ML14237A229

From kanterella
Jump to navigation Jump to search
ANO2-2014-07 Draft Operating Test
ML14237A229
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 07/31/2014
From: Vincent Gaddy
Operations Branch IV
To:
Omaha Public Power District
laura hurley
References
Download: ML14237A229 (67)


Text

ANO-2-JPM-NRC-ADMIN-DNBRL A1 Page 1 of 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2 REV #: 001 DATE:

SYSTEM/DUTY AREA: Conduct of Operations TASK: Determine if COLR DNBR limit is being met during a loss of COLSS.

JTA#: ANO-2-SRO-EOPAOP-OFFNORM-233 KA VALUE RO: 3.9 SRO: 4.2 KA

REFERENCE:

2.1.25 APPROVED FOR ADMINISTRATION TO: RO: SRO: X TASK LOCATION: INSIDE CR: OUTSIDE CR: BOTH: X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: Perform CLASSROOM: Perform POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: CLASSROOM:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): Unit 2 Tech Specs and Unit 2 COLR EXAMINEE'S NAME: Badge #:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time

ANO-2-JPM-NRC-ADMIN-DNBRL A1 Page 2 of 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM INITIAL TASK CONDITIONS:

The plant is at 85% power, Steady State due to 2P-1A Feedwater pump being out of service for maintenance COLSS has been declared inoperable due to failed power supplies The CPC average DNBR is 2.35 The CPC average ASI is -0.0001

  1. 1 CEAC is inoperable for Surveillance testing
  1. 2 CEAC is operable TASK STANDARD: Determine that Technical Specifications LCO 3.2.4 action b is applicable.

TASK PERFORMANCE AIDS: Unit 2 Tech Specs and Unit 2 COLR

ANO-2-JPM-NRC-ADMIN-DNBRL A1 Page 3 of 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:

Determine if any Tech Specs LCOs are applicable and/or actions that are required for this condition.

START TIME:

PERFORMANCE CHECKLIST STANDARD (Circle One)

N/A SAT UNSAT

1. Using Tech Spec 3.2.4 Examinee correctly derived determines that the COLR from Tech Spec 3.2.4 that must be referenced to since COLSS is inoperable, determine if TS are satisfied. the COLR graph must be referenced to determine if Tech Spec 3.2.4 is met.

N/A SAT UNSAT (C) 2. Using COLR figure Examinee correctly derived determines DNBR is not in from graph based on given the acceptable region for values that DNBR is not in the operation and that Tech Spec acceptable region of operation LCO 3.2.4.c should be and determined that LCO entered. 3.2.4.c is applicable for the current condition.

(C) 3. Using Tech 3.2.4 determine Examinee correctly N/A SAT UNSAT that DNBR must meet the determines the DNBR must be requirements of T.S 3.2.4 restored to meet the action b requirements of the COLR graph within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to comply with Tech Spec 3.2.4 action b.

EXAMINER's NOTE: Examinee may discuss the Tech Spec applicability at this point stating that Tech Spec 3.2.4 LCO requires power to be lowered so that DNBR is restored to the acceptable region within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

END STOP TIME:

ANO-2-JPM-NRC-ADMIN-DNBRL A1 Page 4 of 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:

The plant is at 85% power, Steady State due to 2P-1A Feedwater pump being out of service for maintenance COLSS has been declared inoperable due to failed power supplies The CPC average DNBR is 2.35 The CPC average ASI is -0.0001

  1. 1 CEAC is inoperable for Surveillance testing
  1. 2 CEAC is operable INITIATING CUE:

Determine if any Tech Specs LCOs are applicable and/or actions that are required for this condition.

T.S. LCO 3.2.4.c Applicable Tech Spec LCOs (if any) _________________________

T.S. 3.2.4. Action b Actions required to comply with Tech Specs (if any) ______________________________

Tech Spec 3.2.4 LCO Action b requires power to be lowered so that DNBR is restored to the acceptable region within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

ANO-2-JPM-NRC-ADMIN-DNBRL A1 Page 5 of 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

The plant is at 85% power, Steady State due to 2P-1A Feedwater pump being out of service for maintenance COLSS has been declared inoperable due to failed power supplies.

The CPC average DNBR is 2.35 The CPC average ASI is -0.0001

  1. 1 CEAC is inoperable for Surveillance testing
  1. 2 CEAC is operable INITIATING CUE:

Determine if any Tech Specs LCOs are applicable and/or actions that are required for this condition.

Applicable Tech Spec LCOs (if any) _________________________

Actions required to comply with Tech Specs (if any) ______________________________

ANO-2-JPM-NRC-ADMIN-SGCHEM A2 Page 1 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE:

SYSTEM/DUTY AREA: Conduct of Operations TASK: Apply Steam Generator Chemistry limits.

JTA#: ANO-2-SRO-ADMIN-OFFNORM-2 KA VALUE RO: 2.7 SRO: 3.5 KA

REFERENCE:

2.1.34 APPROVED FOR ADMINISTRATION TO: RO: SRO: X TASK LOCATION: INSIDE CR: OUTSIDE CR: BOTH: X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: Perform CLASSROOM: Perform POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: CLASSROOM:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 22 Minutes REFERENCE(S): 1000.043 Steam Generator water Chemistry Monitoring Unit 2 EXAMINEE'S NAME: Badge #:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time

ANO-2-JPM-NRC-ADMIN-SGCHEM A2 Page 2 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM INITIAL TASK CONDITIONS:

The plant is at 80% power Power is being maintained ~80% for NICAL during a power escalation.

The previous shift raised power from 20% to 80%.

All normal chemistry sampling equipment is in service.

Chemistry reports the following sample results:

Steam Generator Blowdown:

Cation conductivity: 0.5 µmho/cm Sodium: 3 ppb Chloride: 15 ppb Sulfate: 12 ppb Main Feedwater:

Dissolved O2: 12 ppb Total Iron: 3 ppb Total Copper: 0.1 ppb Hydrazine: 130 ppb ETA: 4.2 ppm Condensate:

Dissolved O2: 15 ppb TASK STANDARD:

Determined that Attachment 3 of 1000.043 is applicable for operation >50% power.

Determined that Chloride and Sulfate within acceptable values due to 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> allowance of exceeding 50% power.

Determined that Feedwater Dissolved O2 is above action level 2.

Determined that plant power should be reduced to <50% within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of initiation of action level 2 and return Feedwater Dissolved O2 below action level 1 value within 300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> or go to action level 3.

Determined that the following action should be initiated:

Check residual hydrazine; if below normal, increase feed rate.

Institute air inleakage location efforts.

Test other available locations in Feedwater train for dissolved oxygen ingress.

TASK PERFORMANCE AIDS: 1000.043 Steam Generator Water Chemistry monitoring Unit 2

ANO-2-JPM-NRC-ADMIN-SGCHEM A2 Page 3 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:

Determine if Action Levels are applicable (list your basis) and any requirements based on current plant Steam Generator and Secondary Water Chemistry.

START TIME:

PERFORMANCE CHECKLIST STANDARD (Circle One)

1. Review 1000.043, Steam Determined that 1000.043, Generator Water Chemistry Steam Generator Water N/A SAT UNSAT Monitoring Unit 2. Chemistry Monitoring Unit 2 should be reviewed for applicability.
2. Determine which attachment Determined that 1000.043 (C) should be used based on current attachment 3 should be used N/A SAT UNSAT plant conditions. to compare value versus limit.
3. Review provided values to Determined that Chloride and (C) attachment 3 of 1000.043 for Sulfate are NOT above the N/A SAT UNSAT Steam Generator Blowdown action level 1 value due to samples. note J of attachment 3.
4. Review provided values to Determined that Dissolved O2 (C) attachment 3 of 1000.043 for is above the action level 2 N/A SAT UNSAT Main Feedwater samples. value.
5. Review provided values to Determined that Condensate attachment 3 of 1000.043 for Dissolved O2 is not used as a N/A SAT UNSAT Condensate samples. control parameter due to note G

ANO-2-JPM-NRC-ADMIN-SGCHEM A2 Page 4 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARD (Circle One)

6. Review action level 2 for Determined action level 2 (C) requirements. requirements as follows: N/A SAT UNSAT Reduce power to <50% within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of initiation of action level 2. (Critical portion of step)

Consider performing hot soak.

(Not critical)

Return Feedwater Dissolved O2 below action level 1 value within 300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> or go to action level 3. (Critical portion of step)

Perform technical review assessing the abnormal water chemistry condition. (Not critical)

7. Review 1000.043, Attachment 6 Determined the following (C) to determine action required actions: N/A SAT UNSAT based on plant conditions.

Check residual hydrazine; if below normal, increase feed rate.

Institute air inleakage location efforts.

Test other available locations in Feedwater train for dissolved oxygen ingress.

END STOP TIME:

ANO-2-JPM-NRC-ADMIN-SGCHEM A2 Page 5 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERS COPY INITIAL CONDITIONS:

The plant is at 80% power Power is being maintained ~80% for NICAL during a power escalation.

The previous shift raised power from 20% to 80%.

All normal chemistry sampling equipment is in service.

Chemistry reports the following sample results:

Steam Generator Blowdown:

Cation conductivity: 0.5 µmho/cm Sodium: 3 ppb Chloride: 15 ppb Sulfate: 12 ppb Main Feedwater:

Dissolved O2: 12 ppb Total Iron: 3 ppb Total Copper: 0.1 ppb Hydrazine: 130 ppb ETA: 4.2 ppm Condensate:

Dissolved O2: 15 ppb INITIATING CUE:

Determine if Action Levels are applicable (list your basis) and any requirements based on current plant Steam Generator and Secondary Water Chemistry.

ANO-2-JPM-NRC-ADMIN-SGCHEM A2 Page 6 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEES COPY INITIAL CONDITIONS:

The plant is at 80% power Power is being maintained ~80% for NICAL during a power escalation.

The previous shift raised power from 20% to 80%.

All normal chemistry sampling equipment is in service.

Chemistry reports the following sample results:

Steam Generator Blowdown:

Cation conductivity: 0.5 µmho/cm Sodium: 3 ppb Chloride: 15 ppb Sulfate: 12 ppb Main Feedwater:

Dissolved O2: 12 ppb Total Iron: 3 ppb Total Copper: 0.1 ppb Hydrazine: 130 ppb ETA: 4.2 ppm Condensate:

Dissolved O2: 15 ppb INITIATING CUE:

Determine if Action Levels are applicable (list your basis) and any requirements based on current plant Steam Generator and Secondary Water Chemistry.

ANO-2-JPM-NRC-ADMIN-EDGTS A3 Page 1 of 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE 2 REV #: 2 DATE:

SYSTEM/DUTY AREA: Equipment controls TASK: Determine EDG and PZR TS applicability and any required actions.

JTA#: ANO-SRO-ADMIN-NORM-103 KA VALUE RO: 3.6 SRO: 4.6 KA

REFERENCE:

2.2.37 APPROVED FOR ADMINISTRATION TO: RO: SRO: X TASK LOCATION: INSIDE CR: OUTSIDE CR: BOTH: X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: Perform CLASSROOM: Perform POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: CLASSROOM:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): 2203.012-H, Annunciator 2K08 Corrective Actions, 2203.012-U, Annunciator 2E12 Corrective Action, Unit 2 Tech Specs.

EXAMINEE'S NAME: Badge #:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time

ANO-2-JPM-NRC-ADMIN-EDGTS A3 Page 2 of 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

Unit 2 is at 100% power Annunciator 2K08-K1, Fuel System Trouble, is received in the Control Room The Inside Auxiliary Operator reports that the local alarm is 2K-128 Fuel x-fer pump inoperable, there is no light indication for 2P-16A Fuel Oil Transfer Pump, and breaker 2B53-K3 is tripped.

TASK STANDARD:

Determined the current applicable Tech Specs:

T.S. 3.8.1.1.b T.S. 3.4.4 Determined the most restrictive Required Action:

3.8.1.1 Action b.1 Demonstrate the OPERABILITY of both the A.C. circuits by performing Surveillance Requirement 4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter TASK PERFORMANCE AIDS:

2203.012-H, Annunciator 2K08 Corrective Actions, 2203.012-U, Annunciator 2E12 Corrective Action, Unit 2 Tech Specs.

SIMULATOR SETUP N/A EXAMINER NOTES:

None.

ANO-2-JPM-NRC-ADMIN-EDGTS A3 Page 3 of 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:

Annunciator 2K08-K1, Fuel System Trouble, is received in the Control Room The Inside Auxiliary Operator reports that the local alarm is 2K-128 Fuel x-fer pump inoperable, there is no light indication for 2P-16A Fuel Oil Transfer Pump, and breaker 2B53-K3 is tripped.

Determine ALL current applicable Unit 2 Tech Specs associated with this condition AND Identify the most restrictive Required Action.

START TIME:

PERFORMANCE CHECKLIST STANDARD (Circle One)

1. Review Annunciator corrective action Referenced 2K-08 and 2E-12 N/A SAT UNSAT for applicability Annunciator corrective actions determined need to review Tech Specs
2. Review 3.8.1.1 Tech Spec for Examinee reviewed T.S. 3.8.1.1.b N/A SAT UNSAT (C) applicability and determined that the #1 EDG is inoperable and determines action b is applicable.

Review for additional Tech Specs. Using Tech Specs or 2104.036 EDG N/A SAT UNSAT procedure, determined that Tech 3.4.4 should also be reviewed.

3. Review 3.4.4 Tech Spec for applicability Examinee reviewed T.S. 3.4.4 and N/A SAT UNSAT (C) determined that the Pressurizer is inoperable and determines action b is applicable.
4. Review applicable actions and Examinee reviewed the applicable N/A SAT UNSAT (C) determine most limiting requirement. Tech Specs and determined that T.S. 3.8.1.1 action b.1 is the most limiting action requirement.

END STOP TIME:

ANO-2-JPM-NRC-ADMIN-EDGTS A3 Page 4 of 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERS COPY INITIAL CONDITIONS:

Unit 2 is at 100% power Annunciator 2K08-K1, Fuel System Trouble, is received in the Control Room The Inside Auxiliary Operator reports that the local alarm is 2K-128 Fuel x-fer pump inoperable, there is no light indication for 2P-16A Fuel Oil Transfer Pump, and breaker 2B53-K3 is tripped.

INITIATING CUE:

Determine ALL current applicable Unit 2 Tech Specs associated with this condition AND Identify the most restrictive Required Action.

Current applicable Tech Specs:

T.S. 3.8.1.1.b T.S. 3.4.4 Most restrictive Required Action:

3.8.1.1 Action b.1 Demonstrate the OPERABILITY of both the A.C. circuits by performing Surveillance Requirement 4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter

ANO-2-JPM-NRC-ADMIN-EDGTS A3 Page 5 of 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEES COPY INITIAL CONDITIONS:

Unit 2 is at 100% power Annunciator 2K08-K1, Fuel System Trouble, is received in the Control Room The Inside Auxiliary Operator reports that the local alarm is 2K-128 Fuel x-fer pump inoperable, there is no light indication for 2P-16A Fuel Oil Transfer Pump, and breaker 2B53-K3 is tripped.

INITIATING CUE:

Determine ALL current applicable Unit 2 Tech Specs associated with this condition AND Identify the most restrictive Required Action.

Current applicable Tech Specs:

Most restrictive Required Action:

ANO-2-JPM-NRC-ADMIN-KI2 A4 Page 1 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2 REV #: 0 DATE:

SYSTEM/DUTY AREA: Radiation Controls TASK: Approve administration of Potassium Iodide.

JTA#: ANO-SRO-EPLAN-EMERG-292 KA VALUE RO: 3.4 SRO: 3.8 KA

REFERENCE:

2.3.14 APPROVED FOR ADMINISTRATION TO: RO: SRO: X TASK LOCATION: INSIDE CR: OUTSIDE CR: BOTH: X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: Perform CLASSROOM: Perform POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: CLASSROOM:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 20 Minutes REFERENCE(S): 1903.035, Administration of Potassium Iodide EXAMINEE'S NAME: Badge #:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time

ANO-2-JPM-NRC-ADMIN-KI2 A4 Page 2 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

The plant is tripped from 100% power 300 gpm LOCA in progress Loss of Offsite power is in progress LOCA EOP is being implemented RDACS indicates an off site release in progress Data indicates I-131 concentration of 8.0 E-05 ci/cc in area of work in Upper South Piping Penetration room Whole body dose rates in area of work are 1 Rem/hr Site Area Emergency has been declared RP estimates that it will take approximately 15 minutes to complete emergency actions and stop the release and all RP required controls/authorizations are complete Joe Mechanic has read the precaution leaflet and has chosen to take Potassium Iodide if required Air Purifying Respirator with Iodine Canister having a protection factor of 1.0 will be used in place of a SCBA due to piping interference EOF, OSC and TSC are being staffed but are NOT operational TASK STANDARD:

Correctly completed Potassium Iodide (KI) Administration Form 1903.035A AND Did not approve the administration of KI to Joe Mechanic.

TASK PERFORMANCE AIDS: 1903.0035, Potassium Iodide Administration, Form 1903.035C (Completed), ANO Medical Questionnaire-Iodine Sensitivity and Form 1903.035A, Potassium Iodide Administration.

ANO-2-JPM-NRC-ADMIN-KI2 A4 Page 3 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE: Determine if KI, Potassium Iodide, should be issued and complete necessary paperwork, using OP 1903.035.

START TIME:

Examiner Note: Provide the examinee a KI Administration Form 1903.035A and a Medical Questionnaire-Iodine Sensitivity Form 1903.035C that has been completed by Joe Mechanic PERFORMANCE CHECKLIST STANDARD (Circle One)

N/A SAT UNSAT

1. Review 1903.035, Examinee determined the Administration of Potassium criteria for administration of KI Iodide to determine criteria for is 10 REM exposure to thyroid administering KI. committed dose equivalent or if concentration is unknown, (Step 6.1.1 and Step 6.2.3.C.1) the possibility exists for receiving large amounts of radioactive airborne iodine.

N/A SAT UNSAT (C) 2. Using graph on 1903.035 Determined that expected Attachment 1 and information exposure will exceed 10 REM provided in initial conditions, threshold.

determine that Joe Mechanic will exceed 10 REM during the maintenance evolution.

(Step 6.2.3.B)

N/A SAT UNSAT

3. Complete form 1903.035A. Completed all areas of form 1903.035A, Potassium Iodide (Step 6.3) Administration, from initial conditions:

Estimated Thyroid dose commitment.

Date.

Respiratory Protection Factor.

ANO-2-JPM-NRC-ADMIN-KI2 A4 Page 4 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE Examiner Note: Provide the examinee a KI Administration Form 1903.035A and a Medical Questionnaire-Iodine Sensitivity Form 1903.035C that has been completed by Joe Mechanic PERFORMANCE CHECKLIST STANDARD (Circle One)

N/A SAT UNSAT (C) 4. Determine that Joe Mechanic Reviewed 1903.035C form is sensitive to and has and determined that Joe experienced an allergic Mechanic was sensitive to reaction to Iodide. iodine and has experienced an allergic reaction to iodine in the past.

N/A SAT UNSAT (C) 5. Determine that KI should Examinee did NOT approve be NOT approved for distribution of KI to Joe distribution to Joe Mechanic.

Mechanic during the Upper South Piping penetration work.

END STOP TIME:

ANO-2-JPM-NRC-ADMIN-KI2 A4 Page 5 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERS COPY INITIAL CONDITIONS:

The plant is tripped from 100% power 300 gpm LOCA in progress Loss of Offsite power is in progress LOCA EOP is being implemented RDACS indicates an off site release in progress Data indicates I-131 concentration of 8.0 E-05 ci/cc in area of work in Upper South Piping Penetration room Whole body dose rates in area of work are 1 Rem/hr Site Area Emergency has been declared RP estimates that it will take approximately 15 minutes to complete emergency actions and stop the release and all RP required controls/authorizations are complete Joe Mechanic has read the precaution leaflet and has chosen to take Potassium Iodide if required Air Purifying Respirator with Iodine Canister having a protection factor of 1.0 will be used in place of a SCBA due to piping interference EOF, OSC and TSC are being staffed but are NOT operational INITIATING CUE:

Determine if KI, Potassium Iodide, should be issued and complete necessary paperwork, using OP 1903.035.

ANO-2-JPM-NRC-ADMIN-KI2 A4 Page 6 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEES COPY INITIAL CONDITIONS:

The plant is tripped from 100% power 300 gpm LOCA in progress Loss of Offsite power is in progress LOCA EOP is being implemented RDACS indicates an off site release in progress Data indicates I-131 concentration of 8.0 E-05 ci/cc in area of work in Upper South Piping Penetration room Whole body dose rates in area of work are 1 Rem/hr Site Area Emergency has been declared RP estimates that it will take approximately 15 minutes to complete emergency actions and stop the release and all RP required controls/authorizations are complete Joe Mechanic has read the precaution leaflet and has chosen to take Potassium Iodide if required Air Purifying Respirator with Iodine Canister having a protection factor of 1.0 will be used in place of a SCBA due to piping interference EOF, OSC and TSC are being staffed but are NOT operational INITIATING CUE:

Determine if KI, Potassium Iodide, should be issued and complete necessary paperwork, using OP 1903.035.

ANO-2-JPM-NRC-ADMIN-EAL13 A5 Page 1 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2 REV #: 003 DATE:

SYSTEM/DUTY AREA: Emergency Plan TASK: Determine Emergency Action Level/Protective Action Recommendation (Time Critical JPM)

JTA#: ANO-SRO-EPLAN-EMERG-278 KA VALUE RO: 2.9 SRO: 4.6 KA

REFERENCE:

2.4.41 APPROVED FOR ADMINISTRATION TO: RO: SRO: X TASK LOCATION: INSIDE CR: OUTSIDE CR: BOTH: X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: Classroom: Perform POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

15 Minutes - EAL Classification, APPROXIMATE COMPLETION TIME IN MINUTES: 5 Minutes - Boundary determination REFERENCE(S): 1903.010 Emergency Action Level Classification EXAMINEE'S NAME: BADGE:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Stop Total Time Time Time

ANO-2-JPM-NRC-ADMIN-EAL13 A5 Page 2 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE Prepared by:

Reviewed by:

OPS Rep Reviewed by:

Validated by:

Approved by:

INITIAL CONDITIONS: (Time Critical JPM)

A plant trip has occurred due to a loss of offsite power with a concurrent Steam Generator tube rupture on the B Steam Generator estimated to be 200 gpm.

One Main Steam Safety Valve on the B header has stuck open.

1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> following the trip, HP reports a reading of 800 mRem/hr at sample line 2TCD-19 per chemistry sampling procedure RCS T-cold is 355°F PZR pressure is 1170 psia TASK STANDARD: Determined the following (Time Critical - 15 minutes to classify event):

Determined SAE (FS-1) is the appropriate EAL. (Time Critical)

Determined two or the three fission product barriers are failed or potentially failed. (Not Time Critical)

RCB1: RCS leakage > 44 GPM or RCB2: SGTR results in ECCS actuation CNB3: Primary to secondary leak in steam generator > 10 gpm with stuck open main steam safety valve Determined that Fuel boundary is not failed. (Time Critical)

TASK PERFORMANCE AIDS: 1903.010, Emergency Action Level Classification

ANO-2-JPM-NRC-ADMIN-EAL13 A5 Page 3 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:

Determine the status of the fission product boundaries and the highest EAL classification from the given initial conditions (list EAL classification and event number).

START:

PERFORMANCE STANDARD (Circle One)

CHECKLIST (C) 1. Determined SAE EAL Using OP 1903.010, determined N/A SAT UNSAT classification. SAE EAL classification FS1, Loss or potential loss of ANY two barriers.

Stop Time:__________

(C) 2.

EAL determination made in EAL determined within 15 minutes. N/A SAT UNSAT 15 minutes.

(C) 3. Determined RCS barrier Determined RCS barrier Lost or status. Potentially Lost using given 200 gpm N/A SAT UNSAT Pri-Sec leak per OP 1903.010, Attachment 2, RCB1. RCS leak > 44 gpm with letdown isolated and/or RCB2 SGTR results in ECCS actuation.

Determined Containment Determined Containment barrier lost (C) 4. fission product barrier using given stuck open main steam N/A SAT UNSAT status. safety valve on Steam Generator with pri-sec leak per 1903.010, Attachment 2 CNB3.

Determined Fuel Clad Determined Fuel Clad barrier NOT (C) 5. N/A SAT UNSAT barrier status. Lost IAW per 1903.010, Attachment 2.

END STOP:

ANO-2-JPM-NRC-ADMIN-EAL13 A5 Page 4 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE Examiners Copy This JPM (Cue #1) is time critical INITIAL CONDITIONS:

A plant trip has occurred due to a loss of offsite power with a concurrent Steam Generator tube rupture on the B Steam Generator estimated to be 200 gpm.

One Main Steam Safety Valve on the B header has stuck open.

1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> following the trip, HP reports a reading of 800 mRem/hr at sample line 2TCD-19 per chemistry sampling procedure RCS T-cold is 355°F PZR pressure is 1170 psia INITIATING CUE #1:

Determine the status of the EAL classification and Event number/code from the given initial conditions.

EAL Class Event number/code SAE FS-1 INITIATING CUE #2:

Determine the status of the fission product boundaries:

Fission product boundary status: Barrier EAL number, code, etc. if (Failed or Intact) applicable.

Containment Failed CNB3 RCS Failed RCB1 and/or RCB2 Fuel Intact N/A

ANO-2-JPM-NRC-ADMIN-EAL13 A5 Page 5 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE Examinees Copy This JPM is time critical INITIAL CONDITIONS:

A plant trip has occurred due to a loss of offsite power with a concurrent Steam Generator tube rupture on the B Steam Generator estimated to be 200 gpm.

One Main Steam Safety Valve on the B header has stuck open.

1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> following the trip, HP reports a reading of 800 mRem/hr at sample line 2TCD-19 per chemistry sampling procedure RCS T-cold is 355°F PZR pressure is 1170 psia INITIATING CUE #1:

Determine the status of the EAL classification from the given initial conditions EAL Classification Event number/code

ANO-2-JPM-NRC-ADMIN-EAL13 A5 Page 6 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE Examinees Copy INITIAL CONDITIONS:

A plant trip has occurred due to a loss of offsite power with a concurrent Steam Generator tube rupture on the B Steam Generator estimated to be 200 gpm.

One Main Steam Safety Valve on the B header has stuck open.

1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> following the trip, HP reports a reading of 800 mRem/hr at sample line 2TCD-19 per chemistry sampling procedure RCS T-cold is 355°F PZR pressure is 1170 psia INITIATING CUE #2:

Determine the status of the fission product boundaries:

Fission product boundary status: Barrier EAL number, code, etc. if (Failed or Intact) applicable.

Containment RCS Fuel

ANO-2-JPM-NRC-AACFO P1 PAGE 1 OF 8 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 001 DATE:

SYSTEM/DUTY AREA: Emergency Diesel Generator System TASK: Control AAC diesel engine fuel oil day tank level manually JTA#: ANO2-AO-AACDG-OFFNORM-24 Alternate Path Yes: X No: Time Critical: Yes: No: X KA VALUE RO: 3.1 SRO: 3.5 KA

REFERENCE:

064 K1.03 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: OUTSIDE CR: X BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: Simulate SIMULATOR: CLASSROOM:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: CLASSROOM:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 20 Minutes REFERENCE(S): 2203.012Z Annunciator 2C435 Corrective Action EXAMINEE'S NAME: Badge #:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Stop Total Time Time Time

ANO-2-JPM-NRC-AACFO P1 PAGE 2 OF 8 JOB PERFORMANCE MEASURE JPM INITIAL TASK CONDITIONS:

The plant has tripped Offsite power is not available Neither EDG is running The AAC Diesel is running and aligned to 2A3 and has been in service for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Annunciator 2K12-K2, AAC SYSTEM TROUBLE, is in alarm TASK STANDARD:

Performed either of the following to restore day tank level:

Opened/throttled 2AAC-17 to restore day tank level 40 to 84%, and then closed 2AAC-17.

Or, started 2P-235 to restore day tank level to 40% to 84%, and the secured 2P-235.

TASK PERFORMANCE AIDS:

2203.012Z Annunciator 2C435 Corrective Action SIMULATOR SETUP:

N/A

ANO-2-JPM-NRC-AACFO P1 PAGE 3 OF 8 JOB PERFORMANCE MEASURE INITIATING CUE:

The SM/CRS directs you to locally identify the cause of the AAC SYSTEM TROUBLE alarm and take corrective actions.

START TIME:

PERFORMANCE CHECKLIST STANDARDS (Circle One)

1. Locally identify the cause of At Panel 2C435, locally checked N/A SAT UNSAT the AAC System Trouble annunciator panel to determine alarm. cause of alarm to be 2K432-E2, Fuel Oil Day Tank Level Low.

Examiner Cue:

Demonstrate to the applicant that 2K432-E2 is in alarm.

2. Check PLC touchpad and/or On 2LI-7201A at panel 2C442, N/A SAT UNSAT (Step Fuel Day Tank level examinee observed the fuel oil 2.1) indications: day tank level shows < 20%.

Fuel Oil Day Tank OR level (2LI-7201A) On 2LI-7201B in the engine Fuel Oil Day Tank room, examinee observed the level (2LI-7201B) fuel oil day tank level shows

< 20%.

Day Tank Level (L7201) OR On the Local Computer for L7201, examinee observed the Examiner Cue: fuel oil day tank level shows The local tank level indicator < 20%.

(2LI-7201B) shows 15%.

OR On panel 2C442, 2LI-7201A shows 15%.

OR On the PLC for L7201, observed the fuel oil day tank level shows 15%.

3. Verify T-25 outlet (FO-37) Turned FO-37 operating handle N/A SAT UNSAT (Step OPEN. CCW to verify valve fully open.

2.2.1)

Examiner Cue:

FO-37, T-25 outlet, is OPEN.

EXAMINERS NOTE:

The first path chosen to restore day take level will fail the applicant should then chose the other path to restore day tank level. If it the first path chosen provide the negative cue, and if it is the second path chosen provide the positive cue.

ANO-2-JPM-NRC-AACFO P1 PAGE 4 OF 8 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 4. If using Fuel Transfer pump On 2C-440 rotated 2HS-7106A N/A SAT UNSAT (Step (2P-235), then start from either to MANUAL.

2.2.2) of the following:

OR 2HS-7106A on 2C440 On 2B116 rotated 2HS-7106B to 2HS-7106B on 2B161-D5 MANUAL.

Examiner Cue: This step is critical if it is the second path attempted to If asked 2B161-D5 is closed raise level.

with green light on, and there are no problems noted locally with 2P-235.

Negative Examiner Cue:

When 2HS-7106A on 2C-440 is taken to MANUAL, THEN indicate that tank level does not increase and 2P-235 fuel transfer pump is not rotating.

or When 2HS-7106B on 2B116 is taken to MANUAL, THEN indicate that tank level does not increase and 2P-235 fuel transfer pump is not rotating.

Positive Examiner Cue:

When 2HS-7106A on 2C-440 is taken to MANUAL, THEN indicate that tank level is rising and indicates 70%

or When 2HS-7106B on 2B116 is taken to MANUAL, THEN indicate that tank level is rising and indicates 70%.

TRANSITION NOTE:

Go to the AAC diesel generator engine room.

ANO-2-JPM-NRC-AACFO P1 PAGE 5 OF 8 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 5. If using Fuel Oil Header 2T-11 Turned 2AAC-17 operating N/A SAT UNSAT (Step Bypass, then open Fuel Oil handle CCW to the full open 2.2.3) Header 2T-11 Bypass position.

(2AAC-17).

OR Throttled 2AAC-17 to increase Positive Examiner Cue: day tank level.

When 2AAC-17 is simulated opening, Then indicate Checked Fuel Oil Day Tank 2AAC-17 turns in the CCW (2T-11) level rising.

direction and tank level is rising and indicates 70%.

Negative Examiner Cue: This step is critical if it is the second path attempted to When 2AAC-17 is simulated raise level.

opening, Then indicate that 2AAC-17 handwheel is spinning freely and tank level does not increase.

(C) 6. When Fuel Day Tank level WHEN 2T-11 level is > 40%, N/A SAT UNSAT (Step (2LT-7201) 40 to 84%, THEN examinee rotated 2AAC-17 CW 2.2.4) perform EITHER of the to close.

following:

Stop Fuel Transfer pump (2P-235) from either of the following:

o 2HS-7106A on 2C440 o 2HS-7106B on 2B161-D5 Close Fuel Oil Header 2T-11 Bypass (2AAC-17).

Examiner Cue:

Give either of the following cues based on method used to raise tank level.

If 2AAC-17 is taken to close, then 2AAC-17 shut seat is felt and the valve operating handle will NOT turn further and tank level is stable.

Or If 2P-235 HS is taken to stop, then 2P-235 stops running when the HS is taken to stop.

ANO-2-JPM-NRC-AACFO P1 PAGE 6 OF 8 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

7. Depress Reset PLC touchpad. At the local computer touched N/A SAT UNSAT (Step screen, depressed the PLC 3.2) touchpad.

Examiner Cue:

PLC touchpad depressed.

Alarm for Low Day Tank Level is clear.

END STOP TIME:

ANO-2-JPM-NRC-AACFO P1 PAGE 7 OF 8 JOB PERFORMANCE MEASURE Examiners Copy INITIAL CONDITIONS:

The plant has tripped Offsite power is not available Neither EDG is running The AAC Diesel is running and aligned to 2A3 and has been in service for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Annunciator 2K12-K2, AAC SYSTEM TROUBLE, is in alarm INITIATING CUE:

The SM/CRS directs you to locally identify the cause of the AAC SYSTEM TROUBLE alarm and take corrective actions.

ANO-2-JPM-NRC-AACFO P1 PAGE 8 OF 8 JOB PERFORMANCE MEASURE Examinees Copy INITIAL CONDITIONS:

The plant has tripped Offsite power is not available Neither EDG is running The AAC Diesel is running and aligned to 2A3 and has been in service for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Annunciator 2K12-K2, AAC SYSTEM TROUBLE, is in alarm INITIATING CUE:

The SM/CRS directs you to locally identify the cause of the AAC SYSTEM TROUBLE alarm and take corrective actions.

ANO-2-JPM-NRC-FPEM1 P2 PAGE 1 OF 8 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 012 DATE:

SYSTEM/DUTY AREA: Spent Fuel Pool Cooling System TASK: Perform service water emergency makeup to the SFP (with Loop 1 service water)

JTA#: ANO2-WCO-SFP-EMER1 Alternate Path Yes: No: X Time Critical: Yes: No: X KA VALUE RO: 3.1 SRO: 3.5 KA

REFERENCE:

033 A2.03 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: OUTSIDE CR: X BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: Simulate SIMULATOR: CLASSROOM:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: CLASSROOM:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 20 Minutes REFERENCE(S): 2104.006 Fuel Pool Systems EXAMINEE'S NAME: Badge #:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Stop Total Time Time Time

ANO-2-JPM-NRC-FPEM1 P2 PAGE 2 OF 8 JOB PERFORMANCE MEASURE JPM INITIAL TASK CONDITIONS:

(2K11-K5) FUEL POOL TEMP HI is in alarm Neither fuel pool cooling pump is available An operator is stationed at the spent fuel pool to monitor spent fuel pool level Fuel pool level is low 2P66 is aligned to the RWT and running TASK STANDARD:

Aligned Emergency SFP makeup from Loop 1 service water has been commenced by verifying RWT recirc valves are closed, Fuel Pool makeup valves open (2FP-31, 2FP-46, 2SW-57), Service water drain valve closed 2SW-8401, and 2SW-138 throttled open to raise SFP level.

TASK PERFORMANCE AIDS:

2104.006 Fuel Pool Systems Section 14.3.

Do not use a cloth lanyard in a Radiologically controlled area.

SIMULATOR SETUP:

N/A

ANO-2-JPM-NRC-FPEM1 P2 PAGE 3 OF 8 JOB PERFORMANCE MEASURE The CRS directs you to Align Loop 1 service water to provide emergency makeup to the spent fuel pool starting on step 14.3 of 2104.006 Fuel Pool Systems.

START TIME:

PERFORMANCE CHECKLIST STANDARDS (Circle One)

Examiner Note:

Ladders in the aux building are controlled by both Operations and RP. Operations dept. has keys to the ladders but if access is needed greater than 8 RP must be contacted.

1. IF SFP or RWT aligned for Locally rotated 2P66 handswitch N/A SAT UNSAT (Step Purification, THEN secure Fuel (2HS-5411) to STOP and 14.3.1) Pool Purification pump 2P-66 released.

(2HS-5411) to prevent rapid depletion of Fuel Pool DI (2T-5) or addition of Service Water to Observed green light ON, red light the RWT. OFF.

Examiner Cue:

After the pump is simulated to be stopped Report Green light ON, red light OFF.

TRANSITION NOTE:

Go to elevation 354 RAB, just north of the elevator, to the SFP valve gallery.

2. Verify the following valves Closed 2FP-32 by turning N/A SAT UNSAT (Step closed: handwheel clockwise and 14.3.2) observing valve stem insertion Borated MU or RWT to 2P-66 until resistance felt.

(2FP-32)

Examiner Cue:

2FP-32 stem is fully inserted and resistance is felt.

TRANSITION NOTE:

Go to elevation 335' RAB just off elevator

3. Verify the following valves Contacted Control Room to close N/A SAT UNSAT (Step closed: 2CV-5637-1.

14.3.2) RWT Recirculation Isolation (2CV-5637-1).

Examiner Cue:

Control room reports 2CV-5637-1 indicates closed.

Or locally at the valve, the stem fully down/inserted.

ANO-2-JPM-NRC-FPEM1 P2 PAGE 4 OF 8 JOB PERFORMANCE MEASURE

4. Verify the following valves Contacted Control Room to close N/A SAT UNSAT (Step closed: 2CV-5638-2.

14.3.2) RWT Recirculation Isolation (2CV-5638-2) closed.

Examiner Cue:

Control room reports 2CV-5638-2 indicates closed.

Or locally at the valve, the stem fully down/inserted.

TRANSITION NOTE:

Go to elevation 354 RAB, just north of the elevator, to the SFP valve gallery.

(C) 5. Open Borated MU, RWT, SW to Opened 2FP-31 by turning N/A SAT UNSAT (Step Fuel Pool (2FP-31). handwheel CCW.

14.3.3)

Examiner Cue: Observed valve stem fully withdrawn out of the valve.

2FP-31 stem is fully extended.

(C) 6. Open RWT to Fuel Pool Isolation Opened 2FP-46 by turning N/A SAT UNSAT (Step (2FP-46). handwheel CCW.

14.3.4)

Examiner Cue: Observed valve stem fully withdrawn out of the valve.

2FP-46 stem is fully extended.

TRANSITION NOTE:

Go to elevation 335' RAB just off elevator.

(C) 7. Close SW Header 1 Telltale Closed 2SW-8401 by turning N/A SAT UNSAT (Step Drain (2SW-8401). handwheel CW.

14.3.5)

Examiner Cue: Observed valve stem fully inserted into the valve.

2SW-8401 has stem inserted into handwheel and resistance is felt.

8. Record unlocking of SW Hdr 1 Contacted the Control Room to N/A SAT UNSAT (Step Emerg Feed Isol (2SW-57) record 2SW-57 in the Cat E log.

14.3.6. in Cat E log.

A)

Examiner Cue:

2SW-57 has been recorded in the Cat E log.

ANO-2-JPM-NRC-FPEM1 P2 PAGE 5 OF 8 JOB PERFORMANCE MEASURE (C) 9. Unlock and open SW Header 1 Unlocked locking device on N/A SAT UNSAT (Step Emergency Feed Isolation (2SW- 2SW-57 using category "E" valve 14.3.6. 57). key.

B)

Opened 2SW-57 by turning handwheel CCW.

Examiner Cue:

Observed valve stem fully 2SW-57 is unlocked and valve withdrawn out of the valve.

stem is fully extended.

ANO-2-JPM-NRC-FPEM1 P2 PAGE 6 OF 8 JOB PERFORMANCE MEASURE Procedure Caution:

If SFP overfilled, water can spill through SFP Cooling/SFP Purification pipe chase (SFP, ~ 402', SW corner) and contaminate SFP valve gallery (AB 354') and hall near 2F-3A/B (AB 335')

If flow introduced with level > 401' 7", some overflow can occur due to wave motion of water.

Procedure Note:

If CLP (2LI-5400) used as SFP level indication during SFP drain and fill evolutions, SFP and CLP levels will differ slightly until water levels equalize through seal area.

10. IF two Operators available, Verified that an Operator was N/A SAT UNSAT (Step THEN establish and maintain the stationed to monitor SFP level 14.3.7. following:

A)

Operator stationed at SFP to continuously monitor level:

SFP (2LI-5401)

CLP (2LI-5400) if gate removed or deflated Examiner Cue:

Operator is stationed at SFP to monitor level responds to radio communications.

11. Operator stationed at SFP SW Examinee positions self at 2SW- N/A SAT UNSAT (Step Hdr 1 Emerg Feed Isol to 138.

14.3.7. SF Pool (2SW-138) for valve B) adjustment.

12. Communications between Examinee establishes N/A SAT UNSAT (Step stationed Operators. communication with Operator 14.3.7. stationed at the Spent Fuel Pool Examiner Cue:

C)

Operator that stationed at SFP to monitor level responds to radio communications.

13. *IF level being maintained Examinee assesses level being N/A SAT UNSAT (Step without frequent valve maintained.

14.3.7. adjustment, D) THEN the following may be performed:

Secure Operator at 2SW-138.

Reassign remaining Operator to continuously monitor SFP level EXCEPT when 2SW-138 adjustment needed.

Examiner Cue:

Operator at SFP will monitor if level can be maintained without frequent adjustments EXAMINERS NOTE:

- Final valve position is at discretion of examinee to ensure level is raised/maintained.

ANO-2-JPM-NRC-FPEM1 P2 PAGE 7 OF 8 JOB PERFORMANCE MEASURE

14. IF two Operators NOT available, Determined that two operators are N/A SAT UNSAT (Step THEN perform the following: available from initial conditions.

14.3.8) Obtain SM/CRS concurrence.

Station one Operator to align for fill and continuously monitor level EXCEPT when adjusting valve.

(C) 15. Throttle open SW Header 1 Throttled open 2SW-138 by N/A SAT UNSAT (Step Emergency Feed Isolation to SF turning handwheel CCW.

14.3.9) Pool (2SW-138) between 401'4" and 401'7".

Observed valve stem withdrawn out of the valve commensurate Examiner Cue: with valves throttling.

Operator stationed at SFP reports level rising slowly.

END STOP TIME:

ANO-2-JPM-NRC-FPEM1 P2 PAGE 8 OF 8 JOB PERFORMANCE MEASURE Examiners Copy INITIAL CONDITIONS:

(2K11-K5) FUEL POOL TEMP HI is in alarm Neither fuel pool cooling pump is available An operator is stationed at the spent fuel pool to monitor spent fuel pool level Fuel pool level is low 2P66 is aligned to the RWT and running INITIATING CUE:

The CRS directs you to align Loop 1 service water to provide emergency makeup to the spent fuel pool starting on step 14.3 of 2104.006 Fuel Pool Systems.

ANO-2-JPM-NRC-FPEM1 P2 PAGE 9 OF 8 JOB PERFORMANCE MEASURE Examinees Copy INITIAL CONDITIONS:

(2K11-K5) FUEL POOL TEMP HI is in alarm Neither fuel pool cooling pump is available An operator is stationed at the spent fuel pool to monitor spent fuel pool level Fuel pool level is low 2P66 is aligned to the RWT and running INITIATING CUE:

The CRS directs you to align Loop 1 service water to provide emergency makeup to the spent fuel pool starting on step 14.3 of 2104.006 Fuel Pool Systems.

ANO-2-JPM-NRC-AOP02 S1 PAGE 1 OF 8 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 001 DATE:

SYSTEM/DUTY AREA: Containment Cooling Water System TASK: Reset CIAS and establish cooling water to containment JTA#: ANO2-RO-EOPAOP-OFFNORM-219 Alternate Path Yes: No: X Time Critical: Yes: No: X KA VALUE RO: 3.1 SRO: 3.2 KA

REFERENCE:

022-A4.04 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: Perform LAB:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): 2203.039, Inadvertent CIAS EXAMINEE'S NAME: BADGE #:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time

ANO-2-JPM-NRC-AOP02 S1 PAGE 2 OF 8 JOB PERFORMANCE MEASURE Prepared by:

Reviewed by:

OPS Rep Reviewed by:

Validated by:

Approved by:

ANO-2-JPM-NRC-AOP02 S1 PAGE 3 OF 8 JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

An inadvertent CIAS has occurred.

Steps 1-10 of 2203.039 Inadvertent CIAS AOP have been completed.

TASK STANDARD:

CIAS has been reset by performing the following:

Unlocking the trip path Depressing the CIAS reset pushbutton on 2C-23B Depressing the CIAS reset pushbutton on 2C-40 And Containment Chilled water has been realigned to containment by opening the following valves:

2CV-3851-1 2CV-3852-1 2CV-3850-2 TASK PERFORMANCE AIDS:

OP-2203.039, Inadvertent CIAS SIMULATOR SETUP:

Inadvertent CIAS present.

Containment parameters are below setpoints, Verify CBO to VCT valve, 2CV-4847-2 handswitch is in CLOSE.

EXAMINER NOTES:

None.

ANO-2-JPM-NRC-AOP02 S1 PAGE 4 OF 8 JOB PERFORMANCE MEASURE INITIATING CUE:

The SM/CRS directs you to perform steps 11 through 15 of 2203.039, Inadvertent CIAS AOP.

START TIME:

PERFORMANCE CHECKLIST STANDARDS (Circle One)

EXAMINERs NOTE:

Only one channel of PPS is modeled on simulator completely. Correctly resetting of this channel will reset CIAS trip paths.

(C) 1. Reset actuation trip path by Examinee obtained key 15 from N/A SAT UNSAT using key 15 to place Shift Manager.

(Step 11.A)

LK/UNLK switch in UNLK. On panel 2C23B examinee placed key in trip path key switch to UNLK.

(C) 2. Depress CIAS pushbutton on Examinee depressed CIAS N/A SAT UNSAT 2C23. pushbutton for trip path.

(Step 11.B)

3. Place LK/UNLK switch in LK Examinee placed trip path N/A SAT UNSAT and remove key. keyswitch to LK and removed key.

(Step 11.C)

4. Repeat steps as needed to Examinee simulated resetting the N/A SAT UNSAT reset remaining trip paths. three remaining trip paths.

(Step 11.D)

Examiners Cue:

All four PPS trip path channels have been reset.

EXAMINERs NOTE:

Only 2C40 is modeled on simulator completely. 2C39 is not modeled on the simulator. Correctly resetting 2C40 will reset CIAS actuation paths.

(C) 5. Depress CIAS Lockout Reset Examinee depressed CIAS Lockout N/A SAT UNSAT pushbutton on 2C40 and Reset pushbutton on 2C40 and (Step 12.A) verify Reset light ON. verified Reset light ON.

ANO-2-JPM-NRC-AOP02 S1 PAGE 5 OF 8 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

6. Depress CIAS Lockout Reset Examinee simulated depressing N/A SAT UNSAT pushbutton on 2C39 and CIAS Lockout Reset pushbutton on (Step 12.B) verify Reset light ON. 2C39 and verified Reset light ON.

Examiners Cue:

2C39 ESF CIAS actuation has been reset.

7. Go to step 14. Examinee transitioned to step 14. N/A SAT UNSAT (Step 12.C)

Procedure Note:

Other ESFAS actuations may require resetting before components can be restored.

8. Open RCP Bleedoff to VCT On panel 2C17, examinee placed N/A SAT UNSAT valve, 2CV-4846-1. handswitch for RCP bleedoff to (Step 14)

VCT valve 2CV-4846-1 to OPEN.

Examinee observed RED light ON and GREEN light OFF above hand switch.

9. Open RCP Bleedoff to VCT On panel 2C16, examinee placed N/A SAT UNSAT valve, 2CV-4847-2. handswitch for RCP bleedoff to (Step 14)

VCT valve 2CV-4847-2 to OPEN.

Examinee observed RED light ON and GREEN light OFF above hand switch.

(C) 10. Open Chilled water to On panel 17, examinee placed N/A SAT UNSAT CNTMT valve 2CV-3851-1. handswitch for Chilled Water to (Step 15.A CNTMT Isolation valve Bullet 1) 2CV-3851-1 to OPEN.

Examinee observed RED light ON and GREEN light OFF above hand switch.

(C) 11. Open Chilled water to On panel 17, examinee placed N/A SAT UNSAT CNTMT valve 2CV-3852-1. handswitch for Chilled Water to (Step 15.A CNTMT Isolation valve Bullet 2) 2CV-3852-1 to OPEN.

Examinee observed RED light ON and GREEN light OFF above hand switch.

ANO-2-JPM-NRC-AOP02 S1 PAGE 6 OF 8 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 12. Open Chilled water to On panel 16, examinee placed N/A SAT UNSAT CNTMT valve 2CV-3850-2. handswitch for Chilled Water to (Step 15.A CNTMT Isolation valve Bullet 3) 2CV-3850-2 to OPEN.

Examinee observed RED light ON and GREEN light OFF above hand switch.

13. Verify ONE Main Chiller On panel 2C22, examinee verified N/A SAT UNSAT (2VCH-1A/1B) running. handswitch for 2VCH-1A is in (Step 15.B) normal after start (RED flagged).

Examiners note:

Examinee observed RED light ON The red light above hand and GREEN light OFF above hand switch for 2VCH-1A switch for 2VCH-1A.

indicates the chiller is running.

Examinee observed RED light ON and GREEN light OFF above label Examiners note: for 2HS-3810.

The red light for 2HS-3810 for 2VCH-1A indicates the Examinee observed all chilled 2A1 breaker is closed. water alarms are clear on annunciator 2K13 (Lights slow flashing or clear).

END STOP TIME:

ANO-2-JPM-NRC-AOP02 S1 PAGE 7 OF 8 JOB PERFORMANCE MEASURE EXAMINERS COPY INITIAL CONDITIONS:

An Inadvertent CIAS has occurred.

Steps 1-10 of 2203.039, Inadvertent CIAS AOP have been completed.

INITIATING CUE:

The SM/CRS directs you to perform steps 11 through 15 of 2203.039, Inadvertent CIAS AOP.

ANO-2-JPM-NRC-AOP02 S1 PAGE 8 OF 8 JOB PERFORMANCE MEASURE EXAMINEES COPY INITIAL TASK CONDITIONS:

An Inadvertent CIAS has occurred.

Steps 1-10 of 2203.039, Inadvertent CIAS AOP have been completed.

INITIATING CUE:

The SM/CRS directs you to perform steps 11 through 15 of 2203.039, Inadvertent CIAS AOP.

ANO-2-JPM-NRC-AOP05 S2 PAGE 1 OF 7 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE:

SYSTEM/DUTY AREA: PZR spray operation TASK: Respond to a failed closed PZR spray valve.

JTA#:

Alternate Path Yes: X No: Time Critical Yes: No: X KA VALUE RO: 4.0 SRO: 3.9 KA

REFERENCE:

027 AA1.01 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: Perform CLASSROOM:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: CLASSROOM:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 10 Minutes REFERENCE(S): 2203.028 PZR Systems Malfunction EXAMINEE'S NAME: Badge #:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Stop Total Time Time Time

ANO-2-JPM-NRC-AOP05 S2 PAGE 2 OF 7 JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

Mode 3 2P-32A and D Reactor Coolant pumps are secured in preps for cooldown The Steam Dump Bypass Control System has failed causing Steam Generator pressure and RCS pressure to rise 2CV-4652 B RCP spray valve did not open automatically TASK STANDARD:

Regen HX to RCP B/C valves closed 2CV-4827-2 2CV-4831-2 And Aux spray valve 2CV-4824-2 throttled open to restore RCS pressure 2025 to 2275 psia.

TASK PERFORMANCE AIDS:

2203.028 PZR System Malfunctions SIMULATOR SETUP:

CV4651, value = 0 CV4652, value =0 Steam dump emergency off actuated.

ANO-2-JPM-NRC-AOP05 S2 PAGE 3 OF 7 JOB PERFORMANCE MEASURE INITIATING CUE:

The CRS directs you to control RCS pressure using 2203.028 PZR System Malfunction AOP.

START TIME:

PERFORMANCE CHECKLIST STANDARDS (Circle One)

EXAMINER NOTE: Maintain the simulator in Freeze until the applicant is ready to start.

1. Check the following criteria: Determined that the PZR spray N/A SAT UNSAT valve is failed closed and (Step 1) A. IF any PZR spray valve transitioned to step 4.

failed open, THEN GO TO Step 2.

B. IF any PZR spray valve failed closed, THEN GO TO Step 4.

2. IF ANY PZR Spray valve failed On panel 2C04, rotated N/A SAT UNSAT closed, THEN perform the handswitch (2HS-4652B) for (Step following as needed: 2CV-4652 to manual.

4.A)

Place affected PZR Spray valves in MANUAL:

  • 2CV-4652 (Step Throttle PZR Spray valves as On panel 2C04, placed N/A SAT UNSAT 4.B) necessary to maintain RCS handswitch for 2CV-4652 to pressure 2025 psia to 2275 open.

psia.

Recognized that 2CV-4652 did not open and pressure is continuing to rise.

3. IF PZR Spray valves will NOT Transitioned to 2202.010, N/A SAT UNSAT open, THEN maintain RCS Attachment 48, RCS pressure (Step pressure 2025 psia to 2275 control.

4.B. psia with Aux Spray using continge ncy) 2202.010, Attachment 48, RCS Pressure Control.

Procedure Note:

Once method of pressure control is established, this attachment is not required in hand or continuous use.

A change to the method of pressure control will require in hand or continuous use until the new pressure control method is established.

ANO-2-JPM-NRC-AOP05 S2 PAGE 4 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

4. *Maintain RCS pressure with Determined that the PZR N/A SAT UNSAT heaters and spray using one or pressure controller will not (Step more of the following: control pressure.

1.A)

IF desired to use PZR Pressure controller (2PIC-4626A/B), THEN perform the following:

5. IF desired to use PZR Heaters, Determined that the PZR N/A SAT UNSAT THEN perform the following: heaters will not lower pressure.

(Step 1.B) Examiner note: applicant may elect to secure heaters but this will not maintain pressure in the required band.

6. IF desired to use NORMAL Determined that normal spray N/A SAT UNSAT Spray, THEN perform the will not control pressure.

(Step following:

1.C)

7. IF desired to use AUXILIARY Check SPDS or chart recorder N/A SAT UNSAT Spray, THEN perform the and determined that MTS is (Step following: greater than 30 degrees.

1.D.1)

  • Verify RCS MTS greater than 30 degrees.
8. Verify at least ONE Charging Checked at least one charging N/A SAT UNSAT pump running. pump running by red light on (Step 1.D.2) 2P-36A, B, or C Also verified flow on 2FI-4863 or computer (not critical)

(C) 9. Close Regen HX to RCP B/C On panel 2C09, placed N/A SAT UNSAT valves: handswitch for 2CV-4827-2 to (Step 2CV-4827-2 1.D.3) close.

2CV-4831-2 On panel 2C09, placed handswitch for 2CV-4831-2 to close.

Procedure Note:

PZR Spray Block valves 2CV-4653 and 2CV-4655 are de-energized due to degraded power supply cables

10. Verify PZR Spray On panel 2C04, verified 2CV- N/A SAT UNSAT (2CV-4651/2CV-4652) or PZR 4651 and 2CV-4652 closed by (Step Spray Isolation valves green light on and red light off.

1.D.4) (2HS-4655/2HS-4653) closed.

ANO-2-JPM-NRC-AOP05 S2 PAGE 5 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 11. Throttle Aux Spray valve On panel 2C09, Throttled 2CV- N/A SAT UNSAT (2CV-4824-2) as necessary. 4824-2 open to restore and (Step 1.D.5) control RCS pressure 2025 to Examiner Cue: 2275 psia.

If asked CRS will direct a band of 2175 to 2225 psia.

END STOP TIME:

ANO-2-JPM-NRC-AOP05 S2 PAGE 6 OF 7 JOB PERFORMANCE MEASURE EXAMINERs COPY INITIAL CONDITIONS:

Mode 3 2P-32A and D Reactor Coolant pumps are secured in preps for cooldown The Steam Dump Bypass Control System has failed causing Steam Generator pressure and RCS pressure to rise 2CV-4652 B RCP spray valve did not open automatically INITIATING CUE:

The CRS directs you to control RCS pressure using 2203.028 PZR System Malfunction AOP.

ANO-2-JPM-NRC-AOP05 S2 PAGE 7 OF 7 JOB PERFORMANCE MEASURE EXAMINEEs COPY INITIAL CONDITIONS:

Mode 3 2P-32A and D Reactor Coolant pumps are secured in preps for cooldown The Steam Dump Bypass Control System has failed causing Steam Generator pressure and RCS pressure to rise 2CV-4652 B RCP spray valve did not open automatically INITIATING CUE:

The CRS directs you to control RCS pressure using 2203.028 PZR System Malfunction AOP.

ANO-2-JPM-NRC-RCP02 S3 PAGE 1 OF 7 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 006 DATE:

SYSTEM/DUTY AREA: Reactor Coolant Pumps TASK: Restore component cooling water to reactor coolant pumps JTA#: ANO2-RO-EOPAOP-EMERG-32 Alternate Path Yes: X No: Time Critical: Yes: No: X KA VALUE RO: 3.2 SRO: 2.9 KA

REFERENCE:

003 A4.08 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: Perform CLASSROOM:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT CLASSROOM:

SITE:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): 2202.010 Attachment 21 EXAMINEE'S NAME: BADGE# :

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Stop Total Time Time Time

ANO-2-JPM-NRC-RCP02 S3 PAGE 2 OF 7 JOB PERFORMANCE MEASURE INITIAL CONDITIONS:

2A1 is re-energized from SU#2 following a degraded power situation 2202.010 ATT. 29 steps up to 1.M.7 have been completed CCW pump has been restored Service water has been aligned to CCW TASK STANDARD:

Controlled bleed off isolated to VCT and CBO relief valve isolated by closing the following valves:

2CV-4846-1 2CV-4847-2 2CV-4856 TASK PERFORMANCE AIDS:

2202.010 Attachment 21 SIMULATOR SETUP:

Set up CCW valves per EOP 2202.010 Attachment 29 "STARTUP XFM# 2 USAGE" perform actions through step 1.M.6. Close RCP CCW RETURN valve, 2CV-5255-1, 2CV-5254-2 and 2CV-5236-1. NO SIAS actuation and RCP seal temperatures >180.

Set T4 = 2CV 5255 red light. When 2CV 5255-1 is taken to open position, it will trip the breaker T4=DO_HS_5255_R off (override)

T4=DO_HS_5255_G off (override)

T4=CV52551 = 0.0% (component malfunction)

ANO-2-JPM-NRC-RCP02 S3 PAGE 3 OF 7 JOB PERFORMANCE MEASURE INITIATING CUE:

The SM/CRS directs you to restore CCW to the RCP's using EOP 2202.010 Attachment 21 starting with step 2.

START TIME:

PERFORMANCE CHECKLIST STANDARDS (Circle One)

1. Align Controlled Bleedoff as On panel 2C16 verified N/A SAT UNSAT follows: 2CV-4847-2 red light on; control (Step switch in OPEN.

2 A) IF SIAS OR CIAS NOT actuated, THEN verify RCP Bleedoff to On panel 2C17, verified VCT valves open: 2CV-4846-1 red light on.

2. Verify RCP Bleed-off Relief On panel 2C09, verified N/A SAT UNSAT Isolation to Quench Tank open. 2CV-4856 red light on; key-(Step switch in LOCKED OPEN.

2 B)

3. IF RCP seal temperatures less On panel 2C14 or on PMS N/A SAT UNSAT than 180°F, computer determined RCP seal (Step THEN restore CCW to RCPs temperatures greater than 1800F
3) by performing the following:
4. IF RCP seal temperatures On panel 2C17, verified N/A SAT UNSAT 180°F or greater, 2CV-5255-1 closed.

(Step 4 A) THEN restore CCW to RCPs as follows: Observed green light ON; red light OFF above handswitch.

Verify RCP CCW Return valve (2CV-5255-1) CLOSED.

(C) 5. Verify RCP CCW Supply valve On panel 2C17, placed N/A SAT UNSAT (2CV-5236-1) open. handswitch for 2CV-5236-1 in (Step OPEN.

4 B)

Observed green light OFF; red light ON.

ANO-2-JPM-NRC-RCP02 S3 PAGE 4 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 6. Verify RCP CCW Return valve On panel 2C16, Verified N/A SAT UNSAT (2CV-5254-2) open. handswitch for 2CV-5254-2 (Step "OPEN".

4 C)

Observed green light OFF; red light ON.

EXAMINERS NOTE:

When 2CV-5255-1 is taken to OPEN, the breaker will trip and cannot be reset. The valve will be bound closed.

(C) 7. Throttle open RCP CCW On panel 2C17, took handswitch N/A SAT UNSAT Return valve (2CV-5255-1) for 2CV-5255-1 to "OPEN" for (Step with a single 1 second one (1) second then released.

4 D) modulation.

Observed red and green lights Examiner Cue: OFF.

If WCO sent to the valve report that 2CV-5255-1. EXAMINEE may ask to dispatch If asked 2CV-5255-1 cannot a NLO to the valve and or be opened. breaker.

If AO sent to the breaker, 2B53-G4 report that it is open. If asked the breaker for 2CV-5255-1 cannot be reset.

EXAMINERS NOTE:

The examinee may elect to monitor RCP seal cooldown before making the decision that CCW cannot be restored. This monitoring of RCP seal cooldown may take 10 minutes to validate that 2CV-5255-1 did not open.

The examinee should go to step 5 of Attachment 21.

8. IF EITHER of the following On panel 2C04, observed N/A SAT UNSAT occur, 2P32A, B, C, and D RCP (Step handswitches in STOP or PTL.
5) CCW to RCPs can NOT be restored Observed handswitch is green CCW Surge Tank levels flagged; green light ON and red lower to 13% following light OFF.

restoration THEN verify ALL RCPs stopped.

ANO-2-JPM-NRC-RCP02 S3 PAGE 5 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

9. Isolate CCW to RCPs by On panel 2C16, placed N/A SAT UNSAT closing the following valves: handswitch for 2CV-5254-2 to (Step CLOSE 5 A) Close 2CV-5254-2.

Close 2CV-5236-1. Observed green light ON; red light OFF.

On panel 2C17, placed handswitch for 2CV-5236-1 to CLOSE Observed green light ON; red light OFF.

(C) 10. Isolate Controlled Bleedoff as On panel 2C17, placed N/A SAT UNSAT follows: handswitch for 2CV-4846-1 to (Step Verify RCP Bleedoff to VCT CLOSE.

5 B.1) valves closed:

On panel 2C16, placed handswitch for 2CV-4847-2 to 2CV-4846-1 CLOSE.

2CV-4847-2 For each valve, observed green light ON; red light OFF.

(C) 11. Close RCP bleedoff relief On panel 2C09, placed N/A SAT UNSAT isolation to quench tank valve handswitch for 2CV-4856 to (Step (2CV-4856). CLOSE 5

B.2)

Observed green light ON; red light OFF.

END STOP TIME:

ANO-2-JPM-NRC-RCP02 S3 PAGE 6 OF 7 JOB PERFORMANCE MEASURE EXAMINERS COPY INITIAL CONDITIONS:

2A1 is re-energized from SU#2 following a degraded power situation 2202.010 ATT. 29 steps up to 1.M.7 have been completed CCW pumps have been restored Service water has been aligned to CCW INITIATING CUE:

The SM/CRS directs you to restore CCW to the RCP's using EOP 2202.010 Attachment 21 starting with step 2.

ANO-2-JPM-NRC-RCP02 S3 PAGE 7 OF 7 JOB PERFORMANCE MEASURE EXAMINEES COPY INITIAL CONDITIONS:

2A1 is re-energized from SU#2 following a degraded power situation 2202.010 ATT. 29 steps up to 1.M.7 have been completed CCW pumps have been restored Service water has been aligned to CCW INITIATING CUE:

The SM/CRS directs you to restore CCW to the RCP's using EOP 2202.010 Attachment 21 starting with step 2.