ML17206A839

From kanterella
Revision as of 00:41, 30 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
RO 335-79-16 on 790523:four Restraints Were Misplaced on 4-inch & 8-inch Component Cooling Water Lines.Four Restraints Will Be Properly Installed Before Startup from Present Refueling Shutdown
ML17206A839
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 05/25/1979
From: Wethy C
FLORIDA POWER & LIGHT CO.
To:
References
NUDOCS 7906140376
Download: ML17206A839 (4)


Text

4.

/

'n

  • l li

v mm/psL Ltr. Sk f 557

~ ~

Copies to) C!5f, 388, CAM, AN, RM.

ilORIDAPCAZR 4 I.IGnT CQv Offsite: ADS, JRI, COLt~ lfAS, REQ, Rfg Be& P, 1979 To! Mr. J. P. O'Reilly, Director, Region Office of Inspection and Enforcement II PQ 2:27

+Q 0 S ~ Nuclear Regulatory ConLnLission htlanta, Ceorgfa 30303 ~Pl Pl From. Mr. C H lfethy, Plant Manager J~

St ~ Lucia Plant DPR 67 Q ~

Pcarez 6 Light Coupany

-'loridm Miami, Florida Sub)ect, NHiO FOR FACSBfILE TRANSMISSION TO COSFIBN PROtPT REPORTASLg OCCURRENCE 335-79-16 This mano confirms our verbal notification of the sub)ect 14 day reportable occurrence to Mr. E Hi webster oZ your office yesterday Occurrence; On Nay 23 at about 4 p.tn., a report vas received from Ebasco through our Engineeriog Department that a restraint probient had been noted awhile completing as buQt print verification in contain-ment. Tea restraints vere interchanged on tvo 8" Component Cooling Mater (CQ4) lines running parallel about 2 feet apart. Tvo other res-traints vere mistaken)y installed on 4" CCM piping of similar configura-tion bur. at a different, azinLuthal location, This portion of CCM is non-safety relate1 but vas designed to be seismically restrained due to an adjacent 1 fill line for a safety infection tank (accunlulator) ~

Assuming a seismic event and LOCA the l" line, iflittle ruptured, would have no significant eff~t an BIT operationp and very effect on the it is attached

~

8) header to, Corrective Action The 4 misplaced restraints vt11 be properly insea11ed before'tartup froa the present refueling shutdovn.

L P. O'IKllLY Q JL UPRNtHT P D CHENDESh

L'NNA
j. tONG.

I, 5, JhURPl&

.),.T, SuTmamaa~

- RM. 0AM

)00(

I

~ 1