NRC 2017-0057, Response to Request for Additional Information Regarding License Amendment Request 286, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactor

From kanterella
Revision as of 04:33, 26 April 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Response to Request for Additional Information Regarding License Amendment Request 286, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactor
ML17363A143
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 12/21/2017
From: Coffey R
Point Beach
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NEI 99-01, Rev 6, NRC 2017-0057
Download: ML17363A143 (2)


Text

NEXTera ENERGY~ POINT BEACH December 21, 2017 NRC 2017-0057 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Response to Request for Additional Information Regarding License Amendment Request 286, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, "Development of Emergency Action Levels for Non-Passive Reactors"

References:

(1) (2) NextEra Energy Point Beach, LLC letter to NRC, dated June 23, 2017, License Amendment Request 286, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, "Development of Emergency Action Levels for Non-Passive Reactors" (ML 17174A458)

NRC electronic mail to NextEra Energy Point Beach, LLC, dated November 7, 2017, Draft Request for Additional Information (RAI) -License Amendment Request (LAR) to Revise the Emergency Action Level (EAL) Scheme for Point Beach Nuclear Plant (PBNP), Units 1 and 2 -(CAC No. MF9589, EPID L-2017-LLA-0278)

In Reference 1, NextEra Energy Point Beach, LLC (NextEra) submitted a request for an amendment to revise the facility operating licenses for the Point Beach Nuclear Plant (PBNP) Units 1 and 2. Specifically, the proposed change involves revising the Emergency Plan for PBNP to adopt the Nuclear Energy lnstitute's (NEl's) revised Emergency Action Level (EAL) scheme described in NEI 99-01, Revision 6, "Development of Emergency Action Levels for Non-Passive Reactors," which has been endorsed by the NRC. In Reference 2, the NRC staff requested additional information to complete its review of the requested amendment.

Enclosure 1 provides the NextEra response to the NRC staff's request for additional information.

The following information is included as attachments to the Enclosure to aid NRC review and approval and replaces the attachments in its entirety from Reference 1:

  • Attachment 1 -Updated Redline Markup ofNEI 99-01 Revision 6
  • Attachment 2 -Updated Clean Copy of the Proposed PBNP EAL Scheme
  • Attachment 3 -Updated Deviations and Differences Matrix
  • Attachment 4 -Updated Supporting Technical Information
  • Attachment 5 -Updated PBNP EAL Scheme Wallboards This letter contains no new regulatory commitments and no revisions to existing regulatory commitments.

NextEra Energy Point Beach, LLC 6610 Nuclear Road, Two Rivers, WI 54241 Document Control Desk Page 2 If you have any questions regarding this letter, please contact Mr. Eric Schultz, Licensing Manager at (920) 755-7854.

I declare under penalty of perjury that the foregoing is true and correct. Executed on December 21, 2017. Sincerely, Robert Coffey Site Vice President Point Beach Nuclear Plant Enclosure cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW

Text

NEXTera ENERGY~ POINT BEACH December 21, 2017 NRC 2017-0057 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Response to Request for Additional Information Regarding License Amendment Request 286, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, "Development of Emergency Action Levels for Non-Passive Reactors"

References:

(1) (2) NextEra Energy Point Beach, LLC letter to NRC, dated June 23, 2017, License Amendment Request 286, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, "Development of Emergency Action Levels for Non-Passive Reactors" (ML 17174A458)

NRC electronic mail to NextEra Energy Point Beach, LLC, dated November 7, 2017, Draft Request for Additional Information (RAI) -License Amendment Request (LAR) to Revise the Emergency Action Level (EAL) Scheme for Point Beach Nuclear Plant (PBNP), Units 1 and 2 -(CAC No. MF9589, EPID L-2017-LLA-0278)

In Reference 1, NextEra Energy Point Beach, LLC (NextEra) submitted a request for an amendment to revise the facility operating licenses for the Point Beach Nuclear Plant (PBNP) Units 1 and 2. Specifically, the proposed change involves revising the Emergency Plan for PBNP to adopt the Nuclear Energy lnstitute's (NEl's) revised Emergency Action Level (EAL) scheme described in NEI 99-01, Revision 6, "Development of Emergency Action Levels for Non-Passive Reactors," which has been endorsed by the NRC. In Reference 2, the NRC staff requested additional information to complete its review of the requested amendment.

Enclosure 1 provides the NextEra response to the NRC staff's request for additional information.

The following information is included as attachments to the Enclosure to aid NRC review and approval and replaces the attachments in its entirety from Reference 1:

  • Attachment 1 -Updated Redline Markup ofNEI 99-01 Revision 6
  • Attachment 2 -Updated Clean Copy of the Proposed PBNP EAL Scheme
  • Attachment 3 -Updated Deviations and Differences Matrix
  • Attachment 4 -Updated Supporting Technical Information
  • Attachment 5 -Updated PBNP EAL Scheme Wallboards This letter contains no new regulatory commitments and no revisions to existing regulatory commitments.

NextEra Energy Point Beach, LLC 6610 Nuclear Road, Two Rivers, WI 54241 Document Control Desk Page 2 If you have any questions regarding this letter, please contact Mr. Eric Schultz, Licensing Manager at (920) 755-7854.

I declare under penalty of perjury that the foregoing is true and correct. Executed on December 21, 2017. Sincerely, Robert Coffey Site Vice President Point Beach Nuclear Plant Enclosure cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW