{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD. ARLINGTON, TX  76011-4511   August 7, 2014
{{#Wiki_filter:UNITED STATES
NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD. ARLINGTON, TX  76011-4511
  August 7, 2014  
   
   
Mr. Mark E. Reddemann Chief Executive Officer Energy Northwest  
Mr. Mark E. Reddemann  
Chief Executive Officer  
Energy Northwest  
P. O. Box 968 (Mail Drop 1023)  
P. O. Box 968 (Mail Drop 1023)  
Richland, WA  99352-0968  
Richland, WA  99352-0968  
  SUBJECT: COLUMBIA GENERATING STATION - NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS, AND PERMANENT PLANT  
 
  SUBJECT: COLUMBIA GENERATING STATION
- NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS, AND PERMANENT PLANT  
MODIFICATIONS INSPECTION (05000397/2014005) AND REQUEST FOR  
MODIFICATIONS INSPECTION (05000397/2014005) AND REQUEST FOR  
INFORMATION  Dear Mr. Reddemann:   
INFORMATION  
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff will conduct the baseline inspection of changes, tests, experiments, and permanent plant  
  Dear Mr. Reddemann:  
   
The purpose of this letter is to notify you that  
U.S. Nuclear Regulatory Commission (NRC) staff will conduct the baseline inspection of changes, tests, experiments, and permanent plant  
modifications at your Columbia Generating Station from September 22-26, 2014, and October 5-10, 2014.  The inspection will consist of three reactor inspectors from the NRC's Region IV office for two weeks.  The inspection will be conducted in accordance with NRC Inspection Procedure 71111.17T, "Evaluations of Changes, Tests, and Experiments and  
modifications at your Columbia Generating Station from September 22-26, 2014, and October 5-10, 2014.  The inspection will consist of three reactor inspectors from the NRC's Region IV office for two weeks.  The inspection will be conducted in accordance with NRC Inspection Procedure 71111.17T, "Evaluations of Changes, Tests, and Experiments and  
Permanent Plant Modifications."   
Permanent Plant Modifications."   
Experience has shown that this
inspection is resource intens
ive for both the NRC inspectors and your staff.  In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for information.  Please note that the
information is requested to be provided by S
eptember 15, 2014.  Upon review of this information, the inspectors will select additional information for review upon arrival onsite.  It is
important that all of this information is up-to-date and complete in order to minimize the amount of additional information requested during the preparation and/or the onsite portions of the inspection.
   
   
Experience has shown that this inspection is resource intensive for both the NRC inspectors and your staff.  In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for information.  Please note that the
information is requested to be provided by September 15, 2014.  Upon review of this information, the inspectors will select additional information for review upon arrival onsite.  It is
important that all of this information is up-to-date and complete in order to minimize the amount of additional information requested during the preparation and/or the onsite portions of the inspection. 
We have discussed the schedule for these inspection activities with your staff and understand  
We have discussed the schedule for these inspection activities with your staff and understand  
that our regulatory contact for this inspection will be Richard Garcia of your licensing  
that our regulatory contact for this inspection will be Richard Garcia of your licensing  
organization.  If there are any questions about this inspection or the material requested, please contact the lead inspector, Jonathan Braisted, by telephone at 817-200-1194, or by e-mail at Jonathan.Braisted@nrc.gov.   
organization.  If there are any questions about this inspection or the material requested, please contact the lead inspector, Jonathan Braisted, by telephone at 817-200-1194, or by e-mail at Jonathan.Braisted@nrc.gov.   
   
   
This letter does not contain new or amended information collection requirements subject to the  
This letter does not contain new or amended information collection requirements subject to the  
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011.  The NRC may not conduct or sponsor, and a person is not required to  
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection requirements were approved by the Offi
ce of Management and Budget, control number 3150-0011.  The NRC may not conduct or sponsor, and a person is not required to  
respond to, a request for information or an information collection requirement unless the  
respond to, a request for information or an information collection requirement unless the  
requesting document displays a currently valid Office of Management and Budget control number.   
requesting document displays a currently valid Office of Management and Budget control  
M. Reddemann - 2 -     In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).  ADAMS is accessible from the NRC Web site at   
number.   
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).   Sincerely,   
M. Reddemann - 2 -
  In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its  
enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).  ADAMS is accessible from the NRC Web site at   
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  
Sincerely,  
   
  /RA/  
  /RA/  
   
   
  Thomas R. Farnholtz, Chief Engineering Branch 1  
  Thomas R. Farnholtz, Chief Engineering Branch 1  
Division of Reactor Safety   
 
Docket No.:  50-397 License No.: NPF-21   
Division of Reactor Safety  
   
Docket No.:  50-397 License No.: NPF-21  
   
Enclosure:   
Enclosure:   
Evaluations of Changes, Tests,   
Evaluations of Changes, Tests,   
  and Experiments and Permanent Plant   
  and Experiments and Permanent Plant   
  Modifications Inspection Request for Information  Electronic Distribution to Columbia Generating Station  
  Modifications Inspection Request for Information  
  Electronic Distribution to Columbia Generating Station  
 
   
   
   
   
    
    
   Enclosure Request for Information Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications Inspection Columbia Generating Station   
   Enclosure  
Request for Information  
Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications  
Inspection Columbia Generating Station  
    
Inspection Report:  05000397/20140045  
Inspection Report:  05000397/20140045  
  Inspection Dates:  September 22-26, 2014, and October 5-10, 2014   
 
Inspection Procedure: IP 71111.17T, "Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications"  Lead Inspector:  Jonathan Braisted, Reactor Inspector
  Inspection Dates:  September 22-26, 2014, and October 5-10, 2014  
  Information Requested for the In-Office Preparation Week
   
Inspection Procedure: IP 71111.17T, "Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications"  
  Lead Inspector:  Jonathan Braisted, Reactor Inspector
 
  Information Requested for the In-Office Preparation Week
 
The following information should be sent to the Region IV office in hard copy or electronic format (preferred) by September 15, 2014, to the attention of Jonathan Braisted.  We request  
The following information should be sent to the Region IV office in hard copy or electronic format (preferred) by September 15, 2014, to the attention of Jonathan Braisted.  We request  
that you categorize the documents in your response with the numbered list below.  The  
that you categorize the documents in your response with the numbered list below.  The  
inspectors will select specific items from the information requested below and request from your staff additional documents needed during the onsite inspection weeks.  We ask that the specific  
inspectors will select specific items from the information requested below and request from your staff additional documents needed during the onsite inspection weeks.  We ask that the specific  
items requested be available and ready for review on the first day of inspection.  If you have any questions regarding this information request, please contact the lead inspector as soon as possible.  
items requested be available and ready for review on the first day of inspection.  If you have any questions regarding this information request, please contact the lead inspector as soon as possible.  
  1. Procedure(s) for conducting 10 CFR 50.59 screenings and evaluations.  2. A list with descriptions of all 50.59 screenings (or equivalent) performed since the last triennial modification inspection that did not result in an evaluation.  
 
3. A list with descriptions of all 10 CFR 50.59 evaluations performed the last triennial modification inspection that did not result in an application for license amendment.   4. A list with descriptions of all corrective action documents related to 10 CFR 50.59 screenings and evaluations since the last triennial modification inspection.   5. Procedure(s) for implementing permanent plant modifications.  6. A list with descriptions of all permanent plant modifications since the last triennial modification inspection.   7. A list with descriptions of all corrective action documents related to permanent plant modifications since the last triennial modification inspection.   8. A list of personnel qualified to prepare 10 CFR 50.59 screenings and/or evaluations, including qualification dates.  9. A list of personnel qualified to review and approve 10 CFR 50.59 screenings and/or evaluations, including qualification dates.   
  1. Procedure(s) for conducting 10 CFR 50.59 screenings and evaluations.  
   - 2 -  10. Current revisions of the Technical Specifications and Bases and the Updated Final Safety Analysis Report.  Note:  Descriptions should be brief but of sufficient detail to ensure that inspectors can  
  2. A list with descriptions of all 50.59 screenings (or equivalent) performed since the last triennial modification inspection that did not result in an evaluation.
3. A list with descriptions of all 10 CFR 50.59 evaluations performed the last triennial modification inspection that did not result in an application for license amendment.  
4. A list with descriptions of all corrective action documents related to 10 CFR 50.59 screenings and evaluations since the last triennial modification inspection.  
5. Procedure(s) for implementing permanent plant modifications.  
  6. A list with descriptions of all permanent plant modifications since the last triennial modification inspection.
7. A list with descriptions of all corrective action documents related to permanent plant modifications since the last triennial modification inspection.
8. A list of personnel qualified to prepare 10 CFR 50.59 screenings and/or evaluations, including qualification dates.  
  9. A list of personnel qualified to review and approve 10 CFR 50.59 screenings and/or evaluations, including qualification dates.  
    
   - 2 -  10. Current revisions of the Technical Specifications and Bases and the Updated Final Safety Analysis Report.  
  Note:  Descriptions should be brief but of sufficient detail to ensure that inspectors can  
determine the safety and/or risk significance of the screenings, evaluations, and modifications.  
determine the safety and/or risk significance of the screenings, evaluations, and modifications.  
   
   
Note:  For this inspection, permanent plant modifications include permanent plant changes,  
Note:  For this inspection, permanent plant modifications include permanent plant changes,  
design changes, set point changes, procedure changes, equivalency evaluations, suitability analyses, calculations, and commercial grade dedications   
design changes, set point changes, procedure changes, equivalency evaluations, suitability analyses, calculations, and commercial grade dedications  
   
   
   
   
   
Inspector Contact Information:  Jonathan Braisted  Mahdi Hayes    Nnaerika Okonkwo  
Inspector Contact Information:  
  Jonathan Braisted  Mahdi Hayes    Nnaerika Okonkwo  
Reactor Inspector  Operations Engineer  Reactor Inspector  
Reactor Inspector  Operations Engineer  Reactor Inspector  
817-200-1194    817-200-1508  817-200-1114  
817-200-1194    817-200-1508  817-200-1114  
Jonathan.Braisted@nrc.gov  Mahdi.Hayes@nrc.gov Nnaerika.Okonkwo@nrc.gov   
Jonathan.Braisted@nrc.gov  Mahdi.Hayes@nrc.gov Nnaerika.Okonkwo@nrc.gov  
    
Mailing Address:  
Mailing Address:  
   
   
U.S. NRC, Region IV  
U.S. NRC, Region IV  
Attn: Jonathan Braisted 1600 East Lamar Blvd. Arlington, TX  76011-4125  
Attn: Jonathan Braisted 1600 East Lamar Blvd. Arlington, TX  76011-4125  
   
   
    
    


   ML14219A751 SUNSI Review By:  JDB ADAMS:    Yes      No  Sensitive    Non-Sensitive  Non-Publicly Available    Publicly Available Keyword NRC-002 OFFICE RI:DRS/EB1 C:/DRP/PBD  C:DRS/EB1 NAME JBraisted/tek BHagar  TFarnholtz SIGNATURE /RA/ /RA/  /RA/ DATE 8/6/14 8/6/14  8/7/14   
   ML14219A751
     Letter to Mark Reddemann from Thomas Farnholtz, dated August 7, 2014  SUBJECT:  COLUMBIA GENERATING STATION - NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS, AND PERMANENT PLANT MODIFICATIONS  
SUNSI Review By:  JDB ADAMS:    Yes      No  Sensitive    Non-Sensitive  Non-Publicly Available    Publicly Available Keyword NRC-002 OFFICE RI:DRS/EB1 C:/DRP/PBD  C:DRS/EB1 NAME JBraisted/tek BHagar  TFarnholtz SIGNATURE /RA/ /RA/  /RA/ DATE 8/6/14 8/6/14  8/7/14   
     Letter to Mark Reddemann from Thomas Farnholtz, dated August 7, 2014  
  SUBJECT:  COLUMBIA GENERATING STATION
- NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS, AND PERMANENT PLANT MODIFICATIONS  
INSPECTION (05000397/2014005) AND REQUEST FOR INFORMATION  
INSPECTION (05000397/2014005) AND REQUEST FOR INFORMATION  
   
   
DISTRIBUTION: Regional Administrator (Marc.Dapas@nrc.gov) Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) Acting DRP Director (Troy.Pruett@nrc.gov)  
DISTRIBUTION
: Regional Administrator (Marc.Dapas@nrc.gov) Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) Acting DRP Director (Troy.Pruett@nrc.gov)  
Acting DRP Deputy Director (Michael.Hay@nrc.gov)  
Acting DRP Deputy Director (Michael.Hay@nrc.gov)  
DRS Director (Anton.Vegel@nrc.gov)  
DRS Director (Anton.Vegel@nrc.gov)  
DRS Deputy Director (Jeff.Clark@nrc.gov)  Senior Resident Inspector (Jeremy.Groom@nrc.gov) Resident Inspector (Dan.Bradley@nrc.gov)  
DRS Deputy Director (Jeff.Clark@nrc.gov)  Senior Resident Inspector (Jeremy.Groom@nrc.gov)  
Resident Inspector (Dan.Bradley@nrc.gov)  
Administrative Assistant (Douglas.Bodine@nrc.gov)  
Administrative Assistant (Douglas.Bodine@nrc.gov)  
Acting Branch Chief, DRP/D (Nick.Taylor@nrc.gov)  
Acting Branch Chief, DRP/D (Nick.Taylor@nrc.gov)  
Senior Project Engineer, DRP/D (Bob.Hagar@nrc.gov) Project Engineer, DRP/D (Brian.Parks@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov)  
Senior Project Engineer, DRP/D (Bob.Hagar@nrc.gov) Project Engineer, DRP/D (Brian.Parks@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov)  
Public Affairs Officer (Lara.Uselding@nrc.gov)  
Public Affairs Officer (Lara.Uselding@nrc.gov)  
Project Manager (Andrea.George@nrc.gov)  
Project Manager (Andrea.George@nrc.gov)  
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)   
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)   
RITS Coordinator (Marisa.Herrera@nrc.gov) ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov)  
RITS Coordinator (Marisa.Herrera@nrc.gov)  
ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov)  
Technical Support Assistant (Loretta.Williams@nrc.gov)  
Technical Support Assistant (Loretta.Williams@nrc.gov)  
Congressional Affairs Officer (Jenny.Weil@nrc.gov)  
Congressional Affairs Officer (Jenny.Weil@nrc.gov)  
RIV/ETA: OEDO (Anthony.Bowers@nrc.gov)
RIV/ETA: OEDO (Anthony.Bowers@nrc.gov)
}}
}}

Revision as of 11:24, 1 July 2018

Columbia Generating Station, Notification of Evaluations of Changes, Tests, and Experiments, and Permanent Plant Modifications Inspection (05000397-14-005) and Request for Information
ML14219A751
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/07/2014
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Reddemann M E
Energy Northwest
References
IR-14-005
Download: ML14219A751 (6)


See also: IR 05000397/2014005

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD. ARLINGTON, TX 76011-4511

August 7, 2014

Mr. Mark E. Reddemann

Chief Executive Officer

Energy Northwest

P. O. Box 968 (Mail Drop 1023)

Richland, WA 99352-0968

SUBJECT: COLUMBIA GENERATING STATION

- NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS, AND PERMANENT PLANT

MODIFICATIONS INSPECTION (05000397/2014005) AND REQUEST FOR

INFORMATION

Dear Mr. Reddemann:

The purpose of this letter is to notify you that

U.S. Nuclear Regulatory Commission (NRC) staff will conduct the baseline inspection of changes, tests, experiments, and permanent plant

modifications at your Columbia Generating Station from September 22-26, 2014, and October 5-10, 2014. The inspection will consist of three reactor inspectors from the NRC's Region IV office for two weeks. The inspection will be conducted in accordance with NRC Inspection Procedure 71111.17T, "Evaluations of Changes, Tests, and Experiments and

Permanent Plant Modifications."

Experience has shown that this

inspection is resource intens

ive for both the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for information. Please note that the

information is requested to be provided by S

eptember 15, 2014. Upon review of this information, the inspectors will select additional information for review upon arrival onsite. It is

important that all of this information is up-to-date and complete in order to minimize the amount of additional information requested during the preparation and/or the onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Richard Garcia of your licensing

organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, Jonathan Braisted, by telephone at 817-200-1194, or by e-mail at Jonathan.Braisted@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Offi

ce of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number.

M. Reddemann - 2 -

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Thomas R. Farnholtz, Chief Engineering Branch 1

Division of Reactor Safety

Docket No.: 50-397 License No.: NPF-21

Enclosure:

Evaluations of Changes, Tests,

and Experiments and Permanent Plant

Modifications Inspection Request for Information

Electronic Distribution to Columbia Generating Station

Enclosure

Request for Information

Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications

Inspection Columbia Generating Station

Inspection Report: 05000397/20140045

Inspection Dates: September 22-26, 2014, and October 5-10, 2014

Inspection Procedure: IP 71111.17T, "Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications"

Lead Inspector: Jonathan Braisted, Reactor Inspector

Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or electronic format (preferred) by September 15, 2014, to the attention of Jonathan Braisted. We request

that you categorize the documents in your response with the numbered list below. The

inspectors will select specific items from the information requested below and request from your staff additional documents needed during the onsite inspection weeks. We ask that the specific

items requested be available and ready for review on the first day of inspection. If you have any questions regarding this information request, please contact the lead inspector as soon as possible.

1. Procedure(s) for conducting 10 CFR 50.59 screenings and evaluations.

2. A list with descriptions of all 50.59 screenings (or equivalent) performed since the last triennial modification inspection that did not result in an evaluation.

3. A list with descriptions of all 10 CFR 50.59 evaluations performed the last triennial modification inspection that did not result in an application for license amendment.

4. A list with descriptions of all corrective action documents related to 10 CFR 50.59 screenings and evaluations since the last triennial modification inspection.

5. Procedure(s) for implementing permanent plant modifications.

6. A list with descriptions of all permanent plant modifications since the last triennial modification inspection.

7. A list with descriptions of all corrective action documents related to permanent plant modifications since the last triennial modification inspection.

8. A list of personnel qualified to prepare 10 CFR 50.59 screenings and/or evaluations, including qualification dates.

9. A list of personnel qualified to review and approve 10 CFR 50.59 screenings and/or evaluations, including qualification dates.

- 2 - 10. Current revisions of the Technical Specifications and Bases and the Updated Final Safety Analysis Report.

Note: Descriptions should be brief but of sufficient detail to ensure that inspectors can

determine the safety and/or risk significance of the screenings, evaluations, and modifications.

Note: For this inspection, permanent plant modifications include permanent plant changes,

design changes, set point changes, procedure changes, equivalency evaluations, suitability analyses, calculations, and commercial grade dedications

Inspector Contact Information:

Jonathan Braisted Mahdi Hayes Nnaerika Okonkwo

Reactor Inspector Operations Engineer Reactor Inspector

817-200-1194 817-200-1508 817-200-1114

Jonathan.Braisted@nrc.gov Mahdi.Hayes@nrc.gov Nnaerika.Okonkwo@nrc.gov

Mailing Address:

U.S. NRC, Region IV

Attn: Jonathan Braisted 1600 East Lamar Blvd. Arlington, TX 76011-4125

ML14219A751

SUNSI Review By: JDB ADAMS: Yes No Sensitive Non-Sensitive Non-Publicly Available Publicly Available Keyword NRC-002 OFFICE RI:DRS/EB1 C:/DRP/PBD C:DRS/EB1 NAME JBraisted/tek BHagar TFarnholtz SIGNATURE /RA/ /RA/ /RA/ DATE 8/6/14 8/6/14 8/7/14

Letter to Mark Reddemann from Thomas Farnholtz, dated August 7, 2014

SUBJECT: COLUMBIA GENERATING STATION

- NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS, AND PERMANENT PLANT MODIFICATIONS

INSPECTION (05000397/2014005) AND REQUEST FOR INFORMATION

DISTRIBUTION

Regional Administrator (Marc.Dapas@nrc.gov) Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) Acting DRP Director (Troy.Pruett@nrc.gov)

Acting DRP Deputy Director (Michael.Hay@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov) Senior Resident Inspector (Jeremy.Groom@nrc.gov)

Resident Inspector (Dan.Bradley@nrc.gov)

Administrative Assistant (Douglas.Bodine@nrc.gov)

Acting Branch Chief, DRP/D (Nick.Taylor@nrc.gov)

Senior Project Engineer, DRP/D (Bob.Hagar@nrc.gov) Project Engineer, DRP/D (Brian.Parks@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Andrea.George@nrc.gov)

Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV/ETA: OEDO (Anthony.Bowers@nrc.gov)