{{#Wiki_filter:Appendix C Job Performance Measure Form ES-C-1  Worksheet 2014 HNP NRC Exam Simulator JPM CR a Rev. FINAL Facility:
{{#Wiki_filter:Appendix C Job Performance Measure Form ES-C-1  Worksheet   20 14 HNP NRC Exam Simulator JPM CR a Rev. FINAL Facility: Shearon Harris Task No.: 001001H201 Task Title:
Shearon Harris Task No.:
Perform Control Rod and Rod Position Indicator Exercise JPM No.: 20 1 4 NRC Exam Simulator JPM CR a      K/A  
001001H201 Task Title:
Perform Control Rod and Rod Position Indicator Exercise JPM No.: 2014 NRC Exam Simulator JPM CR a      K/A  


==Reference:==
==Reference:==


001 A2.11     RO 3.7 SRO 4.0 ALTERNATE PATH
001 A2.1 1     RO 3.7 SRO 4.0 ALTERNATE PATH
  - YES  Examinee:
  - YES  Examinee: ________________________
________________________
NRC Examiner:
NRC Examiner:
_________________
_________________
Line 35: Line 32:
Simulated Performance:
Simulated Performance:
Actual Performance:
Actual Performance:
X  Classroom Simulator X Plant  READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
X  Classroom Simulator X Plant  READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Initial Conditions:
The plant is operating at 100% power.
The plant is operating at 100% power.
OST-1005, "Control Rod and Rod Position Indicator Exercise Quarterly Interval Modes 1  
OST-1005, "Control Rod and Rod Position Indicator Exercise Quarterly Interval Modes 1  
- 3", is in progress. All prerequisites to perform the test have been met and a briefing has been conducted. The CRS has given permission to continue with this OST.
- 3", is in progress. All prerequisites to perform the test have been met and a briefing has been conducted. The CRS has given permission to continue with this OST. 'A' PRZ backup heaters have been energized to support OST
  'A' PRZ backup heaters have been energized to support OST
-1005. Initiating Cue:
-1005. Initiating Cue:
The CRS is directing you to continue OST
The CRS is directing you to continue OST
-1005, Section 7.2.4, commencing with Control Bank D
-1005, Section 7.2.4, commencing with Control Bank D. The briefing has determined the following control rod test order shall be used:  CB-D, CB-A, CB-B, CB-C then SDB
. The briefing has determined the following control rod test order shall be used:  CB-D, CB-A, CB-B, CB-C then SDB
-A, SDB-B and SDB-C. NOTE:  During the performance of this OST you will be required to obtain DRPI position when appropriate. Another operator will stay at the Reactor console while you are obtaining these values.
-A, SDB-B and SDB
-C. NOTE:  During the performance of this OST you will be required to obtain DRPI position when appropriate. Another operator will stay at the Reactor console while you are obtaining these values.


Examiners Note:
Examiners Note:
To expedite the examination schedule, the candidate should review the INITIAL CONDITIONS, INITIATING CUE, and the marked up copy of OST-1005 prior to entering the simulator to perform the JPM.
To expedite the examination schedule, the candidate should review the INITIAL CONDITIONS, INITIATING CUE, and the marked up copy of OST-1005 prior to entering the simulator to perform the JPM.


Appendix C Job Performance Measure Form ES-C-1  Worksheet 2014 HNP NRC Exam Simulator JPM CR a Rev. FINAL Task Standard:
Appendix C Job Performance Measure Form ES-C-1  Worksheet   20 14 HNP NRC Exam Simulator JPM CR a Rev. FINAL Task Standard:
The Reactor has been manually Tripped in response to continuous inward rod motion with rod control in manual.
The Reactor has been manually Tripped in response to continuous inward rod motion with rod control in manual.
Required Materials:
Required Materials:
Line 60: Line 54:
OST-1005, Control Rod and Rod Position Indicator Exercise Quarterly Interval Modes 1  
OST-1005, Control Rod and Rod Position Indicator Exercise Quarterly Interval Modes 1  
- 3, Rev. 21 AOP-001, Malfunction of Rod Control and Indication System, Rev.
- 3, Rev. 21 AOP-001, Malfunction of Rod Control and Indication System, Rev.
43 EOP-E-0, Reactor Trip or Safety Injection, Rev. 3 Handouts:
4 3 EOP-E-0, Reactor Trip or Safety Injection, Rev. 3 Handouts: OST-1005 marked up with prerequisites and step 7.1 completed
OST-1005 marked up with prerequisites and step 7.1 completed
. To expedite the examination schedule, the candidate should review the INITIAL CONDITIONS, INITIATING CUE, and the marked up copy of OST-1005 prior to entering the simulator to perform the JPM.
. To expedite the examination schedule, the candidate should review the INITIAL CONDITIONS, INITIATING CUE, and the marked up copy of OST-1005 prior to entering the simulator to perform the JPM.
Time Critical Task:
Time Critical Task:
N/A  Validation Time:
N/A  Validation Time:
15 minutes Appendix C Job Performance Measure Form ES-C-1  Worksheet 2014 HNP NRC Exam Simulator JPM CR a Rev. FINAL CRITICAL STEP JUSTIFICATION Step 4  Must be performed to operate the correct bank of control rods.
1 5 minutes Appendix C Job Performance Measure Form ES-C-1  Worksheet   20 14 HNP NRC Exam Simulator JPM CR a Rev. FINAL CRITICAL STEP JUSTIFICATION Step 4  Must be performed to operate the correct bank of control rods.
Step 5  Must be performed to test control rod ability to freely move in the inward direction.
Step 5  Must be performed to test control rod ability to freely move in the inward direction.
Step 7  Must be performed to test control rod ability to freely move in the outward direction.
Step 7  Must be performed to test control rod ability to freely move in the outward direction.
Line 72: Line 65:
Step 14  Must be performed to be in compliance with an Abnormal Operating Procedure immediate action step and avoid placing the Reactor in a unanalyzed condition.  
Step 14  Must be performed to be in compliance with an Abnormal Operating Procedure immediate action step and avoid placing the Reactor in a unanalyzed condition.  


Appendix C Job Performance Measure Form ES-C-1  Worksheet 2014 HNP NRC Exam Simulator JPM CR a Rev. FINAL 2014 NRC Exam  
Appendix C Job Performance Measure Form ES-C-1  Worksheet   20 14 HNP NRC Exam Simulator JPM CR a Rev. FINAL 201 4 NRC Exam - SIMULATOR SETUP Simulator Operator Reset to IC
- SIMULATOR SETUP Simulator Operator Reset to IC
-16 5   Password "spurs"  Place reactivity data sheet for IC
-165   Password "spurs"  Place reactivity data sheet for IC
-1 9 on plant status board (this will be used for obtaining boron concentrations for the RCS and BAT)
-19 on plant status board (this will be used for obtaining boron concentrations for the RCS and BAT)
May have to update rods Place Restricted Access signs on swing gates CRT displays  
May have to update rods Place Restricted Access signs on swing gates CRT displays  
- CRT 3: QP Startup and display QP POAH on CR T 4  Go to RUN and wait ~ 10 seconds then silence and acknowledge alarms.
- CRT 3: QP Startup and display QP POAH on CR T 4  Go to RUN and wait ~ 10 seconds then silence and acknowledge alarms.
GO TO FREEZE and inform the lead examiner the Simulator is ready. DO NOT GO TO RUN until directed by the lead examiner.  (The examiner has provided to the candidate with initial conditions and the initiating cues prior to placing the simulator in RUN.)
GO TO FREEZE and inform the lead examiner the Simulator is ready. DO NOT GO TO RUN until directed by the lead examiner.  (The examiner has provided to the candidate with initial conditions and the initiating cues prior to placing the simulator in RUN.)
To recreate the IC setup for this JPM:
To recreate the IC setup for this JPM:
o Reset to IC-19, 100% power M OL  o Place Rod Control Selector Switch to AUTO  o Rod height CBD 218 steps  o Create malfunction to fail the rod selector switch to the selected bank and continuously demand rod motion on Trigger 1 o imf crf15a (1  00:00:00  00:00:00) TRUE o ior xc1i110 (1  00:00:00  00:00:00) ASIS o Slightly Open PZR Spray valves manually the place the 'A' PZR heater to on o Allow the plant to stabilize then place the PZR Spray valves back to AUTO o FREEZE and SNAP.
o Reset to IC-1 9 , 100% power M OL  o Place Rod Control Selector Switch to AUTO  o Rod height CBD 21 8 steps  o Create malfunction to fail the rod selector switch to the selected bank and continuously demand rod motion on Trigger 1 o imf crf 15 a (1  00:00:00  00:00:00) TRUE o ior xc1i110 (1  00:00:00  00:00:00) ASIS o Slightly Open PZR Spray valves manually the place the 'A' PZR heater to on o Allow the plant to stabilize then place the PZR Spray valves back to AUTO o FREEZE and SNAP.
o After the candidate is ready, place simulator in RUN.
o After the candidate is ready, place simulator in RUN.
o While Control Bank A is being inserted to 10 steps from the original position
o While Control Bank A is being inserted to 10 steps from the original position , activate Trigger 1
, activate Trigger 1


Appendix C Page 5 of 14 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 5 of 14 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR a Rev. FINAL Simulator Operator:
   - Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR a Rev. FINAL Simulator Operator:
When directed by the Lead Examiner go to Run.
When directed by the Lead Examiner go to Run.
Performance Step: 1 Obtain procedure.
Performance Step: 1 Obtain procedure.
Standard:
Standard: Reviews procedure.
Reviews procedure.
Comment:    START TIME:
Comment:    START TIME:
OST-1005, 7.2
OST-1005, 7.2.4  Procedure Note:
.4  Procedure Note:
NOTE: IF in Mode 1, THEN testing of Control Bank D can be conducted during lowering of plant power per Section 7.4. and the next section may be marked N/A. NOTE: IF Control Bank D is less than 10 steps, THEN testing of Control Bank D rods can be conducted per Section 7.3. and the next section may be marked N/A.
NOTE: IF in Mode 1, THEN testing of Control Bank D can be conducted during lowering of plant power per Section 7.4. and the next section may be marked N/A. NOTE: IF Control Bank D is less than 10 steps, THEN testing of Control Bank D rods can be conducted per Section 7.3. and the next section may be marked N/A.
NOTE: When inserting rods, the Bank Low Insertion and Bank Low-Low Insertion Limit Alarm may be actuated.
NOTE: When inserting rods, the Bank Low Insertion and Bank Low-Low Insertion Limit Alarm may be actuated.
Performance Step: 2 Control Bank D Testing  For CONTROL BANK D, REFER to Attachment 1 and test the rod bank per the following instructions:
Performance Step: 2 Control Bank D Testing  For CONTROL BANK D, REFER to Attachment 1 and test the rod bank per the following instructions:
Standard:
Standard: Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)
Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)
Comment:
Comment:
Appendix C Page 6 of 14 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 6 of 14 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR a Rev. FINAL OST-1005, Step 7.2.
   - Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR a Rev. FINAL OST-1005 , Step 7.2.4.1.a  Performance Step: 3 For Control Bank D, record on Attachment 1 the initial rod heights as indicated by Group Step Counters and DRPI.
4.1.a  Performance Step: 3 For Control Bank D, record on Attachment 1 the initial rod heights as indicated by Group Step Counters and DRPI.
Standard: On Attachment 1, for Control Bank "
Standard:
D":    Records both Group Position indications as "2 18". Records all DRPI position indications as "2 16". Comment:      OST-1005, Step 7.2.4.1.b  Performance Step: 4 Rotate the Rod Bank Selector to CB D. Evaluator Note:
On Attachment 1, for Control Bank "
D":    Records both Group Position indications as "2 18". Records all DRPI position indications as "216". Comment:      OST-1005, Step 7.2.
4.1.b  Performance Step: 4 Rotate the Rod Bank Selector to CB D. Evaluator Note:
OMM-001 Att 13 provides Stable Plant TAVG Control Band of   
OMM-001 Att 13 provides Stable Plant TAVG Control Band of   
+/- 2° F and Trip Limit of +/
+/- 2° F and Trip Limit of +/
- 10° F from TREF with Rod Control  in manual.
- 10° F from TREF with Rod Control  in manual.
Standard:
Standard: Locates the ROD BANK SELECTOR switch and rotates position to the "CB D" position.
Locates the ROD BANK SELECTOR switch and rotates position to the "CB D" position.
Verifies 48 steps per minute on rod speed indicator, SI
Verifies 48 steps per minute on rod speed indicator, SI
-408. Comment:
-408. Comment:
Appendix C Page 7 of 14 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 7 of 14 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR a Rev. FINAL Evaluator Note
   - Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR a Rev. FINAL Evaluator Note
: During the performance of the OST
: During the performance of the OST
-1005 procedure guidance allows the operator to step the control rods IN further than 10 total without any consequence.
-1005 procedure guidance allows the operator to step the control rods IN further than 10 total without any consequence.
This can be an evaluator comment but it is OK.
This can be an evaluator comment but it is OK.
OST-1005, Step 7.2.
OST-1005 , Step 7.2.4.1.c  Performance Step: 5 With the Rod Motion lever, insert Control Bank D IN 10 steps as indicated by Group Step Counters.
4.1.c  Performance Step: 5 With the Rod Motion lever, insert Control Bank D IN 10 steps as indicated by Group Step Counters.
Standard: Places the ROD MOTION lever to the "IN" position and inserts Control Bank "
Standard:
D" rods 10 steps by observing Group Step Counters. Comment:      OST-1005 , Step 7.2.4.1.d  Performance Step: 6 Record on Attachment 1, the rod heights for Control Bank D, as indicated by Group Step Counters and DRPI.
Places the ROD MOTION lever to the "IN" position and inserts Control Bank "
Standard: On Attachment 1, for control Bank "D":
D" rods 10 steps by observing Group Step Counters. Comment:      OST-1005, Step 7.2.
Records both Group Position indications as "208". Records all DRPI position indications as "204".
4.1.d  Performance Step: 6 Record on Attachment 1, the rod heights for Control Bank D, as indicated by Group Step Counters and DRPI.
Standard:
On Attachment 1, for control Bank "D":
Records both Group Position indications as "208".
Records all DRPI position indications as "204".
Comment:
Comment:
Appendix C Page 8 of 14 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 8 of 14 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR a Rev. FINAL Evaluator Note
   - Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR a Rev. FINAL Evaluator Note
: During the performance of the OST
: During the performance of the OST
-1005 procedure guidance allows the operator to step the control rods OUT further than 10 total without any consequence.
-1005 procedure guidance allows the operator to step the control rods OUT further than 10 total without any consequence.
This can be an evaluator comment but it is OK.
This can be an evaluator comment but it is OK.
IF a student does step Control Bank 'D' out past 218 steps (for example 219 / 218 steps)
IF a student does step Control Bank 'D' out past 218 steps (for example 219 / 218 steps)
CUE: Return Control Bank 'D' to 218 steps and continue with OST-1005 OST-1005, Step 7.2.4.1.e  Performance Step: 7 With the Rod Motion lever, WITHDRAW Control Bank D OUT 10 steps as indicated by Group Step Counters.
CUE: Return Control Bank 'D' to 218 steps and continue with OST-1005 OST-1005 , Step 7.2.4.1.e  Performance Step: 7 With the Rod Motion lever, WITHDRAW Control Bank D OUT 10 steps as indicated by Group Step Counters.
Standard:
Standard: Places the ROD MOTION lever in the "OUT" position and withdraws Control Bank "D" rods 10 steps by observing Group Step Counters.
Places the ROD MOTION lever in the "OUT" position and withdraws Control Bank "D" rods 10 steps by observing Group Step Counters.
When completed both Control Bank "D" Group Step Counters should read 218 steps.
When completed both Control Bank "D" Group Step Counters should read 218 steps.
Comment:    OST-1005, Step 7.2.4.1.f  Performance Step: 8 Record on Attachment 1, the final rod heights for Control Bank D, as indicated by Group Step Counters and DRPI. Standard:
Comment:    OST-1005 , Step 7.2.4.1.f  Performance Step: 8 Record on Attachment 1, the final rod heights for Control Bank D, as indicated by Group Step Counters and DRPI. Standard: On Attachment 1, for control Bank "D":
On Attachment 1, for control Bank "D":
Records both Group Position indications as "218".
Records both Group Position indications as "218".
Records all DRPI position indications as "216".
Records all DRPI position indications as "216".
Line 147: Line 124:


Appendix C Page 9 of 14 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 9 of 14 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR a Rev. FINAL Evaluator Note
   - Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR a Rev. FINAL Evaluator Note
: Based on the instructions provided on the initial cues the student should be testing Control Bank 'A' next.   
: Based on the instructions provided on the initial cues the student should be testing Control Bank 'A' next.   


OST-1005, 7.2
OST-1005, 7.2.1  Procedure Note:
.1  Procedure Note:
NOTE: When inserting rods, ALB 13/8
NOTE: When inserting rods, ALB 13/8
-2, BANK LOW INSERTION and ALB 13/8-3, BANK LOW
-2, BANK LOW INSERTION and ALB 13/8-3, BANK LOW
Line 157: Line 133:
NOTE: ALB 13/8-5, COMP ALARM ROD DEVIATION/SEQUENCE will annunciate during this procedure due to bank out of sequence, and should be considered an expected alarm.
NOTE: ALB 13/8-5, COMP ALARM ROD DEVIATION/SEQUENCE will annunciate during this procedure due to bank out of sequence, and should be considered an expected alarm.
Performance Step: 9 Control Bank A Testing For CONTROL BANK A, REFER to Attachment 1 and test the rod bank per the following instructions:
Performance Step: 9 Control Bank A Testing For CONTROL BANK A, REFER to Attachment 1 and test the rod bank per the following instructions:
Standard:
Standard: Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)
Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)
Comment:      OST-1005 , Step 7.2.1.1.a  Performance Step: 10 For Control Bank A, record on Attachment 1 the rod heights as indicated by Group Step Counters and DRPI.
Comment:      OST-1005, Step 7.2.
Standard: On Attachment 1, for Control Bank "A":
1.1.a  Performance Step: 10 For Control Bank A, record on Attachment 1 the rod heights as indicated by Group Step Counters and DRPI.
Standard:
On Attachment 1, for Control Bank "A":
Records both Group Position indications as "231
Records both Group Position indications as "231
". Records all DRPI position indications as "228". Comment:
". Records all DRPI position indications as "2 28". Comment:
Appendix C Page 10 of 14 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 10 of 14 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR a Rev. FINAL OST-1005, Step 7.2.
   - Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR a Rev. FINAL OST-1005, Step 7.2.
1.1.b  Performance Step: 11 Rotate the Rod Bank Selector to CB A. Standard:
1.1.b  Performance Step: 11 Rotate the Rod Bank Selector to CB A. Standard: Rotates the ROD BANK SELECTOR switch to the "CB A" position. Comment:    Simulator Operator:
Rotates the ROD BANK SELECTOR switch to the "CB A" position.
Comment:    Simulator Operator:
When the rod bank selector switch is taken to "CBA" position AND rods have been inserted 2
When the rod bank selector switch is taken to "CBA" position AND rods have been inserted 2
-3 steps actuate Trigger 1 (continuous demand for rod motion
-3 steps actuate Trigger 1 (continuous demand for rod motion)      OST-1005 , Step 7.2.1.1.c
)      OST-1005, Step 7.2.1.1.c
  - ALTERNATE PATH Performance Step: 12 With the Rod Motion lever, insert Control Bank A IN 10 steps as indicated by Group Step Counters.
  - ALTERNATE PATH Performance Step: 12 With the Rod Motion lever, insert Control Bank A IN 10 steps as indicated by Group Step Counters.
Standard:
Standard: Places the ROD MOTION lever in the "IN" position and inserts Control Bank "A" rods 10 steps by observing Group Step Counters. Comment:
Places the ROD MOTION lever in the "IN" position and inserts Control Bank "A" rods 10 steps by observing Group Step Counters. Comment:
Appendix C Page 11 of 14 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 11 of 14 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR a Rev. FINAL Alternate Path Performance Step: 13 Monitors Rod Motion. When Rod Motion level is released CB A rods continue to step IN.
   - Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR a Rev. FINAL Alternate Path Performance Step: 13 Monitors Rod Motion. When Rod Motion level is released CB A rods continue to step IN.
Standard:
Standard: Determines rod motion continues without a demand observing:
Determines rod motion continues without a demand observing:
Group Step Counter continues to count in DRPI continues to lower Lowering Rx power Lowering Tavg Comment:
Group Step Counter continues to count in DRPI continues to lower Lowering Rx power Lowering Tavg Comment:
Appendix C Page 12 of 14 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 12 of 14 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR a Rev. FINAL Evaluator Note:
   - Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR a Rev. FINAL Evaluator Note:
Placing rods in MANUAL is considered to be any position of the Rod Bank Selector switch other than AUTO. This meets the intent of the immediate actions for AOP
Placing rods in MANUAL is considered to be any position of the Rod Bank Selector switch other than AUTO. This meets the intent of the immediate actions for AOP
-001. AOP-001 Immediate Action s  Performance Step:
-001. AOP-001 Immediate Action s  Performance Step:
14 Informs the CRS of the continued rod motion with rods in manual and states entry conditions for AOP
14 Informs the CRS of the continued rod motion with rods in manual and states entry conditions for AOP
-001, (Malfunction of Rod Control and Indication System)
-001, (Malfunction of Rod Control and Indication System)
Standard:
Standard: Informs the CRS.
Informs the CRS.
Initiates immediate actions of AOP
Initiates immediate actions of AOP
-001  Check that < 2 control rods are dropped (YES)
-001  Check that < 2 control rods are dropped (YES)
Line 197: Line 164:
- OPEN (YES)
- OPEN (YES)
Rod Bottom Lights  
Rod Bottom Lights  
- LIT (YES)
- LIT (YES) Neutron Flux  
Neutron Flux  
- DROPPING (YES)
- DROPPING (YES)
Check Turbine Trip  
Check Turbine Trip  
Line 209: Line 175:
STOP TIME:
STOP TIME:


Appendix C Page 13 of 14 Form ES-C-1  VERIFICATION OF COMPLETION 2014 HNP NRC Exam Simulator JPM CR a Rev. FINAL Job Performance Measure No.:
Appendix C Page 13 of 14 Form ES-C-1  VERIFICATION OF COMPLETION 20 14 HNP NRC Exam Simulator JPM CR a Rev. FINAL Job Performance Measure No.:
2014 HNP NRC Exam Simulator JPM CR a Perform Control Rod and Rod Position Indicator Exercise per OST-1005  Examinee's Name:
2014 HNP NRC Exam Simulator JPM CR a Perform Control Rod and Rod Position Indicator Exercise per OST-1005  Examinee's Name:
Date Performed:
Date Performed:
Line 217: Line 183:
Question Documentation:
Question Documentation:
Question:
Question:
 
Response:
===Response===
 
Result:  SAT  UNSAT    Examiner's Signature:
Result:  SAT  UNSAT    Examiner's Signature:
Date:
Date:
Appendix C Form ES-C-1  JPM CUE SHEET 2014 HNP NRC Exam Simulator JPM CR a Rev. FINAL Initial Conditions:
Appendix C Form ES-C-1  JPM CUE SHEET 20 14 HNP NRC Exam Simulator JPM CR a Rev. FINAL Initial Conditions:
The plant is operating at 100% power.
The plant is operating at 100% power.
OST-1005, "Control Rod and Rod Position Indicator Exercise Quarterly Interval Modes 1  
OST-1005, "Control Rod and Rod Position Indicator Exercise Quarterly Interval Modes 1  
Line 232: Line 196:
-1005, Section 7.2.4, commencing with Control Bank D.
-1005, Section 7.2.4, commencing with Control Bank D.
The briefing has determined the following control rod test order shall    be used:
The briefing has determined the following control rod test order shall    be used:
CB-D, CB-A, CB-B, CB-C then SDB
CB-D, CB-A, CB-B, C B-C then SDB
-A, SDB-B and SDB
-A, SDB-B and SDB-C  NOTE:  During the performance of this OST you will be required to obtain DRPI position when appropriate. Another operator will stay at the Reactor console while you are obtaining these values.
-C  NOTE:  During the performance of this OST you will be required to obtain DRPI position when appropriate. Another operator will stay at the Reactor console while you are obtaining these values.
Appendix C Page 1 of 15 Form ES-C-1  Worksheet   20 14 HNP NRC Exam Simulator JPM CR b Rev. FINAL  Facility: Shearon Harris Task No.: 301136H601 Task Title:
Appendix C Page 1 of 15 Form ES-C-1  Worksheet 2014 HNP NRC Exam Simulator JPM CR b Rev. FINAL  Facility:
Vent An Unisolable SI Accumulator during a Steam Generator Tube Rupture Event JPM No.: 20 1 4 NRC Exam Simulator JPM CR b    K/A  
Shearon Harris Task No.:
301136H601 Task Title:
Vent An Unisolable SI Accumulator during a Steam Generator Tube Rupture Event JPM No.: 2014 NRC Exam Simulator JPM CR b    K/A  


==Reference:==
==Reference:==


006  A4.02 RO 4.0  SRO 3.8  ALTERNATE PATH
006  A4.02 RO 4.0  SRO 3.8  ALTERNATE PATH
  - YES    Examinee:
  - YES    Examinee: ________________________
________________________
NRC Examiner:
NRC Examiner:
_________________
_________________
Line 251: Line 211:
Date: ________  Method of testing: Simulated Performance:
Date: ________  Method of testing: Simulated Performance:
Actual Performance:
Actual Performance:
X  Classroom Simulator X Plant    READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
X  Classroom Simulator X Plant    READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Initial Conditions:
The unit was operating at 100% power when a leak developed in the 'A' Steam Generator.
The unit was operating at 100% power when a leak developed in the 'A' Steam Generator.
Line 267: Line 227:
-3 foldout page
-3 foldout page


Appendix C Page 2 of 15 Form ES-C-1  Worksheet 2014 HNP NRC Exam Simulator JPM CR b Rev. FINAL  Task Standard:
Appendix C Page 2 of 15 Form ES-C-1  Worksheet   20 14 HNP NRC Exam Simulator JPM CR b Rev. FINAL  Task Standard:
Identify an Accumulator that cannot be isolated as directed by EOP-E-3, Steam Generator Tube Rupture and perform actions of OP
Identify an Accumulator that cannot be isolated as directed by EOP-E-3, Steam Generator Tube Rupture and perform actions of OP
-110, Safety Injection to vent the unisolable Accumulator.
-110, Safety Injection to vent the unisolable Accumulator.
Required Materials:
Required Materials:
Replacement copies of EOP-E-3, SG Tube Rupture, Rev.
Replacement copies of EOP-E-3, SG Tube Rupture, Rev.
1 and OP-110 Section 8.3, pages 17-19, Rev. 45   General  
1 and OP-110 Section 8.3, pages 17-19, Rev. 4 5   General  


==References:==
==References:==
Line 282: Line 242:
Step 16 Opening the Accumulator Vent Pressure Control Valve will vent the accumulator to the containment.
Step 16 Opening the Accumulator Vent Pressure Control Valve will vent the accumulator to the containment.


Appendix C Page 3 of 15 Form ES-C-1  Worksheet 2014 HNP NRC Exam Simulator JPM CR b Rev. FINAL  2014 HNP NRC Exam - SIMULATOR SETUP Simulator Operator Reset to IC
Appendix C Page 3 of 15 Form ES-C-1  Worksheet   20 14 HNP NRC Exam Simulator JPM CR b Rev. FINAL  20 1 4 HNP NRC Exam - SIMULATOR SETUP Simulator Operator Reset to IC
-166  Password "spurs"  Switch check override Gen lockouts to Freeze Roll 86 Relays to trip position:
-166  Password "spurs"  Switch check override Gen lockouts to Freeze Roll 86 Relays to trip position:
o Run AMS file  
o Run AMS file  
Line 297: Line 257:
-15% to maintain RCS pressure stable and < 1000#
-15% to maintain RCS pressure stable and < 1000#
Silence Acknowledge and Reset Annunciators Freeze and Snap these conditions to your exam IC Appendix C Page 4 of 15 Form ES-C-1  PERFORMANCE INFORMATION
Silence Acknowledge and Reset Annunciators Freeze and Snap these conditions to your exam IC Appendix C Page 4 of 15 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR b Rev. FINAL    Simulator Operator:
   - Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR b Rev. FINAL    Simulator Operator:
When directed by the Lead Examiner go to Run.
When directed by the Lead Examiner go to Run.
START TIME:
START TIME:
Performance Step: 1 OBTAINS PROCEDURE Standard:
Performance Step: 1 OBTAIN S PROCEDURE     Standard: Obtains a copy of EOP
Obtains a copy of EOP
-E-3, Steam Generator Tube Rupture and reviews step 90.
-E-3, Steam Generator Tube Rupture and reviews step 90.
Evaluator Note:
Evaluator Note:
Line 307: Line 266:
Comment:        EOP-E-3, Step 90.a Performance Step: 2 Check If SI Accumulators Should Be Isolated:
Comment:        EOP-E-3, Step 90.a Performance Step: 2 Check If SI Accumulators Should Be Isolated:
RCS pressure  
RCS pressure  
- LESS THAN 1000 PSIG Standard:
- LESS THAN 1000 PSIG Standard: Reviews ERFIS/Main Control Board RCS pressure instruments to identify current RCS pressure.
Reviews ERFIS/Main Control Board RCS pressure instruments to identify current RCS pressure.
Identifies that RCS pressure is < 1000 psig Comment:
Identifies that RCS pressure is < 1000 psig Comment:
Appendix C Page 5 of 15 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 5 of 15 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR b Rev. FINAL    EOP-E-3 Step 90.b Performance Step: 3 Locally unlock AND close both breakers for each SI accumulator discharge valve:  
   - Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR b Rev. FINAL    EOP-E-3 Step 90.b Performance Step: 3 Locally unlock AND close both breakers for each SI accumulator discharge valve:  


1SI-246 (MCC-1A21-SA-5C) 1SI-247 (MCC-1B21-SB-5C) 1SI-248 (MCC-1A21-SA-3D)    Standard:
1SI-246 (MCC-1A21-SA-5C) 1SI-247 (MCC-1B21-SB-5C) 1SI-248 (MCC-1A21-SA-3D)    Standard: Contacts an Auxiliary Operator to  locally unlock AND close both breakers for each SI accumulator discharge valve:  
Contacts an Auxiliary Operator to  locally unlock AND close both breakers for each SI accumulator discharge valve:  


1SI-246 (MCC-1A21-SA-5C) 1SI-247 (MCC-1B21-SB-5C) 1SI-248 (MCC-1A21-SA-3D)    Simulator Operator
1SI-246 (MCC-1A21-SA-5C) 1SI-247 (MCC-1B21-SB-5C) 1SI-248 (MCC-1A21-SA-3D)    Simulator Operator
Line 323: Line 280:
-  sis/SI Accum Power Apply Comment:
-  sis/SI Accum Power Apply Comment:
Appendix C Page 6 of 15 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 6 of 15 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR b Rev. FINAL    Evaluator Note:
   - Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR b Rev. FINAL    Evaluator Note:
1SI-246 is failed as is and will not shut when the candidate attempts to shut the MCB position switch. This will require the candidate to use an Alternate Path to accomplish this task. EOP-E-3 Step 90.c  Performance Step: 4 Shut SI accumulator discharge valves:
1SI-246 is failed as is and will not shut when the candidate attempts to shut the MCB position switch. This will require the candidate to use an Alternate Path to accomplish this task. EOP-E-3 Step 90.c  Performance Step: 4 Shut SI accumulator discharge valves:
1SI-246 1SI-247 1SI-248    Standard:
1SI-246 1SI-247 1SI-248    Standard: Locates MCB SI accumulator discharge valve position switches and takes switch to shut for each valve.
Locates MCB SI accumulator discharge valve position switches and takes switch to shut for each valve.
Places control switches for 1SI
Places control switches for 1SI
-246/247/248 to SHUT Identifies that 1SI-246 ('A' Accumulator discharge) will not shut (Green Light is off/Red Light On)
-246/247/248 to SHUT Identifies that 1SI-246 ('A' Accumulator discharge) will not shut (Green Light is off/Red Light On)
Line 334: Line 290:
Alternate Path begins here - E-3 Step 90.c RNO Performance Step: 5 Vent any unisolable accumulator using OP
Alternate Path begins here - E-3 Step 90.c RNO Performance Step: 5 Vent any unisolable accumulator using OP
-110, "SAFETY INJECTION", Section 8.3.
-110, "SAFETY INJECTION", Section 8.3.
Standard:
Standard: Reads step and obtains a copy of OP
Reads step and obtains a copy of OP
-110, "SAFETY INJECTION", Section 8.3 Comment:
-110, "SAFETY INJECTION", Section 8.3 Comment:
Appendix C Page 7 of 15 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 7 of 15 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR b Rev. FINAL    OP-110, Section 8.3, Venting the SI Accumulators Section 8.3.1 - Initial Conditions Performance Step: 6
   - Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR b Rev. FINAL    OP-110 , Section 8.3, Venting the SI Accumulators Section 8.3.1 - Initial Conditions Performance Step: 6
: 1. Accumulator pressure is approaching Technical Specification or alarm limit.
: 1. Accumulator pressure is approaching Technical Specification or alarm limit.
OR 2. Accumulator is to be depressurized.
O R 2. Accumulator is to be depressurized.
: 3. If Personnel are in Containment, Health Physics has been notified to monitor Containment O2 while venting SI Accumulators.
: 3. If Personnel are in Containment, Health Physics has been notified to monitor Containment O2 while venting SI Accumulators.
: 4. If the Accumulator is to be depressurized, the area 20 feet on either side of the vent on 236 foot elevation should be taped off with red and black warning tape and posted per SAF
: 4. If the Accumulator is to be depressurized, the area 20 feet on either side of the vent on 236 foot elevation should be taped off with red and black warning tape and posted per SAF
-NGGC-2172 to restrict access to this area. NOTE: Accumulators were vented at beginning of R17 with purge secured. This resulted in low oxygen levels which required Containment to be evacuated. Containment Purge, Normal or Pre-entry, should be aligned if possible.
-NGGC-2172 to restrict access to this area. NOTE: Accumulators were vented at beginning of R17 with purge secured. This resulted in low oxygen levels which required Containment to be evacuated. Containment Purge, Normal or Pre-entry, should be aligned if possible.
: 5. If Personnel are in Containment, Containment Purge is in service if available.
: 5. If Personnel are in Containment, Containment Purge is in service if available.
Standard:
Standard: Reviews the initial conditions and determines the following:
Reviews the initial conditions and determines the following:
Item 1 - N/A Item 2 - this is the reason for venting the
Item 1 - N/A Item 2 - this is the reason for venting the
  'A' Accumulator  
  'A' Accumulator  
Line 355: Line 309:


Appendix C Page 8 of 15 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 8 of 15 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR b Rev. FINAL    OP-110, Section 8.3.2, Note prior to Step 1  Performance Step: 7 NOTE: To minimize any potential sluicing between Accumulators through leaking valves, Accumulator pressures should normally be left approximately equal (at or below 4 psid between lowest and highest ERFIS indications) at the completion of this Section.
   - Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR b Rev. FINAL    OP-110, Section 8.3.2, Note prior to Step 1  Performance Step: 7 NOTE: To minimize any potential sluicing between Accumulators through leaking valves, Accumulator pressures should normally be left approximately equal (at or below 4 psid between lowest and highest ERFIS indications) at the completion of this Section.
Standard:
Standard: Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)
Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)
Comment:        OP-110, Section 8.3.2, Step 1 Performance Step:
Comment:        OP-110, Section 8.3.2, Step 1 Performance Step:
8 PERFORM the following Steps on only ONE Accumulator at a time.
8 PERFORM the following Steps on only ONE Accumulator at a time.
Standard:
Standard: Reads and initials step Comment:
Reads and initials step Comment:
Appendix C Page 9 of 15 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 9 of 15 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR b Rev. FINAL    OP-110, Section 8.3.2, Step 2 Performance Step:
   - Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR b Rev. FINAL    OP-110, Section 8.3.2, Step 2 Performance Step:
9 At the MCB, PERFORM the following:
9 At the MCB, PERFORM the following:
NOTE: Nitrogen is the primary motive force to LTOPS. The impact on LTOPS operability should be determined prior to shutting 1SI
NOTE: Nitrogen is the primary motive force to LTOPS. The impact on LTOPS operability should be determined prior to shutting 1SI
-287 per Precaution and Limitation 4.0.6.
-287 per Precaution and Limitation 4.0.6.
Standard:
Standard: Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)
Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)
Comment:    Evaluator Cue:
Comment:    Evaluator Cue:
If asked:  LTOPS operability has been reviewed and determined that it is not required at the current RCS Temperature. You may continue with your procedure.
If asked:  LTOPS operability has been reviewed and determined that it is not required at the current RCS Temperature. You may continue with your procedure.
OP-110, Section 8.3.2, Step 2.a Performance Step:
OP-110, Section 8.3.2, Step 2.a Performance Step:
11 IF necessary, THEN INITIATE an EIR. Standard:
11 IF necessary, THEN INITIATE an EIR. Standard: Candidate may ask for EIR (would be tracking) or may realize that LTOPS is still blocked.
Candidate may ask for EIR (would be tracking) or may realize that LTOPS is still blocked.
Comment:  LTOPS has not been made OPERABLE yet. The RO may ask for a tracking EIR to track the status of N 2 to Containment for PORV Operability restoration in GP
Comment:  LTOPS has not been made OPERABLE yet. The RO may ask for a tracking EIR to track the status of N 2 to Containment for PORV Operability restoration in GP
-006. Evaluator Cue:
-006. Evaluator Cue:
Line 380: Line 330:


Appendix C Page 10 of 15 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 10 of 15 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR b Rev. FINAL    OP-110, Section 8.3.2, Step 2.b Performance Step: 12 SHUT 1SI-287, ACCUMULATORS & PRZ PORV N 2 SUPPLY. Standard:
   - Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR b Rev. FINAL    OP-110, Section 8.3.2, Step 2.b Performance Step: 12 SHUT 1SI-287, ACCUMULATORS & PRZ PORV N 2 SUPPLY. Standard: Locates 1SI-287, ACCUMULATORS & PRZ PORV N 2 SUPPLY switch and places it to shut Comment:  Red Light goes out and Green Light comes On.
Locates 1SI-287, ACCUMULATORS & PRZ PORV N 2 SUPPLY switch and places it to shut Comment:  Red Light goes out and Green Light comes On.
OP-110, Section 8.3.2, Step 2.c  Performance Step: 13 DECLARE the associated Accumulator inoperable per Tech Spec 3.5.1, due to being connected to Non
OP-110, Section 8.3.2, Step 2.c  Performance Step: 13 DECLARE the associated Accumulator inoperable per Tech Spec 3.5.1, due to being connected to Non
-Safety piping (a one hour action statement in Modes 1 through 3 above 1000 psig).
-Safety piping (a one hour action statement in Modes 1 through 3 above 1000 psig).
Standard:
Standard: N/A (RCS pressure is <
N/A (RCS pressure is <
1000 psig)
1000 psig)
Comment:  Evaluator Cue:
Comment:  Evaluator Cue:
Line 394: Line 342:


Appendix C Page 11 of 15 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 11 of 15 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR b Rev. FINAL    OP-110, Section 8.3.2, Step 2.d Performance Step: 14 OPEN the ACCUMULATOR N 2 SUPPLY & VENT for the Accumulator to be vented:
   - Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR b Rev. FINAL    OP-110, Section 8.3.2, Step 2.d Performance Step: 14 OPEN the ACCUMULATOR N 2 SUPPLY & VENT for the Accumulator to be vented:
1SI-295, ACCUMULATOR A N 2 SUPPLY & VENT.
1SI-295, ACCUMULATOR A N 2 SUPPLY & VENT.
Standard:
Standard: Locates MCB switch for 1SI-295, ACCUMULATOR A N 2 SUPPLY & VENT and takes switch to Open Comment:  Green Light goes out and Red Light comes On.
Locates MCB switch for 1SI-295, ACCUMULATOR A N 2 SUPPLY & VENT and takes switch to Open Comment:  Green Light goes out and Red Light comes On.
OP-110, Section 8.3.2, Caution prior to Step 3 Performance Step: 15 CAUTION In modes 1, 2, and 3, ensure Accumulators are maintained within Technical Specification limits for pressure and level when venting SI Accumulators.
OP-110, Section 8.3.2, Caution prior to Step 3 Performance Step: 15 CAUTION In modes 1, 2, and 3, ensure Accumulators are maintained within Technical Specification limits for pressure and level when venting SI Accumulators.
Standard:
Standard: Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)
Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)
Comment:        OP-110, Section 8.3.2, Step 3 Performance Step: 16 SLOWLY ADJUST HC-936, 1SI-298 ACCUM VENT PRESS CNTL, control potentiometer output signal to open 1SI-298 and vent the Accumulator.
Comment:        OP-110, Section 8.3.2, Step 3 Performance Step: 16 SLOWLY ADJUST HC-936, 1SI-298 ACCUM VENT PRESS CNTL, control potentiometer output signal to open 1SI-298 and vent the Accumulator.
Standard:
Standard: Locates MCB potentiometer for 1SI-298 and slowly increases the output signal to open the valve.
Locates MCB potentiometer for 1SI-298 and slowly increases the output signal to open the valve.
Comment:
Comment:
Appendix C Page 12 of 15 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 12 of 15 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR b Rev. FINAL    OP-110, Section 8.3.2, Step 4 Performance Step: 1 7 IF the Accumulator is being depressurized with personnel in containment AND the oxygen concentration outside the taped off area decreases below 19.5%,
   - Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR b Rev. FINAL    OP-110, Section 8.3.2, Step 4 Performance Step: 1 7 IF the Accumulator is being depressurized with personnel in containment AND the oxygen concentration outside the taped off area decreases below 19.5%, THEN STOP venting until the concentration is restored to greater than 19.5% oxygen.
THEN STOP venting until the concentration is restored to greater than 19.5% oxygen.
Standard: Marks step N/A, no personnel are in Containment Comment:
Standard:
Marks step N/A, no personnel are in Containment Comment:
Appendix C Page 13 of 15 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 13 of 15 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR b Rev. FINAL    OP-110, Section 8.3.2, Step 5 Performance Step: 1 8 VENT the Accumulator to the desired pressure as indicated by the associated instruments:
   - Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR b Rev. FINAL    OP-110, Section 8.3.2, Step 5 Performance Step: 1 8 VENT the Accumulator to the desired pressure as indicated by the associated instruments:
PI-921, 923, ACCUMULATOR TK A PRESS.
PI-921, 923, ACCUMULATOR TK A PRESS.
Standard:
Standard: Observes pressure decreasing on PI
Observes pressure decreasing on PI
-921 and PI
-921 and PI
-923    (pressure instrumentation associated with the 'A' Accumulator)
-923    (pressure instrumentation associated with the 'A' Accumulator)
Line 421: Line 363:
(ERFIS or OSI
(ERFIS or OSI
-PI)  During the pressure decrease annunciator ALB-01-7-1, ACCUMULATOR TANK A HIGH
-PI)  During the pressure decrease annunciator ALB-01-7-1, ACCUMULATOR TANK A HIGH
-LOW PRESS, will alarm (the low pressure setpoint is 602 psig)
-LOW PRESS, will alarm (the low pressure setpoint is 602 psig). With all associated vent valves full open 'A' Accumulator pressure will decrease at          ~10 psig per minute
. With all associated vent valves full open 'A' Accumulator pressure will decrease at          ~10 psig per minute
. Evaluator Cue:
. Evaluator Cue:
To continue with OP
To continue with OP
Line 438: Line 379:
When directed by the Lead Examiner then go to Freeze.   
When directed by the Lead Examiner then go to Freeze.   


Appendix C Form ES-C-1  VERIFICATION OF COMPLETION 2014 HNP NRC Exam Simulator JPM CR b Rev. FINAL    Job Performance Measure No.: 2014 NRC Exam  Simulator JPM CR b Vent An Unisolable SI Accumulator during a Steam Generator Tube Rupture Event (E-3 and OP-110)  Examinee's Name:
Appendix C Form ES-C-1  VERIFICATION OF COMPLETION 20 14 HNP NRC Exam Simulator JPM CR b Rev. FINAL    Job Performance Measure No.: 2014 NRC Exam  Simulator JPM CR b Vent An Unisolable SI Accumulator during a Steam Generator Tube Rupture Event (E-3 and OP-110)  Examinee's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 444: Line 385:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Question:
Question:   Response:
 
===Response===
 
Result:  SAT  UNSAT    Examiner's Signature:
Result:  SAT  UNSAT    Examiner's Signature:
Date:
Date:
Appendix C Form ES-C-1  JPM CUE SHEET 2014 HNP NRC Exam Simulator JPM CR b Rev. FINAL  Initial Conditions:
Appendix C Form ES-C-1  JPM CUE SHEET 20 14 HNP NRC Exam Simulator JPM CR b Rev. FINAL  Initial Conditions:
The unit was operating at 100% power when a leak developed in the 'A' Steam Generator.
The unit was operating at 100% power when a leak developed in the 'A' Steam Generator.
The crew entered AOP
The crew entered AOP
Line 464: Line 402:
-3 foldout page
-3 foldout page


Appendix C Page 1 of 17 Form ES-C-1  Worksheet 2014 HNP NRC Exam Simulator JPM CR c Rev. FINAL Facility:
Appendix C Page 1 of 17 Form ES-C-1  Worksheet   20 14 HNP NRC Exam Simulator JPM CR c Rev. FINAL Facility: Harris Nuclear Plant Task No.: 301149H601 Task Title:
Harris Nuclear Plant Task No.:
301149H601 Task Title:
Align ECCS for Long Term Recirculation JPM No.: 2014 HNP NRC Exam Simulator JPM CR c    K/A  
Align ECCS for Long Term Recirculation JPM No.: 2014 HNP NRC Exam Simulator JPM CR c    K/A  


Line 472: Line 408:


006 A4.05 RO 3.9 SRO 3.8 ALTERNATE PATH  
006 A4.05 RO 3.9 SRO 3.8 ALTERNATE PATH  
- YES  Examinee:
- YES  Examinee: ________________________
________________________
NRC Examiner:
NRC Examiner:
_________________
_________________
Line 482: Line 417:
Simulated Performance:
Simulated Performance:
Actual Performance:
Actual Performance:
X  Classroom Simulator X Plant    READ TO THE EXAMINEE:
X  Classroom Simulator X Plant    READ TO THE EXAMINEE:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Initial Conditions:
Line 494: Line 429:
-critical JPM because the procedure would normally be read to the operator.
-critical JPM because the procedure would normally be read to the operator.


Appendix C Page 2 of 17 Form ES-C-1  Worksheet 2014 HNP NRC Exam Simulator JPM CR c Rev. FINAL  Task Standard:
Appendix C Page 2 of 17 Form ES-C-1  Worksheet   20 14 HNP NRC Exam Simulator JPM CR c Rev. FINAL  Task Standard:
Recirculation flow established on both trains.
Recirculation flow established on both trains.
Required Materials:
Required Materials:
Line 501: Line 436:
==References:==
==References:==


EOP-ES-1.3, Transfer to Cold Leg Recirculation, Rev
EOP-E S-1.3, Transfer to Cold Leg Recirculation, Rev. 2  Handout: Use Simulator copy of EOP-E S-1.3 and ensure it is replaced after each use. Time Critical Task:
. 2  Handout: Use Simulator copy of EOP-ES-1.3 and ensure it is replaced after each use. Time Critical Task:
N/A  Validation Time:
N/A  Validation Time:
10 minutes  Critical Step Justification Step 6  Required to isolate RHR pumps from RWST as suction source.
10 minutes  Critical Step Justification Step 6  Required to isolate RHR pumps from RWST as suction source.
Line 509: Line 443:
-745 to isolate miniflow to RWST.
-745 to isolate miniflow to RWST.
Step 13  Required to ensure a supply suction flowpath from sump to CSIP.
Step 13  Required to ensure a supply suction flowpath from sump to CSIP.
Step 16 Required to ensure the RWST suction is isolated while aligned for recirc.
Step 1 6 Required to ensure the RWST suction is isolated while aligned for recirc.
Step 21 Required to establish injection flowpath.
Step 2 1 Required to establish injection flowpath.
Step 24  Critical to separate SI Trains during recirculation phase.
Step 24  Critical to separate SI Trains during recirculation phase.


Appendix C Page 3 of 17 Form ES-C-1  Worksheet 2014 HNP NRC Exam Simulator JPM CR c Rev. FINAL 2014 NRC Exam - SIMULATOR SETUP Simulator Operator Reset to IC-167 Password "spurs"  Roll 86 Relays to trip position:
Appendix C Page 3 of 17 Form ES-C-1  Worksheet   20 14 HNP NRC Exam Simulator JPM CR c Rev. FINAL 2014 NRC Exam - SIMULATOR SETUP Simulator Operator Reset to IC-16 7 Password "spurs"  Roll 86 Relays to trip position:
o Run AMS file  
o Run AMS file  
- Roll Gen 86 Relays Go to Run Silence and Acknowledge annunciators GO TO FREEZE and inform the lead examiner the Simulator is ready. DO NOT GO TO RUN until directed by the lead examiner.  (The examiner has provided to the candidate with initial conditions and the initiating cues prior to placing the simulator in RUN.)  
- Roll Gen 86 Relays Go to Run Silence and Acknowledge annunciators GO TO FREEZE and inform the lead examiner the Simulator is ready. DO NOT GO TO RUN until directed by the lead examiner.  (The examiner has provided to the candidate with initial conditions and the initiating cues prior to placing the simulator in RUN.)  


To recreate the IC setup for this JPM:
To recreate the IC setup for this JPM:
Initial Simulator IC was IC
Initial Simulator IC was IC
-19 Go to run then to FREEZE Insert the follow changes to the setup:
-1 9 Go to run then to FREEZE Insert the follow changes to the setup:
Substitute CSIP "C" for CSIP "B" as follows:
Substitute CSIP "C" for CSIP "B" as follows:
o irf cvc045 (n 00:00:00 00:00:00)
o i rf cvc 0 45 (n 00:00:00 00:00:00)
ON o irf cvc046 (n 00:00:00 00:00:00) TRAINBIN o irf cvc049 (n 00:00:00 00:00:00) OFF o irf cvc050 (n 00:00:00 00:00:00) RACK_OUT    Insert a failure of 1SI-340 to the OPEN position o irf sis029 (n 00:00:00 00:00:00) ENGAGED  Insert a failure of 1SI
ON o i rf cvc 0 46 (n 00:00:00 00:00:00) TRAINBIN o irf cvc049 (n 00:00:00 00:00:00) OFF o i rf cvc 0 50 (n 00:00:00 00:00:00) RACK_OUT    Insert a failure of 1SI-340 to the OPEN position o irf sis029 (n 00:00:00 00:00:00) ENGAGED  Insert a failure of 1SI
-4 to OPEN (failed SHUT) o irf sis017 (n 00 00:00:00 00:00:00) engaged o irf sis018 (n 00 00:00:00 00:00:00) 0 0 0    Insert a failure of PT
-4 to OPEN (failed SHUT) o irf sis017 (n 00 00:00:00 00:00:00) engaged o irf sis018 (n 00 00:00:00 00:00:00) 0 0 0    Insert a failure of PT
-402 HIGH o imf pt:402 (n 00:00:00 00:00:00) 3000 0 2229.49    Insert a large break LOCA accident o imf rcs01a (n 00:00:00 00:00:00) 100 0 0  Go To Run  
-402 HIGH o i mf pt:402 (n 00:00:00 00:00:00) 3000 0 2229.49    Insert a large break LOCA accident o imf rcs01a (n 00:00:00 00:00:00) 100 0 0  Go To Run  
- Let the Simulator run long enough for the Reactor to Trip and a Safety Injection to activate (about 60 seconds) o Go to FREEZE Insert a failure of 1CS
- Let the Simulator run long enough for the Reactor to Trip and a Safety Injection to activate (about 60 seconds) o Go to FREEZE Insert a failure of 1CS
-746 to the OPEN position o Open 1 CS
-746 to the OPEN position o Open 1 CS-746 o ir f cvc085 (n 00:00:00 00:00:00) ENGAGED  Go back to RUN Perform actions of EOP
-746 o irf cvc085 (n 00:00:00 00:00:00) ENGAGED  Go back to RUN Perform actions of EOP
-E-0 and EO P-E-1. Wait until RWST level is <23.4% on 2/4 Channels Annunciator ALB 2-4 is in alarm                                                      (ready to transition to EOP
-E-0 and EOP-E-1. Wait until RWST level is <23.4% on 2/4 Channels Annunciator ALB 2-4 is in alarm                                                      (ready to transition to EOP
-ES-1.3) o Ensure SI RESET and CCW is align ed to the RHR heat exchangers Silence Acknowledge and Reset Annunciators Freeze and Snap these conditions to your exam IC
-ES-1.3) o Ensure SI RESET and CCW is aligned to the RHR heat exchangers Silence Acknowledge and Reset Annunciators Freeze and Snap these conditions to your exam IC


Appendix C Page 4 of 17 Form ES-C-1  PERFORMANCE INFORAMTION
Appendix C Page 4 of 17 Form ES-C-1  PERFORMANCE INFORAMTION
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR c Rev. FINAL  Simulator Operator:
   - Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR c Rev. FINAL  Simulator Operator:
When directed by the Lead Evaluator place the Simulator in RUN. START TIME:
When directed by the Lead Evaluator place the Simulator in RUN. START TIME:
Performance Step: 1 Obtain copy of EOP
Performance Step: 1 Obtain copy of EOP
-ES-1.3. Standard:
-E S-1.3. Standard: Enters EOP-E S-1.3. Evaluator's Cue:
Enters EOP-ES-1.3. Evaluator's Cue:
Direct candidate to use Simulator copy of EOP
Direct candidate to use Simulator copy of EOP
-ES-1.3 if necessary.
-ES-1.3 if necessary.
Comment:    EOP-ES-1.3,  CAUTION Prior to Step 1 Performance Step: 2 Perform Steps 1 through 9 without delay. Do NOT implement Function Restoration Procedures prior to completion of these steps.
Comment:    EOP-ES-1.3 ,  CAUTION Prior to Step 1 Performance Step: 2 Perform Steps 1 through 9 without delay. Do NOT implement Function Restoration Procedures prior to completion of these steps.
SI recirculation flow to RCS must be maintained at all times. Switchover to recirculation may cause high radiation levels in the reactor auxiliary building. Radiation levels must be assessed prior to performance of local actions in the affected area.
SI recirculation flow to RCS must be maintained at all times. Switchover to recirculation may cause high radiation levels in the reactor auxiliary building. Radiation levels must be assessed prior to performance of local actions in the affected area.
Standard:
Standard: Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)
Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)
Comment:
Comment:
Appendix C Page 5 of 17 Form ES-C-1  PERFORMANCE INFORAMTION
Appendix C Page 5 of 17 Form ES-C-1  PERFORMANCE INFORAMTION
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR c Rev. FINAL  EOP-ES-1.3,  NOTE Prior to Step 1 Performance Step: 3 Foldout applies.
   - Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR c Rev. FINAL  EOP-ES-1.3 ,  NOTE Prior to Step 1 Performance Step: 3 Foldout applies.
A minimum of 142 INCHES CNMT wide range sump level ensures the recirculation sump strainers are completely submerged AND assures a long term recirculation suction source. The following sequence of steps to transfer to cold leg recirculation assumes operability of at least one train of safeguards equipment.
A minimum of 142 INCHES CNMT wide range sump level ensures the recirculation sump strainers are completely submerged AND assures a long term recirculation suction source. The following sequence of steps to transfer to cold leg recirculation assumes operability of at least one train of safeguards equipment.
Standard:
Standard: Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash) before Step 1 and may review the FOLDOUT items.
Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash) before Step 1 and may review the FOLDOUT items.
Comment:
Comment:
EOP-ES-1.3,  Step 1.a  Performance Step: 4 Check RHR Pump Recirculation Alignment:
EOP-ES-1.3 ,  Step 1.a  Performance Step: 4 Check RHR Pump Recirculation Alignment:
Verify both RHR pumps  
Verify both RHR pumps  
- Running. Standard:
- Running. Standard: Verifies both RHR pumps running by observing RED light ON, flow and/or current indicated.
Verifies both RHR pumps running by observing RED light ON, flow and/or current indicated.
Comment:
Comment:
Appendix C Page 6 of 17 Form ES-C-1  PERFORMANCE INFORAMTION
Appendix C Page 6 of 17 Form ES-C-1  PERFORMANCE INFORAMTION
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR c Rev. FINAL  EOP-ES-1.3,  Step 1.b  Performance Step: 5 Verify CNMT sump to RHR pump suction valves OPEN:
   - Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR c Rev. FINAL  EOP-ES-1.3 ,  Step 1.b  Performance Step: 5 Verify CNMT sump to RHR pump suction valves OPEN:
Train A RHR pump:  1SI-300 AND 1SI
Train A RHR pump:  1SI-300 AND 1SI
-310    Train B RHR pump:  1SI
-310    Train B RHR pump:  1SI
-301 AND 1SI
-301 AND 1SI
-311    Standard:
-311    Standard: Verifies Train A sump valves open by observing RED lights ON, green lights OFF on 1SI
Verifies Train A sump valves open by observing RED lights ON, green lights OFF on 1SI
-300 and 1SI
-300 and 1SI
-310    Verifies Train B sump valves open by observing RED lights ON, green lights OFF on 1SI
-310    Verifies Train B sump valves open by observing RED lights ON, green lights OFF on 1SI
-301 and 1SI
-301 and 1SI
-311    Comment:      EOP-ES-1.3,  Step 2.a  Performance Step: 6 Establish RHR Pump Recirculation Alignment:
-311    Comment:      EOP-ES-1.3 ,  Step 2.a  Performance Step: 6 Establish RHR Pump Recirculation Alignment:
Shut RWST to RHR pump suction valves:
Shut RWST to RHR pump suction valves:
1SI-322 (Train A) 1SI-323 (Train B)
1SI-322 (Train A) 1SI-323 (Train B)
Standard:
Standard: Places 1SI
Places 1SI
-322 and 1SI-323 handswitches to CLOSE Verify valves closed by observing RED lights O FF, green lights O N on 1SI-322 and 1SI
-322 and 1SI-323 handswitches to CLOSE Verify valves closed by observing RED lights O FF, green lights ON on 1SI-322 and 1SI
-323    Comment:
-323    Comment:
Appendix C Page 7 of 17 Form ES-C-1  PERFORMANCE INFORAMTION
Appendix C Page 7 of 17 Form ES-C-1  PERFORMANCE INFORAMTION
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR c Rev. FINAL  EOP-ES-1.3,  Step 2.b  Performance Step: 7 Shut low head SI Train A to cold leg valve:  1SI
   - Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR c Rev. FINAL  EOP-ES-1.3 ,  Step 2.b  Performance Step: 7 Shut low head SI Train A to cold leg valve:  1SI
-340    Standard:
-340    Standard: Places 1SI
Places 1SI
-340 Control Power ON Removes 1SI
-340 Control Power ON Removes 1SI
-340 from Pull
-340 from Pull
Line 581: Line 507:
-340 control switch to CLOSE Determines that 1SI
-340 control switch to CLOSE Determines that 1SI
-340 does NOT close by observing RED light ON, GREEN light OFF Goes to Step 1.c RNO Comment: Note:  the operator may make a second attempt at shutting 1SI-340 with the control switch.
-340 does NOT close by observing RED light ON, GREEN light OFF Goes to Step 1.c RNO Comment: Note:  the operator may make a second attempt at shutting 1SI-340 with the control switch.
EOP-ES-1.3,  Step 2.b RNO - Alternate Path Performance Step: 8 Shut low head SI Train B to cold leg valve:  1SI
EOP-ES-1.3 ,  Step 2.b RNO - Alternate Path Performance Step: 8 Shut low head SI Train B to cold leg valve:  1SI
-341    Standard:
-341    Standard: Places 1SI
Places 1SI
-341 Control Power ON.
-341 Control Power ON.
Removes 1SI
Removes 1SI
Line 594: Line 519:
Comment:
Comment:
Appendix C Page 8 of 17 Form ES-C-1  PERFORMANCE INFORAMTION
Appendix C Page 8 of 17 Form ES-C-1  PERFORMANCE INFORAMTION
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR c Rev. FINAL  EOP-ES-1.3,  Step 2.c  Performance Step: 9 Check RHR Pump recirculation alignment  
   - Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR c Rev. FINAL  EOP-ES-1.3 ,  Step 2.c  Performance Step: 9 Check RHR Pump recirculation alignment  
- at least one train established.
- at least one train established.
Standard:
Standard: Verifies both trains aligned with CNMT sump to RHR pump suction valves OPEN and RWST to RHR pump suction valves SHUT. Comment:    EOP-ES-1.3 ,  Step 3.a   Performance Step: 10 Establish CSIP Recirculation Alignment:
Verifies both trains aligned with CNMT sump to RHR pump suction valves OPEN and RWST to RHR pump suction valves SHUT. Comment:    EOP-ES-1.3,  Step 3.a Performance Step: 10 Establish CSIP Recirculation Alignment:
: a. Shut CSIP alternate miniflow isolation valves:
: a. Shut CSIP alternate miniflow isolation valves:
1CS-746 (Train A CSIP) 1CS-752 (Train B CSIP)
1CS-746 (Train A CSIP) 1CS-752 (Train B CSIP)
Standard:
Standard: Places 1CS
Places 1CS
-746  control switch in CLOSE.
-746  control switch in CLOSE.
Determines 1CS
Determines 1CS
Line 611: Line 534:
Comment:
Comment:
Appendix C Page 9 of 17 Form ES-C-1  PERFORMANCE INFORAMTION
Appendix C Page 9 of 17 Form ES-C-1  PERFORMANCE INFORAMTION
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR c Rev. FINAL  EOP-ES-1.3,  Step 3.a RNO - Alternate Path Performance Step: 11 Shut the associated block valve: 1CS-745 (Train A CSIP). Standard:
   - Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR c Rev. FINAL  EOP-ES-1.3 ,  Step 3.a RNO - Alternate Path Performance Step: 11 Shut the associated block valve: 1CS-745 (Train A CSIP). Standard: Places 1CS
Places 1CS
-745 control switch in CLOSE.
-745 control switch in CLOSE.
Verifies 1CS
Verifies 1CS
Line 621: Line 543:
-745, however only the shutting of 1CS
-745, however only the shutting of 1CS
-745 is critical.
-745 is critical.
Comment:      EOP-ES-1.3,  Step 3.b  Performance Step: 12 Verify normal miniflow isolation valves  
Comment:      EOP-ES-1.3 ,  Step 3.b  Performance Step: 12 Verify normal miniflow isolation valves  
- SHUT    1CS-182    1CS-196    1CS-210    1CS-214    Standard:
- SHUT    1CS-182    1CS-196    1CS-210    1CS-214    Standard: Verifies at least one valve closed in each line (RED lights OFF, GREEN lights ON.
Verifies at least one valve closed in each line (RED lights OFF, GREEN lights ON.
)    Comment:
)    Comment:
Appendix C Page 10 of 17 Form ES-C-1  PERFORMANCE INFORAMTION
Appendix C Page 10 of 17 Form ES-C-1  PERFORMANCE INFORAMTION
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR c Rev. FINAL  EOP-ES-1.3,  Step 3.c  Performance Step: 13 Open RHR discharge to CSIP suction valves:
   - Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR c Rev. FINAL  EOP-ES-1.3 ,  Step 3.c  Performance Step: 13 Open RHR discharge to CSIP suction valves:
1RH-25    1RH-63    Standard:
1RH-25    1RH-63    Standard: Places control switches for both 1RH
Places control switches for both 1RH
-25 and 1RH
-25 and 1RH
-63 in OPEN. Verifies 1RH
-63 in OPEN. Verifies 1RH
-25 and 1RH
-25 and 1RH
-63 open by observing RED lights ON, GREEN lights OFF.
-63 open by observing RED lights ON, GREEN lights OFF.
Comment:      EOP-ES-1.3,  Step 3.d  Performance Step: 14 Reset SI.
Comment:      EOP-ES-1.3 ,  Step 3.d  Performance Step: 14 Reset SI. Standard: SI RESET in Initial Conditions Evaluator Note:
Standard:
SI RESET in Initial Conditions Evaluator Note:
Candidate may reset again by locating both SI reset switches and momentarily taking each to RESET and then verify successful reset by Bypass Permissive Panel light 4
Candidate may reset again by locating both SI reset switches and momentarily taking each to RESET and then verify successful reset by Bypass Permissive Panel light 4
-1 "SI ACTUATED" is extinguished.
-1 "SI ACTUATED" is extinguished.
Comment:      EOP-ES-1.3,  Step 3.e  Performance Step: 15 Manually realign safeguards equipment following a loss of offsite power. Standard:
Comment:      EOP-ES-1.3 ,  Step 3.e  Performance Step: 15 Manually realign safeguards equipment following a loss of offsite power. Standard: Reads step and determines off
Reads step and determines off
-site power available.
-site power available.
Comment:
Comment:
Appendix C Page 11 of 17 Form ES-C-1  PERFORMANCE INFORAMTION
Appendix C Page 11 of 17 Form ES-C-1  PERFORMANCE INFORAMTION
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR c Rev. FINAL  EOP-ES-1.3,  Step 3.f  Performance Step: 16 Shut RWST to CSIP suction valves AND place in pull
   - Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR c Rev. FINAL  EOP-ES-1.3 ,  Step 3.f  Performance Step: 16 Shut RWST to CSIP suction valves AND place in pull
-to-lock position:
-to-lock position:   1CS-291 (LCV-115B)    1CS-292 (LCV-115D)    Standard: Places LCV
1CS-291 (LCV-115B)    1CS-292 (LCV-115D)    Standard:
Places LCV
-115B and LCV
-115B and LCV
-115D in CLOSE and then in PULL-TO-LOCK    Verifies LCV
-115D in CLOSE and then in PULL-TO-LOCK    Verifies LCV
-115B and LCV
-115B and LCV
-115D closed by observing RED lights OFF, GREEN lights ON.
-115D closed by observing RED lights OFF, GREEN lights ON.
Comment:      EOP-ES-1.3,  Step 4.a  Performance Step: 17 Check Charging AND SI System Status:
Comment:      EOP-ES-1.3 ,  Step 4.a  Performance Step: 17 Check Charging AND SI System Status:
Check charging line isolation valves  
Check charging line isolation valves  
- SHUT      Standard:
- SHUT      Standard: Checks Charging Line Isolation Valves 1CS-235 and 1CS-238 CLOSED by observing RED lights OFF, GREEN lights ON for each valve
Checks Charging Line Isolation Valves 1CS-235 and 1CS-238 CLOSED by observing RED lights OFF, GREEN lights ON for each valve
. May also check FCV
. May also check FCV
-122.1 CLOSED by observing flow indication at ZERO. Comment:
-122.1 CLOSED by observing flow indication at ZERO. Comment:
Appendix C Page 12 of 17 Form ES-C-1  PERFORMANCE INFORAMTION
Appendix C Page 12 of 17 Form ES-C-1  PERFORMANCE INFORAMTION
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR c Rev. FINAL  EOP-ES-1.3,  Step 4.b  Performance Step: 18 Verify Both Charging Pumps  
   - Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR c Rev. FINAL  EOP-ES-1.3 ,  Step 4.b  Performance Step: 18 Verify Both Charging Pumps  
- RUNNING. Train A CSIP Train B CSIP Standard:
- RUNNING. Train A CSIP Train B CSIP Standard: Verifies CSIPs 1A
Verifies CSIPs 1A
-SA and 1C-SB both running by observing RED lights ON, GREEN lights OFF.
-SA and 1C
-SB both running by observing RED lights ON, GREEN lights OFF.
Comment: CSIP 1C-SB is running in place of 'B' CSIP Evaluator Cue:
Comment: CSIP 1C-SB is running in place of 'B' CSIP Evaluator Cue:
  (IF NEEDED)
  (IF NEEDED)
IF the student thinks that step 4.b requires the 'B' CSIP to be running and performs the RNO step to consult plant operation staff then:
IF the student thinks that step 4.b requires the 'B' CSIP to be running and performs the RNO step to consult plant operation staff then:
Cue: Operations Staff Acknowledges
Cue: Operations Staff Acknowledges
.      EOP-ES-1.3,  Step 4.c  Performance Step: 19 Check alternate cold leg AND hot leg injection valves  
.      EOP-ES-1.3 ,  Step 4.c  Performance Step: 19 Check alternate cold leg AND hot leg injection valves  
- SHUT    1SI-52  1SI-86  1SI-107  Standard:
- SHUT    1SI-52  1SI-86  1SI-107  Standard: Checks Alternate Cold leg AND Hot leg Injection Valves 1SI-52, 1SI-86 and 1SI
Checks Alternate Cold leg AND Hot leg Injection Valves 1SI-52, 1SI-86 and 1SI
-107 CLOSED by observing RED lights OFF, GREEN lights ON for each valve.
-107 CLOSED by observing RED lights OFF, GREEN lights ON for each valve.
Comment:
Comment:
Appendix C Page 13 of 17 Form ES-C-1  PERFORMANCE INFORAMTION
Appendix C Page 13 of 17 Form ES-C-1  PERFORMANCE INFORAMTION
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR c Rev. FINAL  EOP-ES-1.3,  CAUTION Prior to Step 5 Performance Step: 2 0 The maximum calculated dose rate in the vicinity of MCC 1A35
   - Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR c Rev. FINAL  EOP-ES-1.3 ,  CAUTION Prior to Step 5 Performance Step: 2 0 The maximum calculated dose rate in the vicinity of MCC 1A35
-SA and MCC 1B35
-SA and MCC 1B35
-SB is between 10 MREM/HR and 150 MREM/HR    Standard:
-SB is between 10 MREM/HR and 150 MREM/HR    Standard: Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)
Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)
Comment:    EOP-ES-1.3 ,  Step 5.a  Performance Step: 21 Establish Recirculation Injection Flowpath:
Comment:    EOP-ES-1.3,  Step 5.a  Performance Step: 21 Establish Recirculation Injection Flowpath:
Open alternate high head SI to cold leg valve: 1SI
Open alternate high head SI to cold leg valve: 1SI
-52        Standard:
-52        Standard: Places 1SI-52 Control Power ON.
Places 1SI-52 Control Power ON.
Verifies ORANGE Control Power Light ON.
Verifies ORANGE Control Power Light ON.
Places 1SI-52 control switch to OPEN.
Places 1 SI-52 control switch to OPEN.
Verifies 1SI
Verifies 1SI
-52 open by observing RED light ON, green light OFF.
-52 open by observing RED light ON, green light OFF.
Line 688: Line 597:


Appendix C Page 14 of 17 Form ES-C-1  PERFORMANCE INFORAMTION
Appendix C Page 14 of 17 Form ES-C-1  PERFORMANCE INFORAMTION
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR c Rev. FINAL Evaluator Note:
   - Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR c Rev. FINAL Evaluator Note:
1SI-4 is failed SHUT and will not open from the MCB switch. Since 1SI
1SI-4 is failed SHUT and will not open from the MCB switch. Since 1SI-3 is OPEN step 5.b is met and the candidate should NOT perform the RNO action to stop the Train B CSIP.        EOP-ES-1.3 ,  Step 5.b  Performance Step: 22 Check any BIT outlet valve
-3 is OPEN step 5.b is met and the candidate should NOT perform the RNO action to stop the Train B CSIP.        EOP-ES-1.3,  Step 5.b  Performance Step: 22 Check any BIT outlet valve
  - open    1SI YES    1SI-4 -NO    Standard: Verifies that 1SI-3 is OPEN and 1SI-4 is NOT OPEN and will NOT OPEN by observing RED and GREEN OFF.
  - open    1SI YES    1SI-4 -NO    Standard:
Verifies that 1SI-3 is OPEN and 1SI-4 is NOT OPEN and will NOT OPEN by observing RED and GREEN OFF.
Informs CRS that 1SI
Informs CRS that 1SI
-4 will not OPEN Comment:    Evaluator Cue:
-4 will not OPEN Comment:    Evaluator Cue:
  (IF informed of 1SI
  (IF informed of 1SI
-4 not OPENING) Acknowledge  
-4 not OPENING) Acknowledge  
- 1SI-4 will not open EOP-ES-1.3,  Step 5.c  Performance Step: 23 Check power for CSIP discharge cross
- 1SI-4 will not open EOP-ES-1.3 ,  Step 5.c  Performance Step: 23 Check power for CSIP discharge cross
-connect valves  
-connect valves  
- Available 1CS219 (MCC 1A35SA14E)  1CS217 (MCC 1B35SB12C)  1CS218 (MCC 1A35SA14D)  1CS220 (MCC 1B35SB9D)    Standard:
- Available   1CS219 (MCC 1A35SA14E)  1CS217 (MCC 1B35SB12C)  1CS218 (MCC 1A35SA14D)  1CS220 (MCC 1B35SB9D)    Standard: Checks power available by checking red position indicating lights on for CSIP discharge cross
Checks power available by checking red position indicating lights on for CSIP discharge cross
-connect valves    Comment:
-connect valves    Comment:
Appendix C Page 15 of 17 Form ES-C-1  PERFORMANCE INFORAMTION
Appendix C Page 15 of 17 Form ES-C-1  PERFORMANCE INFORAMTION
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR c Rev. FINAL  EOP-ES-1.3,  Step 5.d  Performance Step: 2 4 Shut CSIP discharge cross connect valves based on Table:  CSIP "A" and CSIP "C" running:
   - Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR c Rev. FINAL  EOP-ES-1.3 ,  Step 5.d  Performance Step: 2 4 Shut CSIP discharge cross connect valves based on Table:  CSIP "A" and CSIP "C" running:
1CS-217 and 1CS-219    Standard:
1CS-217 and 1CS-219    Standard: Places control switches to CLOSE position for valves 1CS-217 and 1CS
Places control switches to CLOSE position for valves 1CS-217 and 1CS
-219 ()    Verifies respective valves re
-219 ()    Verifies respective valves re
-position by observing RED lights OFF, GREEN lights ON Comment:      EOP-ES-1.3,  Step 6  Performance Step: 2 5 Check High Head SI Flow:
-position by observing RED lights OFF, GREEN lights ON Comment:      EOP-ES-1.3 ,  Step 6  Performance Step: 2 5 Check High Head SI Flow:
Alternate header flow (Train A):
Alternate header flow (Train A):
FI-940    Normal header flow (Train B):
FI-940    Normal header flow (Train B):
FI-943      Standard:
FI-943      Standard: Verifies Train A flow indication on FI
Verifies Train A flow indication on FI
-940. Verifies Train B flow indication on FI
-940. Verifies Train B flow indication on FI
-943. Comment:  Evaluator Note:
-943. Comment:  Evaluator Note:
Line 721: Line 625:
When directed by the Lead Examiner then go to Freeze.   
When directed by the Lead Examiner then go to Freeze.   


Appendix C Page 16 of 17 Form ES-C-1  VERIFICATION OF COMPLETION 2014 HNP NRC Exam Simulator JPM CR c Rev. FINAL  Job Performance Measure No.:
Appendix C Page 16 of 17 Form ES-C-1  VERIFICATION OF COMPLETION 20 14 HNP NRC Exam Simulator JPM CR c Rev. FINAL  Job Performance Measure No.:
2014 HNP NRC Exam Simulator JPM CR c Align ECCS for Long Term Recirculation (EOP-ES-1.3) EOP-ES-1.3, Transfer to Cold Leg Recirculation Examinee's Name:
2014 HNP NRC Exam Simulator JPM CR c Align ECCS for Long Term Recirculation (EOP-ES-1.3) EOP-ES-1.3 , Transfer to Cold Leg Recirculation Examinee's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 728: Line 632:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Question:
Question:   ResponseResult:  SAT  UNSAT    Examiner's Signature:
 
===Response===
Result:  SAT  UNSAT    Examiner's Signature:
Date:
Date:
Appendix C Form ES-C-1  JPM CUE SHEET 2014 HNP NRC Exam Simulator JPM CR c Rev. FINAL  Initial Conditions:
Appendix C Form ES-C-1  JPM CUE SHEET 20 14 HNP NRC Exam Simulator JPM CR c Rev. FINAL  Initial Conditions:
A large break LOCA caused a Reactor trip and Safety Injection  SI has been reset and CCW has been aligned to the RHR HXs CSIP "A-SA" and CSIP "C
A large break LOCA caused a Reactor trip and Safety Injection  SI has been reset and CCW has been aligned to the RHR HXs CSIP "A-SA" and CSIP "C
-SB" (as "B") are running EOP-ES-1.3, Transfer to Cold Leg Recirculation, was just entered Initiating Cue:
-SB" (as "B") are running EOP-ES-1.3, Transfer to Cold Leg Recirculation, was just entered Initiating Cue:
Line 739: Line 640:
-ES-1.3, the steps should be performed without delay in accordance with Step 1 CAUTION.
-ES-1.3, the steps should be performed without delay in accordance with Step 1 CAUTION.


Appendix C Page 1 of 15 Form ES-C-1  PERFORMANCE INFORMATION 2014 HNP NRC Exam Simulator JPM d Rev. FINAL Facility:
Appendix C Page 1 of 15 Form ES-C-1  PERFORMANCE INFORMATION 2014 HNP NRC Exam Simulator JPM d Rev. FINAL Facility: Harris Nuclear Plant Task No.: 003001H101 Task Title:
Harris Nuclear Plant Task No.:
Start a RCP with Spray Valve Failure JPM No.: 201 4 NRC Exam Simulator JPM CR d    K/A  
003001H101 Task Title:
Start a RCP with Spray Valve Failure JPM No.: 2014 NRC Exam Simulator JPM CR d    K/A  


==Reference:==
==Reference:==


003 A2.02 RO 3.7 SRO 3.9 ALTERNATE PATH  
003 A2.02 RO 3.7 SRO 3.9 ALTERNATE PATH  
- YES    Examinee:
- YES    Examinee: ________________________
________________________
NRC Examiner:
NRC Examiner:
_____________
_____________
Line 757: Line 655:
Simulated Performance:
Simulated Performance:
Actual Performance:
Actual Performance:
X  Classroom Simulator X Plant  READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
X  Classroom Simulator X Plant  READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Initial Conditions:
You are the extra RO during a plant startup.
You are the extra RO during a plant startup.
Line 771: Line 669:


Appendix C Page 2 of 15 Form ES-C-1  PERFORMANCE INFORMATION 2014 HNP NRC Exam Simulator JPM d Rev. FINAL Task Standard:
Appendix C Page 2 of 15 Form ES-C-1  PERFORMANCE INFORMATION 2014 HNP NRC Exam Simulator JPM d Rev. FINAL Task Standard:
Start a RCP and respond to a failed open PZR spray valve when the pump is started in accordance with A OP-019, Malfunction of RCS Pressure Control Required Materials:
Start a RCP and respond to a failed open PZR spray valve when the pump is started in accordance with A OP-01 9 , Malfunction of RCS Pressure Control Required Materials:
OP-100 mark up  with Attachment 3 included.
OP-100 mark up  with Attachment 3 included.
General  
General  
Line 777: Line 675:
==References:==
==References:==


OP-100, Reactor Coolant System, Rev. 40 and AOP-019, Malfunction of RCS Pressure Control, Rev. 24  Time Critical Task:
OP-100, Reactor Coolant System, Rev. 40 and AOP-019 , Malfunction of RCS Pressure Control, Rev. 24  Time Critical Task:
No  Validation Time:
No  Validation Time:
10 minutes    Critical Step Justification Step 9  System interlock requires proper oil pressure be established prior to starting pump Step 13  Administrative requirements state the System flow cannot be established until the lift oil pump breaker is closed for > 2 mins to prevent pump damage Step 21  Entry conditions are met for AOP
10 minutes    Critical Step Justification Step 9  System interlock requires proper oil pressure be established prior to starting pump Step 13  Administrative requirements state the System flow cannot be established until the lift oil pump breaker is closed for > 2 mins to prevent pump damage Step 21  Entry conditions are met for AOP
-019, Malfunction of RCS Pressure Control when PZR Spray valve controller PK
-019, Malfunction of RCS Pressure Control when PZR Spray valve controller PK
-444C.1, PZR Spray Loop A, 1RC-107 fails open upon starting the 'A' RCP. AOP
-444C.1, PZR Spray Loop A, 1RC-10 7 fails open upon starting the 'A' RCP. AOP
-019 requires the operator to perform the immediate actions including the RNO response to control a PZR Spray valve (shut valve) when that valve is NOT properly positioned for current PZR pressure or plant conditions. Performing these actions correctly will prevent an unnecessary Safety Injection from occurring.
-019 requires the operator to perform the immediate actions including the RNO response to control a PZR Spray valve (shut valve) when that valve is NOT properly positioned for current PZR pressure or plant conditions. Performing these actions correctly will prevent an unnecessary Safety Injection from occurring.


Appendix C Page 3 of 15 Form ES-C-1  PERFORMANCE INFORMATION 2014 HNP NRC Exam Simulator JPM d Rev. FINAL 2014 NRC Exam - SIMULATOR SETUP Simulator Operator Reset to IC
Appendix C Page 3 of 15 Form ES-C-1  PERFORMANCE INFORMATION 2014 HNP NRC Exam Simulator JPM d Rev. FINAL 201 4 NRC Exam - SIMULATOR SETUP Simulator Operator Reset to IC
-168   Password "spurs"  Go to RUN CRT displays  
-16 8   Password "spurs"  Go to RUN CRT displays  
- CRT 2: QP VCT, CRT 3: QP TAVG and CRT 4: QP SGLVL  Set Source Range Audio Multiplier to 1000 to establish audible counts Silence and Acknowledge annunciators GO TO FREEZE and inform the lead examiner the Simulator is ready. DO NOT GO TO RUN until directed by the lead examiner.  (The examiner has provided to the candidate with initial conditions and the initiating cues prior to placing the simulator in RUN.)
- CRT 2: QP VCT, CRT 3: QP TAVG and CRT 4: QP SGLVL  Set Source Range Audio Multiplier to 1000 to establish audible counts Silence and Acknowledge annunciators GO TO FREEZE and inform the lead examiner the Simulator is ready. DO NOT GO TO RUN until directed by the lead examiner.  (The examiner has provided to the candidate with initial conditions and the initiating cues prior to placing the simulator in RUN.)
To recreate the IC setup for this JPM:
To recreate the IC setup for this JPM:
Initial Simulator IC was IC
Initial Simulator IC was IC-7 , Mode 3 HSD, MOL conditions
-7, Mode 3 HSD, MOL conditions
  - RCS pressure 2235, RCS temp. 557&deg;F, all rods in GO to run  Secure the "A" RCP    Wait approximately 5 minutes for the simulator to stabilize Create a conditional Trigger to open PZR spray valve PK-444C.1 with a 15 second delay and 45 second ramp after the control switch for the '
  - RCS pressure 2235, RCS temp. 557&deg;F, all rods in GO to run  Secure the "A" RCP    Wait approximately 5 minutes for the simulator to stabilize Create a conditional Trigger to open PZR spray valve PK-444C.1 with a 15 second delay and 45 second ramp after the control switch for the '
A' RCP is taken to start To create the conditional trigger:
A' RCP is taken to start To create the conditional trigger:
Line 806: Line 703:
START TIME:
START TIME:


Obtain Procedure Performance Step: 1 Procedure obtained and begins the task of starting the RCP Standard:
Obtain Procedure Performance Step: 1 Procedure obtained and begins the task of starting the RCP Standard: Obtained OP-10 0 and reviews P & L's and Section 5.1 for 'A' RCP startup
Obtained OP-100 and reviews P & L's and Section 5.1 for 'A' RCP startup
. Reviews and verifies initial conditions are satisfied.
. Reviews and verifies initial conditions are satisfied.
Comment:      OP-100, Section 5.1.2
Comment:      OP-100, Section 5.1.2
, Caution prior to Step 1  Performance Step: 2 Only one RCP is to be started at any one time. If the motor is allowed to coast to a stop between starts, two successive starts are permitted. A third start may be made when the winding and the core have cooled by running for 20 minutes, or by standing idle for 45 minutes.
, Caution prior to Step 1  Performance Step: 2 Only one RCP is to be started at any one time. If the motor is allowed to coast to a stop between starts, two successive starts are permitted. A third start may be made when the winding and the core have cooled by running for 20 minutes, or by standing idle for 45 minutes.
Standard:
Standard: Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)
Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)
Comment:
Comment:
Appendix C Page 5 of 15 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 5 of 15 Form ES-C-1  PERFORMANCE INFORMATION
Line 818: Line 713:
IF jogging RCPs per GP
IF jogging RCPs per GP
-001, THEN VERIFY RCS Pressure is greater than 325 psig.
-001, THEN VERIFY RCS Pressure is greater than 325 psig.
Standard:
Standard: Step 1.a is marked N/A      Comment:      OP-100, Section 5.1.2, Step 1.b  Performance Step: 4 VERIFY      Standard: Locates PI
Step 1.a is marked N/A      Comment:      OP-100, Section 5.1.2, Step 1.b  Performance Step: 4 VERIFY      Standard:
Locates PI
-156A1 and verifies that the '
-156A1 and verifies that the '
A' RCP #1 Seal greater than 200 psid
A' RCP #1 Seal greater than 200 psid
Line 826: Line 719:
5 NOTE:  VCT Outlet Temp TE
5 NOTE:  VCT Outlet Temp TE
-116 should be used for seal injection water temperature.
-116 should be used for seal injection water temperature.
Standard:
Standard: Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)
Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)
Comment:   
Comment:   


Appendix C Page 6 of 15 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 6 of 15 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM d Rev. FINAL OP-100, Section 5.1.2, Step 1.c  Performance Step: 6 VERIFY Seal Injection flow is between 8 and 13 gpm at a temperature between 60 and 130&deg;F.
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM d Rev. FINAL OP-100, Section 5.1.2, Step 1.c  Performance Step: 6 VERIFY Seal Injection flow is between 8 and 13 gpm at a temperature between 60 and 130&deg;F.
Standard:
Standard: Locates seal injection flow indication FI
Locates seal injection flow indication FI
-156A and verifies flow between 8-13 gpm and also verifies VCT temperature indicator TI-116.1 reading between 60
-156A and verifies flow between 8
-13 gpm and also verifies VCT temperature indicator TI-116.1 reading between 60
-130&deg;F. The candidate my use ERFIS points rather than MCB indications.
-130&deg;F. The candidate my use ERFIS points rather than MCB indications.
Comment:      OP-100, Section 5.1.2, Step 1.d  Performance Step: 7 VERIFY # 1 Seal Leakoff is in the normal operating range of Attachment 3.
Comment:      OP-100, Section 5.1.2, Step 1.d  Performance Step: 7 VERIFY # 1 Seal Leakoff is in the normal operating range of Attachment 3.
Standard:
Standard: Locates #1 Seal Leakoff flow indicator FR
Locates #1 Seal Leakoff flow indicator FR
-15 4A and verifies that it meets Attachment 3 requirements (see below).      Evaluator Note:
-154A and verifies that it meets Attachment 3 requirements (see below)
.      Evaluator Note:
Seal Leakoff flow is also available via multiple programs on the Plant Computer (ERFIS, OSI
Seal Leakoff flow is also available via multiple programs on the Plant Computer (ERFIS, OSI
-PI, etc). It is acceptable for the candidate to complete this step using ANY of the available indications.
-PI, etc). It is acceptable for the candidate to complete this step using ANY of the available indications.
Line 848: Line 736:
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM d Rev. FINAL OP-100, Section 5.1.2, Caution prior to Step 2    Performance Step: 8 CAUTION:  RCPs shall not be started with one or more of the RCS cold leg temperatures less than or equal to 325
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM d Rev. FINAL OP-100, Section 5.1.2, Caution prior to Step 2    Performance Step: 8 CAUTION:  RCPs shall not be started with one or more of the RCS cold leg temperatures less than or equal to 325
&deg;F unless the secondary water temperature is less than 50
&deg;F unless the secondary water temperature is less than 50
&deg;F above each of the RCS cold leg temperatures. This caution is only applicable to the first RCP to be started. Standard:
&deg;F above each of the RCS cold leg temperatures. This caution is only applicable to the first RCP to be started. Standard: Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)
Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)
   - Understands the caution is N/A.
   - Understands the caution is N/A.
Comment:
Comment:
OP-100, Section 5.1.2, Step 2  Performance Step: 9 START the RCP Oil Lift Pump.
OP-100, Section 5.1.2, Step 2  Performance Step: 9 START the RCP Oil Lift Pump.
Standard:
Standard: Locates 'A' RCP Oil Lift Pump switch and starts the oil lift pump.
Locates '
A' RCP Oil Lift Pump switch and starts the oil lift pump.
  (Critical to start the RCP Oil Lift Pump)
  (Critical to start the RCP Oil Lift Pump)
START Time ____________
START Time ____________
Line 861: Line 746:
Comment: Note:  Procedure requires a minimum of 2 minutes run time for the lift pump before starting the RCP.
Comment: Note:  Procedure requires a minimum of 2 minutes run time for the lift pump before starting the RCP.
OP-100, Section 5.1.2, Step 3  Performance Step: 10 VERIFY the amber permissive light on the lift pump control switch is lit indicating proper lift oil pressure has been achieved.
OP-100, Section 5.1.2, Step 3  Performance Step: 10 VERIFY the amber permissive light on the lift pump control switch is lit indicating proper lift oil pressure has been achieved.
Standard:
Standard: Locates amber permissive light on the '
Locates amber permissive light on the '
A' RCP Oil Lift Pump Switch and verifies it is lit.
A' RCP Oil Lift Pump Switch and verifies it is lit.
Comment:
Comment:
Appendix C Page 8 of 15 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 8 of 15 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM d Rev. FINAL OP-100, Section 5.1.2, Step 4  Performance Step: 11 ALLOW the RCP Oil Lift Pump to run for a minimum of 2 minutes before starting an RCP
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM d Rev. FINAL OP-100, Section 5.1.2, Step 4  Performance Step: 11 ALLOW the RCP Oil Lift Pump to run for a minimum of 2 minutes before starting an RCP
. Standard:
. Standard: Waits minimum of 2 minutes after starting the oil lift pump prior to starting the 'A' RCP.      Comment:
Waits minimum of 2 minutes after starting the oil lift pump prior to starting the 'A' RCP.      Comment:
OP-100, Section 5.1.2, Note prior to Step 5  Performance Step: 12 When an RCP is started, the RCP ammeter will go off scale high, and then decrease to the normal hot or cold running amps after 15 to 25 seconds.
OP-100, Section 5.1.2, Note prior to Step 5  Performance Step: 12 When an RCP is started, the RCP ammeter will go off scale high, and then decrease to the normal hot or cold running amps after 15 to 25 seconds.
Standard:
Standard: Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)
Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)
Comment:    Evaluator Note: When the 'A' RCP start switch is taken to "start" a timer starts and runs for 15 seconds after which 1RC
Comment:    Evaluator Note: When the 'A' RCP start switch is taken to "start" a timer starts and runs for 15 seconds after which 1RC
-107 will ramp open over 45 seconds lowering RCS pressure and requiring the operator to enter into AOP-019. Annunciators AL B-009-5-1, PZR High
-107 will ramp open over 45 seconds lowering RCS pressure and requiring the operator to ent e r into AOP-019. Annunciators AL B-009-5-1, PZR High
-Low Press and ALB
-Low Press and ALB
-009-3-3, PZR Cont Low Press and Heaters On will alarm ~60 seconds after 1RC
-009-3-3, PZR Cont Low Press and Heaters On will alarm ~60 seconds after 1RC
Line 881: Line 763:
Appendix C Page 9 of 15 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 9 of 15 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM d Rev. FINAL OP-100, Section 5.1.2, Step 5  Performance Step: 13 START the RCP.
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM d Rev. FINAL OP-100, Section 5.1.2, Step 5  Performance Step: 13 START the RCP.
Standard:
Standard: Locates control switch for 'A' RCP and starts 'A
Locates control switch for 'A' RCP and starts 'A
' RCP      Comment: START Time ____________ (> 2minutes since lift pump start)
' RCP      Comment: START Time ____________ (
> 2minutes since lift pump start)
The two minute minimum is not critical but ensures start permissives are met for the RCP start.
The two minute minimum is not critical but ensures start permissives are met for the RCP start.
OP-100, Section 5.1.2, Step 6  Performance Step: 14 VERIFY the following normal operating parameters:
OP-100, Section 5.1.2, Step 6  Performance Step: 14 VERIFY the following normal operating parameters:
Line 890: Line 770:
   # 1 Seal P Greater than 200 psid
   # 1 Seal P Greater than 200 psid
   # 1 Seal leakoff in the normal operating range of Attachment 3 Motor Winding temperature
   # 1 Seal leakoff in the normal operating range of Attachment 3 Motor Winding temperature
  <300&deg;F    Standard:
  <300&deg;F    Standard: Locates and verifies each parameter is in the normal operating range (ERFIS or MCB indications may be used)
Locates and verifies each parameter is in the normal operating range (ERFIS or MCB indications may be used)
Comment: Note:  Hot running motor amp range of 460 to 540 amps will apply.
Comment: Note:  Hot running motor amp range of 460 to 540 amps will apply.
Appendix C Page 10 of 15 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 10 of 15 Form ES-C-1  PERFORMANCE INFORMATION
Line 898: Line 777:
OP-100, Section 5.1.2, Note prior to Step 7  Performance Step: 15 NOTE:  The oil lift pump should be run at least 1 minute after starting an RCP.
OP-100, Section 5.1.2, Note prior to Step 7  Performance Step: 15 NOTE:  The oil lift pump should be run at least 1 minute after starting an RCP.
After at least 1 minute, STOP the RCP OIL LIFT PUMP.
After at least 1 minute, STOP the RCP OIL LIFT PUMP.
Standard:
Standard: Waits at least 1 minute then secures the 'A' RCP oil lift pump.
Waits at least 1 minute then secures the 'A' RCP oil lift pump.
Comment: Secure Time ____________ (> 1 minute since RCP start)
Comment: Secure Time ____________ (
> 1 minute since RCP start)
ALTERNATE PATH Performance Step: 16 Identifies RCS pressure lowering and Spray valve 1RC
ALTERNATE PATH Performance Step: 16 Identifies RCS pressure lowering and Spray valve 1RC
-107 failure Annunciators:
-107 failure Annunciators:
ALB-009-5-1, PZR High
ALB-009-5-1, PZR High
-Low Press ALB-009-3-3, PZR Cont Low Press and Heaters On Standard:
-Low Press ALB-009-3-3, PZR Cont Low Press and Heaters On Standard: Identifies RCS pressure lowering Identifies PZR Spray Loop A PCV
Identifies RCS pressure lowering Identifies PZR Spray Loop A PCV
-444C (1RC-107) red indication light and valve demand increasing (or at 100%)
-444C (1RC
-107) red indication light and valve demand increasing (or at 100%)
Acknowledges alar ms and reports conditions to CRS May review APP or directly enter AOP
Acknowledges alar ms and reports conditions to CRS May review APP or directly enter AOP
-019 based on current plant indications  
-019 based on current plant indications  
Line 921: Line 796:
Securing 'A' RCP is an action contained in AOP
Securing 'A' RCP is an action contained in AOP
-019 but this action is not performed immediately. Stopping the 'A' RCP would be performed at step 14 in Section 3.1 of the procedure unless other trip limits on the RCP are exceeded prior to reaching this step.
-019 but this action is not performed immediately. Stopping the 'A' RCP would be performed at step 14 in Section 3.1 of the procedure unless other trip limits on the RCP are exceeded prior to reaching this step.
AOP-019, Malfunction of RCS Pressure Control Performance Step: 17 Steps 1 through 3 are immediate actions Standard:
AOP-019, Malfunction of RCS Pressure Control Performance Step: 17 Steps 1 through 3 are immediate actions Standard: Performs immediate actions from memory without accessing or reading from the AOP Comment:      AOP-019, Step 1 Performance Step: 18 CHECK that a bubble exists in the PRZ. (YES)    Standard: States that a bubble exists in the PRZ Comment:
Performs immediate actions from memory without accessing or reading from the AOP Comment:      AOP-019, Step 1 Performance Step: 18 CHECK that a bubble exists in the PRZ. (YES)    Standard:
States that a bubble exists in the PRZ Comment:
AOP-019, Step 2 Performance Step: 19 VERIFY ALL PRZ PORVs AND associated block valves properly positioned for current PRZ pressure and plant conditions.
AOP-019, Step 2 Performance Step: 19 VERIFY ALL PRZ PORVs AND associated block valves properly positioned for current PRZ pressure and plant conditions.
  (YES)    Standard:
  (YES)    Standard: Verifies ALL PRZ PORVs AND associated block valves properly Positioned by observing green shut lights indicated for all PZR PORV and all red open lights on for PZR PORV Block Valve control switches.
Verifies ALL PRZ PORVs AND associated block valves properly Positioned by observing green shut lights indicated for all PZR PORV and all red open lights on for PZR PORV Block Valve control switches.
Comment:   
Comment:   


Line 933: Line 805:
PCV-444C PZR Spray Loop A (1RC
PCV-444C PZR Spray Loop A (1RC
-107)  - OPEN - NO  PCV-444D PZR Spray Loop B (1RC
-107)  - OPEN - NO  PCV-444D PZR Spray Loop B (1RC
-103)  -  SHUT - YES      Standard:
-103)  -  SHUT - YES      Standard: Identifies that the PZR Spray valves are NOT properly positioned for current plant conditions.
Identifies that the PZR Spray valves are NOT properly positioned for current plant conditions.
     - Takes RNO actions Comment: 1RC-107 should not be full open (or going full open for this condition)
     - Takes RNO actions Comment: 1RC-107 should not be full open (or going full open for this condition)
. 1RC-103 is shut which is its proper position.
. 1RC-103 is shut which is its proper position.
AOP-019, Step 3 RNO Performance Step: 21 CONTROL PRZ Spray Valves using ONE of the following methods (listed in order of preference):
AOP-019, Step 3 RNO Performance Step: 21 CONTROL PRZ Spray Valves using ONE of the following methods (listed in order of preference):
   - AFFECTED Spray Valve controller in MANUAL (if only one is obviously malfunctioning)
   - AFFECTED Spray Valve controller in MANUAL (if only one is obviously malfunctioning)
OR - PK-444A, Master Pressure Controller, in MANUAL OR - BOTH individual Spray Valve controllers in MANUAL Standard:
OR - PK-444A, Master Pressure Controller, in MANUAL OR - BOTH individual Spray Valve controllers in MANUAL Standard: Places PCV
Places PCV
-444C PZR Spray Loop A controller to manual and lowers the output to zero (0).
-444C PZR Spray Loop A controller to manual and lowers the output to zero (0).
Stops RCS pressure reduction caused from open spray valve.
Stops RCS pressure reduction caused from open spray valve.
Line 948: Line 818:
Appendix C Page 13 of 15 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 13 of 15 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM d Rev. FINAL AOP-019, Malfunction of RCS Pressure Control Performance Step: 22 Obtain copy of AOP
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM d Rev. FINAL AOP-019, Malfunction of RCS Pressure Control Performance Step: 22 Obtain copy of AOP
-019    Standard:
-019    Standard: Announces immediate actions of AOP
Announces immediate actions of AOP
-019 are complete and obtains a copy of AOP
-019 are complete and obtains a copy of AOP
-019 to continue actions associated with the procedure.
-019 to continue actions associated with the procedure.
Line 963: Line 832:


Appendix C Page 14 of 15 Form ES-C-1  VERIFICATION OF COMPLETION 2014 HNP NRC Exam Simulator JPM d Rev. FINAL  Job Performance Measure No.:
Appendix C Page 14 of 15 Form ES-C-1  VERIFICATION OF COMPLETION 2014 HNP NRC Exam Simulator JPM d Rev. FINAL  Job Performance Measure No.:
2014 HNP NRC Exam Simulator JPM d Start A Reactor Coolant Pump, IAW OP-100, Section 5.1
2014 HNP NRC Exam Simulator JPM d Start A Reactor Coolant Pump, IAW OP-100 , Section 5.1 , Reactor Coolant Pump Start
, Reactor Coolant Pump Start
-up - Alternate Path
-up - Alternate Path
  - Pressurizer Spray Valve fails open after pump start OP-100  Examinee's Name:
  - Pressurizer Spray Valve fails open after pump start OP-100  Examinee's Name:
Line 970: Line 838:
Facility Evaluator:
Facility Evaluator:
Number of Attempts:
Number of Attempts:
Time to Complete:
Time to Complete:   Question Documentation:
Question Documentation:
Question:   Response:
Question:
 
===Response===
 
Result:  SAT  UNSAT    Examiner's Signature:
Result:  SAT  UNSAT    Examiner's Signature:
Date:
Date:
Line 987: Line 851:
-up. The initial conditions have been verified.
-up. The initial conditions have been verified.


Appendix C Job Performance Measure Form ES-C-1  Worksheet 2014 HNP NRC Exam Simulator JPM CR e Rev. FINAL Facility:
Appendix C Job Performance Measure Form ES-C-1  Worksheet   2014 HNP NRC Exam Simulator JPM CR e Rev. FINAL Facility: Harris Nuclear Plant Task No.: 061007H101 Task Title:
Harris Nuclear Plant Task No.:
Using ESW System As A Backup Source Of Water To AFW JPM No.: 20 1 4 NRC Exam Simulator JPM CR e    K/A  
061007H101 Task Title:
Using ESW System As A Backup Source Of Water To AFW JPM No.: 2014 NRC Exam Simulator JPM CR e    K/A  


==Reference:==
==Reference:==


054 AA1.01 RO 4.5  SRO 4.4  ALTERNATE PATH  
054 AA1.01 RO 4.5  SRO 4.4  ALTERNATE PATH  
- NO Examinee:
- NO Examinee: ________________________
________________________
NRC Examiner:
NRC Examiner:
_________________
_________________
Line 1,005: Line 866:
Simulated Performance:
Simulated Performance:
Actual Performance:
Actual Performance:
X  Classroom Simulator X Plant    READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
X  Classroom Simulator   X Plant    READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Initial Conditions:
A LOCA has occurred and EOP-E-1, Loss of Reactor or Secondary Coolant is being implemented. Both A and B Motor Driven AFW pumps are in operation.
A LOCA has occurred and EOP-E-1, Loss of Reactor or Secondary Coolant is being implemented. Both A and B Motor Driven AFW pumps are in operation.
Line 1,017: Line 878:
-137 prior to entering the simulator to perform the JPM.
-137 prior to entering the simulator to perform the JPM.


Appendix C Job Performance Measure Form ES-C-1  Worksheet 2014 HNP NRC Exam Simulator JPM CR e Rev. FINAL  Task Standard:
Appendix C Job Performance Measure Form ES-C-1  Worksheet   2014 HNP NRC Exam Simulator JPM CR e Rev. FINAL  Task Standard:
Train A ESW is supplying AFW pumps.
Train A ESW is supplying AFW pumps.
Required Materials:
Required Materials:
OP-137 pages 32
OP-137 pages 32
-33, step 2 and 3 marked N/A and pages 36
-33, step 2 and 3 marked N/A and pages 36
-38 OP-169 page 15, initial condition 7.1.1, step 1.a and 1.b and step 2, AH2 B-SA and AH
-38 OP-169 page 15, initial condition 7.1.1, step 1.a and 1.b and step 2, AH2 B-SA and AH-3 B-SA and step 3 marked N/A General  
-3 B-SA and step 3 marked N/A General  


==References:==
==References:==
Line 1,029: Line 889:
OP-137, Auxiliary Feedwater System, Rev. 38, OP-169, Containment Cooling and Ventilation, Rev. 24  Time Critical Task:
OP-137, Auxiliary Feedwater System, Rev. 38, OP-169, Containment Cooling and Ventilation, Rev. 24  Time Critical Task:
No  Validation Time:
No  Validation Time:
15 Minutes    CRITICAL STEP JUSTIFICATION Step 7  Isolation of ESW flow will ensure required cooling to maintain EDG operable for LOSP.
1 5 Minutes    CRITICAL STEP JUSTIFICATION Step 7  Isolation of ESW flow will ensure required cooling to maintain EDG operable for LOSP.
Step 9  Isolation of ESW flow will ensure required cooling to maintain EDG operable for LOSP.
Step 9  Isolation of ESW flow will ensure required cooling to maintain EDG operable for LOSP.
Step 12 Opening 1SW
Step 1 2 Opening 1SW
-121SA provides ESW suction from the A header to the "A" MDAFW pump Step 13 Opening 1SW
-121SA provides ESW suction from the A header to the "A" MDAFW pump Step 1 3 Opening 1SW
-123SA provides ESW suction from the A header to the "A" MDAFW pump Step 23 Opening 1SW
-123SA provides ESW suction from the A header to the "A" MDAFW pump Step 2 3 Opening 1SW
-124SA provides ESW suction from the A header to the TDAFW pump Step 24 Opening 1SW-126SA provides ESW suction from the A header to the TDAFW pump
-124SA provides ESW suction from the A header to the TDAFW pump Step 2 4 Opening 1SW-126SA provides ESW suction from the A header to the TDAFW pump


Appendix C Job Performance Measure Form ES-C-1  Worksheet 2014 HNP NRC Exam Simulator JPM CR e Rev. FINAL    2014 NRC Exam  
Appendix C Job Performance Measure Form ES-C-1  Worksheet   2014 HNP NRC Exam Simulator JPM CR e Rev. FINAL    2014 NRC Exam  
- SIMULATOR SETUP Simulator Operator Reset to IC
- SIMULATOR SETUP Simulator Operator Reset to IC
-169 password "spurs"  NOTE:  It may be necessary to override the 86 Generator lockouts if they are tripped prior to going to run.
-169 password "spurs"  NOTE:  It may be necessary to override the 86 Generator lockouts if they are tripped prior to going to run.
Line 1,050: Line 910:
-9010B1 SB should read 8.3%)
-9010B1 SB should read 8.3%)
o imf LT:901b (n 0 0) 8.3 0 3 Annunciators will be on due to these actions:
o imf LT:901b (n 0 0) 8.3 0 3 Annunciators will be on due to these actions:
ALB-017-4-5 CST Empty ALB-017-5-5 CST Low Minimum Level ALB-017-6-5 CST Hi-Hi/Lo-Lo Level  IMF RCS18A (n 0 0) 15 0 Small Break LOCA A Loop 15% of 4.5" line Implement E-0 then E-1 as necessary Secure the TDAFW Pump o Close 1MS
ALB-017-4-5 CST Empty ALB-017-5-5 CST Low Minimum Level ALB-017-6-5 CST Hi-Hi/Lo-Lo Level  IMF RCS18A (n 0 0) 15 0 Small Break LOCA A Loop 15% of 4.5" line Implement E-0 then E-1 as necessary Secure the TDAFW Pump o Close 1MS-70 o Close 1MS-72  Restore power to 1A
-70 o Close 1MS
-72  Restore power to 1A
-1 and 1B-1  Reduce AFW flow to 300 KPPH total Silence, acknowledge and reset annunciators GO TO FREEZE and create a snap IC
-1 and 1B-1  Reduce AFW flow to 300 KPPH total Silence, acknowledge and reset annunciators GO TO FREEZE and create a snap IC


Line 1,066: Line 924:
-137 section 7.1. Give marked
-137 section 7.1. Give marked
-up copy of procedure.
-up copy of procedure.
Standard:
Standard: Locates MCB control switch for B MDAFW and identifies that the RED light is lit.
Locates MCB control switch for B MDAFW and identifies that the RED light is lit.
Takes the control switch for 'B' MDAFW Pump from neutral to STOP and identifies that the RED light is out and the GREEN light is lit.
Takes the control switch for 'B' MDAFW Pump from neutral to STOP and identifies that the RED light is out and the GREEN light is lit.
Comment:    Performance Step:
Comment:    Performance Step:
2 OBTAIN PROCEDURE Standard:
2 OBTAIN PROCEDURE Standard: Locates OP
Locates OP
-137 and refers to Section 8.1 and reviews initial conditions.
-137 and refers to Section 8.1 and reviews initial conditions.
Evaluator Cue:
Evaluator Cue:
Line 1,082: Line 938:
3 Caution: The Emergency Service Water System serves as a backup source of water to the Auxiliary Feedwater System if the Condensate Storage Tank volume is exhausted or unavailable. Since the Emergency Service Water System uses raw reservoir water, it is only used in extreme emergencies.
3 Caution: The Emergency Service Water System serves as a backup source of water to the Auxiliary Feedwater System if the Condensate Storage Tank volume is exhausted or unavailable. Since the Emergency Service Water System uses raw reservoir water, it is only used in extreme emergencies.
Caution: Isolating Service Water to the Containment Fan Coolers will make the Coolers inoperable, therefore only one Train of ESW should be aligned to the suction of the AFW pumps unless a determination has been made on the desirability of making both Trains of Containment Fan Coolers inoperable.
Caution: Isolating Service Water to the Containment Fan Coolers will make the Coolers inoperable, therefore only one Train of ESW should be aligned to the suction of the AFW pumps unless a determination has been made on the desirability of making both Trains of Containment Fan Coolers inoperable.
Standard:
Standard: Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)
Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)
Comment:
Comment:
OP-137 section 8.1
OP-137 section 8.1
Line 1,089: Line 944:
4 To supply AFW Pump 1A
4 To supply AFW Pump 1A
-SA from ESW header A, Perform the following:
-SA from ESW header A, Perform the following:
: a. Declare A train Containment Fan Coolers inoperable Standard:
: a. Declare A train Containment Fan Coolers inoperable Standard: Notifies CRS to declare A Train of Containment Fan Coolers INOPERABLE Evaluator Cue:
Notifies CRS to declare A Train of Containment Fan Coolers INOPERABLE Evaluator Cue:
CRS acknowledges 'A' Train CFCs are inoperable Comment:    Evaluator NOTE:
CRS acknowledges 'A' Train CFCs are inoperable Comment:    Evaluator NOTE:
After Candidate determines that they need to use OP
After Candidate determines that they need to use OP
Line 1,100: Line 954:
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR e Rev. FINAL  OP-137 section 8.1
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR e Rev. FINAL  OP-137 section 8.1
.2 Step 1.b  Performance Step:
.2 Step 1.b  Performance Step:
5 Verify A Train Containment Fan Coolers are secured per OP-169    Standard:
5 Verify A Train Containment Fan Coolers are secured per OP-169    Standard: Obtains copy of OP
Obtains copy of OP
-169 section 7.1 Rev. 24 and perform step 2    Comment:      OP-169 section 7.1 step 2.
-169 section 7.1 Rev. 24 and perform step 2    Comment:      OP-169 section 7.1 step 2.
Performance Step:
Performance Step:
6 PLACE the control switch for each of the following fans to be removed from service to STOP:
6 PLACE the control switch for each of the following fans to be removed from service to STOP:
Standard:
Standard: Locates switch for AH
Locates switch for AH
-2 A-SA and Identifies that the Red LO SPD light is lit.
-2 A-SA and Identifies that the Red LO SPD light is lit.
Takes the control switch for AH
Takes the control switch for AH
-2 A-SA from neutral to STOP. Verifies that the RED light goes out and the GREEN light is lit.
-2 A-SA from neutral to STOP. Verifies that the RED light goes out and the GREEN light is lit.
Standard:
Standard: Locates switch for AH
Locates switch for AH
-3 A-SA and identifies that the Red LO SPD light is lit.
-3 A-SA and identifies that the Red LO SPD light is lit.
Takes the control switch for AH
Takes the control switch for AH
Line 1,123: Line 974:
.2 Step 1.c  Performance Step:
.2 Step 1.c  Performance Step:
7 SHUT 1SW-92 SA, CNMT FAN COOLER AH
7 SHUT 1SW-92 SA, CNMT FAN COOLER AH
-3 INLET. Standard:
-3 INLET. Standard: Locates the control switch for 1SW
Locates the control switch for 1SW
-92 SA and identifies that the RED Light is lit.
-92 SA and identifies that the RED Light is lit.
Takes the control switch for 1SW
Takes the control switch for 1SW
Line 1,132: Line 982:
.2 Step 1.d  Performance Step:
.2 Step 1.d  Performance Step:
8 SHUT 1SW-97 SA, CNMT FAN COOLER AH
8 SHUT 1SW-97 SA, CNMT FAN COOLER AH
-3 OUTLET. Standard:
-3 OUTLET. Standard: Locates the control switch for 1SW
Locates the control switch for 1SW
-97 SA and identifies that the RED Light is lit.
-97 SA and identifies that the RED Light is lit.
Takes the control switch for 1SW
Takes the control switch for 1SW
Line 1,142: Line 991:
.2 Step 1.e  Performance Step:
.2 Step 1.e  Performance Step:
9 SHUT 1SW-91 SA, CNMT FAN COOLER AH
9 SHUT 1SW-91 SA, CNMT FAN COOLER AH
-2 INLET. Standard:
-2 INLET. Standard: Locates the control switch for 1SW-91 SA and identifies that the RED Light is lit.
Locates the control switch for 1SW-91 SA and identifies that the RED Light is lit.
Takes the control switch for 1SW
Takes the control switch for 1SW
-91 SA from neutral to shut. Verifies that the RED light goes out and the GREEN light is lit.
-91 SA from neutral to shut. Verifies that the RED light goes out and the GREEN light is lit.
Line 1,149: Line 997:
.2 Step 1.f  Performance Step:
.2 Step 1.f  Performance Step:
10 SHUT 1SW-109 SA, CNMT FAN COOLER AH
10 SHUT 1SW-109 SA, CNMT FAN COOLER AH
-2 OUTLET. Standard:
-2 OUTLET. Standard: Locates the control switch for 1SW
Locates the control switch for 1SW
-109 SA and identifies that the RED Light is lit.
-109 SA and identifies that the RED Light is lit.
Takes the control switch for 1SW
Takes the control switch for 1SW
Line 1,156: Line 1,003:
Comment:    OP-137 section 8.1
Comment:    OP-137 section 8.1
.2 Step 1.g  Performance Step:
.2 Step 1.g  Performance Step:
11 CLOSE 1SW
1 1 CLOSE 1SW-122, AFW PUMP 1A
-122, AFW PUMP 1A
-SA SW DRAIN ISOLATION.
-SA SW DRAIN ISOLATION.
Standard:
Standard: Directs AO to SHUT 1SW
Directs AO to SHUT 1SW
-122    Simulator Operator:
-122    Simulator Operator:
NOTE: 1SW
NOTE: 1SW-122 is not modeled on the Simulator AO acknowledges direction to shut 1SW
-122 is not modeled on the Simulator AO acknowledges direction to shut 1SW
-122, AFW Pump 1A-SA SW Drain Isolation.
-122, AFW Pump 1A-SA SW Drain Isolation.
Pause 10-15 seconds then report that 1SW
Pause 10-15 seconds then report that 1SW
Line 1,170: Line 1,014:
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR e Rev. FINAL    OP-137 section 8.1
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR e Rev. FINAL    OP-137 section 8.1
.2 Step 1.h  Performance Step:
.2 Step 1.h  Performance Step:
12 OPEN 1SW-121 SA, SW HEADER A TO AUX FW MOTOR PUMP A-SA. Standard:
1 2 OPEN 1SW-121 SA, SW HEADER A TO AUX FW MOTOR PUMP A-SA. Standard: Locates MCB control switch for 1SW
Locates MCB control switch for 1SW
-121 SA and identifies that the green light is lit.
-121 SA and identifies that the green light is lit.
Takes control switch for 1SW-121 SA from neutral to open and identifies that the GREEN light is out and the RED light is lit.
Takes control switch for 1SW-121 SA from neutral to open and identifies that the GREEN light is out and the RED light is lit.
Comment:    OP-137 section 8.1
Comment:    OP-137 section 8.1
.2 Step 1.i  Performance Step:
.2 Step 1.i  Performance Step:
13 OPEN 1SW-123 SA, SW HEADER A TO AUX FW MOTOR PUMP A-SA. Standard:
1 3 OPEN 1SW-123 SA, SW HEADER A TO AUX FW MOTOR PUMP A-SA. Standard: Locates MCB control switch for 1SW
Locates MCB control switch for 1SW
-123 SA and identifies that the green light is lit.
-123 SA and identifies that the green light is lit.
Takes control switch for 1SW
Takes control switch for 1SW
Line 1,183: Line 1,025:
Comment:    OP-137 section 8.1
Comment:    OP-137 section 8.1
.2 Step 1.j  Performance Step:
.2 Step 1.j  Performance Step:
14 Monitor AFW system parameters to ensure proper operation
1 4 Monitor AFW system parameters to ensure proper operation
. Standard:
. Standard: Monitors PI
Monitors PI
-2150A1 A DISCH PRESS and PI
-2150A1 A DISCH PRESS and PI
-2250A1 A SUCT PRESS/ Monitors Aux Feedwater Flow on FI
-2250A1 A SUCT PRESS/ Monitors Aux Feedwater Flow on FI
Line 1,193: Line 1,034:
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR e Rev. FINAL      OP-137 section 8.1
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR e Rev. FINAL      OP-137 section 8.1
.2 Caution prior to step 3 Performance Step: 1 5 CAUTION:  Do NOT cross tie the ESW trains together via the TDAFW pump suction supply from ESW. Crosstie is prevented by performing only Step 8.1.2.3 OR 8.1.2.
.2 Caution prior to step 3 Performance Step: 1 5 CAUTION:  Do NOT cross tie the ESW trains together via the TDAFW pump suction supply from ESW. Crosstie is prevented by performing only Step 8.1.2.3 OR 8.1.2.
4    Standard:
4    Standard: Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)
Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)
Comment:
Comment:
OP-137 section 8.1
OP-137 section 8.1
.2 Step 3  Performance Step:
.2 Step 3  Performance Step:
16 To supply AFW Pump 1X
1 6 To supply AFW Pump 1X
-SAB from ESW header A:
-SAB from ESW header A:
: a. Declare A train Containment Fan Coolers inoperable Standard:
: a. Declare A train Containment Fan Coolers inoperable Standard: No action required (already declared)
No action required (already declared)
Comment:      OP-137 section 8.1 Step 3.b  Performance Step:
Comment:      OP-137 section 8.1 Step 3.b  Performance Step:
17 Verify A Train Containment Fan Coolers are secured per OP-169    Standard:
1 7 Verify A Train Containment Fan Coolers are secured per OP-169    Standard: No action required (already performed)
No action required (already performed)
Comment:
Comment:
Appendix C Page 11 of 15 Form ES-C-1  PERFORMANCE INFORAMTION
Appendix C Page 11 of 15 Form ES-C-1  PERFORMANCE INFORAMTION
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR e Rev. FINAL  OP-137 section 8.1
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR e Rev. FINAL  OP-137 section 8.1
.2 Step 3.c  Performance Step:
.2 Step 3.c  Performance Step:
18 Verify shut 1SW
1 8 Verify shut 1SW
-92 SA, Cnmt Fan Cooler AH
-92 SA, Cnmt Fan Cooler AH
-3 inlet    Standard:
-3 inlet    Standard: No action required (already performed)
No action required (already performed)
Comment:      OP-137 section 8.1
Comment:      OP-137 section 8.1
.2 Step 3.d  Performance Step:
.2 Step 3.d  Performance Step:
19 Shut 1SW-97 SA, Cnmt Fan Cooler AH
1 9 Shut 1SW-97 SA, Cnmt Fan Cooler AH
-3 outlet    Standard:
-3 outlet    Standard: No action required (already performed)
No action required (already performed)
Comment:    OP-137 section 8.1
Comment:    OP-137 section 8.1
.2 Step 3.e  Performance Step:
.2 Step 3.e  Performance Step:
20 Verify shut 1SW
20 Verify shut 1SW
-91 SA, Cnmt Fan Cooler AH
-91 SA, Cnmt Fan Cooler AH
-2 inlet    Standard:
-2 inlet    Standard: No action required (already performed)
No action required (already performed)
Comment:    OP-137 section 8.1
Comment:    OP-137 section 8.1
.2 Step 3.f  Performance Step:
.2 Step 3.f  Performance Step:
21 Verify Shut 1SW
2 1 Verify Shut 1SW
-109 SA, Cnmt Fan Cooler AH
-109 SA, Cnmt Fan Cooler AH
-2 outlet    Standard:
-2 outlet    Standard: No action required (already performed)
No action required (already performed)
Comment:
Comment:
Appendix C Page 12 of 15 Form ES-C-1  PERFORMANCE INFORAMTION
Appendix C Page 12 of 15 Form ES-C-1  PERFORMANCE INFORAMTION
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR e Rev. FINAL  OP-137 section 8.1
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR e Rev. FINAL  OP-137 section 8.1
.2 Step 3.g  Performance Step:
.2 Step 3.g  Performance Step:
22 Shut 1SW-125, AFW Pump 1X-SAB SW Header A Drain Isolation Standard:
2 2 Shut 1SW-125, AFW Pump 1X-SAB SW Header A Drain Isolation     Standard: Contacts AO and tells him to close 1SW
Contacts AO and tells him to close 1SW
-125. Simulator Operator OR Evaluator Cue
-125. Simulator Operator OR Evaluator Cue
: NOTE:  1SW
: NOTE:  1SW
Line 1,244: Line 1,077:
-125 closed.
-125 closed.
Comment:    OP-137 section 8.1
Comment:    OP-137 section 8.1
.2 Step 3.h.
.2 Step 3.h. Performance Step:
Performance Step:
23 OPEN 1SW-124 SA, SW HEADER A TO AUX FW TURBINE PMP    Standard: Locates MCB control switch for 1SW
23 OPEN 1SW-124 SA, SW HEADER A TO AUX FW TURBINE PMP    Standard:
-124 SA and identifies that the green light is lit.
Locates MCB control switch for 1SW
-124SA and identifies that the green light is lit.
Takes control switch for 1SW
Takes control switch for 1SW
-124 SA from neutral to open and identifies that the GREEN light is out and the RED light is lit.
-124 SA from neutral to open and identifies that the GREEN light is out and the RED light is lit.
Line 1,255: Line 1,086:
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR e Rev. FINAL  OP-137 section 8.1
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR e Rev. FINAL  OP-137 section 8.1
.2 Step 3.i  Performance Step:
.2 Step 3.i  Performance Step:
24 Open 1SW-126 SA, SW HEADER A TO AUX FW TURBINE PUMP    Standard:
2 4 Open 1SW-126 SA, SW HEADER A TO AUX FW TURBINE PUMP    Standard: Locates MCB control switch for 1SW
Locates MCB control switch for 1SW
-126 SA and identifies that the GREEN light is lit Takes control switch for 1SW
-126 SA and identifies that the GREEN light is lit Takes control switch for 1SW
-126 SA from neutral to open and identifies that the GREEN light is out and the RED light is lit.
-126 SA from neutral to open and identifies that the GREEN light is out and the RED light is lit.
Line 1,262: Line 1,092:
OP-137 section 8.1
OP-137 section 8.1
.2 Step 3.j  Performance Step:
.2 Step 3.j  Performance Step:
25 Monitor AFW System to ensure proper operation
2 5 Monitor AFW System to ensure proper operation
. Standard:
. Standard: No action required 1X-SAB AFW pump is not running but TDAFW pump Suction pressure should be seen to increase
No action required 1X-SAB AFW pump is not running but TDAFW pump Suction pressure should be seen to increase
.
.
Report to CRS that 'A' ESW Header is supplying the 'A' MDAFW pump and the TDAFW pump.
Report to CRS that 'A' ESW Header is supplying the 'A' MDAFW pump and the TDAFW pump.
Line 1,282: Line 1,111:
Question Documentation:
Question Documentation:
Question:
Question:
 
Response:
===Response===
 
Result:  SAT  UNSAT    Examiner's Signature:
Result:  SAT  UNSAT    Examiner's Signature:
Date:
Date:
Line 1,296: Line 1,123:
You will silence all alarms and another RO will address alarms not associated with this evolution.
You will silence all alarms and another RO will address alarms not associated with this evolution.


Appendix C Page 1 of 16 Form ES-C-1  Worksheet 2014 NRC Exam Simulator JPM CR f Rev. FINAL  Facility:
Appendix C Page 1 of 16 Form ES-C-1  Worksheet   20 1 4 NRC Exam Simulator JPM CR f Rev. FINAL  Facility: Harris Nuclear Plant Task No.: 022001H101 Task Title:
Harris Nuclear Plant Task No.:
Swapping Containment Fan Cooler Lead Fans JPM No.: 20 1 4 NRC Exam Simulator JPM CR f    K/A  
022001H101 Task Title:
Swapping Containment Fan Cooler Lead Fans JPM No.: 2014 NRC Exam Simulator JPM CR f    K/A  


==Reference:==
==Reference:==


022 A4.01 RO  3.6 / SRO 3.6  ALTERNATE PATH
022 A4.0 1 RO  3.6 / SRO 3.6  ALTERNATE PATH
  - NO   Examinee:
  - N O   Examinee: ________________________
________________________
NRC Examiner:
NRC Examiner:
_________________
_________________
Line 1,313: Line 1,137:
Simulated Performance:
Simulated Performance:
Actual Performance:
Actual Performance:
X  Classroom Simulator X Plant  READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
X  Classroom Simulator X Plant  READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Initial Conditions:
The plant is operating at 100% power
The plant is operating at 100% power
Line 1,320: Line 1,144:
-1095, Sequencer Block Circuit And Containment Fan Cooler Testing Train A (B)
-1095, Sequencer Block Circuit And Containment Fan Cooler Testing Train A (B)
Quarterly Interval All Modes Initiating Cue:
Quarterly Interval All Modes Initiating Cue:
The CRS is directing you to swap all of the Containment Fan Cooler Lead Fans to the 1B-SA and 1B-SB position in accordance with OP-169, Containment Cooling And Ventilation, Section 8.8 Examiners Note:
The CRS is directing you to swap all of the Containment Fan Cooler Lead Fans to the 1 B-SA and 1 B-SB position in accordance with OP-169, Containment Cooling And Ventilation, Section 8.8 Examiners Note:
To expedite the examination schedule, provide the candidate with a copy of OP
To expedite the examination schedule, provide the candidate with a copy of OP
-169 section 8.8 prior to entering the simulator to perform the JPM. This will allow the candidate time to task preview the procedure.  
-169 section 8.8 prior to entering the simulator to perform the JPM. This will allow the candidate time to task preview the procedure.  


Appendix C Page 2 of 16 Form ES-C-1  Worksheet 2014 NRC Exam Simulator JPM CR f Rev. FINAL  Task Standard:
Appendix C Page 2 of 16 Form ES-C-1  Worksheet   20 1 4 NRC Exam Simulator JPM CR f Rev. FINAL  Task Standard:
Containment Fan Coolers lead selector switches are in the 1B
Containment Fan Coolers lead selector switches are in the 1B
-SB position.
-SB position. Required Materials:
Required Materials:
OP-169, Containment Cooling And Ventilation, pages 1-6, and pages 35-39, Rev. 24  General  
OP-169, Containment Cooling And Ventilation, pages 1-6, and pages 35-39, Rev. 24  General  


==References:==
==References:==


OP-169, Containment Cooling And Ventilation, Revision 24  Handouts:
OP-169, Containment Cooling And Ventilation, Revision 24  Handouts: OP-169, Section 8.8 Time Critical Task:
OP-169, Section 8.8 Time Critical Task:
N/A  Validation Time:
N/A  Validation Time:
15 minutes    Critical Step Justification Step 5  Stopping the running fan in the train not selected as the lead fan must be performed in order to comply with procedure and to not have all Containment fans in service when not required. This step will leave only the lead fans in operation.
15 minutes    Critical Step Justification Step 5  Stopping the running fan in the train not selected as the lead fan must be performed in order to comply with procedure and to not have all Containment fans in service when not required. This step will leave only the lead fans in operation.
Line 1,344: Line 1,166:
- After any fan cooler is started in low speed, the fan should be allowed to come up to speed for approximately 15 seconds before shifting to fast speed. This reduces the starting current required for high speed operation.
- After any fan cooler is started in low speed, the fan should be allowed to come up to speed for approximately 15 seconds before shifting to fast speed. This reduces the starting current required for high speed operation.


Appendix C Page 3 of 16 Form ES-C-1  Worksheet 2014 NRC Exam Simulator JPM CR f Rev. FINAL  2014 NRC Exam - SIMULATOR SETUP Simulator Operator Reset to IC
Appendix C Page 3 of 16 Form ES-C-1  Worksheet   20 1 4 NRC Exam Simulator JPM CR f Rev. FINAL  20 1 4 NRC Exam - SIMULATOR SETUP Simulator Operator Reset to IC
-19  Silence and Acknowledge annunciators GO TO FREEZE and inform the lead examiner the Simulator is ready. DO NOT GO TO RUN until directed by the lead examiner.  (The examiner has provided to the candidate with initial conditions and the initiating cues prior to placing the simulator in RUN.)
-19  Silence and Acknowledge annunciators GO TO FREEZE and inform the lead examiner the Simulator is ready. DO NOT GO TO RUN until directed by the lead examiner.  (The examiner has provided to the candidate with initial conditions and the initiating cues prior to placing the simulator in RUN.)
To recreate the IC setup for this JPM:
To recreate the IC setup for this JPM:
NOTE:  There are no special needs for this JPM it can be ran in any 100% power IC Initial Simulator IC was IC-19  Silence Acknowledge and Reset Annunciators Freeze and Snap these conditions to your exam IC Appendix C Page 4 of 16 Form ES-C-1  PERFORMANCE INFORMATION
NOTE:  There are no special needs for this JPM it can be ran in any 100% power IC Initial Simulator IC was IC-19  Silence Acknowledge and Reset Annunciators Freeze and Snap these conditions to your exam IC Appendix C Page 4 of 16 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 NRC Exam Simulator JPM CR f Rev. FINAL    Simulator Operator:
   - Denotes Critical Steps 20 14 NRC Exam Simulator JPM CR f Rev. FINAL    Simulator Operator:
When directed by the Lead Examiner go to Run.
When directed by the Lead Examiner go to Run.
START TIME:
START TIME:
Performance Step: 1 OBTAIN PROCEDURE Standard:
Performance Step: 1 OBTAIN PROCEDURE Standard: Has task previewed OP
Has task previewed OP
-169 section 8.8 in preparations of swapping Containment Fan Cooler Lead Fans.
-169 section 8.8 in preparations of swapping Containment Fan Cooler Lead Fans.
Comment:
Comment:
OP-169, Section 8.8 Initial Conditions Performance Step: 2 It is desired to select other fan as lead in Containment Fan Cooler Unit(s).
OP-169, Section 8.8 Initial Conditions Performance Step: 2 It is desired to select other fan as lead in Containment Fan Cooler Unit(s).
Standard:
Standard: Initials section 8.8.1 initial conditions.
Initials section 8.8.1 initial conditions.
Comment:      OP-169, Section 8.8.2 Notes prior to step 1 Performance Step: 3 NOTE: Due to circuit design, swapping the Containment Fan Cooler Lead Fan Selector Switch (for lead fan on Sequencer start) may cause the running fans to trip. To minimize the potential impact, the selector switch should not be repositioned when fans are running, unless the selected fan is no longer operable or CRS permission is obtained.
Comment:      OP-169, Section 8.8.2 Notes prior to step 1 Performance Step: 3 NOTE: Due to circuit design, swapping the Containment Fan Cooler Lead Fan Selector Switch (for lead fan on Sequencer start) may cause the running fans to trip. To minimize the potential impact, the selector switch should not be repositioned when fans are running, unless the selected fan is no longer operable or CRS permission is obtained.
NOTE: The following step should be repeated as needed on one Containment Fan Cooler Unit at a time.
NOTE: The following step should be repeated as needed on one Containment Fan Cooler Unit at a time.
Standard:
Standard: Operator reads and placekeeps any note or caution (initials, checks or circle/slash)
Operator reads and placekeeps any note or caution (initials, checks or circle/slash)
Comment:
Comment:
Appendix C Page 5 of 16 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 5 of 16 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 NRC Exam Simulator JPM CR f Rev. FINAL    OP-169, Section 8.8.2 Caution prior to step 1 Performance Step: 4 CAUTION - Failure of equipment to secure in this section will result in the associated EDG being inoperable. Tech Spec 3.8.1.1 is  applicable until the breaker for the affected load is opened. Standard:
   - Denotes Critical Steps 20 14 NRC Exam Simulator JPM CR f Rev. FINAL    OP-169, Section 8.8.2 Caution prior to step 1 Performance Step: 4 CAUTION - Failure of equipment to secure in this section will result in the associated EDG being inoperable. Tech Spec 3.8.1.1 is  applicable until the breaker for the affected load is opened. Standard: Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)
Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)
Comment:
Comment:
Appendix C Page 6 of 16 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 6 of 16 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 NRC Exam Simulator JPM CR f Rev. FINAL  Evaluator Note:
   - Denotes Critical Steps 20 14 NRC Exam Simulator JPM CR f Rev. FINAL  Evaluator Note:
Per the procedure note ONLY one Containment Fan Cooler Unit (there are 2 fans per unit) will be stopped at a time and the steps will be repeated for the second Unit.
Per the procedure note ONLY one Containment Fan Cooler Unit (there are 2 fans per unit) will be stopped at a time and the steps will be repeated for the second Unit.
During the performance of the JPM annunciators associated with AH-2 (ALB-27-7-2) and AH
During the performance of the JPM annunciators associated with AH-2 (ALB-27-7-2) and AH-3 (ALB-27-8-2) low flow alarms will come in. These are expected alarms during starting and stopping these Air Handlers.
-3 (ALB-27-8-2) low flow alarms will come in. These are expected alarms during starting and stopping these Air Handlers.
OP-169, Section 8.8.2 step 1 Performance Step: 5 IF any fan is running in the Containment Fan Cooler Unit in which the LEAD FAN SEL switch will be repositioned, THEN PERFORM the following:
OP-169, Section 8.8.2 step 1 Performance Step: 5 IF any fan is running in the Containment Fan Cooler Unit in which the LEAD FAN SEL switch will be repositioned, THEN PERFORM the following:
: a. PLACE the control switch for each running fan in the unit in which the LEAD FAN SEL switch will be repositioned to STOP:
: a. PLACE the control switch for each running fan in the unit in which the LEAD FAN SEL switch will be repositioned to STOP:
AH-1 unit AH-1 A-SB - OFF AH-1 B-SB - OFF  AH-2 unit AH-2 A-SA - RUNNING AH-2 B-SA - RUNNING  AH-3 unit AH-3 A-SA - RUNNING AH-3 B-SA - RUNNING AH-4 unit AH-4 A-SB - OFF AH-4 B-SB - OFF      Standard:
AH-1 unit AH-1 A-SB - OFF AH-1 B-SB - OFF  AH-2 unit AH-2 A-SA - RUNNING AH-2 B-SA - RUNNING  AH-3 unit AH-3 A-SA - RUNNING AH-3 B-SA - RUNNING AH-4 unit AH-4 A-SB - OFF AH-4 B-SB - OFF      Standard: Identifies that Train 'A' are in service and that both fans in AH-2 unit and AH
Identifies that Train 'A' are in service and that both fans in AH-2 unit and AH
-3 unit is operating.
-3 unit is operating.
Locates MCB controls for Containment Fan Cooler Unit AH
Locates MCB controls for Containment Fan Cooler Unit AH
-2 and takes control switch to STOP for AH
-2 and takes control switch to STOP for AH
-2 A-SA and AH
-2 A-SA and AH-2 B-S A     Comment:
-2 B-SA     Comment:
Appendix C Page 7 of 16 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 7 of 16 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 NRC Exam Simulator JPM CR f Rev. FINAL    OP-169, Section 8.8.2 Note prior to step 1.b  Performance Step: 6 For AH-1 and AH-4, OST-1095 verifies that 1A
   - Denotes Critical Steps 20 14 NRC Exam Simulator JPM CR f Rev. FINAL    OP-169, Section 8.8.2 Note prior to step 1.b  Performance Step: 6 For AH-1 and AH-4, OST-1095 verifies that 1A
-SB is selected during first and third quarters, and that 1B
-SB is selected during first and third quarters, and that 1B
-SB is selected for second and fourth quarters.
-SB is selected for second and fourth quarters.
Line 1,388: Line 1,203:
-SA is selected during first and third quarters, and that 1B
-SA is selected during first and third quarters, and that 1B
-SA is selected for second and fourth quarters.
-SA is selected for second and fourth quarters.
Standard:
Standard: Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)
Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)
Comment:      OP-169, Section 8.8.2 step 1.b Performance Step: 7 PLACE the LEAD FAN SEL switch in the desired position for the Containment Fan Cooler Unit in which the fans were just secured: -SB (1B-SB) for AH
Comment:      OP-169, Section 8.8.2 step 1.b Performance Step: 7 PLACE the LEAD FAN SEL switch in the desired position for the Containment Fan Cooler Unit in which the fans were just secured: -SB (1B-SB) for AH
-1  1A-SA (1B-SA) for AH
-1  1A-SA (1B-SA) for AH
-2  -SA (1B-SA) for AH
-2  -SA (1B-SA) for AH
-3  -SB (1B-SB) for AH
-3  -SB (1B-SB) for AH
-4    Standard:
-4    Standard: Locates MCB Lead Fan Selector switch for AH
Locates MCB Lead Fan Selector switch for AH
-2 and rotates switch to the 1B
-2 and rotates switch to the 1B
-SA position.
-SA position.
Comment:
Comment:
Appendix C Page 8 of 16 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 8 of 16 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 NRC Exam Simulator JPM CR f Rev. FINAL    OP-169, Section 8.8.2 Note prior to step 1.c Performance Step:
   - Denotes Critical Steps 20 14 NRC Exam Simulator JPM CR f Rev. FINAL    OP-169, Section 8.8.2 Note prior to step 1.c Performance Step:
8 NOTE: When shifting speed of the Containment Fan Coolers from high speed to low speed, allow at least 30 seconds for the fan to coast down before starting in low speed to minimize equipment stresses.
8 NOTE: When shifting speed of the Containment Fan Coolers from high speed to low speed, allow at least 30 seconds for the fan to coast down before starting in low speed to minimize equipment stresses.
Standard:
Standard: Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)
Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)
Comment:      OP-169, Section 8.8.2 step 1.c Performance Step:
Comment:      OP-169, Section 8.8.2 step 1.c Performance Step:
9 For the Containment Fan Cooler Unit in which the LEAD FAN SEL switch was just manipulated, PLACE the control switches for any fan that was secured in Step 8.8.2.1.a to LO
9 For the Containment Fan Cooler Unit in which the LEAD FAN SEL switch was just manipulated, PLACE the control switches for any fan that was secured in Step 8.8.2.1.a to LO
-SPD:  AH-2 unit -2 A-SA  -2 B-SA      Standard:
-SPD:  AH-2 unit -2 A-SA  -2 B-SA      Standard: Locates AH
Locates AH
-2 A-SA control switch and starts fan in LO
-2 A-SA control switch and starts fan in LO
-SPD Locates AH
-SPD Locates AH
Line 1,413: Line 1,224:
-SPD    Comment:
-SPD    Comment:
Appendix C Page 9 of 16 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 9 of 16 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 NRC Exam Simulator JPM CR f Rev. FINAL    OP-169, Section 8.8.2 Note prior to step 1.d Performance Step:
   - Denotes Critical Steps 20 14 NRC Exam Simulator JPM CR f Rev. FINAL    OP-169, Section 8.8.2 Note prior to step 1.d Performance Step:
10 NOTE: After any fan cooler is started in low speed, the fan should be allowed to come up to speed for approximately 15 seconds before shifting to fast speed. This reduces the starting current required for high speed operation.
10 NOTE: After any fan cooler is started in low speed, the fan should be allowed to come up to speed for approximately 15 seconds before shifting to fast speed. This reduces the starting current required for high speed operation.
NOTE: Step 8.8.2.1.e must be performed without delay following Step 8.8.2.1.d. The fan should not be allowed to coast down before being started in fast speed. These two steps should be performed together, one fan at a time.
NOTE: Step 8.8.2.1.e must be performed without delay following Step 8.8.2.1.d. The fan should not be allowed to coast down before being started in fast speed. These two steps should be performed together, one fan at a time.
Standard:
Standard: Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)
Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)
Comment:
Comment:
OP-169, Section 8.8.2 steps 1.d and 1.e Performance Step:
OP-169, Section 8.8.2 steps 1.d and 1.e Performance Step:
11 PLACE the control switches for any fan that was started in Step 8.8.2.1.c to STOP:
11 PLACE the control switches for any fan that was started in Step 8.8.2.1.c to STOP:
AH-2 unit -2 A-SA  -2 B-SA  PLACE the control switches for any fan that was stopped in Step 8.8.2.1.d to HI
AH-2 unit -2 A-SA  -2 B-SA  PLACE the control switches for any fan that was stopped in Step 8.8.2.1.d to HI
-SPD: AH-2 unit -2 A-SA  -2 B-SA      Standard:
-SPD: AH-2 unit -2 A-SA  -2 B-SA      Standard: Locates AH-2 unit control switches for:
Locates AH-2 unit control switches for:
AH-2 A-SA  Takes control switches to STOP then to HI
AH-2 A-SA  Takes control switches to STOP then to HI
-SPD AH-2 B-SA  Takes control switches to STOP then to HI
-SPD AH-2 B-SA  Takes control switches to STOP then to HI
-SPD      Comment:
-SPD      Comment:
Appendix C Page 10 of 16 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 10 of 16 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 NRC Exam Simulator JPM CR f Rev. FINAL    OP-169, Section 8.8.2 step 1.f Performance Step:
   - Denotes Critical Steps 20 14 NRC Exam Simulator JPM CR f Rev. FINAL    OP-169, Section 8.8.2 step 1.f Performance Step:
12 REPEAT Steps 8.8.2.1.a through 8.8.2.1.e as needed for the remaining Containment Fan Cooler Units in which there are fans running. Standard:
12 REPEAT Steps 8.8.2.1.a through 8.8.2.1.e as needed for the remaining Containment Fan Cooler Units in which there are fans running. Standard: Reads step and returns to steps 8.8.2.1.a through 8.8.2.1.e for AH-3    Comment:
Reads step and returns to steps 8.8.2.1.a through 8.8.2.1.e for AH-3    Comment:
OP-169, Section 8.8.2 step 1 Performance Step: 13 IF any fan is running in the Containment Fan Cooler Unit in which the LEAD FAN SEL switch will be repositioned, THEN PERFORM the following:
OP-169, Section 8.8.2 step 1 Performance Step: 13 IF any fan is running in the Containment Fan Cooler Unit in which the LEAD FAN SEL switch will be repositioned, THEN PERFORM the following:
: a. PLACE the control switch for each running fan in the unit in which the LEAD FAN SEL switch will be repositioned to STOP:
: a. PLACE the control switch for each running fan in the unit in which the LEAD FAN SEL switch will be repositioned to STOP:
AH-3 unit -3 A-SA - RUNNING -3 B-SA - RUNNING      Standard:
AH-3 unit -3 A-SA - RUNNING -3 B-SA - RUNNING      Standard: Identified that Train 'A' is in service and that both fans in AH
Identified that Train 'A' is in service and that both fans in AH
-2 unit and AH
-2 unit and AH
-3 unit is operating.
-3 unit is operating.
Locates MCB controls for Containment Fan Cooler Unit AH
Locates MCB controls for Containment Fan Cooler Unit AH
-3 and takes control switch to STOP for AH
-3 and takes control switch to STOP for AH
-3 A-SA and AH
-3 A-SA and AH-3 B-S A     Comment:
-3 B-SA     Comment:
Appendix C Page 11 of 16 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 11 of 16 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 NRC Exam Simulator JPM CR f Rev. FINAL OP-169, Section 8.8.2 step 1.b Performance Step: 14 PLACE the LEAD FAN SEL switch in the desired position for the Containment Fan Cooler Unit in which the fans were just secured: -SB (1B-SB) for AH
   - Denotes Critical Steps 20 14 NRC Exam Simulator JPM CR f Rev. FINAL OP-169, Section 8.8.2 step 1.b Performance Step: 14 PLACE the LEAD FAN SEL switch in the desired position for the Containment Fan Cooler Unit in which the fans were just secured: -SB (1B-SB) for AH
-1  1A-SA (1B-SA) for AH
-1  1A-SA (1B-SA) for AH
-2  1A-SA (1B-SA) for AH
-2  1A-SA (1B-SA) for AH
-3  1A-SB (1B-SB) for AH
-3  1A-SB (1B-SB) for AH
-4    Standard:
-4    Standard: Locates MCB Lead Fan Selector switch for AH
Locates MCB Lead Fan Selector switch for AH
-3 and rotates switch to the 1B
-3 and rotates switch to the 1B
-SA position.
-SA position.
Comment:      OP-169, Section 8.8.2 Note prior to step 1.c Performance Step:
Comment:      OP-169, Section 8.8.2 Note prior to step 1.c Performance Step:
15 NOTE: When shifting speed of the Containment Fan Coolers from high speed to low speed, allow at least 30 seconds for the fan to coast down before starting in low speed to minimize equipment stresses.
15 NOTE: When shifting speed of the Containment Fan Coolers from high speed to low speed, allow at least 30 seconds for the fan to coast down before starting in low speed to minimize equipment stresses.
Standard:
Standard: Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)
Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)
Comment:
Comment:
Appendix C Page 12 of 16 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 12 of 16 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 NRC Exam Simulator JPM CR f Rev. FINAL    OP-169, Section 8.8.2 step 1.c Performance Step: 1 6 For the Containment Fan Cooler Unit in which the LEAD FAN SEL switch was just manipulated, PLACE the control switches for any fan that was secured in Step 8.8.2.1.a to LO-SPD:  AH-3 unit -3 A-SA  -3 B-SA      Standard:
   - Denotes Critical Steps 20 14 NRC Exam Simulator JPM CR f Rev. FINAL    OP-169, Section 8.8.2 step 1.c Performance Step: 1 6 For the Containment Fan Cooler Unit in which the LEAD FAN SEL switch was just manipulated, PLACE the control switches for any fan that was secured in Step 8.8.2.1.a to LO-SPD:  AH-3 unit -3 A-SA  -3 B-SA      Standard: Locates AH
Locates AH
-3 A-SA control switch and starts fan in LO
-3 A-SA control switch and starts fan in LO
-SPD Locates AH
-SPD Locates AH
Line 1,463: Line 1,266:
-SPD    Comment:      OP-169, Section 8.8.2 Note prior to step 1.d  Performance Step: 1 7 NOTE: After any fan cooler is started in low speed, the fan should be allowed to come up to speed for approximately 15 seconds before shifting to fast speed. This reduces the starting current required for high speed operation.
-SPD    Comment:      OP-169, Section 8.8.2 Note prior to step 1.d  Performance Step: 1 7 NOTE: After any fan cooler is started in low speed, the fan should be allowed to come up to speed for approximately 15 seconds before shifting to fast speed. This reduces the starting current required for high speed operation.
NOTE: Step 8.8.2.1.e must be performed without delay following Step 8.8.2.1.d. The fan should not be allowed to coast down before being started in fast speed. These two steps should be performed together, one fan at a time.
NOTE: Step 8.8.2.1.e must be performed without delay following Step 8.8.2.1.d. The fan should not be allowed to coast down before being started in fast speed. These two steps should be performed together, one fan at a time.
Standard:
Standard: Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)
Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)
Comment:     
Comment:     


Appendix C Page 13 of 16 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 13 of 16 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 NRC Exam Simulator JPM CR f Rev. FINAL    OP-169, Section 8.8.2 steps 1.d and 1.e Performance Step: 1 8 PLACE the control switches for any fan that was started in Step 8.8.2.1.c to STOP:
   - Denotes Critical Steps 20 14 NRC Exam Simulator JPM CR f Rev. FINAL    OP-169, Section 8.8.2 steps 1.d and 1.e Performance Step: 1 8 PLACE the control switches for any fan that was started in Step 8.8.2.1.c to STOP:
AH-3 unit -3 A-SA  -3 B-SA  PLACE the control switches for any fan that was stopped in Step 8.8.2.1.d to HI
AH-3 unit -3 A-SA  -3 B-SA  PLACE the control switches for any fan that was stopped in Step 8.8.2.1.d to HI
-SPD: AH-3 unit -3 A-SA  -3 B-SA      Standard:
-SPD: AH-3 unit -3 A-SA  -3 B-SA      Standard: Locates AH-3 unit control switches for:
Locates AH-3 unit control switches for:
AH-3 A-SA  Takes control switches to STOP then to HI
AH-3 A-SA  Takes control switches to STOP then to HI
-SPD  AH-3 B-SA  Takes control switches to STOP then to HI
-SPD  AH-3 B-SA  Takes control switches to STOP then to HI
-SPD      Comment:      OP-169, Section 8.8.2 Note prior to step 2 Performance Step:
-SPD      Comment:      OP-169, Section 8.8.2 Note prior to step 2 Performance Step:
19 NOTE: For AH-1 and AH-4, OST-1095 verifies that 1A
1 9 NOTE: For AH-1 and AH-4, OST-1095 verifies that 1A
-SB is selected during first and third quarters, and that 1B
-SB is selected during first and third quarters, and that 1B
-SB is selected for second and fourth quarters.
-SB is selected for second and fourth quarters.
Line 1,481: Line 1,282:
-SA is selected during first and third quarters, and that 1B
-SA is selected during first and third quarters, and that 1B
-SA is selected for second and fourth quarters.
-SA is selected for second and fourth quarters.
Standard:
Standard: Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)
Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)
Comment:
Comment:
Appendix C Page 14 of 16 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 14 of 16 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 NRC Exam Simulator JPM CR f Rev. FINAL    OP-169, Section 8.8.2 step 2 Performance Step:
   - Denotes Critical Steps 20 14 NRC Exam Simulator JPM CR f Rev. FINAL    OP-169, Section 8.8.2 step 2 Performance Step:
20 IF there is no fan running in the Containment Fan Cooler Unit, THEN PLACE the LEAD FAN SEL switch in the desired position for the Containment Fan Cooler Unit:
20 IF there is no fan running in the Containment Fan Cooler Unit, THEN PLACE the LEAD FAN SEL switch in the desired position for the Containment Fan Cooler Unit:
  -SB (1B-SB) for AH
  -SB (1B-SB) for AH
Line 1,491: Line 1,291:
-2  -SA (1B-SA) for AH
-2  -SA (1B-SA) for AH
-3  -SB (1B-SB) for AH
-3  -SB (1B-SB) for AH
-4    Standard:
-4    Standard: Identifies that AH
Identifies that AH
-1 and AH-4 do not have fans running and places LEAD FAN SEL switches to 1B
-1 and AH-4 do not have fans running and places LEAD FAN SEL switches to 1B
-SB for each AH.
-SB for each AH.
Line 1,498: Line 1,297:
-SB AH-4 LEAD FAN SEL switch to 1B
-SB AH-4 LEAD FAN SEL switch to 1B
-SB    Comment:      OP-169, Section 8.8.2 step 3 Performance Step:
-SB    Comment:      OP-169, Section 8.8.2 step 3 Performance Step:
21 VERIFY that the fans selected in Steps 8.8.2.1.c and 8.8.2.2 are OPERABLE.
2 1 VERIFY that the fans selected in Steps 8.8.2.1.c and 8.8.2.2 are OPERABLE. Standard: Initials step that fans selected in Steps 8.8.2.1.c and 8.8.2.2 are OPERABLE. Evaluator Cue:
Standard:
When student identifies or states that the fans are operable CUE: I will get a second operator to complete the configuration closeout. Evaluation on this JPM is complete.
Initials step that fans selected in Steps 8.8.2.1.c and 8.8.2.2 are OPERABLE.
Evaluator Cue:
When student identifies or states that the fans are operable CUE: I will get a second operator to complete the configuration closeout.
Evaluation on this JPM is complete.
END OF JPM Inform the Simulator Operator to place Simulator in FREEZE STOP TIME:
END OF JPM Inform the Simulator Operator to place Simulator in FREEZE STOP TIME:
Simulator Operator:
Simulator Operator:
When directed by the Lead Examiner then go to Freeze.   
When directed by the Lead Examiner then go to Freeze.   


Appendix C Page 15 of 16 Form ES-C-1  VERIFICATION OF COMPLETION 2014 NRC Exam Simulator JPM CR f Rev. FINAL  Job Performance Measure No.: 2014 NRC Exam Simulator JPM CR f    Swapping Containment Fan Cooler Lead Fans OP-169, Containment Cooling and Ventilation, Section 8.
Appendix C Page 15 of 16 Form ES-C-1  VERIFICATION OF COMPLETION 20 14 NRC Exam Simulator JPM CR f Rev. FINAL  Job Performance Measure No.: 20 1 4 NRC Exam Simulator JPM CR f    Swapping Containment Fan Cooler Lead Fans OP-169 , Containment Cooling and Ventilation, Section 8.
8  Examinee's Name:
8  Examinee's Name:
Date Performed:
Date Performed:
Line 1,515: Line 1,310:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Question:
Question:   ResponseResult:  SAT  UNSAT    Examiner's Signature:
 
===Response===
Result:  SAT  UNSAT    Examiner's Signature:
Date:
Date:
Appendix C Form ES-C-1  JPM CUE SHEET 2014 NRC Exam Simulator JPM CR f Rev. FINAL  Initial Conditions:
Appendix C Form ES-C-1  JPM CUE SHEET 20 14 NRC Exam Simulator JPM CR f Rev. FINAL  Initial Conditions:
The plant is operating at 100% power
The plant is operating at 100% power
   'A' Train equipment is in service The oncoming shifts will be performing fourth quarter sequencer testing in accordance with OST
   'A' Train equipment is in service The oncoming shifts will be performing fourth quarter sequencer testing in accordance with OST
Line 1,526: Line 1,318:
-1095, Sequencer Block Circuit And Containment Fan Cooler Testing Train A (B) Quarterly Interval All Modes Initiating Cue:
-1095, Sequencer Block Circuit And Containment Fan Cooler Testing Train A (B) Quarterly Interval All Modes Initiating Cue:
The CRS is directing you to swap all of the Containment Fan Cooler Lead Fans to the 1B
The CRS is directing you to swap all of the Containment Fan Cooler Lead Fans to the 1B
-SA and 1B
-SA and 1B-SB position in accordance with  OP
-SB position in accordance with  OP
-169, Containment Cooling And Ventilation, Section 8.8  
-169, Containment Cooling And Ventilation, Section 8.8  


Appendix C Job Performance Measure Form ES-C-1  Worksheet 2014 HNP NRC Exam Simulator JPM CR g Rev. FINAL  1Facility:
Appendix C Job Performance Measure Form ES-C-1  Worksheet   2014 HNP NRC Exam Simulator JPM CR g Rev. FINAL  1Facility: Harris Nuclear Plant Task No.: 301092H401 Task Title:
Harris Nuclear Plant Task No.:
301092H401 Task Title:
Reset CVIS and Restore RM
Reset CVIS and Restore RM
-3502A to Operation JPM No.: 2014 NRC Exam Simulator JPM CR g    K/A  
-3502A to Operation JPM No.: 201 4 NRC Exam Simulator JPM CR g    K/A  


==Reference:==
==Reference:==


073 A4.02 RO 3.7 SRO 3.7 ALTERNATE PATH  
073 A4.02 RO 3.7 SRO 3.7 ALTERNATE PATH  
- NO  Examinee:
- NO  Examinee: ________________________
________________________
NRC Examiner:
NRC Examiner:
_________________
_________________
Line 1,549: Line 1,337:
Simulated Performance:
Simulated Performance:
Actual Performance:
Actual Performance:
X  Classroom Simulator X Plant    READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
X  Classroom Simulator X Plant    READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Initial Conditions:
The plant is operating at 100% power Breaker 105 opened resulting in a loss of 1A
The plant is operating at 100% power Breaker 105 opened resulting in a loss of 1A
Line 1,556: Line 1,344:
You are the BOP and the CRS has directed you to perform      AOP-025, Loss Of One Emergency AC Or One Emergency DC Bus Attachment 3  
You are the BOP and the CRS has directed you to perform      AOP-025, Loss Of One Emergency AC Or One Emergency DC Bus Attachment 3  
- Resetting CVIS and Restoring RM
- Resetting CVIS and Restoring RM
-3502A Operation You will silence all alarms and another RO will address alarms not associated with this evolution.
-3502A Operation You will silence all alarms and another RO will address alarms not associated with this evolution.
Evaluator Note:
Evaluator Note:
At this time provide the candidate a copy of AOP
At this time provide the candidate a copy of AOP
-025, Attachment 3
-025, Attachment 3


Appendix C Job Performance Measure Form ES-C-1  Worksheet 2014 HNP NRC Exam Simulator JPM CR g Rev. FINAL  Task Standard:
Appendix C Job Performance Measure Form ES-C-1  Worksheet   2014 HNP NRC Exam Simulator JPM CR g Rev. FINAL  Task Standard:
CVIS reset and RM
CVIS reset and RM
-3502A restored to operation.
-3502A restored to operation.
Line 1,570: Line 1,358:
==References:==
==References:==


AOP-025, Loss Of One Emergency AC Or One Emergency DC Bus, Revision 38  OP-118, Radiation Monitoring System, Revision 32   Handouts:
AOP-025, Loss Of One Emergency AC Or One Emergency DC Bus , Revision 38  OP-118, Radiation Monitoring System, Revision 3 2   Handouts: AOP-025, Attachment 3 OP-118, Section 6.3 Time Critical Task:
AOP-025, Attachment 3 OP-118, Section 6.3 Time Critical Task:
N/A  Validation Time:
N/A  Validation Time:
10 minutes    Critical Step Justification Step 9 Proper completion of this step restores operations to Containment Vacuum Breakers and results in exiting  Tech Spec 3.0.3 Step 10  Must open the Sample Panel valve to line up flow to the Rad Monitor. Without opening the valve the Rad Monitor will not be monitoring anything.
10 minutes    Critical Step Justification Step 9 Proper completion of this step restores operations to Containment Vacuum Breakers and results in exiting  Tech Spec 3.0.3 Step 10  Must open the Sample Panel valve to line up flow to the Rad Monitor. Without opening the valve the Rad Monitor will not be monitoring anything.
Step 11  Must depress the "flow" pushbutton to allow the Rad Monitor to obtain flow through the monitor.
Step 11  Must depress the "flow" pushbutton to allow the Rad Monitor to obtain flow through the monitor.


Appendix C Job Performance Measure Form ES-C-1  Worksheet 2014 HNP NRC Exam Simulator JPM CR g Rev. FINAL  2014 NRC Exam  
Appendix C Job Performance Measure Form ES-C-1  Worksheet   2014 HNP NRC Exam Simulator JPM CR g Rev. FINAL  2014 NRC Exam  
- SIMULATOR SETUP Simulator Operator Reset to IC
- SIMULATOR SETUP Simulator Operator Reset to IC
-171 password "spurs"    Go to RUN Silence and Acknowledge annunciators GO TO FREEZE and inform the lead examiner the Simulator is ready. DO NOT GO TO RUN until directed by the lead examiner.  (The examiner has provided to the candidate with initial conditions and the initiating cues prior to placing the simulator in RUN.)
-1 71 password "spurs"    Go to RUN Silence and Acknowledge annunciators GO TO FREEZE and inform the lead examiner the Simulator is ready. DO NOT GO TO RUN until directed by the lead examiner.  (The examiner has provided to the candidate with initial conditions and the initiating cues prior to placing the simulator in RUN.)
The following setup information is how this exam IC was developed.
The following setup information is how this exam IC was developed.
Initial Simulator IC was IC-19 Go to run  Insert a loss of 6.9KV Emergency Bus 1A
Initial Simulator IC was IC-1 9 Go to run  Insert a loss of 6.9KV Emergency Bus 1A
-SA (Normal Feed Bkr 105) imf eps05a (n 00:00:00 00:00:00) true Reduce AFW flow to minimum (recirc flow only)
-SA (Normal Feed Bkr 105) imf eps05a (n 00:00:00 00:00:00) true Reduce AFW flow to minimum (recirc flow only)
Shut 1MS-70  Shut 1AF-147, 143, 149 Allow sequencer to reach Load Block
Shut 1MS-70  Shut 1AF-147, 143, 149 Allow sequencer to reach Load Block
-9  Re-energize 480V Emergency Bus 1A1 Allow SG levels to stabilize (about 5-10 minutes)
-9  Re-energize 480V Emergency Bus 1A1 Allow SG levels to stabilize (about 5-10 minutes)
Silence, Acknowledge and Reset Annunciators
Silence , Acknowledge and Reset Annunciators


Freeze and Snap these conditions to your exam IC Appendix C Page 4 of 16 Form ES-C-1  PERFORMANCE INFORMATION
Freeze and Snap these conditions to your exam IC Appendix C Page 4 of 16 Form ES-C-1  PERFORMANCE INFORMATION
Line 1,590: Line 1,377:
When directed by the Lead Examiner place the Simulator in Run. START TIME:
When directed by the Lead Examiner place the Simulator in Run. START TIME:
Performance Step: 1 Obtain/review procedure.
Performance Step: 1 Obtain/review procedure.
Standard:
Standard: Reviews AOP-025, Loss Of One Emergency AC Bus or One Emergency DC Bus, Attachment 3 Evaluator's Cue:
Reviews AOP-025, Loss Of One Emergency AC Bus or One Emergency DC Bus, Attachment 3 Evaluator's Cue:
Provide OP
Provide OP
-118, Section 6.3 when the need is determined.
-118, Section 6.3 when the need is determined.
Line 1,599: Line 1,385:
   (1) Perform Channel Checks per OP
   (1) Perform Channel Checks per OP
-118, Radiation Monitoring System, Section 6.3.
-118, Radiation Monitoring System, Section 6.3.
Standard:
Standard: Obtain OP-118, Section 6.3 and performs channel checks Comment:
Obtain OP
-118, Section 6.3 and performs channel checks Comment:
Appendix C Page 5 of 16 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 5 of 16 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR g Rev. FINAL Evaluator Note:
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR g Rev. FINAL Evaluator Note:
Line 1,607: Line 1,391:
Performance Step: 3 Perform Channel Checks per OP
Performance Step: 3 Perform Channel Checks per OP
-118, Radiation Monitoring System, Section 6.3
-118, Radiation Monitoring System, Section 6.3
. Standard:
. Standard: At RM-11:    Selects RM 3561 A from Group 2 or Grid 2 or Grid 6  Verifies each monitor status indicates "green".
At RM-11:    Selects RM 3561 A from Group 2 or Grid 2 or Grid 6  Verifies each monitor status indicates "green".
Depresses the <HOURLY TREND> key and reviews the current value for each channel.
Depresses the <HOURLY TREND> key and reviews the current value for each channel.
After checking RM 3561 A Proceeds to check RM 3561 C Evaluator Cue:
After checking RM 3561 A Proceeds to check RM 3561 C Evaluator Cue:
Line 1,616: Line 1,399:
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR g Rev. FINAL Performance Step: 4 Perform Channel Checks per OP
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR g Rev. FINAL Performance Step: 4 Perform Channel Checks per OP
-118, Radiation Monitoring System, Section 6.3. Continued:
-118, Radiation Monitoring System, Section 6.3. Continued:
Standard:
Standard: At RM-11:    Selects RM 3561 C from Group 2 or Grid 2 or Grid 6  Verifies each monitor status indicates "green".
At RM-11:    Selects RM 3561 C from Group 2 or Grid 2 or Grid 6  Verifies each monitor status indicates "green".
Depresses the <HOURLY TREND> key and reviews the current value for each channel. After checking RM 3561 C  
Depresses the <HOURLY TREND> key and reviews the current value for each channel. After checking RM 3561 C  
- Restores RM
- Restores RM
Line 1,630: Line 1,412:
5 Perform the following to reset CVIS:
5 Perform the following to reset CVIS:
   (2) Direct Health Physics to perform HPP
   (2) Direct Health Physics to perform HPP
-780, Radiation Monitor System, Operators Manual, for the monitors affected by the loss of power RM 3561A and 3561C. Standard:
-780, Radiation Monitor System, Operators Manual, for the monitors affected by the loss of power RM 3561A and 3561C. Standard: Contacts Health Physics.
Contacts Health Physics.
Evaluator Cue:
Evaluator Cue:
Acknowledge request, (state: using time compression)
Acknowledge request, (state: using time compression)
HPP-780 checks have been completed.
HPP-780 checks have been completed.
Comment:
Comment:
Line 1,646: Line 1,427:
Momentarily place the following Containment Purge Dampers in SHUT:    Normal Purge Inlet/Discharge 1CP
Momentarily place the following Containment Purge Dampers in SHUT:    Normal Purge Inlet/Discharge 1CP
-9 & 5    Normal Purge Inlet/Discharge 1CP
-9 & 5    Normal Purge Inlet/Discharge 1CP
-6 & 3    Standard:
-6 & 3    Standard: Momentarily selects each of the following to SHUT:
Momentarily selects each of the following to SHUT:
Switch for 1CP
Switch for 1CP
-9 and 1CP
-9 and 1CP-5 (Already Shut
-5 (Already Shut
- Green Light On/Red Light off)
- Green Light On/Red Light off)
Switch for 1CP
Switch for 1CP
-6 and 1CP
-6 and 1CP-3 (Already Shut
-3 (Already Shut
- Green Light On/Red Light off)    Comment:      AOP-025, Attachment 3 Step 1.
- Green Light On/Red Light off)    Comment:      AOP-025, Attachment 3 Step 1.
c  Performance Step:
c  Performance Step:
Line 1,660: Line 1,438:
Momentarily place Normal Purge Supply Fan (AH
Momentarily place Normal Purge Supply Fan (AH
-82A and AH-82B) control switches to STOP.
-82A and AH-82B) control switches to STOP.
Standard:
Standard: Momentarily place each of the following control switches to STOP:    AH-82A (Already STOPPED - Green Light on/Red Light off)    AH-82B (Already STOPPED - - Green Light on/Red Light off)    Comment:
Momentarily place each of the following control switches to STOP:    AH-82A (Already STOPPED - Green Light on/Red Light off)    AH-82B (Already STOPPED - - Green Light on/Red Light off)    Comment:
Appendix C Page 8 of 16 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 8 of 16 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR g Rev. FINAL AOP-025, Attachment 3, Note prior to Step 1.d Performance Step:
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR g Rev. FINAL AOP-025, Attachment 3, Note prior to Step 1.d Performance Step:
8 The following step will restore Containment Vacuum Breakers and result in exiting Tech Spec 3.0.3.
8 The following step will restore Containment Vacuum Breakers and result in exiting Tech Spec 3.0.3.
Standard:
Standard: Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)
Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)
Informs CRS of Tech Spec 3.0.3 exit point Evaluator Cue:
Informs CRS of Tech Spec 3.0.3 exit point Evaluator Cue:
Acknowledge report.
Acknowledge report.
Comment:      AOP-025, Attachment 3 Step 1.d Performance Step:
Comment:      AOP-025, Attachment 3 Step 1.d Performance Step:
9 Perform the following to reset CVIS:
9 Perform the following to reset CVIS:
Reset CVIS using both CNMT Ventilation Isol Train A (B) Switch    Standard:
Reset CVIS using both CNMT Ventilation Isol Train A (B) Switch    Standard: Resets both CVIS trains using the respective switches
Resets both CVIS trains using the respective switches
. Comment: There is no definitive indication to verify that CVIS has been reset Appendix C Page 9 of 16 Form ES-C-1  PERFORMANCE INFORMATION
. Comment: There is no definitive indication to verify that CVIS has been reset Appendix C Page 9 of 16 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR g Rev. FINAL AOP-025, Attachment 3, Step 2.a Performance Step:
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR g Rev. FINAL AOP-025, Attachment 3, Step 2.a Performance Step:
Line 1,679: Line 1,454:
1SP-16 and 1SP
1SP-16 and 1SP
-939    1SP-916 and 1 SP
-939    1SP-916 and 1 SP
-918      Standard:
-918      Standard: Locates MCB switches on AEP
Locates MCB switches on AEP
-1    1SP-16 and 1SP
-1    1SP-16 and 1SP
-939 (already open  
-939 (already open  
Line 1,688: Line 1,462:
-918 to Open - critical element. Green Lights out and Red Lights On.
-918 to Open - critical element. Green Lights out and Red Lights On.
Comment:    AOP-025, Attachment 3, Step 2.b Performance Step: 1 1 Start the RM 3502A sample pump by depressing the FLOW pushbutton on RM 3502A.
Comment:    AOP-025, Attachment 3, Step 2.b Performance Step: 1 1 Start the RM 3502A sample pump by depressing the FLOW pushbutton on RM 3502A.
Standard:
Standard: Locates RM-3502A FLOW pushbutton on Panel - Radiation Monitor Control and Display Unit 1 Train A Bay 2 and depresses the FLOW push button on monitor display RC
Locates RM-3502A FLOW pushbutton on Panel  
- Radiation Monitor Control and Display Unit 1 Train A Bay 2 and depresses the FLOW push button on monitor display RC
-1LT-3502A-SA CNMT LEAK DET SYS then verifies that the push button is illuminated.
-1LT-3502A-SA CNMT LEAK DET SYS then verifies that the push button is illuminated.
  (critical element)  Reports to CRS AOP
  (critical element)  Reports to CRS AOP
Line 1,722: Line 1,494:
Facility Evaluator:
Facility Evaluator:
Number of Attempts:
Number of Attempts:
Time to Complete:
Time to Complete:   Question Documentation:
Question Documentation:
Question:   Response:
Question:
 
===Response===
 
Result:  SAT  UNSAT    Examiner's Signature:
Result:  SAT  UNSAT    Examiner's Signature:
Date:
Date:
Line 1,736: Line 1,504:
You are the BOP and the CRS has directed you to perform      AOP-025, Loss Of One Emergency AC Or One Emergency DC Bus Attachment 3  
You are the BOP and the CRS has directed you to perform      AOP-025, Loss Of One Emergency AC Or One Emergency DC Bus Attachment 3  
- Resetting CVIS and Restoring RM
- Resetting CVIS and Restoring RM
-3502A Operation You will silence all alarms and another RO will address alarms not associated with this evolution
-3502A Operation You will silence all alarms and another RO will address alarms not associated with this evolution
.
.
Appendix C Page 1 of 15 Form ES-C-1  Worksheet 2014 HNP NRC Exam Simulator JPM CR h Rev. FINAL Facility:
Appendix C Page 1 of 15 Form ES-C-1  Worksheet   2014 HNP NRC Exam Simulator JPM CR h Rev. FINAL Facility: Harris Nuclear Plant Task No.: 088018H101 Task Title:
Harris Nuclear Plant Task No.:
Restoring the Control Room Area HVAC System to Normal After a Control Room Isolation Signal JPM No.: 201 4 NRC Exam Simulator JPM CR h    K/A  
088018H101 Task Title:
Restoring the Control Room Area HVAC System to Normal After a Control Room Isolation Signal JPM No.: 2014 NRC Exam Simulator JPM CR h    K/A  


==Reference:==
==Reference:==


APE067 AA1.05 RO 3.0 SRO 3.1  ALTERNATE PATH  
APE067 AA1.05 RO 3.0 SRO 3.1  ALTERNATE PATH  
- YES    Examinee:
- YES    Examinee: ________________________
________________________
NRC Examiner:
NRC Examiner:
_________________
_________________
Line 1,755: Line 1,520:
Simulated Performance:
Simulated Performance:
Actual Performance:
Actual Performance:
X  Classroom Simulator X Plant    READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
X  Classroom Simulator X Plant    READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Initial Conditions:
The unit is operating at 100% power when a fire occurred at the Emergency Shutdown Diesel Generator during testing.
The unit is operating at 100% power when a fire occurred at the Emergency Shutdown Diesel Generator during testing.
Line 1,764: Line 1,529:
You are the BOP.
You are the BOP.
The CRS has directed you to restore the Control Room Area HVAC System to normal in accordance with OP
The CRS has directed you to restore the Control Room Area HVAC System to normal in accordance with OP
-173, Control Room Area HVAC System, Section 8.4
-173 , Control Room Area HVAC System, Section 8.4
. The initial conditions are satisfied and the HVAC system is in operation per section 8.1 of  OP-173.   
. The initial conditions are satisfied and the HVAC system is in operation per section 8.1 of  OP-173.   


Appendix C Page 2 of 15 Form ES-C-1  Worksheet 2014 HNP NRC Exam Simulator JPM CR h Rev. FINAL Task Standard:
Appendix C Page 2 of 15 Form ES-C-1  Worksheet   2014 HNP NRC Exam Simulator JPM CR h Rev. FINAL Task Standard:
Place the Control Room Area HVAC system in normal operation Required Materials:
Place the Control Room Area HVAC system in normal operation Required Materials:
Replacement copy of OP
Replacement copy of OP
-173, Control Room Area HVAC System, Rev. 34 for each JPM performed General  
-173 , Control Room Area HVAC System, Rev. 34 for each JPM performed General  


==References:==
==References:==


OP-173, Control Room Area HVAC System, Rev. 34, ALB-030-6-4, Rev. 34  Time Critical Task:
OP-173, Control Room Area HVAC System, Rev. 3 4, ALB-030-6-4, Rev. 34  Time Critical Task:
No  Validation Time:
No  Validation Time:
15 minutes      CRITICAL STEP JUSTIFICATION Step 4  Must reset both trains of Control Room ventilation or the system cannot be taken out of the Emergency filtration lineup.
1 5 minutes      CRITICAL STEP JUSTIFICATION Step 4  Must reset both trains of Control Room ventilation or the system cannot be taken out of the Emergency filtration lineup.
Step 7  Must open the normal intake valves to return system lineup to normal flow path for operation.
Step 7  Must open the normal intake valves to return system lineup to normal flow path for operation.
Step 10  Must start a normal exhaust fan to obtain flow and obtain correct damper alignment.
Step 10  Must start a normal exhaust fan to obtain flow and obtain correct damper alignment.
Line 1,784: Line 1,549:
-establish Main Control Room ventilation.
-establish Main Control Room ventilation.


Appendix C Page 3 of 15 Form ES-C-1  Worksheet 2014 HNP NRC Exam Simulator JPM CR h Rev. FINAL 2014 NRC Exam - SIMULATOR SETUP Simulator Operator Reset to IC
Appendix C Page 3 of 15 Form ES-C-1  Worksheet   2014 HNP NRC Exam Simulator JPM CR h Rev. FINAL 201 4 NRC Exam - SIMULATOR SETUP Simulator Operator Reset to IC
-172   Password "spurs" Go to RUN Ensure RM
-1 72   Password "spurs" Go to RUN Ensure RM-11 is NORMAL Silence and Acknowledge annunciators GO TO FREEZE and inform the lead examiner the Simulator is ready. DO NOT GO TO RUN until directed by the lead examiner.  (The examiner has provided to the candidate with initial conditions and the initiating cues prior to placing the simulator in RUN.)
-11 is NORMAL Silence and Acknowledge annunciators GO TO FREEZE and inform the lead examiner the Simulator is ready. DO NOT GO TO RUN until directed by the lead examiner.  (The examiner has provided to the candidate with initial conditions and the initiating cues prior to placing the simulator in RUN.)
To recreate the IC setup for this JPM:
To recreate the IC setup for this JPM:
Initial Simulator IC was IC go to RUN Enter a Control Room Isolation Signal (CRIS) (the JPM has the signal in due to smoke but there isn't a relay that can be individually used so use the one for Radiation) o irf rms011 (n 00:00:00 00:00:00) 0.0005 00:00:00 o irf rms013 (n 00:00:00 00:00:00) 0.0005 00:00:00 After the fans and dampers have completed switching positions reset the rad monitors to 1e
Initial Simulator IC was IC go to RUN Enter a Control Room Isolation Signal (CRIS) (the JPM has the signal in due to smoke but there isn't a relay that can be individually used so use the one for Radiation) o irf rms011 (n 00:00:00 00:00:00) 0.000 5 00:00:00 o irf rms013 (n 00:00:00 00:00:00) 0.0005 00:00:00 After the fans and dampers have completed switching positions reset the rad monitors to 1e
-7 or they will not clear (value is  
-7 or they will not clear (value is  
< the alarm setpoint on RM
< the alarm setpoint on RM
Line 1,800: Line 1,564:
  - Find Annuciator ALB
  - Find Annuciator ALB
-030-6-4 assign Trigger 1 to alarm on o ior xn30d06 (1 00:00:00 00:00:00) ALARM_ON
-030-6-4 assign Trigger 1 to alarm on o ior xn30d06 (1 00:00:00 00:00:00) ALARM_ON
  - Go to triggers o Click on Trigger 1 o Click on 'Assign File' o Choose CZD61Shut o (source file should now have CZD61Shut
  - Go to triggers o Click on Trigger 1 o Click on 'Assign File' o Choose CZD61Shut o (source file should now have CZD61Shut)  Silence, Acknowledge and Reset the annunciators Freeze and Snap and save these conditions to your exam IC Appendix C Page 4 of 15 Form ES-C-1  PERFORMANCE INFORMATION
)  Silence, Acknowledge and Reset the annunciators Freeze and Snap and save these conditions to your exam IC Appendix C Page 4 of 15 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR h Rev. FINAL Simulator Operator:
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR h Rev. FINAL Simulator Operator:
When directed by the Lead Examiner go to Run
When directed by the Lead Examiner go to Run
. START TIME:
. START TIME:
Performance Step: 1 Previews procedure Standard:
Performance Step: 1 Previews procedure     Standard: OP-173 and refers to Section 8.4 IF asked by candidate Evaluator Cue:
OP-173 and refers to Section 8.4 IF asked by candidate Evaluator Cue:
Initial Conditions have been satisfied Control Room Area HVAC System in operation per    Section 8.1, 8.2 or 8.3 Comment:        OP-173, Section 8.4 Note prior to Step 1 Performance Step: 2 NOTE: The following Step will cause ALB
Initial Conditions have been satisfied Control Room Area HVAC System in operation per    Section 8.1, 8.2 or 8.3 Comment:        OP-173, Section 8.4 Note prior to Step 1 Performance Step: 2 NOTE: The following Step will cause ALB
-030/1-1, Control Room Isolation Train A, and ALB-030/2-1, Control Room Isolation Train B, to clear Standard:
-030/1-1, Control Room Isolation Train A, and ALB-030/2-1, Control Room Isolation Train B, to clear Standard: Operator reads and placekeeps any note or caution (initials, checks or circle/slash)
Operator reads and placekeeps any note or caution (initials, checks or circle/slash)
Comment:
Comment:
Appendix C Page 5 of 15 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 5 of 15 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR h Rev. FINAL OP-173, Section 8.4 Caution prior to Step 1 Performance Step: 3 CAUTION: Failure of equipment to secure in this section will result in the associated EDG being inoperable. Tech Spec 3.8.1.1 is applicable until the breaker for the affected load is opened. Standard:
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR h Rev. FINAL OP-173, Section 8.4 Caution prior to Step 1 Performance Step: 3 CAUTION: Failure of equipment to secure in this section will result in the associated EDG being inoperable. Tech Spec 3.8.1.1 is applicable until the breaker for the affected load is opened. Standard: Operator reads and placekeeps any note or caution (initials, checks or circle/slash)
Operator reads and placekeeps any note or caution (initials, checks or circle/slash)
Comment:
Comment:
OP-173, Section 8.4 Step 1 Performance Step:
OP-173, Section 8.4 Step 1 Performance Step:
4 PLACE the CONTROL ROOM ISOL TRAIN A and B RESET switches to RESET. CONTROL ROOM ISOL TRAIN A RESET CONTROL ROOM ISOL TRAIN B RESET Standard:
4 PLACE the CONTROL ROOM ISOL TRAIN A and B RESET switches to RESET. CONTROL ROOM ISOL TRAIN A RESET CONTROL ROOM ISOL TRAIN B RESET Standard: Locates and momentarily operates the Control Room Isol Train A reset switch to reset and the Train B reset switch to reset (ALB-030/1-1 and ALB-030/2-1 alarms clears. Operator resets alarm using reset button on MCB and reports to CRS.
Locates and momentarily operates the Control Room Isol Train A reset switch to reset and the Train B reset switch to reset (ALB-030/1-1 and ALB
-030/2-1 alarms clears. Operator resets alarm using reset button on MCB and reports to CRS.
Comment:
Comment:
Appendix C Page 6 of 15 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 6 of 15 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR h Rev. FINAL OP-173, Section 8.4, Step 2 Performance Step:
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR h Rev. FINAL OP-173, Section 8.4, Step 2 Performance Step:
5 Shut any of the following EMER FILT SOUTH (NORTH) OUTSIDE AIR INLET valves that are open, EMER FILT SOUTH OUTSIDE AIR INLET 1CZ-9 SA  EMER FILT SOUTH OUTSIDE AIR INLET 1CZ-10 SB  EMER FILT NORTH OUTSIDE AIR INLET 1CZ-11 SA  EMER FILT NORTH OUTSIDE AIR INLET 1CZ-12 SB    Standard:
5 Shut any of the following EMER FILT SOUTH (NORTH) OUTSIDE AIR INLET valves that are open, EMER FILT SOUTH OUTSIDE AIR INLET 1CZ-9 SA  EMER FILT SOUTH OUTSIDE AIR INLET 1CZ-10 SB  EMER FILT NORTH OUTSIDE AIR INLET 1CZ-11 SA  EMER FILT NORTH OUTSIDE AIR INLET 1CZ-12 SB    Standard: Locates valves and verifies ALL outside air inlets are closed.  (Position indication lights are all green.)
Locates valves and verifies ALL outside air inlets are closed.  (Position indication lights are all green.)
Comment:      OP-173, Section 8.4, Note prior to Step 3 Performance Step:
Comment:      OP-173, Section 8.4, Note prior to Step 3 Performance Step:
6 NOTE:  Performing steps 8.4.2.3 through 8.4.2.6 quickly will minimize excessive pressurization of the Main Control Room Standard:
6 NOTE:  Performing steps 8.4.2.3 through 8.4.2.6 quickly will minimize excessive pressurization of the Main Control Room Standard: Operator reads and placekeeps any note or caution (initials, checks or circle/slash)
Operator reads and placekeeps any note or caution (initials, checks or circle/slash)
. Comment:      OP-173, Section 8.4, Step 3 Performance Step:
. Comment:      OP-173, Section 8.4, Step 3 Performance Step:
7 OPEN the following Control Normal Outside Air Intake Valves:
7 OPEN the following Control Normal Outside Air Intake Valves:
NORMAL INTAKE 1CZ-1 SA      NORMAL INTAKE 1CZ-2 SB    Standard:
NORMAL INTAKE 1CZ-1 SA      NORMAL INTAKE 1CZ-2 SB    Standard: Locates and Opens NORMAL INTAKES 1CZ-1 SA and 1CZ
Locates and Opens NORMAL INTAKES 1CZ-1 SA and 1CZ
-2 SB (Green Light goes off and Red Light comes on)     Comment:
-2 SB (Green Light goes off and Red Light comes on)
Comment:
Appendix C Page 7 of 15 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 7 of 15 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR h Rev. FINAL OP-173, Section 8.4, Step 4 Performance Step:
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR h Rev. FINAL OP-173, Section 8.4, Step 4 Performance Step:
8 If more than one NORMAL SUPPLY FAN AH
8 If more than one NORMAL SUPPLY FAN AH
-15 ASA (BSB) is running, stop one fan
-15 ASA (BSB) is running, stop one fan
. Standard:
. Standard: Identifies ONLY one NORMAL SUPPLY FAN is running (AH
Identifies ONLY one NORMAL SUPPLY FAN is running (AH
-15 ASA) and there is no need to stop a fan Comment:
-15 ASA) and there is no need to stop a fan Comment:
OP-173, Section 8.4, Step 5  Performance Step: 9 Verify associated valves/dampers align for the stopped train as follows:
OP-173, Section 8.4, Step 5  Performance Step: 9 Verify associated valves/dampers align for the stopped train as follows:   AH-15 IN CZ-D1 (CZ-D2) Shut (indication) on SLB
AH-15 IN CZ-D1 (CZ-D2) Shut (indication) on SLB
-5 (6) AH-15 IN CZ-25 (CZ-26)  Shut (indication) on SLB
-5 (6) AH-15 IN CZ-25 (CZ-26)  Shut (indication) on SLB
-5 (6) CONT ROM NORMAL RECIRC DAMPER CZ-D69 SA (CZ
-5 (6) CONT ROM NORMAL RECIRC DAMPER CZ-D69 SA (CZ
-D70 SB)
-D70 SB)
Shut      Standard:
Shut      Standard: Locates and verifies the associated valves/dampers align ed for the stopped train.
Locates and verifies the associated valves/dampers align ed for the stopped train.
AH-15 IN CZ-D1 (CZ-D2) Shut (indication) on SLB
AH-15 IN CZ-D1 (CZ-D2) Shut (indication) on SLB
-5 (6)  AH-15 IN CZ-25 (CZ-26)  Shut (indication) on SLB
-5 (6)  AH-15 IN CZ-25 (CZ-26)  Shut (indication) on SLB
Line 1,855: Line 1,606:
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR h Rev. FINAL OP-173, Section 8.4, Step 6  Performance Step:
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR h Rev. FINAL OP-173, Section 8.4, Step 6  Performance Step:
10 Start NORMAL EXHAUST FAN E
10 Start NORMAL EXHAUST FAN E
-9 A (B)      Standard:
-9 A (B)      Standard: Takes Normal Exhaust Fan E
Takes Normal Exhaust Fan E
-9 A fan switch to start, confirms RED light is lit Comment:      OP-173, Section 8.4, Step 7  Performance Step: 1 1 Verify the following valves/dampers are aligned as indicated:
-9 A fan switch to start, confirms RED light is lit Comment:      OP-173, Section 8.4, Step 7  Performance Step: 1 1 Verify the following valves/dampers are aligned as indicated:
E-9A(B) IN CZ
E-9A(B) IN CZ
Line 1,863: Line 1,613:
-D12 (CZ-13)    Modulates              (located on SLB
-D12 (CZ-13)    Modulates              (located on SLB
-7)  NORMAL EXHAUST                  1CZ-3 SA and 1CZ
-7)  NORMAL EXHAUST                  1CZ-3 SA and 1CZ
-4 SB    Open      Standard:
-4 SB    Open      Standard: Verifies:    E-9A IN CZ-D6    Open  (located on SLB
Verifies:    E-9A IN CZ-D6    Open  (located on SLB
-7)  E-9A OUT CZ-D12    Modulates (located on SLB
-7)  E-9A OUT CZ
-D12    Modulates (located on SLB
-7)  NORMAL EXHAUST        1CZ-3 SA and 1CZ-4 SB    Open        Comment:
-7)  NORMAL EXHAUST        1CZ-3 SA and 1CZ-4 SB    Open        Comment:
Appendix C Page 9 of 15 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 9 of 15 Form ES-C-1  PERFORMANCE INFORMATION
Line 1,875: Line 1,623:
-21 (CZ-22)      Shut [located on SLB
-21 (CZ-22)      Shut [located on SLB
-5 (6)]  EMERGENCY FILTRATION DISCHARGE 1CZ-19 SA and 1CZ
-5 (6)]  EMERGENCY FILTRATION DISCHARGE 1CZ-19 SA and 1CZ
-20 SB  Shut    Standard:
-20 SB  Shut    Standard: Locates and stops both EMERGENCY FILTRATION FANS      R-2 A-SA and R-2 B-SB (critical to stop fans
Locates and stops both EMERGENCY FILTRATION FANS      R-2 A-SA and R-2 B-SB (critical to stop fans
) and verifies:
) and verifies:
R2 INLET CZ
R2 INLET CZ
Line 1,886: Line 1,633:
Appendix C Page 10 of 15 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 10 of 15 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR h Rev. FINAL NOTE: Alternate Path Starts Here Lead Examiner and Simulator Operator:
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR h Rev. FINAL NOTE: Alternate Path Starts Here Lead Examiner and Simulator Operator:
When the candidate shuts CZ-D61 SB a conditional trigger will trip the running Control Room Emergency Supply Fan breaker (AH-15 ASA breaker 1A36-SA-5A )    OP-173, Section 8.4, Step 11  Performance Step: 1 3 Shut the EMERGENCY FILTRATION RECIRC dampers EMERGENCY FILTRATION RECIRC DAMPER CZ-D66 SA    and  EMERGENCY FILTRATION RECIRC DAMPER CZ-D61 SB    Standard:
When the candidate shuts CZ-D61 SB a conditional trigger will trip the running Control Room Emergency Supply Fan breaker (AH-15 ASA breaker 1A36-SA-5A )    OP-173, Section 8.4, Step 11  Performance Step: 1 3 Shut the EMERGENCY FILTRATION RECIRC dampers EMERGENCY FILTRATION RECIRC DAMPER CZ-D66 SA    and  EMERGENCY FILTRATION RECIRC DAMPER CZ-D61 SB    Standard: Locates the control switches and SHUTS the EMERGENCY FILTRATION RECIRC dampers CZ-D66 SA (Green Light On) and CZ-D61 SB (supply breaker 1A36
Locates the control switches and SHUTS the EMERGENCY FILTRATION RECIRC dampers CZ-D66 SA (Green Light On) and CZ-D61 SB (supply breaker 1A36
-SA-5A trips)Green light On Comment:      Supply breaker 1A36-SA-5A for AH-15 ASA trips open  Performance Step: 14 Annunciator ALB
-SA-5A trips)Green light On Comment:      Supply breaker 1A36-SA-5A for AH
-030-6-4, CONT ROOM HVAC NORMAL SUPPLY FANS AH-15 LOW FLOW-O/L    Standard: Acknowledges alarm and identifies that AH
-15 ASA trips open  Performance Step: 14 Annunciator ALB
-030-6-4, CONT ROOM HVAC NORMAL SUPPLY FANS AH-15 LOW FLOW-O/L    Standard:
Acknowledges alarm and identifies that AH
-15A SA has lost green indication on MCB and reports information to CRS.
-15A SA has lost green indication on MCB and reports information to CRS.
Pulls APP and reviews response for alarm Evaluator Cue: The CRS acknowledges the report. If the candidate identifies the AH
Pulls APP and reviews response for alarm Evaluator Cue: The CRS acknowledges the report. If the candidate identifies the AH
Line 1,905: Line 1,649:
-SA-5A or 1B36-SB-3A. (3) DISPATCH an operator to check for tripped breaker on 1A36-SA-5A or 1B36
-SA-5A or 1B36-SB-3A. (3) DISPATCH an operator to check for tripped breaker on 1A36-SA-5A or 1B36
-SB-3A. c. CHECK damper alignment on MCB for CZ
-SB-3A. c. CHECK damper alignment on MCB for CZ
-D1SA-1, CZ-D2SB-1, CZ-25 and CZ
-D1SA-1, CZ-D2SB-1, CZ-25 and CZ-26. d. IF alb-030-6-3 is ALARMING, THEN REFER TO    ALB-030-6-3    Standard: Identifies that AH
-26. d. IF alb-030-6-3 is ALARMING, THEN REFER TO    ALB-030-6-3    Standard:
Identifies that AH
-15 ASA has tripped and the white fan trouble light is NOT lit Start the standby fan:
-15 ASA has tripped and the white fan trouble light is NOT lit Start the standby fan:
o Obtains a copy of OP-173 section 5.1, Control Room Area HVAC and starts the standby fan Comment:
o Obtains a copy of OP-173 section 5.1, Control Room Area HVAC and starts the standby fan Comment:
Line 1,916: Line 1,658:
Section 5.1.1 Initial Conditions
Section 5.1.1 Initial Conditions
: 1. Attachment 1 is complete
: 1. Attachment 1 is complete
: 2. Attachment 2 is complete Standard:
: 2. Attachment 2 is complete Standard: Reviews initial conditions of Attachment 1 and Attachment 2 for completeness Lead Evaluator Cue:
Reviews initial conditions of Attachment 1 and Attachment 2 for completeness Lead Evaluator Cue:
Using time compression the Initial Conditions are met
Using time compression the Initial Conditions are met
. Standard:
. Standard: Initials section 5.1.1 step 1 and 2 for initial conditions complete Comment:      OP-173, Section 5.1.2, Notes prior to step 1 Performance Step: 17 NOTE: The following Steps align Train A Control Room Area HVAC components to service. Train B nomenclature is in parenthesis.
Initials section 5.1.1 step 1 and 2 for initial conditions complete Comment:      OP-173, Section 5.1.2, Notes prior to step 1 Performance Step: 17 NOTE: The following Steps align Train A Control Room Area HVAC components to service. Train B nomenclature is in parenthesis.
NOTE: If Swapping Control Room Ventilation Fans, it is preferable to secure the running fan first, then start the desired fans with this section.
NOTE: If Swapping Control Room Ventilation Fans, it is preferable to secure the running fan first, then start the desired fans with this section.
Standard:
Standard: Operator reads and placekeeps any note or caution (initials, checks or circle/slash)
Operator reads and placekeeps any note or caution (initials, checks or circle/slash)
Comment:
Comment:
Appendix C Page 13 of 15 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 13 of 15 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR h Rev. FINAL OP-173, Section 5.1.2, step 1 Performance Step: 18 START the NORMAL SUPPLY FAN AH
   - Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR h Rev. FINAL OP-173, Section 5.1.2, step 1 Performance Step: 18 START the NORMAL SUPPLY FAN AH
-15 BSB    Standard:
-15 BSB    Standard: Locates MCB switch for AH
Locates MCB switch for AH
-15 BSB and takes switch to start Comment:    OP-173, Section 5.1.2, step 2 Performance Step: 19 VERIFY that the following components are aligned properly:
-15 BSB and takes switch to start Comment:    OP-173, Section 5.1.2, step 2 Performance Step: 19 VERIFY that the following components are aligned properly:
AH-15 IN CZ-D2 -------------..Open SLB
AH-15 IN CZ-D2 -------------..Open SLB
Line 1,937: Line 1,675:
-D70 SB- Open NORMAL EXHAUST FAN E
-D70 SB- Open NORMAL EXHAUST FAN E
-9B--------.. Running E-9B IN CZ-D7 --------------.Open SLB
-9B--------.. Running E-9B IN CZ-D7 --------------.Open SLB
-7 E-9B OUT CZ
-7 E-9B OUT CZ-D13 ----------.Modulates SLB
-D13 ----------.Modulates SLB
-7 NORMAL EXHAUST 1CZ
-7 NORMAL EXHAUST 1CZ
-3 SA and 1CZ
-3 SA and 1CZ
-4 SB ---..Open Standard:
-4 SB ---..Open     Standard: VERIFIES that the following components are aligned properly: AH-15 IN CZ-D2 -------------..Open SLB-6 AH-15 DISCH CZ ----------..Open SLB-6 NORMAL INTAKE 1CZ
VERIFIES that the following components are aligned properly:
AH-15 IN CZ-D2 -------------..Open SLB-6 AH-15 DISCH CZ ----------..Open SLB-6 NORMAL INTAKE 1CZ
-1 SA and 1CZ
-1 SA and 1CZ
-2 SB----.. .Open CONT RM NORMAL RECIRC DAMPER CZ-D70 SB- Open NORMAL EXHAUST FAN E
-2 SB----.. .Open CONT RM NORMAL RECIRC DAMPER CZ-D70 SB- Open NORMAL EXHAUST FAN E
-9B--------..
-9B--------..
Running E-9B IN CZ-D7 --------------.Open SLB-7 E-9B OUT CZ
Running E-9B IN CZ-D7 --------------.Open SLB-7 E-9B OUT CZ-D13 ----------.Modulates SLB
-D13 ----------.Modulates SLB
-7 NORMAL EXHAUST 1CZ
-7 NORMAL EXHAUST 1CZ
-3 SA and 1CZ
-3 SA and 1CZ
Line 1,962: Line 1,696:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Question:
Question:   ResponseResult:  SAT  UNSAT    Examiner's Signature:
 
===Response===
Result:  SAT  UNSAT    Examiner's Signature:
Date:
Date:
Appendix C Form ES-C-1  JPM CUE SHEET 2014 HNP NRC Exam Simulator JPM CR h Rev. FINAL Initial Conditions:
Appendix C Form ES-C-1  JPM CUE SHEET 2014 HNP NRC Exam Simulator JPM CR h Rev. FINAL Initial Conditions:
Line 1,978: Line 1,709:
-173 "Control Room Area HVAC System", Section 8.4
-173 "Control Room Area HVAC System", Section 8.4
. The initial conditions are satisfied and the HVAC system is in operation per section 8.1 of  OP-173.
. The initial conditions are satisfied and the HVAC system is in operation per section 8.1 of  OP-173.
Appendix C Job Performance Measure Form ES-C-1  Worksheet 2014 HNP NRC Exam In-Plant JPM i Rev. FINAL Facility:
Appendix C Job Performance Measure Form ES-C-1  Worksheet   20 14 HNP NRC Exam In-Plant JPM i Rev. FINAL Facility: Harris Nuclear Plant Task No.: 063007H104 Task Title:
Harris Nuclear Plant Task No.:
Shift Battery Chargers JPM No.: 201 4 NRC Exam In-Plant JPM i    K/A  
063007H104 Task Title:
Shift Battery Chargers JPM No.: 2014 NRC Exam In-Plant JPM i    K/A  


==Reference:==
==Reference:==


063 G2.1.30 RO 4.4 SRO 4.0 Examinee:
063 G2.1.30 RO 4.4 SRO 4.0 Examinee: ________________________
________________________
NRC Examiner:  _________________
NRC Examiner:  _________________
Facility Evaluator:
Facility Evaluator:
Line 1,994: Line 1,722:
Simulated Performance:
Simulated Performance:
X  Actual Performance:
X  Actual Performance:
Classroom Simulator Plant X  READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Classroom Simulator   Plant X  READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Initial Conditions:
The plant is operating at 100% power 1A-SA BATTERY CHARGER is scheduled for maintenance this shift.
The plant is operating at 100% power 1A-SA BATTERY CHARGER is scheduled for maintenance this shift.
Line 2,001: Line 1,729:
-SA BATTERY CHARGER to 1B-SA BATTERY CHARGER in accordance with OP-156.01, DC Electrical Distribution, Section 8.3
-SA BATTERY CHARGER to 1B-SA BATTERY CHARGER in accordance with OP-156.01, DC Electrical Distribution, Section 8.3
.
.
Evaluator
Evaluator: At this time provide the student a copy of OP
: At this time provide the student a copy of OP
-156.01,      Section 8.3
-156.01,      Section 8.3
.
.
Appendix C Job Performance Measure Form ES-C-1  Worksheet 2014 HNP NRC Exam In-Plant JPM i Rev. FINAL Task Standard:
Appendix C Job Performance Measure Form ES-C-1  Worksheet   20 14 HNP NRC Exam In-Plant JPM i Rev. FINAL Task Standard:
1B-SA BATTERY CHARGER in SERVICE; 1A
1B-SA BATTERY CHARGER in SERVICE; 1A
-SA BATTERY CHARGER secured.
-SA BATTERY CHARGER secured.
Line 2,013: Line 1,740:
==References:==
==References:==


OP-156.01, DC Electrical Distribution, Revision 36  Handouts:
OP-156.01, DC Electrical Distribution, Revision 36  Handouts: OP-156.01 Section 8.3, Rotation of Train A Battery Chargers Pages 1-6, and 46-50, Rev 36  Time Critical Task:
OP-156.01 Section 8.3, Rotation of Train A Battery Chargers Pages 1-6, and 46
-50, Rev 36  Time Critical Task:
N/A  Validation Time:
N/A  Validation Time:
20 minutes Appendix C Job Performance Measure Form ES-C-1  Worksheet 2014 HNP NRC Exam In-Plant JPM i Rev. FINAL SIMULATOR SETUP N/A  This is an In
20 minutes Appendix C Job Performance Measure Form ES-C-1  Worksheet   20 14 HNP NRC Exam In-Plant JPM i Rev. FINAL SIMULATOR SETUP N/A  This is an In
-Plant JPM  
-Plant JPM  


Line 2,024: Line 1,749:
Step 5  Must place DC Output breaker to ON to obtain output power.
Step 5  Must place DC Output breaker to ON to obtain output power.
Step 8  Must place AC input breaker to the ON position to obtain input power.
Step 8  Must place AC input breaker to the ON position to obtain input power.
Step 17 Must select OFF for the AC input breaker to secure AC input power.
Step 1 7 Must select OFF for the AC input breaker to secure AC input power.
Step 18 Must select OFF for the DC output breaker to secure DC output power.
Step 1 8 Must select OFF for the DC output breaker to secure DC output power.
Step 19 Must place DP
Step 1 9 Must place DP
-1A-SA-30 to OFF to complete the lineup to secure the charger.
-1A-SA-30 to OFF to complete the lineup to secure the charger.
Appendix C Page 4 of 16 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 4 of 16 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 HNP NRC Exam In-Plant JPM i Rev. FINA L BEFORE YOU START THIS JPM INPLANT JPM SAFETY CONSIDERATIONS
   - Denotes Critical Steps 20 14 HNP NRC Exam In-Plant JPM i Rev. FINA L BEFORE YOU START THIS JPM INPLANT JPM SAFETY CONSIDERATIONS
:  CAUTION: EQUIPMENT MAY AUTO START OR MAY BE ENERGIZED  
:  CAUTION: EQUIPMENT MAY AUTO START OR MAY BE ENERGIZED  
       - SIMULATE ONLY
       - SIMULATE ONLY
Line 2,038: Line 1,763:
NOTE: Add one minute for Take a Minute Core 4 checks.
NOTE: Add one minute for Take a Minute Core 4 checks.
START TIME:
START TIME:
OP-156.01, DC Electrical Distribution Section 8.3, Rotation of Train A Battery Chargers Performance Step: 1 Previews task contained in procedure    Standard:
OP-156.01, DC Electrical Distribution Section 8.3, Rotation of Train A Battery Chargers Performance Step: 1 Previews task contained in procedure    Standard: Reviews OP
Reviews OP
-156.01, Section 8.3 Comment:      OP-156.01 Step 8.3.1 Initial Condition Performance Step: 2 Initial Condition:
-156.01, Section 8.3 Comment:      OP-156.01 Step 8.3.1 Initial Condition Performance Step: 2 Initial Condition:
A Train Battery Charger is in operation per Section 5.3.
A Train Battery Charger is in operation per Section 5.3.
Standard:
Standard: Initial Conditions met based on JPM Initial Conditions or observation of A Train Battery Charger in operation
Initial Conditions met based on JPM Initial Conditions or observation of A Train Battery Charger in operation
. Comment:
. Comment:
Appendix C Page 5 of 16 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 5 of 16 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 HNP NRC Exam In-Plant JPM i Rev. FINA L  OP-156.01 Step 8.3.
   - Denotes Critical Steps 20 14 HNP NRC Exam In-Plant JPM i Rev. FINA L  OP-156.01 Step 8.3.2 NOTES prior to step 1 Procedure Note:
2 NOTES prior to step 1 Procedure Note:
The following Steps describe placing Battery Charger 1B
The following Steps describe placing Battery Charger 1B
-SA in operation and removing Battery Charger 1A
-SA in operation and removing Battery Charger 1A
Line 2,053: Line 1,775:
-SA in operation and removing Battery Charger 1B
-SA in operation and removing Battery Charger 1B
-SA from operation is in parenthesis.
-SA from operation is in parenthesis.
Amperage and voltage should be monitored before and after rotation of Battery Chargers to detect any potential problems.
Amperage and voltage should be monitored before and after rotation of Battery Chargers to detect any potential problems. It is recommended that Safety Related Battery Charger rotations occur Monday through Friday day shift, to provide reasonable assurance of Electrical support if problems occur. Standard: Operator reads and placekeeps any note or caution (initials, checks or circle/slash at each bulleted item to indicate read and understood)
It is recommended that Safety Related Battery Charger rotations occur Monday through Friday day shift, to provide reasonable assurance of Electrical support if problems occur. Standard:
Operator reads and placekeeps any note or caution (initials, checks or circle/slash at each bulleted item to indicate read and understood)
Comment:      OP-156.01 Step 8.3.2 step 1 Performance Step: 3 At Battery Charger 1B
Comment:      OP-156.01 Step 8.3.2 step 1 Performance Step: 3 At Battery Charger 1B
-SA, VERIFY the following switch lineup:
-SA, VERIFY the following switch lineup:
SWITCH  POSITION AC INPUT OFF DC OUTPUT OFF NORMAL/EQUALIZE NORMAL    Standard:
SWITCH  POSITION AC INPUT OFF DC OUTPUT OFF NORMAL/EQUALIZE NORMAL    Standard: At Battery Charger 1B (1A)
At Battery Charger 1B (1A)
-SA locates the following switches and verifies position of each:
-SA locates the following switches and verifies position of each:
Examiners Cue:
Examiners Cue:
SWITCH  VERIFIED POSITION AC INPUT OFF DC OUTPUT OFF NORMAL/EQUALIZE  NORMAL    Comment:   
SWITCH  VERIFIED POSITION AC INPUT OFF DC OUTPUT OFF NORMAL/EQUALIZE  NORMAL    Comment:   


Appendix C Page 6 of 16 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 6 of 16 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 HNP NRC Exam In-Plant JPM i Rev. FINA L  Step 8.3.2 NOTE prior to step 2  Procedure Note:
   - Denotes Critical Steps 20 14 HNP NRC Exam In-Plant JPM i Rev. FINA L  Step 8.3.2 NOTE prior to step 2  Procedure Note:
A momentary ground may exist when the DC breakers are closed. If a ground is received the associated DC Bus Trouble alarm will be received on ALB
A momentary ground may exist when the DC breakers are closed. If a ground is received the associated DC Bus Trouble alarm will be received on ALB
-015. Standard:
-015. Standard: Operator reads and placekeeps any note or caution (initials, checks or circle/slash)
Operator reads and placekeeps any note or caution (initials, checks or circle/slash)
Comment:    Step 8.3.2 step 2    Performance Step: 4 PLACE DP-1A-SA-31, Battery Charger 1B
Comment:    Step 8.3.2 step 2    Performance Step: 4 PLACE DP-1A-SA-31, Battery Charger 1B
-SA, to ON.
-SA, to ON.
Standard:
Standard: Places DP-1A-SA Circuit 31 to the ON position Examiners Cue:
Places DP-1A-SA Circuit 31 to the ON position Examiners Cue:
DP-1A-SA Circuit 31 is ON.
DP-1A-SA Circuit 31 is ON.
Comment:      Step 8.3.2 step 3  Performance Step: 5 At Battery Charger 1B
Comment:      Step 8.3.2 step 3  Performance Step: 5 At Battery Charger 1B
-SA, PLACE the DC Output Breaker to ON. Standard:
-SA, PLACE the DC Output Breaker to ON. Standard: Places 1B-SA BATTERY CHARGER DC OUTPUT BREAKER to the ON position.
Places 1B-SA BATTERY CHARGER DC OUTPUT BREAKER to the ON position.
Examiners Cue:
Examiners Cue:
1B-SA BATTERY CHARGER DC OUTPUT BREAKER is in the ON position.
1B-SA BATTERY CHARGER DC OUTPUT BREAKER is in the ON position.
Comment:
Comment:
Appendix C Page 7 of 16 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 7 of 16 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 HNP NRC Exam In-Plant JPM i Rev. FINA L  Step 8.3.2 Notes Prior to step 4  Performance Step: 6 NOTE: To prevent an inadvertent High Voltage trip, the output filters should be allowed to charge for a minimum of 30 seconds before closing the AC Input Breaker. The AC Input and Feeder Breaker may trip if the filter capacitors are not fully charged when the AC Input Breaker is closed.
   - Denotes Critical Steps 20 14 HNP NRC Exam In-Plant JPM i Rev. FINA L  Step 8.3.2 Notes Prior to step 4  Performance Step: 6 NOTE: To prevent an inadvertent High Voltage trip, the output filters should be allowed to charge for a minimum of 30 seconds before closing the AC Input Breaker. The AC Input and Feeder Breaker may trip if the filter capacitors are not fully charged when the AC Input Breaker is closed.
NOTE: A Low DC Volt alarm is normal during the time required to charge the output rectifiers. This alarm should clear before closing the AC input breaker, or a High Voltage trip could occur. Failure of the Low DC Volt alarm to clear could indicate the DC Output breaker tripped after manually shutting. The DC Output breaker may not indicate its tripped condition.
NOTE: A Low DC Volt alarm is normal during the time required to charge the output rectifiers. This alarm should clear before closing the AC input breaker, or a High Voltage trip could occur. Failure of the Low DC Volt alarm to clear could indicate the DC Output breaker tripped after manually shutting. The DC Output breaker may not indicate its tripped condition.
NOTE: Steadily decreasing voltage is indicative of an internal fault in the battery charger being placed in service. If this is observed, the battery charger should NOT be placed on line until the cause is found and corrected.
NOTE: Steadily decreasing voltage is indicative of an internal fault in the battery charger being placed in service. If this is observed, the battery charger should NOT be placed on line until the cause is found and corrected.
Standard:
Standard: Operator reads and placekeeps any note or caution (initials, checks or circle/slash)
Operator reads and placekeeps any note or caution (initials, checks or circle/slash)
Comment:      Step 8.3.2 step 4  Performance Step:
Comment:      Step 8.3.2 step 4  Performance Step:
7 MONITOR Battery Charger 1B
7 MONITOR Battery Charger 1B
-SA Voltmeter:
-SA Voltmeter:
: a. IF voltage indicates a steady decrease, THEN PERFORM the following:
: a. IF voltage indicates a steady decrease, THEN PERFORM the following:
Standard:
Standard: Verifies 1B
Verifies 1B
-SA BATTERY CHARGER voltmeter is not steadily decreasing
-SA BATTERY CHARGER voltmeter is not steadily decreasing
. Examiners Cue:
. Examiners Cue:
Voltage is stable at 134V DC on 1B
Voltage is stable at 134V DC on 1B
-SA BATTERY CHARGER voltmeter
-SA BATTERY CHARGER voltmeter. Comment:      Standard: N/A's step 4.a (1), (2), (3), and (4)
. Comment:      Standard:
N/A's step 4.a (1), (2), (3), and (4)


Appendix C Page 8 of 16 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 8 of 16 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 HNP NRC Exam In-Plant JPM i Rev. FINA L  Step 8.3.2 step 4.b  Performance Step:
   - Denotes Critical Steps 20 14 HNP NRC Exam In-Plant JPM i Rev. FINA L  Step 8.3.2 step 4.b  Performance Step:
8 After 30 seconds, with Battery Charger 1B
8 After 30 seconds, with Battery Charger 1B
-SA Voltmeter stabilized between 132 and 135 VDC, PLACE AC Input Breaker to ON. Standard:
-SA Voltmeter stabilized between 132 and 135 VDC, PLACE AC Input Breaker to ON. Standard: Verifies 1B
Verifies 1B
-SA BATTERY CHARGER voltmeter stabilizes between 132 and 135 VDC
-SA BATTERY CHARGER voltmeter stabilizes between 132 and 135 VDC
. Ensures 30 seconds have passed since placing the DC output breaker ON.
. Ensures 30 seconds have passed since placing the DC output breaker ON.
Line 2,112: Line 1,823:
The AC INPUT BREAKER is in the ON position Comment:
The AC INPUT BREAKER is in the ON position Comment:
Appendix C Page 9 of 16 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 9 of 16 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 HNP NRC Exam In-Plant JPM i Rev. FINA L  Step 8.3.2 step 5  Performance Step:
   - Denotes Critical Steps 20 14 HNP NRC Exam In-Plant JPM i Rev. FINA L  Step 8.3.2 step 5  Performance Step:
9 VERIFY proper operation of Battery Charger 1B
9 VERIFY proper operation of Battery Charger 1B
-SA by observing the following:
-SA by observing the following:
PARAMETER CONDITION DC VOLTAGE 132 to 135 VDC DC AMPERES 0 to 150 Amps AC POWER ON light ON HIGH DC VOLTS light OFF LOW DC VOLTS light OFF PHASE FAILURE light OFF    Standard:
PARAMETER CONDITION DC VOLTAGE 132 to 135 VDC DC AMPERES 0 to 150 Amps AC POWER ON light O N HIGH DC VOLTS light OFF LOW DC VOLTS light OFF PHASE FAILURE light OFF    Standard: Locates indication for each listed parameter on 1B
Locates indication for each listed parameter on 1B
-SA BATTERY CHARGER. Examiners Cue:
-SA BATTERY CHARGER. Examiners Cue:
As each parameter is located:
As each parameter is located:
PARAMETER CONDITION DC VOLTAGE 134 VDC DC AMPERAGE 15 Amps AC POWER ON light ON HIGH DC VOLT light OFF LOW DC VOLT light OFF PHASE FAILURE light OFF    Comment:
PARAMETER CONDITION DC VOLTAGE 134 VDC DC AMPERAGE 15 Amps AC POWER ON light ON HIGH DC VOLT light OFF LOW DC VOLT light OFF PHASE FAILURE light OFF    Comment:
Appendix C Page 10 of 16 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 10 of 16 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 HNP NRC Exam In-Plant JPM i Rev. FINA L  Step 8.3.2 step 6.a  Performance Step:
   - Denotes Critical Steps 20 14 HNP NRC Exam In-Plant JPM i Rev. FINA L  Step 8.3.2 step 6.a  Performance Step:
10 PERFORM a ground test of Battery Charger 1B
10 PERFORM a ground test of Battery Charger 1B
-SA as follows:
-SA as follows:
: a. NOTIFY the Control Room that a 125 VDC EMERG BUS A TROUBLE annunciator will alarm.
: a. NOTIFY the Control Room that a 125 VDC EMERG BUS A TROUBLE annunciator will alarm.
Standard:
Standard: Notifies Control Room that a 125
Notifies Control Room that a 125
-V DC EMERG BUS A TROUBLE annunciator will alarm.
-V DC EMERG BUS A TROUBLE annunciator will alarm.
Examiners Cue:
Examiners Cue:
Line 2,132: Line 1,841:
Comment:      Step 8.3.2 step 6.b, c    Performance Step: 1 1 b. DEPRESS the POS Ground Test Pushbutton.
Comment:      Step 8.3.2 step 6.b, c    Performance Step: 1 1 b. DEPRESS the POS Ground Test Pushbutton.
: c. VERIFY a positive deflection exists on the bus ground voltmeter.
: c. VERIFY a positive deflection exists on the bus ground voltmeter.
Standard:
Standard: Depresses POS Ground Test Pushbutton and holds while observing each listed indication
Depresses POS Ground Test Pushbutton and holds while observing each listed indication
. Examiners Cue: The POS Ground Test pushbutton is depressed
. Examiners Cue: The POS Ground Test pushbutton is depressed
. As each indication is pointed out:
. As each indication is pointed out:
Line 2,140: Line 1,848:
Comment:
Comment:
Appendix C Page 11 of 16 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 11 of 16 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 HNP NRC Exam In-Plant JPM i Rev. FINA L  Step 8.3.2 Note prior to step 6.d Performance Step: 1 2 PERFORM a ground test of Battery Charger 1B
   - Denotes Critical Steps 20 14 HNP NRC Exam In-Plant JPM i Rev. FINA L  Step 8.3.2 Note prior to step 6.d Performance Step: 1 2 PERFORM a ground test of Battery Charger 1B-SA as follows:
-SA as follows:
NOTE: If a ground exists, the White GROUND light will be lit. Standard: Operator reads and placekeeps any note or caution (initials, checks or circle/slash)
NOTE: If a ground exists, the White GROUND light will be lit. Standard:
Operator reads and placekeeps any note or caution (initials, checks or circle/slash)
Comment:      Step 8.3.2 step 6.d, and e Performance Step
Comment:      Step 8.3.2 step 6.d, and e Performance Step
: 13 d. VERIFY the White GROUND light is off.
: 1 3 d. VERIFY the White GROUND light is off.
: e. RELEASE the POS Ground Test Pushbutton.
: e. RELEASE the POS Ground Test Pushbutton.
Standard:
Standard: Verifies the white ground light is off and releases the POS ground test pushbutton Examiners Cue:
Verifies the white ground light is off and releases the POS ground test pushbutton Examiners Cue:
The White Ground Light is extinguished.
The White Ground Light is extinguished.
The POS Ground Test Pushbutton is released
The POS Ground Test Pushbutton is released
Line 2,154: Line 1,859:


Appendix C Page 12 of 16 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 12 of 16 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 HNP NRC Exam In-Plant JPM i Rev. FINA L  Step 8.3.2 step 6.f, g, h, and i Performance Step: 1 4 PERFORM a ground test of Battery Charger 1B (1A)
   - Denotes Critical Steps 20 14 HNP NRC Exam In-Plant JPM i Rev. FINA L  Step 8.3.2 step 6.f, g, h, and i Performance Step: 1 4 PERFORM a ground test of Battery Charger 1B (1A)
-SA as follows: f. DEPRESS the NEG Ground Test Pushbutton.
-SA as follows: f. DEPRESS the NEG Ground Test Pushbutton.
: g. VERIFY a negative deflection exists on the bus ground voltmeter.
: g. VERIFY a negative deflection exists on the bus ground voltmeter.
: h. VERIFY the White GROUND light is off.
: h. VERIFY the White GROUND light is off.
: i. RELEASE the NEG Ground Test Pushbutton.
: i. RELEASE the NEG Ground Test Pushbutton.
Standard:
Standard: Depresses the NEG Ground Test Pushbutton and holds while observing each listed indication
Depresses the NEG Ground Test Pushbutton and holds while observing each listed indication
. Examiners Cue:
. Examiners Cue:
The NEG Ground Test pushbutton is depressed
The NEG Ground Test pushbutton is depressed
Line 2,169: Line 1,873:
The NEG Ground Test Pushbutton is released
The NEG Ground Test Pushbutton is released
. Comment:      Step 8.3.2 Note prior to step 7  Performance Step: 1 5 Note: Steps 7 and 8 will deenergize the previously operating battery charger.
. Comment:      Step 8.3.2 Note prior to step 7  Performance Step: 1 5 Note: Steps 7 and 8 will deenergize the previously operating battery charger.
Standard:
Standard: Operator reads and placekeeps any note or caution (initials, checks or circle/slash)
Operator reads and placekeeps any note or caution (initials, checks or circle/slash)
Comment:
Comment:
Appendix C Page 13 of 16 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 13 of 16 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 HNP NRC Exam In-Plant JPM i Rev. FINA L  Step 8.3.2 step 7
   - Denotes Critical Steps 20 14 HNP NRC Exam In-Plant JPM i Rev. FINA L  Step 8.3.2 step 7.a  Performance Step: 1 6 At Battery Charger 1A
.a  Performance Step: 1 6 At Battery Charger 1A
-SA, PLACE the following breaker to OFF:
-SA, PLACE the following breaker to OFF:
: a. AC Input Breaker Standard:
: a. AC Input Breaker Standard: Selects the AC Input Breaker to the OFF position. Examiners Cue:
Selects the AC Input Breaker to the OFF position.
Examiners Cue:
The AC Input Breaker is in the OFF position.
The AC Input Breaker is in the OFF position.
Comment:      Step 8.3.2 step 7.b  Performance Step: 1 7 b. DC Output Breaker Standard:
Comment:      Step 8.3.2 step 7.b  Performance Step: 1 7 b. DC Output Breaker Standard: Selects the DC Output Breaker to the OFF position. Examiners Cue:
Selects the DC Output Breaker to the OFF position.
The D C Output Breaker is in the OFF position.
Examiners Cue:
The DC Output Breaker is in the OFF position.
Comment:      Step 8.3.2 step 8  Performance Step: 1 8 PLACE DP-1A-SA-30, Battery Charger 1A
Comment:      Step 8.3.2 step 8  Performance Step: 1 8 PLACE DP-1A-SA-30, Battery Charger 1A
-SA, to OFF.
-SA, to OFF.
Standard:
Standard: Places DP-1A-SA Circuit 30 in the OFF position. Examiners Cue:
Places DP-1A-SA Circuit 30 in the OFF position.
Examiners Cue:
The DP-1A-SA Circuit 30 is in the OFF position
The DP-1A-SA Circuit 30 is in the OFF position
. Comment:
. Comment:
Appendix C Page 14 of 16 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 14 of 16 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 HNP NRC Exam In-Plant JPM i Rev. FINA L  Step 8.3.2 Note prior to step 9  Performance Step:
   - Denotes Critical Steps 20 14 HNP NRC Exam In-Plant JPM i Rev. FINA L  Step 8.3.2 Note prior to step 9  Performance Step:
19 NOTE:  Steadily decreasing voltage is indicative of an internal fault in the battery charger being placed in service. If this is observed, the battery charger should NOT remain on line until the cause is found and corrected. The now off
19 NOTE:  Steadily decreasing voltage is indicative of an internal fault in the battery charger being placed in service. If this is observed, the battery charger should NOT remain on line until the cause is found and corrected. The now off
-line charger can be placed back in service until Maintenance has investigated.
-line charger can be placed back in service until Maintenance has investigated.
Standard:
Standard: Operator reads and placekeeps any note or caution (initials, checks or circle/slash)
Operator reads and placekeeps any note or caution (initials, checks or circle/slash)
Comment:      Step 8.3.2 step 9  Performance Step:
Comment:      Step 8.3.2 step 9  Performance Step:
20 At Battery Charger 1B
2 0 At Battery Charger 1B
-SA, VERIFY the NO CHARGE light is off and voltage is 132 to 135 VDC.
-SA, VERIFY the NO CHARGE light is off and voltage is 132 to 135 VDC.
Standard:
Standard: Verifies NO CHARGE light is OFF. Verifies voltage 132 to 135V DC. Examiners Cue:
Verifies NO CHARGE light is OFF. Verifies voltage 132 to 135V DC. Examiners Cue:
The NO CHARGE light is OFF.
The NO CHARGE light is OFF.
Voltage is 134 VDC
Voltage is 134 VDC
Line 2,208: Line 1,902:
STOP TIME:
STOP TIME:


Appendix C Page 15 of 16 Form ES-C-1  VERIFICATION OF COMPLETION 2014 HNP NRC Exam In-Plant JPM i Rev. FINAL Job Performance Measure No.:
Appendix C Page 15 of 16 Form ES-C-1  VERIFICATION OF COMPLETION 20 14 HNP NRC Exam In-Plant JPM i Rev. FINAL Job Performance Measure No.:
2014 NRC Exam In
2014 NRC Exam In
-Plant JPM i OP-156.01, DC Electrical Distribution Examinee's Name:
-Plant JPM i OP-156.01, DC Electrical Distribution Examinee's Name:
Line 2,215: Line 1,909:
Number of Attempts:
Number of Attempts:
Time to Complete:
Time to Complete:
Question Documentatio n:  Question:
Question Documentatio n:  Question:   ResponseResult:  SAT  UNSAT    Examiner's Signature:
 
===Response===
Result:  SAT  UNSAT    Examiner's Signature:
Date:
Date:
Appendix C Form ES-C-1  JPM CUE SHEET 2014 HNP NRC Exam In-Plant JPM i Rev. FINAL BEFORE YOU START THIS JPM INPLANT JPM SAFETY CONSIDERATIONS
Appendix C Form ES-C-1  JPM CUE SHEET 20 14 HNP NRC Exam In-Plant JPM i Rev. FINAL BEFORE YOU START THIS JPM INPLANT JPM SAFETY CONSIDERATIONS
:  CAUTION: EQUIPMENT MAY AUTO START OR MAYBE ENERGIZED  
:  CAUTION: EQUIPMENT MAY AUTO START OR MAYBE ENERGIZED  
       - SIMULATE ONLY
       - SIMULATE ONLY
Line 2,233: Line 1,924:
-156.01, DC Electrical Distribution, Section 8.3
-156.01, DC Electrical Distribution, Section 8.3
.
.
Appendix C Job Performance Measure Form ES-C-1  Worksheet 2014 HNP NRC Exam In-Plant JPM j Rev. FINAL Facility:
Appendix C Job Performance Measure Form ES-C-1  Worksheet   20 14 HNP NRC Exam In-Plant JPM j Rev. FINAL Facility: Harris Nuclear Plant Task No.: 3010 13H401     Task Title:
Harris Nuclear Plant Task No.:
Isolate the ECCS Accumulators After a Control Room Evacuation JPM No.: 201 4 NRC Exam In-Plant JPM j    K/A  
301013H401     Task Title:
Isolate the ECCS Accumulators After a Control Room Evacuation JPM No.: 2014 NRC Exam In-Plant JPM j    K/A  


==Reference:==
==Reference:==


APE068 G2.1.30 RO 4.4 SRO 4.0 Examinee:
APE068 G2.1.30 RO 4.4 SRO 4.0 Examinee: ________________________
________________________
NRC Examiner:
NRC Examiner:
_________________
_________________
Line 2,250: Line 1,938:
Simulated Performance:
Simulated Performance:
X  Actual Performance:
X  Actual Performance:
Classroom Simulator Plant X  READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Classroom Simulator Plant X  READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Initial Conditions:
The control room has been evacuated due to a fire.
The control room has been evacuated due to a fire.
Line 2,260: Line 1,948:
- Isolate SI Accumulators.
- Isolate SI Accumulators.


Evaluator
Evaluator: At this time provide the student a copy of AOP
: At this time provide the student a copy of AOP
-004, step 31, pages 37 and 38
-004, step 31, pages 37 and 38
.
.
Appendix C Job Performance Measure Form ES-C-1  Worksheet 2014 HNP NRC Exam In-Plant JPM j Rev. FINAL Task Standard:
Appendix C Job Performance Measure Form ES-C-1  Worksheet   20 14 HNP NRC Exam In-Plant JPM j Rev. FINAL Task Standard:
All accumulators isolated and MOV's de
All accumulators isolated and MOV's de
-energized
-energized. Required Materials:
. Required Materials:
Standard PPE Provide the evaluator with a key for ATP Cabinet. Discuss with CRS allowing applicants to reset local alarm caused by opening ATP Cabinet door.
Standard PPE Provide the evaluator with a key for ATP Cabinet. Discuss with CRS allowing applicants to reset local alarm caused by opening ATP Cabinet door.
General  
General  
Line 2,273: Line 1,959:
==References:==
==References:==


AOP-004, Remote Shutdown, REV 65  Handout: AOP-004, Step 3 1 (Pgs. 37 and 38
AOP-004, Remote Shutdown, REV 65  Handout: AOP-004, Step 3 1 (Pgs. 37 and 38)  Time Critical Task:
)  Time Critical Task:
NO  Validation Time:
NO  Validation Time:
20 minutes Appendix C Job Performance Measure Form ES-C-1  Worksheet 2014 HNP NRC Exam In-Plant JPM j Rev. FINAL SIMULATOR SETUP N/A  This is an In
20 minutes Appendix C Job Performance Measure Form ES-C-1  Worksheet   20 14 HNP NRC Exam In-Plant JPM j Rev. FINAL SIMULATOR SETUP N/A  This is an In
-Plant JPM  
-Plant JPM  


Line 2,285: Line 1,970:


Appendix C Page 4 of 11 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 4 of 11 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 HNP NRC Exam In-Plant JPM j Rev. FINAL  BEFORE YOU START THIS JPM INPLANT JPM SAFETY CONSIDERATIONS
   - Denotes Critical Steps 20 14 HNP NRC Exam In-Plant JPM j Rev. FINAL  BEFORE YOU START THIS JPM INPLANT JPM SAFETY CONSIDERATIONS
:  CAUTION: EQUIPMENT MAY AUTO START OR MAY BE ENERGIZED  
:  CAUTION: EQUIPMENT MAY AUTO START OR MAY BE ENERGIZED  
       - SIMULATE ONLY
       - SIMULATE ONLY
Line 2,295: Line 1,980:


AOP-004  Performance Step:
AOP-004  Performance Step:
1 Obtain locked valve and ATP Cabinet keys.      Standard:
1 Obtain locked valve and ATP Cabinet key s.      Standard: Discusses how to obtain key s (ACP Room Key Locker)
Discusses how to obtain key s (ACP Room Key Locker)
. Evaluator Note:
. Evaluator Note:
The Evaluator can elect to have the applicant locate the ACP Room Key Locker or to discuss the key acquisition
The Evaluator can elect to have the applicant locate the ACP Room Key Locker or to discuss the key acquisition
Line 2,307: Line 1,991:


Appendix C Page 5 of 11 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 5 of 11 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 HNP NRC Exam In-Plant JPM j Rev. FINAL  Evaluator Note:
   - Denotes Critical Steps 20 14 HNP NRC Exam In-Plant JPM j Rev. FINAL  Evaluator Note:
Performance Step 2 or 3 can be performed in any order.
Performance Step 2 or 3 can be performed in any order.
Evaluator Note:
Evaluator Note:
Line 2,313: Line 1,997:
-SA    AOP-004, Step 31.a Performance Step: 2 WHEN RCS pressure is 900 to 1000 psig, as indicated on        PI-402.2, THEN ISOLATE SI accumulators:
-SA    AOP-004, Step 31.a Performance Step: 2 WHEN RCS pressure is 900 to 1000 psig, as indicated on        PI-402.2, THEN ISOLATE SI accumulators:
286' RAB / RO with locked valve key
286' RAB / RO with locked valve key
: a. UNLOCK AND TURN ON accumulator discharge valve breakers:
: a. UNLOCK AND TURN ON accumulator discharge valve breakers: Accumulator A: 1A21
Accumulator A: 1A21
-SA-5C (both breakers)  Accumulator C: 1A21
-SA-5C (both breakers)  Accumulator C: 1A21
-SA-3D (both breakers)
-SA-3D (both breakers)
Standard:
Standard: Locates MCC 1A21-SA breaker 5C, UNLOCK s then places  both breakers for Accumulator A in ON position. Locates MCC 1A21-SA breaker 3D , UNLOCKs then places  both breakers for Accumulator C in ON position.
Locates MCC 1A21-SA breaker 5C, UNLOCKs then places  both breakers for Accumulator A in ON position
. Locates MCC 1A21-SA breaker 3D, UNLOCKs then places  both breakers for Accumulator C in ON position.
Evaluator Cue:
Evaluator Cue:
Red light is on for each breaker, when breaker is placed to ON position.
Red light is on for each breaker, when breaker is placed to ON position.
Comment:
Comment:
Appendix C Page 6 of 11 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 6 of 11 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 HNP NRC Exam In-Plant JPM j Rev. FINAL  AOP-004, 31.a (continued)
   - Denotes Critical Steps 20 14 HNP NRC Exam In-Plant JPM j Rev. FINAL  AOP-004, 31.a (continued)
Performance Step: 3 WHEN RCS pressure is 900 to 1000 psig, as indicated on        PI-402.2, THEN ISOLATE SI accumulators:
Performance Step: 3 WHEN RCS pressure is 900 to 1000 psig, as indicated on        PI-402.2, THEN ISOLATE SI accumulators:
286' RAB / RO with locked valve key
286' RAB / RO with locked valve key
: a. UNLOCK AND TURN ON accumulator discharge valve breakers:
: a. UNLOCK AND TURN ON accumulator discharge valve breakers: Accumulator B: 1B21
Accumulator B: 1B21
-SB-5C (both breakers)    Standard: Locates MCC 1B21-SB breaker 5C , UNLOCKs then places  both breakers for Accumulator B in ON position.
-SB-5C (both breakers)    Standard:
Locates MCC 1B21-SB breaker 5C, UNLOCKs then places  both breakers for Accumulator B in ON position.
Evaluator Cue:
Evaluator Cue:
Red light is on, when breaker is placed to ON position.
Red light is on, when breaker is placed to ON position.
Comment:
Comment:
Appendix C Page 7 of 11 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 7 of 11 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 HNP NRC Exam In-Plant JPM j Rev. FINAL  Evaluator Note: Performance Step 4 or 5 can be performed in any order.
   - Denotes Critical Steps 20 14 HNP NRC Exam In-Plant JPM j Rev. FINAL  Evaluator Note: Performance Step 4 or 5 can be performed in any order.
Opening the ATP door in performance Step 4 or 5, actuates an alarm in the control room.
Opening the ATP door in performance Step 4 or 5, actuates an alarm in the control room.
Accumulators A and C discharge valve controls are located in the same Aux Transfer Panel AOP-004, Step 31
Accumulators A and C discharge valve controls are located in the same Aux Transfer Panel AOP-004, Step 31.b  Performance Step: 4 SHUT SI accumulator discharge valves at the Auxiliary Transfer Panels listed:
.b  Performance Step: 4 SHUT SI accumulator discharge valves at the Auxiliary Transfer Panels listed:
Cable Vault A / RO with ATP cabinet key 1SI-246, Accumulator A Discharge (at ATP A)
Cable Vault A / RO with ATP cabinet key 1SI-246, Accumulator A Discharge (at ATP A)
Cable Vault A / RO with ATP cabinet key 1SI-248, Accumulator C Discharge (at ATP A)
Cable Vault A / RO with ATP cabinet key 1SI-248, Accumulator C Discharge (at ATP A)
Standard:
Standard: Locates and opens ATP "A" and places 1SI-246 control switch in the SHUT position.
Locates and opens ATP "A" and places 1SI-246 control switch in the SHUT position.
Locates and opens ATP "A" and places 1SI
Locates and opens ATP "A" and places 1SI
-248 control switch in the SHUT position.
-248 control switch in the SHUT position.
Line 2,350: Line 2,027:
Performance Step: 5 SHUT SI accumulator discharge valves at the Auxiliary Transfer Panels listed:
Performance Step: 5 SHUT SI accumulator discharge valves at the Auxiliary Transfer Panels listed:
Cable Vault B / RO with ATP cabinet key 1SI-247, Accumulator B Discharge (at ATP B)
Cable Vault B / RO with ATP cabinet key 1SI-247, Accumulator B Discharge (at ATP B)
Standard:
Standard: Locates and opens ATP "B" and places 1SI
Locates and opens ATP "B" and places 1SI
-247 control switch in the SHUT position.
-247 control switch in the SHUT position.
Evaluator Cue:
Evaluator Cue:
Provide feedback on valve position.
Provide feedback on valve position. (Single Green light lit)
(Single Green light lit)
Comment:
Comment:
Appendix C Page 8 of 11 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 8 of 11 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 HNP NRC Exam In-Plant JPM j Rev. FINAL  Evaluator Note:
   - Denotes Critical Steps 20 14 HNP NRC Exam In-Plant JPM j Rev. FINAL  Evaluator Note:
Performance Step 6 or 7 can be performed in any order.
Performance Step 6 or 7 can be performed in any order.
AOP-004, Step 3 1.c  Performance Step: 6 286' RAB / RO with locked valve key TURN OFF AND LOCK accumulator discharge valve breakers:
AOP-004, Step 3 1.c  Performance Step: 6 286' RAB / RO with locked valve key TURN OFF AND LOCK accumulator discharge valve breakers: Accumulator A: 1A21
Accumulator A: 1A21
-SA-5C (both breakers)
-SA-5C (both breakers)
Accumulator C: 1A21
Accumulator C: 1A21
-SA-3D (both breakers)
-SA-3D (both breakers)
Standard:
Standard: Returns to 1A21-SA-5C , places both breakers to OFF position then LOCK s both breakers for Accumulator A.
Returns to 1A21-SA-5C, places both breakers to OFF position then LOCK s both breakers for Accumulator A.
Returns to 1A21-SA-3D , places both breakers to OFF position then LOCKs both breakers for Accumulator C. Evaluator Cue:
Returns to 1A21-SA-3D, places both breakers to OFF position then LOCKs both breakers for Accumulator C. Evaluator Cue:
Provide feedback on breaker position.
Provide feedback on breaker position.
Lights will now indicate that the valves are SHUT, however operating the breakers will have no effect on the lights.
Lights will now indicate that the valves are SHUT, however operating the breakers will have no effect on the lights.
Comment:
Comment:
Appendix C Page 9 of 11 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 9 of 11 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 HNP NRC Exam In-Plant JPM j Rev. FINAL  AOP-004, Step 3 1.c (continued)
   - Denotes Critical Steps 20 14 HNP NRC Exam In-Plant JPM j Rev. FINAL  AOP-004, Step 3 1.c (continued)
Performance Step: 7 286' RAB / RO with locked valve key TURN OFF AND LOCK accumulator discharge valve breakers:
Performance Step: 7 286' RAB / RO with locked valve key TURN OFF AND LOCK accumulator discharge valve breakers: Accumulator B: 1B21
Accumulator B: 1B21
-SB-5C (both breakers)
-SB-5C (both breakers)
Standard:
Standard: Returns to 1B21-SB-5C , places both breakers to OFF position then LOCKs both breakers for Accumulator B. Evaluator Cue:
Returns to 1B21-SB-5C, places both breakers to OFF position then LOCKs both breakers for Accumulator B. Evaluator Cue:
Provide feedback on breaker position.
Provide feedback on breaker position.
Lights will now indicate that the valves are SHUT, however operating the breakers will have no effect on the lights.
Lights will now indicate that the valves are SHUT, however operating the breakers will have no effect on the lights.
Line 2,385: Line 2,056:
Comment:    STOP TIME:
Comment:    STOP TIME:


Appendix C Page 10 of 11 Form ES-C-1  VERIFICATION OF COMPLETION 2014 HNP NRC Exam In-Plant JPM j Rev. FINAL Job Performance Measure No.:
Appendix C Page 10 of 11 Form ES-C-1  VERIFICATION OF COMPLETION 20 14 HNP NRC Exam In-Plant JPM j Rev. FINAL Job Performance Measure No.:
2014 NRC Exam In
2014 NRC Exam In
-Plant JPM j Isolate the ECCS Accumulators After a Control Room Evacuation In Accordance With AOP
-Plant JPM j Isolate the ECCS Accumulators After a Control Room Evacuation In Accordance With AOP
-004, Remote Shutdown Examinee's Name:
-004 , Remote Shutdown Examinee's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 2,394: Line 2,065:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Question:
Question:   Response:
 
===Response===
 
Result:  SAT  UNSAT    Examiner's Signature:
Result:  SAT  UNSAT    Examiner's Signature:
Date:
Date:
Appendix C Form ES-C-1  JPM CUE SHEET 2014 HNP NRC Exam In-Plant JPM j Rev. FINAL BEFORE YOU START THIS JPM INPLANT JPM SAFETY CONSIDERATIONS
Appendix C Form ES-C-1  JPM CUE SHEET 20 14 HNP NRC Exam In-Plant JPM j Rev. FINAL BEFORE YOU START THIS JPM INPLANT JPM SAFETY CONSIDERATIONS
:  CAUTION: EQUIPMENT MAY AUTO START OR MAYBE ENERGIZED  
:  CAUTION: EQUIPMENT MAY AUTO START OR MAYBE ENERGIZED  
       - SIMULATE ONLY
       - SIMULATE ONLY
  -  DO NOT OPERATE ANY ACTUAL PLANT EQUIPMENT!!!    Before entering the performance location of this JPM, ensure you AND the examiner have the proper PPE for the area you are going to go to or will travel through to get there.
  -  DO NOT OPERATE ANY ACTUAL PLANT EQUIPMENT!!!    Before entering the performance location of this JPM, ensure you AND the examiner have the proper PPE for the area you are going to go to or will travel through to get there.
Avoid contacting any plant equipment, Follow ALARA practices in the RCA.
Avoid contacting any plant equipment, Follow ALARA practices in the RCA.
Do NOT remove ladders from their storage locations. Simulate obtaining and using a ladder if one would be needed during the actual performance of this task.
Do NOT remove ladders from their storage locations. Simulate obtaining and using a ladder if one would be needed during the actual performance of this task.
Initial Conditions:
Initial Conditions:
Line 2,413: Line 2,081:
- Isolate SI Accumulators.
- Isolate SI Accumulators.


Appendix C Job Performance Measure Form ES-C-1  Worksheet 2014 NRC Exam In
Appendix C Job Performance Measure Form ES-C-1  Worksheet   201 4 NRC Exam In
-Plant JPM k Rev. FINAL Facility:
-Plant JPM k Rev. FINAL Facility: Harris Nuclear Plant Task No.: 061012H104 Task Title:
Harris Nuclear Plant Task No.:
061012H104 Task Title:
Reset the Turbine
Reset the Turbine
-Driven AFW Pump Mechanical Overspeed JPM No.: 2014 NRC Exam In-Plant JPM k    K/A  
-Driven AFW Pump Mechanical Overspeed JPM No.: 20 1 4 NRC Exam In-Plant JPM k    K/A  


==Reference:==
==Reference:==


061 A2.04        RO 3.4 SRO 3.8    Examinee:
061 A2.04        RO 3.4 SRO 3.8    Examinee: ________________________
________________________
NRC Examiner:
NRC Examiner:
_________________
_________________
Line 2,432: Line 2,097:
Simulated Performance:
Simulated Performance:
X  Actual Performance:
X  Actual Performance:
Classroom Simulator Plant X  READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Classroom Simulator Plant X  READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Initial Conditions:
The plant was manually tripped from 100
The plant was manually tripped from 100
% power due to a loss of the 'A' MFW pump
% power due to a loss of the 'A' MFW pump. The Turbine-driven AFW pump is needed for plant cooldown but the pump tripped on overspeed.
. The Turbine-driven AFW pump is needed for plant cooldown but the pump tripped on overspeed.
The cause of the overspeed trip has been identified and corrected.
The cause of the overspeed trip has been identified and corrected.
Main Steam isolation valves 1MS
Main Steam isolation valves 1MS
Line 2,446: Line 2,110:
Assume that the Mechanical Overspeed Trip Linkage is currently in the tripped position.
Assume that the Mechanical Overspeed Trip Linkage is currently in the tripped position.
The Trip and Throttle Valve will be reopened from the Control Room. All Initial Conditions are met.
The Trip and Throttle Valve will be reopened from the Control Room. All Initial Conditions are met.
Evaluator
Evaluator: At this time provide the student with a copy of OP-137,  Section 8.4 Initial conditions are MET.
: At this time provide the student with a copy of OP-137,  Section 8.4 Initial conditions are MET.
NOTE: Expect that the entry and exit from the RCA will add time to complete this JPM.
NOTE: Expect that the entry and exit from the RCA will add time to complete this JPM.


Appendix C Job Performance Measure Form ES-C-1  Worksheet 2014 NRC Exam In
Appendix C Job Performance Measure Form ES-C-1  Worksheet   201 4 NRC Exam In
-Plant JPM k Rev. FINAL Task Standard:
-Plant JPM k Rev. FINAL Task Standard:
The Turbine-driven AFW pump turbine trip and throttle valve is latched.
The Turbine-driven AFW pump turbine trip and throttle valve is latched.
Line 2,458: Line 2,121:
==References:==
==References:==


OP-137, Auxiliary Feedwater System, Rev. 37     Handout: OP-137, Section 8.4, Rev. 3 7  OR OP-137, Attachment 6 (locally mounted on wall as an operator aid)
OP-137, Auxiliary Feedwater System, Rev. 3 7     Handout: OP-137, Section 8.4, Rev. 3 7  OR OP-137, Attachment 6 (locally mounted on wall as an operator aid)
Time Critical Task:
Time Critical Task:
No  Validation Time:
No  Validation Time:
10 minutes Appendix C Job Performance Measure Form ES-C-1  Worksheet 2014 NRC Exam In
10 minutes Appendix C Job Performance Measure Form ES-C-1  Worksheet   201 4 NRC Exam In
-Plant JPM k Rev. FINAL SIMULATOR SETUP N/A  This is an In
-Plant JPM k Rev. FINAL SIMULATOR SETUP N/A  This is an In
-Plant JPM CRITICAL STEP JUSTIFICATION Step 7  If the connecting rod is not properly positioned and locked in place the overspeed reset cannot be accomplished.
-Plant JPM   CRITICAL STEP JUSTIFICATION Step 7  If the connecting rod is not properly positioned and locked in place the overspeed reset cannot be accomplished.
Step 8  If the tappet nut is not held down properly and in the correct sequence the overspeed trip cannot be reset.   
Step 8  If the tappet nut is not held down properly and in the correct sequence the overspeed trip cannot be reset.   


Line 2,478: Line 2,141:
START TIME:
START TIME:
Reviews OP
Reviews OP
-137, Section 8.4 prior to task performance Performance Step: 1 Reviews Section 8.4.1 reads and initials step 1 NOTE: Loss of B
-137, Section 8.4 prior to task performance Performance Step: 1 Reviews Section 8.4.1 reads and initials step 1 NOTE: Loss of B-SB DC Power is not considered "normal operation" in the following initial condition. If B
-SB DC Power is not considered "normal operation" in the following initial condition. If B
-SB DC Power has been lost and cannot be restored then the following initial condition does not apply.
-SB DC Power has been lost and cannot be restored then the following initial condition does not apply.
Standard:
Standard: Placekeeps the note (initials, checks or circle/slash) and initials blanks for steps 1 and 2 of Initial Conditions.
Placekeeps the note (initials, checks or circle/slash) and initials blanks for steps 1 and 2 of Initial Conditions.
Comment:
Comment:
Appendix C Page 5 of 16 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 5 of 16 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 NRC Exam In
   - Denotes Critical Steps 2014 NRC Exam In
-Plant JPM k Rev. FINAL OP-137 Section 8.4.2 NOTES prior to step 1 Performance Step: 2 NOTE:  Attachment 6 diagram may be used as a reference for nomenclature.
-Plant JPM k Rev. FINAL OP-137 Section 8.4.2 NOTES prior to step 1 Performance Step: 2 NOTE:  Attachment 6 diagram may be used as a reference for nomenclature.
NOTE:  If any of the following information is changed,  and local pump information should also be changed. Standard:
NOTE:  If any of the following information is changed,  and local pump information should also be changed. Standard: Operator reads and placekeeps any note or caution (initials, checks or circle/slash)
Operator reads and placekeeps any note or caution (initials, checks or circle/slash)
Comment:
Comment:
OP-137 Section 8.4.2 step 1 Performance Step: 3 Verify the following valves are shut:
OP-137 Section 8.4.2 step 1 Performance Step: 3 Verify the following valves are shut:
1MS-70 SA, MAIN STEAM B TO AUX FW TURBINE 1MS-72 SB, MAIN STEAM C TO AUX FW TURBINE Standard:
1MS-70 SA, MAIN STEAM B TO AUX FW TURBINE 1MS-72 SB, MAIN STEAM C TO AUX FW TURBINE Standard: Status provided in Initial Conditions.
Status provided in Initial Conditions.
Evaluator's Cue:
Evaluator's Cue:
If asked: 1MS
If asked: 1MS
Line 2,499: Line 2,158:
Appendix C Page 6 of 16 Form ES-C-1  PERFORMANCE INFORMATION
Appendix C Page 6 of 16 Form ES-C-1  PERFORMANCE INFORMATION
   - Denotes Critical Steps 2014 NRC Exam In
   - Denotes Critical Steps 2014 NRC Exam In
-Plant JPM k Rev. FINAL OP-137 Section 8.4.2 step 2
-Plant JPM k Rev. FINAL OP-137 Section 8.4.2 step 2.a  Performance Step: 4 IF DP-1B-SB 125V DC Power is available, THEN PERFORM the following steps:
.a  Performance Step: 4 IF DP-1B-SB 125V DC Power is available, THEN PERFORM the following steps:
CHECK the local red indicating lamp for TURBINE OVERSPEED TRIP is ON Standard: Verifies that the red lamp is lit for the TURBINE OVERSPEED TRIP on the local control panel.
CHECK the local red indicating lamp for TURBINE OVERSPEED TRIP is ON Standard:
Verifies that the red lamp is lit for the TURBINE OVERSPEED TRIP on the local control panel.
Evaluator's Cue: (Lamp is located on Aux Feedwater Control Panel 1X
Evaluator's Cue: (Lamp is located on Aux Feedwater Control Panel 1X
-SAB)  The red TURBINE OVERSPEED TRIP lamp is lit.
-SAB)  The red TURBINE OVERSPEED TRIP lamp is lit.
Comment:      OP-137 Section 8.4.2 step 2.b  Performance Step:
Comment:      OP-137 Section 8.4.2 step 2.b  Performance Step:
5 VERIFY the flat side of the tappet nut is aligned toward the tappet lever.
5 VERIFY the flat side of the tappet nut is aligned toward the tappet lever.
Standard:
Standard: Verifies flat side of the tappet nut aligned toward the tappet lever.
Verifies flat side of the tappet nut aligned toward the tappet lever.
Evaluator's Cue:
Evaluator's Cue:
The flat side of tappet nut is aligned toward the tappet lever.
The flat side of tappet nut is aligned toward the tappet lever.
Line 2,516: Line 2,172:
-Plant JPM k Rev. FINAL OP-137 Section 8.4.2 NOTES prior to step 2.c  Performance Step: 6 NOTE: The next two Steps must be coordinated to ensure proper reset of the Trip and Throttle valve.
-Plant JPM k Rev. FINAL OP-137 Section 8.4.2 NOTES prior to step 2.c  Performance Step: 6 NOTE: The next two Steps must be coordinated to ensure proper reset of the Trip and Throttle valve.
NOTE: If the local red indicating lamp for TURBINE OVERSPEED TRIP does not extinguish, it is an indication that one of the limit switches did not reset, and further investigation may be warranted.
NOTE: If the local red indicating lamp for TURBINE OVERSPEED TRIP does not extinguish, it is an indication that one of the limit switches did not reset, and further investigation may be warranted.
Standard:
Standard: Placekeeps the note (initials, checks or circle/slash)
Placekeeps the note (initials, checks or circle/slash)
Comment:      OP-137 Section 8.4.2 step 2.c  Performance Step:
Comment:      OP-137 Section 8.4.2 step 2.c  Performance Step:
7 PULL the connecting rod toward the Trip and Throttle valve until the rod locks in place AND the local red indicating lamp for TURBINE OVERSPEED TRIP is OFF
7 PULL the connecting rod toward the Trip and Throttle valve until the rod locks in place AND the local red indicating lamp for TURBINE OVERSPEED TRIP is OFF
. Standard:
. Standard: Locates connecting rod and pulls it toward the trip/throttle valve.
Locates connecting rod and pulls it toward the trip/throttle valve.
Verifies rod locked in place AND the local red indicating lamp for TURBINE OVERSPEED TRIP is OFF.
Verifies rod locked in place AND the local red indicating lamp for TURBINE OVERSPEED TRIP is OFF.
Evaluator's Cue:
Evaluator's Cue:
Line 2,531: Line 2,185:
-Plant JPM k Rev. FINAL OP-137 Section 8.4.2 step 2.d  Performance Step:
-Plant JPM k Rev. FINAL OP-137 Section 8.4.2 step 2.d  Performance Step:
8 PRESS DOWN AND HOLD the tappet nut in the fully seated position while releasing the connecting rod.
8 PRESS DOWN AND HOLD the tappet nut in the fully seated position while releasing the connecting rod.
Standard:
Standard: Presses down and holds the tappet nut in the fully seated position until the connecting rod is released.
Presses down and holds the tappet nut in the fully seated position until the connecting rod is released.
Evaluator's Cue:
Evaluator's Cue:
The tappet remains fully seated and the connecting rod is locked in place.
The tappet remains fully seated and the connecting rod is locked in place.
Line 2,538: Line 2,191:
9 VERIFY the Trip and Throttle valve operator in the shut position by observing the T &
9 VERIFY the Trip and Throttle valve operator in the shut position by observing the T &
T VALVE OPERATOR CLOSED light on the Aux Feedwater Control Panel 1X
T VALVE OPERATOR CLOSED light on the Aux Feedwater Control Panel 1X
-SAB. Standard:
-SAB. Standard: Verifies trip/throttle valve operator is shut by observing indicating lights on local panel 1X
Verifies trip/throttle valve operator is shut by observing indicating lights on local panel 1X
-SAB. Evaluator's Cue:
-SAB. Evaluator's Cue:
The green shut light is ON and the red open light is OFF.  
The green shut light is ON and the red open light is OFF.  
Line 2,549: Line 2,201:
-Plant JPM k Rev. FINAL OP-137 Section 8.4.2 step 2.f  Performance Step:
-Plant JPM k Rev. FINAL OP-137 Section 8.4.2 step 2.f  Performance Step:
10 VERIFY the flat side of the tappet nut is against the tappet lever and fully seated
10 VERIFY the flat side of the tappet nut is against the tappet lever and fully seated
. Standard:
. Standard: Verifies flat side of the tappet nut against the tappet lever and fully seated
Verifies flat side of the tappet nut against the tappet lever and fully seated
. Evaluator's Cue:
. Evaluator's Cue:
The flat side of tappet nut is against the tappet lever and fully seated.
The flat side of tappet nut is against the tappet lever and fully seated.
Comment:      OP-137 Section 8.4.2 step 2.g  Performance Step:
Comment:      OP-137 Section 8.4.2 step 2.g  Performance Step:
11 VERIFY the latch lever is being held up by the trip hook.
11 VERIFY the latch lever is being held up by the trip hook.
Standard:
Standard: Verifies latch lever is being held up by the trip hook.
Verifies latch lever is being held up by the trip hook.
Evaluator's Cue:
Evaluator's Cue:
The latch is being held up by the trip hook.
The latch is being held up by the trip hook.
Comment:    OP-137 Section 8.4.2 step 2.h  Performance Step:
Comment:    OP-137 Section 8.4.2 step 2.h  Performance Step:
12 VERIFY the TURBINE OVERSPEED TRIP light is extinguished on the AFW Control Panel 1X
12 VERIFY the TURBINE OVERSPEED TRIP light is extinguished on the AFW Control Panel 1X
-SAB    Standard:
-SAB    Standard: Verifies TURBINE OVERSPEED TRIP light status on Panel 1X-SAB. Evaluator's Cue:
Verifies TURBINE OVERSPEED TRIP light status on Panel 1X-SAB. Evaluator's Cue:
The TURBINE OVERSPEED TRIP light is extinguished.
The TURBINE OVERSPEED TRIP light is extinguished.
Comment:
Comment:
Line 2,568: Line 2,217:
   - Denotes Critical Steps 2014 NRC Exam In
   - Denotes Critical Steps 2014 NRC Exam In
-Plant JPM k Rev. FINAL OP-137 Section 8.4.2 step 2.i  Performance Step:
-Plant JPM k Rev. FINAL OP-137 Section 8.4.2 step 2.i  Performance Step:
13 Notify the Control Room that the mechanical overspeed linkage is reset and inform them they can now open the Trip and Throttle valve. Standard:
13 Notify the Control Room that the mechanical overspeed linkage is reset and inform them they can now open the Trip and Throttle valve. Standard: Simulates notifying the Control Room.
Simulates notifying the Control Room.
Evaluator's Cue:
Evaluator's Cue:
Acknowledge report.
Acknowledge report.
Line 2,576: Line 2,224:
Appendix C Page 11 of 16 Form ES-C-1  VERIFICATION OF COMPLETION 2014 NRC Exam In
Appendix C Page 11 of 16 Form ES-C-1  VERIFICATION OF COMPLETION 2014 NRC Exam In
-Plant JPM k Rev. FINAL Job Performance Measure No.:
-Plant JPM k Rev. FINAL Job Performance Measure No.:
2014 NRC Exam In-Plant JPM k  Reset the Turbine
201 4 NRC Exam In-Plant JPM k  Reset the Turbine
-Driven AFW Pump Mechanical Overspeed OP-137, Auxiliary Feedwater System Examinee's Name:
-Driven AFW Pump Mechanical Overspeed OP-137 , Auxiliary Feedwater System Examinee's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 2,583: Line 2,231:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Question:
Question:   Response:
 
===Response===
 
Result:  SAT  UNSAT    Examiner's Signature:
Result:  SAT  UNSAT    Examiner's Signature:
Date:
Date:

Revision as of 08:00, 9 July 2018

Harris Initial Exam 2014-302 Final Sim_IN-Plant JPMs
ML15013A267
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 01/13/2015
From:
NRC/RGN-II
To:
Progress Energy Carolinas
Shared Package
ML15013A407 List:
References
50-400/OL-14
Download: ML15013A267 (166)


Text

Appendix C Job Performance Measure Form ES-C-1 Worksheet 20 14 HNP NRC Exam Simulator JPM CR a Rev. FINAL Facility: Shearon Harris Task No.: 001001H201 Task Title:

Perform Control Rod and Rod Position Indicator Exercise JPM No.: 20 1 4 NRC Exam Simulator JPM CR a K/A

Reference:

001 A2.1 1 RO 3.7 SRO 4.0 ALTERNATE PATH

- YES Examinee: ________________________

NRC Examiner:

_________________

Facility Evaluator:

________________________

Date: ________

Method of testing:

Simulated Performance:

Actual Performance:

X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

The plant is operating at 100% power.

OST-1005, "Control Rod and Rod Position Indicator Exercise Quarterly Interval Modes 1

- 3", is in progress. All prerequisites to perform the test have been met and a briefing has been conducted. The CRS has given permission to continue with this OST. 'A' PRZ backup heaters have been energized to support OST

-1005. Initiating Cue:

The CRS is directing you to continue OST

-1005, Section 7.2.4, commencing with Control Bank D. The briefing has determined the following control rod test order shall be used: CB-D, CB-A, CB-B, CB-C then SDB

-A, SDB-B and SDB-C. NOTE: During the performance of this OST you will be required to obtain DRPI position when appropriate. Another operator will stay at the Reactor console while you are obtaining these values.

Examiners Note:

To expedite the examination schedule, the candidate should review the INITIAL CONDITIONS, INITIATING CUE, and the marked up copy of OST-1005 prior to entering the simulator to perform the JPM.

Appendix C Job Performance Measure Form ES-C-1 Worksheet 20 14 HNP NRC Exam Simulator JPM CR a Rev. FINAL Task Standard:

The Reactor has been manually Tripped in response to continuous inward rod motion with rod control in manual.

Required Materials:

None General

References:

OST-1005, Control Rod and Rod Position Indicator Exercise Quarterly Interval Modes 1

- 3, Rev. 21 AOP-001, Malfunction of Rod Control and Indication System, Rev.

4 3 EOP-E-0, Reactor Trip or Safety Injection, Rev. 3 Handouts: OST-1005 marked up with prerequisites and step 7.1 completed

. To expedite the examination schedule, the candidate should review the INITIAL CONDITIONS, INITIATING CUE, and the marked up copy of OST-1005 prior to entering the simulator to perform the JPM.

Time Critical Task:

N/A Validation Time:

1 5 minutes Appendix C Job Performance Measure Form ES-C-1 Worksheet 20 14 HNP NRC Exam Simulator JPM CR a Rev. FINAL CRITICAL STEP JUSTIFICATION Step 4 Must be performed to operate the correct bank of control rods.

Step 5 Must be performed to test control rod ability to freely move in the inward direction.

Step 7 Must be performed to test control rod ability to freely move in the outward direction.

Step 11 Must be performed to operate the correct bank of control rods.

Step 12 Must be performed to test control rod ability to freely move in the inward direction.

Step 14 Must be performed to be in compliance with an Abnormal Operating Procedure immediate action step and avoid placing the Reactor in a unanalyzed condition.

Appendix C Job Performance Measure Form ES-C-1 Worksheet 20 14 HNP NRC Exam Simulator JPM CR a Rev. FINAL 201 4 NRC Exam - SIMULATOR SETUP Simulator Operator Reset to IC

-16 5 Password "spurs" Place reactivity data sheet for IC

-1 9 on plant status board (this will be used for obtaining boron concentrations for the RCS and BAT)

May have to update rods Place Restricted Access signs on swing gates CRT displays

- CRT 3: QP Startup and display QP POAH on CR T 4 Go to RUN and wait ~ 10 seconds then silence and acknowledge alarms.

GO TO FREEZE and inform the lead examiner the Simulator is ready. DO NOT GO TO RUN until directed by the lead examiner. (The examiner has provided to the candidate with initial conditions and the initiating cues prior to placing the simulator in RUN.)

To recreate the IC setup for this JPM:

o Reset to IC-1 9 , 100% power M OL o Place Rod Control Selector Switch to AUTO o Rod height CBD 21 8 steps o Create malfunction to fail the rod selector switch to the selected bank and continuously demand rod motion on Trigger 1 o imf crf 15 a (1 00:00:00 00:00:00) TRUE o ior xc1i110 (1 00:00:00 00:00:00) ASIS o Slightly Open PZR Spray valves manually the place the 'A' PZR heater to on o Allow the plant to stabilize then place the PZR Spray valves back to AUTO o FREEZE and SNAP.

o After the candidate is ready, place simulator in RUN.

o While Control Bank A is being inserted to 10 steps from the original position , activate Trigger 1

Appendix C Page 5 of 14 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR a Rev. FINAL Simulator Operator:

When directed by the Lead Examiner go to Run.

Performance Step: 1 Obtain procedure.

Standard: Reviews procedure.

Comment: START TIME:

OST-1005, 7.2.4 Procedure Note:

NOTE: IF in Mode 1, THEN testing of Control Bank D can be conducted during lowering of plant power per Section 7.4. and the next section may be marked N/A. NOTE: IF Control Bank D is less than 10 steps, THEN testing of Control Bank D rods can be conducted per Section 7.3. and the next section may be marked N/A.

NOTE: When inserting rods, the Bank Low Insertion and Bank Low-Low Insertion Limit Alarm may be actuated.

Performance Step: 2 Control Bank D Testing For CONTROL BANK D, REFER to Attachment 1 and test the rod bank per the following instructions:

Standard: Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)

Comment:

Appendix C Page 6 of 14 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR a Rev. FINAL OST-1005 , Step 7.2.4.1.a Performance Step: 3 For Control Bank D, record on Attachment 1 the initial rod heights as indicated by Group Step Counters and DRPI.

Standard: On Attachment 1, for Control Bank "

D": Records both Group Position indications as "2 18". Records all DRPI position indications as "2 16". Comment: OST-1005, Step 7.2.4.1.b Performance Step: 4 Rotate the Rod Bank Selector to CB D. Evaluator Note:

OMM-001 Att 13 provides Stable Plant TAVG Control Band of

+/- 2° F and Trip Limit of +/

- 10° F from TREF with Rod Control in manual.

Standard: Locates the ROD BANK SELECTOR switch and rotates position to the "CB D" position.

Verifies 48 steps per minute on rod speed indicator, SI

-408. Comment:

Appendix C Page 7 of 14 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR a Rev. FINAL Evaluator Note

During the performance of the OST

-1005 procedure guidance allows the operator to step the control rods IN further than 10 total without any consequence.

This can be an evaluator comment but it is OK.

OST-1005 , Step 7.2.4.1.c Performance Step: 5 With the Rod Motion lever, insert Control Bank D IN 10 steps as indicated by Group Step Counters.

Standard: Places the ROD MOTION lever to the "IN" position and inserts Control Bank "

D" rods 10 steps by observing Group Step Counters. Comment: OST-1005 , Step 7.2.4.1.d Performance Step: 6 Record on Attachment 1, the rod heights for Control Bank D, as indicated by Group Step Counters and DRPI.

Standard: On Attachment 1, for control Bank "D":

Records both Group Position indications as "208". Records all DRPI position indications as "204".

Comment:

Appendix C Page 8 of 14 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR a Rev. FINAL Evaluator Note

During the performance of the OST

-1005 procedure guidance allows the operator to step the control rods OUT further than 10 total without any consequence.

This can be an evaluator comment but it is OK.

IF a student does step Control Bank 'D' out past 218 steps (for example 219 / 218 steps)

CUE: Return Control Bank 'D' to 218 steps and continue with OST-1005 OST-1005 , Step 7.2.4.1.e Performance Step: 7 With the Rod Motion lever, WITHDRAW Control Bank D OUT 10 steps as indicated by Group Step Counters.

Standard: Places the ROD MOTION lever in the "OUT" position and withdraws Control Bank "D" rods 10 steps by observing Group Step Counters.

When completed both Control Bank "D" Group Step Counters should read 218 steps.

Comment: OST-1005 , Step 7.2.4.1.f Performance Step: 8 Record on Attachment 1, the final rod heights for Control Bank D, as indicated by Group Step Counters and DRPI. Standard: On Attachment 1, for control Bank "D":

Records both Group Position indications as "218".

Records all DRPI position indications as "216".

Comment:

Appendix C Page 9 of 14 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR a Rev. FINAL Evaluator Note

Based on the instructions provided on the initial cues the student should be testing Control Bank 'A' next.

OST-1005, 7.2.1 Procedure Note:

NOTE: When inserting rods, ALB 13/8

-2, BANK LOW INSERTION and ALB 13/8-3, BANK LOW

-LOW INSERTION LIMIT Alarms may be actuated.

NOTE: ALB 13/8-5, COMP ALARM ROD DEVIATION/SEQUENCE will annunciate during this procedure due to bank out of sequence, and should be considered an expected alarm.

Performance Step: 9 Control Bank A Testing For CONTROL BANK A, REFER to Attachment 1 and test the rod bank per the following instructions:

Standard: Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)

Comment: OST-1005 , Step 7.2.1.1.a Performance Step: 10 For Control Bank A, record on Attachment 1 the rod heights as indicated by Group Step Counters and DRPI.

Standard: On Attachment 1, for Control Bank "A":

Records both Group Position indications as "231

". Records all DRPI position indications as "2 28". Comment:

Appendix C Page 10 of 14 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR a Rev. FINAL OST-1005, Step 7.2.

1.1.b Performance Step: 11 Rotate the Rod Bank Selector to CB A. Standard: Rotates the ROD BANK SELECTOR switch to the "CB A" position. Comment: Simulator Operator:

When the rod bank selector switch is taken to "CBA" position AND rods have been inserted 2

-3 steps actuate Trigger 1 (continuous demand for rod motion) OST-1005 , Step 7.2.1.1.c

- ALTERNATE PATH Performance Step: 12 With the Rod Motion lever, insert Control Bank A IN 10 steps as indicated by Group Step Counters.

Standard: Places the ROD MOTION lever in the "IN" position and inserts Control Bank "A" rods 10 steps by observing Group Step Counters. Comment:

Appendix C Page 11 of 14 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR a Rev. FINAL Alternate Path Performance Step: 13 Monitors Rod Motion. When Rod Motion level is released CB A rods continue to step IN.

Standard: Determines rod motion continues without a demand observing:

Group Step Counter continues to count in DRPI continues to lower Lowering Rx power Lowering Tavg Comment:

Appendix C Page 12 of 14 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR a Rev. FINAL Evaluator Note:

Placing rods in MANUAL is considered to be any position of the Rod Bank Selector switch other than AUTO. This meets the intent of the immediate actions for AOP

-001. AOP-001 Immediate Action s Performance Step:

14 Informs the CRS of the continued rod motion with rods in manual and states entry conditions for AOP

-001, (Malfunction of Rod Control and Indication System)

Standard: Informs the CRS.

Initiates immediate actions of AOP

-001 Check that < 2 control rods are dropped (YES)

Position Rod Bank Selector Switch to MAN (YES)

Check Control Bank motion STOPPED (NO)

Trip the Reactor AND GO TO E

-0 Locates MCB Reactor trip switch and turns switch to TRIP. () EOP-E-0 Verify Reactor Trip Rx Trip and Bypass Bkrs

- OPEN (YES)

Rod Bottom Lights

- LIT (YES) Neutron Flux

- DROPPING (YES)

Check Turbine Trip

- All Throttle Valves Shut (YES) Evaluator's Cue:

Another Operator will complete the remaining actions of EOP-E-0. Comment: Evaluator Cue: When the first immediate action of E-0 is implemented

Evaluation on this JPM is complete.

Direct Simulator Operator to place the Simulator in Freeze.

Simulator Operator:

When directed by the Lead Examiner then go to Freeze.

STOP TIME:

Appendix C Page 13 of 14 Form ES-C-1 VERIFICATION OF COMPLETION 20 14 HNP NRC Exam Simulator JPM CR a Rev. FINAL Job Performance Measure No.:

2014 HNP NRC Exam Simulator JPM CR a Perform Control Rod and Rod Position Indicator Exercise per OST-1005 Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response:

Result: SAT UNSAT Examiner's Signature:

Date:

Appendix C Form ES-C-1 JPM CUE SHEET 20 14 HNP NRC Exam Simulator JPM CR a Rev. FINAL Initial Conditions:

The plant is operating at 100% power.

OST-1005, "Control Rod and Rod Position Indicator Exercise Quarterly Interval Modes 1

- 3", is in progress. All prerequisites to perform the test have been met and a briefing has been conducted.

The CRS has given permission to continue with this OST.

'A' PRZ backup heaters have been energized to support OST

-1005. Initiating Cue:

The CRS is directing you to continue OST

-1005, Section 7.2.4, commencing with Control Bank D.

The briefing has determined the following control rod test order shall be used:

CB-D, CB-A, CB-B, C B-C then SDB

-A, SDB-B and SDB-C NOTE: During the performance of this OST you will be required to obtain DRPI position when appropriate. Another operator will stay at the Reactor console while you are obtaining these values.

Appendix C Page 1 of 15 Form ES-C-1 Worksheet 20 14 HNP NRC Exam Simulator JPM CR b Rev. FINAL Facility: Shearon Harris Task No.: 301136H601 Task Title:

Vent An Unisolable SI Accumulator during a Steam Generator Tube Rupture Event JPM No.: 20 1 4 NRC Exam Simulator JPM CR b K/A

Reference:

006 A4.02 RO 4.0 SRO 3.8 ALTERNATE PATH

- YES Examinee: ________________________

NRC Examiner:

_________________

Facility Evaluator:

________________________

Date: ________ Method of testing: Simulated Performance:

Actual Performance:

X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

The unit was operating at 100% power when a leak developed in the 'A' Steam Generator.

The crew entered AOP

-016, Excessive Primary Plant Leakage.

While implementing AOP

-016 the leak rate increased and exceeded VCT makeup capability. The Reactor was manually tripped and an Safety Injection was activated.

The crew has completed EOP E

-0 and transitioned to and is implementing EOP

-E-3, Steam Generator Tube Rupture.

The crew has just completed EOP

-E-3 step 89.

Initiating C ue: Your position is BOP and the CRS has directed you to continue implementing EOP-E-3 beginning at step 90.

Another operator is responsible for the E

-3 foldout page

Appendix C Page 2 of 15 Form ES-C-1 Worksheet 20 14 HNP NRC Exam Simulator JPM CR b Rev. FINAL Task Standard:

Identify an Accumulator that cannot be isolated as directed by EOP-E-3, Steam Generator Tube Rupture and perform actions of OP

-110, Safety Injection to vent the unisolable Accumulator.

Required Materials:

Replacement copies of EOP-E-3, SG Tube Rupture, Rev.

1 and OP-110 Section 8.3, pages 17-19, Rev. 4 5 General

References:

EOP-E-3, Steam Generator Tube Rupture, Rev.

1 and OP-110 Section 8.3, Rev. 4 5 Time Critical Task:

No Validation Time:

15 minutes Critical Step Justification Step 3 Must have power turned on to breakers for the valves to operate Step 4 Must shut the Accumulator discharge valves to isolate the Accumulator or Nitrogen could be injected into the RCS potentially preventing loop flow as RCS pressure is decreased Step 12 Shutting the Nitrogen supply valve to the Accumulators prevents increasing the Accumulator pressure which would occur if the vent valve was opened Step 14 Opening the 'A' Accumulator vent valve will line up the 'A' Accumulator vent path to the Containment.

Step 16 Opening the Accumulator Vent Pressure Control Valve will vent the accumulator to the containment.

Appendix C Page 3 of 15 Form ES-C-1 Worksheet 20 14 HNP NRC Exam Simulator JPM CR b Rev. FINAL 20 1 4 HNP NRC Exam - SIMULATOR SETUP Simulator Operator Reset to IC

-166 Password "spurs" Switch check override Gen lockouts to Freeze Roll 86 Relays to trip position:

o Run AMS file

- Roll Gen 86 Relays Go to run Silence and Acknowledge annunciators Go to FREEZE Place RED off normal STAR placards on the following components:

o 'A' SG PORV controller (it is set to 88%)

o 'A' MSIV (it is closed) o 1AF-55 (it is closed) o 1AF-137 (it is closed)

Inform the lead examiner the Simulator is ready. DO NOT GO TO RUN until directed by the lead examiner. (The examiner has provided to the candidate with initial conditions and the initiating cues prior to placing the simulator in RUN.)

To recreate the IC setup for this JPM:

Initial Simulator IC was IC-19 Place the Simulator in RUN Insert a SG tube rupture on the 'A' SG of 420 gpm (I made it trigger 1 with a 30 second ramp time) o Imf sgn07a (1 0 0) 420 00:00:30 0 Insert a failure of 1SI

-246 to open ('A' accumulator discharge valve) o ior xaai067 (n 0 0) ASIS Activate trigger 1, when RCS leakage exceeds CVS makeup capability manually trip the Reactor and activate an SI Secure the RCPs when SI flow is > 200 gpm and RCS pressure is < 1400#

Implement the other actions of E

-0 up to the point to transition to E

-3, implement the actions of E-3 up to step 90 o Other things I did to get to a stable IC o Adjusted AFW flows prior to SG depressurization and after stabilization o Performed a rapid SG depressurization to cooldown the RCS using Steam Dumps (after securing the 'A' MSIV, B and C MSIV remain open) o Set 'A' SG PORV to 88%, set 'B' and 'C' SG PORV to maintain RCS temp at ~515°F o Depressurized the RCS to = 'A' SG pressure o Don't be in a hurry to do this next step or you will cool down the RCS too much-To get the RCS to < 1000 # you will also have to depressurize the 'A' SG to ~ 950 psig by opening the 'A' SG PORV and correspondingly opening the PZR spray valves again to lower RCS pressure to < 1000 psig (approximately equal to 'A' SG pressure) o I placed all 3 letdown orifices in service to avoid going solid on the PZR o In the final setting prior to freezing the Simulator I had both PZR spray valves open ~10

-15% to maintain RCS pressure stable and < 1000#

Silence Acknowledge and Reset Annunciators Freeze and Snap these conditions to your exam IC Appendix C Page 4 of 15 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR b Rev. FINAL Simulator Operator:

When directed by the Lead Examiner go to Run.

START TIME:

Performance Step: 1 OBTAIN S PROCEDURE Standard: Obtains a copy of EOP

-E-3, Steam Generator Tube Rupture and reviews step 90.

Evaluator Note:

The candidate may take a minute to review EOP-E-3 steps prior to step 90 to understand what the current plant conditions and configuration is at this point in time.

Comment: EOP-E-3, Step 90.a Performance Step: 2 Check If SI Accumulators Should Be Isolated:

RCS pressure

- LESS THAN 1000 PSIG Standard: Reviews ERFIS/Main Control Board RCS pressure instruments to identify current RCS pressure.

Identifies that RCS pressure is < 1000 psig Comment:

Appendix C Page 5 of 15 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR b Rev. FINAL EOP-E-3 Step 90.b Performance Step: 3 Locally unlock AND close both breakers for each SI accumulator discharge valve:

1SI-246 (MCC-1A21-SA-5C) 1SI-247 (MCC-1B21-SB-5C) 1SI-248 (MCC-1A21-SA-3D) Standard: Contacts an Auxiliary Operator to locally unlock AND close both breakers for each SI accumulator discharge valve:

1SI-246 (MCC-1A21-SA-5C) 1SI-247 (MCC-1B21-SB-5C) 1SI-248 (MCC-1A21-SA-3D) Simulator Operator

When contacted by candidate:

Acknowledge request to locally unlock AND close both breakers for each SI accumulator discharge valve:

1SI-246 (MCC-1A21-SA-5C) 1SI-247 (MCC-1B21-SB-5C) 1SI-248 (MCC-1A21-SA-3D) NOTE: the following AMS file takes approximately 90 seconds to run so to reduce the time here execute the steps over 15-20 seconds then make a report that-

"all breaker for the SI Accumulator Discharge valves have been unlocked and closed." RUN AMS file

- sis/SI Accum Power Apply Comment:

Appendix C Page 6 of 15 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR b Rev. FINAL Evaluator Note:

1SI-246 is failed as is and will not shut when the candidate attempts to shut the MCB position switch. This will require the candidate to use an Alternate Path to accomplish this task. EOP-E-3 Step 90.c Performance Step: 4 Shut SI accumulator discharge valves:

1SI-246 1SI-247 1SI-248 Standard: Locates MCB SI accumulator discharge valve position switches and takes switch to shut for each valve.

Places control switches for 1SI

-246/247/248 to SHUT Identifies that 1SI-246 ('A' Accumulator discharge) will not shut (Green Light is off/Red Light On)

Informs the CRS Reads RNO statement and performs RNO actions for 1SI-246 (ONLY)

Comment: Evaluator Cue:

Acknowledge the communication IF the CRS is informed that 1SI-246 will not SHUT.

Alternate Path begins here - E-3 Step 90.c RNO Performance Step: 5 Vent any unisolable accumulator using OP

-110, "SAFETY INJECTION", Section 8.3.

Standard: Reads step and obtains a copy of OP

-110, "SAFETY INJECTION", Section 8.3 Comment:

Appendix C Page 7 of 15 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR b Rev. FINAL OP-110 , Section 8.3, Venting the SI Accumulators Section 8.3.1 - Initial Conditions Performance Step: 6

1. Accumulator pressure is approaching Technical Specification or alarm limit.

O R 2. Accumulator is to be depressurized.

3. If Personnel are in Containment, Health Physics has been notified to monitor Containment O2 while venting SI Accumulators.
4. If the Accumulator is to be depressurized, the area 20 feet on either side of the vent on 236 foot elevation should be taped off with red and black warning tape and posted per SAF

-NGGC-2172 to restrict access to this area. NOTE: Accumulators were vented at beginning of R17 with purge secured. This resulted in low oxygen levels which required Containment to be evacuated. Containment Purge, Normal or Pre-entry, should be aligned if possible.

5. If Personnel are in Containment, Containment Purge is in service if available.

Standard: Reviews the initial conditions and determines the following:

Item 1 - N/A Item 2 - this is the reason for venting the

'A' Accumulator

- to depressurize the Accumulator, initials step Item 3 - N/A - no personnel are in Containment Items 4 and 5

- N/A without personnel in Containment Reads NOTE between initial condition steps 4 and 5, circle/slashes note to identify it was read Comment: Evaluator Cue:

IF asked: There are NO personnel inside Containment.

IF requested to tape off area for step 4: The Shift Manager will not approve Containment Entry. At this time taping the area off is not required.

Appendix C Page 8 of 15 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR b Rev. FINAL OP-110, Section 8.3.2, Note prior to Step 1 Performance Step: 7 NOTE: To minimize any potential sluicing between Accumulators through leaking valves, Accumulator pressures should normally be left approximately equal (at or below 4 psid between lowest and highest ERFIS indications) at the completion of this Section.

Standard: Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)

Comment: OP-110, Section 8.3.2, Step 1 Performance Step:

8 PERFORM the following Steps on only ONE Accumulator at a time.

Standard: Reads and initials step Comment:

Appendix C Page 9 of 15 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR b Rev. FINAL OP-110, Section 8.3.2, Step 2 Performance Step:

9 At the MCB, PERFORM the following:

NOTE: Nitrogen is the primary motive force to LTOPS. The impact on LTOPS operability should be determined prior to shutting 1SI

-287 per Precaution and Limitation 4.0.6.

Standard: Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)

Comment: Evaluator Cue:

If asked: LTOPS operability has been reviewed and determined that it is not required at the current RCS Temperature. You may continue with your procedure.

OP-110, Section 8.3.2, Step 2.a Performance Step:

11 IF necessary, THEN INITIATE an EIR. Standard: Candidate may ask for EIR (would be tracking) or may realize that LTOPS is still blocked.

Comment: LTOPS has not been made OPERABLE yet. The RO may ask for a tracking EIR to track the status of N 2 to Containment for PORV Operability restoration in GP

-006. Evaluator Cue:

IF CRS is asked to create EIR for LTOPS state:

I have initiated an EIR for LTOPS.

Appendix C Page 10 of 15 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR b Rev. FINAL OP-110, Section 8.3.2, Step 2.b Performance Step: 12 SHUT 1SI-287, ACCUMULATORS & PRZ PORV N 2 SUPPLY. Standard: Locates 1SI-287, ACCUMULATORS & PRZ PORV N 2 SUPPLY switch and places it to shut Comment: Red Light goes out and Green Light comes On.

OP-110, Section 8.3.2, Step 2.c Performance Step: 13 DECLARE the associated Accumulator inoperable per Tech Spec 3.5.1, due to being connected to Non

-Safety piping (a one hour action statement in Modes 1 through 3 above 1000 psig).

Standard: N/A (RCS pressure is <

1000 psig)

Comment: Evaluator Cue:

Acknowledge any communications IF the student declares the Accumulator inoperable.

NOTE: Since the unit is NOT in Modes 1

- 3 with the RCS pressure >

1000 psig the Accumulator is NOT inoperable and the LCO does not apply.

Appendix C Page 11 of 15 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR b Rev. FINAL OP-110, Section 8.3.2, Step 2.d Performance Step: 14 OPEN the ACCUMULATOR N 2 SUPPLY & VENT for the Accumulator to be vented:

1SI-295, ACCUMULATOR A N 2 SUPPLY & VENT.

Standard: Locates MCB switch for 1SI-295, ACCUMULATOR A N 2 SUPPLY & VENT and takes switch to Open Comment: Green Light goes out and Red Light comes On.

OP-110, Section 8.3.2, Caution prior to Step 3 Performance Step: 15 CAUTION In modes 1, 2, and 3, ensure Accumulators are maintained within Technical Specification limits for pressure and level when venting SI Accumulators.

Standard: Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)

Comment: OP-110, Section 8.3.2, Step 3 Performance Step: 16 SLOWLY ADJUST HC-936, 1SI-298 ACCUM VENT PRESS CNTL, control potentiometer output signal to open 1SI-298 and vent the Accumulator.

Standard: Locates MCB potentiometer for 1SI-298 and slowly increases the output signal to open the valve.

Comment:

Appendix C Page 12 of 15 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR b Rev. FINAL OP-110, Section 8.3.2, Step 4 Performance Step: 1 7 IF the Accumulator is being depressurized with personnel in containment AND the oxygen concentration outside the taped off area decreases below 19.5%, THEN STOP venting until the concentration is restored to greater than 19.5% oxygen.

Standard: Marks step N/A, no personnel are in Containment Comment:

Appendix C Page 13 of 15 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR b Rev. FINAL OP-110, Section 8.3.2, Step 5 Performance Step: 1 8 VENT the Accumulator to the desired pressure as indicated by the associated instruments:

PI-921, 923, ACCUMULATOR TK A PRESS.

Standard: Observes pressure decreasing on PI

-921 and PI

-923 (pressure instrumentation associated with the 'A' Accumulator)

Evaluator Note:

In addition to MCB indication the candidate can monitor the 'A' Accumulator pressure via multiple methods using the computer.

(ERFIS or OSI

-PI) During the pressure decrease annunciator ALB-01-7-1, ACCUMULATOR TANK A HIGH

-LOW PRESS, will alarm (the low pressure setpoint is 602 psig). With all associated vent valves full open 'A' Accumulator pressure will decrease at ~10 psig per minute

. Evaluator Cue:

To continue with OP

-110 vent isolation the following information can be used at Evaluator discretion.

After observing the 'A' Accumulator High

-Low pressure alarm and a decreasing trend on 'A' Accumulator pressure then cue the candidate:

Using time compression

- the 'A' Accumulator pressure now reads zero psig.

Announce "I have the shift" END OF JPM

Direct the Simulator Operator to go to Freeze.

Comment: STOP TIME:

Simulator Operator:

When directed by the Lead Examiner then go to Freeze.

Appendix C Form ES-C-1 VERIFICATION OF COMPLETION 20 14 HNP NRC Exam Simulator JPM CR b Rev. FINAL Job Performance Measure No.: 2014 NRC Exam Simulator JPM CR b Vent An Unisolable SI Accumulator during a Steam Generator Tube Rupture Event (E-3 and OP-110) Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question: Response:

Result: SAT UNSAT Examiner's Signature:

Date:

Appendix C Form ES-C-1 JPM CUE SHEET 20 14 HNP NRC Exam Simulator JPM CR b Rev. FINAL Initial Conditions:

The unit was operating at 100% power when a leak developed in the 'A' Steam Generator.

The crew entered AOP

-016, Excessive Primary Plant Leakage.

While implementing AOP

-016 the leak rate increased and exceeded VCT makeup capability. The Reactor was manually tripped and an Safety Injection was activated.

The crew ha s completed EOP E

-0 and transitioned to and are implementing EOP

-E-3, Steam Generator Tube Rupture.

The crew has just completed EOP-E-3 step 89.

Initiating C ue: Your position is BOP and the CRS has directed you to continue implementing EOP-E-3 beginning at step 90.

Another operator is responsible for the E

-3 foldout page

Appendix C Page 1 of 17 Form ES-C-1 Worksheet 20 14 HNP NRC Exam Simulator JPM CR c Rev. FINAL Facility: Harris Nuclear Plant Task No.: 301149H601 Task Title:

Align ECCS for Long Term Recirculation JPM No.: 2014 HNP NRC Exam Simulator JPM CR c K/A

Reference:

006 A4.05 RO 3.9 SRO 3.8 ALTERNATE PATH

- YES Examinee: ________________________

NRC Examiner:

_________________

Facility Evaluator:

________________________

Date: ________

Method of testing:

Simulated Performance:

Actual Performance:

X Classroom Simulator X Plant READ TO THE EXAMINEE:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

A large break LOCA caused a reactor trip and safety injection SI has been reset and CCW has been aligned to the RHR HXs CSIP "A-SA" and CSIP "C

-SB" (as "B") are running EOP-ES-1.3, Transfer to Cold Leg Recirculation, was just entered Initiating Cue:

Perform EOP

-ES-1.3, the steps should be performed without delay in accordance with Step 1 CAUTION.

Evaluator Note:

This is NOT a time

-critical JPM because the procedure would normally be read to the operator.

Appendix C Page 2 of 17 Form ES-C-1 Worksheet 20 14 HNP NRC Exam Simulator JPM CR c Rev. FINAL Task Standard:

Recirculation flow established on both trains.

Required Materials:

None General

References:

EOP-E S-1.3, Transfer to Cold Leg Recirculation, Rev. 2 Handout: Use Simulator copy of EOP-E S-1.3 and ensure it is replaced after each use. Time Critical Task:

N/A Validation Time:

10 minutes Critical Step Justification Step 6 Required to isolate RHR pumps from RWST as suction source.

Step 8 Required to isolate one train to comply with WOG EOP BKG assumptions.

Step 11 Required to CLOSE 1CS

-745 to isolate miniflow to RWST.

Step 13 Required to ensure a supply suction flowpath from sump to CSIP.

Step 1 6 Required to ensure the RWST suction is isolated while aligned for recirc.

Step 2 1 Required to establish injection flowpath.

Step 24 Critical to separate SI Trains during recirculation phase.

Appendix C Page 3 of 17 Form ES-C-1 Worksheet 20 14 HNP NRC Exam Simulator JPM CR c Rev. FINAL 2014 NRC Exam - SIMULATOR SETUP Simulator Operator Reset to IC-16 7 Password "spurs" Roll 86 Relays to trip position:

o Run AMS file

- Roll Gen 86 Relays Go to Run Silence and Acknowledge annunciators GO TO FREEZE and inform the lead examiner the Simulator is ready. DO NOT GO TO RUN until directed by the lead examiner. (The examiner has provided to the candidate with initial conditions and the initiating cues prior to placing the simulator in RUN.)

To recreate the IC setup for this JPM:

Initial Simulator IC was IC

-1 9 Go to run then to FREEZE Insert the follow changes to the setup:

Substitute CSIP "C" for CSIP "B" as follows:

o i rf cvc 0 45 (n 00:00:00 00:00:00)

ON o i rf cvc 0 46 (n 00:00:00 00:00:00) TRAINBIN o irf cvc049 (n 00:00:00 00:00:00) OFF o i rf cvc 0 50 (n 00:00:00 00:00:00) RACK_OUT Insert a failure of 1SI-340 to the OPEN position o irf sis029 (n 00:00:00 00:00:00) ENGAGED Insert a failure of 1SI

-4 to OPEN (failed SHUT) o irf sis017 (n 00 00:00:00 00:00:00) engaged o irf sis018 (n 00 00:00:00 00:00:00) 0 0 0 Insert a failure of PT

-402 HIGH o i mf pt:402 (n 00:00:00 00:00:00) 3000 0 2229.49 Insert a large break LOCA accident o imf rcs01a (n 00:00:00 00:00:00) 100 0 0 Go To Run

- Let the Simulator run long enough for the Reactor to Trip and a Safety Injection to activate (about 60 seconds) o Go to FREEZE Insert a failure of 1CS

-746 to the OPEN position o Open 1 CS-746 o ir f cvc085 (n 00:00:00 00:00:00) ENGAGED Go back to RUN Perform actions of EOP

-E-0 and EO P-E-1. Wait until RWST level is <23.4% on 2/4 Channels Annunciator ALB 2-4 is in alarm (ready to transition to EOP

-ES-1.3) o Ensure SI RESET and CCW is align ed to the RHR heat exchangers Silence Acknowledge and Reset Annunciators Freeze and Snap these conditions to your exam IC

Appendix C Page 4 of 17 Form ES-C-1 PERFORMANCE INFORAMTION

- Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR c Rev. FINAL Simulator Operator:

When directed by the Lead Evaluator place the Simulator in RUN. START TIME:

Performance Step: 1 Obtain copy of EOP

-E S-1.3. Standard: Enters EOP-E S-1.3. Evaluator's Cue:

Direct candidate to use Simulator copy of EOP

-ES-1.3 if necessary.

Comment: EOP-ES-1.3 , CAUTION Prior to Step 1 Performance Step: 2 Perform Steps 1 through 9 without delay. Do NOT implement Function Restoration Procedures prior to completion of these steps.

SI recirculation flow to RCS must be maintained at all times. Switchover to recirculation may cause high radiation levels in the reactor auxiliary building. Radiation levels must be assessed prior to performance of local actions in the affected area.

Standard: Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)

Comment:

Appendix C Page 5 of 17 Form ES-C-1 PERFORMANCE INFORAMTION

- Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR c Rev. FINAL EOP-ES-1.3 , NOTE Prior to Step 1 Performance Step: 3 Foldout applies.

A minimum of 142 INCHES CNMT wide range sump level ensures the recirculation sump strainers are completely submerged AND assures a long term recirculation suction source. The following sequence of steps to transfer to cold leg recirculation assumes operability of at least one train of safeguards equipment.

Standard: Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash) before Step 1 and may review the FOLDOUT items.

Comment:

EOP-ES-1.3 , Step 1.a Performance Step: 4 Check RHR Pump Recirculation Alignment:

Verify both RHR pumps

- Running. Standard: Verifies both RHR pumps running by observing RED light ON, flow and/or current indicated.

Comment:

Appendix C Page 6 of 17 Form ES-C-1 PERFORMANCE INFORAMTION

- Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR c Rev. FINAL EOP-ES-1.3 , Step 1.b Performance Step: 5 Verify CNMT sump to RHR pump suction valves OPEN:

Train A RHR pump: 1SI-300 AND 1SI

-310 Train B RHR pump: 1SI

-301 AND 1SI

-311 Standard: Verifies Train A sump valves open by observing RED lights ON, green lights OFF on 1SI

-300 and 1SI

-310 Verifies Train B sump valves open by observing RED lights ON, green lights OFF on 1SI

-301 and 1SI

-311 Comment: EOP-ES-1.3 , Step 2.a Performance Step: 6 Establish RHR Pump Recirculation Alignment:

Shut RWST to RHR pump suction valves:

1SI-322 (Train A) 1SI-323 (Train B)

Standard: Places 1SI

-322 and 1SI-323 handswitches to CLOSE Verify valves closed by observing RED lights O FF, green lights O N on 1SI-322 and 1SI

-323 Comment:

Appendix C Page 7 of 17 Form ES-C-1 PERFORMANCE INFORAMTION

- Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR c Rev. FINAL EOP-ES-1.3 , Step 2.b Performance Step: 7 Shut low head SI Train A to cold leg valve: 1SI

-340 Standard: Places 1SI

-340 Control Power ON Removes 1SI

-340 from Pull

-to-Lock position Verifies ORANGE Control Power Light ON Places 1SI

-340 control switch to CLOSE Determines that 1SI

-340 does NOT close by observing RED light ON, GREEN light OFF Goes to Step 1.c RNO Comment: Note: the operator may make a second attempt at shutting 1SI-340 with the control switch.

EOP-ES-1.3 , Step 2.b RNO - Alternate Path Performance Step: 8 Shut low head SI Train B to cold leg valve: 1SI

-341 Standard: Places 1SI

-341 Control Power ON.

Removes 1SI

-341 from Pull

-to-Lock position Verifies ORANGE Control Power Light ON.

Places 1SI

-341 handswitch to CLOSE.

Verifies that 1SI

-341 closes by observing RED light OFF, GREEN light ON.

Comment:

Appendix C Page 8 of 17 Form ES-C-1 PERFORMANCE INFORAMTION

- Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR c Rev. FINAL EOP-ES-1.3 , Step 2.c Performance Step: 9 Check RHR Pump recirculation alignment

- at least one train established.

Standard: Verifies both trains aligned with CNMT sump to RHR pump suction valves OPEN and RWST to RHR pump suction valves SHUT. Comment: EOP-ES-1.3 , Step 3.a Performance Step: 10 Establish CSIP Recirculation Alignment:

a. Shut CSIP alternate miniflow isolation valves:

1CS-746 (Train A CSIP) 1CS-752 (Train B CSIP)

Standard: Places 1CS

-746 control switch in CLOSE.

Determines 1CS

-746 did NOT close by observing RED light ON, GREEN light OFF.

Goes to Step 3.a RNO. Places 1CS

-752 control switch in CLOSE.

Verifies 1CS

-752 closed by observing RED light OFF, GREEN light ON.

Comment:

Appendix C Page 9 of 17 Form ES-C-1 PERFORMANCE INFORAMTION

- Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR c Rev. FINAL EOP-ES-1.3 , Step 3.a RNO - Alternate Path Performance Step: 11 Shut the associated block valve: 1CS-745 (Train A CSIP). Standard: Places 1CS

-745 control switch in CLOSE.

Verifies 1CS

-745 closed by observing RED light OFF, GREEN light ON.

Evaluator Note: Shutting the associated block valve 1CS

-745 is the critical element of this step

. It is acceptable for the candidate to shut 1CS-753 in addition to 1CS

-745, however only the shutting of 1CS

-745 is critical.

Comment: EOP-ES-1.3 , Step 3.b Performance Step: 12 Verify normal miniflow isolation valves

- SHUT 1CS-182 1CS-196 1CS-210 1CS-214 Standard: Verifies at least one valve closed in each line (RED lights OFF, GREEN lights ON.

) Comment:

Appendix C Page 10 of 17 Form ES-C-1 PERFORMANCE INFORAMTION

- Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR c Rev. FINAL EOP-ES-1.3 , Step 3.c Performance Step: 13 Open RHR discharge to CSIP suction valves:

1RH-25 1RH-63 Standard: Places control switches for both 1RH

-25 and 1RH

-63 in OPEN. Verifies 1RH

-25 and 1RH

-63 open by observing RED lights ON, GREEN lights OFF.

Comment: EOP-ES-1.3 , Step 3.d Performance Step: 14 Reset SI. Standard: SI RESET in Initial Conditions Evaluator Note:

Candidate may reset again by locating both SI reset switches and momentarily taking each to RESET and then verify successful reset by Bypass Permissive Panel light 4

-1 "SI ACTUATED" is extinguished.

Comment: EOP-ES-1.3 , Step 3.e Performance Step: 15 Manually realign safeguards equipment following a loss of offsite power. Standard: Reads step and determines off

-site power available.

Comment:

Appendix C Page 11 of 17 Form ES-C-1 PERFORMANCE INFORAMTION

- Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR c Rev. FINAL EOP-ES-1.3 , Step 3.f Performance Step: 16 Shut RWST to CSIP suction valves AND place in pull

-to-lock position: 1CS-291 (LCV-115B) 1CS-292 (LCV-115D) Standard: Places LCV

-115B and LCV

-115D in CLOSE and then in PULL-TO-LOCK Verifies LCV

-115B and LCV

-115D closed by observing RED lights OFF, GREEN lights ON.

Comment: EOP-ES-1.3 , Step 4.a Performance Step: 17 Check Charging AND SI System Status:

Check charging line isolation valves

- SHUT Standard: Checks Charging Line Isolation Valves 1CS-235 and 1CS-238 CLOSED by observing RED lights OFF, GREEN lights ON for each valve

. May also check FCV

-122.1 CLOSED by observing flow indication at ZERO. Comment:

Appendix C Page 12 of 17 Form ES-C-1 PERFORMANCE INFORAMTION

- Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR c Rev. FINAL EOP-ES-1.3 , Step 4.b Performance Step: 18 Verify Both Charging Pumps

- RUNNING. Train A CSIP Train B CSIP Standard: Verifies CSIPs 1A

-SA and 1C-SB both running by observing RED lights ON, GREEN lights OFF.

Comment: CSIP 1C-SB is running in place of 'B' CSIP Evaluator Cue:

(IF NEEDED)

IF the student thinks that step 4.b requires the 'B' CSIP to be running and performs the RNO step to consult plant operation staff then:

Cue: Operations Staff Acknowledges

. EOP-ES-1.3 , Step 4.c Performance Step: 19 Check alternate cold leg AND hot leg injection valves

- SHUT 1SI-52 1SI-86 1SI-107 Standard: Checks Alternate Cold leg AND Hot leg Injection Valves 1SI-52, 1SI-86 and 1SI

-107 CLOSED by observing RED lights OFF, GREEN lights ON for each valve.

Comment:

Appendix C Page 13 of 17 Form ES-C-1 PERFORMANCE INFORAMTION

- Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR c Rev. FINAL EOP-ES-1.3 , CAUTION Prior to Step 5 Performance Step: 2 0 The maximum calculated dose rate in the vicinity of MCC 1A35

-SA and MCC 1B35

-SB is between 10 MREM/HR and 150 MREM/HR Standard: Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)

Comment: EOP-ES-1.3 , Step 5.a Performance Step: 21 Establish Recirculation Injection Flowpath:

Open alternate high head SI to cold leg valve: 1SI

-52 Standard: Places 1SI-52 Control Power ON.

Verifies ORANGE Control Power Light ON.

Places 1 SI-52 control switch to OPEN.

Verifies 1SI

-52 open by observing RED light ON, green light OFF.

Comment:

Appendix C Page 14 of 17 Form ES-C-1 PERFORMANCE INFORAMTION

- Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR c Rev. FINAL Evaluator Note:

1SI-4 is failed SHUT and will not open from the MCB switch. Since 1SI-3 is OPEN step 5.b is met and the candidate should NOT perform the RNO action to stop the Train B CSIP. EOP-ES-1.3 , Step 5.b Performance Step: 22 Check any BIT outlet valve

- open 1SI YES 1SI-4 -NO Standard: Verifies that 1SI-3 is OPEN and 1SI-4 is NOT OPEN and will NOT OPEN by observing RED and GREEN OFF.

Informs CRS that 1SI

-4 will not OPEN Comment: Evaluator Cue:

(IF informed of 1SI

-4 not OPENING) Acknowledge

- 1SI-4 will not open EOP-ES-1.3 , Step 5.c Performance Step: 23 Check power for CSIP discharge cross

-connect valves

- Available 1CS219 (MCC 1A35SA14E) 1CS217 (MCC 1B35SB12C) 1CS218 (MCC 1A35SA14D) 1CS220 (MCC 1B35SB9D) Standard: Checks power available by checking red position indicating lights on for CSIP discharge cross

-connect valves Comment:

Appendix C Page 15 of 17 Form ES-C-1 PERFORMANCE INFORAMTION

- Denotes Critical Steps 20 14 HNP NRC Exam Simulator JPM CR c Rev. FINAL EOP-ES-1.3 , Step 5.d Performance Step: 2 4 Shut CSIP discharge cross connect valves based on Table: CSIP "A" and CSIP "C" running:

1CS-217 and 1CS-219 Standard: Places control switches to CLOSE position for valves 1CS-217 and 1CS

-219 () Verifies respective valves re

-position by observing RED lights OFF, GREEN lights ON Comment: EOP-ES-1.3 , Step 6 Performance Step: 2 5 Check High Head SI Flow:

Alternate header flow (Train A):

FI-940 Normal header flow (Train B):

FI-943 Standard: Verifies Train A flow indication on FI

-940. Verifies Train B flow indication on FI

-943. Comment: Evaluator Note:

After the candidate checks High Head SI flow on BOTH the Alternate and Normal Header the following cue maybe used to terminate the JPM Evaluator Cue:

CCW is currently aligned to the RHR heat exchangers, another operator will continue with ES

-1.3. End of JPM Direct Simulator Operator to place the Simulator in Freeze.

Comment: STOP TIME:

Simulator Operator:

When directed by the Lead Examiner then go to Freeze.

Appendix C Page 16 of 17 Form ES-C-1 VERIFICATION OF COMPLETION 20 14 HNP NRC Exam Simulator JPM CR c Rev. FINAL Job Performance Measure No.:

2014 HNP NRC Exam Simulator JPM CR c Align ECCS for Long Term Recirculation (EOP-ES-1.3) EOP-ES-1.3 , Transfer to Cold Leg Recirculation Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question: Response: Result: SAT UNSAT Examiner's Signature:

Date:

Appendix C Form ES-C-1 JPM CUE SHEET 20 14 HNP NRC Exam Simulator JPM CR c Rev. FINAL Initial Conditions:

A large break LOCA caused a Reactor trip and Safety Injection SI has been reset and CCW has been aligned to the RHR HXs CSIP "A-SA" and CSIP "C

-SB" (as "B") are running EOP-ES-1.3, Transfer to Cold Leg Recirculation, was just entered Initiating Cue:

Perform EOP

-ES-1.3, the steps should be performed without delay in accordance with Step 1 CAUTION.

Appendix C Page 1 of 15 Form ES-C-1 PERFORMANCE INFORMATION 2014 HNP NRC Exam Simulator JPM d Rev. FINAL Facility: Harris Nuclear Plant Task No.: 003001H101 Task Title:

Start a RCP with Spray Valve Failure JPM No.: 201 4 NRC Exam Simulator JPM CR d K/A

Reference:

003 A2.02 RO 3.7 SRO 3.9 ALTERNATE PATH

- YES Examinee: ________________________

NRC Examiner:

_____________

Facility Evaluator:

________________________

Date: ________

Method of testing:

Simulated Performance:

Actual Performance:

X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

You are the extra RO during a plant startup.

GP-004, Reactor Startup is in progress and is currently on HOLD. The plant has been stabilized with Shutdown Banks withdrawn.

Two hours ago the "A" RCP was removed from service for maintenance.

Maintenance has been completed and the "A" RCP is ready for operation.

The previous crew ha s verified that all initial conditions to start the RCP are met and have initialed all steps Initiating Cue:

The CRS has instructed you to start "A" RCP, in accordance with OP-100, Reactor Coolant System, Section 5.1, Reactor Coolant Pump Start

-up. The initial conditions have been verified.

Evaluators Note: To expedite the examination schedule, provide the candidate with a copy of OP

-100 pages 1

-16 with the initial conditions signed off prior to entering the simulator to perform the JPM. This will allow the candidate time to task preview the procedure.

Appendix C Page 2 of 15 Form ES-C-1 PERFORMANCE INFORMATION 2014 HNP NRC Exam Simulator JPM d Rev. FINAL Task Standard:

Start a RCP and respond to a failed open PZR spray valve when the pump is started in accordance with A OP-01 9 , Malfunction of RCS Pressure Control Required Materials:

OP-100 mark up with Attachment 3 included.

General

References:

OP-100, Reactor Coolant System, Rev. 40 and AOP-019 , Malfunction of RCS Pressure Control, Rev. 24 Time Critical Task:

No Validation Time:

10 minutes Critical Step Justification Step 9 System interlock requires proper oil pressure be established prior to starting pump Step 13 Administrative requirements state the System flow cannot be established until the lift oil pump breaker is closed for > 2 mins to prevent pump damage Step 21 Entry conditions are met for AOP

-019, Malfunction of RCS Pressure Control when PZR Spray valve controller PK

-444C.1, PZR Spray Loop A, 1RC-10 7 fails open upon starting the 'A' RCP. AOP

-019 requires the operator to perform the immediate actions including the RNO response to control a PZR Spray valve (shut valve) when that valve is NOT properly positioned for current PZR pressure or plant conditions. Performing these actions correctly will prevent an unnecessary Safety Injection from occurring.

Appendix C Page 3 of 15 Form ES-C-1 PERFORMANCE INFORMATION 2014 HNP NRC Exam Simulator JPM d Rev. FINAL 201 4 NRC Exam - SIMULATOR SETUP Simulator Operator Reset to IC

-16 8 Password "spurs" Go to RUN CRT displays

- CRT 2: QP VCT, CRT 3: QP TAVG and CRT 4: QP SGLVL Set Source Range Audio Multiplier to 1000 to establish audible counts Silence and Acknowledge annunciators GO TO FREEZE and inform the lead examiner the Simulator is ready. DO NOT GO TO RUN until directed by the lead examiner. (The examiner has provided to the candidate with initial conditions and the initiating cues prior to placing the simulator in RUN.)

To recreate the IC setup for this JPM:

Initial Simulator IC was IC-7 , Mode 3 HSD, MOL conditions

- RCS pressure 2235, RCS temp. 557°F, all rods in GO to run Secure the "A" RCP Wait approximately 5 minutes for the simulator to stabilize Create a conditional Trigger to open PZR spray valve PK-444C.1 with a 15 second delay and 45 second ramp after the control switch for the '

A' RCP is taken to start To create the conditional trigger:

- Go to malfunctions

- Find PRS14A Pressurizer Spray Valve 444C Failure (with manual control) o Open the malfunction window o Set delay to 15 seconds o Set ramp time to 45 seconds o Set initial severity to 30 (that way the meter will not go to 0

- adjust this to whatever percent open 1RC

-107 is at after securing the 'A' RCP and the simulator is stable) o Set the malfunction to Trigger 1

- Go to triggers o Click on Trigger 1 o Click on 'Assign File' o Choose RCP_A_START o (source file should now have RCP_A_START)

Silence Acknowledge and Reset Annunciators FREEZE and Snap these conditions to your exam Appendix C Page 4 of 15 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM d Rev. FINAL Simulator Operator:

When directed by the Lead Evaluator place the Simulator in Run Evaluator Note:

The candidates should be briefed outside of the Simulator prior to performing this JPM. Provide them with a copy of the procedure (with initial conditions initialed as completed).

This will allow them to review the Precautions and Limitations associated with OP

-100 and have time for a task preview of the steps to accomplish starting the RCP. Expect that the candidates will take about 20 minutes to complete this review.

During the performance of the JPM the candidate may use either MCB indication or ERFIS indications when reviewing RCP pump indications.

START TIME:

Obtain Procedure Performance Step: 1 Procedure obtained and begins the task of starting the RCP Standard: Obtained OP-10 0 and reviews P & L's and Section 5.1 for 'A' RCP startup

. Reviews and verifies initial conditions are satisfied.

Comment: OP-100, Section 5.1.2

, Caution prior to Step 1 Performance Step: 2 Only one RCP is to be started at any one time. If the motor is allowed to coast to a stop between starts, two successive starts are permitted. A third start may be made when the winding and the core have cooled by running for 20 minutes, or by standing idle for 45 minutes.

Standard: Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)

Comment:

Appendix C Page 5 of 15 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM d Rev. FINAL OP-100, Section 5.1.2, Step 1.a Performance Step: 3 VERIFY the following before pump start:

IF jogging RCPs per GP

-001, THEN VERIFY RCS Pressure is greater than 325 psig.

Standard: Step 1.a is marked N/A Comment: OP-100, Section 5.1.2, Step 1.b Performance Step: 4 VERIFY Standard: Locates PI

-156A1 and verifies that the '

A' RCP #1 Seal greater than 200 psid

. Comment: OP-100, Section 5.1.2, Note prior to Step 1.c Performance Step:

5 NOTE: VCT Outlet Temp TE

-116 should be used for seal injection water temperature.

Standard: Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)

Comment:

Appendix C Page 6 of 15 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM d Rev. FINAL OP-100, Section 5.1.2, Step 1.c Performance Step: 6 VERIFY Seal Injection flow is between 8 and 13 gpm at a temperature between 60 and 130°F.

Standard: Locates seal injection flow indication FI

-156A and verifies flow between 8-13 gpm and also verifies VCT temperature indicator TI-116.1 reading between 60

-130°F. The candidate my use ERFIS points rather than MCB indications.

Comment: OP-100, Section 5.1.2, Step 1.d Performance Step: 7 VERIFY # 1 Seal Leakoff is in the normal operating range of Attachment 3.

Standard: Locates #1 Seal Leakoff flow indicator FR

-15 4A and verifies that it meets Attachment 3 requirements (see below). Evaluator Note:

Seal Leakoff flow is also available via multiple programs on the Plant Computer (ERFIS, OSI

-PI, etc). It is acceptable for the candidate to complete this step using ANY of the available indications.

Comment:

Appendix C Page 7 of 15 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM d Rev. FINAL OP-100, Section 5.1.2, Caution prior to Step 2 Performance Step: 8 CAUTION: RCPs shall not be started with one or more of the RCS cold leg temperatures less than or equal to 325

°F unless the secondary water temperature is less than 50

°F above each of the RCS cold leg temperatures. This caution is only applicable to the first RCP to be started. Standard: Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)

- Understands the caution is N/A.

Comment:

OP-100, Section 5.1.2, Step 2 Performance Step: 9 START the RCP Oil Lift Pump.

Standard: Locates 'A' RCP Oil Lift Pump switch and starts the oil lift pump.

(Critical to start the RCP Oil Lift Pump)

START Time ____________

Comment: Note: Procedure requires a minimum of 2 minutes run time for the lift pump before starting the RCP.

OP-100, Section 5.1.2, Step 3 Performance Step: 10 VERIFY the amber permissive light on the lift pump control switch is lit indicating proper lift oil pressure has been achieved.

Standard: Locates amber permissive light on the '

A' RCP Oil Lift Pump Switch and verifies it is lit.

Comment:

Appendix C Page 8 of 15 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM d Rev. FINAL OP-100, Section 5.1.2, Step 4 Performance Step: 11 ALLOW the RCP Oil Lift Pump to run for a minimum of 2 minutes before starting an RCP

. Standard: Waits minimum of 2 minutes after starting the oil lift pump prior to starting the 'A' RCP. Comment:

OP-100, Section 5.1.2, Note prior to Step 5 Performance Step: 12 When an RCP is started, the RCP ammeter will go off scale high, and then decrease to the normal hot or cold running amps after 15 to 25 seconds.

Standard: Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)

Comment: Evaluator Note: When the 'A' RCP start switch is taken to "start" a timer starts and runs for 15 seconds after which 1RC

-107 will ramp open over 45 seconds lowering RCS pressure and requiring the operator to ent e r into AOP-019. Annunciators AL B-009-5-1, PZR High

-Low Press and ALB

-009-3-3, PZR Cont Low Press and Heaters On will alarm ~60 seconds after 1RC

-107 begins to fail open.

IF no actions are taken a SI will occur ~4:30 minutes from event onset.

Appendix C Page 9 of 15 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM d Rev. FINAL OP-100, Section 5.1.2, Step 5 Performance Step: 13 START the RCP.

Standard: Locates control switch for 'A' RCP and starts 'A

' RCP Comment: START Time ____________ (> 2minutes since lift pump start)

The two minute minimum is not critical but ensures start permissives are met for the RCP start.

OP-100, Section 5.1.2, Step 6 Performance Step: 14 VERIFY the following normal operating parameters:

Running amps: Hot 460 to 540 amps Cold 715 amps RCS flow: Greater than or equal to 98%

  1. 1 Seal P Greater than 200 psid
  1. 1 Seal leakoff in the normal operating range of Attachment 3 Motor Winding temperature

<300°F Standard: Locates and verifies each parameter is in the normal operating range (ERFIS or MCB indications may be used)

Comment: Note: Hot running motor amp range of 460 to 540 amps will apply.

Appendix C Page 10 of 15 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM d Rev. FINAL Evaluators Note:

The actions to secure the 'A' RCP oil lift pump do not have to be performed since the RCS pressure reduction will take precedence over this step.

OP-100, Section 5.1.2, Note prior to Step 7 Performance Step: 15 NOTE: The oil lift pump should be run at least 1 minute after starting an RCP.

After at least 1 minute, STOP the RCP OIL LIFT PUMP.

Standard: Waits at least 1 minute then secures the 'A' RCP oil lift pump.

Comment: Secure Time ____________ (> 1 minute since RCP start)

ALTERNATE PATH Performance Step: 16 Identifies RCS pressure lowering and Spray valve 1RC

-107 failure Annunciators:

ALB-009-5-1, PZR High

-Low Press ALB-009-3-3, PZR Cont Low Press and Heaters On Standard: Identifies RCS pressure lowering Identifies PZR Spray Loop A PCV

-444C (1RC-107) red indication light and valve demand increasing (or at 100%)

Acknowledges alar ms and reports conditions to CRS May review APP or directly enter AOP

-019 based on current plant indications

Announces "AOP

-019 Entry Conditions met, taking immediate actions for AOP

-019." Comment: Evaluator Cue:

CRS acknowledges report

Appendix C Page 11 of 15 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM d Rev. FINAL Evaluator Note:

Securing 'A' RCP is an action contained in AOP

-019 but this action is not performed immediately. Stopping the 'A' RCP would be performed at step 14 in Section 3.1 of the procedure unless other trip limits on the RCP are exceeded prior to reaching this step.

AOP-019, Malfunction of RCS Pressure Control Performance Step: 17 Steps 1 through 3 are immediate actions Standard: Performs immediate actions from memory without accessing or reading from the AOP Comment: AOP-019, Step 1 Performance Step: 18 CHECK that a bubble exists in the PRZ. (YES) Standard: States that a bubble exists in the PRZ Comment:

AOP-019, Step 2 Performance Step: 19 VERIFY ALL PRZ PORVs AND associated block valves properly positioned for current PRZ pressure and plant conditions.

(YES) Standard: Verifies ALL PRZ PORVs AND associated block valves properly Positioned by observing green shut lights indicated for all PZR PORV and all red open lights on for PZR PORV Block Valve control switches.

Comment:

Appendix C Page 12 of 15 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM d Rev. FINAL AOP-019, Step 3 Performance Step: 20 CHECK BOTH PRZ Spray Valves properly positioned for current PRZ pressure and plant conditions.

PCV-444C PZR Spray Loop A (1RC

-107) - OPEN - NO PCV-444D PZR Spray Loop B (1RC

-103) - SHUT - YES Standard: Identifies that the PZR Spray valves are NOT properly positioned for current plant conditions.

- Takes RNO actions Comment: 1RC-107 should not be full open (or going full open for this condition)

. 1RC-103 is shut which is its proper position.

AOP-019, Step 3 RNO Performance Step: 21 CONTROL PRZ Spray Valves using ONE of the following methods (listed in order of preference):

- AFFECTED Spray Valve controller in MANUAL (if only one is obviously malfunctioning)

OR - PK-444A, Master Pressure Controller, in MANUAL OR - BOTH individual Spray Valve controllers in MANUAL Standard: Places PCV

-444C PZR Spray Loop A controller to manual and lowers the output to zero (0).

Stops RCS pressure reduction caused from open spray valve.

Stabilizes RCS pressure.

Comment: (Critical to stop the RCS pressure reduction using one of the methods listed to prevent an unnecessary automatic SI from occurring.

)

Appendix C Page 13 of 15 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM d Rev. FINAL AOP-019, Malfunction of RCS Pressure Control Performance Step: 22 Obtain copy of AOP

-019 Standard: Announces immediate actions of AOP

-019 are complete and obtains a copy of AOP

-019 to continue actions associated with the procedure.

Evaluator Cue:

CRS acknowledges report Comment: Examiner Cue:

After the candidate has shut 1RC

-107 and has obtained a copy of AOP

-019: Evaluation on this JPM is complete.

Announce END OF JPM Direct Simulator Operator to place the Simulator in FREEZE.

STOP TIME:

Simulator Operator:

When directed by the Lead Examiner then go to Freeze.

Appendix C Page 14 of 15 Form ES-C-1 VERIFICATION OF COMPLETION 2014 HNP NRC Exam Simulator JPM d Rev. FINAL Job Performance Measure No.:

2014 HNP NRC Exam Simulator JPM d Start A Reactor Coolant Pump, IAW OP-100 , Section 5.1 , Reactor Coolant Pump Start

-up - Alternate Path

- Pressurizer Spray Valve fails open after pump start OP-100 Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete: Question Documentation:

Question: Response:

Result: SAT UNSAT Examiner's Signature:

Date:

Appendix C Form ES-C-1 JPM CUE SHEET 2014 HNP NRC Exam Simulator JPM d Rev. FINAL Initial Conditions:

You are the extra RO during a plant startup.

GP-004, Reactor Startup is in progress and is currently on HOLD. The plant has been stabilized with Shutdown Banks withdrawn.

Two hours ago the "A" RCP was removed from service for maintenance.

Maintenance has been completed and the "A" RCP is ready for operation.

The previous crew ha s verified that all initial conditions to start the RCP are met and have initialed all steps Initiating Cue:

The CRS has instructed you to start "A" RCP, in accordance with OP-100, Reactor Coolant System, Section 5.1, Reactor Coolant Pump Start

-up. The initial conditions have been verified.

Appendix C Job Performance Measure Form ES-C-1 Worksheet 2014 HNP NRC Exam Simulator JPM CR e Rev. FINAL Facility: Harris Nuclear Plant Task No.: 061007H101 Task Title:

Using ESW System As A Backup Source Of Water To AFW JPM No.: 20 1 4 NRC Exam Simulator JPM CR e K/A

Reference:

054 AA1.01 RO 4.5 SRO 4.4 ALTERNATE PATH

- NO Examinee: ________________________

NRC Examiner:

_________________

Facility Evaluator:

________________________

Date: ________

Method of testing:

Simulated Performance:

Actual Performance:

X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

A LOCA has occurred and EOP-E-1, Loss of Reactor or Secondary Coolant is being implemented. Both A and B Motor Driven AFW pumps are in operation.

Initiating Cue:

A leak has developed in the Condensate Storage Tank (CST) and level has decreased to less than 10 percent.

Your directions are to secure the B Motor Drive n AFW pump per OP-137 section 7.1 and to switch the AFW water supply from the CST to ESW Header A for the A Motor Driven AFW pump and the Turbine Driven AFW pump per OP

-137, Auxiliary Feedwater System, Section 8.1.

You will silence all alarms and another RO will address alarms not associated with this evolution.

Examiners Note:

To expedite the examination schedule, the candidate should review the INITIAL CONDITIONS, INITIATING CUE, and the copy of OP

-137 prior to entering the simulator to perform the JPM.

Appendix C Job Performance Measure Form ES-C-1 Worksheet 2014 HNP NRC Exam Simulator JPM CR e Rev. FINAL Task Standard:

Train A ESW is supplying AFW pumps.

Required Materials:

OP-137 pages 32

-33, step 2 and 3 marked N/A and pages 36

-38 OP-169 page 15, initial condition 7.1.1, step 1.a and 1.b and step 2, AH2 B-SA and AH-3 B-SA and step 3 marked N/A General

References:

OP-137, Auxiliary Feedwater System, Rev. 38, OP-169, Containment Cooling and Ventilation, Rev. 24 Time Critical Task:

No Validation Time:

1 5 Minutes CRITICAL STEP JUSTIFICATION Step 7 Isolation of ESW flow will ensure required cooling to maintain EDG operable for LOSP.

Step 9 Isolation of ESW flow will ensure required cooling to maintain EDG operable for LOSP.

Step 1 2 Opening 1SW

-121SA provides ESW suction from the A header to the "A" MDAFW pump Step 1 3 Opening 1SW

-123SA provides ESW suction from the A header to the "A" MDAFW pump Step 2 3 Opening 1SW

-124SA provides ESW suction from the A header to the TDAFW pump Step 2 4 Opening 1SW-126SA provides ESW suction from the A header to the TDAFW pump

Appendix C Job Performance Measure Form ES-C-1 Worksheet 2014 HNP NRC Exam Simulator JPM CR e Rev. FINAL 2014 NRC Exam

- SIMULATOR SETUP Simulator Operator Reset to IC

-169 password "spurs" NOTE: It may be necessary to override the 86 Generator lockouts if they are tripped prior to going to run.

o Run AMS file

- Roll Gen 86 Relays Go to RUN Silence and Acknowledge annunciators

GO TO FREEZE and inform the lead examiner the Simulator is ready. DO NOT GO TO RUN until directed by the lead examiner. (The examiner has provided to the candidate with initial conditions and the initiating cues prior to placing the simulator in RUN.)

The following setup information is how this exam IC was developed.

Initial Simulator IC was IC

-19 Level transmitter LI

-9010A1 SA should read 8.5 %

o imf LT:901a (n 00:00:00) 8.5 0 Level transmitter LI

-9010B1 SB should read 8.3%)

o imf LT:901b (n 0 0) 8.3 0 3 Annunciators will be on due to these actions:

ALB-017-4-5 CST Empty ALB-017-5-5 CST Low Minimum Level ALB-017-6-5 CST Hi-Hi/Lo-Lo Level IMF RCS18A (n 0 0) 15 0 Small Break LOCA A Loop 15% of 4.5" line Implement E-0 then E-1 as necessary Secure the TDAFW Pump o Close 1MS-70 o Close 1MS-72 Restore power to 1A

-1 and 1B-1 Reduce AFW flow to 300 KPPH total Silence, acknowledge and reset annunciators GO TO FREEZE and create a snap IC

Appendix C Page 4 of 15 Form ES-C-1 PERFORMANCE INFORAMTION

- Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR e Rev. FINAL Simulator Operator:

When directed by the Lead Examiner go to Run.

START TIME:

Evaluator Note:

There isn't a step in OP

-137 that directs when to secure the B MDAFW Pump. It will be at the candidate's discretion when to stop the pump. The JPM step to stop the pump is placed after lining up ESW to the A MDAFW Pump just as a place keeper. The candidate can secure the B MDAFW at any time prior to, during, or after the ESW alignment.

Performance Step: 1 STOPS B MDAFW PUMP Evaluator Cue:

When Operator determines that he needs copy of OP

-137 section 7.1. Give marked

-up copy of procedure.

Standard: Locates MCB control switch for B MDAFW and identifies that the RED light is lit.

Takes the control switch for 'B' MDAFW Pump from neutral to STOP and identifies that the RED light is out and the GREEN light is lit.

Comment: Performance Step:

2 OBTAIN PROCEDURE Standard: Locates OP

-137 and refers to Section 8.1 and reviews initial conditions.

Evaluator Cue:

Initial conditions have been met for OP

-137 Section 8.1.

Comment:

Appendix C Page 5 of 15 Form ES-C-1 PERFORMANCE INFORAMTION

- Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR e Rev. FINAL OP-137 section 8.1

.2 Cautions prior to step 1 Performance Step:

3 Caution: The Emergency Service Water System serves as a backup source of water to the Auxiliary Feedwater System if the Condensate Storage Tank volume is exhausted or unavailable. Since the Emergency Service Water System uses raw reservoir water, it is only used in extreme emergencies.

Caution: Isolating Service Water to the Containment Fan Coolers will make the Coolers inoperable, therefore only one Train of ESW should be aligned to the suction of the AFW pumps unless a determination has been made on the desirability of making both Trains of Containment Fan Coolers inoperable.

Standard: Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)

Comment:

OP-137 section 8.1

.2 Step 1 Performance Step:

4 To supply AFW Pump 1A

-SA from ESW header A, Perform the following:

a. Declare A train Containment Fan Coolers inoperable Standard: Notifies CRS to declare A Train of Containment Fan Coolers INOPERABLE Evaluator Cue:

CRS acknowledges 'A' Train CFCs are inoperable Comment: Evaluator NOTE:

After Candidate determines that they need to use OP

-169 to perform the next step then provide the candidate with a marked up copy of OP

-169 Sect. 7.1 CUE: The CRS has reviewed OP

-169 and has N/A'd the steps that are not required to be performed.

Appendix C Page 6 of 15 Form ES-C-1 PERFORMANCE INFORAMTION

- Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR e Rev. FINAL OP-137 section 8.1

.2 Step 1.b Performance Step:

5 Verify A Train Containment Fan Coolers are secured per OP-169 Standard: Obtains copy of OP

-169 section 7.1 Rev. 24 and perform step 2 Comment: OP-169 section 7.1 step 2.

Performance Step:

6 PLACE the control switch for each of the following fans to be removed from service to STOP:

Standard: Locates switch for AH

-2 A-SA and Identifies that the Red LO SPD light is lit.

Takes the control switch for AH

-2 A-SA from neutral to STOP. Verifies that the RED light goes out and the GREEN light is lit.

Standard: Locates switch for AH

-3 A-SA and identifies that the Red LO SPD light is lit.

Takes the control switch for AH

-3 A-SA from neutral to STOP. Verifies that the RED light goes out and the GREEN light is lit.

Comment:

Appendix C Page 7 of 15 Form ES-C-1 PERFORMANCE INFORAMTION

- Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR e Rev. FINAL Evaluator Note:

Per EOP Users Guide "Unless otherwise specified, a required task need not be fully completed before proceeding to the next instruction. Generally, it is sufficient to begin a task and have assurance that it is progressing satisfactorily".

Operator may start next valve stroke before current step is complete.

OP-137 section 8.1

.2 Step 1.c Performance Step:

7 SHUT 1SW-92 SA, CNMT FAN COOLER AH

-3 INLET. Standard: Locates the control switch for 1SW

-92 SA and identifies that the RED Light is lit.

Takes the control switch for 1SW

-92 SA from neutral to shut. Verifies that the RED light goes out and the GREEN light is lit.

Comment:

OP-137 section 8.1

.2 Step 1.d Performance Step:

8 SHUT 1SW-97 SA, CNMT FAN COOLER AH

-3 OUTLET. Standard: Locates the control switch for 1SW

-97 SA and identifies that the RED Light is lit.

Takes the control switch for 1SW

-97 SA from neutral to shut. Verifies that the RED light goes out and the GREEN light is lit.

Comment:

Appendix C Page 8 of 15 Form ES-C-1 PERFORMANCE INFORAMTION

- Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR e Rev. FINAL OP-137 section 8.1

.2 Step 1.e Performance Step:

9 SHUT 1SW-91 SA, CNMT FAN COOLER AH

-2 INLET. Standard: Locates the control switch for 1SW-91 SA and identifies that the RED Light is lit.

Takes the control switch for 1SW

-91 SA from neutral to shut. Verifies that the RED light goes out and the GREEN light is lit.

Comment: OP-137 section 8.1

.2 Step 1.f Performance Step:

10 SHUT 1SW-109 SA, CNMT FAN COOLER AH

-2 OUTLET. Standard: Locates the control switch for 1SW

-109 SA and identifies that the RED Light is lit.

Takes the control switch for 1SW

-109 SA from neutral to shut. Verifies that the RED light goes out and the GREEN light is lit.

Comment: OP-137 section 8.1

.2 Step 1.g Performance Step:

1 1 CLOSE 1SW-122, AFW PUMP 1A

-SA SW DRAIN ISOLATION.

Standard: Directs AO to SHUT 1SW

-122 Simulator Operator:

NOTE: 1SW-122 is not modeled on the Simulator AO acknowledges direction to shut 1SW

-122, AFW Pump 1A-SA SW Drain Isolation.

Pause 10-15 seconds then report that 1SW

-122, AFW Pump 1A SW Drain Isolation has been SHUT Comment:

Appendix C Page 9 of 15 Form ES-C-1 PERFORMANCE INFORAMTION

- Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR e Rev. FINAL OP-137 section 8.1

.2 Step 1.h Performance Step:

1 2 OPEN 1SW-121 SA, SW HEADER A TO AUX FW MOTOR PUMP A-SA. Standard: Locates MCB control switch for 1SW

-121 SA and identifies that the green light is lit.

Takes control switch for 1SW-121 SA from neutral to open and identifies that the GREEN light is out and the RED light is lit.

Comment: OP-137 section 8.1

.2 Step 1.i Performance Step:

1 3 OPEN 1SW-123 SA, SW HEADER A TO AUX FW MOTOR PUMP A-SA. Standard: Locates MCB control switch for 1SW

-123 SA and identifies that the green light is lit.

Takes control switch for 1SW

-123 SA from neutral to open and identifies that the GREEN light is out and the RED light is lit.

Comment: OP-137 section 8.1

.2 Step 1.j Performance Step:

1 4 Monitor AFW system parameters to ensure proper operation

. Standard: Monitors PI

-2150A1 A DISCH PRESS and PI

-2250A1 A SUCT PRESS/ Monitors Aux Feedwater Flow on FI

-2050A1, B1, and C1. (Candidate may report to CRS that ESW is aligned to A AFW Pump. If so acknowledge information and direct candidate to continue lineup)

Comment:

Appendix C Page 10 of 15 Form ES-C-1 PERFORMANCE INFORAMTION

- Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR e Rev. FINAL OP-137 section 8.1

.2 Caution prior to step 3 Performance Step: 1 5 CAUTION: Do NOT cross tie the ESW trains together via the TDAFW pump suction supply from ESW. Crosstie is prevented by performing only Step 8.1.2.3 OR 8.1.2.

4 Standard: Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)

Comment:

OP-137 section 8.1

.2 Step 3 Performance Step:

1 6 To supply AFW Pump 1X

-SAB from ESW header A:

a. Declare A train Containment Fan Coolers inoperable Standard: No action required (already declared)

Comment: OP-137 section 8.1 Step 3.b Performance Step:

1 7 Verify A Train Containment Fan Coolers are secured per OP-169 Standard: No action required (already performed)

Comment:

Appendix C Page 11 of 15 Form ES-C-1 PERFORMANCE INFORAMTION

- Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR e Rev. FINAL OP-137 section 8.1

.2 Step 3.c Performance Step:

1 8 Verify shut 1SW

-92 SA, Cnmt Fan Cooler AH

-3 inlet Standard: No action required (already performed)

Comment: OP-137 section 8.1

.2 Step 3.d Performance Step:

1 9 Shut 1SW-97 SA, Cnmt Fan Cooler AH

-3 outlet Standard: No action required (already performed)

Comment: OP-137 section 8.1

.2 Step 3.e Performance Step:

20 Verify shut 1SW

-91 SA, Cnmt Fan Cooler AH

-2 inlet Standard: No action required (already performed)

Comment: OP-137 section 8.1

.2 Step 3.f Performance Step:

2 1 Verify Shut 1SW

-109 SA, Cnmt Fan Cooler AH

-2 outlet Standard: No action required (already performed)

Comment:

Appendix C Page 12 of 15 Form ES-C-1 PERFORMANCE INFORAMTION

- Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR e Rev. FINAL OP-137 section 8.1

.2 Step 3.g Performance Step:

2 2 Shut 1SW-125, AFW Pump 1X-SAB SW Header A Drain Isolation Standard: Contacts AO and tells him to close 1SW

-125. Simulator Operator OR Evaluator Cue

NOTE: 1SW

-125 is not modeled on the Simulator.

AO acknowledges direction to shut 1SW

-125, AFW Pump 1X-SAB SW Header A Drain Isolation.

(Pause 10 - 15 seconds) AO reports 1SW

-125 closed.

Comment: OP-137 section 8.1

.2 Step 3.h. Performance Step:

23 OPEN 1SW-124 SA, SW HEADER A TO AUX FW TURBINE PMP Standard: Locates MCB control switch for 1SW

-124 SA and identifies that the green light is lit.

Takes control switch for 1SW

-124 SA from neutral to open and identifies that the GREEN light is out and the RED light is lit.

Comment:

Appendix C Page 13 of 15 Form ES-C-1 PERFORMANCE INFORAMTION

- Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR e Rev. FINAL OP-137 section 8.1

.2 Step 3.i Performance Step:

2 4 Open 1SW-126 SA, SW HEADER A TO AUX FW TURBINE PUMP Standard: Locates MCB control switch for 1SW

-126 SA and identifies that the GREEN light is lit Takes control switch for 1SW

-126 SA from neutral to open and identifies that the GREEN light is out and the RED light is lit.

Comment:

OP-137 section 8.1

.2 Step 3.j Performance Step:

2 5 Monitor AFW System to ensure proper operation

. Standard: No action required 1X-SAB AFW pump is not running but TDAFW pump Suction pressure should be seen to increase

.

Report to CRS that 'A' ESW Header is supplying the 'A' MDAFW pump and the TDAFW pump.

Evaluator Cue:

CRS acknowledges that 'A' ESW Header is supplying the 'A' MDAFW Pump and the TDAFW Pump.

Announce: End of JPM Direct Simulator Operator to place the Simulator in FREEZE.

Comment: STOP TIME:

Simulator Operator:

When directed by the Lead Examiner go to Freeze.

Appendix C Page 14 of 15 Form ES-C-1 VERIFICATION OF COMPLETION 2014 HNP NRC Exam Simulator JPM CR e Rev. FINAL Job Performance Measure No.:

2014 HNP NRC Exam Simulator JPM CR e Using ESW System As A Backup Source Of Water To AFW OP-137, Auxiliary Feedwater System Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response:

Result: SAT UNSAT Examiner's Signature:

Date:

Appendix C Form ES-C-1 JPM CUE SHEET 2014 HNP NRC Exam Simulator JPM CR e Rev. FINAL Initial Conditions:

A LOCA has occurred and EOP

-E-1, Loss of Reactor or Secondary Coolant is being implemented. Both A and B Motor Driven AFW pumps are in operation.

Initiating Cue:

A leak has developed in the Condensate Storage Tank (CST) and level has decreased to less than 10 percent.

Your directions are to secure the B Motor Drive n AFW pump per OP-137 section 7.1 and to switch the AFW water supply from the CST to ESW Header A for the A Motor Driven AFW pump and the Turbine Driven AFW pump per OP

-137, Auxiliary Feedwater System, Section 8.1.

You will silence all alarms and another RO will address alarms not associated with this evolution.

Appendix C Page 1 of 16 Form ES-C-1 Worksheet 20 1 4 NRC Exam Simulator JPM CR f Rev. FINAL Facility: Harris Nuclear Plant Task No.: 022001H101 Task Title:

Swapping Containment Fan Cooler Lead Fans JPM No.: 20 1 4 NRC Exam Simulator JPM CR f K/A

Reference:

022 A4.0 1 RO 3.6 / SRO 3.6 ALTERNATE PATH

- N O Examinee: ________________________

NRC Examiner:

_________________

Facility Evaluator:

________________________

Date: ________ Method of testing:

Simulated Performance:

Actual Performance:

X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

The plant is operating at 100% power

'A' Train equipment is in service The oncoming shift will be performing fourth quarter sequencer testing in accordance with OST

-1094 and OST

-1095, Sequencer Block Circuit And Containment Fan Cooler Testing Train A (B)

Quarterly Interval All Modes Initiating Cue:

The CRS is directing you to swap all of the Containment Fan Cooler Lead Fans to the 1 B-SA and 1 B-SB position in accordance with OP-169, Containment Cooling And Ventilation, Section 8.8 Examiners Note:

To expedite the examination schedule, provide the candidate with a copy of OP

-169 section 8.8 prior to entering the simulator to perform the JPM. This will allow the candidate time to task preview the procedure.

Appendix C Page 2 of 16 Form ES-C-1 Worksheet 20 1 4 NRC Exam Simulator JPM CR f Rev. FINAL Task Standard:

Containment Fan Coolers lead selector switches are in the 1B

-SB position. Required Materials:

OP-169, Containment Cooling And Ventilation, pages 1-6, and pages 35-39, Rev. 24 General

References:

OP-169, Containment Cooling And Ventilation, Revision 24 Handouts: OP-169, Section 8.8 Time Critical Task:

N/A Validation Time:

15 minutes Critical Step Justification Step 5 Stopping the running fan in the train not selected as the lead fan must be performed in order to comply with procedure and to not have all Containment fans in service when not required. This step will leave only the lead fans in operation.

Step 7 Step must be properly performed in order to meet the intent of JPM. If the Lead Fan Selector Switch is not determined and properly aligned then the swap of Lead fans will not occur.

Step 11 To comply with OP

-169, Precaution and Limitation #11

- After any fan cooler is started in low speed, the fan should be allowed to come up to speed for approximately 15 seconds before shifting to fast speed. This reduces the starting current required for high speed operation.

Step 14 Step must be properly performed in order to meet the intent of JPM. If the Lead Fan Selector Switch is not determined and properly aligned then the swap of Lead fans will not occur. Step 18 To comply with OP

-169, Precaution and Limitation #11

- After any fan cooler is started in low speed, the fan should be allowed to come up to speed for approximately 15 seconds before shifting to fast speed. This reduces the starting current required for high speed operation.

Appendix C Page 3 of 16 Form ES-C-1 Worksheet 20 1 4 NRC Exam Simulator JPM CR f Rev. FINAL 20 1 4 NRC Exam - SIMULATOR SETUP Simulator Operator Reset to IC

-19 Silence and Acknowledge annunciators GO TO FREEZE and inform the lead examiner the Simulator is ready. DO NOT GO TO RUN until directed by the lead examiner. (The examiner has provided to the candidate with initial conditions and the initiating cues prior to placing the simulator in RUN.)

To recreate the IC setup for this JPM:

NOTE: There are no special needs for this JPM it can be ran in any 100% power IC Initial Simulator IC was IC-19 Silence Acknowledge and Reset Annunciators Freeze and Snap these conditions to your exam IC Appendix C Page 4 of 16 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 20 14 NRC Exam Simulator JPM CR f Rev. FINAL Simulator Operator:

When directed by the Lead Examiner go to Run.

START TIME:

Performance Step: 1 OBTAIN PROCEDURE Standard: Has task previewed OP

-169 section 8.8 in preparations of swapping Containment Fan Cooler Lead Fans.

Comment:

OP-169, Section 8.8 Initial Conditions Performance Step: 2 It is desired to select other fan as lead in Containment Fan Cooler Unit(s).

Standard: Initials section 8.8.1 initial conditions.

Comment: OP-169, Section 8.8.2 Notes prior to step 1 Performance Step: 3 NOTE: Due to circuit design, swapping the Containment Fan Cooler Lead Fan Selector Switch (for lead fan on Sequencer start) may cause the running fans to trip. To minimize the potential impact, the selector switch should not be repositioned when fans are running, unless the selected fan is no longer operable or CRS permission is obtained.

NOTE: The following step should be repeated as needed on one Containment Fan Cooler Unit at a time.

Standard: Operator reads and placekeeps any note or caution (initials, checks or circle/slash)

Comment:

Appendix C Page 5 of 16 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 20 14 NRC Exam Simulator JPM CR f Rev. FINAL OP-169, Section 8.8.2 Caution prior to step 1 Performance Step: 4 CAUTION - Failure of equipment to secure in this section will result in the associated EDG being inoperable. Tech Spec 3.8.1.1 is applicable until the breaker for the affected load is opened. Standard: Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)

Comment:

Appendix C Page 6 of 16 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 20 14 NRC Exam Simulator JPM CR f Rev. FINAL Evaluator Note:

Per the procedure note ONLY one Containment Fan Cooler Unit (there are 2 fans per unit) will be stopped at a time and the steps will be repeated for the second Unit.

During the performance of the JPM annunciators associated with AH-2 (ALB-27-7-2) and AH-3 (ALB-27-8-2) low flow alarms will come in. These are expected alarms during starting and stopping these Air Handlers.

OP-169, Section 8.8.2 step 1 Performance Step: 5 IF any fan is running in the Containment Fan Cooler Unit in which the LEAD FAN SEL switch will be repositioned, THEN PERFORM the following:

a. PLACE the control switch for each running fan in the unit in which the LEAD FAN SEL switch will be repositioned to STOP:

AH-1 unit AH-1 A-SB - OFF AH-1 B-SB - OFF AH-2 unit AH-2 A-SA - RUNNING AH-2 B-SA - RUNNING AH-3 unit AH-3 A-SA - RUNNING AH-3 B-SA - RUNNING AH-4 unit AH-4 A-SB - OFF AH-4 B-SB - OFF Standard: Identifies that Train 'A' are in service and that both fans in AH-2 unit and AH

-3 unit is operating.

Locates MCB controls for Containment Fan Cooler Unit AH

-2 and takes control switch to STOP for AH

-2 A-SA and AH-2 B-S A Comment:

Appendix C Page 7 of 16 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 20 14 NRC Exam Simulator JPM CR f Rev. FINAL OP-169, Section 8.8.2 Note prior to step 1.b Performance Step: 6 For AH-1 and AH-4, OST-1095 verifies that 1A

-SB is selected during first and third quarters, and that 1B

-SB is selected for second and fourth quarters.

For AH-2 and AH-3, OST-1094 verifies that 1A

-SA is selected during first and third quarters, and that 1B

-SA is selected for second and fourth quarters.

Standard: Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)

Comment: OP-169, Section 8.8.2 step 1.b Performance Step: 7 PLACE the LEAD FAN SEL switch in the desired position for the Containment Fan Cooler Unit in which the fans were just secured: -SB (1B-SB) for AH

-1 1A-SA (1B-SA) for AH

-2 -SA (1B-SA) for AH

-3 -SB (1B-SB) for AH

-4 Standard: Locates MCB Lead Fan Selector switch for AH

-2 and rotates switch to the 1B

-SA position.

Comment:

Appendix C Page 8 of 16 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 20 14 NRC Exam Simulator JPM CR f Rev. FINAL OP-169, Section 8.8.2 Note prior to step 1.c Performance Step:

8 NOTE: When shifting speed of the Containment Fan Coolers from high speed to low speed, allow at least 30 seconds for the fan to coast down before starting in low speed to minimize equipment stresses.

Standard: Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)

Comment: OP-169, Section 8.8.2 step 1.c Performance Step:

9 For the Containment Fan Cooler Unit in which the LEAD FAN SEL switch was just manipulated, PLACE the control switches for any fan that was secured in Step 8.8.2.1.a to LO

-SPD: AH-2 unit -2 A-SA -2 B-SA Standard: Locates AH

-2 A-SA control switch and starts fan in LO

-SPD Locates AH

-2 B-SA control switch and starts fan in LO

-SPD Comment:

Appendix C Page 9 of 16 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 20 14 NRC Exam Simulator JPM CR f Rev. FINAL OP-169, Section 8.8.2 Note prior to step 1.d Performance Step:

10 NOTE: After any fan cooler is started in low speed, the fan should be allowed to come up to speed for approximately 15 seconds before shifting to fast speed. This reduces the starting current required for high speed operation.

NOTE: Step 8.8.2.1.e must be performed without delay following Step 8.8.2.1.d. The fan should not be allowed to coast down before being started in fast speed. These two steps should be performed together, one fan at a time.

Standard: Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)

Comment:

OP-169, Section 8.8.2 steps 1.d and 1.e Performance Step:

11 PLACE the control switches for any fan that was started in Step 8.8.2.1.c to STOP:

AH-2 unit -2 A-SA -2 B-SA PLACE the control switches for any fan that was stopped in Step 8.8.2.1.d to HI

-SPD: AH-2 unit -2 A-SA -2 B-SA Standard: Locates AH-2 unit control switches for:

AH-2 A-SA Takes control switches to STOP then to HI

-SPD AH-2 B-SA Takes control switches to STOP then to HI

-SPD Comment:

Appendix C Page 10 of 16 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 20 14 NRC Exam Simulator JPM CR f Rev. FINAL OP-169, Section 8.8.2 step 1.f Performance Step:

12 REPEAT Steps 8.8.2.1.a through 8.8.2.1.e as needed for the remaining Containment Fan Cooler Units in which there are fans running. Standard: Reads step and returns to steps 8.8.2.1.a through 8.8.2.1.e for AH-3 Comment:

OP-169, Section 8.8.2 step 1 Performance Step: 13 IF any fan is running in the Containment Fan Cooler Unit in which the LEAD FAN SEL switch will be repositioned, THEN PERFORM the following:

a. PLACE the control switch for each running fan in the unit in which the LEAD FAN SEL switch will be repositioned to STOP:

AH-3 unit -3 A-SA - RUNNING -3 B-SA - RUNNING Standard: Identified that Train 'A' is in service and that both fans in AH

-2 unit and AH

-3 unit is operating.

Locates MCB controls for Containment Fan Cooler Unit AH

-3 and takes control switch to STOP for AH

-3 A-SA and AH-3 B-S A Comment:

Appendix C Page 11 of 16 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 20 14 NRC Exam Simulator JPM CR f Rev. FINAL OP-169, Section 8.8.2 step 1.b Performance Step: 14 PLACE the LEAD FAN SEL switch in the desired position for the Containment Fan Cooler Unit in which the fans were just secured: -SB (1B-SB) for AH

-1 1A-SA (1B-SA) for AH

-2 1A-SA (1B-SA) for AH

-3 1A-SB (1B-SB) for AH

-4 Standard: Locates MCB Lead Fan Selector switch for AH

-3 and rotates switch to the 1B

-SA position.

Comment: OP-169, Section 8.8.2 Note prior to step 1.c Performance Step:

15 NOTE: When shifting speed of the Containment Fan Coolers from high speed to low speed, allow at least 30 seconds for the fan to coast down before starting in low speed to minimize equipment stresses.

Standard: Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)

Comment:

Appendix C Page 12 of 16 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 20 14 NRC Exam Simulator JPM CR f Rev. FINAL OP-169, Section 8.8.2 step 1.c Performance Step: 1 6 For the Containment Fan Cooler Unit in which the LEAD FAN SEL switch was just manipulated, PLACE the control switches for any fan that was secured in Step 8.8.2.1.a to LO-SPD: AH-3 unit -3 A-SA -3 B-SA Standard: Locates AH

-3 A-SA control switch and starts fan in LO

-SPD Locates AH

-3 B-SA control switch and starts fan in LO

-SPD Comment: OP-169, Section 8.8.2 Note prior to step 1.d Performance Step: 1 7 NOTE: After any fan cooler is started in low speed, the fan should be allowed to come up to speed for approximately 15 seconds before shifting to fast speed. This reduces the starting current required for high speed operation.

NOTE: Step 8.8.2.1.e must be performed without delay following Step 8.8.2.1.d. The fan should not be allowed to coast down before being started in fast speed. These two steps should be performed together, one fan at a time.

Standard: Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)

Comment:

Appendix C Page 13 of 16 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 20 14 NRC Exam Simulator JPM CR f Rev. FINAL OP-169, Section 8.8.2 steps 1.d and 1.e Performance Step: 1 8 PLACE the control switches for any fan that was started in Step 8.8.2.1.c to STOP:

AH-3 unit -3 A-SA -3 B-SA PLACE the control switches for any fan that was stopped in Step 8.8.2.1.d to HI

-SPD: AH-3 unit -3 A-SA -3 B-SA Standard: Locates AH-3 unit control switches for:

AH-3 A-SA Takes control switches to STOP then to HI

-SPD AH-3 B-SA Takes control switches to STOP then to HI

-SPD Comment: OP-169, Section 8.8.2 Note prior to step 2 Performance Step:

1 9 NOTE: For AH-1 and AH-4, OST-1095 verifies that 1A

-SB is selected during first and third quarters, and that 1B

-SB is selected for second and fourth quarters.

For AH-2 and AH-3, OST-1094 verifies that 1A

-SA is selected during first and third quarters, and that 1B

-SA is selected for second and fourth quarters.

Standard: Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)

Comment:

Appendix C Page 14 of 16 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 20 14 NRC Exam Simulator JPM CR f Rev. FINAL OP-169, Section 8.8.2 step 2 Performance Step:

20 IF there is no fan running in the Containment Fan Cooler Unit, THEN PLACE the LEAD FAN SEL switch in the desired position for the Containment Fan Cooler Unit:

-SB (1B-SB) for AH

-1 -SA (1B-SA) for AH

-2 -SA (1B-SA) for AH

-3 -SB (1B-SB) for AH

-4 Standard: Identifies that AH

-1 and AH-4 do not have fans running and places LEAD FAN SEL switches to 1B

-SB for each AH.

AH-1 LEAD FAN SEL switch to 1B

-SB AH-4 LEAD FAN SEL switch to 1B

-SB Comment: OP-169, Section 8.8.2 step 3 Performance Step:

2 1 VERIFY that the fans selected in Steps 8.8.2.1.c and 8.8.2.2 are OPERABLE. Standard: Initials step that fans selected in Steps 8.8.2.1.c and 8.8.2.2 are OPERABLE. Evaluator Cue:

When student identifies or states that the fans are operable CUE: I will get a second operator to complete the configuration closeout. Evaluation on this JPM is complete.

END OF JPM Inform the Simulator Operator to place Simulator in FREEZE STOP TIME:

Simulator Operator:

When directed by the Lead Examiner then go to Freeze.

Appendix C Page 15 of 16 Form ES-C-1 VERIFICATION OF COMPLETION 20 14 NRC Exam Simulator JPM CR f Rev. FINAL Job Performance Measure No.: 20 1 4 NRC Exam Simulator JPM CR f Swapping Containment Fan Cooler Lead Fans OP-169 , Containment Cooling and Ventilation, Section 8.

8 Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question: Response: Result: SAT UNSAT Examiner's Signature:

Date:

Appendix C Form ES-C-1 JPM CUE SHEET 20 14 NRC Exam Simulator JPM CR f Rev. FINAL Initial Conditions:

The plant is operating at 100% power

'A' Train equipment is in service The oncoming shifts will be performing fourth quarter sequencer testing in accordance with OST

-1094 and OST

-1095, Sequencer Block Circuit And Containment Fan Cooler Testing Train A (B) Quarterly Interval All Modes Initiating Cue:

The CRS is directing you to swap all of the Containment Fan Cooler Lead Fans to the 1B

-SA and 1B-SB position in accordance with OP

-169, Containment Cooling And Ventilation, Section 8.8

Appendix C Job Performance Measure Form ES-C-1 Worksheet 2014 HNP NRC Exam Simulator JPM CR g Rev. FINAL 1Facility: Harris Nuclear Plant Task No.: 301092H401 Task Title:

Reset CVIS and Restore RM

-3502A to Operation JPM No.: 201 4 NRC Exam Simulator JPM CR g K/A

Reference:

073 A4.02 RO 3.7 SRO 3.7 ALTERNATE PATH

- NO Examinee: ________________________

NRC Examiner:

_________________

Facility Evaluator:

________________________

Date: ________

Method of testing:

Simulated Performance:

Actual Performance:

X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

The plant is operating at 100% power Breaker 105 opened resulting in a loss of 1A

-SA 6.9 KV Bus The 'A' EDG has re

-energized the bus Initiating Cue:

You are the BOP and the CRS has directed you to perform AOP-025, Loss Of One Emergency AC Or One Emergency DC Bus Attachment 3

- Resetting CVIS and Restoring RM

-3502A Operation You will silence all alarms and another RO will address alarms not associated with this evolution.

Evaluator Note:

At this time provide the candidate a copy of AOP

-025, Attachment 3

Appendix C Job Performance Measure Form ES-C-1 Worksheet 2014 HNP NRC Exam Simulator JPM CR g Rev. FINAL Task Standard:

CVIS reset and RM

-3502A restored to operation.

Required Materials:

AOP-025 Attachment 3, OP

-118 section 6.3 General

References:

AOP-025, Loss Of One Emergency AC Or One Emergency DC Bus , Revision 38 OP-118, Radiation Monitoring System, Revision 3 2 Handouts: AOP-025, Attachment 3 OP-118, Section 6.3 Time Critical Task:

N/A Validation Time:

10 minutes Critical Step Justification Step 9 Proper completion of this step restores operations to Containment Vacuum Breakers and results in exiting Tech Spec 3.0.3 Step 10 Must open the Sample Panel valve to line up flow to the Rad Monitor. Without opening the valve the Rad Monitor will not be monitoring anything.

Step 11 Must depress the "flow" pushbutton to allow the Rad Monitor to obtain flow through the monitor.

Appendix C Job Performance Measure Form ES-C-1 Worksheet 2014 HNP NRC Exam Simulator JPM CR g Rev. FINAL 2014 NRC Exam

- SIMULATOR SETUP Simulator Operator Reset to IC

-1 71 password "spurs" Go to RUN Silence and Acknowledge annunciators GO TO FREEZE and inform the lead examiner the Simulator is ready. DO NOT GO TO RUN until directed by the lead examiner. (The examiner has provided to the candidate with initial conditions and the initiating cues prior to placing the simulator in RUN.)

The following setup information is how this exam IC was developed.

Initial Simulator IC was IC-1 9 Go to run Insert a loss of 6.9KV Emergency Bus 1A

-SA (Normal Feed Bkr 105) imf eps05a (n 00:00:00 00:00:00) true Reduce AFW flow to minimum (recirc flow only)

Shut 1MS-70 Shut 1AF-147, 143, 149 Allow sequencer to reach Load Block

-9 Re-energize 480V Emergency Bus 1A1 Allow SG levels to stabilize (about 5-10 minutes)

Silence , Acknowledge and Reset Annunciators

Freeze and Snap these conditions to your exam IC Appendix C Page 4 of 16 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR g Rev. FINAL Simulator Operator:

When directed by the Lead Examiner place the Simulator in Run. START TIME:

Performance Step: 1 Obtain/review procedure.

Standard: Reviews AOP-025, Loss Of One Emergency AC Bus or One Emergency DC Bus, Attachment 3 Evaluator's Cue:

Provide OP

-118, Section 6.3 when the need is determined.

Comment: AOP-025, Attachment 3 Step 1.

a.1 Performance Step: 2 Perform the following to reset CVIS:

Verify operability of RM 3561A(B) and RM 3561C(D) as follows:

(1) Perform Channel Checks per OP

-118, Radiation Monitoring System, Section 6.3.

Standard: Obtain OP-118, Section 6.3 and performs channel checks Comment:

Appendix C Page 5 of 16 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR g Rev. FINAL Evaluator Note:

The evaluation of all the channels may be performed using the group display to satisfy the channel check. Evaluation of the trend for each individual channel is acceptable but not required therefore the candidate may verify RM's 3561A through D.

Performance Step: 3 Perform Channel Checks per OP

-118, Radiation Monitoring System, Section 6.3

. Standard: At RM-11: Selects RM 3561 A from Group 2 or Grid 2 or Grid 6 Verifies each monitor status indicates "green".

Depresses the <HOURLY TREND> key and reviews the current value for each channel.

After checking RM 3561 A Proceeds to check RM 3561 C Evaluator Cue:

After <HOURLY TREND> is selected for RM 3561 A cue: If asked the current value and trend is consistent with the recorded hourly data over the past 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Comment:

Appendix C Page 6 of 16 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR g Rev. FINAL Performance Step: 4 Perform Channel Checks per OP

-118, Radiation Monitoring System, Section 6.3. Continued:

Standard: At RM-11: Selects RM 3561 C from Group 2 or Grid 2 or Grid 6 Verifies each monitor status indicates "green".

Depresses the <HOURLY TREND> key and reviews the current value for each channel. After checking RM 3561 C

- Restores RM

-11 screen to desired Grid display Returns to AOP

-025, Attachment 3.

Evaluator Cue:

After <HOURLY TREND> is selected for RM 3561 C cue:

If asked the current value and trend is consistent with the recorded hourly data over the past 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Note: Returning Grid display to any display (#

1 - #6) is OK AOP-025, Attachment 3 Step 1.a.2

Performance Step:

5 Perform the following to reset CVIS:

(2) Direct Health Physics to perform HPP

-780, Radiation Monitor System, Operators Manual, for the monitors affected by the loss of power RM 3561A and 3561C. Standard: Contacts Health Physics.

Evaluator Cue:

Acknowledge request, (state: using time compression)

HPP-780 checks have been completed.

Comment:

Appendix C Page 7 of 16 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR g Rev. FINAL Evaluator Note:

Placing 1CP

-9 / 1CP-5, and 1CP

-6 / 1CP-3 and both Air Handlers to the Shut / Stopped conditions ensures that when the Containment Isolation Signal is reset the equipment will be in a known alignment.

AOP-025, Attachment 3 Step 1.

b Performance Step:

6 Perform the following to reset CVIS:

Momentarily place the following Containment Purge Dampers in SHUT: Normal Purge Inlet/Discharge 1CP

-9 & 5 Normal Purge Inlet/Discharge 1CP

-6 & 3 Standard: Momentarily selects each of the following to SHUT:

Switch for 1CP

-9 and 1CP-5 (Already Shut

- Green Light On/Red Light off)

Switch for 1CP

-6 and 1CP-3 (Already Shut

- Green Light On/Red Light off) Comment: AOP-025, Attachment 3 Step 1.

c Performance Step:

7 Perform the following to reset CVIS:

Momentarily place Normal Purge Supply Fan (AH

-82A and AH-82B) control switches to STOP.

Standard: Momentarily place each of the following control switches to STOP: AH-82A (Already STOPPED - Green Light on/Red Light off) AH-82B (Already STOPPED - - Green Light on/Red Light off) Comment:

Appendix C Page 8 of 16 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR g Rev. FINAL AOP-025, Attachment 3, Note prior to Step 1.d Performance Step:

8 The following step will restore Containment Vacuum Breakers and result in exiting Tech Spec 3.0.3.

Standard: Operator reads and placekeeps at any procedure note or caution (initials, checks or circle/slash)

Informs CRS of Tech Spec 3.0.3 exit point Evaluator Cue:

Acknowledge report.

Comment: AOP-025, Attachment 3 Step 1.d Performance Step:

9 Perform the following to reset CVIS:

Reset CVIS using both CNMT Ventilation Isol Train A (B) Switch Standard: Resets both CVIS trains using the respective switches

. Comment: There is no definitive indication to verify that CVIS has been reset Appendix C Page 9 of 16 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR g Rev. FINAL AOP-025, Attachment 3, Step 2.a Performance Step:

10 Perform the following to restore RM 3502A:

Open the following RCS Leak Det Sample Isol Valves:

1SP-16 and 1SP

-939 1SP-916 and 1 SP

-918 Standard: Locates MCB switches on AEP

-1 1SP-16 and 1SP

-939 (already open

- 'B' Train valves

- Red Light s On) Both lights on 1 control switch.

Momentarily place switch (both lights on one control switch) for 1SP-916 and 1SP

-918 to Open - critical element. Green Lights out and Red Lights On.

Comment: AOP-025, Attachment 3, Step 2.b Performance Step: 1 1 Start the RM 3502A sample pump by depressing the FLOW pushbutton on RM 3502A.

Standard: Locates RM-3502A FLOW pushbutton on Panel - Radiation Monitor Control and Display Unit 1 Train A Bay 2 and depresses the FLOW push button on monitor display RC

-1LT-3502A-SA CNMT LEAK DET SYS then verifies that the push button is illuminated.

(critical element) Reports to CRS AOP

-025 Attachment 3 is complete.

Comment: Evaluator Cue:

CRS Acknowledge report.

END of JPM Direct the Simulator Operator to place the Simulator in FREEZE. STOP TIME:

Appendix C Page 10 of 16 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR g Rev. FINAL Simulator Operator:

When directed by the Lead Examiner then go to Freeze.

Examiners Pages follow:

The following pages are what the candidate's copy of the paper work for the channel checks should look like when completed. This is provided to allow the examiner to make comments on how the procedure was filled out by the candidate. It is not intended to be pass/fail criteria.

Appendix C Page 11 of 16 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR g Rev. FINAL

Appendix C Page 12 of 16 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR g Rev. FINAL

Appendix C Page 13 of 16 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR g Rev. FINAL

Appendix C Page 14 of 16 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR g Rev. FINAL

Appendix C Page 15 of 16 Form ES-C-1 VERIFICATION OF COMPLETION 2014 HNP NRC Exam Simulator JPM CR g Rev. FINAL Job Performance Measure No.:

2014 HNP NRC Exam Simulator JPM CR g Reset CVIS and Restore RM

-3502A to Operation IAW AOP-025, Loss Of One Emergency AC Or One Emergency DC Bus, Attachment 3 Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete: Question Documentation:

Question: Response:

Result: SAT UNSAT Examiner's Signature:

Date:

Appendix C Form ES-C-1 JPM CUE SHEET 2014 HNP NRC Exam Simulator JPM CR g Rev. FINAL Initial Conditions:

The plant is operating at 100% power Breaker 105 opened resulting in a loss of 1A

-SA 6.9 KV Bus The 'A' EDG has re

-energized the bus Initiating Cue:

You are the BOP and the CRS has directed you to perform AOP-025, Loss Of One Emergency AC Or One Emergency DC Bus Attachment 3

- Resetting CVIS and Restoring RM

-3502A Operation You will silence all alarms and another RO will address alarms not associated with this evolution

.

Appendix C Page 1 of 15 Form ES-C-1 Worksheet 2014 HNP NRC Exam Simulator JPM CR h Rev. FINAL Facility: Harris Nuclear Plant Task No.: 088018H101 Task Title:

Restoring the Control Room Area HVAC System to Normal After a Control Room Isolation Signal JPM No.: 201 4 NRC Exam Simulator JPM CR h K/A

Reference:

APE067 AA1.05 RO 3.0 SRO 3.1 ALTERNATE PATH

- YES Examinee: ________________________

NRC Examiner:

_________________

Facility Evaluator:

________________________

Date: ________ Method of testing:

Simulated Performance:

Actual Performance:

X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

The unit is operating at 100% power when a fire occurred at the Emergency Shutdown Diesel Generator during testing.

The smoke from the fire caused a Control Room Ventilation Isolation signal to occur.

(Smoke detected at the normal intake Zone 1

-150)

The Fire Brigade has put the fire out and the smoke has been cleared. Initiating Cue:

You are the BOP.

The CRS has directed you to restore the Control Room Area HVAC System to normal in accordance with OP

-173 , Control Room Area HVAC System, Section 8.4

. The initial conditions are satisfied and the HVAC system is in operation per section 8.1 of OP-173.

Appendix C Page 2 of 15 Form ES-C-1 Worksheet 2014 HNP NRC Exam Simulator JPM CR h Rev. FINAL Task Standard:

Place the Control Room Area HVAC system in normal operation Required Materials:

Replacement copy of OP

-173 , Control Room Area HVAC System, Rev. 34 for each JPM performed General

References:

OP-173, Control Room Area HVAC System, Rev. 3 4, ALB-030-6-4, Rev. 34 Time Critical Task:

No Validation Time:

1 5 minutes CRITICAL STEP JUSTIFICATION Step 4 Must reset both trains of Control Room ventilation or the system cannot be taken out of the Emergency filtration lineup.

Step 7 Must open the normal intake valves to return system lineup to normal flow path for operation.

Step 10 Must start a normal exhaust fan to obtain flow and obtain correct damper alignment.

Step 12 Must stop both emergency filtration fans to return to normal filtration lineup and to shift dampers back to normal lineup.

Step 13 Must shut emergency exhaust Recirc dampers to complete normal alignment of Control Room ventilation system.

Step 18 Must start the standby fan to re

-establish Main Control Room ventilation.

Appendix C Page 3 of 15 Form ES-C-1 Worksheet 2014 HNP NRC Exam Simulator JPM CR h Rev. FINAL 201 4 NRC Exam - SIMULATOR SETUP Simulator Operator Reset to IC

-1 72 Password "spurs" Go to RUN Ensure RM-11 is NORMAL Silence and Acknowledge annunciators GO TO FREEZE and inform the lead examiner the Simulator is ready. DO NOT GO TO RUN until directed by the lead examiner. (The examiner has provided to the candidate with initial conditions and the initiating cues prior to placing the simulator in RUN.)

To recreate the IC setup for this JPM:

Initial Simulator IC was IC go to RUN Enter a Control Room Isolation Signal (CRIS) (the JPM has the signal in due to smoke but there isn't a relay that can be individually used so use the one for Radiation) o irf rms011 (n 00:00:00 00:00:00) 0.000 5 00:00:00 o irf rms013 (n 00:00:00 00:00:00) 0.0005 00:00:00 After the fans and dampers have completed switching positions reset the rad monitors to 1e

-7 or they will not clear (value is

< the alarm setpoint on RM

-11) o mrf rms011 (n 00:00:00 00:00:00) 1e

-007 00:00:00 o mrf rms013 (n 00:00:00 00:00:00) 1e

-007 00:00:00 o Reset RM-11 back to normal Start the Motor Driven Fire Pump o irf msc029 (n 0 0 ) START Place 2 alarms to on to simulate a fire Fire Detection System Trouble o ian xn30a07 (n 0 0) ALARM_ON Reflash Fire Pump System Trouble o ian xn30b07 (n 0 0) ALARM_ON Create a conditional Trigger to trip AH-15 A SA when the control switch for Emergency Filtration Recirc Damper CA

-D61 SB is taken to SHUT To create the conditional trigger:

- Go to malfunctions

- Find Control Room Normal Support Fan AH-15-1A assign Trigger 1 with switch to STOP and GREEN light OFF o ior xdi085 (1 00:00:00 00:00:00) STOP o ior xd2o085 (1 00:00:00 00:00:00) OFF

- Wait for ALB 30 3 CNT Room Air Low P to alarm

- Find Annuciator ALB

-030-6-4 assign Trigger 1 to alarm on o ior xn30d06 (1 00:00:00 00:00:00) ALARM_ON

- Go to triggers o Click on Trigger 1 o Click on 'Assign File' o Choose CZD61Shut o (source file should now have CZD61Shut) Silence, Acknowledge and Reset the annunciators Freeze and Snap and save these conditions to your exam IC Appendix C Page 4 of 15 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR h Rev. FINAL Simulator Operator:

When directed by the Lead Examiner go to Run

. START TIME:

Performance Step: 1 Previews procedure Standard: OP-173 and refers to Section 8.4 IF asked by candidate Evaluator Cue:

Initial Conditions have been satisfied Control Room Area HVAC System in operation per Section 8.1, 8.2 or 8.3 Comment: OP-173, Section 8.4 Note prior to Step 1 Performance Step: 2 NOTE: The following Step will cause ALB

-030/1-1, Control Room Isolation Train A, and ALB-030/2-1, Control Room Isolation Train B, to clear Standard: Operator reads and placekeeps any note or caution (initials, checks or circle/slash)

Comment:

Appendix C Page 5 of 15 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR h Rev. FINAL OP-173, Section 8.4 Caution prior to Step 1 Performance Step: 3 CAUTION: Failure of equipment to secure in this section will result in the associated EDG being inoperable. Tech Spec 3.8.1.1 is applicable until the breaker for the affected load is opened. Standard: Operator reads and placekeeps any note or caution (initials, checks or circle/slash)

Comment:

OP-173, Section 8.4 Step 1 Performance Step:

4 PLACE the CONTROL ROOM ISOL TRAIN A and B RESET switches to RESET. CONTROL ROOM ISOL TRAIN A RESET CONTROL ROOM ISOL TRAIN B RESET Standard: Locates and momentarily operates the Control Room Isol Train A reset switch to reset and the Train B reset switch to reset (ALB-030/1-1 and ALB-030/2-1 alarms clears. Operator resets alarm using reset button on MCB and reports to CRS.

Comment:

Appendix C Page 6 of 15 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR h Rev. FINAL OP-173, Section 8.4, Step 2 Performance Step:

5 Shut any of the following EMER FILT SOUTH (NORTH) OUTSIDE AIR INLET valves that are open, EMER FILT SOUTH OUTSIDE AIR INLET 1CZ-9 SA EMER FILT SOUTH OUTSIDE AIR INLET 1CZ-10 SB EMER FILT NORTH OUTSIDE AIR INLET 1CZ-11 SA EMER FILT NORTH OUTSIDE AIR INLET 1CZ-12 SB Standard: Locates valves and verifies ALL outside air inlets are closed. (Position indication lights are all green.)

Comment: OP-173, Section 8.4, Note prior to Step 3 Performance Step:

6 NOTE: Performing steps 8.4.2.3 through 8.4.2.6 quickly will minimize excessive pressurization of the Main Control Room Standard: Operator reads and placekeeps any note or caution (initials, checks or circle/slash)

. Comment: OP-173, Section 8.4, Step 3 Performance Step:

7 OPEN the following Control Normal Outside Air Intake Valves:

NORMAL INTAKE 1CZ-1 SA NORMAL INTAKE 1CZ-2 SB Standard: Locates and Opens NORMAL INTAKES 1CZ-1 SA and 1CZ

-2 SB (Green Light goes off and Red Light comes on) Comment:

Appendix C Page 7 of 15 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR h Rev. FINAL OP-173, Section 8.4, Step 4 Performance Step:

8 If more than one NORMAL SUPPLY FAN AH

-15 ASA (BSB) is running, stop one fan

. Standard: Identifies ONLY one NORMAL SUPPLY FAN is running (AH

-15 ASA) and there is no need to stop a fan Comment:

OP-173, Section 8.4, Step 5 Performance Step: 9 Verify associated valves/dampers align for the stopped train as follows: AH-15 IN CZ-D1 (CZ-D2) Shut (indication) on SLB

-5 (6) AH-15 IN CZ-25 (CZ-26) Shut (indication) on SLB

-5 (6) CONT ROM NORMAL RECIRC DAMPER CZ-D69 SA (CZ

-D70 SB)

Shut Standard: Locates and verifies the associated valves/dampers align ed for the stopped train.

AH-15 IN CZ-D1 (CZ-D2) Shut (indication) on SLB

-5 (6) AH-15 IN CZ-25 (CZ-26) Shut (indication) on SLB

-5 (6) CONT ROM NORMAL RECIRC DAMPER CZ-D69 SA (CZ

-D70 SB)

Shut Comment:

Appendix C Page 8 of 15 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR h Rev. FINAL OP-173, Section 8.4, Step 6 Performance Step:

10 Start NORMAL EXHAUST FAN E

-9 A (B) Standard: Takes Normal Exhaust Fan E

-9 A fan switch to start, confirms RED light is lit Comment: OP-173, Section 8.4, Step 7 Performance Step: 1 1 Verify the following valves/dampers are aligned as indicated:

E-9A(B) IN CZ

-D6 (CZ-D7) Open (located on SLB

-7) E-9A(B) OUT CZ

-D12 (CZ-13) Modulates (located on SLB

-7) NORMAL EXHAUST 1CZ-3 SA and 1CZ

-4 SB Open Standard: Verifies: E-9A IN CZ-D6 Open (located on SLB

-7) E-9A OUT CZ-D12 Modulates (located on SLB

-7) NORMAL EXHAUST 1CZ-3 SA and 1CZ-4 SB Open Comment:

Appendix C Page 9 of 15 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR h Rev. FINAL OP-173, Section 8.4, Step s 8, 9 and 10 Performance Step: 1 2 If running, THEN STOP BOTH EMERGENCY FILTRATION FAN R-2 A-SA and R-2 B-SB and verify:

R2 INLET CZ

-23 (CZ-24) Shut [located on SLB

-5 (6)] R2 DISCH CZ

-21 (CZ-22) Shut [located on SLB

-5 (6)] EMERGENCY FILTRATION DISCHARGE 1CZ-19 SA and 1CZ

-20 SB Shut Standard: Locates and stops both EMERGENCY FILTRATION FANS R-2 A-SA and R-2 B-SB (critical to stop fans

) and verifies:

R2 INLET CZ

-23 (CZ-24) Shut [located on SLB

-5 (6)] R2 DISCH CZ

-21 (CZ-22) Shut [located on SLB

-5 (6)] And verifies that EMERGENCY FILTRATION DISCHARGE 1CZ-19 SA and 1CZ

-20 SB Shut Comment:

Appendix C Page 10 of 15 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR h Rev. FINAL NOTE: Alternate Path Starts Here Lead Examiner and Simulator Operator:

When the candidate shuts CZ-D61 SB a conditional trigger will trip the running Control Room Emergency Supply Fan breaker (AH-15 ASA breaker 1A36-SA-5A ) OP-173, Section 8.4, Step 11 Performance Step: 1 3 Shut the EMERGENCY FILTRATION RECIRC dampers EMERGENCY FILTRATION RECIRC DAMPER CZ-D66 SA and EMERGENCY FILTRATION RECIRC DAMPER CZ-D61 SB Standard: Locates the control switches and SHUTS the EMERGENCY FILTRATION RECIRC dampers CZ-D66 SA (Green Light On) and CZ-D61 SB (supply breaker 1A36

-SA-5A trips)Green light On Comment: Supply breaker 1A36-SA-5A for AH-15 ASA trips open Performance Step: 14 Annunciator ALB

-030-6-4, CONT ROOM HVAC NORMAL SUPPLY FANS AH-15 LOW FLOW-O/L Standard: Acknowledges alarm and identifies that AH

-15A SA has lost green indication on MCB and reports information to CRS.

Pulls APP and reviews response for alarm Evaluator Cue: The CRS acknowledges the report. If the candidate identifies the AH

-15A SA has tripped and determines the APP will be addressed after the task to restore ventilation is complete as the CRS direct the candidate to address the APP before continuing with the task.

Comment:

Appendix C Page 11 of 15 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR h Rev. FINAL Response to ALB

-030-6-4, CONT ROOM HVAC NORMAL SUPPLY FANS AH-15 LOW FLOW-O/L Performance Step: 15 PERFORM Corrective Actions:

a. CHECK AH-15 fans status indication on MCB.
b. IF fan is tripped, THEN PERFORM the following:

(1) START the standby fan using OP-173, Control Room Area HVAC System.

(2) IF white fan trouble light is LIT, THEN DISPATCH an operator to check overload relays on 1A36

-SA-5A or 1B36-SB-3A. (3) DISPATCH an operator to check for tripped breaker on 1A36-SA-5A or 1B36

-SB-3A. c. CHECK damper alignment on MCB for CZ

-D1SA-1, CZ-D2SB-1, CZ-25 and CZ-26. d. IF alb-030-6-3 is ALARMING, THEN REFER TO ALB-030-6-3 Standard: Identifies that AH

-15 ASA has tripped and the white fan trouble light is NOT lit Start the standby fan:

o Obtains a copy of OP-173 section 5.1, Control Room Area HVAC and starts the standby fan Comment:

Appendix C Page 12 of 15 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR h Rev. FINAL OP-173, Section 5.1, Startup of Normal Supply and Exhaust Fans Performance Step: 16 PERFORM Corrective Actions:

(1) START the standby fan using OP

-173, Control Room Area HVAC System.

Section 5.1.1 Initial Conditions

1. Attachment 1 is complete
2. Attachment 2 is complete Standard: Reviews initial conditions of Attachment 1 and Attachment 2 for completeness Lead Evaluator Cue:

Using time compression the Initial Conditions are met

. Standard: Initials section 5.1.1 step 1 and 2 for initial conditions complete Comment: OP-173, Section 5.1.2, Notes prior to step 1 Performance Step: 17 NOTE: The following Steps align Train A Control Room Area HVAC components to service. Train B nomenclature is in parenthesis.

NOTE: If Swapping Control Room Ventilation Fans, it is preferable to secure the running fan first, then start the desired fans with this section.

Standard: Operator reads and placekeeps any note or caution (initials, checks or circle/slash)

Comment:

Appendix C Page 13 of 15 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 2014 HNP NRC Exam Simulator JPM CR h Rev. FINAL OP-173, Section 5.1.2, step 1 Performance Step: 18 START the NORMAL SUPPLY FAN AH

-15 BSB Standard: Locates MCB switch for AH

-15 BSB and takes switch to start Comment: OP-173, Section 5.1.2, step 2 Performance Step: 19 VERIFY that the following components are aligned properly:

AH-15 IN CZ-D2 -------------..Open SLB

-6 AH-15 DISCH CZ ----------..Open SLB

-6 NORMAL INTAKE 1CZ

-1 SA and 1CZ

-2 SB----.. .Open CONT RM NORMAL RECIRC DAMPER CZ

-D70 SB- Open NORMAL EXHAUST FAN E

-9B--------.. Running E-9B IN CZ-D7 --------------.Open SLB

-7 E-9B OUT CZ-D13 ----------.Modulates SLB

-7 NORMAL EXHAUST 1CZ

-3 SA and 1CZ

-4 SB ---..Open Standard: VERIFIES that the following components are aligned properly: AH-15 IN CZ-D2 -------------..Open SLB-6 AH-15 DISCH CZ ----------..Open SLB-6 NORMAL INTAKE 1CZ

-1 SA and 1CZ

-2 SB----.. .Open CONT RM NORMAL RECIRC DAMPER CZ-D70 SB- Open NORMAL EXHAUST FAN E

-9B--------..

Running E-9B IN CZ-D7 --------------.Open SLB-7 E-9B OUT CZ-D13 ----------.Modulates SLB

-7 NORMAL EXHAUST 1CZ

-3 SA and 1CZ

-4 SB ---..Open Evaluator Cue:

After verification of step 2 components CUE: Another Operator will continue with any remaining ventilation restoration.

END OF JPM STOP TIME:

Appendix C Page 14 of 15 Form ES-C-1 VERIFICATION OF COMPLETION 2014 HNP NRC Exam Simulator JPM CR h Rev. FINAL Job Performance Measure No.:

2014 HNP NRC Exam Simulator JPM h Restoring the Control Room Area HVAC System to Normal After a Control Room Isolation Signal OP-173, Control Room Area HVAC System Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question: Response: Result: SAT UNSAT Examiner's Signature:

Date:

Appendix C Form ES-C-1 JPM CUE SHEET 2014 HNP NRC Exam Simulator JPM CR h Rev. FINAL Initial Conditions:

The unit is operating at 100% power when a fire occurred at the Emergency Shutdown Diesel Generator during testing.

The smoke from the fire caused a Control Room Ventilation Isolation signal to occur. (Smoke detected at the normal intake Zone 1

-150)

The Fire Brigade has put the fire out and the smoke has been cleared.

Initiating Cue:

You are the BOP.

The CRS has directed you to restore the Control Room Area HVAC System to normal in accordance with OP

-173 "Control Room Area HVAC System", Section 8.4

. The initial conditions are satisfied and the HVAC system is in operation per section 8.1 of OP-173.

Appendix C Job Performance Measure Form ES-C-1 Worksheet 20 14 HNP NRC Exam In-Plant JPM i Rev. FINAL Facility: Harris Nuclear Plant Task No.: 063007H104 Task Title:

Shift Battery Chargers JPM No.: 201 4 NRC Exam In-Plant JPM i K/A

Reference:

063 G2.1.30 RO 4.4 SRO 4.0 Examinee: ________________________

NRC Examiner: _________________

Facility Evaluator:

________________________

Date: ________

Method of testing:

Simulated Performance:

X Actual Performance:

Classroom Simulator Plant X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

The plant is operating at 100% power 1A-SA BATTERY CHARGER is scheduled for maintenance this shift.

Initiating Cue:

The CRS directs you to shift from 1A

-SA BATTERY CHARGER to 1B-SA BATTERY CHARGER in accordance with OP-156.01, DC Electrical Distribution, Section 8.3

.

Evaluator: At this time provide the student a copy of OP

-156.01, Section 8.3

.

Appendix C Job Performance Measure Form ES-C-1 Worksheet 20 14 HNP NRC Exam In-Plant JPM i Rev. FINAL Task Standard:

1B-SA BATTERY CHARGER in SERVICE; 1A

-SA BATTERY CHARGER secured.

Required Materials:

Standard PPE General

References:

OP-156.01, DC Electrical Distribution, Revision 36 Handouts: OP-156.01 Section 8.3, Rotation of Train A Battery Chargers Pages 1-6, and 46-50, Rev 36 Time Critical Task:

N/A Validation Time:

20 minutes Appendix C Job Performance Measure Form ES-C-1 Worksheet 20 14 HNP NRC Exam In-Plant JPM i Rev. FINAL SIMULATOR SETUP N/A This is an In

-Plant JPM

CRITICAL STEP JUSTIFICATION Step 4 Must place DP

-1A-SA circuit to the ON position to line up input power.

Step 5 Must place DC Output breaker to ON to obtain output power.

Step 8 Must place AC input breaker to the ON position to obtain input power.

Step 1 7 Must select OFF for the AC input breaker to secure AC input power.

Step 1 8 Must select OFF for the DC output breaker to secure DC output power.

Step 1 9 Must place DP

-1A-SA-30 to OFF to complete the lineup to secure the charger.

Appendix C Page 4 of 16 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 20 14 HNP NRC Exam In-Plant JPM i Rev. FINA L BEFORE YOU START THIS JPM INPLANT JPM SAFETY CONSIDERATIONS

CAUTION: EQUIPMENT MAY AUTO START OR MAY BE ENERGIZED

- SIMULATE ONLY

- DO NOT OPERATE ANY ACTUAL PLANT EQUIPMENT!!! Before entering the performance location of this JPM, ensure you AND the candidate have the proper PPE for the area you are going to go to or will travel through to get there.

Avoid contacting any plant equipment.

Follow ALARA practices in the RCA.

Do NOT remove ladders from their storage locations. Have the candidate simulate obtaining and using a ladder if one would be needed during the actual performance of this task.

NOTE: Add one minute for Take a Minute Core 4 checks.

START TIME:

OP-156.01, DC Electrical Distribution Section 8.3, Rotation of Train A Battery Chargers Performance Step: 1 Previews task contained in procedure Standard: Reviews OP

-156.01, Section 8.3 Comment: OP-156.01 Step 8.3.1 Initial Condition Performance Step: 2 Initial Condition:

A Train Battery Charger is in operation per Section 5.3.

Standard: Initial Conditions met based on JPM Initial Conditions or observation of A Train Battery Charger in operation

. Comment:

Appendix C Page 5 of 16 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 20 14 HNP NRC Exam In-Plant JPM i Rev. FINA L OP-156.01 Step 8.3.2 NOTES prior to step 1 Procedure Note:

The following Steps describe placing Battery Charger 1B

-SA in operation and removing Battery Charger 1A

-SA from operation. Nomenclature for placing Battery Charger 1A

-SA in operation and removing Battery Charger 1B

-SA from operation is in parenthesis.

Amperage and voltage should be monitored before and after rotation of Battery Chargers to detect any potential problems. It is recommended that Safety Related Battery Charger rotations occur Monday through Friday day shift, to provide reasonable assurance of Electrical support if problems occur. Standard: Operator reads and placekeeps any note or caution (initials, checks or circle/slash at each bulleted item to indicate read and understood)

Comment: OP-156.01 Step 8.3.2 step 1 Performance Step: 3 At Battery Charger 1B

-SA, VERIFY the following switch lineup:

SWITCH POSITION AC INPUT OFF DC OUTPUT OFF NORMAL/EQUALIZE NORMAL Standard: At Battery Charger 1B (1A)

-SA locates the following switches and verifies position of each:

Examiners Cue:

SWITCH VERIFIED POSITION AC INPUT OFF DC OUTPUT OFF NORMAL/EQUALIZE NORMAL Comment:

Appendix C Page 6 of 16 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 20 14 HNP NRC Exam In-Plant JPM i Rev. FINA L Step 8.3.2 NOTE prior to step 2 Procedure Note:

A momentary ground may exist when the DC breakers are closed. If a ground is received the associated DC Bus Trouble alarm will be received on ALB

-015. Standard: Operator reads and placekeeps any note or caution (initials, checks or circle/slash)

Comment: Step 8.3.2 step 2 Performance Step: 4 PLACE DP-1A-SA-31, Battery Charger 1B

-SA, to ON.

Standard: Places DP-1A-SA Circuit 31 to the ON position Examiners Cue:

DP-1A-SA Circuit 31 is ON.

Comment: Step 8.3.2 step 3 Performance Step: 5 At Battery Charger 1B

-SA, PLACE the DC Output Breaker to ON. Standard: Places 1B-SA BATTERY CHARGER DC OUTPUT BREAKER to the ON position.

Examiners Cue:

1B-SA BATTERY CHARGER DC OUTPUT BREAKER is in the ON position.

Comment:

Appendix C Page 7 of 16 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 20 14 HNP NRC Exam In-Plant JPM i Rev. FINA L Step 8.3.2 Notes Prior to step 4 Performance Step: 6 NOTE: To prevent an inadvertent High Voltage trip, the output filters should be allowed to charge for a minimum of 30 seconds before closing the AC Input Breaker. The AC Input and Feeder Breaker may trip if the filter capacitors are not fully charged when the AC Input Breaker is closed.

NOTE: A Low DC Volt alarm is normal during the time required to charge the output rectifiers. This alarm should clear before closing the AC input breaker, or a High Voltage trip could occur. Failure of the Low DC Volt alarm to clear could indicate the DC Output breaker tripped after manually shutting. The DC Output breaker may not indicate its tripped condition.

NOTE: Steadily decreasing voltage is indicative of an internal fault in the battery charger being placed in service. If this is observed, the battery charger should NOT be placed on line until the cause is found and corrected.

Standard: Operator reads and placekeeps any note or caution (initials, checks or circle/slash)

Comment: Step 8.3.2 step 4 Performance Step:

7 MONITOR Battery Charger 1B

-SA Voltmeter:

a. IF voltage indicates a steady decrease, THEN PERFORM the following:

Standard: Verifies 1B

-SA BATTERY CHARGER voltmeter is not steadily decreasing

. Examiners Cue:

Voltage is stable at 134V DC on 1B

-SA BATTERY CHARGER voltmeter. Comment: Standard: N/A's step 4.a (1), (2), (3), and (4)

Appendix C Page 8 of 16 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 20 14 HNP NRC Exam In-Plant JPM i Rev. FINA L Step 8.3.2 step 4.b Performance Step:

8 After 30 seconds, with Battery Charger 1B

-SA Voltmeter stabilized between 132 and 135 VDC, PLACE AC Input Breaker to ON. Standard: Verifies 1B

-SA BATTERY CHARGER voltmeter stabilizes between 132 and 135 VDC

. Ensures 30 seconds have passed since placing the DC output breaker ON.

Places the AC INPUT BREAKER in the ON position

. Examiners Cue:

Voltage is stable at 134

-V DC on 1B-SA BATTERY CHARGER voltmeter.

The AC INPUT BREAKER is in the ON position Comment:

Appendix C Page 9 of 16 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 20 14 HNP NRC Exam In-Plant JPM i Rev. FINA L Step 8.3.2 step 5 Performance Step:

9 VERIFY proper operation of Battery Charger 1B

-SA by observing the following:

PARAMETER CONDITION DC VOLTAGE 132 to 135 VDC DC AMPERES 0 to 150 Amps AC POWER ON light O N HIGH DC VOLTS light OFF LOW DC VOLTS light OFF PHASE FAILURE light OFF Standard: Locates indication for each listed parameter on 1B

-SA BATTERY CHARGER. Examiners Cue:

As each parameter is located:

PARAMETER CONDITION DC VOLTAGE 134 VDC DC AMPERAGE 15 Amps AC POWER ON light ON HIGH DC VOLT light OFF LOW DC VOLT light OFF PHASE FAILURE light OFF Comment:

Appendix C Page 10 of 16 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 20 14 HNP NRC Exam In-Plant JPM i Rev. FINA L Step 8.3.2 step 6.a Performance Step:

10 PERFORM a ground test of Battery Charger 1B

-SA as follows:

a. NOTIFY the Control Room that a 125 VDC EMERG BUS A TROUBLE annunciator will alarm.

Standard: Notifies Control Room that a 125

-V DC EMERG BUS A TROUBLE annunciator will alarm.

Examiners Cue:

Acknowledge report as the Control Room.

Comment: Step 8.3.2 step 6.b, c Performance Step: 1 1 b. DEPRESS the POS Ground Test Pushbutton.

c. VERIFY a positive deflection exists on the bus ground voltmeter.

Standard: Depresses POS Ground Test Pushbutton and holds while observing each listed indication

. Examiners Cue: The POS Ground Test pushbutton is depressed

. As each indication is pointed out:

The Bus Ground Meter indicates + 100

-V DC ground.

Comment:

Appendix C Page 11 of 16 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 20 14 HNP NRC Exam In-Plant JPM i Rev. FINA L Step 8.3.2 Note prior to step 6.d Performance Step: 1 2 PERFORM a ground test of Battery Charger 1B-SA as follows:

NOTE: If a ground exists, the White GROUND light will be lit. Standard: Operator reads and placekeeps any note or caution (initials, checks or circle/slash)

Comment: Step 8.3.2 step 6.d, and e Performance Step

1 3 d. VERIFY the White GROUND light is off.
e. RELEASE the POS Ground Test Pushbutton.

Standard: Verifies the white ground light is off and releases the POS ground test pushbutton Examiners Cue:

The White Ground Light is extinguished.

The POS Ground Test Pushbutton is released

. Comment:

Appendix C Page 12 of 16 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 20 14 HNP NRC Exam In-Plant JPM i Rev. FINA L Step 8.3.2 step 6.f, g, h, and i Performance Step: 1 4 PERFORM a ground test of Battery Charger 1B (1A)

-SA as follows: f. DEPRESS the NEG Ground Test Pushbutton.

g. VERIFY a negative deflection exists on the bus ground voltmeter.
h. VERIFY the White GROUND light is off.
i. RELEASE the NEG Ground Test Pushbutton.

Standard: Depresses the NEG Ground Test Pushbutton and holds while observing each listed indication

. Examiners Cue:

The NEG Ground Test pushbutton is depressed

. As each indication is pointed out:

The Bus Ground Meter indicates

- 100-V DC ground.

The White Ground Light is extinguished.

The NEG Ground Test Pushbutton is released

. Comment: Step 8.3.2 Note prior to step 7 Performance Step: 1 5 Note: Steps 7 and 8 will deenergize the previously operating battery charger.

Standard: Operator reads and placekeeps any note or caution (initials, checks or circle/slash)

Comment:

Appendix C Page 13 of 16 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 20 14 HNP NRC Exam In-Plant JPM i Rev. FINA L Step 8.3.2 step 7.a Performance Step: 1 6 At Battery Charger 1A

-SA, PLACE the following breaker to OFF:

a. AC Input Breaker Standard: Selects the AC Input Breaker to the OFF position. Examiners Cue:

The AC Input Breaker is in the OFF position.

Comment: Step 8.3.2 step 7.b Performance Step: 1 7 b. DC Output Breaker Standard: Selects the DC Output Breaker to the OFF position. Examiners Cue:

The D C Output Breaker is in the OFF position.

Comment: Step 8.3.2 step 8 Performance Step: 1 8 PLACE DP-1A-SA-30, Battery Charger 1A

-SA, to OFF.

Standard: Places DP-1A-SA Circuit 30 in the OFF position. Examiners Cue:

The DP-1A-SA Circuit 30 is in the OFF position

. Comment:

Appendix C Page 14 of 16 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 20 14 HNP NRC Exam In-Plant JPM i Rev. FINA L Step 8.3.2 Note prior to step 9 Performance Step:

19 NOTE: Steadily decreasing voltage is indicative of an internal fault in the battery charger being placed in service. If this is observed, the battery charger should NOT remain on line until the cause is found and corrected. The now off

-line charger can be placed back in service until Maintenance has investigated.

Standard: Operator reads and placekeeps any note or caution (initials, checks or circle/slash)

Comment: Step 8.3.2 step 9 Performance Step:

2 0 At Battery Charger 1B

-SA, VERIFY the NO CHARGE light is off and voltage is 132 to 135 VDC.

Standard: Verifies NO CHARGE light is OFF. Verifies voltage 132 to 135V DC. Examiners Cue:

The NO CHARGE light is OFF.

Voltage is 134 VDC

. Evaluation on this JPM is complete.

Comment:

STOP TIME:

Appendix C Page 15 of 16 Form ES-C-1 VERIFICATION OF COMPLETION 20 14 HNP NRC Exam In-Plant JPM i Rev. FINAL Job Performance Measure No.:

2014 NRC Exam In

-Plant JPM i OP-156.01, DC Electrical Distribution Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentatio n: Question: Response: Result: SAT UNSAT Examiner's Signature:

Date:

Appendix C Form ES-C-1 JPM CUE SHEET 20 14 HNP NRC Exam In-Plant JPM i Rev. FINAL BEFORE YOU START THIS JPM INPLANT JPM SAFETY CONSIDERATIONS

CAUTION: EQUIPMENT MAY AUTO START OR MAYBE ENERGIZED

- SIMULATE ONLY

- DO NOT OPERATE ANY ACTUAL PLANT EQUIPMENT!!! Before entering the performance location of this JPM, ensure you AND the examiner have the proper PPE for the area you are going to go to or will travel through to get there.

Avoid contacting any plant equipment.

Follow ALARA practices in the RCA.

Do NOT remove ladders from their storage locations. Simulate obtaining and using a ladder if one would be needed during the actual performance of this task.

Initial Conditions:

The plant is operating at 100% power 1A-SA BATTERY CHARGER is scheduled for maintenance this shift. Initiating Cue:

The CRS directs you to shift from 1A

-SA BATTERY CHARGER to 1B-SA BATTERY CHARGER in accordance with OP

-156.01, DC Electrical Distribution, Section 8.3

.

Appendix C Job Performance Measure Form ES-C-1 Worksheet 20 14 HNP NRC Exam In-Plant JPM j Rev. FINAL Facility: Harris Nuclear Plant Task No.: 3010 13H401 Task Title:

Isolate the ECCS Accumulators After a Control Room Evacuation JPM No.: 201 4 NRC Exam In-Plant JPM j K/A

Reference:

APE068 G2.1.30 RO 4.4 SRO 4.0 Examinee: ________________________

NRC Examiner:

_________________

Facility Evaluator:

________________________

Date: ________

Method of testing:

Simulated Performance:

X Actual Performance:

Classroom Simulator Plant X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

The control room has been evacuated due to a fire.

A cooldown is in progress in accordance with AOP

-004, REMOTE SHUTDOWN.

RCS Pressure is 975 PSIG by PI

-402.2. Initiating Cue:

You are the RO and have been assigned by the CRS to perform AOP-004, Step 31

- Isolate SI Accumulators.

Evaluator: At this time provide the student a copy of AOP

-004, step 31, pages 37 and 38

.

Appendix C Job Performance Measure Form ES-C-1 Worksheet 20 14 HNP NRC Exam In-Plant JPM j Rev. FINAL Task Standard:

All accumulators isolated and MOV's de

-energized. Required Materials:

Standard PPE Provide the evaluator with a key for ATP Cabinet. Discuss with CRS allowing applicants to reset local alarm caused by opening ATP Cabinet door.

General

References:

AOP-004, Remote Shutdown, REV 65 Handout: AOP-004, Step 3 1 (Pgs. 37 and 38) Time Critical Task:

NO Validation Time:

20 minutes Appendix C Job Performance Measure Form ES-C-1 Worksheet 20 14 HNP NRC Exam In-Plant JPM j Rev. FINAL SIMULATOR SETUP N/A This is an In

-Plant JPM

CRITICAL STEP JUSTIFICATION Step 2 Must locate, unlock and turn on power to Accumulator discharge valve breaker in order to change valve position remotely.

Step 3 Must locate, unlock and turn on power to Accumulator discharge valve breaker in order to change valve position remotely.

Step 4 Must locate and shut valves at the Aux Transfer Panel to isolate the Accumulator when required.

Step 5 Must locate and shut valve at the Aux Transfer Panel to isolate the Accumulator when required.

Appendix C Page 4 of 11 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 20 14 HNP NRC Exam In-Plant JPM j Rev. FINAL BEFORE YOU START THIS JPM INPLANT JPM SAFETY CONSIDERATIONS

CAUTION: EQUIPMENT MAY AUTO START OR MAY BE ENERGIZED

- SIMULATE ONLY

- DO NOT OPERATE ANY ACTUAL PLANT EQUIPMENT!!! Before entering the performance location of this JPM, ensure you AND the candidate have the proper PPE for the area you are going to go to or will travel through to get there.

Avoid contacting any plant equipment.

Follow ALARA practices in the RCA.

Do NOT remove ladders from their storage locations. Have the candidate simulate obtaining and using a ladder if one would be needed during the actual performance of this task.

NOTE: Add one minute for Take a Minute Core 4 checks.

AOP-004 Performance Step:

1 Obtain locked valve and ATP Cabinet key s. Standard: Discusses how to obtain key s (ACP Room Key Locker)

. Evaluator Note:

The Evaluator can elect to have the applicant locate the ACP Room Key Locker or to discuss the key acquisition

. The key to the ACP Key Locker is in a "break glass" case.

Evaluator Cue:

Acknowledge discussion and tell applicant to assume that they have the locked valve key

. Provide ATP Cabinet key.

Comment: After providing ATP Cabinet key to candidate start JPM time.

START TIME:

Appendix C Page 5 of 11 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 20 14 HNP NRC Exam In-Plant JPM j Rev. FINAL Evaluator Note:

Performance Step 2 or 3 can be performed in any order.

Evaluator Note:

Accumulators A and C are both powered from bus 1A21

-SA AOP-004, Step 31.a Performance Step: 2 WHEN RCS pressure is 900 to 1000 psig, as indicated on PI-402.2, THEN ISOLATE SI accumulators:

286' RAB / RO with locked valve key

a. UNLOCK AND TURN ON accumulator discharge valve breakers: Accumulator A: 1A21

-SA-5C (both breakers) Accumulator C: 1A21

-SA-3D (both breakers)

Standard: Locates MCC 1A21-SA breaker 5C, UNLOCK s then places both breakers for Accumulator A in ON position. Locates MCC 1A21-SA breaker 3D , UNLOCKs then places both breakers for Accumulator C in ON position.

Evaluator Cue:

Red light is on for each breaker, when breaker is placed to ON position.

Comment:

Appendix C Page 6 of 11 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 20 14 HNP NRC Exam In-Plant JPM j Rev. FINAL AOP-004, 31.a (continued)

Performance Step: 3 WHEN RCS pressure is 900 to 1000 psig, as indicated on PI-402.2, THEN ISOLATE SI accumulators:

286' RAB / RO with locked valve key

a. UNLOCK AND TURN ON accumulator discharge valve breakers: Accumulator B: 1B21

-SB-5C (both breakers) Standard: Locates MCC 1B21-SB breaker 5C , UNLOCKs then places both breakers for Accumulator B in ON position.

Evaluator Cue:

Red light is on, when breaker is placed to ON position.

Comment:

Appendix C Page 7 of 11 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 20 14 HNP NRC Exam In-Plant JPM j Rev. FINAL Evaluator Note: Performance Step 4 or 5 can be performed in any order.

Opening the ATP door in performance Step 4 or 5, actuates an alarm in the control room.

Accumulators A and C discharge valve controls are located in the same Aux Transfer Panel AOP-004, Step 31.b Performance Step: 4 SHUT SI accumulator discharge valves at the Auxiliary Transfer Panels listed:

Cable Vault A / RO with ATP cabinet key 1SI-246, Accumulator A Discharge (at ATP A)

Cable Vault A / RO with ATP cabinet key 1SI-248, Accumulator C Discharge (at ATP A)

Standard: Locates and opens ATP "A" and places 1SI-246 control switch in the SHUT position.

Locates and opens ATP "A" and places 1SI

-248 control switch in the SHUT position.

Evaluator Cue:

Provide feedback on valve position. (Single Green light lit)

Comment: AOP-004, Step 3 1.b (continued)

Performance Step: 5 SHUT SI accumulator discharge valves at the Auxiliary Transfer Panels listed:

Cable Vault B / RO with ATP cabinet key 1SI-247, Accumulator B Discharge (at ATP B)

Standard: Locates and opens ATP "B" and places 1SI

-247 control switch in the SHUT position.

Evaluator Cue:

Provide feedback on valve position. (Single Green light lit)

Comment:

Appendix C Page 8 of 11 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 20 14 HNP NRC Exam In-Plant JPM j Rev. FINAL Evaluator Note:

Performance Step 6 or 7 can be performed in any order.

AOP-004, Step 3 1.c Performance Step: 6 286' RAB / RO with locked valve key TURN OFF AND LOCK accumulator discharge valve breakers: Accumulator A: 1A21

-SA-5C (both breakers)

Accumulator C: 1A21

-SA-3D (both breakers)

Standard: Returns to 1A21-SA-5C , places both breakers to OFF position then LOCK s both breakers for Accumulator A.

Returns to 1A21-SA-3D , places both breakers to OFF position then LOCKs both breakers for Accumulator C. Evaluator Cue:

Provide feedback on breaker position.

Lights will now indicate that the valves are SHUT, however operating the breakers will have no effect on the lights.

Comment:

Appendix C Page 9 of 11 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 20 14 HNP NRC Exam In-Plant JPM j Rev. FINAL AOP-004, Step 3 1.c (continued)

Performance Step: 7 286' RAB / RO with locked valve key TURN OFF AND LOCK accumulator discharge valve breakers: Accumulator B: 1B21

-SB-5C (both breakers)

Standard: Returns to 1B21-SB-5C , places both breakers to OFF position then LOCKs both breakers for Accumulator B. Evaluator Cue:

Provide feedback on breaker position.

Lights will now indicate that the valves are SHUT, however operating the breakers will have no effect on the lights.

When all SI Accumulator Discharge Valves are de

-energized:

Evaluation on this JPM is complete.

Comment: STOP TIME:

Appendix C Page 10 of 11 Form ES-C-1 VERIFICATION OF COMPLETION 20 14 HNP NRC Exam In-Plant JPM j Rev. FINAL Job Performance Measure No.:

2014 NRC Exam In

-Plant JPM j Isolate the ECCS Accumulators After a Control Room Evacuation In Accordance With AOP

-004 , Remote Shutdown Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question: Response:

Result: SAT UNSAT Examiner's Signature:

Date:

Appendix C Form ES-C-1 JPM CUE SHEET 20 14 HNP NRC Exam In-Plant JPM j Rev. FINAL BEFORE YOU START THIS JPM INPLANT JPM SAFETY CONSIDERATIONS

CAUTION: EQUIPMENT MAY AUTO START OR MAYBE ENERGIZED

- SIMULATE ONLY

- DO NOT OPERATE ANY ACTUAL PLANT EQUIPMENT!!! Before entering the performance location of this JPM, ensure you AND the examiner have the proper PPE for the area you are going to go to or will travel through to get there.

Avoid contacting any plant equipment, Follow ALARA practices in the RCA.

Do NOT remove ladders from their storage locations. Simulate obtaining and using a ladder if one would be needed during the actual performance of this task.

Initial Conditions:

The control room has been evacuated due to a fire A cooldown is in progress in accordance with AOP

-004, REMOTE SHUTDOWN RCS Pressure is 975 PSIG by PI

-402.2 Initiating Cue:

You are the RO and have been assigned by the CRS to perform AOP-004, Step 31

- Isolate SI Accumulators.

Appendix C Job Performance Measure Form ES-C-1 Worksheet 201 4 NRC Exam In

-Plant JPM k Rev. FINAL Facility: Harris Nuclear Plant Task No.: 061012H104 Task Title:

Reset the Turbine

-Driven AFW Pump Mechanical Overspeed JPM No.: 20 1 4 NRC Exam In-Plant JPM k K/A

Reference:

061 A2.04 RO 3.4 SRO 3.8 Examinee: ________________________

NRC Examiner:

_________________

Facility Evaluator:

________________________

Date: ________

Method of testing:

Simulated Performance:

X Actual Performance:

Classroom Simulator Plant X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

The plant was manually tripped from 100

% power due to a loss of the 'A' MFW pump. The Turbine-driven AFW pump is needed for plant cooldown but the pump tripped on overspeed.

The cause of the overspeed trip has been identified and corrected.

Main Steam isolation valves 1MS

-70 and 1MS

-72 are shut.

Initiating Cue:

The CRS has directed you to reset the Turbine-driven AFW pump mechanical overspeed trip linkage in accordance with OP

-137, Auxiliary Feedwater System, Section 8.4.

Assume that the Mechanical Overspeed Trip Linkage is currently in the tripped position.

The Trip and Throttle Valve will be reopened from the Control Room. All Initial Conditions are met.

Evaluator: At this time provide the student with a copy of OP-137, Section 8.4 Initial conditions are MET.

NOTE: Expect that the entry and exit from the RCA will add time to complete this JPM.

Appendix C Job Performance Measure Form ES-C-1 Worksheet 201 4 NRC Exam In

-Plant JPM k Rev. FINAL Task Standard:

The Turbine-driven AFW pump turbine trip and throttle valve is latched.

Required Materials:

Standard PPE General

References:

OP-137, Auxiliary Feedwater System, Rev. 3 7 Handout: OP-137, Section 8.4, Rev. 3 7 OR OP-137, Attachment 6 (locally mounted on wall as an operator aid)

Time Critical Task:

No Validation Time:

10 minutes Appendix C Job Performance Measure Form ES-C-1 Worksheet 201 4 NRC Exam In

-Plant JPM k Rev. FINAL SIMULATOR SETUP N/A This is an In

-Plant JPM CRITICAL STEP JUSTIFICATION Step 7 If the connecting rod is not properly positioned and locked in place the overspeed reset cannot be accomplished.

Step 8 If the tappet nut is not held down properly and in the correct sequence the overspeed trip cannot be reset.

Appendix C Page 4 of 16 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 2014 NRC Exam In

-Plant JPM k Rev. FINAL BEFORE YOU START THIS JPM INPLANT JPM SAFETY CONSIDERATIONS

CAUTION: EQUIPMENT MAY AUTO START OR MAY BE ENERGIZED

- SIMULATE ONLY

- DO NOT OPERATE ANY ACTUAL PLANT EQUIPMENT!!! Before entering the performance location of this JPM, ensure you AND the candidate have the proper PPE for the area you are going to go to or will travel through to get there.

Avoid contacting any plant equipment.

Follow ALARA practices in the RCA.

Do NOT remove ladders from their storage locations. Have the candidate simulate obtaining and using a ladder if one would be needed during the actual performance of this task.

NOTE: Add one minute for Take a Minute Core 4 checks.

START TIME:

Reviews OP

-137, Section 8.4 prior to task performance Performance Step: 1 Reviews Section 8.4.1 reads and initials step 1 NOTE: Loss of B-SB DC Power is not considered "normal operation" in the following initial condition. If B

-SB DC Power has been lost and cannot be restored then the following initial condition does not apply.

Standard: Placekeeps the note (initials, checks or circle/slash) and initials blanks for steps 1 and 2 of Initial Conditions.

Comment:

Appendix C Page 5 of 16 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 2014 NRC Exam In

-Plant JPM k Rev. FINAL OP-137 Section 8.4.2 NOTES prior to step 1 Performance Step: 2 NOTE: Attachment 6 diagram may be used as a reference for nomenclature.

NOTE: If any of the following information is changed, and local pump information should also be changed. Standard: Operator reads and placekeeps any note or caution (initials, checks or circle/slash)

Comment:

OP-137 Section 8.4.2 step 1 Performance Step: 3 Verify the following valves are shut:

1MS-70 SA, MAIN STEAM B TO AUX FW TURBINE 1MS-72 SB, MAIN STEAM C TO AUX FW TURBINE Standard: Status provided in Initial Conditions.

Evaluator's Cue:

If asked: 1MS

-70 and 1MS

-72 are shut (as provided on cue sheet) Comment:

Appendix C Page 6 of 16 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 2014 NRC Exam In

-Plant JPM k Rev. FINAL OP-137 Section 8.4.2 step 2.a Performance Step: 4 IF DP-1B-SB 125V DC Power is available, THEN PERFORM the following steps:

CHECK the local red indicating lamp for TURBINE OVERSPEED TRIP is ON Standard: Verifies that the red lamp is lit for the TURBINE OVERSPEED TRIP on the local control panel.

Evaluator's Cue: (Lamp is located on Aux Feedwater Control Panel 1X

-SAB) The red TURBINE OVERSPEED TRIP lamp is lit.

Comment: OP-137 Section 8.4.2 step 2.b Performance Step:

5 VERIFY the flat side of the tappet nut is aligned toward the tappet lever.

Standard: Verifies flat side of the tappet nut aligned toward the tappet lever.

Evaluator's Cue:

The flat side of tappet nut is aligned toward the tappet lever.

Comment:

Appendix C Page 7 of 16 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 2014 NRC Exam In

-Plant JPM k Rev. FINAL OP-137 Section 8.4.2 NOTES prior to step 2.c Performance Step: 6 NOTE: The next two Steps must be coordinated to ensure proper reset of the Trip and Throttle valve.

NOTE: If the local red indicating lamp for TURBINE OVERSPEED TRIP does not extinguish, it is an indication that one of the limit switches did not reset, and further investigation may be warranted.

Standard: Placekeeps the note (initials, checks or circle/slash)

Comment: OP-137 Section 8.4.2 step 2.c Performance Step:

7 PULL the connecting rod toward the Trip and Throttle valve until the rod locks in place AND the local red indicating lamp for TURBINE OVERSPEED TRIP is OFF

. Standard: Locates connecting rod and pulls it toward the trip/throttle valve.

Verifies rod locked in place AND the local red indicating lamp for TURBINE OVERSPEED TRIP is OFF.

Evaluator's Cue:

The connecting rod is locked in place and the red indicating lamp for TURBINE OVERSPEED TRIP is OFF.

(Light is located on Aux Feedwater Control Panel 1X

-SAB) Comment:

Appendix C Page 8 of 16 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 2014 NRC Exam In

-Plant JPM k Rev. FINAL OP-137 Section 8.4.2 step 2.d Performance Step:

8 PRESS DOWN AND HOLD the tappet nut in the fully seated position while releasing the connecting rod.

Standard: Presses down and holds the tappet nut in the fully seated position until the connecting rod is released.

Evaluator's Cue:

The tappet remains fully seated and the connecting rod is locked in place.

Comment: OP-137 Section 8.4.2 step 2.e Performance Step:

9 VERIFY the Trip and Throttle valve operator in the shut position by observing the T &

T VALVE OPERATOR CLOSED light on the Aux Feedwater Control Panel 1X

-SAB. Standard: Verifies trip/throttle valve operator is shut by observing indicating lights on local panel 1X

-SAB. Evaluator's Cue:

The green shut light is ON and the red open light is OFF.

(If necessary: Valve stem indication is at the shut position.)

Comment:

Appendix C Page 9 of 16 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 2014 NRC Exam In

-Plant JPM k Rev. FINAL OP-137 Section 8.4.2 step 2.f Performance Step:

10 VERIFY the flat side of the tappet nut is against the tappet lever and fully seated

. Standard: Verifies flat side of the tappet nut against the tappet lever and fully seated

. Evaluator's Cue:

The flat side of tappet nut is against the tappet lever and fully seated.

Comment: OP-137 Section 8.4.2 step 2.g Performance Step:

11 VERIFY the latch lever is being held up by the trip hook.

Standard: Verifies latch lever is being held up by the trip hook.

Evaluator's Cue:

The latch is being held up by the trip hook.

Comment: OP-137 Section 8.4.2 step 2.h Performance Step:

12 VERIFY the TURBINE OVERSPEED TRIP light is extinguished on the AFW Control Panel 1X

-SAB Standard: Verifies TURBINE OVERSPEED TRIP light status on Panel 1X-SAB. Evaluator's Cue:

The TURBINE OVERSPEED TRIP light is extinguished.

Comment:

Appendix C Page 10 of 16 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 2014 NRC Exam In

-Plant JPM k Rev. FINAL OP-137 Section 8.4.2 step 2.i Performance Step:

13 Notify the Control Room that the mechanical overspeed linkage is reset and inform them they can now open the Trip and Throttle valve. Standard: Simulates notifying the Control Room.

Evaluator's Cue:

Acknowledge report.

END OF JPM Comment: STOP TIME:

Appendix C Page 11 of 16 Form ES-C-1 VERIFICATION OF COMPLETION 2014 NRC Exam In

-Plant JPM k Rev. FINAL Job Performance Measure No.:

201 4 NRC Exam In-Plant JPM k Reset the Turbine

-Driven AFW Pump Mechanical Overspeed OP-137 , Auxiliary Feedwater System Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question: Response:

Result: SAT UNSAT Examiner's Signature:

Date:

Appendix C Form ES-C-1 JPM CUE SHEET 2014 NRC Exam In

-Plant JPM k Rev. FINAL BEFORE YOU START THIS JPM INPLANT JPM SAFETY CONSIDERATIONS

CAUTION: EQUIPMENT MAY AUTO START OR MAYBE ENERGIZED

- SIMULATE ONLY

- DO NOT OPERATE ANY ACTUAL PLANT EQUIPMENT!!! Before entering the performance location of this JPM, ensure you AND the examiner have the proper PPE for the area you are going to go to or will travel through to get there.

Avoid contacting any plant equipment

. Follow ALARA practices in the RCA.

Do NOT remove ladders from their storage locations. Simulate obtaining and using a ladder if one would be needed during the actual performance of this task.

Initial Conditions:

The plant was manually tripped from 100% power due to a loss of the 'A' MFW pump.

The Turbine

-driven AFW pump is needed for plant cooldown but the pump tripped on overspeed.

The cause of the overspeed trip has been identified and corrected.

Main Steam isolation valves 1MS

-70 and 1MS

-72 are shut.

Initiating Cue:

The CRS has directed you to reset the Turbine

-driven AFW pump mechanical overspeed trip linkage in accordance with OP

-137, Auxiliary Feedwater System, Section 8.4.

Assume that the Mechanical Overspeed Trip Linkage is currently in the tripped position.

The Trip and Throttle Valve will be reopened from the Control Room. All Initial Conditions are met..

Appendix C Form ES-C-1 JPM CUE SHEET 2014 NRC Exam In

-Plant JPM k Rev. FINAL

Appendix C Form ES-C-1 JPM CUE SHEET 2014 NRC Exam In

-Plant JPM k Rev. FINAL

Appendix C Form ES-C-1 JPM CUE SHEET 2014 NRC Exam In

-Plant JPM k Rev. FINAL

Appendix C Form ES-C-1 JPM CUE SHEET 2014 NRC Exam In

-Plant JPM k Rev. FINAL