ML16356A262: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:James M. Welsch .. Pacific Gas and Electric Company Vice President, Nuclear Generation Diablci Canyon Power Plant Mail Code 104/6 December 5, 2016 PG&E Letter DCL-16-126 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC. 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Power Plant Units t and 2 Technical Specification Bases. Revision 10  
{{#Wiki_filter:James M. Welsch ..
Pacific Gas and Electric Company Vice President, Nuclear Generation Diablci Canyon Power Plant Mail Code 104/6 December 5, 2016 PG&E Letter DCL-16-126 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC. 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Power Plant Units t and 2 Technical Specification Bases. Revision 10  


==Dear Commissior:==
==Dear Commissior:==
iers and Staff: P. 0. Box 56 Avila Beach, CA 93424 80 5. 545. 3242 Internal: 691.3242 Fax: 805. 545.4884 10 CFR 50.71(e) Pursuant to Diablo Canyon Power Plant (DCPP) Unit 1 and-Unit 2 Technical Specification (TS) 5.5.14, "Technical Specifications (TS) Bases Control Program," Pacific Gas and Electric Company (PG&E) hereby submits Revision 1 O of the DCPP TS Bases. DCPP TS Bases, Revision 10, includes changes made to the DCPP TS *Bases from May 1, 2015, through November 8, 2016, and replaces Revision 9 .in its entirety. Changes are noted by revision bars in the right margin of the affected TS Bases. PG&E is submitting the DCPP TS Bases, Revision 10, on the enclosed compact disc (CD), labeled "Diablo Canyon Power Plant Technical Specification Bases, Revision 10," dated December 2016. The contents are in Adobe Acrobat portable document format. A copy of this CD is being provided to the NRC Region IV Administrator, the DCPP NRC Senior Project Manager, and the DCPP NRC Senior Resident Inspector. , The CD contains the following file: File Name DCPPTSBasesR 1 O.pdf File Size 2.48 Megabytes PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter. * ' If you have any questions regarding this submittal, please contact Mr. Hossein Hamzehee at (805) 545-4720.
iers and Staff: P. 0. Box 56 Avila Beach, CA 93424 80 5. 545. 3242 Internal:
691.3242 Fax: 805. 545.4884 10 CFR 50.71(e)
Pursuant to Diablo Canyon Power Plant (DCPP) Unit 1 and-Unit 2 Technical Specification (TS) 5.5.14, "Technical Specifications (TS) Bases Control Program,"
Pacific Gas and Electric Company (PG&E) hereby submits Revision 1 O of the DCPP TS Bases. DCPP TS Bases, Revision 10, includes changes made to the DCPP TS *Bases from May 1, 2015, through November 8, 2016, and replaces Revision 9 .in its entirety.
Changes are noted by revision bars in the right margin of the affected TS Bases. PG&E is submitting the DCPP TS Bases, Revision 10, on the enclosed compact disc (CD), labeled "Diablo Canyon Power Plant Technical Specification Bases, Revision 10," dated December 2016. The contents are in Adobe Acrobat portable document format. A copy of this CD is being provided to the NRC Region IV Administrator, the DCPP NRC Senior Project Manager, and the DCPP NRC Senior Resident Inspector.  
, The CD contains the following file: File Name DCPPTSBasesR 1 O.pdf File Size 2.48 Megabytes PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter. * ' If you have any questions regarding this submittal, please contact Mr. Hossein Hamzehee at (805) 545-4720.
* A member of the STARS Alliance Callaway
* A member of the STARS Alliance Callaway
* Diablo Canyon
* Diablo Canyon
* Palo Verde
* Palo Verde
* Wolf Creek Document Control Desk December 5, 2016 Page2 E 1 d7 /4418/50708777 Enclosure Diablo Distribution PG&E Letter DCL-16-126 cc: cc/encl: Kriss M. Kennedy, NRC Region IV Administrator Christopher W. Newport, NRC Senior Resident Inspector Balwant K. Singal, NRC Senior Project Manager A member of the STARS Alliance Callaway
* Wolf Creek Document Control Desk December 5, 2016 Page2 E 1 d7 /4418/50708777 Enclosure Diablo Distribution PG&E Letter DCL-16-126 cc: cc/encl:
Kriss M. Kennedy, NRC Region IV Administrator Christopher W. Newport, NRC Senior Resident Inspector Balwant K. Singal, NRC Senior Project Manager A member of the STARS Alliance Callaway
* Diablo Canyon
* Diablo Canyon
* Palo Verde
* Palo Verde
* Wolf Creek i I : H 1-* 1.t II I I, t l* ,!' r 'I H d \Ii *fl ,\(\! Diablo Canyon -Units 1 and 2
* Wolf Creek i I : H 1-* 1.t II I I, t l* ,!' r 'I H d \Ii *fl ,\(\! Diablo Canyon -Units 1 and 2
* Technical Specification Bases Revisi?n 10, December 2016 PG&E Letter DCL-16-126 Enclosure (Revision 10 replaces Revision 9 in its entirety)}}
* Technical Specification Bases Revisi?n 10, December 2016 PG&E Letter DCL-16-126 Enclosure (Revision 10 replaces Revision 9 in its entirety)}}

Revision as of 00:38, 30 June 2018

Diablo Canyon, Units 1 and 2 - Submittal of Revision 10 to Technical Specification Bases
ML16356A262
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 12/05/2016
From: Welsch J M
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML16356A255 List:
References
DCL-16-126
Download: ML16356A262 (3)


Text

James M. Welsch ..

Pacific Gas and Electric Company Vice President, Nuclear Generation Diablci Canyon Power Plant Mail Code 104/6 December 5, 2016 PG&E Letter DCL-16-126 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC. 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Power Plant Units t and 2 Technical Specification Bases. Revision 10

Dear Commissior:

iers and Staff: P. 0. Box 56 Avila Beach, CA 93424 80 5. 545. 3242 Internal:

691.3242 Fax: 805. 545.4884 10 CFR 50.71(e)

Pursuant to Diablo Canyon Power Plant (DCPP) Unit 1 and-Unit 2 Technical Specification (TS) 5.5.14, "Technical Specifications (TS) Bases Control Program,"

Pacific Gas and Electric Company (PG&E) hereby submits Revision 1 O of the DCPP TS Bases. DCPP TS Bases, Revision 10, includes changes made to the DCPP TS *Bases from May 1, 2015, through November 8, 2016, and replaces Revision 9 .in its entirety.

Changes are noted by revision bars in the right margin of the affected TS Bases. PG&E is submitting the DCPP TS Bases, Revision 10, on the enclosed compact disc (CD), labeled "Diablo Canyon Power Plant Technical Specification Bases, Revision 10," dated December 2016. The contents are in Adobe Acrobat portable document format. A copy of this CD is being provided to the NRC Region IV Administrator, the DCPP NRC Senior Project Manager, and the DCPP NRC Senior Resident Inspector.

, The CD contains the following file: File Name DCPPTSBasesR 1 O.pdf File Size 2.48 Megabytes PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter. * ' If you have any questions regarding this submittal, please contact Mr. Hossein Hamzehee at (805) 545-4720.

  • A member of the STARS Alliance Callaway
  • Diablo Canyon
  • Palo Verde
  • Wolf Creek Document Control Desk December 5, 2016 Page2 E 1 d7 /4418/50708777 Enclosure Diablo Distribution PG&E Letter DCL-16-126 cc: cc/encl:

Kriss M. Kennedy, NRC Region IV Administrator Christopher W. Newport, NRC Senior Resident Inspector Balwant K. Singal, NRC Senior Project Manager A member of the STARS Alliance Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek i I : H 1-* 1.t II I I, t l* ,!' r 'I H d \Ii *fl ,\(\! Diablo Canyon -Units 1 and 2
  • Technical Specification Bases Revisi?n 10, December 2016 PG&E Letter DCL-16-126 Enclosure (Revision 10 replaces Revision 9 in its entirety)