ML12153A278: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 14: Line 14:
| page count = 42
| page count = 42
}}
}}
=Text=
{{#Wiki_filter:ES-301 Administrative Topics Outline Form ES-301-1  Facility:  Fort Calhoun Station Date of Examination:  April 16, 2012 Examination Level:  RO Operating Test Number:  2012
-0 1 Administrative Topic (see Note) Type Code* Describe activity to be performed RA1: Conduct of Operations N, R Calculate the estimated critical boron concentration for a reactor startup (Per TDB-II worksheet and curves
)  K/A 2.1.25 Ability to interpret reference materials, such as graphs, curves, tables, etc (CFR:  41.10, 45.12)
RO IR: 3.9 RA2: Conduct of Operations N, R Performa a Quadrant Power Tilt Calculation with Excore detectors operable and ERF inoperable per OI-NI-1  K/A 2.1.20 Ability to interpret and execute procedure steps (CFR: 41.10, 45.12)
RO IR: 4.6 RA3: Equipment Control N, R Prepare a manual clearance for maintenance on component cooling water pump AC
-3C. K/A 2.2.13 Knowledge of tagging and clearance procedures (CFR: 41.10, 45.13)
RO IR: 4.1 RA4: Radiation Control N , R Determine whether to install shielding based on given dose rates and work times.
K/A 2.3.12 Knowledge of radiological safety principles pertaining to licensed operator duties, such as containment entry requirements, fuel handling responsibilities, access to locked high
-radiation areas, aligning filters, etc. (CFR: 45.9, 45.10)
RO IR: 3.2 Emergency Procedures/Plan N/A NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
* Type Codes & Criteria:
(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( (N)ew or (M)odified from bank ( (P)revious 2 exams (      ES-301 Administrative Topics Outline Form ES-301-1 Facility:  Fort Calhoun Station Date of Examination:  April 16, 2012 Examination Level:  SRO Operating Test Number:  2012
-0 1 Administrative Topic (see Note) Type Code* Describe activity to be performed SA1: Conduct of Operations N , R Calculate amount of water and boric acid required to raise SIRWT level ten inches and maintain current SIRWT boric acid concentration.
K/A 2.1.25 Ability to interpret reference materials, such as graphs, curves, tables, etc.
(CFR: 43.5, 45.12
)  SRO IR: 4.
2  SA2: Conduct of Operations (same as RA2)  N , R Perform a Quadrant Power Tilt Calculation with Excore detectors operable and ERF inoperable per OI
-NI-1  K/A 2.1.20 Ability to interpret and execute procedure steps (CFR: 43.5, 45.12)
SRO IR: 4.6 SA3: Equipment Control N , R Review manual clearance for maintenance on component cooling water pump AC
-3C. K/A 2.2.13 Knowledge of tagging and clearance procedures (CFR: 45.13)
SRO IR: 4.3 SA4: Radiation Control N , R Determine whether to install shielding based on given dose rates and work times. K/A 2.3.12 Knowledge of radiological safety principles pertaining to licensed operator duties, such as containment entry requirements, fuel handling responsibilities, access to locked high
-radiation areas, aligning filters, etc.
(CFR: 45.9, 45.10)
SRO IR: 3.
7  SA5: Emergency Procedures/Plan N , R Determine Emergency Action Level for a given emergency.
K/A 2.4.38 Ability to take actions called for in the facility emergency plan, including supporting or acting as emergency coordinator if required. (CFR: 43.5, 45.11)
SRO IR: 4.4 NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
* Type Codes & Criteria:
(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( (N)ew or (M)odified from bank ( (P)revious 2 exams (
ES-301 Control Room/In
-Plant Systems Outline Form ES-301-2  Facility:  Fort Calhoun Station Date of Examination:  April 16, 2012 Exam Level:  RO Operating Test No.:  2012
-0 1 Control Room Systems
@ --U, including 1 ESF)
System / JPM Title Type Code*
Safety Function S-1: Swap pressurizer pressure mode from manual to automatic, followed by spurious actuation of PORV (block valve initially fails to close) N, A, S 3 S-2: Engineered Safeguards Actuation Verification (A PPLS relay fails to actuate, requiring manual initiation of PPLS, and HPSI injection valves fail to open, requiring control room action to open)
N, EN, A, S 2 S-3: Place a containment cooling unit in service (VA-8A/VA-7C) D , S 5 S-4: Place shutdown cooling in service per OI-SC-1, Att. 1 N, L, S 4P S-5: Maintain S/G water levels during startup using AFW.
(Loss of AFW, have to start a main feedwater pump to restore flow)
N, A, L, S 4S S-6: Valve strok e time testing of containment pressure relief valve HCV-246B N, S 8 S-7: Dilute to achieve desired boron concentration for desired critical rod height (an unexpected reactivity increase occurs, requiring securing of dilution
) N, A, L, S 1 S-8: Transfer non-vital buses 1A1 and 1A2 onto 345kV bus per AOP
-32 N, S 6 In-Plant Systems
@ --U) P-1: Respond to a steam bound AFW pump FW-6 (MDAFW pump)
D , E 4S P-2: Rack down a non
-remote equipped 4160V circuit breaker N 6 P-3: Waste gas transfer from the vent header to the gas decay t ank D , A, R 9 @ All RO and SRO
-I control room (and in
-plant) systems must be different and serve different safety -U systems must serve different -plant systems and functions may overlap those tested in the control room.
* Type Codes Criteria for RO / SRO
-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank  (E)mergency or abnormal in
-plant  (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA  (S)imulator 4-6 / 4-6 / 2-3      -  /  -  /      3 /
ES-301 Control Room/In
-Plant Systems Outline Form ES-301-2  Facility:  Fort Calhoun Station Date of Examination:  April 16, 2012 Exam Level:  SRO
-I        Operating Test No.:  2012
-0 1 Control Room Systems
@ --U, including 1 ESF)
System / JPM Title Type Code*
Safety Function S-1: Swap pressurizer pressure mode from manual to automatic, followed by spurious actuation of PORV (block valve initially fails to close) N, A, S 3 S-2: Engineered Safeguards Actuation Verification (A PPLS relay fails to actuate, requiring manual initiation of PPLS, and HPSI injection valves fail to open, requiring control room action to open)
N, EN, A, S 2 S-3: Place a containment cooling unit in service (VA
-8A/VA-7C) D, S 5    S-5: Maintain S/G water levels during startup using AFW. (Loss of AFW, have to start a main feedwater pump to restore flow)
N, A, L, S 4S S-6: Valve stroke time testing of containment pressure relief valve HCV-246B N, S 8 S-7: Dilute to achieve desired boron concentration for desired critical rod height (an unexpected reactivity increase occurs, requiring securing of dilution)
N, A, L, S 1 S-8: Transfer non
-vital buses 1A1 and 1A2 onto 345kV bus per AOP
-32 N, S 6 In-Plant Systems
@ --U) P-1: Respond to a steam bound AFW pump FW
-6 (MDAFW pump) D, E 4S P-2: Rack down a non
-remote equipped 4160V circuit breaker N 6 P-3: Waste gas transfer from the vent header to the gas decay tank D, A, R 9 @ All RO and SRO
-I control room (and in
-plant) systems must be different and serve different safety
--plant systems and functions may overlap those tested in the control room.
* Type Codes Criteria for RO / SRO
-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank  (E)mergency or abnormal in
-plant  (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA  (S)imulator 4-6 / 4-6 / 2-3      -  /  -  /
ES-301 Control Room/In
-Plant Systems Outline Form ES-301-2  Facility:  Fort Calhoun Station Date of Examination:  April 16, 2012 Exam Level:  SRO
-U        Operating Test No.:  2012
-0 1 Control Room Systems
@ --U, including 1 ESF)
System / JPM Title Type Code*
Safety Function S-1: Swap pressurizer pressure mode from manual to automatic, followed by spurious actuation of PORV (block valve initially fails to close) N, A, S 3 S-2: Engineered Safeguards Actuation Verification (A PPLS relay fails to actuate, requiring manual initiation of PPLS, and HPSI injection valves fail to open, requiring control room action to open)
N, EN, A, S 2            S-7: Dilute to achieve desired boron concentration for desired critical rod height (an unexpected reactivity increase occurs, requiring securing of dilution)
N, A, L, S 1    In-Plant Systems
@ --U) P-1: Respond to a steam bound AFW pump FW
-6 (MDAFW pump)
D, E 4S    P-3: Waste gas transfer from the vent header to the gas decay tank D, A, R 9 @ All RO and SRO
-I control room (and in
-plant) systems must be different and serve different safety -U systems must -plant systems and functions may overlap those tested in the control room.
* Type Codes Criteria for RO / SRO
-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank  (E)mergency or abnormal in
-plant  (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA  (S)imulator 4-6 / 4-6 / 2-3      -  /  -  /
Page 1 of 16 Appendix D Scenario Outline Form ES-D-1    Facility: _
Fort Calhoun Station__  Scenario No.: __2____  Revision __1__
Op-Test No.:  _______
Examiners:  ____________________________  Operators:
_____________________________
____________________________
_____________________________
____________________________
_____________________________
Initial Conditions: 100% power.
Condensate pump FW
-2B is currently in service
____________
__________________________________________________________________________________________________________________________________________________________________
Turnover:  ____. Rotate condensate pumps FW
-2B and FW-2C._____________________________
Event No. Malf. No. Event Type* Event Description 1 N/A N-BOPO Rotate condensate pumps FW
-2B and FW-2C per OI-FW-1 Attachment 4.
2  C-ATCO TS-CRS Charging pump CH1B trips. Alarm CB
-1,2,3/A2, Window A
-6L. This isolates letdown. Another charging pump should be started per OI-CH-1. T.S. 2.15(5) applies because it requires CH
-1B and other instruments for AI
-179 (Alt shutdown panel) 3  I-BOPO LT-903Y (Steam generator RC
-1 level transmitter) degrades over a 10 minute period until it fails. This will shift FWCS to manual at the last good signal, requiring operator action to restore level. Alarm is ARP-DCS-FW, L0903E_AL5.
4  I-ATCO TS-CRS Pressurizer pressure instrument fails high. Possible TS 2.10.4(5) if pressure falls below 2075 psia. Uses ARP
-CB-1,2,3/A4 Window B
-4 Pressurizer Pressure Deviation 5  C-ATCO C-BOPO TS-CRS Dropped CEA 4
-01. Alarm CB
-4/A8 Window A
-5L. This will send the operators to AOP-02, which has actions to stabilize the plant. TS 2.10.2(4)(e)
Section III applies because the rod is dropped, this will require a rapid down
-power per AOP
-05. 6 N/A R-ATCO N-BOPO Rapid down
-power per AOP-05. 7  M-All RCP Seal Cooler Leak of CVC16. Due to high RCP temperatures, AOP-35 will be entered. AOP
-35 will direct the operators to trip the reactor and enter EOP
-00. This is an intersystem LOCA. EOP
-03 will be entered after SPTA's are performed.
TS 2.1.4(3) applies but is not counted because it is part of the major event and per the NUREG may be over
-shadowed by it.
8  C-BOPO (CT) Turbine fails to trip. Critical task is for BOP to immediately trip the turbine before performing other SPTA's 9  C-ATCO C-BOPO (CT) HCV-438C fails to close on demand. This LOCA cannot be isolated. It will require a cooldown and depressurization to stop the LOCA. Critical task is to lower RCS pressure before attempting to locally close HCV
-438C. * (N)ormal,    (R)eactivity,    (I)nstrument,    (C)omponent,    (M)ajor
Scenario Event Description NRC Scenario #
2  Page 2 of 16 SCENARIO
==SUMMARY==
NRC #
2  The crew will assume the watch at 100% power with no equipment out of service and instructions to swap condensate pumps FW
-2B and FW-2C.
The first event is swapping out the two condensate pumps per OI
-FW-1, CONDENSATE SYSTEM NORMAL OPERATION, Attachment 4.
The next event is a trip of charging pump CH
-1B, which secures charging flow. Operator actions are per ARP-CB-1,2,3/A2 and include securing letdown. Operator action is then to restore charging and letdown per OI
-CH-1, CHEMICAL AND VOLUME CONTROL SYSTEM NORMAL OPERATION.
SRO will refer to the Technical Specification. T.S. 2.15(5) applies for the loss of CH-1B. The next event is a degradation of LT
-903Y to 40% over a 10 minute period before failing low, resulting in an incorrect setting on the feedwater digital control system. Operator actions are per ARP-DCS-FW, L0903E_AL5 and include the operator taking manual control of the main feed regulating valve to restore steam generator levels to program.
The next event is the controlling pressurizer pressure instrument, PT
-103X failing high. Operator actions are per ARP
-CB-1,2,3/A4 and include taking the controller to manual to maintain pressurizer pressure, and shifting pressure control to PC
-103Y. SRO will refer to Technical Specifications. T.S. 2.10.4(5)(a)(ii) applies if pressure falls below 2075 psia.
The next event is a CEA drop of CEA 4
-01. Operator actions are per ARP
-CB-4/A8 and AOP-02, CEA AND CONTROL SYSTEM MALFUNCTIONS and include stabilizing the plant and taking action to -5, EMERGENCY SHUTDOWN. SRO will refer to Technical Specifications. T.S. 2.10.2(4)(e) applies. Once actions have been taken to start lowering reactor power to less than 70%, a 100% severity RCP seal cooler leak on CVC 16 will be cued. Operator actions are from ARP
-CB-1,2,3/A1 and AOP
-35, REACTOR COOLANT PUMP MALFUNCTIONS. At this time one of the bearing temperatures will exceed the trip criteria for the RCP. Operators will manually trip the reactor and enter EOP
-00. They will also trip the RCP whose trip criteria was exceeded (RCP 3A). When the operators manually trip the reactor, the turbine will fail to trip and the operators will take action to manually trip the turbine (critical task
). After actions of EOP
-00 are complete, the SRO will direct entry into EOP
-03 for a loss of coolant acciden
: t. When operators attempt to isolate the leak by closing HCV
-438C, it fails to close. Operators must commence a cooldown and depressurization prior to sending a local operator to close this valve (critical task
). TS 2.1.4(3) applies but is not counted because it is part of the major event and per the NUREG may be over
-shadowed by it.
The scenario can be terminated once actions have begun to cooldown and depressurize the RCS to allow local operator action to close HCV
-438C.
Page 1 of 18 Appendix D Scenario Outline Form ES-D-1    Facility: _Fort Calhoun Station__  Scenario No.: ___3____  Revision __1__
Op-Test No.:  _______
Examiners:  ____________________________  Operators:
_____________________________
____________________________
_____________________________
____________________________
_____________________________
Initial Conditions: _Reactor is currently at approximately 90% power.
I&C is currently troubleshooting the power range NI power supply. Technical Specification 2.15(1) was entered at 0428 today. Trip units 1, 2, 9, 10, and 12 are currently in BYPASS for channel A
. Turnover:  ___The plant entered TS 2.0.1 due to a condition affecting both diesel generators. A plant shutdown was initiated. After power had been reduced to 90%, the condition was resolved and TS 2.0.1 was exited. You have been directed to maintain power at 90% until the Reactor Engineer prepares PAPeRS guidance for power ascension back to 100% power.____________________
Event No. Malf. No. Event Type* Event Description 1  R-ATCO N-BOPO Maintain power at 90%.                                                                                                                                                                                                                                                       
2  C-BOP O Instrument Air Compressor CA
-1 C fails. Standby compressor CA
-1B running but not loaded. Alarm is ARP
-CB-10,11/A11 Window B
-3L. No entry into AOP
-17. 3  TS-CRS I-ATCO Channel B power range NI summing amplifier fails low
. T.S. 2.15(1) was already entered due to bypassed trip units 1, 2, 9, 10, 12 and these must be placed in trip per T.S. 2.15(2)
. Also, per T.S. Table 2-2 note C, power must be reduced to less than 70%.
AOP-15. 4  C-BOPO Heater Drain Pump FW
-5B trips, standby fails to autostart. Alarm is ARP-CB-10,11/A12 Window A
-4L. Actions are required to start the standby pump.
5  TS-CRS RCS oxygen levels are greater than 0.20 ppm, causing entry into T.S. 2.1.5(1).
6  C-ATCO Raw water pump AC
-10D trips, standby fails to autostart. Alarm is ARP-CB-1,2,3/A1 Window D1U.
Also, alarms CB
-1,2,3/A1 C1U and C1L will come in shortly after pump trip.
7  C-BOPO  Loss of MCC 3C2 due to a ground fault. This causes a loss of boric acid pump CH
-4A, boric acid gravity feed line valve HCV
-265, and boric acid pumps discharge valve HCV
-268. Alarm:  CB
-4/A7 "Boric Acid Valves Trouble."  AOP-32 8  M-ALL (CT) ATWS - RPS pressurizer pressure channel D/PIA
-102Y fails low, causing 2 out of 3 for TM/LP but no RPS trip. Critical task is for ATCO to manually trip the reactor before performing any other actions.
Page 2 of 18 9  C-ATCO (CT) Following manual trip, 5 control rods fail to insert. This will require emergency boration.
However, HCV
-258 is mechanically bound when the operators attempt to open it. This results in the inability to emergency borate using the BASTs and requires use of the SIRWT to emergency borate. EOP
-20. Critical task is to open LCV-218-3, Charging pump suction SIRWT isol. Valve, close LCV
-218-2, VCT Outlet valve, and starting all charging pumps prior to exiting that safety function success path.
* (N)ormal,    (R)eactivity,    (I)nstrument,    (C)omponent,    (M)ajor
Scenario Event Description NRC Scenario #
3  Page 3 of 18 SCENARIO
==SUMMARY==
NRC #3 The crew assumes the watch with the reactor at 90% power. Trip units 1, 2, 9, 10, and 12 for channel A are in BYPASS due to troubleshooting efforts. The crew instructions are to maintain power at 90%
. The first event is a trip of instrument air compressor CA
-1C. The standby is running but unloaded. Operator actions are per ARP
-CB-10,11/A7 and include starting the CS air compressor.
The next event is a failure of the B channel power range NI summing amplifier. Operator action is to place the channel in the tripped position within one hour and downpower to less than 70% per T.S. 2.15(2) and Table 2
-2 Note C. SRO will refer to Technical Specifications. T.S. 2.15(2) applies as does Note C of Table 2
-2. The next event is a trip of heater drain pump FW
-5B. Backup heater drain pump will not start automatically. Operator will need to start the backup pump.
The next event is a high oxygen concentration in the RCS of 0.20 ppm, which is called in by chemistry. No operator action. SRO will refer to Technical Specifications. T.S. 2.1.5(1) applies. The next event is a trip of raw water pump AC
-10D. Backup raw water pump will not start automatically. Operator will need to start backup pump.
The next event is a loss of MCC 3C2 due to a ground fault. Operator action is per ARP
-CB-4/A7 and AOP
-32, LOSS OF 4160 VOLT OR 480 VOLT BUS POWER and includes operating the primary water booster pump and steam generator blowdown transfer pump as necessary. SRO will refer to Technical Specifications (T.S. 2.7.2(g) for loss of MCC
-3C2 is under review by NRR TS branch and was not included as part of the exam grading criteria
). The D channel for RPS pressurizer pressure then fails low, resulting in a 2 out of 3 trip logic for TM/LP, but no reactor trip has occurred. The crew is expected to recognize that an RPS actuation was required, and take action to manually trip the reactor (critical task
). When the operator manually trips the reactor, five CEA's fail to insert requiring emergency boration, which is unsuccessful due to HCV
-258 failure to open. Following completion of standard post trip actions, SRO directs entry into EOP
-20, FUNCTIONAL RECOVERY, Success Path RC-2. The crew will initiate boration using the SIRWT (critical task
).
Once the crew has initiated boration using the SIRWT, the scenario can be terminated.
Page 1 of 18 Appendix D Scenario Outline Form ES-D-1    Facility: _Fort Calhoun Station__  Scenario No.: ____4___  Revision __1__
Op-Test No.:  _______
Examiners:  ____________________________  Operators:
_____________________________
____________________________
_____________________________
____________________________
_____________________________
Initial Conditions: __Mode 2 <1% power. Next step in OP
-2A is to start 1 MFW pump. Desired MFW pump is FW
-4B.___________
__________________________________________________________________________________________________________________________________________________________________
Turnover:  _____Continue in OP
-2A to raise power and load turbine. All requirements to transition to Mode 1 in OP
-4 have been met.__________________________________________________
Event No. Malf. No. Event Type* Event Description 1  N-BOPO Start MFW pump FW-4B per OP-2A, Attachment 3. Attachment 2 contains local operator actions and the instructions for starting the lube oil pump.
2  R-ATCO Raise reactor power to 10% per OP
-2A. 3  C-ATCO TS-CRS Wide range log NI
-002 fails high. This failure should occur when the ATC has raised power sufficient to see reactor response and when directed by lead examiner. ARP
-CB-4/A20, Windows B
-7 and C-1. This will send the operators to AOP-15, where they are directed to secure from raising power and stabilize reactor.
T.S. 2.15(1) applies for failure of NI
. 4  C-BOPO MFW pump FW
-4B trips, no auto start of standby pump. Alarm is ARP-CB-10,11/A12.
5  C-ATCO Controlling pressurizer level instrument 101X fails low. Alarm is ARP-CB-1,k2,3/A4 Windows A
-8 and C-8 6  C-ATCO TS-CRS CCW pump AC
-3A trips, no autostart of standby pump. Alarm is ARP-CB-1,2,3/A2 Window D
-3U. T.S. 2.4(1)b applies. 7  C-BOPO TS-CRS (CT) Inadvertent AFAS. AOP
-28 for inadvertent AFAS. T.S.2.5.(1)D and TS 2.15(3) apply. Critical task is to recognize the AFAS is inadvertent and take action to mitigate (stop feeding the steam generators with AFW) 8  M-ALL Steam line break inside containment on RC-2A. EOP-00 to EOP-05. 9  C-BOPO (CT) SGIS fails. Critical task will be for BOPO to isolate steam generator before exiting procedure step.
10  C-ATCO (CT) Containment spray pump 3B fails to autostart but can be started from control panel. Containment spray pump 3A shaft shears. Critical task is to restore containment spray flow by either starting containment spray pump 3C or 3B.
* (N)ormal,    (R)eactivity,    (I)nstrument,    (C)omponent,    (M)ajor
Scenario Event Description NRC Scenario #4 Page 2 of 18 SCENARIO
==SUMMARY==
NRC #4 The crew assumes the watch with the reactor is Mode 2 at less than 1% reactor power. The crew instructions are to start main feedwater pump FW-4B and continue with power ascension.
The first event is to start a main feedwater pump per OP
-2A, PLANT STARTUP, Attachment 3.
The next event is to raise reactor power to 10% per OP
-2A. Once a reactivity effect is seen on the reactor, the next event will be cued.
The next event is a failure of wide range logarithmic NI
-002 high. Operator action is per CB
-4/A20 and AOP
-15, and includes securing from the power ascension and stabilizing the reactor. SRO will refer to Technical Specifications.
T.S. 2.15(1) applies. The next event is a trip of main feedwater pump FW
-4B with no autostart of the standby pump. Operator actions are per ARP
-CB-10,11/A12 and include starting the standby pump, setting the post SIAS feedwater pump to FW
-4C, and selecting a new standby pump.
The next event is a failure of controlling pressurizer level instrument 101X low. Operator actions are per ARP
-CB-1,2,3/A4 and include placing the pressurizer level control switch to channel Y and placing the pressurizer heater cutout channel select switch to channel Y.
The next even t is a trip of CCW pump AC
-3A with no autostart of the standby pump. Operator actions are per ARP
-CB-1,2,3/A2 and include starting the standby CCW pump. SRO will review Technical Specifications. T.S. 2.4(1)b applies. The next event is an inadvertent auxiliary feedwater actuation signal.
Operator actions are per AOP-28, AUXILIARY FEEDWATER SYSTEM MALFUNCTIONS and include actions to stop the aux feed and bypass the affected AFAS signal (critical t ask). SRO will refer to Technical Specifications. T.S.'s 2.5(1)D and 2.15(3) apply.
After this event a steam line break occurs inside containment on RC
-2A. The crew will enter EOP-00 and perform standard post trip actions. Automatic SGIS fails and the crew should recognize this and take action to manually isolate the steam generators (critical task
).
Once the containment spray is actuated, containment spray pump 3A shaft shears and pump 3B fails to automatically start. The crew should recognize that they do not have any containment spray and take actions to start containment spray pump 3B, or containment spray pump 3C (critical task
)., and they might close one of the containment spray head valves
.
Once the crew has successfully isolated the steam generator and restored containment spray, the scenario may be terminated.
Page 1 of 17 Appendix D Scenario Outline Form ES-D-1  Facility: _Fort Calhoun Station__  Scenario No.: __
1_(Spare)  Revision __1__
Op-Test No.:  _______
Examiners:  ____________________________  Operators:
_____________________________
____________________________
_____________________________
____________________________
_____________________________
Initial Conditions: _100% power, diesel generator #1 is tagged out for maintenance.________________ ___________________________________________________________
Turnover:  __Reduce power to <95% per grid operator.___________________
Event No. Malf. No. Event Type* Event Description 1  R-ATCO N-BOPO N-CRS  Reduce power to <95% per OP
-4, Attachment 2.
2  I-ATCO TS-CRS PIC-244 fails, causing HCV
-204 (Letdown heat exchanger isolation valve ) to close. Alarms are for VCT level low and Pressurizer level high (CB-1,2,3/A2 Window B
-2 and CB-1,2,3/A4 Window A
-8). If pressurizer level goes >69.2%, TS 2.1.7 applies.
3  C-ATCO C-BOPO  HCV-153 opens, causing quench tank level to decrease. Alarm is CB-1,2,3/A4 Window C
-3. Action will be to restore level and close HCV-153 4  C-BOPO TS-CRS (CT) Inadvertent VIAS. AOP-23 Section IV.
TS 2.15(3) applies. Critical task is to reset relays that tripped and reset the inadvertent VIAS actuation.
5  C-BOPO TS-CRS Loss of 161 kV line. Alarm is CB
-20/A15, Window A
-1, 4160V Supply Breaker from 161KV Tripped, also Windows A
-2 and A-3. Since a fast transfer will occur, the ARP states to go to AOP-31. TS 2.7(2)c and TS 2.01 BOTH apply.
6  M-All Loss of 345kV line (LOOP)  Reactor trips, SRO enters EOP
-00 and after SPTA's, transfers to EOP
-07, due to below failure. Upon operator manually closing breaker, power will be restored to one vital bus.
7  C-BOPO (CT) AFW valve HCV
-1108A remains closed.
It can be opened from the control panel. EOP-07 Step 6.1.
Critical task is to restore AFW flow using either FW-54 or FW-10 to steam generator RC-2B prior to reaching 27% wide range level.
8  C-BOPO (CT) Diesel Generator #2 breaker fails to close automatically due to diesel not reaching rated speed. When operators increase governor, the output breaker will close once breaker synch conditions are met. See Step 12 of EOP
-07. Critical task is to perform this action before exiting EOP
-07. * (N)ormal,    (R)eactivity,    (I)nstrument,    (C)omponent,    (M)ajor
Scenario Event Description NRC Scenario #1 Page 2 of 17 SCENARIO
==SUMMARY==
NRC #1 The crew will assume the watch at 100% power, with diesel generator #1 out of service for maintenance, and instructions to downpower to less than 95% per OP
-4, LOAD CHANGE AND NORMAL POWER OPERATION, Attachment 2, "Load Reduction".
The first event is the power reduction which will continue until an observable effect on the reactor is seen (approximately 1
-2% load reduction).
The next event is a failure of PIC
-244 which senses pressure downstream of letdown backpressure control valve. This causes letdown to isolate. Operator actions are per ARP
-CB-1,2,3/A2 and require securing charging flow. Operators will use OI
-CH-1, CHEMICAL AND VOLUME CONTROL SYSTEM NORMAL OPERATION, to restore letdown and charging after manually overriding the HCV
-204 Interlock Override Switch in DEFEAT. SRO will refer to Technical Specifications. T.S. 2.1.7 might apply if pressurizer level goes above 69.2%.
The next event is a spurious opening of HCV
-153, quench tank drain valve, causing quench tank level to decrease. Operator actions are per ARP
-CB-1,2,3/A4 and include closing HCV
-153 and taking action to restore quench tank level using deaerated water.
The next event is an inadvertent ventilation isolation actuation signal. Operator actions are per ARP-AI-30B/A34-1 and AOP-23 and include verifying that the VIAS was inadvertent and taking actions to reset the relays and reset the actuation (these two steps are critical tasks). The SRO will refer to Technical Specifications. T.S. 2.15(3
) applies. The next event is a loss of the 161 KV line. Operator actions are per ARP
-CB-20/A15 and AOP-31, 161 KV GRID MALFUNCTIONS and include establishing balanced 4160 V bus loading by ensuring that condensate pump FW
-2A, feed pump FW
-4A and heater drain pump FW
-5A are operating. SRO will refer to Technical Specifications. T.S. 2.7.2(c) and TS 2.01 both apply
. Once actions for the loss of the 161 KV line are complete, there will be a loss of the 345 KV line, resulting in a LOOP. Diesel generator #2 does not reach rated speed and breaker does not automatically close, causing a station blackout. Crew will enter EOP
-00 and perform standard post trip actions.
Following diagnosis of event, SRO will transition to EOP
-07, STATION BLACKOUT.
While performing the actions for a station blackout, the crew should recognize that HCV
-1108A failed to open and will must restore AFW flow to the RC-2A steam generator (critical task
). The crew will also take actions to raise the governor speed for diesel generator #2, which will result in the breaker closing automatically (critical task
). Once this occurs and diesel generator #2 is feeding its respective bus, the scenario will be terminated.
ES-401 PWR Examination Outline Form ES-401-2  Facility:    Fort Calhoun Station Date of Exam:  16 April 2012 Tier  Group RO K/A Category Points SRO-Only Points K 1 K 2 K 3 K 4 K 5 K 6 A 1 A 2 A 3 A 4 G
* Total A2 G* Total 1. Emergency & Abnormal Plant Evolutions 1 3 3 3  N/A 2 3 N/A 4 18 3 3 6 2 1 1 2 2 1 2 9 1 3 4 Tier Totals 4 4 5 4 4 6 27 4 6 10  2. Plant Systems 1 4 3 3 2 1 2 3 3 3 2 2 28 2 3 5 2 0 0 0 1 2 1 2 1 1 2 0 10 1 1 1 3 Tier Totals 4 3 3 3 3 3 5 4 4 4 2 38 4 4 8 3. Generic Knowledge and Abilities Categories 1 2 3 4 10 1 2 3 4 7 3 2 2 3 2 2 1 2 Note: 1. Ensure that at least two topics from every applicable K/A category are sampled within each tier of the RO and SRO-only outlines (i.e., except for one category in Tier 3 of the SRO-only outline, the "Tier Totals" in each K/A category shall not be less than two).
: 2. The point total for each group and tier in the proposed outline must match that specified in the table.      The final point total for each group and tier may deviate by +/-1 from that specified in the table based on NRC revisions. The final RO exam must total 75 points and the SRO-only exam must total 25 points.
: 3. Systems/evolutions within each group are identified on the associated outline; systems or evolutions that do not apply at the facility should be deleted and justified; operationally important, site
-specific systems/evolutions that are not included on the outline should be added. Refer to Section D.1.b of ES
-401 for guidance regarding the elimination of inappropriate K/A statements.
: 4. Select topics from as many systems and evolutions as possible; sample every system or evolution in the group before selecting a second topic for any system or evolution.
: 5.        Absent a plant-specific priority, only those K/As having an importance rating (IR) of 2.5 or higher shall be selected.      Use the RO and SRO ratings for the RO and SRO-only portions, respectively.
: 6.        Select SRO topics for Tiers 1 and 2 from the shaded systems and K/A categories. 7.*    The generic (G) K/As in Tiers 1 and 2 shall be selected from Section 2 of the K/A Catalog, but the topics  must be relevant  to the applicable evolution or system. Refer to Section D.1.b of ES
-401 for the applicable K/As. 8.      On the following pages, enter the K/A numbers, a brief description of each topic, the topics' importance ratings (IRs) for the applicable license level, and the point totals (#) for each system and category. Enter the gro up and tier totals for each category in the table above; if fuel handling equipment is sampled in other than Category A2 or G* on the    SRO-only exam, enter it on the left side of Column A2 for Tier 2, Group 2 (Note #1 does not apply). Use duplicate pages for RO and SRO-only exams.
: 9.      For Tier 3, select topics from Section 2 of the K/A catalog, and enter the K/A numbers, descriptions, IRs, and point totals (#) on Form ES-401-3. Limit SRO selections to K/As that are linked to 10 CFR 55.43.
ES-401 2 Form ES-401-2  ES-401 PWR Examination Outline Form ES-401-2 Emergency and Abnormal Plant Evolutions
- Tier 1/Group 1 (RO / SRO) E/APE # / Name / Safety Function K 1 K 2 K 3 A 1 A 2 G K/A Topic(s)
IR # 000007 (BW/E02&E10
; CE/E02) Reactor Trip - Stabilization
- Recovery / 1      X 2.4.2 Knowledge of system set points, interlocks and automatic actions associated with EOP entry conditions.
  (CFR: 41.7, 45.7, 45.8) 4.5 51 000008 Pressurizer Vapor Space Accident / 3 X      Knowledge of the operational implications of the following concepts as they apply to a Pressurizer Vapor Space Accident:
AK1.02 Change in leak rate with change in pressure.  (CFR: 41.8, 41.10, 45.3) 3.1 41 000009 Small Break LOCA / 3 X  Ability to determine or interpret the following as they apply to a small break LOCA:
EA2.39 Adequate core cooling.
  (CFR: 43.5, 45.13) 4.3 46 000011 Large Break LOCA / 3 X    Knowledge of the interrelations between the following and the Large Break LOCA:
EK2.02 Pumps (CFR: 41.7, 45.7) 2.6* 40 000015/17 RCP Malfunctions / 4 X      Knowledge of the operational implications of the following concepts as they apply to Reactor Coolant Pump Malfunctions (Loss of RC Flow):
AK1.02 Consequences of an RCPS failure.
  (CFR: 41.8, 41.10, 45.3) 3.7 54 000022 Loss of Rx Coolant Makeup / 2 X  Ability to operate and / or monitor the following as they apply to the Loss of Reactor Coolant Makeup:
AA1.01 CVCS letdown and charging (CFR: 41.7, 45.5, 45.6) 3.4 42 000025 Loss of RHR System / 4 X    Knowledge of the interrelations between the Loss of Residual Heat Removal System and the following:
AK 2.02 LPI or Decay Heat Removal/RHR pumps
.  (CFR: 41.7, 45.7
) 3.2* 52 000026 Loss of Component Cooling Water / 8      X 2.4.35 Knowledge of local auxiliary operator tasks during an emergency and the resultant operational effects.  (CFR: 41.10, 43.5, 45.13) 3.8 43 000027 Pressurizer Pressure Control System Malfunction / 3 X    Knowledge of the interrelations between the Pressurizer Pressure Control Malfunctions and the following:
AK2.03:  Controllers and positioners (CFR: 41.7, 45.7) 2.6 47 000029 ATWS / 1
000038 Steam Gen. Tube Rupture / 3 X    Knowledge of the reasons for the following responses as they apply to the SGTR:
EK3.0 6 Actions contained in EOP for RCS water inventory balance, S/G tube rupture, and plant shutdown procedures (CFR: 41.5, 41.10, 45.6, 45.13) 4.2 44 000040 (BW/E05; CE/E05; W/E12)  Steam Line Rupture
- Excessive Heat      Transfer / 4 X 2.1.28 Knowledge of the purpose and function of major system components and controls (CFR: 41.7
) 4.1 50 000054 (CE/E06) Loss of Main  Feedwater / 4 X    Knowledge of the reasons for the following responses as they apply to the Loss of Feedwater:
EK3.4 RO or SRO function within the control room team as appropriate to the assigned position, in such a way that procedures are adhered to and the limitations in the facilities license and amendments are not violated.
  (CFR: 41.5, 41.10, 45.6, 45.13) 3.2 53 000055 Station Blackout / 6 X    Knowledge of the reasons for the following responses as they apply to the SBO:
EK3.02 Actions contained in EOP for loss of offsite and onsite power (CFR: 41.5, 41.10, 45.6, 45.13) 4.3 39 000056 Loss of Off-site Power / 6 X  Ability to determine and interpret the following as they apply to the Loss of Offsite Power:
AA2.54 Breaker position (remote and local)
  (CFR: 43.5, 45.13) 2.9 48 000057 Loss of Vital AC Inst. Bus / 6 X 2.2.37 Ability to determine operability and/or availability of safety related equipment.
  (CFR: 41.7, 43.5, 45.12
) 3.6 49 000058 Loss of DC Power / 6 X  Ability to operate and / or monitor the following as they apply to the Loss of DC Power:
AA1.01 Cross
-tie of the affected dc bus with the alternate supply
(CFR: 41.7, 45.5, 45.6) 3.4* 55 000062 Loss of Nuclear Svc Water / 4 000065 Loss of Instrument Air / 8 X  Ability to determine and interpret the following as they apply to the Loss of Instrument Air:
AA2.08 Failure modes of air
-operated equipment (CFR: 43.5, 45.13) 2.9* 45 W/E04 LOCA Outside Containment / 3 W/E11 Loss of Emergency Coolant Recirc. / 4 BW/E04; W/E05 Inadequate Heat  Transfer - Loss of Secondary Heat Sink /
4 000077 Generator Voltage and Electric Grid Disturbances / 6 X      Knowledge of the operational implications of the following concepts as they apply to Generator Voltage and Electric Grid Disturbances:
A K1.03 Under
-excitation (CFR: 41.4, 41.5, 41.7, 41.10, 45.8) 3.3 56          K/A Category Totals:
3 3 3 2 3 4 Group Point Total:
18/6 ES-401 3 Form ES-401-2    ES-401 PWR Examination Outline Form ES-401-2 Emergency and Abnormal Plant Evolutions
- Tier 1/Group 2 (RO / SRO) E/APE # / Name / Safety Function K 1 K 2 K 3 A 1 A 2 G K/A Topic(s)
IR # 000001 Continuous Rod Withdrawal / 1 000003 Dropped Control Rod / 1 000005 Inoperable/Stuck Control Rod / 1 X 2.4.11 Knowledge of abnormal condition procedures.
  (CFR:  41.10, 43.5, 45.13) 4.0 57 000024 Emergency Boration / 1 000028 Pressurizer Level Malfunction / 2 000032 Loss of Source Range NI / 7 000033 Loss of Intermediate Range NI / 7 000036 (BW/A08) Fuel Handling Accident / 8 X      Knowledge of the operational implications of the following concepts as they apply to Fuel Handling Incidents:  AK1.01 Radiation exposure hazards (CFR: 41.8, 41.10, 45.3) 3.5 64 000037 Steam Generator Tube Leak / 3 X    Knowledge of the reasons for the following responses as they apply to the Steam Generator Tube Leak:
AK3.10 Automatic actions associated with high radioactivity in the S/G sample lines.
3.3* 60 000051 Loss of Condenser Vacuum / 4 X 2.4.50 Ability to verify system alarm setpoints and operate controls identified in the alarm response manual.
  (CFR: 41.10, 43.5, 45.
: 3) 4.2 61 000059 Accidental Liquid RadWaste Rel. / 9 000060 Accidental Gaseous Radwaste Rel. / 9 000061 ARM System Alarms / 7 000067 Plant Fire On
-site / 8  X    Knowledge of the reasons for the following responses as the apply to the Plant Fire on Site:  AK3.04 Actions contained in EOP for plant fire on site
(CFR: 41.5, 41.10, 45.6, 45.13) 3.3 58 000068 (BW/A06) Control Room Evac. / 8 X  Ability to determine and interpret the following as they apply to the Control Room Evacuation:
AA2.06 RCS pressure
(CFR: 43.5, 45.13) 4.1 63 000069 (W/E14) Loss of CTMT Integrity / 5 000074 (W/E06&E07) Inad. Core Cooling / 4 000076 High Reactor Coolant Activity / 9
W/EO1 & E02 Rediagnosis & SI Termination / 3 W/E13 Steam Generator Over
-pressure / 4 W/E15 Containment Flooding / 5 W/E16 High Containment Radiation / 9 BW/A01 Plant Runback / 1 BW/A02&A03 Loss of NNI-X/Y / 7          BW/A04 Turbine Trip / 4 BW/A05 Emergency Diesel Actuation / 6 BW/A07 Flooding / 8 BW/E03 Inadequate Subcooling Margin / 4 BW/E08; W/E03 LOCA Cooldown
- Depress. / 4 BW/E09; CE/A13; W/E09&E10 Natural Circ. / 4 BW/E13&E14 EOP Rules and Enclosures CE/A11; W/E08 RCS Overcooling
- PTS / 4    X  Ability to operate and / or monitor the following as they apply to the (RCS Overcooling)
AA1.2 Operating behavior characteristics of the facility.
  (CFR: 41.7, 45.5, 45.6) 3.2 65 CE/A16 Excess RCS Leakage / 2 X  Ability to operate and / or monitor the following as they apply to the (Excess RCS Leakage)
AA1.1 Components and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.  (CFR: 41.7, 45.5, 45.6) 3.4 59 CE/E09 Functional Recovery X    Knowledge of the interrelations between the (Functional Recovery) and the following:
EK2.2 Facility's heat removal systems, including primary coolant, emergency coolant, the decay heat removal systems, and relations between the proper operation of these systems to the operation of the facility.  (CFR 41.5, 41.10, 45.6, 45.13) 3.7 62 K/A Category Point Totals:
1 1 2 2 1 2 Group Point Total:
9/4 ES-401 4 Form ES-401-2    ES-401 PWR Examination Outline Form ES-401-2 Plant Systems
- Tier 2/Group 1 (RO / SRO) System # / Name K 1 K 2 K 3 K 4 K 5 K 6 A 1 A 2 A 3 A 4 G K/A Topic(s)
IR # 003 Reactor Coolant Pump X X      Knowledge of RCPS design feature(s) and/or interlocks(s) which provide for the following:  K4.04 Adequate cooling of RCP motor and seals.
  (CFR: 41.7)
Knowledge of the operational implications of the following concepts as they apply to the RCPS:
K5.01 The relationship between the RCPS flow rate and the nuclear reactor core operating parameters (quadrant power tilt, imbalance, DNB rate, local power density, difference in loop T
-hot pressure)  (CFR: 41.5, 45.7) 2.8 3.3 1 
20 004 Chemical and Volume  Control        X  X Ability to (a) predict the impacts of the following malfunctions or operations on the CVCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations:
A2.15 High or low PZR level (CFR: 41.5, 43.5, 45.3, 45.5) 2.1.20 Ability to interpret and execute procedure steps (CFR: 41.10, 43.5, 45.11) 3.5 
4.6 2 
10 005 Residual Heat Removal X X        Knowledge of the bus power supplies to the following:
K2.03 RCS pressure boundary motor
-operated valves.
  (CFR: 41.7)
Knowledge of the effect that a loss or malfunction of the RHRS will have on the following:
K3.01  RCS (CFR: 41.7, 45.6) 2.7*
3.9 5 
9 006 Emergency Core Cooling X      Knowledge of the effect of a loss or malfunction the following will have on the ECCS:
K6.03 Safety Injection Pumps (CFR: 41.7, 45.7) 3.6 24 007 Pressurizer Relief/Quench Tank      X    Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating PRTS controls including:
A1.02 Maintaining quench tank pressure  (CFR: 41.5
) 2.7 13 008 Component Cooling Water X      X  Knowledge of the effect that a loss or malfunction of the CCWS will have on the following:
K3.01 Loads cooled by CCWS.
  (No CFR listed for this K3)
Ability to monitor automatic operation of the CCWS, including:
A3.04 Requirements on and for the CCWS for different conditions of the power plant.
  (CFR: 41.7, 45.5) 3.4 2.9 4    23 010 Pressurizer Pressure Control X          Knowledge of the physical connections and/or cause
-effect relationships between the PZR PCS and the following systems:
K1.01 RPS  (CFR: 41.2 to 41.9, 45.7, 45.8) 3.9 6 012 Reactor Protection X  Ability to monitor automatic operation of the RPS, including:
A3.03 Power supply (CFR: 41.7, 45.5) 3.4 18 013 Engineered Safety Features Actuation X    Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the ESFAS controls including:
A1.07 Containment radiation (CFR: 41.5, 45.5) 3.6 12 022 Containment Cooling X  Ability to manually operate and/or monitor in the control room:
A4.01 CCS fans  (CFR: 41.7, 45.5 to 45.8) 3.6 27 025 Ice Condenser
026 Containment Spray X    Ability to (a) predict the impacts of the following malfunctions or operations on the CSS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations:
A2.08 Safe securing of containment spray (when it can be done)
  (CFR: 41.5, 43.5, 45.3, 45.13) 3.2 19 039 Main and Reheat Steam X  Ability to monitor automatic operation of the MRSS, including:
A3.02 Isolation of the MRSS (CFR: 41.5, 45.5) 3.1 3 059 Main Feedwater X    Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the MFW controls including:
A1.03 Power level restrictions for operation of MFW pumps and valves.
  (CFR: 41.5, 45.5) 2.7* 7 061 Auxiliary/Emergency Feedwater X      Knowledge of the effect of a loss or malfunction of the following will have on the AFW components:
K6.01 Controllers and positioners (CFR: 41.7, 45.7) 2.5 17 062 AC Electrical Distribution X      X    Knowledge of bus power supplies to the following
:  K2.01 Major system loads (CFR: 41.7
)  Ability to (a) predict the impacts of the following malfunctions or operations on the ac distribution system; and (b) based on those predictions, use procedure to correct, control, or mitigate the consequences of those malfunctions or operations:
A2.05 Methods for energizing a dead bus (CFR: 41.5, 43.5, 45.3, 45.13) 3.3 2.9 11
26 063 DC Electrical Distribution X        X  Knowledge of the physical connections and/or caus e-effect relationships between the DC electrical system and the following systems:  K1.02 AC electrical system (CFR: 41.2 to 41.9, 45.7, 45.8)
Ability to manually operate and/or monitor in the control room:
A4.03 Battery discharge rate (CFR: 41.7, 45.5 to 45.8) 2.7 
3.0* 14 
28 064 Emergency Diesel Generator X          Knowledge of the physical connections and/or cause
-effect relationships between the ED/G system and the following systems:
K1.03 Diesel fuel oil supply system (CFR: 41.2 to 41.9, 45.7, 45.8) 3.6 8 073 Process Radiation Monitoring X        Knowledge of PRM system design feature(s) and/or interlock(s) which provide for the following:
K4.0 1 Release termination when radiation exceeds setpoint.
(CFR: 41.7) 4.0 16 076 Service Water  X        X Knowledge of bus power supplies to the following:
K2.01 Service water (CFR: 41.7) 2.4.4 Ability to recognize abnormal indications for system operating parameters that are entry
-level conditions for emergency and abnormal operating procedures.
  (CFR: 41.10, 43.2, 45.6) 2.7*
4.5 25
21 078 Instrument Air X          Knowledge of the physical connections and/or cause
-effect relationships between the IAS and the following systems:
K1.03 Containment air (CFR: 41.2 to 41.9, 45.7, 45.8) 3.3* 15 103 Containment X        Knowledge of the effect that a loss or malfunction of the containment system will have on the following:
K3.02 Loss of containment integrity under normal operations (CFR: 41.7) 3.8  22  K/A Category Point Totals: 4 3 3 2 1 2 3 3 3 2 2 Group Point Total:
28/5 ES-401 5 Form ES-401-2    ES-401 PWR Examination Outline Form ES-401-2 Plant Systems
- Tier 2/Group 2 (RO / SRO) System # / Name K 1 K 2 K 3 K 4 K 5 K 6 A 1 A 2 A 3 A 4 G K/A Topic(s)
IR # 001 Control Rod Drive X      Knowledge of the following operational implications as they apply to the CRDS:  K5.28 Boron reactivity worth vs. boron concentration, i.e., amount of boron needed (ppm) to change core reactivity to desired amount (CFR: 41.5, 45.7) 3.5 38 002 Reactor Coolant X      Knowledge of the effect or a loss or malfunction on  the following RCS components:
K6.03 Reactor vessel level indication (CFR: 41.7, 45.7)`
3.1 37 011 Pressurizer Level Control X    Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the PZR LCS controls including:
A1.03 VCT level (CFR: 41.5, 45.5) 2.8 32 014 Rod Position Indication X  Ability to manually operate and/or monitor in the control room:
A4.02 Control rod mode
-select switch (CFR: 41.5, 45.7) 3.4 35 015 Nuclear Instrumentation X  Ability to monitor automatic operation of the NIS, including:
A3.02 Annunciator and alarm signals (CFR: 41.7) 3.7 31 016 Non-nuclear Instrumentation 017 In-core Temperature Monitor 027 Containment Iodine Removal 028 Hydrogen Recombiner and Purge Control 029 Containment Purge
033 Spent Fuel Pool Cooling X    Ability to (a) predict the impacts of the following malfunctions or operations on the Spent Fuel Pool Cooling System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations:
A2.02  Loss of SFPCS (CFR:  41.5, 43.5, 45.3, 45.13) 2.7 34 034 Fuel Handling Equipment 035 Steam Generator X      Knowledge of operational implications of the following concepts as they apply to the S/GS:
K5.03 Shrink and swell concept.
  (CFR: 41.5, 45.7) 2.8 30 041 Steam Dump/Turbine Bypass Control 045 Main Turbine Generator 055 Condenser Air Removal 056 Condensate 068 Liquid Radwaste 071 Waste Gas Disposal 072 Area Radiation Monitoring X  Ability to manually operate and/or monitor in the control room:
A4.01  Alarm and interlock setpoint checks and adjustments (CFR:  41.7, 45.5
-45.8) 3.0* 33 075 Circulating Water X        Knowledge of circulating water system design feature(s) and interlock(s) which provide for the following:
K4.01 Heat sink
(CFR: 41.7, 45.6) 2.5 36 079 Station Air 086 Fire Protection X    Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with Fire Protection System operating the controls including:
A1.01 Fire header pressure (CFR: 41.5, 45.5) 2.9 29                                                            K/A Category Point Totals:
0 0 0 1 2 1 2 1 1 2 0 Group Point Total:
10/3 ES-401 2 Form ES-401-2  ES-401 PWR Examination Outline Form ES-401-2 Emergency and Abnormal Plant Evolutions
- Tier 1/Group 1 (RO / SRO) E/APE # / Name / Safety Function K 1 K 2 K 3 A 1 A 2 G K/A Topic(s)
IR # 000007 (BW/E02&E10; CE/E02) Reactor Trip - Stabilization
- Recovery / 1 000008 Pressurizer Vapor Space Accident / 3 000009 Small Break LOCA / 3 X  Ability to determine and interpret the following as they apply to a small break LOCA
: EA2.36Difference between overcooling and LOCA indications (CFR 43.5) 4.6 76 000011 Large Break LOCA / 3 000015/17 RCP Malfunctions / 4 000022 Loss of Rx Coolant Makeup / 2 X 2.4.21 Knowledge of the parameters and logic used to assess the status of safety functions, such as reactivity control, core cooling and heat removal, reactor coolant system integrity, containment conditions, radioactivity release control, etc.
  (CFR: 41.7, 43.5, 45.12) 4.6 77 000025 Loss of RHR System / 4 000026 Loss of Component Cooling Water / 8          000027 Pressurizer Pressure Control System Malfunction / 3 000029 ATWS / 1 000038 Steam Gen. Tube Rupture / 3 X  Ability to determine and interpret the following as they apply to a SGTR:
EA2.14 Magnitude of atmospheric radioactive release if cool down must be completed using steam dumps or if atmospheric reliefs lift.
CFR (55.43.4) 4.6 78 000040 (BW/E05; CE/E05; W/E12)  Steam Line Rupture
- Excessive Heat      Transfer / 4 X  Ability to determine and interpret the following as they apply to the (Excess Steam Demand):
EA2.1 Facility conditions and selection of appropriate procedures during abnormal and emergency operations.
(CFR 43.5) 4.0 79 000054 (CE/E06) Loss of Main  Feedwater / 4 000055 Station Blackout / 6 X 2.4.8 Knowledge of how AOP's are used in conjunction with EOP's (CFR 43.5) 4.5 81 000056 Loss of Off-site Power / 6 X 2.2.22 Knowledge of limiting conditions for operations and safety limits.
  (CFR: 41.5, 43.2, 45.2) 4.7 80 000057 Loss of Vital AC Inst. Bus / 6
000058 Loss of DC Power / 6 000062 Loss of Nuclear Svc Water / 4 000065 Loss of Instrument Air / 8 W/E04 LOCA Outside Containment / 3 W/E11 Loss of Emergency Coolant Recirc. / 4 BW/E04; W/E05 Inadequate Heat  Transfer - Loss of Secondary Heat Sink / 4 000077 Generator Voltage and Electric Grid Disturbances / 6 K/A Category Totals:
3 3 Group Point Total:
18/6 ES-401 3 Form ES-401-2    ES-401 PWR Examination Outline Form ES-401-2 Emergency and Abnormal Plant Evolutions
- Tier 1/Group 2 (RO / SRO) E/APE # / Name / Safety Function K 1 K 2 K 3 A 1 A 2 G K/A Topic(s)
IR # 000001 Continuous Rod Withdrawal / 1 000003 Dropped Control Rod / 1 000005 Inoperable/Stuck Control Rod / 1 X 2.2.37 Ability to determine operability of safety related equipment (CFR :43.2) 4.6 82 000024 Emergency Boration / 1 000028 Pressurizer Level Malfunction / 2 000032 Loss of Source Range NI / 7 000033 Loss of Intermediate Range NI / 7 000036 (BW/A08) Fuel Handling Accident / 8 000037 Steam Generator Tube Leak / 3 000051 Loss of Condenser Vacuum / 4 000059 Accidental Liquid RadWaste Rel. / 9 000060 Accidental Gaseous Radwaste Rel. / 9 000061 ARM System Alarms / 7 000067 Plant Fire On
-site / 8          000068 (BW/A06) Control Room Evac. / 8 X 2.4.11 Knowledge of abnormal condition procedures.
(CFR:  43.5) 4.2 84 000069 (W/E14) Loss of CTMT Integrity / 5 X 2.2.40 Ability to apply TS for a system (CFR: 43.2) 4.7 83 000074 (W/E06&E07) Inad. Core Cooling / 4 000076 High Reactor Coolant Activity / 9 W/EO1 & E02 Rediagnosis & SI Termination / 3 W/E13 Steam Generator Over
-pressure / 4 W/E15 Containment Flooding / 5 W/E16 High Containment Radiation / 9 BW/A01 Plant Runback / 1 BW/A02&A03 Loss of NNI-X/Y / 7          BW/A04 Turbine Trip / 4 BW/A05 Emergency Diesel Actuation / 6 BW/A07 Flooding / 8 BW/E03 Inadequate Subcooling Margin / 4 BW/E08; W/E03 LOCA Cooldown
- Depress. / 4 BW/E09; CE/A13; W/E09&E10 Natural Circ. / 4 BW/E13&E14 EOP Rules and Enclosures CE/A11; W/E08 RCS Overcooling
- PTS / 4 CE/A16 Excess RCS Leakage / 2 X  Ability to determine and interpret the following as they apply to the (Excess RCS Leakage)
AA2.1 Facility conditions and selection of appropriate procedures during abnormal and emergency operations.
(CFR: 43.5, 45.13) 3.5 85 CE/E09 Functional Recovery K/A Category Point Totals:
1 3 Group Point Total:
9/4 ES-401 4 Form ES-401-2    ES-401 PWR Examination Outline Form ES-401-2 Plant Systems
- Tier 2/Group 1 (RO / SRO) System # / Name K 1 K 2 K 3 K 4 K 5 K 6 A 1 A 2 A 3 A 4 G K/A Topic(s)
IR # 003 Reactor Coolant Pump 004 Chemical and Volume  Control                005 Residual Heat Removal 006 Emergency Core Cooling X 2.2.38 Knowledge of conditions and limitations in the facility license.
  (CFR: 43.1
) 4.5 86 007 Pressurizer Relief/Quench Tank              008 Component Cooling Water X    Ability to (a) predict the impacts of the following malfunctions or operations on the CCWS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations;
A2.0 3 High/Low CCW Temperature (CFR: 41.5, 43.5, 45.3, 45.
: 13) 3.2 89 010 Pressurizer Pressure Control X 2.2.37 Ability to determine operability and/or availability of safety related equipment.
  (CFR: 41.7, 43.5, 45.13) 4.6 87 012 Reactor Protection 013 Engineered Safety Features Actuation X    Ability to (a) predict the impacts of the following malfunctions or operations on the ESFAS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations;
A2.06 Inadvertent ESFAS actuation (CFR: 41.5, 43.5, 45.3, 45.13) 4.0 88 022 Containment Cooling 025 Ice Condenser 026 Containment Spray 039 Main and Reheat Steam 059 Main Feedwater 061 Auxiliary/Emergency Feedwater 062 AC Electrical Distribution
063 DC Electrical Distribution 064 Emergency Diesel Generator X 2.2.42 Ability to recognize system parameters that are entry level conditions for Technical Specifications (CFR: 43.2, 43.3) 4.6 90 073 Process Radiation  Monitoring 076 Service Water 078 Instrument Air 103 Containment K/A Category Point Totals:
2  3 Group Point Total:
28/5 ES-401 5 Form ES-401-2    ES-401 PWR Examination Outline Form ES-401-2 Plant Systems
- Tier 2/Group 2 (RO / SRO) System # / Name K 1 K 2 K 3 K 4 K 5 K 6 A 1 A 2 A 3 A 4 G K/A Topic(s)
IR # 001 Control Rod Drive 002 Reactor Coolant 011 Pressurizer Level Control 014 Rod Position Indication 015 Nuclear Instrumentation 016 Non-nuclear Instrumentation 017 In-core Temperature Monitor 027 Containment Iodine Removal X 2.2.25 Knowledge of the bases in TS for LCO's and safety limits (CFR 43.2) 4.2 91 028 Hydrogen Recombiner and Purge Control 029 Containment Purge 033 Spent Fuel Pool Cooling 034 Fuel Handling Equipment X        Knowledge of design feature(s) and/or interlock(s) which provide for the following:
K4.02 Fuel movement (CFR: 41.7) 3.3 92 035 Steam Generator 041 Steam Dump/Turbine  Bypass Control 045 Main Turbine Generator 055 Condenser Air Removal              056 Condensate 068 Liquid Radwaste 071 Waste Gas Disposal X    Ability to (a) predict the impacts of the following malfunctions or operations on the Waste Gas Disposal System; and (b) based on those predictions, use procedures, to correct, control, or mitigate the consequences of those malfunctions or operations:
A2.02 Use of waste gas release monitors, radiation, gas flow rate, and totalizer (CFR: 41.5, 43.5, 45.3, 45.13) 3.6 93 072 Area Radiation Monitoring
075 Circulating Water 079 Station Air 086 Fire Protection K/A Category Point Totals:
1    1  1 Group Point Total:
10/3 ES-401 Generic Knowledge and Abilities Outline (Tier
: 3) Form ES-401-3      Facility:                                            Date of Exam:
Category K/A # Topic RO SRO-Only IR # IR #  1. Conduct of Operations 2.1.3 Knowledge of shift or short term relief turnover practices.
  (CFR: 41.10, 45.1 3) 3.7 74  2.1.4 Knowledge of individual licensed operator responsibilities related to shift staffing, such as medical requirements, "no-solo" operation, maintenance of active license status, 10CFR55, etc.
  (CFR: 41.10, 43.2) 3.3 72  2.1.15 Knowledge of administrative requirements for temporary management directives, such as standing orders, night orders, Operations memos, etc.
  (CFR: 41.10, 45.12) 2.7 68  2.1.35 Knowledge of the fuel
-handling responsibilities of SROs.
  (CFR: 41.10, 43.7) 3.9 94 2.1.37 Knowledge of procedures, guidelines, or limitations associated with reactivity management.
  (CFR: 41.1, 43.6, 45.6) 4.6 95      Subtotal  3  2    2. Equipment Control 2.2.2 Ability to manipulate the console controls as required to operate the facility between shutdown and designated power levels.
  (CFR: 41.6, 41.7, 45.2) 4.6 67  2.2.13 Knowledge of tagging and clearance procedures (CFR: 41.10, 43.5, 45.13) 4.1 69  2.2.6 Knowledge of the process for making changes to procedures.
  (CFR: 41.10, 43.3, 45.13)  3.6 96 2.2.12 Knowledge of Surveillance Procedures (CFR: 41.7, 41.10, 43.1, 45.13) 4.2 97 2.2.      2.2.      Subtotal  2  2  2.3.     
: 3. Radiation Control 2.3.11 Ability to control radiation releases.
  (CFR: 41.11, 43.4, 45.10) 3.8 71  2.3.13 Knowledge of radiological safety procedures pertaining to licensed operator duties, such as response to radiation monitor alarms, containment entry requirements, fuel handling responsibilities, access to locked high-radiation areas, aligning filters, etc.
3.4 66  2.3.4 Knowledge of radiation exposure limits under normal or emergency conditions.
(CFR: 43.4)  3.7 98 2.3.      2.3.      Subtotal  2  1  4. Emergency Procedures / Plan 2.4.13 Knowledge of crew roles and responsibilities during EOP usage.  (CFR: 41.10, 45.12
) 4.0 73  2.4.37 Knowledge of the lines of authority during implementation of the emergency plan.
  (CFR: 41.10, 45.13) 3.0 75  2.4.17 2.4.17 Knowledge of EOP terms and definitions.
  (CFR: 41.10, 45.13
) 3.9 70  2.4.8 Knowledge of how abnormal operating procedures are used in conjunction with EOPs.
  (CFR: 41.10, 43.5, 45.13) 4.5 99 2.4.9 Knowledge of low power / shutdown implications in accident (e.g. Loss of coolant accident loss of residual heat removal) mitigation strategies.
(CFR: 41.10, 43.5, 45.13) 4.2 100 2.4.      Subtotal  3  2 Tier 3 Point Total 10  7 ES-401 Record of Rejected K/As Form ES-401-4  Tier / Group Randomly Selected K/A Reason for Rejection 1/1 APE 022 AK2.01-2.06 No importance rating 1/1 APE 27  AK2.01, AK2.02, AK2.04,  Importance rating not  1/1  EK2.01-2.07 Importance rating not  1/1    1/2    2/1  Importance rating not  2/1  A2.02 Resample to obtain required (by NUREG
-1021) sample of category  2/1 006 K6.04 K6.16 Importance rating not  2/1 007 K4.02  Importance rating not  2/1 022 K6.01 -  Importance rating not  2/1 026 A2.06 Importance rating not  2/1 026 A2.01 recirculation is not an expected plant response (A2.01). Also, FCS  2/1  No importance rating . Randomly . 2/1  A1.07  2/1 062 A1.02  Importance rating not  2/1  K1.04 Importance rating not  2/1  K4.02  2/2 014 A4 Resample to obtain required (by NUREG
-1021) sample of category  2/2 014 2/2 027 K2.01 cted Steam  2/2  Importance rating not  2/2    2/2  Importance rating not  2/2    2/1 004  A2. 2/1  2.4.41 - 2/2 001  1/1  Resampled  2/1    2/1    2/1  - 2/2  Resampled for better question distribution. Too many containment  2/2 001  2/2  A2.04 Resampled for better question distribution. Too many liquid  2/2 041 A4.07 FCS does not remote gag stuck open  2/2  A1.04  1/1    1/2 00040 2.2.42  1/2  2.2.40 - 1/2  AK1.01  to obtain better K/A distribution and issue distribution (already  7 n 2/2  modification cannot be completed until plant restarts, and mpled  1/2 000076  1/1  2/1 0007 K4.01 2.2.20  2.4.42 - definitions.
Tier / Group  Randomly Selected K/A Reason for Rejection  1 / 1  -  1 / 1  - rejected since not capable - Transfer EA2.1 1 / 1  000022 Loss of RCS makeup
-K/A since selection. Reselected  1 / 1    only ,
1 / 1  K 1 / 2      K/A G , rejected since  Inoperable/Stuck Control Rod , K/A  1 / 2      K/A , rejected since not capable topic and K/A,  Containment Integrity, K/A 2.2.40 2 / 1    order to balance CFR diselected for plant mods.
2 / 1      2 / 1    2 / 2 G2.2.22        G2.2.12 1/1  -}}

Revision as of 01:40, 2 August 2018

FC-2012-04 Final Written and Op Test Outlines
ML12153A278
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 04/20/2012
From:
Division of Reactor Safety IV
To:
References
50-285/12-004
Download: ML12153A278 (42)


Text

ES-301 Administrative Topics Outline Form ES-301-1 Facility: Fort Calhoun Station Date of Examination: April 16, 2012 Examination Level: RO Operating Test Number: 2012

-0 1 Administrative Topic (see Note) Type Code* Describe activity to be performed RA1: Conduct of Operations N, R Calculate the estimated critical boron concentration for a reactor startup (Per TDB-II worksheet and curves

) K/A 2.1.25 Ability to interpret reference materials, such as graphs, curves, tables, etc (CFR: 41.10, 45.12)

RO IR: 3.9 RA2: Conduct of Operations N, R Performa a Quadrant Power Tilt Calculation with Excore detectors operable and ERF inoperable per OI-NI-1 K/A 2.1.20 Ability to interpret and execute procedure steps (CFR: 41.10, 45.12)

RO IR: 4.6 RA3: Equipment Control N, R Prepare a manual clearance for maintenance on component cooling water pump AC

-3C. K/A 2.2.13 Knowledge of tagging and clearance procedures (CFR: 41.10, 45.13)

RO IR: 4.1 RA4: Radiation Control N , R Determine whether to install shielding based on given dose rates and work times.

K/A 2.3.12 Knowledge of radiological safety principles pertaining to licensed operator duties, such as containment entry requirements, fuel handling responsibilities, access to locked high

-radiation areas, aligning filters, etc. (CFR: 45.9, 45.10)

RO IR: 3.2 Emergency Procedures/Plan N/A NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.

  • Type Codes & Criteria:

(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( (N)ew or (M)odified from bank ( (P)revious 2 exams ( ES-301 Administrative Topics Outline Form ES-301-1 Facility: Fort Calhoun Station Date of Examination: April 16, 2012 Examination Level: SRO Operating Test Number: 2012

-0 1 Administrative Topic (see Note) Type Code* Describe activity to be performed SA1: Conduct of Operations N , R Calculate amount of water and boric acid required to raise SIRWT level ten inches and maintain current SIRWT boric acid concentration.

K/A 2.1.25 Ability to interpret reference materials, such as graphs, curves, tables, etc.

(CFR: 43.5, 45.12

) SRO IR: 4.

2 SA2: Conduct of Operations (same as RA2) N , R Perform a Quadrant Power Tilt Calculation with Excore detectors operable and ERF inoperable per OI

-NI-1 K/A 2.1.20 Ability to interpret and execute procedure steps (CFR: 43.5, 45.12)

SRO IR: 4.6 SA3: Equipment Control N , R Review manual clearance for maintenance on component cooling water pump AC

-3C. K/A 2.2.13 Knowledge of tagging and clearance procedures (CFR: 45.13)

SRO IR: 4.3 SA4: Radiation Control N , R Determine whether to install shielding based on given dose rates and work times. K/A 2.3.12 Knowledge of radiological safety principles pertaining to licensed operator duties, such as containment entry requirements, fuel handling responsibilities, access to locked high

-radiation areas, aligning filters, etc.

(CFR: 45.9, 45.10)

SRO IR: 3.

7 SA5: Emergency Procedures/Plan N , R Determine Emergency Action Level for a given emergency.

K/A 2.4.38 Ability to take actions called for in the facility emergency plan, including supporting or acting as emergency coordinator if required. (CFR: 43.5, 45.11)

SRO IR: 4.4 NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.

  • Type Codes & Criteria:

(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( (N)ew or (M)odified from bank ( (P)revious 2 exams (

ES-301 Control Room/In

-Plant Systems Outline Form ES-301-2 Facility: Fort Calhoun Station Date of Examination: April 16, 2012 Exam Level: RO Operating Test No.: 2012

-0 1 Control Room Systems

@ --U, including 1 ESF)

System / JPM Title Type Code*

Safety Function S-1: Swap pressurizer pressure mode from manual to automatic, followed by spurious actuation of PORV (block valve initially fails to close) N, A, S 3 S-2: Engineered Safeguards Actuation Verification (A PPLS relay fails to actuate, requiring manual initiation of PPLS, and HPSI injection valves fail to open, requiring control room action to open)

N, EN, A, S 2 S-3: Place a containment cooling unit in service (VA-8A/VA-7C) D , S 5 S-4: Place shutdown cooling in service per OI-SC-1, Att. 1 N, L, S 4P S-5: Maintain S/G water levels during startup using AFW.

(Loss of AFW, have to start a main feedwater pump to restore flow)

N, A, L, S 4S S-6: Valve strok e time testing of containment pressure relief valve HCV-246B N, S 8 S-7: Dilute to achieve desired boron concentration for desired critical rod height (an unexpected reactivity increase occurs, requiring securing of dilution

) N, A, L, S 1 S-8: Transfer non-vital buses 1A1 and 1A2 onto 345kV bus per AOP

-32 N, S 6 In-Plant Systems

@ --U) P-1: Respond to a steam bound AFW pump FW-6 (MDAFW pump)

D , E 4S P-2: Rack down a non

-remote equipped 4160V circuit breaker N 6 P-3: Waste gas transfer from the vent header to the gas decay t ank D , A, R 9 @ All RO and SRO

-I control room (and in

-plant) systems must be different and serve different safety -U systems must serve different -plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO

-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in

-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 - / - / 3 /

ES-301 Control Room/In

-Plant Systems Outline Form ES-301-2 Facility: Fort Calhoun Station Date of Examination: April 16, 2012 Exam Level: SRO

-I Operating Test No.: 2012

-0 1 Control Room Systems

@ --U, including 1 ESF)

System / JPM Title Type Code*

Safety Function S-1: Swap pressurizer pressure mode from manual to automatic, followed by spurious actuation of PORV (block valve initially fails to close) N, A, S 3 S-2: Engineered Safeguards Actuation Verification (A PPLS relay fails to actuate, requiring manual initiation of PPLS, and HPSI injection valves fail to open, requiring control room action to open)

N, EN, A, S 2 S-3: Place a containment cooling unit in service (VA

-8A/VA-7C) D, S 5 S-5: Maintain S/G water levels during startup using AFW. (Loss of AFW, have to start a main feedwater pump to restore flow)

N, A, L, S 4S S-6: Valve stroke time testing of containment pressure relief valve HCV-246B N, S 8 S-7: Dilute to achieve desired boron concentration for desired critical rod height (an unexpected reactivity increase occurs, requiring securing of dilution)

N, A, L, S 1 S-8: Transfer non

-vital buses 1A1 and 1A2 onto 345kV bus per AOP

-32 N, S 6 In-Plant Systems

@ --U) P-1: Respond to a steam bound AFW pump FW

-6 (MDAFW pump) D, E 4S P-2: Rack down a non

-remote equipped 4160V circuit breaker N 6 P-3: Waste gas transfer from the vent header to the gas decay tank D, A, R 9 @ All RO and SRO

-I control room (and in

-plant) systems must be different and serve different safety

--plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO

-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in

-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 - / - /

ES-301 Control Room/In

-Plant Systems Outline Form ES-301-2 Facility: Fort Calhoun Station Date of Examination: April 16, 2012 Exam Level: SRO

-U Operating Test No.: 2012

-0 1 Control Room Systems

@ --U, including 1 ESF)

System / JPM Title Type Code*

Safety Function S-1: Swap pressurizer pressure mode from manual to automatic, followed by spurious actuation of PORV (block valve initially fails to close) N, A, S 3 S-2: Engineered Safeguards Actuation Verification (A PPLS relay fails to actuate, requiring manual initiation of PPLS, and HPSI injection valves fail to open, requiring control room action to open)

N, EN, A, S 2 S-7: Dilute to achieve desired boron concentration for desired critical rod height (an unexpected reactivity increase occurs, requiring securing of dilution)

N, A, L, S 1 In-Plant Systems

@ --U) P-1: Respond to a steam bound AFW pump FW

-6 (MDAFW pump)

D, E 4S P-3: Waste gas transfer from the vent header to the gas decay tank D, A, R 9 @ All RO and SRO

-I control room (and in

-plant) systems must be different and serve different safety -U systems must -plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO

-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in

-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 - / - /

Page 1 of 16 Appendix D Scenario Outline Form ES-D-1 Facility: _

Fort Calhoun Station__ Scenario No.: __2____ Revision __1__

Op-Test No.: _______

Examiners: ____________________________ Operators:

_____________________________

____________________________

_____________________________

____________________________

_____________________________

Initial Conditions: 100% power.

Condensate pump FW

-2B is currently in service

____________

__________________________________________________________________________________________________________________________________________________________________

Turnover: ____. Rotate condensate pumps FW

-2B and FW-2C._____________________________

Event No. Malf. No. Event Type* Event Description 1 N/A N-BOPO Rotate condensate pumps FW

-2B and FW-2C per OI-FW-1 Attachment 4.

2 C-ATCO TS-CRS Charging pump CH1B trips. Alarm CB

-1,2,3/A2, Window A

-6L. This isolates letdown. Another charging pump should be started per OI-CH-1. T.S. 2.15(5) applies because it requires CH

-1B and other instruments for AI

-179 (Alt shutdown panel) 3 I-BOPO LT-903Y (Steam generator RC

-1 level transmitter) degrades over a 10 minute period until it fails. This will shift FWCS to manual at the last good signal, requiring operator action to restore level. Alarm is ARP-DCS-FW, L0903E_AL5.

4 I-ATCO TS-CRS Pressurizer pressure instrument fails high. Possible TS 2.10.4(5) if pressure falls below 2075 psia. Uses ARP

-CB-1,2,3/A4 Window B

-4 Pressurizer Pressure Deviation 5 C-ATCO C-BOPO TS-CRS Dropped CEA 4

-01. Alarm CB

-4/A8 Window A

-5L. This will send the operators to AOP-02, which has actions to stabilize the plant. TS 2.10.2(4)(e)

Section III applies because the rod is dropped, this will require a rapid down

-power per AOP

-05. 6 N/A R-ATCO N-BOPO Rapid down

-power per AOP-05. 7 M-All RCP Seal Cooler Leak of CVC16. Due to high RCP temperatures, AOP-35 will be entered. AOP

-35 will direct the operators to trip the reactor and enter EOP

-00. This is an intersystem LOCA. EOP

-03 will be entered after SPTA's are performed.

TS 2.1.4(3) applies but is not counted because it is part of the major event and per the NUREG may be over

-shadowed by it.

8 C-BOPO (CT) Turbine fails to trip. Critical task is for BOP to immediately trip the turbine before performing other SPTA's 9 C-ATCO C-BOPO (CT) HCV-438C fails to close on demand. This LOCA cannot be isolated. It will require a cooldown and depressurization to stop the LOCA. Critical task is to lower RCS pressure before attempting to locally close HCV

-438C. * (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

Scenario Event Description NRC Scenario #

2 Page 2 of 16 SCENARIO

SUMMARY

NRC #

2 The crew will assume the watch at 100% power with no equipment out of service and instructions to swap condensate pumps FW

-2B and FW-2C.

The first event is swapping out the two condensate pumps per OI

-FW-1, CONDENSATE SYSTEM NORMAL OPERATION, Attachment 4.

The next event is a trip of charging pump CH

-1B, which secures charging flow. Operator actions are per ARP-CB-1,2,3/A2 and include securing letdown. Operator action is then to restore charging and letdown per OI

-CH-1, CHEMICAL AND VOLUME CONTROL SYSTEM NORMAL OPERATION.

SRO will refer to the Technical Specification. T.S. 2.15(5) applies for the loss of CH-1B. The next event is a degradation of LT

-903Y to 40% over a 10 minute period before failing low, resulting in an incorrect setting on the feedwater digital control system. Operator actions are per ARP-DCS-FW, L0903E_AL5 and include the operator taking manual control of the main feed regulating valve to restore steam generator levels to program.

The next event is the controlling pressurizer pressure instrument, PT

-103X failing high. Operator actions are per ARP

-CB-1,2,3/A4 and include taking the controller to manual to maintain pressurizer pressure, and shifting pressure control to PC

-103Y. SRO will refer to Technical Specifications. T.S. 2.10.4(5)(a)(ii) applies if pressure falls below 2075 psia.

The next event is a CEA drop of CEA 4

-01. Operator actions are per ARP

-CB-4/A8 and AOP-02, CEA AND CONTROL SYSTEM MALFUNCTIONS and include stabilizing the plant and taking action to -5, EMERGENCY SHUTDOWN. SRO will refer to Technical Specifications. T.S. 2.10.2(4)(e) applies. Once actions have been taken to start lowering reactor power to less than 70%, a 100% severity RCP seal cooler leak on CVC 16 will be cued. Operator actions are from ARP

-CB-1,2,3/A1 and AOP

-35, REACTOR COOLANT PUMP MALFUNCTIONS. At this time one of the bearing temperatures will exceed the trip criteria for the RCP. Operators will manually trip the reactor and enter EOP

-00. They will also trip the RCP whose trip criteria was exceeded (RCP 3A). When the operators manually trip the reactor, the turbine will fail to trip and the operators will take action to manually trip the turbine (critical task

). After actions of EOP

-00 are complete, the SRO will direct entry into EOP

-03 for a loss of coolant acciden

t. When operators attempt to isolate the leak by closing HCV

-438C, it fails to close. Operators must commence a cooldown and depressurization prior to sending a local operator to close this valve (critical task

). TS 2.1.4(3) applies but is not counted because it is part of the major event and per the NUREG may be over

-shadowed by it.

The scenario can be terminated once actions have begun to cooldown and depressurize the RCS to allow local operator action to close HCV

-438C.

Page 1 of 18 Appendix D Scenario Outline Form ES-D-1 Facility: _Fort Calhoun Station__ Scenario No.: ___3____ Revision __1__

Op-Test No.: _______

Examiners: ____________________________ Operators:

_____________________________

____________________________

_____________________________

____________________________

_____________________________

Initial Conditions: _Reactor is currently at approximately 90% power.

I&C is currently troubleshooting the power range NI power supply. Technical Specification 2.15(1) was entered at 0428 today. Trip units 1, 2, 9, 10, and 12 are currently in BYPASS for channel A

. Turnover: ___The plant entered TS 2.0.1 due to a condition affecting both diesel generators. A plant shutdown was initiated. After power had been reduced to 90%, the condition was resolved and TS 2.0.1 was exited. You have been directed to maintain power at 90% until the Reactor Engineer prepares PAPeRS guidance for power ascension back to 100% power.____________________

Event No. Malf. No. Event Type* Event Description 1 R-ATCO N-BOPO Maintain power at 90%.

2 C-BOP O Instrument Air Compressor CA

-1 C fails. Standby compressor CA

-1B running but not loaded. Alarm is ARP

-CB-10,11/A11 Window B

-3L. No entry into AOP

-17. 3 TS-CRS I-ATCO Channel B power range NI summing amplifier fails low

. T.S. 2.15(1) was already entered due to bypassed trip units 1, 2, 9, 10, 12 and these must be placed in trip per T.S. 2.15(2)

. Also, per T.S. Table 2-2 note C, power must be reduced to less than 70%.

AOP-15. 4 C-BOPO Heater Drain Pump FW

-5B trips, standby fails to autostart. Alarm is ARP-CB-10,11/A12 Window A

-4L. Actions are required to start the standby pump.

5 TS-CRS RCS oxygen levels are greater than 0.20 ppm, causing entry into T.S. 2.1.5(1).

6 C-ATCO Raw water pump AC

-10D trips, standby fails to autostart. Alarm is ARP-CB-1,2,3/A1 Window D1U.

Also, alarms CB

-1,2,3/A1 C1U and C1L will come in shortly after pump trip.

7 C-BOPO Loss of MCC 3C2 due to a ground fault. This causes a loss of boric acid pump CH

-4A, boric acid gravity feed line valve HCV

-265, and boric acid pumps discharge valve HCV

-268. Alarm: CB

-4/A7 "Boric Acid Valves Trouble." AOP-32 8 M-ALL (CT) ATWS - RPS pressurizer pressure channel D/PIA

-102Y fails low, causing 2 out of 3 for TM/LP but no RPS trip. Critical task is for ATCO to manually trip the reactor before performing any other actions.

Page 2 of 18 9 C-ATCO (CT) Following manual trip, 5 control rods fail to insert. This will require emergency boration.

However, HCV

-258 is mechanically bound when the operators attempt to open it. This results in the inability to emergency borate using the BASTs and requires use of the SIRWT to emergency borate. EOP

-20. Critical task is to open LCV-218-3, Charging pump suction SIRWT isol. Valve, close LCV

-218-2, VCT Outlet valve, and starting all charging pumps prior to exiting that safety function success path.

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

Scenario Event Description NRC Scenario #

3 Page 3 of 18 SCENARIO

SUMMARY

NRC #3 The crew assumes the watch with the reactor at 90% power. Trip units 1, 2, 9, 10, and 12 for channel A are in BYPASS due to troubleshooting efforts. The crew instructions are to maintain power at 90%

. The first event is a trip of instrument air compressor CA

-1C. The standby is running but unloaded. Operator actions are per ARP

-CB-10,11/A7 and include starting the CS air compressor.

The next event is a failure of the B channel power range NI summing amplifier. Operator action is to place the channel in the tripped position within one hour and downpower to less than 70% per T.S. 2.15(2) and Table 2

-2 Note C. SRO will refer to Technical Specifications. T.S. 2.15(2) applies as does Note C of Table 2

-2. The next event is a trip of heater drain pump FW

-5B. Backup heater drain pump will not start automatically. Operator will need to start the backup pump.

The next event is a high oxygen concentration in the RCS of 0.20 ppm, which is called in by chemistry. No operator action. SRO will refer to Technical Specifications. T.S. 2.1.5(1) applies. The next event is a trip of raw water pump AC

-10D. Backup raw water pump will not start automatically. Operator will need to start backup pump.

The next event is a loss of MCC 3C2 due to a ground fault. Operator action is per ARP

-CB-4/A7 and AOP

-32, LOSS OF 4160 VOLT OR 480 VOLT BUS POWER and includes operating the primary water booster pump and steam generator blowdown transfer pump as necessary. SRO will refer to Technical Specifications (T.S. 2.7.2(g) for loss of MCC

-3C2 is under review by NRR TS branch and was not included as part of the exam grading criteria

). The D channel for RPS pressurizer pressure then fails low, resulting in a 2 out of 3 trip logic for TM/LP, but no reactor trip has occurred. The crew is expected to recognize that an RPS actuation was required, and take action to manually trip the reactor (critical task

). When the operator manually trips the reactor, five CEA's fail to insert requiring emergency boration, which is unsuccessful due to HCV

-258 failure to open. Following completion of standard post trip actions, SRO directs entry into EOP

-20, FUNCTIONAL RECOVERY, Success Path RC-2. The crew will initiate boration using the SIRWT (critical task

).

Once the crew has initiated boration using the SIRWT, the scenario can be terminated.

Page 1 of 18 Appendix D Scenario Outline Form ES-D-1 Facility: _Fort Calhoun Station__ Scenario No.: ____4___ Revision __1__

Op-Test No.: _______

Examiners: ____________________________ Operators:

_____________________________

____________________________

_____________________________

____________________________

_____________________________

Initial Conditions: __Mode 2 <1% power. Next step in OP

-2A is to start 1 MFW pump. Desired MFW pump is FW

-4B.___________

__________________________________________________________________________________________________________________________________________________________________

Turnover: _____Continue in OP

-2A to raise power and load turbine. All requirements to transition to Mode 1 in OP

-4 have been met.__________________________________________________

Event No. Malf. No. Event Type* Event Description 1 N-BOPO Start MFW pump FW-4B per OP-2A, Attachment 3. Attachment 2 contains local operator actions and the instructions for starting the lube oil pump.

2 R-ATCO Raise reactor power to 10% per OP

-2A. 3 C-ATCO TS-CRS Wide range log NI

-002 fails high. This failure should occur when the ATC has raised power sufficient to see reactor response and when directed by lead examiner. ARP

-CB-4/A20, Windows B

-7 and C-1. This will send the operators to AOP-15, where they are directed to secure from raising power and stabilize reactor.

T.S. 2.15(1) applies for failure of NI

. 4 C-BOPO MFW pump FW

-4B trips, no auto start of standby pump. Alarm is ARP-CB-10,11/A12.

5 C-ATCO Controlling pressurizer level instrument 101X fails low. Alarm is ARP-CB-1,k2,3/A4 Windows A

-8 and C-8 6 C-ATCO TS-CRS CCW pump AC

-3A trips, no autostart of standby pump. Alarm is ARP-CB-1,2,3/A2 Window D

-3U. T.S. 2.4(1)b applies. 7 C-BOPO TS-CRS (CT) Inadvertent AFAS. AOP

-28 for inadvertent AFAS. T.S.2.5.(1)D and TS 2.15(3) apply. Critical task is to recognize the AFAS is inadvertent and take action to mitigate (stop feeding the steam generators with AFW) 8 M-ALL Steam line break inside containment on RC-2A. EOP-00 to EOP-05. 9 C-BOPO (CT) SGIS fails. Critical task will be for BOPO to isolate steam generator before exiting procedure step.

10 C-ATCO (CT) Containment spray pump 3B fails to autostart but can be started from control panel. Containment spray pump 3A shaft shears. Critical task is to restore containment spray flow by either starting containment spray pump 3C or 3B.

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

Scenario Event Description NRC Scenario #4 Page 2 of 18 SCENARIO

SUMMARY

NRC #4 The crew assumes the watch with the reactor is Mode 2 at less than 1% reactor power. The crew instructions are to start main feedwater pump FW-4B and continue with power ascension.

The first event is to start a main feedwater pump per OP

-2A, PLANT STARTUP, Attachment 3.

The next event is to raise reactor power to 10% per OP

-2A. Once a reactivity effect is seen on the reactor, the next event will be cued.

The next event is a failure of wide range logarithmic NI

-002 high. Operator action is per CB

-4/A20 and AOP

-15, and includes securing from the power ascension and stabilizing the reactor. SRO will refer to Technical Specifications.

T.S. 2.15(1) applies. The next event is a trip of main feedwater pump FW

-4B with no autostart of the standby pump. Operator actions are per ARP

-CB-10,11/A12 and include starting the standby pump, setting the post SIAS feedwater pump to FW

-4C, and selecting a new standby pump.

The next event is a failure of controlling pressurizer level instrument 101X low. Operator actions are per ARP

-CB-1,2,3/A4 and include placing the pressurizer level control switch to channel Y and placing the pressurizer heater cutout channel select switch to channel Y.

The next even t is a trip of CCW pump AC

-3A with no autostart of the standby pump. Operator actions are per ARP

-CB-1,2,3/A2 and include starting the standby CCW pump. SRO will review Technical Specifications. T.S. 2.4(1)b applies. The next event is an inadvertent auxiliary feedwater actuation signal.

Operator actions are per AOP-28, AUXILIARY FEEDWATER SYSTEM MALFUNCTIONS and include actions to stop the aux feed and bypass the affected AFAS signal (critical t ask). SRO will refer to Technical Specifications. T.S.'s 2.5(1)D and 2.15(3) apply.

After this event a steam line break occurs inside containment on RC

-2A. The crew will enter EOP-00 and perform standard post trip actions. Automatic SGIS fails and the crew should recognize this and take action to manually isolate the steam generators (critical task

).

Once the containment spray is actuated, containment spray pump 3A shaft shears and pump 3B fails to automatically start. The crew should recognize that they do not have any containment spray and take actions to start containment spray pump 3B, or containment spray pump 3C (critical task

)., and they might close one of the containment spray head valves

.

Once the crew has successfully isolated the steam generator and restored containment spray, the scenario may be terminated.

Page 1 of 17 Appendix D Scenario Outline Form ES-D-1 Facility: _Fort Calhoun Station__ Scenario No.: __

1_(Spare) Revision __1__

Op-Test No.: _______

Examiners: ____________________________ Operators:

_____________________________

____________________________

_____________________________

____________________________

_____________________________

Initial Conditions: _100% power, diesel generator #1 is tagged out for maintenance.________________ ___________________________________________________________

Turnover: __Reduce power to <95% per grid operator.___________________

Event No. Malf. No. Event Type* Event Description 1 R-ATCO N-BOPO N-CRS Reduce power to <95% per OP

-4, Attachment 2.

2 I-ATCO TS-CRS PIC-244 fails, causing HCV

-204 (Letdown heat exchanger isolation valve ) to close. Alarms are for VCT level low and Pressurizer level high (CB-1,2,3/A2 Window B

-2 and CB-1,2,3/A4 Window A

-8). If pressurizer level goes >69.2%, TS 2.1.7 applies.

3 C-ATCO C-BOPO HCV-153 opens, causing quench tank level to decrease. Alarm is CB-1,2,3/A4 Window C

-3. Action will be to restore level and close HCV-153 4 C-BOPO TS-CRS (CT) Inadvertent VIAS. AOP-23 Section IV.

TS 2.15(3) applies. Critical task is to reset relays that tripped and reset the inadvertent VIAS actuation.

5 C-BOPO TS-CRS Loss of 161 kV line. Alarm is CB

-20/A15, Window A

-1, 4160V Supply Breaker from 161KV Tripped, also Windows A

-2 and A-3. Since a fast transfer will occur, the ARP states to go to AOP-31. TS 2.7(2)c and TS 2.01 BOTH apply.

6 M-All Loss of 345kV line (LOOP) Reactor trips, SRO enters EOP

-00 and after SPTA's, transfers to EOP

-07, due to below failure. Upon operator manually closing breaker, power will be restored to one vital bus.

7 C-BOPO (CT) AFW valve HCV

-1108A remains closed.

It can be opened from the control panel. EOP-07 Step 6.1.

Critical task is to restore AFW flow using either FW-54 or FW-10 to steam generator RC-2B prior to reaching 27% wide range level.

8 C-BOPO (CT) Diesel Generator #2 breaker fails to close automatically due to diesel not reaching rated speed. When operators increase governor, the output breaker will close once breaker synch conditions are met. See Step 12 of EOP

-07. Critical task is to perform this action before exiting EOP

-07. * (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

Scenario Event Description NRC Scenario #1 Page 2 of 17 SCENARIO

SUMMARY

NRC #1 The crew will assume the watch at 100% power, with diesel generator #1 out of service for maintenance, and instructions to downpower to less than 95% per OP

-4, LOAD CHANGE AND NORMAL POWER OPERATION, Attachment 2, "Load Reduction".

The first event is the power reduction which will continue until an observable effect on the reactor is seen (approximately 1

-2% load reduction).

The next event is a failure of PIC

-244 which senses pressure downstream of letdown backpressure control valve. This causes letdown to isolate. Operator actions are per ARP

-CB-1,2,3/A2 and require securing charging flow. Operators will use OI

-CH-1, CHEMICAL AND VOLUME CONTROL SYSTEM NORMAL OPERATION, to restore letdown and charging after manually overriding the HCV

-204 Interlock Override Switch in DEFEAT. SRO will refer to Technical Specifications. T.S. 2.1.7 might apply if pressurizer level goes above 69.2%.

The next event is a spurious opening of HCV

-153, quench tank drain valve, causing quench tank level to decrease. Operator actions are per ARP

-CB-1,2,3/A4 and include closing HCV

-153 and taking action to restore quench tank level using deaerated water.

The next event is an inadvertent ventilation isolation actuation signal. Operator actions are per ARP-AI-30B/A34-1 and AOP-23 and include verifying that the VIAS was inadvertent and taking actions to reset the relays and reset the actuation (these two steps are critical tasks). The SRO will refer to Technical Specifications. T.S. 2.15(3

) applies. The next event is a loss of the 161 KV line. Operator actions are per ARP

-CB-20/A15 and AOP-31, 161 KV GRID MALFUNCTIONS and include establishing balanced 4160 V bus loading by ensuring that condensate pump FW

-2A, feed pump FW

-4A and heater drain pump FW

-5A are operating. SRO will refer to Technical Specifications. T.S. 2.7.2(c) and TS 2.01 both apply

. Once actions for the loss of the 161 KV line are complete, there will be a loss of the 345 KV line, resulting in a LOOP. Diesel generator #2 does not reach rated speed and breaker does not automatically close, causing a station blackout. Crew will enter EOP

-00 and perform standard post trip actions.

Following diagnosis of event, SRO will transition to EOP

-07, STATION BLACKOUT.

While performing the actions for a station blackout, the crew should recognize that HCV

-1108A failed to open and will must restore AFW flow to the RC-2A steam generator (critical task

). The crew will also take actions to raise the governor speed for diesel generator #2, which will result in the breaker closing automatically (critical task

). Once this occurs and diesel generator #2 is feeding its respective bus, the scenario will be terminated.

ES-401 PWR Examination Outline Form ES-401-2 Facility: Fort Calhoun Station Date of Exam: 16 April 2012 Tier Group RO K/A Category Points SRO-Only Points K 1 K 2 K 3 K 4 K 5 K 6 A 1 A 2 A 3 A 4 G

  • Total A2 G* Total 1. Emergency & Abnormal Plant Evolutions 1 3 3 3 N/A 2 3 N/A 4 18 3 3 6 2 1 1 2 2 1 2 9 1 3 4 Tier Totals 4 4 5 4 4 6 27 4 6 10 2. Plant Systems 1 4 3 3 2 1 2 3 3 3 2 2 28 2 3 5 2 0 0 0 1 2 1 2 1 1 2 0 10 1 1 1 3 Tier Totals 4 3 3 3 3 3 5 4 4 4 2 38 4 4 8 3. Generic Knowledge and Abilities Categories 1 2 3 4 10 1 2 3 4 7 3 2 2 3 2 2 1 2 Note: 1. Ensure that at least two topics from every applicable K/A category are sampled within each tier of the RO and SRO-only outlines (i.e., except for one category in Tier 3 of the SRO-only outline, the "Tier Totals" in each K/A category shall not be less than two).
2. The point total for each group and tier in the proposed outline must match that specified in the table. The final point total for each group and tier may deviate by +/-1 from that specified in the table based on NRC revisions. The final RO exam must total 75 points and the SRO-only exam must total 25 points.
3. Systems/evolutions within each group are identified on the associated outline; systems or evolutions that do not apply at the facility should be deleted and justified; operationally important, site

-specific systems/evolutions that are not included on the outline should be added. Refer to Section D.1.b of ES

-401 for guidance regarding the elimination of inappropriate K/A statements.

4. Select topics from as many systems and evolutions as possible; sample every system or evolution in the group before selecting a second topic for any system or evolution.
5. Absent a plant-specific priority, only those K/As having an importance rating (IR) of 2.5 or higher shall be selected. Use the RO and SRO ratings for the RO and SRO-only portions, respectively.
6. Select SRO topics for Tiers 1 and 2 from the shaded systems and K/A categories. 7.* The generic (G) K/As in Tiers 1 and 2 shall be selected from Section 2 of the K/A Catalog, but the topics must be relevant to the applicable evolution or system. Refer to Section D.1.b of ES

-401 for the applicable K/As. 8. On the following pages, enter the K/A numbers, a brief description of each topic, the topics' importance ratings (IRs) for the applicable license level, and the point totals (#) for each system and category. Enter the gro up and tier totals for each category in the table above; if fuel handling equipment is sampled in other than Category A2 or G* on the SRO-only exam, enter it on the left side of Column A2 for Tier 2, Group 2 (Note #1 does not apply). Use duplicate pages for RO and SRO-only exams.

9. For Tier 3, select topics from Section 2 of the K/A catalog, and enter the K/A numbers, descriptions, IRs, and point totals (#) on Form ES-401-3. Limit SRO selections to K/As that are linked to 10 CFR 55.43.

ES-401 2 Form ES-401-2 ES-401 PWR Examination Outline Form ES-401-2 Emergency and Abnormal Plant Evolutions

- Tier 1/Group 1 (RO / SRO) E/APE # / Name / Safety Function K 1 K 2 K 3 A 1 A 2 G K/A Topic(s)

IR # 000007 (BW/E02&E10

CE/E02) Reactor Trip - Stabilization

- Recovery / 1 X 2.4.2 Knowledge of system set points, interlocks and automatic actions associated with EOP entry conditions.

(CFR: 41.7, 45.7, 45.8) 4.5 51 000008 Pressurizer Vapor Space Accident / 3 X Knowledge of the operational implications of the following concepts as they apply to a Pressurizer Vapor Space Accident:

AK1.02 Change in leak rate with change in pressure. (CFR: 41.8, 41.10, 45.3) 3.1 41 000009 Small Break LOCA / 3 X Ability to determine or interpret the following as they apply to a small break LOCA:

EA2.39 Adequate core cooling.

(CFR: 43.5, 45.13) 4.3 46 000011 Large Break LOCA / 3 X Knowledge of the interrelations between the following and the Large Break LOCA:

EK2.02 Pumps (CFR: 41.7, 45.7) 2.6* 40 000015/17 RCP Malfunctions / 4 X Knowledge of the operational implications of the following concepts as they apply to Reactor Coolant Pump Malfunctions (Loss of RC Flow):

AK1.02 Consequences of an RCPS failure.

(CFR: 41.8, 41.10, 45.3) 3.7 54 000022 Loss of Rx Coolant Makeup / 2 X Ability to operate and / or monitor the following as they apply to the Loss of Reactor Coolant Makeup:

AA1.01 CVCS letdown and charging (CFR: 41.7, 45.5, 45.6) 3.4 42 000025 Loss of RHR System / 4 X Knowledge of the interrelations between the Loss of Residual Heat Removal System and the following:

AK 2.02 LPI or Decay Heat Removal/RHR pumps

. (CFR: 41.7, 45.7

) 3.2* 52 000026 Loss of Component Cooling Water / 8 X 2.4.35 Knowledge of local auxiliary operator tasks during an emergency and the resultant operational effects. (CFR: 41.10, 43.5, 45.13) 3.8 43 000027 Pressurizer Pressure Control System Malfunction / 3 X Knowledge of the interrelations between the Pressurizer Pressure Control Malfunctions and the following:

AK2.03: Controllers and positioners (CFR: 41.7, 45.7) 2.6 47 000029 ATWS / 1

000038 Steam Gen. Tube Rupture / 3 X Knowledge of the reasons for the following responses as they apply to the SGTR:

EK3.0 6 Actions contained in EOP for RCS water inventory balance, S/G tube rupture, and plant shutdown procedures (CFR: 41.5, 41.10, 45.6, 45.13) 4.2 44 000040 (BW/E05; CE/E05; W/E12) Steam Line Rupture

- Excessive Heat Transfer / 4 X 2.1.28 Knowledge of the purpose and function of major system components and controls (CFR: 41.7

) 4.1 50 000054 (CE/E06) Loss of Main Feedwater / 4 X Knowledge of the reasons for the following responses as they apply to the Loss of Feedwater:

EK3.4 RO or SRO function within the control room team as appropriate to the assigned position, in such a way that procedures are adhered to and the limitations in the facilities license and amendments are not violated.

(CFR: 41.5, 41.10, 45.6, 45.13) 3.2 53 000055 Station Blackout / 6 X Knowledge of the reasons for the following responses as they apply to the SBO:

EK3.02 Actions contained in EOP for loss of offsite and onsite power (CFR: 41.5, 41.10, 45.6, 45.13) 4.3 39 000056 Loss of Off-site Power / 6 X Ability to determine and interpret the following as they apply to the Loss of Offsite Power:

AA2.54 Breaker position (remote and local)

(CFR: 43.5, 45.13) 2.9 48 000057 Loss of Vital AC Inst. Bus / 6 X 2.2.37 Ability to determine operability and/or availability of safety related equipment.

(CFR: 41.7, 43.5, 45.12

) 3.6 49 000058 Loss of DC Power / 6 X Ability to operate and / or monitor the following as they apply to the Loss of DC Power:

AA1.01 Cross

-tie of the affected dc bus with the alternate supply

(CFR: 41.7, 45.5, 45.6) 3.4* 55 000062 Loss of Nuclear Svc Water / 4 000065 Loss of Instrument Air / 8 X Ability to determine and interpret the following as they apply to the Loss of Instrument Air:

AA2.08 Failure modes of air

-operated equipment (CFR: 43.5, 45.13) 2.9* 45 W/E04 LOCA Outside Containment / 3 W/E11 Loss of Emergency Coolant Recirc. / 4 BW/E04; W/E05 Inadequate Heat Transfer - Loss of Secondary Heat Sink /

4 000077 Generator Voltage and Electric Grid Disturbances / 6 X Knowledge of the operational implications of the following concepts as they apply to Generator Voltage and Electric Grid Disturbances:

A K1.03 Under

-excitation (CFR: 41.4, 41.5, 41.7, 41.10, 45.8) 3.3 56 K/A Category Totals:

3 3 3 2 3 4 Group Point Total:

18/6 ES-401 3 Form ES-401-2 ES-401 PWR Examination Outline Form ES-401-2 Emergency and Abnormal Plant Evolutions

- Tier 1/Group 2 (RO / SRO) E/APE # / Name / Safety Function K 1 K 2 K 3 A 1 A 2 G K/A Topic(s)

IR # 000001 Continuous Rod Withdrawal / 1 000003 Dropped Control Rod / 1 000005 Inoperable/Stuck Control Rod / 1 X 2.4.11 Knowledge of abnormal condition procedures.

(CFR: 41.10, 43.5, 45.13) 4.0 57 000024 Emergency Boration / 1 000028 Pressurizer Level Malfunction / 2 000032 Loss of Source Range NI / 7 000033 Loss of Intermediate Range NI / 7 000036 (BW/A08) Fuel Handling Accident / 8 X Knowledge of the operational implications of the following concepts as they apply to Fuel Handling Incidents: AK1.01 Radiation exposure hazards (CFR: 41.8, 41.10, 45.3) 3.5 64 000037 Steam Generator Tube Leak / 3 X Knowledge of the reasons for the following responses as they apply to the Steam Generator Tube Leak:

AK3.10 Automatic actions associated with high radioactivity in the S/G sample lines.

3.3* 60 000051 Loss of Condenser Vacuum / 4 X 2.4.50 Ability to verify system alarm setpoints and operate controls identified in the alarm response manual.

(CFR: 41.10, 43.5, 45.

3) 4.2 61 000059 Accidental Liquid RadWaste Rel. / 9 000060 Accidental Gaseous Radwaste Rel. / 9 000061 ARM System Alarms / 7 000067 Plant Fire On

-site / 8 X Knowledge of the reasons for the following responses as the apply to the Plant Fire on Site: AK3.04 Actions contained in EOP for plant fire on site

(CFR: 41.5, 41.10, 45.6, 45.13) 3.3 58 000068 (BW/A06) Control Room Evac. / 8 X Ability to determine and interpret the following as they apply to the Control Room Evacuation:

AA2.06 RCS pressure

(CFR: 43.5, 45.13) 4.1 63 000069 (W/E14) Loss of CTMT Integrity / 5 000074 (W/E06&E07) Inad. Core Cooling / 4 000076 High Reactor Coolant Activity / 9

W/EO1 & E02 Rediagnosis & SI Termination / 3 W/E13 Steam Generator Over

-pressure / 4 W/E15 Containment Flooding / 5 W/E16 High Containment Radiation / 9 BW/A01 Plant Runback / 1 BW/A02&A03 Loss of NNI-X/Y / 7 BW/A04 Turbine Trip / 4 BW/A05 Emergency Diesel Actuation / 6 BW/A07 Flooding / 8 BW/E03 Inadequate Subcooling Margin / 4 BW/E08; W/E03 LOCA Cooldown

- Depress. / 4 BW/E09; CE/A13; W/E09&E10 Natural Circ. / 4 BW/E13&E14 EOP Rules and Enclosures CE/A11; W/E08 RCS Overcooling

- PTS / 4 X Ability to operate and / or monitor the following as they apply to the (RCS Overcooling)

AA1.2 Operating behavior characteristics of the facility.

(CFR: 41.7, 45.5, 45.6) 3.2 65 CE/A16 Excess RCS Leakage / 2 X Ability to operate and / or monitor the following as they apply to the (Excess RCS Leakage)

AA1.1 Components and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features. (CFR: 41.7, 45.5, 45.6) 3.4 59 CE/E09 Functional Recovery X Knowledge of the interrelations between the (Functional Recovery) and the following:

EK2.2 Facility's heat removal systems, including primary coolant, emergency coolant, the decay heat removal systems, and relations between the proper operation of these systems to the operation of the facility. (CFR 41.5, 41.10, 45.6, 45.13) 3.7 62 K/A Category Point Totals:

1 1 2 2 1 2 Group Point Total:

9/4 ES-401 4 Form ES-401-2 ES-401 PWR Examination Outline Form ES-401-2 Plant Systems

- Tier 2/Group 1 (RO / SRO) System # / Name K 1 K 2 K 3 K 4 K 5 K 6 A 1 A 2 A 3 A 4 G K/A Topic(s)

IR # 003 Reactor Coolant Pump X X Knowledge of RCPS design feature(s) and/or interlocks(s) which provide for the following: K4.04 Adequate cooling of RCP motor and seals.

(CFR: 41.7)

Knowledge of the operational implications of the following concepts as they apply to the RCPS:

K5.01 The relationship between the RCPS flow rate and the nuclear reactor core operating parameters (quadrant power tilt, imbalance, DNB rate, local power density, difference in loop T

-hot pressure) (CFR: 41.5, 45.7) 2.8 3.3 1

20 004 Chemical and Volume Control X X Ability to (a) predict the impacts of the following malfunctions or operations on the CVCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations:

A2.15 High or low PZR level (CFR: 41.5, 43.5, 45.3, 45.5) 2.1.20 Ability to interpret and execute procedure steps (CFR: 41.10, 43.5, 45.11) 3.5

4.6 2

10 005 Residual Heat Removal X X Knowledge of the bus power supplies to the following:

K2.03 RCS pressure boundary motor

-operated valves.

(CFR: 41.7)

Knowledge of the effect that a loss or malfunction of the RHRS will have on the following:

K3.01 RCS (CFR: 41.7, 45.6) 2.7*

3.9 5

9 006 Emergency Core Cooling X Knowledge of the effect of a loss or malfunction the following will have on the ECCS:

K6.03 Safety Injection Pumps (CFR: 41.7, 45.7) 3.6 24 007 Pressurizer Relief/Quench Tank X Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating PRTS controls including:

A1.02 Maintaining quench tank pressure (CFR: 41.5

) 2.7 13 008 Component Cooling Water X X Knowledge of the effect that a loss or malfunction of the CCWS will have on the following:

K3.01 Loads cooled by CCWS.

(No CFR listed for this K3)

Ability to monitor automatic operation of the CCWS, including:

A3.04 Requirements on and for the CCWS for different conditions of the power plant.

(CFR: 41.7, 45.5) 3.4 2.9 4 23 010 Pressurizer Pressure Control X Knowledge of the physical connections and/or cause

-effect relationships between the PZR PCS and the following systems:

K1.01 RPS (CFR: 41.2 to 41.9, 45.7, 45.8) 3.9 6 012 Reactor Protection X Ability to monitor automatic operation of the RPS, including:

A3.03 Power supply (CFR: 41.7, 45.5) 3.4 18 013 Engineered Safety Features Actuation X Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the ESFAS controls including:

A1.07 Containment radiation (CFR: 41.5, 45.5) 3.6 12 022 Containment Cooling X Ability to manually operate and/or monitor in the control room:

A4.01 CCS fans (CFR: 41.7, 45.5 to 45.8) 3.6 27 025 Ice Condenser

026 Containment Spray X Ability to (a) predict the impacts of the following malfunctions or operations on the CSS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations:

A2.08 Safe securing of containment spray (when it can be done)

(CFR: 41.5, 43.5, 45.3, 45.13) 3.2 19 039 Main and Reheat Steam X Ability to monitor automatic operation of the MRSS, including:

A3.02 Isolation of the MRSS (CFR: 41.5, 45.5) 3.1 3 059 Main Feedwater X Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the MFW controls including:

A1.03 Power level restrictions for operation of MFW pumps and valves.

(CFR: 41.5, 45.5) 2.7* 7 061 Auxiliary/Emergency Feedwater X Knowledge of the effect of a loss or malfunction of the following will have on the AFW components:

K6.01 Controllers and positioners (CFR: 41.7, 45.7) 2.5 17 062 AC Electrical Distribution X X Knowledge of bus power supplies to the following

K2.01 Major system loads (CFR: 41.7

) Ability to (a) predict the impacts of the following malfunctions or operations on the ac distribution system; and (b) based on those predictions, use procedure to correct, control, or mitigate the consequences of those malfunctions or operations:

A2.05 Methods for energizing a dead bus (CFR: 41.5, 43.5, 45.3, 45.13) 3.3 2.9 11

26 063 DC Electrical Distribution X X Knowledge of the physical connections and/or caus e-effect relationships between the DC electrical system and the following systems: K1.02 AC electrical system (CFR: 41.2 to 41.9, 45.7, 45.8)

Ability to manually operate and/or monitor in the control room:

A4.03 Battery discharge rate (CFR: 41.7, 45.5 to 45.8) 2.7

3.0* 14

28 064 Emergency Diesel Generator X Knowledge of the physical connections and/or cause

-effect relationships between the ED/G system and the following systems:

K1.03 Diesel fuel oil supply system (CFR: 41.2 to 41.9, 45.7, 45.8) 3.6 8 073 Process Radiation Monitoring X Knowledge of PRM system design feature(s) and/or interlock(s) which provide for the following:

K4.0 1 Release termination when radiation exceeds setpoint.

(CFR: 41.7) 4.0 16 076 Service Water X X Knowledge of bus power supplies to the following:

K2.01 Service water (CFR: 41.7) 2.4.4 Ability to recognize abnormal indications for system operating parameters that are entry

-level conditions for emergency and abnormal operating procedures.

(CFR: 41.10, 43.2, 45.6) 2.7*

4.5 25

21 078 Instrument Air X Knowledge of the physical connections and/or cause

-effect relationships between the IAS and the following systems:

K1.03 Containment air (CFR: 41.2 to 41.9, 45.7, 45.8) 3.3* 15 103 Containment X Knowledge of the effect that a loss or malfunction of the containment system will have on the following:

K3.02 Loss of containment integrity under normal operations (CFR: 41.7) 3.8 22 K/A Category Point Totals: 4 3 3 2 1 2 3 3 3 2 2 Group Point Total:

28/5 ES-401 5 Form ES-401-2 ES-401 PWR Examination Outline Form ES-401-2 Plant Systems

- Tier 2/Group 2 (RO / SRO) System # / Name K 1 K 2 K 3 K 4 K 5 K 6 A 1 A 2 A 3 A 4 G K/A Topic(s)

IR # 001 Control Rod Drive X Knowledge of the following operational implications as they apply to the CRDS: K5.28 Boron reactivity worth vs. boron concentration, i.e., amount of boron needed (ppm) to change core reactivity to desired amount (CFR: 41.5, 45.7) 3.5 38 002 Reactor Coolant X Knowledge of the effect or a loss or malfunction on the following RCS components:

K6.03 Reactor vessel level indication (CFR: 41.7, 45.7)`

3.1 37 011 Pressurizer Level Control X Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the PZR LCS controls including:

A1.03 VCT level (CFR: 41.5, 45.5) 2.8 32 014 Rod Position Indication X Ability to manually operate and/or monitor in the control room:

A4.02 Control rod mode

-select switch (CFR: 41.5, 45.7) 3.4 35 015 Nuclear Instrumentation X Ability to monitor automatic operation of the NIS, including:

A3.02 Annunciator and alarm signals (CFR: 41.7) 3.7 31 016 Non-nuclear Instrumentation 017 In-core Temperature Monitor 027 Containment Iodine Removal 028 Hydrogen Recombiner and Purge Control 029 Containment Purge

033 Spent Fuel Pool Cooling X Ability to (a) predict the impacts of the following malfunctions or operations on the Spent Fuel Pool Cooling System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations:

A2.02 Loss of SFPCS (CFR: 41.5, 43.5, 45.3, 45.13) 2.7 34 034 Fuel Handling Equipment 035 Steam Generator X Knowledge of operational implications of the following concepts as they apply to the S/GS:

K5.03 Shrink and swell concept.

(CFR: 41.5, 45.7) 2.8 30 041 Steam Dump/Turbine Bypass Control 045 Main Turbine Generator 055 Condenser Air Removal 056 Condensate 068 Liquid Radwaste 071 Waste Gas Disposal 072 Area Radiation Monitoring X Ability to manually operate and/or monitor in the control room:

A4.01 Alarm and interlock setpoint checks and adjustments (CFR: 41.7, 45.5

-45.8) 3.0* 33 075 Circulating Water X Knowledge of circulating water system design feature(s) and interlock(s) which provide for the following:

K4.01 Heat sink

(CFR: 41.7, 45.6) 2.5 36 079 Station Air 086 Fire Protection X Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with Fire Protection System operating the controls including:

A1.01 Fire header pressure (CFR: 41.5, 45.5) 2.9 29 K/A Category Point Totals:

0 0 0 1 2 1 2 1 1 2 0 Group Point Total:

10/3 ES-401 2 Form ES-401-2 ES-401 PWR Examination Outline Form ES-401-2 Emergency and Abnormal Plant Evolutions

- Tier 1/Group 1 (RO / SRO) E/APE # / Name / Safety Function K 1 K 2 K 3 A 1 A 2 G K/A Topic(s)

IR # 000007 (BW/E02&E10; CE/E02) Reactor Trip - Stabilization

- Recovery / 1 000008 Pressurizer Vapor Space Accident / 3 000009 Small Break LOCA / 3 X Ability to determine and interpret the following as they apply to a small break LOCA

EA2.36Difference between overcooling and LOCA indications (CFR 43.5) 4.6 76 000011 Large Break LOCA / 3 000015/17 RCP Malfunctions / 4 000022 Loss of Rx Coolant Makeup / 2 X 2.4.21 Knowledge of the parameters and logic used to assess the status of safety functions, such as reactivity control, core cooling and heat removal, reactor coolant system integrity, containment conditions, radioactivity release control, etc.

(CFR: 41.7, 43.5, 45.12) 4.6 77 000025 Loss of RHR System / 4 000026 Loss of Component Cooling Water / 8 000027 Pressurizer Pressure Control System Malfunction / 3 000029 ATWS / 1 000038 Steam Gen. Tube Rupture / 3 X Ability to determine and interpret the following as they apply to a SGTR:

EA2.14 Magnitude of atmospheric radioactive release if cool down must be completed using steam dumps or if atmospheric reliefs lift.

CFR (55.43.4) 4.6 78 000040 (BW/E05; CE/E05; W/E12) Steam Line Rupture

- Excessive Heat Transfer / 4 X Ability to determine and interpret the following as they apply to the (Excess Steam Demand):

EA2.1 Facility conditions and selection of appropriate procedures during abnormal and emergency operations.

(CFR 43.5) 4.0 79 000054 (CE/E06) Loss of Main Feedwater / 4 000055 Station Blackout / 6 X 2.4.8 Knowledge of how AOP's are used in conjunction with EOP's (CFR 43.5) 4.5 81 000056 Loss of Off-site Power / 6 X 2.2.22 Knowledge of limiting conditions for operations and safety limits.

(CFR: 41.5, 43.2, 45.2) 4.7 80 000057 Loss of Vital AC Inst. Bus / 6

000058 Loss of DC Power / 6 000062 Loss of Nuclear Svc Water / 4 000065 Loss of Instrument Air / 8 W/E04 LOCA Outside Containment / 3 W/E11 Loss of Emergency Coolant Recirc. / 4 BW/E04; W/E05 Inadequate Heat Transfer - Loss of Secondary Heat Sink / 4 000077 Generator Voltage and Electric Grid Disturbances / 6 K/A Category Totals:

3 3 Group Point Total:

18/6 ES-401 3 Form ES-401-2 ES-401 PWR Examination Outline Form ES-401-2 Emergency and Abnormal Plant Evolutions

- Tier 1/Group 2 (RO / SRO) E/APE # / Name / Safety Function K 1 K 2 K 3 A 1 A 2 G K/A Topic(s)

IR # 000001 Continuous Rod Withdrawal / 1 000003 Dropped Control Rod / 1 000005 Inoperable/Stuck Control Rod / 1 X 2.2.37 Ability to determine operability of safety related equipment (CFR :43.2) 4.6 82 000024 Emergency Boration / 1 000028 Pressurizer Level Malfunction / 2 000032 Loss of Source Range NI / 7 000033 Loss of Intermediate Range NI / 7 000036 (BW/A08) Fuel Handling Accident / 8 000037 Steam Generator Tube Leak / 3 000051 Loss of Condenser Vacuum / 4 000059 Accidental Liquid RadWaste Rel. / 9 000060 Accidental Gaseous Radwaste Rel. / 9 000061 ARM System Alarms / 7 000067 Plant Fire On

-site / 8 000068 (BW/A06) Control Room Evac. / 8 X 2.4.11 Knowledge of abnormal condition procedures.

(CFR: 43.5) 4.2 84 000069 (W/E14) Loss of CTMT Integrity / 5 X 2.2.40 Ability to apply TS for a system (CFR: 43.2) 4.7 83 000074 (W/E06&E07) Inad. Core Cooling / 4 000076 High Reactor Coolant Activity / 9 W/EO1 & E02 Rediagnosis & SI Termination / 3 W/E13 Steam Generator Over

-pressure / 4 W/E15 Containment Flooding / 5 W/E16 High Containment Radiation / 9 BW/A01 Plant Runback / 1 BW/A02&A03 Loss of NNI-X/Y / 7 BW/A04 Turbine Trip / 4 BW/A05 Emergency Diesel Actuation / 6 BW/A07 Flooding / 8 BW/E03 Inadequate Subcooling Margin / 4 BW/E08; W/E03 LOCA Cooldown

- Depress. / 4 BW/E09; CE/A13; W/E09&E10 Natural Circ. / 4 BW/E13&E14 EOP Rules and Enclosures CE/A11; W/E08 RCS Overcooling

- PTS / 4 CE/A16 Excess RCS Leakage / 2 X Ability to determine and interpret the following as they apply to the (Excess RCS Leakage)

AA2.1 Facility conditions and selection of appropriate procedures during abnormal and emergency operations.

(CFR: 43.5, 45.13) 3.5 85 CE/E09 Functional Recovery K/A Category Point Totals:

1 3 Group Point Total:

9/4 ES-401 4 Form ES-401-2 ES-401 PWR Examination Outline Form ES-401-2 Plant Systems

- Tier 2/Group 1 (RO / SRO) System # / Name K 1 K 2 K 3 K 4 K 5 K 6 A 1 A 2 A 3 A 4 G K/A Topic(s)

IR # 003 Reactor Coolant Pump 004 Chemical and Volume Control 005 Residual Heat Removal 006 Emergency Core Cooling X 2.2.38 Knowledge of conditions and limitations in the facility license.

(CFR: 43.1

) 4.5 86 007 Pressurizer Relief/Quench Tank 008 Component Cooling Water X Ability to (a) predict the impacts of the following malfunctions or operations on the CCWS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations;

A2.0 3 High/Low CCW Temperature (CFR: 41.5, 43.5, 45.3, 45.

13) 3.2 89 010 Pressurizer Pressure Control X 2.2.37 Ability to determine operability and/or availability of safety related equipment.

(CFR: 41.7, 43.5, 45.13) 4.6 87 012 Reactor Protection 013 Engineered Safety Features Actuation X Ability to (a) predict the impacts of the following malfunctions or operations on the ESFAS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations;

A2.06 Inadvertent ESFAS actuation (CFR: 41.5, 43.5, 45.3, 45.13) 4.0 88 022 Containment Cooling 025 Ice Condenser 026 Containment Spray 039 Main and Reheat Steam 059 Main Feedwater 061 Auxiliary/Emergency Feedwater 062 AC Electrical Distribution

063 DC Electrical Distribution 064 Emergency Diesel Generator X 2.2.42 Ability to recognize system parameters that are entry level conditions for Technical Specifications (CFR: 43.2, 43.3) 4.6 90 073 Process Radiation Monitoring 076 Service Water 078 Instrument Air 103 Containment K/A Category Point Totals:

2 3 Group Point Total:

28/5 ES-401 5 Form ES-401-2 ES-401 PWR Examination Outline Form ES-401-2 Plant Systems

- Tier 2/Group 2 (RO / SRO) System # / Name K 1 K 2 K 3 K 4 K 5 K 6 A 1 A 2 A 3 A 4 G K/A Topic(s)

IR # 001 Control Rod Drive 002 Reactor Coolant 011 Pressurizer Level Control 014 Rod Position Indication 015 Nuclear Instrumentation 016 Non-nuclear Instrumentation 017 In-core Temperature Monitor 027 Containment Iodine Removal X 2.2.25 Knowledge of the bases in TS for LCO's and safety limits (CFR 43.2) 4.2 91 028 Hydrogen Recombiner and Purge Control 029 Containment Purge 033 Spent Fuel Pool Cooling 034 Fuel Handling Equipment X Knowledge of design feature(s) and/or interlock(s) which provide for the following:

K4.02 Fuel movement (CFR: 41.7) 3.3 92 035 Steam Generator 041 Steam Dump/Turbine Bypass Control 045 Main Turbine Generator 055 Condenser Air Removal 056 Condensate 068 Liquid Radwaste 071 Waste Gas Disposal X Ability to (a) predict the impacts of the following malfunctions or operations on the Waste Gas Disposal System; and (b) based on those predictions, use procedures, to correct, control, or mitigate the consequences of those malfunctions or operations:

A2.02 Use of waste gas release monitors, radiation, gas flow rate, and totalizer (CFR: 41.5, 43.5, 45.3, 45.13) 3.6 93 072 Area Radiation Monitoring

075 Circulating Water 079 Station Air 086 Fire Protection K/A Category Point Totals:

1 1 1 Group Point Total:

10/3 ES-401 Generic Knowledge and Abilities Outline (Tier

3) Form ES-401-3 Facility: Date of Exam:

Category K/A # Topic RO SRO-Only IR # IR # 1. Conduct of Operations 2.1.3 Knowledge of shift or short term relief turnover practices.

(CFR: 41.10, 45.1 3) 3.7 74 2.1.4 Knowledge of individual licensed operator responsibilities related to shift staffing, such as medical requirements, "no-solo" operation, maintenance of active license status, 10CFR55, etc.

(CFR: 41.10, 43.2) 3.3 72 2.1.15 Knowledge of administrative requirements for temporary management directives, such as standing orders, night orders, Operations memos, etc.

(CFR: 41.10, 45.12) 2.7 68 2.1.35 Knowledge of the fuel

-handling responsibilities of SROs.

(CFR: 41.10, 43.7) 3.9 94 2.1.37 Knowledge of procedures, guidelines, or limitations associated with reactivity management.

(CFR: 41.1, 43.6, 45.6) 4.6 95 Subtotal 3 2 2. Equipment Control 2.2.2 Ability to manipulate the console controls as required to operate the facility between shutdown and designated power levels.

(CFR: 41.6, 41.7, 45.2) 4.6 67 2.2.13 Knowledge of tagging and clearance procedures (CFR: 41.10, 43.5, 45.13) 4.1 69 2.2.6 Knowledge of the process for making changes to procedures.

(CFR: 41.10, 43.3, 45.13) 3.6 96 2.2.12 Knowledge of Surveillance Procedures (CFR: 41.7, 41.10, 43.1, 45.13) 4.2 97 2.2. 2.2. Subtotal 2 2 2.3.

3. Radiation Control 2.3.11 Ability to control radiation releases.

(CFR: 41.11, 43.4, 45.10) 3.8 71 2.3.13 Knowledge of radiological safety procedures pertaining to licensed operator duties, such as response to radiation monitor alarms, containment entry requirements, fuel handling responsibilities, access to locked high-radiation areas, aligning filters, etc.

3.4 66 2.3.4 Knowledge of radiation exposure limits under normal or emergency conditions.

(CFR: 43.4) 3.7 98 2.3. 2.3. Subtotal 2 1 4. Emergency Procedures / Plan 2.4.13 Knowledge of crew roles and responsibilities during EOP usage. (CFR: 41.10, 45.12

) 4.0 73 2.4.37 Knowledge of the lines of authority during implementation of the emergency plan.

(CFR: 41.10, 45.13) 3.0 75 2.4.17 2.4.17 Knowledge of EOP terms and definitions.

(CFR: 41.10, 45.13

) 3.9 70 2.4.8 Knowledge of how abnormal operating procedures are used in conjunction with EOPs.

(CFR: 41.10, 43.5, 45.13) 4.5 99 2.4.9 Knowledge of low power / shutdown implications in accident (e.g. Loss of coolant accident loss of residual heat removal) mitigation strategies.

(CFR: 41.10, 43.5, 45.13) 4.2 100 2.4. Subtotal 3 2 Tier 3 Point Total 10 7 ES-401 Record of Rejected K/As Form ES-401-4 Tier / Group Randomly Selected K/A Reason for Rejection 1/1 APE 022 AK2.01-2.06 No importance rating 1/1 APE 27 AK2.01, AK2.02, AK2.04, Importance rating not 1/1 EK2.01-2.07 Importance rating not 1/1 1/2 2/1 Importance rating not 2/1 A2.02 Resample to obtain required (by NUREG

-1021) sample of category 2/1 006 K6.04 K6.16 Importance rating not 2/1 007 K4.02 Importance rating not 2/1 022 K6.01 - Importance rating not 2/1 026 A2.06 Importance rating not 2/1 026 A2.01 recirculation is not an expected plant response (A2.01). Also, FCS 2/1 No importance rating . Randomly . 2/1 A1.07 2/1 062 A1.02 Importance rating not 2/1 K1.04 Importance rating not 2/1 K4.02 2/2 014 A4 Resample to obtain required (by NUREG

-1021) sample of category 2/2 014 2/2 027 K2.01 cted Steam 2/2 Importance rating not 2/2 2/2 Importance rating not 2/2 2/1 004 A2. 2/1 2.4.41 - 2/2 001 1/1 Resampled 2/1 2/1 2/1 - 2/2 Resampled for better question distribution. Too many containment 2/2 001 2/2 A2.04 Resampled for better question distribution. Too many liquid 2/2 041 A4.07 FCS does not remote gag stuck open 2/2 A1.04 1/1 1/2 00040 2.2.42 1/2 2.2.40 - 1/2 AK1.01 to obtain better K/A distribution and issue distribution (already 7 n 2/2 modification cannot be completed until plant restarts, and mpled 1/2 000076 1/1 2/1 0007 K4.01 2.2.20 2.4.42 - definitions.

Tier / Group Randomly Selected K/A Reason for Rejection 1 / 1 - 1 / 1 - rejected since not capable - Transfer EA2.1 1 / 1 000022 Loss of RCS makeup

-K/A since selection. Reselected 1 / 1 only ,

1 / 1 K 1 / 2 K/A G , rejected since Inoperable/Stuck Control Rod , K/A 1 / 2 K/A , rejected since not capable topic and K/A, Containment Integrity, K/A 2.2.40 2 / 1 order to balance CFR diselected for plant mods.

2 / 1 2 / 1 2 / 2 G2.2.22 G2.2.12 1/1 -