2014-05-Draft Outline Comments
ML14184B321
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 05/22/2014
From: Vincent Gaddy
Operations Branch IV
To:
Omaha Public Power District
laura hurley
References
Download: ML14184B321 (2)


Text

DRAFT OUTLINE COMMENTS Facility: FCS First Exam Date: May 19, 2014 Written Exam Outline Comment Resolution Many of the KAs rejected were Following the discussion many of the original 1 inappropriate - will discuss with the KAs were restored.

exam author.

2 3

4 5

Administrative JPM Outline Comment Resolution 1 No Comments.

2 3

4 5

Control Room / In-Plant System JPM Outline (Date)

Comment Resolution 1 No Comments.

2 3

4 5

Simulator Scenario Outline Comments (Date)

Comment Resolution

  • Change Event 6 to a Major These comments were addressed during the Transient (M) on-site validation.
  • Change Event 8 to a Component 1 failure (C)
  • Add a normal event (swap pumps, fans, etc.) to the beginning of the scenario OBDI 202 - IOLE Process Rev 1
  • Add a normal event at the beginning of the scenario
  • There are no I/C failures for the BOPO prior to the major transient 2
  • Delete one ATCO and/or add two BOPO I/C events prior to the major transient
  • Combine Event 3 and 4 into one event.
  • Delete Event 2 3
  • Only one TS event identified -

there needs to be 2

  • Add event numbers to outline
  • Add normal event to beginning of outline 4
  • There is only one BOPO I/C event prior to the major transient

- add one.

5 OBDI 202 - IOLE Process Rev 1