 Emergency Action Level Classification 51-52

1903.11 Emergency Response / Notifications 48 & 50

1903.062 Communications System Operating Procedure 28

Equipment Important to Emergency

1903.069 3

Preparedness

2203.012K Annunciator 2K11 Corrective Action 45

EN-DC-329 Engineering Programs Control and Oversight 6

Entergy Nuclear Management Manual -

EN-DC-105 4

Configuration Management

Entergy Nuclear Management Manual -

EN-DC-112 8

Engineering Change Request Process

Entergy Nuclear Management Manual -

EN-DC-126 5

Engineering Calculation Process

Entergy Nuclear Management Manual - Control

EN-DC-132 7

of Engineering Documents

Entergy Nuclear Management Manual - Design

EN-DC-134 6

Verification

Employee Concern Coordinator Training

EN-EC-100-01 1

Program

-8- Enclosure

PROCEDURES

Number Title Revision/Date

Guidelines for Implementation of the Employee

EN-EC-100 9

Concerns

2104.037 Alternate AC Diesel Generator Operations 31

1403.152 Unit 1 A4 Bus Undervoltage Relay Calibration 10

FCBT-GET-PATSS Entergy Fleet Plant Access Training 22

EN-HR-138 Executive Review Board Process for Employees 5

Executive Review Board for Supplemental

EN-HR-138-01 1

Personnel

EN-DC-195 Margin Management 8

EN-MA-130 NMM FIN Team Process 3

Management and Oversight of Supplemental

EN-OM-126 11

Personnel

Qualification of Responsible Oversight for

EN-OM-126-02 2

Supplemental Personnel

EN-OM-126-03 Qualification of Supplemental Supervisors 2

EN-OM-OU-103 Long Range Outage Planning 3

EN-FAP-OU-100 Refueling Outage Preparation and Milestones 7

Refueling Outage Scope Identification and

EN-FAP-OU-104 4

Control

SEP-WTI-ANO-001 Wall Thinning Inspection (WTI) 1

ASME Section XI, Division 1 ANO 1 Inservice

SEP-ISI-ANO1-101 1

Inspection Program

ASME Section XI, Division 1 ANO 2 Inservice

SEP-ISI-ANO2-105 1

Inspection Program

Classification of Structures, Systems, and

EN-DC-167 8

Components

NRC Generic Letter 89-13 Service Water

EN-DC-184 3

Program

Microbiologically Influenced Corrosion (MIC)

EN-DC-340 3

Monitoring Program

Non-EQ Insulated Cables and Connections

EN-DC-348 5

Inspection

1412.054 Unit 1 AC Motor Control Centers 32

EN-FAP-LR-007 Evaluation of Aging Management Programs 6

-9- Enclosure

PROCEDURES

Number Title Revision/Date

EN-FAP-LR-020 License Renewal Implementation 2

SEP-RR-ANO-C-001 ASME Repair Replacement Program 2

1203.012H Annunciator K09 Corrective Action 46

Service Water Piping Leak Evaluation and

1032.036 4

Monitoring

P-7 A&B Emergency Feedwater Pump

1402.009 12

Maintenance

2104.039 HPSI System Operation 45

2311.002 Service Water System Flow Test 21

2305.020 SW to EFW Flush and MOV DP Tests 10

PQR-107 1

Termination, Splicing and Soldering of Cable

6030.110 004-050-0

and Wire

Facility Ratings per NERC Reliability Standard

EN-DC-222 0

FAC-008

EN-DC-349 Metal Enclosed Bus Inspection Procedure 3

EN-DC-346 Cable Reliability Program 6

1203.25 Natural Emergencies 56

2203.008 Natural Emergencies 38

6030.101 Installation of Penetration Seals 12

2412.074 Unit 2 AC Motor Control Centers 21

ENGINEERING

REPORTS

Number Title Revision/Date

Inservice Inspection Summary Report for Twenty-

OAR 1431 May 21, 2015

Fifth Refueling Outage (1R25)

Inservice Inspection Summary Report for the

OAR 1422 Twenty-Fourth Refueling Outage (1R24), ANO - October 8, 2013

Unit 1

Inservice Inspection Summary Report for the

OAR 2421 August 18, 2014

Twenty-Third Refueling Outage (2R23)- ANO Unit 2

- 10 - Enclosure

ENGINEERING REPORTS

Number Title Revision/Date

Inservice Inspection Summary Report for the

December 3,

OAR 2412 Twenty-Second Refueling Outage (2R22) ANO -

2012

Unit2

September 1,

2-BOP-UT-15-048 Service Water Supply Header #2-MIC 2.B.2.13

2015

ANO Microbiological Influenced Corrosion (MIC)

A-EP-2005-001 1

Program

NALCO Analysis - Unit 1 Service Supply To November 7,

NF001099 Reactor Building Coolers VCC-2A/2B (A EFW

2011

Pump Room)

NALCO Analysis - Unit 1 Intake (P-4A Discharge At November 1,

NF001100

Upstream Weld of CV-3646) 2011

September 11,

ANO2 2P32C RCP Discharge - DMW

2009

September 10,

ANO2 2P32D RCP Discharge - DMW

2009

September 12,

ANO2 2SI-15B Safety Injection Nozzle - DMW

2009

Design Report Update: Upgraded Public Alert and

Notification System (ANS) Arkansas Nuclear One May 2009

(ANO)

Arkansas Nuclear One On-Shift Staffing Analysis December 13,

Final Report 2012

Emergency Response Staffing Drill Report -

1903.062C June 27, 2011

Quarterly Call-In Drill

Emergency Response Staffing Drill Report -

1903.062C June 22, 2012

Quarterly Call-In Drill

Emergency Response Staffing Drill Report - Off November 27,

1903.062C

Hours Mobilization Drill 2012

Emergency Response Staffing Drill Report - August 23,

1903.062C

Quarterly Call-In Drill 2014

Emergency Response Staffing Drill Report - Off September 10,

1903.062C

Hours Mobilization Drill 2015

Arkansas Nuclear One ANS Design Report Update June 14,

EP-2011-0023

Corrections 2011

- 11 - Enclosure

ENGINEERING REPORTS

Number Title Revision/Date

January 8,

EP-2015-024 December 9, 2015 Full Scale Drill

2016

NQ-2007-007 QA Surveillance Report QS-2007-ANO-001 April 17, 2007

Quality Assurance Surveillance Report QS-2010-

NQ-2010-008 April 27, 2009

ANO-003

NQ-2011-010 Quality Assurance Audit Report QA-07-2011-ANO-1 June 28, 2011

Emergency Response Staffing Drill Report - February 27,

1903.062C

Quarterly Call-In Drill 2014

Emergency Response Staffing Drill Report -

1903.062C March 15, 2013

Quarterly Call-In Drill

Quality Assurance Audit Report QA-07-2015-ANO-

NQ-2015-028 June 10, 2015

01, Emergency Plan

TRAINING LESSON PLANS

Number Title Revision/Date

ASLPSTASRO Operability Determination Functionality Assessment January 26,

1603 Fundamentals 2016

ASLPOPSTAG January 26,

Tagging OE

1603 2016

ASWKBEAL16 January 25,

EAL Workbook

03 2016

A1LPNLORRX January 21,

Reactor Theory

T1603 2016

WORK ORDERS (WO)

52577704 52608471 52370372 52367410 00347269

52331320 52531334 52508905 52571931 00389851

00241168 0369570 00412506 0353954 03 00353954 09

00353954 17 00353954 19 00253954 30 00353954 45 00354318 01

00346560 30 00354320 01 00414355 04 52273592 01 52517147 01

52516176 01 00128151 01 00128143 01 52366905 01 51670375 01

0021546501 5240333301 5259301401 52544655 01 5227083301

0035994401 5248507101 00369706 00393937 435863

0036449901 5253132301 0028543101 00122821 00122823

- 12 - Enclosure

WORK ORDERS (WO)

5151546901 5257036701 5244879101 0036958301 0039057501

0015558801 5235599001 5260741801 435862 52608471

5220054901 5257584001 5254548301 5226553301 5260741801

0015558801 5235599001

ENGINEERING REQUESTS (ER)

002409E201 974487E201 ER-ANO-2005- ER-ANO-2003- ER-ANO-2005-

0149-005 0258-000 0149-004

ER-963419E201 ER-991392-E301 ER-ANO-2001-

1205-001

ENGINEERING CHANGE (EC)

002409E201 974487E201 EC-34948 EC-46318 EC-51913

EC-51777 EC-51778 EC-48771 EC-45635 EC-5568

EC-46389 EC-52545 EC-53949 EC-62927 EC-49725

EC-15295

DESIGN CHANGE PACKAGE (DCP)

Number Title Revision/Date

ANO Offsite Power Regulation for Start-Up #3 and September 29,

92-2021

Start-Up #2 1994

September 1,

93-1003 ANO Offsite Power Regulation for Start-Up #1

1993

EQUIVALENT CHANGE (EC)

Number Title Revision/Date

Provide justification and documentation to mitigate

the risk of water induced electrical faults associated

with the Startup Transformer #2 switchgear 2A-111,

2A-211, 2H-13, 2H-23 and associated non-

EC-52493 July 13, 2015

segregated buses and also associated with Startup

Transformer #3 switchgear 2A-113, 2A-213, 2H-15,

2H-25 and associated non-segregated buses.

Evaluate minor changes associated with the repair

EC-45220

and reinstallation of the power cables

- 13 - Enclosure

COMPLETED SURVEILLANCE, MAINTENANCE AND MODIFICATION TESTING

Number Title Revision/Date

5220.009, Unit-2, Containment Building & Exterior September 20,

5220.009, Unit-2

Structural Inspection 2015

2-ISI-VT-15-147, Visual Examination of IWE October 20,

2-ISI-VT-15-147

Surfaces (General), Summary A2.E1.11.WS-028 2015

2-ISI-VT-15-148, Visual Examination of IWE October 20,

2-ISI-VT-15-148

Surfaces (General), Summary A2.E1.11.WS-029 2015

2-ISI-VT-15-149, Visual Examination of IWE October 10,

2-ISI-VT-15-149

Surfaces (General), Summary A2.E1.11.WS-030 2015

2-ISI-VT-15-159, Visual Examination of IWE

October 29,

2-ISI-VT-15-159 Surfaces (General), Summary A2.E1.30, Moisture

2015

Barrier

2-ISI-VT-15-162, Visual Examination of IWE

November 3,

2-ISI-VT-15-162 Surfaces (General), Summary A2.E1.30, Moisture

2015

Barrier

OP-1405.016, U-1, Penetration Fire Barrier Visual

1405.016, U-1 20

Inspections

2405.016, U-2 OP-2405.016, U-2, Penetration Fire Barrier Visual 20

ACTION REQUESTS (ARs)

228139 229523 229036 228140

CONDITION REPORTS (CRs) FROM NRC QUESTIONING

CR-ANO-1-2016-00339 CR-ANO-1-2016-00472 CR-ANO-1-2016-00511

CR-ANO-1-2016-00340 CR-ANO-1-2016-00473 CR-ANO-1-2016-00517

CR-ANO-1-2016-00341 CR-ANO-1-2016-00474 CR-ANO-1-2016-00733

CR-ANO-1-2016-00342 CR-ANO-1-2016-00481 CR-ANO-1-2016-00739

CR-ANO-1-2016-00343 CR-ANO-1-2016-00484 CR-ANO-1-2016-00767

CR-ANO-1-2016-00347 CR-ANO-1-2016-00486 CR-ANO-1-2016-00768

CR-ANO-1-2016-00348 CR-ANO-1-2016-00487 CR-ANO-1-2016-00769

CR-ANO-1-2016-00350 CR-ANO-1-2016-00488 CR-ANO-1-2016-00689

CR-ANO-1-2016-00352 CR-ANO-1-2016-00490 CR-ANO-1-2016-00824

CR-ANO-1-2016-00353 CR-ANO-1-2016-00491 CR-ANO-1-2016-00834

CR-ANO-1-2016-00354 CR-ANO-1-2016-00492 CR-ANO-1-2016-00836

CR-ANO-1-2016-00356 CR-ANO-1-2016-00493 CR-ANO-1-2016-00839

CR-ANO-1-2016-00357 CR-ANO-1-2016-00494 CR-ANO-C-2016-00428

CR-ANO-1-2016-00372 CR-ANO-1-2016-00439 CR-ANO-2-2016-00343

CR-ANO-1-2016-00374 CR-ANO-1-2016-00445 CR-ANO-2-2016-00346

CR-ANO-1-2016-00375 CR-ANO-1-2016-00641 CR-ANO-2-2016-00347

CR-ANO-1-2016-00545 CR-ANO-1-2016-00592 CR-ANO-2-2016-00417

CR-ANO-1-2016-00549 CR-ANO-1-2016-00606 CR-ANO-2-2016-00421

- 14 - Enclosure

CONDITION REPORTS (CRs) FROM NRC QUESTIONING

CR-ANO-1-2016-00550 CR-ANO-1-2016-00333 CR-ANO-2-2016-00921

CR-ANO-1-2016-00551 CR-ANO-1-2016-00334 CR-ANO-2-2016-00391

CR-ANO-1-2016-00552 CR-ANO-1-2016-00335 CR-ANO-2-2016-00396

CR-ANO-2-2016-00508 CR-ANO-1-2016-00336 CR-ANO-2-2016-00397

CR-ANO-2-2016-00490 CR-ANO-1-2016-00337 CR-ANO-2-2016-00398

CR-ANO-2-2016-00510 CR-ANO-1-2016-00338 CR-ANO-2-2016-00399

CR-ANO-2-2016-00533 CR-ANO-2-2016-00670 CR-ANO-2-2016-00401

CR-ANO-2-2016-00632 CR-ANO-2-2016-00672 CR-ANO-2-2016-00403

CR-ANO-2-2016-00431 CR-ANO-2-2016-00674 CR-ANO-2-2016-00508

CR-ANO-2-2016-00445 CR-ANO-2-2016-00676 CR-ANO-1-2016-00098

CR-ANO-2-2016-00404 CR-ANO-2-2016-00677 CR-ANO-C-2016-00418

CR-ANO-2-2016-00405 CR-ANO-2-2016-00287 CR-ANO-C-2016-00435

CR-ANO-2-2016-00406 CR-ANO-2-2016-00372 CR-ANO-C-2016-00434

CR-ANO-2-2016-00407 CR-ANO-2-2016-00375 CR-ANO-1-2016-01075

CR-ANO-2-2016-00408 CR-ANO-C-2016-00446 CR-ANO-1-2016-01087

CR-ANO-2-2016-00410 CR-ANO-C-2016-00456 CR-ANO-C-2016-00524

CR-ANO-2-2016-00412 CR-ANO-C-2016-00457 CR-ANO-2-2016-00443

CR-ANO-2-2016-00413 CR-ANO-C-2016-00463 CR-ANO-2-2016-00454

CR-ANO-C-2016-00178 CR-ANO-C-2016-00471 CR-ANO-2-2016-00722

CR-ANO-C-2016-00074 CR-ANO-C-2016-00476 CR-ANO-2-2016-00730

CR-ANO-C-2016-0399 CR-ANO-C-2016-00478 CR-ANO-2-2016-00648

CR-ANO-C-2016-0422 CR-ANO-C-2016-00479 CR-ANO-2-2016-00264

CR-ANO-C-2016-0425 CR-ANO-C-2016-00480 CR-ANO-2-2016-00283

CR-ANO-C-2016-0462 CR-ANO-C-2016-00482 CR-ANO-C-2016-00419

CR-ANO-C-2016-0510 CR-ANO-C-2016-01264 CR-ANO-C-2016-00563

CR-ANO-C-2016-00230 CR-ANO-C-2016-00582 CR-ANO-C-2016-00582

CR-ANO-C-2016-00323 CR-ANO-1-2016-00209 CR-ANO-1-2016-00236

CR-ANO-C-2016-00400 CR-ANO-C-2016-00558 CR-ANO-1-2016-00606

CR-ANO-C-2016-00463 CR-ANO-C-2016-00782 CR-ANO-1-2016-00402

CR-ANO-C-2016-00571 CR-ANO-C-2016-01224 CR-ANO-1-2016-00396

CR-ANO-C-2016-01224 CR-ANO-C-2016-01264 CR-ANO-2-2016-00677

CR-ANO-C-2016-01264 CR-ANO-C-2016-00651 CR-ANO-2-2016-00670

CR-ANO-C-2016-00678 CR-ANO-2-2016-00361 CR-ANO-2-2016-00421

CR-ANO-C-2016-00614 CR-ANO-C-2016-00679 CR-ANO-C-2016-00587

CR-ANO-C-2016-01348 CR-ANO-1-2016-01102 CR-ANO-1-2016-00488

CR-ANO-C-2016-01389 CR-ANO-2-2016-01319 CR-ANO-2-2016-00789

CR-ANO-2-2016-00946 CR-ANO-C-2016-01528 CR-ANO-C-2016-00377

CR-ANO-C-2016-00895 CR-ANO-C-2016-01529 CR-ANO-1-2016-00769

CR-ANO-1-2016-00401 CR-ANO-1-2016-00787 CR-ANO-1-2016-00778

CR-ANO-1-2016-00438 CR-ANO-2-2016-00343 CR-ANO-1-2016-00149

CR-ANO-1-2016-00397 CR-ANO-C-2016-00588 CR-ANO-C-2016-00255

CR-ANO-1-2016-00056 CR-ANO-2-2016-00764 CR-ANO-1-2016-00320

CR-ANO-C-2016-0462 CR-ANO-C-2016-00803 CR-ANO-C-2016-00328

CR-ANO-C-2016-00331 CR-ANO-C-2016-00816 CR-ANO-1-2016-00334

- 15 - Enclosure

CONDITION REPORTS (CRs) FROM NRC QUESTIONING

CR-ANO-1-2016-00490 CR-ANO-C-2016-00838 CR-ANO-1-2016-00240

CR-ANO-C-2016-0399 CR-ANO-C-2016-00884 CR-ANO-1-2016-00279

CR-ANO-C-2016-0422 CR-ANO-C-2016-00895 CR-ANO-C-2016-01131

CR-ANO-2-2016-00375 CR-ANO-C-2016-00905 CR-ANO-C-2016-01155

CR-ANO-C-2016-00194 CR-ANO-1-2016-00352 CR-ANO-1-2016-00237

CONDITION REPORTS (CRs)

CR-ANO-C-2015-2221 CR-ANO-C-2015-2286 CR-ANO-C-2015-2451

CR-ANO-C-2015-2323 CR-ANO-C-2015-1864 CR-ANO-C-2015-2282

CR-ANO-1-2015-2346 CR-ANO-C-2015-2467 CR-ANO-C-2015-2244

CR-ANO-C-2015-2241 CR-ANO-C-2015-2775 CR-ANO-C-2015-1746

CR-ANO-2-2015-1746 CR-ANO-C-2015-2328 CR-ANO-C-2015-2328

CR-ANO-C-2015-2406 CR-ANO-C-2015-2379 CR-ANO-C-2015-2368

CR-ANO-C-2015-2318 CR-ANO-C-2015-2523 CR-ANO-C-2015-1245

CR-ANO-C-2015-2500 CR-ANO-1-2015-2643 CR-ANO-C-2014-2488

CR-ANO-1-2014-00759 CR-ANO-2-2015-01671 CR-ANO-C-2011-02942

CR-ANO-1-2015-02230 CR-ANO-2-2015-05263 CR-ANO-C-2014-00259

CR-ANO-1-2015-02618 CR-ANO-2-2015-02879 CR-ANO-C-2015-01240

CR-ANO-1-2015-02619 CR-ANO-C-2015-02831 CR-ANO-C-2015-02145

CR-ANO-1-2015-02620 CR-ANO-2-2015-01826 CR-ANO-C-2015-02241

CR-ANO-1-2015-02621 CR-ANO-C-2015-01032 CR-ANO-C-2015-02244

CR-ANO-1-2015-02628 CR-ANO-2-2015-00797 CR-ANO-C-2015-02245

CR-ANO-1-2015-02630 CR-ANO-2-2014-02970 CR-ANO-C-2015-02249

CR-ANO-1-2015-02633 CR-ANO-C-2014-02814 CR-ANO-C-2015-02829

CR-ANO-1-2015-02634 CR-ANO-1-2014-01628 CR-ANO-C-2015-02832

CR-ANO-1-2015-02670 CR-ANO-2-2013-01961 CR-ANO-C-2015-02834

CR-ANO-1-2015-04178 CR-ANO-2-2013-01913 CR-ANO-C-2015-03030

CR-ANO-2-2013-02502 CR-ANO-1-2009-01045 CR-ANO-C-2015-03567

CR-ANO-2-2015-02879 CR-ANO-1-2008-02560 CR-ANO-C-2015-04389

CR-ANO-1-2015-00882 CR-ANO-1-2005-01140 CR-ANO-C-2015-02831

CR-ANO-C-2015-03029 CR-ANO-1-2015-03272 CR-ANO-C-2013-02916

CR-ANO-C-2006-00665 CR-ANO-C-2010-00977 CR-ANO-C-2010-02502

CR-ANO-C-2012-00098 CR-ANO-C-2012-00358 CR-ANO-C-2013-00666

CR-ANO-C-2013-00781 CR-ANO-2-2015-04328 CR-ANO-C-2014-02478

CR-ANO-C-2015-03618 CR-ANO-C-2015-04767 CR-ANO-C-2014-02596

CR-ANO-C-2014-02597 CR-ANO-C-2015-02834 CR-ANO-C-2015-02388

CR-ANO-C-2015-04198 CR-ANO-1-2004-00668 CR-ANO-C-2015-02982

CR-ANO-C-2015-04521 CR-ANO-C-2015-03663 CR-ANO-C-2015-00712

CR-ANO-C-2015-04766 CR-ANO-C-2015-04884 CR-ANO-C-2015-04768

CR-ANO-C-2015-04769 CR-ANO-C-2015-04865 CR-ANO-C-2015-04879

CR-ANO-C-2015-04406 CR-ANO-C-2015-04893 CR-ANO-C-2015-04881

CR-ANO-C-2015-04950 CR-ANO-C-2015-01493 CR-ANO-C-2015-02385

- 16 - Enclosure

CONDITION REPORTS (CRs)

CR-ANO-C-2015-04769 CR-ANO-C-2015-03033 CR-ANO-C-2015-04770

CR-ANO-C-2015-04659 CR-ANO-C-2015-02413 CR-ANO-C-2015-01239

CR-ANO-C-2013-02823 CR-ANO-C-2013-02973 CR-ANO-C-2014-03276

CR-ANO-C-2015-02336 CR-ANO-C-2015-02406 CR-ANO-C-2015-01342

CR-ANO-2-2013-02242 CR-ANO-C-2011-01540 CR-ANO-1-2015-02735

CR-ANO-1-2015-02230 CR-ANO-C-2015-02412 CR-ANO-1-2015-01940

CR-ANO-C-2004-02078 CR-ANO-C-2015-02365 CR-ANO-2-2015-02253

CR-ANO-2-2013-01621 CR-ANO-C-2015-01962 CR-ANO-1-2015-00795

CR-ANO-2-2013-01620 CR-ANO-C-2015-01577 CR-ANO-1-2013-01054

CR-ANO-2-2013-01616 CR-ANO-2-2014-00707 CR-ANO-2-2015-04711

CR-ANO-C-2010-01551 CR-ANO-2-2015-00550 CR ANO-C-2015-03031

CR-ANO-C-2003-00905 CR-ANO-2-2013-00565 CR ANO-C-2015-02830

CR-ANO-1-2003-00958 CR ANO-C-2013-02838 CR ANO-C-2015-04677

CR-ANO-2-2003-01417 CR-ANO-1-2015-02857 CR-ANO-1-2015-02353

CR-ANO-2-2003-01544 CR-ANO-2-2015-03105 CR-ANO-1-2015-02631

CR-ANO-1-2005-00578 CR-ANO-1-2007-01622 CR-ANO-1-2015-02306

CR-ANO-2-2015-05156 CR-ANO-C-2015-01711 CR-ANO-1-2013-02185

CR-ANO-1-2010-01457 CR-ANO-2-2014-00232 CR-ANO-1-2013-02846

CR-ANO-2-2011-00386 CR-ANO-C-2014-00259 CR-ANO-2-2015-04749

CR-ANO 2-2011-01098 CR-ANO-2-2014-00264 CR-ANO-1-2015-01028

CR-ANO 1-2011-01680 CR-ANO-1-2015-00193 CR-ANO-1-2015-02346

CR-ANO 1-2013-00510 CR-ANO-1-2015-00200 CR-ANO-2-2015-01634

CR-ANO 2-2013-00892 CR-ANO-1-2015-00498 CR-ANO-2-2015-02221

CR-ANO C-2013-01097 CR-ANO-1-2015-00762 CR-ANO-2-2015-03011

CR-ANO C-2013-01156 CR-ANO-1-2015-00861 CR-ANOC-2015-01284

CR-ANO C-2013-01304 CR-ANO-1-2015-00881 CR-ANO-C-2015-01493

CR-ANO 2-2013-01822 CR-ANO-C-2013-02916 CR-ANO-2-2015-05013

CR-ANO-C-2014-00202 CR-ANO-C-2015-03229 CR-ANO-C-2015-03033

CR-ANO-C-2014-00210 CR-ANO-2-2015-04187 CR-ANO-C-2015-03942

CR-ANO-C-2015-2379 CR-ANO-C-2014-2488 CR-ANO-C-2015-02838

CR-ANO-C-2015-2368 CR-ANO-2-2015-04348 CR-ANO-C-2015-05072

CR-ANO-C-2015-2436 CR-ANO-2-2015-04386 CR-ANO-C-2015-2175

CR-ANO-C-2015-1864 CR-ANO-1-2015-00902 CR-ANO-C-2014-01925

CR-ANO-1-2015-02643 CR-ANO-1-2015-01112 CR-ANO-1-2015-00627

CR-ANO-C-2015-02285 CR-ANO-2-2014-00648 CR-ANO-1-2015-05010

CR-ANO-C-2015-2328 CR-ANO-2-2014-03475 CR-ANO-1-2015-02618

CR-ANO-1-2015-02456 CR-ANO-2-2015-00581 CR-ANO-C-2015-02287

CR-ANO-1-2015-02630 CR-ANO-2-2015-02210 CR-ANO-C-2015-02284

CR-ANO-1-2015-02620 CR-ANO-2-2015-01364 CR-ANO-1-2015-2643

CR-ANO-C-2015-01879 CR-ANO-C-2015-02833 CR-ANO-C-2015-02368

CR-ANO-2-2015-05036 CR-ANO-C-2015-04461 CR-ANO-C-2015-00627

CR-ANO-C-2015-02296 CR-ANO-C-2015-02367 CR-ANO-C-2015-02369

CR-ANO-1-2015-00408 CR-ANO-C-2015-03034 CR-ANO-C-2015-02222

CR-ANO-C-2015-02834 CR-ANO-C-2015-03788 CR-ANO-1-2015-00513

- 17 - Enclosure

CONDITION REPORTS (CRs)

CR-ANO-C-2015-04965 CR-ANO-C-2015-05010 CR-ANO-C-2015-04804

CR-ANO-C-2015-02460 CR-HQN-2014-00291 CR-ANO-1-2015-00386

CR-HQN-2016-00105 CR-HQN-2016-00207 CR-ANO-1-2015-03766

CR-HQN-2016-00207 CR-HQN-2015-868 CR-HQN-2014-00570

CR-HQN-2015-00566 CR-HQN-2014-0291 CR-HQN-2013-00278

CR-HQN-2014-00667 CR-IP3-2015-03795 CR-RBS-2013-03328

MISCELLANEOUS DOCUMENTS

Title Revision/Date

ANO Unit 1, At-Power Probabilistic Risk Analysis Model 4

ANO Unit 2, At-Power Probabilistic Risk Analysis Model 4

ANO Unit 2 Service Water Performance Monitoring Plan and Trending

Data

ANO Unit 1 Emergency Feedwater System 8

November 11,

Arkansas Nuclear One Integrated Resource Allocation Project Plan

2015

0

Arkansas Nuclear One Collective Evaluation Report, Part 1

ANO 5-Year Staffing Summary 2016-2021 February 1, 2016

ANO Unit 2 Condensate, Heater Drain System Health Report, 4th Quarter 2014

ANO Unit 2 Condensate, Heater Drain System Health Report, 4th Quarter 2015

0, 36, 37, 38, 39,

ANO Emergency Plan

& 40

ANO Unit 1 Operations 5 year Staffing Summary Target Year 2016, February 1, 2016

ANO 1R25 Outage Commitment List

ANO 2R24 Outage Commitment List

ANO 2015 Equipment Reliability Online Commitment List

ANO 2016 Equipment Reliability Online Commitment List (Draft)

ANO 2016 Backlog Reduction Project Plan

January 25,

ANO Current O&M Projects (2016-2020)

2016

ANO Long Range Outage Plan Summary - Next 5 Outages

ANO MPRC Capital Spreadsheet (2016-2020) February 3, 2016

ANO-1 AC Distribution Health Report 3Q15

ANO-1 DC Distribution Health Report 3Q15

- 18 - Enclosure

MISCELLANEOUS DOCUMENTS

Title Revision/Date

ANO-1 Reactor Protection System Health Report 3Q15

ANO-1 Emergency Feedwater System Health Report 3Q15

ANO-1 Service Water Health Report 3Q15

ANO-1 AC Distribution Performance Monitoring Plan and Trending Data,

4Q15

ANO-1 DC Distribution Performance Monitoring Plan and Trending Data,

4Q15

ANO-1 Reactor Protection System Performance Monitoring Plan and

Trending Data, 4Q15

ANO-1 Emergency Feedwater Performance Monitoring Plan and Trending

Data, 4Q15

ANO-1 Service Water Performance Monitoring Plan and Trending Data,

4Q15

ANO-2 AC Distribution Health Report 3Q15

ANO-2 DC Distribution Health Report 3Q15

ANO-2 Reactor Protection System Health Report 3Q15

ANO-2 Emergency Feedwater System Health Report 3Q15

ANO-2 Service Water Health Report 3Q15

ANO-2 AC Distribution Performance Monitoring Plan and Trending Data,

4Q15

ANO-2 DC Distribution Performance Monitoring Plan and Trending Data,

4Q15

ANO-2 Reactor Protection System Performance Monitoring Plan and

Trending Data, 4Q15

ANO-2 Emergency Feedwater Performance Monitoring Plan and Trending

Data, 4Q15

ANO-2 Service Water Performance Monitoring Plan and Trending Data,

4Q15

December 10,

ANO Communication Handbook

2014

ANO Predictive Maintenance Component Watchlist

Apparent Cause Evaluation CR-ANO-C-2014-1012, Collective Evaluation

April 15, 2014

of 7 Risk-Significant Issues in 2013

Apparent Cause Evaluation CR-ANO-C-2015-4626, Training to Improve January 26,

Effectiveness 2016

ASLP-MMCT-PRSVL, Pressure Relief Valves 0

- 19 - Enclosure

MISCELLANEOUS DOCUMENTS

Title Revision/Date

A2SPGLOR160101, EOL Rapid Shutdown Simulator Lesson July 27, 2015

ASLP-GM-PMOWN, Maintenance PM Program Owner Training Module 0

ASVEN-SUPV-SAFCON; PowerPoint Presentation: Management Actions

January 2016

to Detect and Prevent Retaliation and Minimize Chilling Effect

ANO People Health Committee Organizational Metrics and Risk November 1,

Assessment for Nuclear Engineering 2015

February 22,

ANO People Health Committee Meeting Minutes

2016

ANO Organizational Capacity Assessment Policy Guide 7

ANO Organizational Engagement (OR) Survey Analysis August 25, 2015

ANO Organizational Engagement (OR) Survey Analysis January 6, 2016

February 22,

ANO People Heath Committee Meeting Minutes

2016

February 24,

CARB Meeting Minutes

2016

January 11,

CRG Meeting Minutes

2016

January 12,

CRG Meeting Minutes

2016

January 26,

CRG Meeting Minutes

2016

January 28,

CRG Meeting Minutes

2016

Comparative Gap Analysis of the ANO Vendor Oversight Fundamental

0

Problem to CR-ANO-C-2014-02318 Stator Lift Assembly Collapse

Corporate vs. ANO Reconciliation of EN-PL-100 Implementation Topics February 16-17,

and Question Meeting Summary 2016

Conger-Elsea Arkansas Nuclear One (ANO) Station 95003 Inspection December 4,

Readiness Assessment Report 2015

January 14,

Emergency Response Organization Staff Assignments

2015

Emergency Response Organization Staff Assignments February 4, 2016

Engineering Programs Snapshot Assessment - Entergy EN-DC-174- December 17,

Engineering Program Section-ASME Code Section XI ISI Program 2015

Engineering Programs Snapshot Assessment - Entergy EN-DC-174- December 14,

Engineering Program Section XI Repair and Replacement (RR) 2015

Containment Repair and Replacement Program

- 20 - Enclosure

MISCELLANEOUS DOCUMENTS

Title Revision/Date

Engineering Programs Snapshot Assessment - Arkansas Nuclear One, December 11,

Welding Program 2015

Engineering Programs Snapshot Assessment - Arkansas Nuclear One December 9,

Microbiologically Induced Corrosion Monitoring Program 2015

December 15,

Engineering Programs Snapshot Assessment - Arkansas Nuclear One 2015

Generic Letter (GL) 89-13 Service Water Program

ESEM-SUPC-SCWE; Safety Conscious Work Environment 0

ERWG Management of Preventative Maintenance on Non-Critical

0

Components

FCBT-ADM-SCWE; Safety Conscious Work Environment 2

Force 431, Revision 3, Change in Technical Specifications End States

March 26, 2013

(BAW-2441, Arkansas Nuclear One, Unit 1

January 28,

FORM OPS-A26, Control of Room Checklist - RCS 200F

2016

January 28,

FORM OPS-B28, Control of Room Task Checklist and Miscellaneous Log

2016

Historical Data Review Performance Area Report 0

Integrated Nuclear Safety Culture Assessment (INSCAR) December 2015

IER L2 15-29 Weakness in Reactivity Control

Indus Asset Suite (IAS Work Control Software Suite)

Industry Guideline 2013-001, Equipment Reliability Working Group,

Management of Preventive Maintenance on Non-Critical Components 0

Letter 2CAN031303, License Amendment Request, Adoption of

Technical Specification Task Force 422, Revision 2, Change in Technical

March 26, 2013

Specifications End States (CE NPSD-1186), Arkansas Nuclear One,

Unit 2

Letter 1CAN031306, License Amendment Request, Adoption of

Technical Specification Task Force 431, Revision 3, Change in Technical March 26, 2013

Specifications End States (BAW-2441, Arkansas Nuclear One, Unit 1

Letter 1CAN031306, License Amendment Request, Adoption of

Technical Specification Task Force 431, Revision 3, Change in Technical March 26, 2013

Specifications End States (BAW-2441, Arkansas Nuclear One, Unit 1

Letter 1CAN121302, License Amendment Request, Technical December 20,

Specification Change to Extend the Type A Test Frequency to 15 Years, 2013

Arkansas Nuclear One, Unit 1

List of Self-Assessments and Benchmarks 2016

- 21 - Enclosure

MISCELLANEOUS DOCUMENTS

Title Revision/Date

Letter of Agreement between Entergy Operations, Inc. and Arkansas January 16,

Department of Health 2015

Leadership Team Discussion Conceptual Design

LT - Apparent Cause Evaluation Report - Undocumented Control September 19,

Circuitry Jumpers Found on SU3 VR 2013

Mechanical Superintendent Bench Strength Planning Report January 29,

2016

Model Change Requests List for ANO, Unit 1, Probabilistic Risk Analysis January 28,

Model 2016

Model Change Requests List for ANO, Unit 2, Probabilistic Risk Analysis January 28,

Model 2016

Management Program for License Renewal Implementation 0

NSC Observation Data Analysis for the Week January 29,

2016

NRC Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency

Sump Recirculation at PWRs

Nuclear Safety Culture Assessment, November 2014 Final Results

March 1, 2015

Report, Synergy Consulting Services

Operations Shift Schedule CY 2016

Operational Decision Making Issue; R1 Reactor Vessel Flange Inner

January 5, 2016

O-ring Leakage

ODMI: Increasing Void Size Downstream of CV-1400 per PI-1400 December 8,

Blowdowns 2014

January 30,

ODMI Precursor for CR-ANO-1-2015-4273

2016

Operational Excellence, Arkansas Nuclear One Recovery Plan (from the

Operations Website)

Plant Health Problem Area

February 2,

Plant Health Committee Meeting Package

2016

February 1,

Plant Health Working Group Meeting Package

2016

Plant Health Project Plan 1

Plant Health Committee Meeting Package January 26,

2016

September 25,

PM Basis Template - EN - Switchgear - Medium Voltage - 1kV to 7kV

2008

Project Plant to Implement Standards Team During Refuel Outage 2R24

- 22 - Enclosure

Miscellaneous Documents

Title Revision/Date

Post-Event Simulator Testing: ANO-2 ASI Trip During 1-Hour Shutdown April 27, 2014

Preventive Maintenance Optimization Software (PMOS PM Database)

Post-Outage Reports for refueling outages 1R20 through 1R25 and 2R19

through 2R24

Production Performance Review Meeting Report January 29,

2016

Predictive Maintenance Watch List

Performance Review Meeting Report ANO / Radiation Protection January 2016

Performance Review Meeting Report ANO / Security January 2016

PowerPoint Presentation, Fleet Performance Evaluation RCE & Update

Repair Replacement Plan 2E-35A September 30,

2015

Repair Replacement Plan 2E-35B September 30,

2015

Repair Replacement Plan 2SW-25B October 26,

2014

Radiation Protection Performance Review Meeting January 2016

Recovery Team Phase 2 Indoctrination Briefing

SARB Observation Sheet February 2, 2016

SARB Meeting Agenda February 2, 2016

Selected Condition Review Group (CRG) Meetings January 27, 2016 /

February 1, 2016 /

February 2, 2016

Standing Order: Condition Reports Bypassing the Control Room with January 27,

Potential Operability Impact 2016

Sump Recirculation at PWRs

October 10,

SU3 Non-Segregated Bus - Insulation Test Data

2015

January 2014 -

Safety Culture Leadership Team Minutes

January 2016

System Health Report - Switchyard Q3 - 2015

January 15,

Task to Training Matrix, ANO Mechanical Maintenance

2016

Task to Training Matrix, ANO Instrument and Controls Maintenance February 22,

2016

- 23 - Enclosure

Miscellaneous Documents

Title Revision/Date

Technical Manual 01-1236437-00; Instructions Manual Unit 1 Reactor

5

Vessel

TDI075 0260, Instruction Manual for Ingersoll-Rand High Pressure Safety

Injection Pumps

TRM 3.7.12, Unit 1, Fire Barriers

TRM 3.7.5, Unit 2, Fire Barriers

Third Party Nuclear Safety Culture Performance Assessment (TPSCPA) May 1, 2015

T+1 Meeting Week Critique for January 25, 2016 February 4, 2016

February 12,

T+1 Meeting Week Critique for February 1, 2016

2016

February 19,

T+1 Meeting Week Critique for February 8, 2016

2016

January 28,

T+1 Meeting Week Critique for January 18, 2016

2016

Unit 2 Operations Manning & Active List Q1 - 2016

Unit 1 Shift Relief Sheet (living document reviewed daily from 1/25/2016

through 2/5/2016)

January 25,

Unit 1 and Unit 2 Crane Deficiency Lists

2016

Unit 1 Shift Relief Sheet (computer generated living document)

Unit 2 Shift Relief Sheet (computer generated living document)

Unit 1 Operations Manning & Active List Q1 - 2016

Unmitigated SPV PMs from 2015 Project Excel Spreadsheet

V-1007-00, Unit 1, High Pressure Injection MOV Data 2

Welding Material Requisition No. 05368 December 1,

2014

2015 Senior Leader Face to Face Meeting Matrix (Excel spreadsheet)

2016 Corporate Oversight Plan ANO 95-003 Recovery, Interoffice Memo, 0

Interim Paired Observation Guideline,

2R25 Master Activities List for HPSI, LPSI, SDC, EFW, Spray, and SI January 20,

2016

October 10,

2X-03 4160V Hi-POT Test 2015

October 10,

2X-03 6900V HI-POT Test 2015

- 24 - Enclosure

MISCELLANEOUS DOCUMENTS

Number Title Revision/Date

ULD-1-SYS-12 ANO Unit 1 Emergency Feedwater System 8

ULD-1-TOP-20 ANO-1 Reactor Building Sump Qualification Basis

SCEW A013, CV-

System Component Evaluation Worksheet 10

1000, AZ-1000

EQDRS A013 EQ Data Record Summary Sheet 5

WT-WTANO-2013-

325

EQRA V33-003 Environmental Qualification Report Assessment 6

ULD-1-TOP-20 ANO-1 Reactor Building Sump Qualification Basis

Att. 9.2, 10 CFR 50.54(q) Evaluation - ANO E-Plan Revision December 5,

EN-EP-305 36 2012

Att. 9.2, 10 CFR 50.54(q) Evaluation - ANO E-Plan Revision February 13,

EN-EP-305 37 2013

Att. 9.2, 10 CFR 50.54(q) Evaluation - ANO E-Plan Revision January 20,

EN-EP-305 37 (Addendum) 2016

Att. 9.2, 10 CFR 50.54(q) Evaluation - ANO E-Plan Revision December 17,

EN-EP-305 38 2013

Att. 9.2, 10 CFR 50.54(q) Evaluation - ANO E-Plan Revision January 20,

EN-EP-305 38 (Addendum) 2016

Att. 9.2, 10 CFR 50.54(q) Evaluation - ANO E-Plan Revision October 23,

EN-EP-305 39 2014

Att. 9.2, 10 CFR 50.54(q) Evaluation - ANO E-Plan Revision January 20,

EN-EP-305 39 (Addendum) 2016

Att. 9.2, 10 CFR 50.54(q) Evaluation - ANO E-Plan Revision December 15,

EN-EP-305 40 2015

Limitorque Type HBC, SB/SMB-0 and Type SMB-00

8.Q.3-8.1 17

Valve Operator Maintenance

ASLP-EP-A0060 Training Material: Duty Emergency Planner 8

ASGATT-EM- Training - Non-Conservative Decision Making,

DECISION Operating Experience Responses and Assumptions,

MAKING Lifted Leads, and PMTs

January 20,

CEO-99/00089 Switchyard and Transmission Interface Agreements

2016

Qualification of the Unit 1 Circulating Water Lifting

EC-61177 7

Tool

EC-26194 Intake Structure Spreader Lifting Beam Re-Rate 0

Determination of Limiting ANO-2 Condensate Pump

Pressure to Avoid

EC12402 1

Exceeding Allowable Flow

WPS-SS-8/8-B

- 25 - Enclosure

MISCELLANEOUS DOCUMENTS

Number Title Revision/Date

Evaluate Leak from 2SI-13D for Boric Acid February 13,

EC 61455, 2R24

2013

Switchyard and Transmission Interface

ENS-PL-158

Requirements

Department Performance Improvement Coordinator

FFAM-CAA-DPIC 7

(DPIC) Job Familiarization Guide

FFAM-OE- OE Coordinator / ICES Coordinator Job

0

OECOORD Familiarization Guide

FFAM-PI-CARB CARB Member Job Familiarization Guide 0

FFAM-PI-RMCAP Corrective Action Program Responsible Manager 0

FLP-CAA- 1

Trend Analysis Training

TRENDANALYSIS

ANO-Historical Data Review - HDR Performance

HDR-95003-001 0

Area Report

ANO-Historical Data Review - HDR Assessment

HDR-95003-002 0

Area Report

ANO EN-LI-123- Focused Assessment Performance Area Report,

May 11, 2015

BA-FA-001 Problem Identification and Resolution

OE-NOE-2013- December 5,

000482 2012

OE-NOE-2015- January 20,

000123 2016

OE-NOE-2015- December 17,

00199 2013

Inadequate Interrupting Capability of Switchyard February 10,

SIDP-1029

22kV Breakers 20015

B0125 - Replace Bushings and Develop PSR for June 3, 2015

SIDP-7479

Breaker Replacement

Re-Design and Replace U2 SU2 and SU3 Non-Seg September 1,

SIPD-7388

Bus 2015

B0126 - 22kV Breaker Replacement in 2R26 (Fall January 28,

SIPD-7776

2018) 2016

Electronic Only Installation Operation and 0

TDI075 0390 Maintenance Manual for Unit II

Condensate Pumps

October 23,

ULD-2-SYS-16 Upper Level Document, ANO Unit 2, 4.16 kV System

2014

Conceptual Design for Station Blackout (SBO)

0CNA129208 Modification - ANO, Unites 1 and 2 (TAC NOS.

M84338 and 84339)

Response to Request for Additional Information

(RAI) Regarding Response to Bulletin 2012001,

0CAN021401 Design Vulnerability in Electric Power System ANO -

Units 1 and 2 Docket Nos. 50-313 and 50-368

License Nos. DPR-51 and NPF-6

- 26 - Enclosure

MISCELLANEOUS DOCUMENTS

Number Title Revision/Date

0CAN119507 Notification of Completion of Station Blackout Diesel

Testing Commitments

0CAN089203 Conceptual Design for Station Blackout Modification

(TAC Nos. M68508 and M68509)

1007914 EPRI Report, Lifting, Rigging, and Small Hoist Usage 0

Guide

0CNA119310 Station Blackout (SBO) Commitment For A One-

Time Confirmatory Load Test, ANO, Units 1 and 2

(Tac Nos. M85956 and M85957)

1378-1 (Obsolete) GE Technical Information Letter (Proprietary) - December 12,

Improving Reliability of Medium Voltage Generator 2002

Auxiliary Equipment

1701 (Obsolete) GE Technical Information Letter (Proprietary) - December 12,

Improving Reliability of Medium Voltage Generator 2002

Auxiliary Equipment

1701-R1 GE Technical Information Letter (Proprietary) - March 2, 2015

Improving the Reliability of Medium and High Voltage

Auxiliary Equipment

LEARNING ORGANIZATION

Number Title Revision/Date

ANO Preventative Maintenance Program Focused February 3,

LO-ALO-2011-049

Self-Assessment 2012

LO-ALO-2014-001

Snapshot Assessment Focusing Specifically on

LO-ALO-2014-066

Reactivity Management

Maintenance Services Supplemental Worker December 9,

LO-ALO-2014-094

Oversight 2015

LO-ALO-2015-001

Pre-NRC Fire Protection Triennial Self-Assessment

LO-ALO-2015-043

Plan

LO-ALO-2015-059

Entergy Nuclear Vendor Manuals and the Re-Contact January 11,

LO-ALO-2015-071

Process 2016

January 10,

LO-ALO-2015-072 Entergy Nuclear Acceptance of Vendor Documents

2016

January 8,

LO-ALO-2015-107 10 CFR Part 37 Materials Security Review

2016

Outage Readiness and OCC Effectiveness Snapshot January 10,

LO-ALO-2014-072

Self-Assessment 2016

- 27 - Enclosure

LEARNING ORGANIZATION

Number Title Revision/Date

Preventive Maintenance Component Classification December 16,

LO-ALO-2015-073

Assessment 2015

January 5,

LO-ALO-2015-079 Single Point Vulnerability Process-Assessment

2016

Margin Management Self-Assessment January 5,

LO-ALO-2015-081

2016

Entergy Predictive Maintenance Program January 7,

LO-ALO-2015-084

Assessment 2016

Entergy ANO Protective System Maintenance December 15,

LO-ALO-2015-090

Monitoring Program Assessment 2015

Performance Analysis and Training Needs Analysis

LO-ALO-2015-115

Snapshot Self-Assessment

LO-ALO-2015-117 Ops Training Comprehensive Assessment Plan

LO-ALO-2015-093 Motor Operated Valve Program Snapshot November 18,

Assessment 2015

LO-ALO-2015-098 Entergy Large Motor Program Assessment January 8,

2016

DRAWINGS

Title Revision/Date

M-230 Sheet 1; Piping & Instrument Diagram - Reactor Coolant System 120

RC-201 Sheet 1; Small Pipe Isometric - Reactor Vessel R-1 Flange Gasket

6

Leak-off Drain

RC-202 Sheet 1: Small Pipe Isometric - Reactor Vessel Flange Gasket

8

Leak-off (Pressure Test Connection)

LW-263 Sheet 1; P-32A/B/C/D (seal) Overflow and Leakage Drains

4

to RB Sump

M1B-223 Sheet 1; Upper (RV) Shell Assembly 1

M1B-400 Sheet 1; Specification Drawing for Replacement RVCH ANO-1 0

M1B-408 Sheet 1; ANO-1 Replacement RVCH - Final Machining of Sealing

0

Surface, Gasket Grooves and Flange External Diameter

M1B-425 Sheet 1; ANO-1 Replacement RVCH - Final Machining of Stud

0

Holes and o-ring Clip Location Grooves

M-213 Sheet 2; Piping & Instrument Diagram - Laundry Waste and

31

Containment & Aux Building Sump Drainage

6600-M-2084 Piping Class Sheet 10

C-149 Reactor Building Reinforced Concrete Ground Floor EL. 3570 8

C-151 Reactor Building Reinforced Concrete Plans EL. 362-0 to 376-6 2

- 28 - Enclosure

DRAWINGS

Title Revision/Date

C-152 Reactor Building Reinforced Concrete Operating Floor EL. 401-6 7

C-155 Reactor Building Reinforced Concrete Wall Sections & Details -

8

Sheet 2

C-161 Reactor Building Reinforced Concrete Plan EL. 396-6 To EL.

4

406-6

C-174 Reactor Building Structural Steel Plan EL. 357-0 13

C-175 Reactor Building Structural Steel Plan EL. 373-6 and 376-6 11

C-176 Reactor Building Structural Steel Plan EL. 401-6 10

C-177 Reactor Building Structural Steel Plan at EL. 424-6 27

C-179 Reactor Building Structural Steel Miscellaneous Platforms 7

C-109 Reactor Building Liner Plate Typical Details 12

C-202, Unit 1, Auxiliary Building Plan Elevation 335-0 14

C-2113, Reactor Building Liner Plate Typical Wall Details 13

C-2148 Reactor Building Concrete Outline Plans at EL. 336-6, EL. 357-0

11

& EL.376-6

C-2151 Reactor Building Reinforced Concrete Plan EL. 357-0 6

C-2152 Reactor Building Reinforced Concrete Plan EL. 376-6 8

ANO-M-592, Containment Sump Strainer Specification 3

C-2167, Reactor Building Reinforced Concrete Miscellaneous Sections &

8

Details, Sheet 1

C-2202, Auxiliary Building Plan Elevation 335-0 15

C-2612, Containment Building IWE Boundaries, Sheet 10 5

C-2612 Containment Building IWE Boundary Drawing, Sheet 19 0

C-2612 Containment Building IWE Boundary, Sheet 24 0

FB-160-1, Fire Barrier Penetration Computer Room, Sheet 1 1

FB-160-1, Fire Barrier Penetration Computer Room, Sheet 2 2

FB-2109, Fire Penetration MCC Room, Sheet 1 1

M-120, Plumbing and Draining Containment Building Area 25, Plan

N

Elevation 336-6-337-0, Sheet 3

M-213, Unit-1, Piping & Instrument Diagram-Laundry Waste and

31

Containment & Aux. Building Sump Drainage, Sheet 2

- 29 - Enclosure

DRAWINGS

Title Revision/Date

M-232, Unit-1, Piping & Instrument Diagram-Decay Heat Removal System,

106

Sheet 1

M-592-1, Unit-1, RB Sump Strainer Final Design Strainer Layout

M-592-5, Unit-1, Sump Strainer Cartridge 400/10 Pockets, Sheet 1 00

M-2206, Unit 2, Piping & Instrument Diagram-Steam Generator Secondary

152

System, Sheet 1

M-2213, Unit 2, Piping & Instrument Diagram-Liquid Radioactive Waste

11

System Reactor Building All Elevations, Sheet 8

M-2230, Unit 2, Piping & Instrument Diagram-Reactor Coolant System,

44

Sheet 2

M-592, Containment Sump Strainer Specification 3

CALCULATIONS

Title Revision/Date

CALC-ANO1-ME-11000027, Review of the Wall Thinning Inspection Aging

CALC 89-E-0137-01; Service Water Flow to the Emergency Feedwater

3

System

CALC-1.1.1 RB Seismic Analysis for Containment BLDG and Internals 0

CALC-46 Reactor Bldg. Internals 0

CALC-ANO-SE-15-00001 - Single Point Vulnerabilities Project 0

CALC-47 Reactor Bldg. Internals 0

CALC-95-R-0024-01, Basic Requirement for the Component Data Base on 12

Station Doors and Hatches

CALC-07-E-0019-01, Accountability of Unit 1 RB Sump Strainers Sacrificial 2

Surface Area

CALC-ANO2-FP-09-00035, Fire Protection Engineering Evaluation for 2

Penetration Seals in Fire Area GG

CALC-05-E-0005-01, Allowable Liner Plate Thickness 0

CALC-ANOC-CS-14-00005, PCI Promatec Product 12 Flood Sealant 0

CALC-ANO1-ME-11000027, Review of the Wall Thinning Inspection Aging

CALC-89-E-0137-01; Service Water Flow to the Emergency Feedwater 3

System

CALC-1.1.1 RB Seismic Analysis for Containment BLDG and Internals 0

CALC-46 and CALC-47 Reactor Bldg. Internals 0

- 30 - Enclosure