ML18087A735: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 2: Line 2:
| number = ML18087A735
| number = ML18087A735
| issue date = 03/12/1983
| issue date = 03/12/1983
| title = Rev 1 to safety-related, Solid State Protection Sys Functional Test Train A.
| title = Rev 1 to safety-related, Solid State Protection Sys Functional Test Train a
| author name =  
| author name =  
| author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY
| author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:",)                               NOTE: PRESS HARD YOU ARE MAKING FIVE (5) COPIES CHANGE TYPE:
{{#Wiki_filter:",)
ADMINISTRATIVE PROCEDURE 3 ON-THE-SPOT CHANGE                                                   ~     PERMANENT (GREENJ       D       *TEMPORARY         ORANGE
NOTE: PRESS HARD YOU ARE MAKING FIVE (5) COPIES ADMINISTRATIVE PROCEDURE 3 ON-THE-SPOT CHANGE CHANGE TYPE:
                                                                                                                *EXPIRES:
~
PERMANENT (GREENJ D *TEMPORARY ORANGE  
*EXPIRES:
ALL ON-THE-SPOT CHAl'IGES TO BE CONSIDERED FOR APPLICABILITY TO BOTH UNITS.
ALL ON-THE-SPOT CHAl'IGES TO BE CONSIDERED FOR APPLICABILITY TO BOTH UNITS.
[29     UNIT 1     PROCEDURENO.~-\~\:>                 t:>__-____,~s~*~'~*~[)~o..;;;._CC>=-----~
[29 UNIT 1 UNIT 2 PROCEDURENO.~-\\~\\:>
____                                        REV. NO. _ _.__ _ CHANGE No._L/_._*_ _
____ t:> __ -____  
UNIT 2    PRocEDURENo.                 P.........,~=--~'~B~,~'-*~O~a~o""'-~~-
,~s~*~'~*~[)~o..;;;._CC>=-----~
                                                  ..........                                            REV. NO. _ _._l*_ _ CHANGE N0. _ _              1~-
PRocEDURENo........... P.........,~=--~'~B~,~'-*~O~a~o""'-~~-
PROPOSED CHANGE:             r~':)e., \O Q-~       \e.'f'- c.\..o1 ~~;\'.' 'o..-..._.p..&#xa5;.,t,-s ~ ** b ~Pt<;s b~e . . . ~c.t-s               f\1'-<a.....    'f\C.. \I...~~
REV. NO. _ _._ __ CHANGE No._L/_._* __
0 cv-X> {\~ ~ \-e.~~~!V~ 0 ~ ~~\'r-c'}(... \ ~ \JC~                                               \S        "1-o r '1"1\~L ..)
REV. NO. __
REASON FOR CHANGE:
._l* __ CHANGE N0. __ 1~-
          \o . C\.?<r~~~ ~\'\,) ~~\'fC'J-
PROPOSED CHANGE:
* If\\\
r~':)e., \\O Q-~ \\e.'f'- c.\\..o1  
            \\t'~ r .f...c.~~ d e> v....\:-.
~~;\\'.'
ACTION TAKEN FOR OTHER UNIT:
cv-X>
                    '5~~
{\\~
AUTHORIZATION:
~
                                        **SUPERVISOR IN CHARGE 4/~-JA--
REASON FOR CHANGE:
CUTY SENIOR $..;:rsUPERVISOR
'o..-..._.p..&#xa5;.,t,-s ~ ** b0
                                                                                                                                          ;;fe/&#xa2;.1 CATE OR SHIFT SUPERVISOR
~Pt<;s b~e...... ~c.t-s  
        **SIGNATURE ALSO VERIFIES THAT APPLICABILITY TO BOTH UNITS HAS BEEN CONSIDERED.
\\-e.~~~!V~ 0 ~  
ACCEPT ABLE:                                         POST CHANGE-REVIEW/APPROVAL YES           NO IZJ D                                 o{i)ircdlz_          CEPARTMENT HEAD                                        I    ~ATE DD                                                                   SQAE                                                DATE DD                                                           SORC (CHAIRMANJ                                            DATE MEETING NO.
~~\\'r-c'}(...  
            ~'           .....------., _
\\ ~ \\JC~  
GENERJ'.L MANAGER* SALEM OPERATIONS                                         DATE RETURN COMPLETED OR REJECTED FORM TO DEPARTMENT REQUESTING CHANGE.
\\o. C\\.?<r~~~  
FOLLOW-UP TO REJECTED ON-THE*SPOT CHANGE ACTION TAKEN:
~\\'\\,)  
"      .8303160568 8303i4-~--
~~\\'fC'J- *
\..:.-- ~DR ADOCK 05000~b~
\\\\t'~ r.f...c.~~ d e> v....\\:-.
ACTION TAKEN FOR OTHER UNIT:  
'5~~
f\\1'-<a.....
'f\\C.. \\I...~~
\\S "1-o r '1"1\\~L.. )
If\\\\\\
AUTHORIZATION:  
**SUPERVISOR IN CHARGE 4/~-JA--
CUTY SENIOR $..;:rsUPERVISOR  
;;fe/&#xa2;.1 CATE OR SHIFT SUPERVISOR  
**SIGNATURE ALSO VERIFIES THAT APPLICABILITY TO BOTH UNITS HAS BEEN CONSIDERED.
ACCEPT ABLE:
YES NO IZJ D DD DD MEETING NO.  
~'.....------., _
POST CHANGE-REVIEW/APPROVAL o{i)ircdlz_
CEPARTMENT HEAD SQAE SORC (CHAIRMANJ GENERJ'.L MANAGER* SALEM OPERATIONS RETURN COMPLETED OR REJECTED FORM TO DEPARTMENT REQUESTING CHANGE.
FOLLOW-UP TO REJECTED ON-THE*SPOT CHANGE  
.8303160568 8303i4-~--
ACTION TAKEN:
\\..:.--
~DR ADOCK 05000~b~
PERFORMED, BY:
PERFORMED, BY:
SIGNATURE                                               DATE RETURN TO DEPARTMENT HEAD FOR ROUTING THROUGH POST CHANGE-REVIEW/APPROVAL CYCLE.
SIGNATURE RETURN TO DEPARTMENT HEAD FOR ROUTING THROUGH POST CHANGE-REVIEW/APPROVAL CYCLE.
FORMAP.3-1                                                               REV, 12
FORMAP.3-1 I
~ATE DATE DATE DATE DATE REV, 12  


          '\
'\\
NOTE: PRESS HARD YOU ARE MAKING FIVE (5) COPIES
NOTE: PRESS HARD YOU ARE MAKING FIVE (5) COPIES  
      ~,.--   ......~~~~~~~~~~~-~~~~~~~-~~--~~-~~~-~~~---~~~~-~~~-~~-~~~~~
~,.--...... ~~~~~~~~~~~-~~~~~~~-~~--~~-~~~-~~~---~~~~-~~~-~~-~~~~~
......                                                                          CHANGE TYPE:
CHANGE TYPE:  
      .,,.. ADMINISTRATIVE PROCEDURE 3 ON*THE*SPOT CHANGE                                     5(:1 PERMANENT(GREEN)       D     *TEMPORARY ORANGE PRocEDURE TITLE         SS/}s       pc.,oJCT1DrJkk       yg:;;;:,=                       *EXPIRES:
.,,.. ADMINISTRATIVE PROCEDURE 3 ON*THE*SPOT CHANGE 5(:1 PERMANENT(GREEN) D *TEMPORARY ORANGE PRocEDURE TITLE SS/}s pc.,oJCT1DrJkk yg:;;;:,=  
*EXPIRES:
ALL ON*THE-SPOT CHANGES TO BE CONSIDERED FOR APPLICABILITY TO BOTH UNITS.
ALL ON*THE-SPOT CHANGES TO BE CONSIDERED FOR APPLICABILITY TO BOTH UNITS.
0         'UNIT I   PROCEDURENO.~~/_P_D;;;._-__._/~8'&deg;'--'-,/'--,=0~C)~'8=--~----~ REV. No. _ _, ___ CHANGE No._3  _ __
0 'UNIT I 12(] UNIT 2 PROCEDURENO.~~/_P_D;;;._-__._/~8'&deg;'--'-,/'--,=0~C)~'8=--~----~
12(]      UNIT 2    PROCEDURENO.~_.Z__'f'__D_-__J~g_,_J_,_~-~--~----------         REV. NO. _ _/ : - - - CHANGE N0._3____
PROCEDURENO.~_.Z
PROPOSED CHANGE:
__ 'f' __ D_-__
{J1-)-C, E tf 7 - //11-4J4
J~g_,_J_,_~-~--~----------
* 0. 2. 51. /f
REV. No. __
                            ~Al 9 g-             77Zri-//f/                                           Tx!J'f-1 IV ~
, ___ CHANGE No._3 REV. NO. __
/:--- CHANGE N0._3 PROPOSED CHANGE:
{J 1-)-C, E tf 7 - //
11-4 J4
* 0. 2. 51. /f  
~Al 9 g-77Zri-//f/
Tx!J'f-1 IV ~
* REASON FOR CHANGE:
* REASON FOR CHANGE:
ACTION TAKEN FOR OTHER UNIT:
ACTION TAKEN FOR OTHER UNIT:
AUTHORIZATION:
AUTHORIZATION:
DATE OR SHIFT SUPERVISOR
OR SHIFT SUPERVISOR  
          **SIGNATURE AL.SO VERIFIES THAT APPL.ICABIL.ITY TO BOTH UNITS HAS BEEN CONSIDERED.
**SIGNATURE AL.SO VERIFIES THAT APPL.ICABIL.ITY TO BOTH UNITS HAS BEEN CONSIDERED.
ACCEPTABLE:                                 POST CHANGE-REVIEW/APPROVAL Q~
ACCEPTABLE:
YES        NO
POST CHANGE-REVIEW/APPROVAL YES NO Q~  
                                          /~~<AD                                                                 I  DATE Jz.)2.L-/!L SORC (CHAIRMAN)                                 7    DNfE
/~~<AD SORC (CHAIRMAN)
                      ?1 MEETJNG NO.
MEETJNG NO.  
r---..
?1 r---..
RETURN COMPL.ETED OR REJECTED FORM TO DEPARTMENT REQUESTING CHANGE.
RETURN COMPL.ETED OR REJECTED FORM TO DEPARTMENT REQUESTING CHANGE.
FOLLOW-UP TO REJECTED ON-THE-SPOT CHANGE ACTION TAKEN:
FOLLOW-UP TO REJECTED ON-THE-SPOT CHANGE ACTION TAKEN:
PERFORMED BY:
PERFORMED BY:
SIGNATURE                                         DATE RETURN TO DEPARTMENT HEAD FOR ROUTING THR-:JUGH POST CHANGE-REVIEW/APPROVAL. CYCL.E.
SIGNATURE RETURN TO DEPARTMENT HEAD FOR ROUTING THR-:JUGH POST CHANGE-REVIEW/APPROVAL. CYCL.E.
AP.3                                                         FORM AP-3-1                                               REV. 1Z
AP.3 FORM AP-3-1 DATE I
DATE Jz.)2.L-/!L 7
DNfE DATE REV. 1Z  


NOTE: PRESS HARD YOU ARE MAKING FIVE (5) COPIES
NOTE: PRESS HARD YOU ARE MAKING FIVE (5) COPIES ADMINISTRATIVE PROCEDURE 3 ON-THE-SPOT CHANGE NGE TYPE:
              .                                                                    ADMINISTRATIVE PROCEDURE 3                                                                                         NGE TYPE:
PERMANENTD (GREEN)
                                                                                                                                                                                                                                              *TEMPORARY ON-THE-SPOT CHANGE                                                                                       PERMANENTD (GREEN)                            (ORANGE)
PROCEDURE TITLE *.:;, ')
PROCEDURE TITLE *.:;, ')
* f -,; *                                                                                         *EXPIRES:
* f -,; *  
ALL ON-THE-SPOT CHANGES TO BE CONSIDERED !"OR APPLICABILITY TO BOTH UNITS.
*EXPIRES:
                      ~UNIT!                                           PROCEDURENO.~~~'--r~\)~--\_~_-_,_,_._c_c_'_~_*~~~~                                                           REV. N O . - - - - CHANGE N0. _ _                                  2-I)( I            UNIT 2                          PROCEDURENO._~_-::t_V_-_*\.>_-_\_~_._\_,~U~l~'-5_'_ _ _~                                                     REV. NO. _ _ _ _ CHANGE NO.
ALL ON-THE-SPOT CHANGES TO BE CONSIDERED !"OR APPLICABILITY TO BOTH UNITS.  
PROPOSED CHANGE:                                                   ~~'.\'t!.... &deg;3~'.)
*TEMPORARY (ORANGE)
                                                ?.~~ ~\~~- 5 ""* 5                                               "") \2
~UNIT!
                                                                                                                \'"* ..,,\:'II~
I)( I UNIT 2 PROCEDURENO.~~~'--r~\\)~--\\_~_-_,_,_._c_c_'_~_*~~~~ REV. NO.---- CHANGE N0. __ 2-PROCEDURENO._~_-::t_V_-_*\\.>_-_\\_~_._\\_,~U~l~'-5_' ___ ~
                                                                                                                                    \',..,.'I P
REV. NO. ____ CHANGE NO.
                                                                                                                                                          ' " ,I l\w -~ \'":>           \ ~'\' ~s                           ..:.;t ., . , . <:.....    \-t ~ \-
PROPOSED CHANGE:  
                                                                                                                \'~,...::'...\....- * ''1c:: r*, \. ~         \~     '1 \')~         *.:_i,*>i             t5      C; \.             .&#xa5;-. ~v\)
~~'.\\'t!....  
                                                                                                                  ~ \o{..)J... '      \I... ~ c"~ )        \(. I..;> (; '-\ '        ~ "-'
&deg;3~'.)  
                                                                                                                                                                                      \J' -,Q     e   J   \c:_ lei.)'\         I       *~ ~\(;   )
?.~~ ~\\~~-
                                                                                                                    \\1..:d ""\....*\\                 \e.\'f>.'\~.
5 ""* 5  
R-: \'' 1"c *--                                                                  \ l'.l
\\"") \\2  
                                                                                                                      \l ,:ii,~~\...
\\',..,.'I
,I
'"*..,,\\:'II~
P l\\w -~  
\\'":>  
\\ ~'\\' ~s  
\\'~,...::'...\\....- * ''1c:: r*, \\. ~ \\ ~ '1 \\')~ *.:_i,*>i  
..:.;t.,,..,,. <:..... \\-t ~ \\-
t5 C; \\.  
.&#xa5;-. ~v\\)
\\J' -,Q e J  
\\c:_ lei.)'\\
I  
*~ ~\\(; )  
~
\\o{..)J... '
\\I... ~ c"~ )
\\(. I..;> (; '-\\ '  
~ "-'
REASON FOR CHANGE:
REASON FOR CHANGE:
ACTION TAKEN FOR OTHER UNIT:
ACTION TAKEN FOR OTHER UNIT:
s;; ~""' -<-
s;; ~""' -<-
AUTHOR I Z AT 10 N:                                         .
\\\\1..:d ""\\....*\\\\
dd            d.e_-4:-
\\e.\\'f>.'\\~.
                                                                                          *suPERVISOR IN CHARGE                                                                                                                             DATE
R-: \\'' 1"c *--
                      **SIGNATURE AL.SO VERIFIES THAT APPL.ICABILITY TO BOTH UNITS HAS BEE                                                                               CONSIDERED.
\\l,:ii,~~\\...
ACCEPTABLE:                                                                             POST CHANGE-REVIEW/APPROVAL YES                                 NO 00 WD                         1 ltZT N cyJ I I                                                                                                                                         N
AUTHOR I Z AT 10 N:  
                                                                                                                          .                                                      \
. d d d.e_-4:-
*suPERVISOR IN CHARGE  
**SIGNATURE AL.SO VERIFIES THAT APPL.ICABILITY TO BOTH UNITS HAS BEE CONSIDERED.
ACCEPTABLE:
POST CHANGE-REVIEW/APPROVAL YES NO 00 WD ltZT1N cyJ I I
N  
\\
RETURN COMPL.ETED OR REJECTED FORM TO DEPARTMENT REQUESTING CHANGE.
RETURN COMPL.ETED OR REJECTED FORM TO DEPARTMENT REQUESTING CHANGE.
FOLLOW-UP TO REJECTED ON-THE-SPOT CHANGE ACTION TAKEN:
FOLLOW-UP TO REJECTED ON-THE-SPOT CHANGE ACTION TAKEN:
I PERFORMED BY:
PERFORMED BY:
SIGNATURE                                                                             DATE RETURN TO O . . ARTMENT HEAO *OR ROUT<NG THROUGH *OH CHANGE-REVOEWIA . . ROVAC CYCLE-FORM*AP-3-t REV. 9
SIGNATURE  
*.* *-** -*-.~'t"-*.-:**~**, ..**o.~11";",".*~-.--:-:---**,::*~~ .. ~:.-;''"*::~--=-*;*:~* ---.*--;-             .r ""* *-***-*         **,* *****  - **                    *"" * *,
\\ l'.l DATE DATE I
RETURN TO O.. ARTMENT HEAO *OR ROUT<NG THROUGH *OH CHANGE-REVOEWIA.. ROVAC CYCLE-
*.* *-** -*-.~'t"-*.-:**~**,.. **o.~11";",".*~-.--:-:---**,::*~~.. ~:.-;''"*::~--=-*;*:~* ---.*--;-
.r ""* *-***-*
FORM*AP-3-t REV. 9


NOTE: PRESS HARD YOU ARE MAKING FIVE (5) COPIES
NOTE: PRESS HARD YOU ARE MAKING FIVE (5) COPIES ADMINISTRATIVE PROCEDURE 3 CHANGE TYPE:
        .                          ADMINISTRATIVE PROCEDURE 3                                                                             CHANGE TYPE:
ON-THE-SPOT CHANGE
ON-THE-SPOT CHANGE
_P_R_O_C_E_D_U_R_E_T_l_T_L_E--s--.--~-
                                              .*-P,.....-.s-,--~-\1.-bl_<"  __\-.,-.u-....'-,p..-\_--\-"f'_..S._\-
____  \_'("_A_j_N__B_~
[$] p~:~:::tT D
[$] p~:~:::tT D
                                                                                                                                          *EXP IR ES:
_P_R_O_C_E_D_U_R_E_T_l_T_L_E--s--. --~-.*
                                                                                                                                                                *TEMPORARY (ORANGE)
-P,.....-.s-,--~-\\1.-bl_<" __ \\-.,-.u-.... '-,p..-\\_--\\-"f'_..S._\\-____
'*        ALL. ON-THE-SPOT CHANGES TO BE CONSIDERED !="OR APPL.ICABIL.ITY TO BOTH UNITS.
\\_'("_A_j_N __ B_~ *EXP IR ES:  
          ~UNIT 1           PROCEDURE NO. _                       PD-=-_-_\;...;B::;...._'_\_,_o_o__
*TEMPORARY (ORANGE)
__,_\....                                    s______                "REV. NO. _ __._t__  CHANGE NO. _ _,\_ _
ALL. ON-THE-SPOT CHANGES TO BE CONSIDERED !="OR APPL.ICABIL.ITY TO BOTH UNITS.  
(ZJ  UNIT 2                                        ~nr:.         - \<l, \ \ ()0                   co PROCEDURE NO. _......;;;;....;;;.,&#xa3;U"--"~-"'""'-..!2=-"'--..;....;'-__.;_........;;______                           \                      \
~UNIT 1
REV. N O . - - - - - CHANGE N O * - - - ' - -
(ZJ UNIT 2 PROCEDURE NO. _
PROPOSED CHANGE:           ~ ~~'"'-       30,,,
__,_\\.... PD-=-_-_\\;...;B::;...._' _\\_,_o_o __ s ______ "REV. NO. _
Q.~~~~ o~~\
__._t __ CHANGE NO. _
                                    ~1"1'             B.~\.\\           )   -s,~,.sJ                   co.a..\.\'\'
_,\\ __
: 8. a.\.\ ) ta. ;l..\,&deg;i                               '8. a...\ '  \'()
~nr:. - \\<l, \\ \\ ()0 co  
REASON FOR CHANGE:
\\
\\
PROCEDURE NO. _......;;;;....;;;.,&#xa3;U"--"~-"'""'-..!2=-"'--..;....;'-__.;_........;;______ REV. NO.----- CHANGE NO*---'--
PROPOSED CHANGE: ~  
~~'"'- 30,,,
Q.~~~~ o~~\\
~1"1' B.~\\.\\\\ ) -s,~,.sJ
: 8. a.\\.\\ ) ta. ;l..\\,&deg;i REASON FOR CHANGE:
ACTION TAKEN FOR OTHER UNIT:
ACTION TAKEN FOR OTHER UNIT:
            **SIGNATURE AL.SO VERIFIES THAT APPL.ICABIL.ITY TO BOTH UNITS HAS BEEN CONSIDERED.
co.a..\\.\\'\\'
                                                                                                      ~                OR SHi-FT SUPERVISOR ACCEPTABLE:                                             POST CHANGE-REVIEW/APPROVAL YES           NO 1~10                                                                                                                                   f-2-fz:-
'8. a...\\ ' \\'()
rno MEETING   No.frZ13
~
                                                ;t;K ~me                                         SQAE DD I 21 RETURN COMPL.ETED OR REJECTED FORM TO DEPARTMENT REQUESTING CHANGE.
OR SHi-FT SUPERVISOR
**SIGNATURE AL.SO VERIFIES THAT APPL.ICABIL.ITY TO BOTH UNITS HAS BEEN CONSIDERED.
ACCEPTABLE:
YES NO 1~10 rno MEETING No.frZ13 DD I 21 POST CHANGE-REVIEW/APPROVAL
;t;K SQAE
~me RETURN COMPL.ETED OR REJECTED FORM TO DEPARTMENT REQUESTING CHANGE.
FOL.LOW-UP TO REJECTED ON-THE-SPOT CHANGE ACTION TAKEN:
FOL.LOW-UP TO REJECTED ON-THE-SPOT CHANGE ACTION TAKEN:
PERFORMED BY:
PERFORMED BY:
SIGNATURE                                                   DATE RETURN TO DEPARTMENT HEAD FOR ROUTING THROUGH POST CHANGE-REVIEW/APPROVAL. CYCL.E.
SIGNATURE RETURN TO DEPARTMENT HEAD FOR ROUTING THROUGH POST CHANGE-REVIEW/APPROVAL. CYCL.E.
FORM AP-3-1 REV. 9
f-2-fz:-
DATE FORM AP-3-1 REV. 9  


                '                                                                                SALEM NUCLEAR GENERATING STATION PUBLIC SERVICE ELECTRIC & GAS COMPANY ELECTRIC GENERATION DEPARTMENT SAFETY
PROCEDURE:
                                                                                                                                                            - . *- - . RELATED PROCEDURE APPROVAL COVER SHEET PROCEDURE:
REMARKS:
lPD-18.1.008 - SOLID STATE PROTECTION SYSTEM REMARKS:                                                                      FUNCTIONAL TEST - TRAIN A REV. 1 - General Revision to incorporate On-The-Spot-Changes.
SALEM NUCLEAR GENERATING STATION PUBLIC SERVICE ELECTRIC & GAS COMPANY ELECTRIC GENERATION DEPARTMENT PROCEDURE APPROVAL COVER SHEET SAFETY RELATED lPD-18.1.008 -
EED                       QA         SORC     STA. SUPT.
SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST -
REV                            SUBMITTED                                                            APPROVED                              REVIEWED    REVIEWED    APPROVED 0                                                                                                                                                       82-\2:>
TRAIN A REV. 1 -
1
General Revision to incorporate On-The-Spot-Changes.
-. -- *: ....... "":' ...........~,. ...--:"**:"'";"*"**"- ."'1~""';.,,..*.-.."':*":".*,.. ,.-,..... _*~ ....... ~**-*****-;- .............. .
REV SUBMITTED EED APPROVED QA REVIEWED SORC REVIEWED STA. SUPT.
APPROVED 0
82-\\2:>
1  
-. -- *:....... "":'........... ~,....--:"**:"'";"*"**"-
."'1~""';.,,..*.-.."':*":".*,..,.-,..... _*~....... ~**-*****-;-...............  


x SALEM GENERATING STATION                                                                                                                                    NUMBER -     lPD-18 .1. 008 REV. NO. 1 PERFORMANCE DEPARTMENT (I & C)
x NUMBER -
DATE          5/24/82 TEST PROCEDURE                                                                                                                   PAGE   1     OF 50 TITLE                                                             SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A
REV. NO.
DATE lPD-18.1. 008 1
5/24/82 SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
TEST PROCEDURE PAGE 1
OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A  


==1.0 Purpose==
==1.0 Purpose==
1.1                         The purpose of this procedure is to verify the operability                                                             _
1.1 The purpose of this procedure is to verify the operability _
of Solid State Protection System Train A.
of Solid State Protection System Train A.
1.2                         To satisfy the train surveillance requirement of the technical specifications.
1.2 To satisfy the train surveillance requirement of the technical specifications.
2.0                              
2.0  


==References:==
==References:==
2.1 Solid State Protection System Manual.
2.2 Wiring Diagrams:
203688, 222885, 224305 I & C - 001
**.. *.. *-*..,*-:***-......... :... ~~***.-.... -.-.*.- :................... :~*---:*;-~-....~:"'.,..,.,_;;-"'--**--*--... *-****.-
:*,*~**:*..
*~***.-.*.*... -~.,...


2.1                        Solid State Protection System Manual.
x SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
2.2                        Wiring Diagrams:                                                            203688, 222885, 224305
TEST PROCEDURE NUMBER -
* I & C - 001
REV. NO.
    ** ..*.. *-*. ,*-:***-......... :...~~***.- .... -.-.*.- :................... :~*---:*;-~-....~:"' .,..,.,_;;-"'--**--*-- ... *-****.- :*,*~**:* .. *~***.-.*.* ... -~., .. .
DATE lPD-18.1. 008 1
 
5/24/82 PAGE 2
x SALEM GENERATING STATION                    NUMBER -      lPD-18 .1. 008 REV. NO.      1 PERFORMANCE DEPARTMENT (I & C)
OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A  
DATE          5/24/82 TEST PROCEDURE                                PAGE   2   OF   50 TITLE       SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A


==3.0 Precautions==
==3.0 Precautions==
3.1 Test conditions must be applied to only Train A.         A reactor t~ip will occur if both trains have a general warning condition. Therefore, it is extremely important that the doors to only one train at a time are open, to preclude the introduction of test c6nditions into both trains.
3.1 Test conditions must be applied to only Train A.
3.2 Test conditions may be applied to one train using its built-in testers, while tne opp0site train is used to maintain the plant protection and provide data to         the demultiplexers. If in the process of testing, mal-functions are detected, they can be isolated by care-fully following the procedures in Section 6 of       th~
A reactor t~ip will occur if both trains have a general warning condition.
Therefore, it is extremely important that the doors to only one train at a time are open, to preclude the introduction of test c6nditions into both trains.
3.2 Test conditions may be applied to one train using its built-in testers, while tne opp0site train is used to maintain the plant protection and provide data to the demultiplexers.
If in the process of testing, mal-functions are detected, they can be isolated by care-fully following the procedures in Section 6 of th~
Solid State Protection Manual.
Solid State Protection Manual.
3.3 This procedure must be completed in the sequence given to insure successful completion .
3.3 This procedure must be completed in the sequence given to insure successful completion.
I & C - 001
I & C - 001  


          .* x SALEM GENERATING STATION                                                                           NUMBER -      lPD-18.1.008
.* x SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
* PERFORMANCE DEPARTMENT (I & C)
TEST PROCEDURE NUMBER -
TEST PROCEDURE REV. NO.
REV. NO.
DATE PAGE 1
DATE lPD-18.1.008 1
5/24/82
5/24/82 PAGE 3
                                                                                                                                                    - OF 50 TITLE                                         SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A 4.0                 Limitations and Actions:
OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A 4.0 Limitations and Actions:
4.1                 If, at any time during the performance of this test, there is any reason to suspect_ that the test equipment being used may not be performing properly, a comparison check shall be performed with a similar device or the device shall be checked*for calibration against a standard.                         This shall be done prior to taking any
4.1 If, at any time during the performance of this test, there is any reason to suspect_ that the test equipment being used may not be performing properly, a comparison check shall be performed with a similar device or the device shall be checked*for calibration against a standard.
**                                                        4.2 other corrective action.
This shall be done prior to taking any 4.2 other corrective action.
If, during the performance of this test, the "As Found" data does                       no~ meet the requirements of the specified accuracy, the Job Supervisor shall be notified immediately and PD-14.1.001 shall be performed.
If, during the performance of this test, the "As Found" data does no~ meet the requirements of the specified accuracy, the Job Supervisor shall be notified immediately and PD-14.1.001 shall be performed.
: 4. 3                 If, during the _.,performance of this procedur~, the required status indication cannot be obtained, the Job Supervisor shall be notified immediately.                               Exceptions to the required indication, due to plant conditions at the time of the test, may be made by the' Job Supervisor.
: 4. 3 If, during the _.,performance of this procedur~, the required status indication cannot be obtained, the Job Supervisor shall be notified immediately.
Exceptions to the required indication, due to plant conditions at the time of the test, may be made by the' Job Supervisor.
Any exceptions of this nature must be indicated and explained in the Remarks section of this procedure.
Any exceptions of this nature must be indicated and explained in the Remarks section of this procedure.
4.4                 An entry will be made in the Remarks section of this procedure indicating any deficiency and the corrective action taken .
4.4 An entry will be made in the Remarks section of this procedure indicating any deficiency and the corrective action taken.
I & C - 001
I & C - 001  
,.-.,.. * ._,. __.... _. * . __ ._.,.....,.,~,..~' **** - * * . .,,. ___ ,.. ____ _....,..._ ****r-****..,* ** *
,.-.,.. *._,. __.... _. *. __._.,.....,.,~,..~'  
**** - **..,,. ___,.. ____ _....,..._ ****r-****..,*  


,X SALEM GENERATING STATION                                           NUMBER -      lPD-18 .1. 008
,X I & C - 001 SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
* PERFORMANCE DEPARTMENT (I & C)
TEST PROCEDURE NUMBER -
TEST PROCEDURE REV.NO.
lPD-18.1. 008 REV.NO.
DATE
____:l ______ _
____:l_ _ _ _ _ __
DATE 5/24/82 PAGE 4
PAGE 5/24/82 4
OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A 5.0 Test Equipment:
                                                                                                ---  OF 50 TITLE                                 SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A 5.0             Test Equipment:
Device Name PD No.
Device Name                     PD No.               Recal. Date Fluke (2)
Recal. Date Fluke (2)
Stop Watch
Stop Watch  
*I & C - 001
**.-**:-~**:.**-~r"*~- *.  
              .. **.-**:-~**:.**-~r"*~- *..-*..-~*.**~-*
.-*..-~*.**~-*  


..x SALEM GENERATING STATION                   NUMBER -     lPD-18.1.008 REV. NO.      1 PERFORMANCE DEPARTMENT (I & C)
.. x SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
DATE          5/24/82 TEST PROCEDURE PAGE   5
TEST PROCEDURE NUMBER -
                                                                      ---  OF 50 TITLE       SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A
REV. NO.
DATE lPD-18.1.008 1
5/24/82 PAGE 5
OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A  


==6.0 Prerequisites==
==6.0 Prerequisites==
6.1   The individual assigned to perform this procedure is qualified to do so in accordance with Solid State Protection System Qualification Card 2.6.
6.1 The individual assigned to perform this procedure is qualified to do so in accordance with Solid State Protection System Qualification Card 2.6.
Supervisor 6.2   The Senior ~hift Supervisor/Shift Supervisor* has granted permission to perform this procedure.
Supervisor 6.2 The Senior ~hift Supervisor/Shift Supervisor* has granted permission to perform this procedure.
Senior Shift Supervisor/Shift Supervisor Date/Time 6.3   The Control Operator is aware of all of the alarms
Senior Shift Supervisor/Shift Supervisor Date/Time 6.3 The Control Operator is aware of all of the alarms  
                        .and indications that will result from the performance of this procedure.
.and indications that will result from the performance of this procedure.
Control Operator I & C - 001
Control Operator I & C - 001  


,X SALEM GENERATING STATION                                                                                                                                                         NUMBER -         lPD-18 .1. 008 REV. NO.        1 PERFORMANCE DEPARTMENT (I & C)
,X SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
DATE            5/24/82 TEST PROCEDURE PAGE   6   OF   50 TITLE                                           SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A 7.0                   System Line-up:
TEST PROCEDURE NUMBER -
7.1                     The following conditions must be established and/or verified by the Control Operator.
REV. NO.
7.1.1                                                 Reactor Trip Bypass Breaker B is open and in the Racked Out position.
DATE lPD-18.1. 008 1
7 .1. 2                                              Safeguard actions which are being blocked by virtue of having been Reset from the Control Bezel will be re-initiated at the completion of this test if the necessary logic signal is present.                                                               The Safeguard actions involved are:
5/24/82 PAGE 6
: 1.                   Containment Spray
OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A 7.0 System Line-up:
: 2.                   Phase A Isolation
7.1 The following conditions must be established and/or verified by the Control Operator.
: 3.                   Phase B Isolation
7.1.1 7.1. 2 Reactor Trip Bypass Breaker B is open and in the Racked Out position.
: 4.                   Feedwater Isolation
Safeguard actions which are being blocked by virtue of having been Reset from the Control Bezel will be re-initiated at the completion of this test if the necessary logic signal is present.
: 5.                   Containment Ventilation Isolation from Safety Injection signal Control Operator I & C - 001
The Safeguard actions involved are:
          * * * * * . '/' ".'*' * .- ' - -~*---*"\,.,..-...-,*.**"":'*<"--=***** ...-.".;;.*-"?"'""" ..._-.,.. **;** *. '-~-* ~ ......-.*r * ~ **' *. * -, ,. * .. , .... .. *.*.. ~* .. -.. . . . - ,........
: 1.
Containment Spray
: 2.
Phase A Isolation
: 3.
Phase B Isolation
: 4.
Feedwater Isolation
: 5.
Containment Ventilation Isolation from Safety Injection signal Control Operator I & C - 001  
* * * * *. '/' ".'*' *.- ' -
-~*---*"\\,.,..-...-,*.**"":'*<"--=*****...-.".;;.*-"?"'"""..._-.,.. **;** *. '-~-* ~...... -.*r * ~ **' *. * -,,. *..,......  
*.*.. ~*.. -..... -,........  


x SALEM GENERATING STATION                     NUMBER -     lPD-18 .1. 008 PERFORMANCE DEPARTMENT (I & C)              REV. NO.   --=l'--------
x SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
DATE         5/24/82 TEST PROCEDURE PAGE _7..:..___ OF 5O TITLE       .SOI.ID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A
TEST PROCEDURE NUMBER -
lPD-18.1. 008 REV. NO.  
--=l'--------
DATE 5/24/82 PAGE _7..:..___ OF 5 O TITLE  
.SOI.ID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A  


==8.0 Instructions==
==8.0 Instructions==
8.1   Measure and record the following instrument Bus Voltages (Required llT + 10 VAC).
8.1 Measure and record the following instrument Bus Voltages (Required llT + 10 VAC).
8.1.l     Bus #1 TB-110 - 11 & 12                 VAC 8.1.2     Bus #2 TB-210 - 11 & 12                   VAC 8.1.3-     Bus #3 TB-310 - 11 & 12                   VAC 8 .1. 4   Bus #4 TB-410 - 11 & 12                   VAC 8 .1. 5   Bus #1 TB-654 - 1 & 12                 VAC 8.2   Open the front doors of Train A Logic Bay and Train A Output Relay Bay.
8.1.l Bus #1 TB-110 - 11 & 12 8.1.2 Bus #2 TB-210 -
8.3   On the Logic Tester* Panel, verify and record the following Power Supply Voltages 8.3.l       +48VDC #1 Required 48.7 + 0.2 VDC As Found             As Left
11 & 12 8.1.3-Bus #3 TB-310 -
* 8.3.2       +48VDC #2 Required 48.7 + 0.2 VDC As Found             As Left I & C - 001
11 & 12 8.1. 4 Bus #4 TB-410 -
11 & 12 VAC VAC VAC VAC 8.1. 5 Bus #1 TB-654 -
1 & 12 VAC 8.2 Open the front doors of Train A Logic Bay and Train A Output Relay Bay.
8.3 On the Logic Tester* Panel, verify and record the following Power Supply Voltages 8.3.l  
+48VDC #1 Required 48.7 + 0.2 VDC As Found As Left 8.3.2  
+48VDC #2 Required 48.7 + 0.2 VDC As Found As Left I & C - 001  


.x SALEM GENERATIN.G STATION                 NUMBER-     lPD-18.1.008 REV.NO. __;;l_ _ _ _ _ __
.x SALEM GENERATIN.G STATION PERFORMANCE DEPARTMENT (I & C)
PERFORMANCE DEPARTMENT (I & C)
TEST PROCEDURE NUMBER-lPD-18.1.008 REV.NO.
DATE         5/24/82 TEST PROCEDURE                              PAGE _8__ OF     50 TITLE       SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A
__;;l ______ _
DATE 5/24/82 PAGE _8 __ OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A  


==8.0 Instructions==
==8.0 Instructions==
(Continued)                                   Initial 8.3.3     +15VDC #1 Required 15.7 + 0.2 VDC As Found           As Left 8.3.4     +~5VDC #2 Required 15.7 + 0.2 VDC As Found           As Left 8.4   Verify the following Solid State Protection System General Warnings Lamps are Off.
(Continued) 8.3.3  
8.4.1     General Warning Lamp - Train A 8.4.2     General Warning.Lamp - Train B 8.5   Depress the following General Warning Lamps and verify the Lamp Lights, and then remains OFF.
+15VDC #1 Required 15.7 + 0.2 VDC As Found As Left 8.3.4  
8.5.1     General Warning Lamp - Train A 8.5.2     General Warning Lamp - Train B 1& r.. nn1
+~5VDC #2 Required 15.7 + 0.2 VDC As Found As Left 8.4 Verify the following Solid State Protection System General Warnings Lamps are Off.
8.4.1 General Warning Lamp - Train A 8.4.2 General Warning.Lamp -
Train B 8.5 Depress the following General Warning Lamps and verify the Lamp Lights, and then remains OFF.
8.5.1 General Warning Lamp - Train A 8.5.2 General Warning Lamp -
Train B 1 & r.. nn1 Initial


.x
.x SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
    ..                                                NUMBER_ lPD-18 .1. 008 SALEM GENERATING STATION REV.NO. _1_ _ _ _ _ _ __
TEST PROCEDURE NUMBER_
PERFORMANCE DEPARTMENT (I & C)
lPD-18.1. 008 REV.NO.
TEST PROCEDURE DATE
_1 _______ _
                                                                -5/24/82 PAGE   9     OF 50
DATE 5/24/82 PAGE 9 OF 50  
                                                                  -=----
-=----
TITLE       SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A
TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A  


==8.0 Instructions==
==8.0 Instructions==
(Continued)                                 Initial 8.6   On the Logic Test Panel, verify that each of the following indicators will light by depressing it.
(Continued) 8.6 On the Logic Test Panel, following indicators will 8.6.1 Testing 8.6.2 Bad 8.6.3 Good 8.6.4 Continuity 8.6.5 Memory Set 8.6.6 1/1 8.6.7 1/2
8.6.1     Testing 8.6.2     Bad 8.6.3     Good 8.6.4     Continuity 8.6.5     Memory Set 8.6.6     1/1 8.6.7     1/2
: 8. 6. 8 1/3
: 8. 6. 8   1/3
: 8. 6. 9 1/4 8.6.10 2/2 8.6.11 2/3 8.6.12 2/4 I & C - 001 verify light that each of the by depressing it.
: 8. 6. 9   1/4 8.6.10     2/2 8.6.11   2/3 8.6.12   2/4 I & C - 001
Initial


~x SALEM GENERATING STATION                                                                 NUMBER -                 lPD-18 .1. 008 REV. NO.                1 PERFORMANCE DEPARTMENT (I & C)
~x SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
DATE                    5/24/82 TEST PROCEDURE PAGE         10           OF     50 TITLE       SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A
TEST PROCEDURE NUMBER -
REV. NO.
DATE lPD-18.1. 008 1
5/24/82 PAGE 10 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A  


==8.0 Instructions==
==8.0 Instructions==
(Continued)                                                                                             Initial 8.7 Record UV Coil Voltage Meter Reading.
(Continued) 8.7 Record UV Coil Voltage Meter Reading.
Required 43 VDC                       ~       2 VDC (when shutdown 0 VDC + 2 VDC)                                                       As Found                                           '\
Required 43 VDC ~ 2 VDC Initial (when shutdown 0 VDC + 2 VDC)
:c:1.;: \.;.',.,, .. i.:.1- -t~.,-. 't.i.-.:;,... t-~~ -:.- '~.., \-r"-::"; \i;,\!.....~*'('~ '?\1t::- ,-~*::.*.....!_~. (:_._\*' Pt J
As Found  
(          .            "                                      ,:J                       .                                            /
'\\
1 1 8.8 O~~~~'~_.::b~~p~~{*~:la~ d..T"e~*t P*~~e ~ ; <~l~~e'                                             the Mode Selector
(
* Switch in the Test position.
:c:1.;: \\.;.',.,,.. i.:.1-
8.9 Verify the Operate Lamp is not lighted.
-t~.,-. 't.i.-.:;,... t-~~ -:.-
'~.., \\-r"-::"; \\i;,\\!..... ~*'('~  
'?\\1t::-
,-~*::.*..... !_~. (:_._\\*' Pt J  
,:J  
/
8.8 O~~~~'~_.::b~~p~~{*~:la~ d..T"e~*t P*~~e 1
~
1
; <~l~~e' the Mode Selector Switch in the Test position.
8.9 Verify the Operate Lamp is not lighted.
8.10 Verify the General Warning Lamp is lighted.
8.10 Verify the General Warning Lamp is lighted.
8.11 Verify the operation of the Semi-Automatic Tester.
8.11 Verify the operation of the Semi-Automatic Tester.
Self-check as follows:
Self-check as follows:  
                                                                    -NOTE-Steps 8.11.6 through 8.11.11 will result in continuous alarms in the Control Room if there are any tripped inputs to the SSPS.
-NOTE-Steps 8.11.6 through 8.11.11 will result in continuous alarms in the Control Room if there are any tripped inputs to the SSPS.
8 .11.1                     Verify that the continuity lamp is lighted.
8.11.1 8.11. 2 Verify that the continuity lamp is lighted.
8 .11. 2                    On the Tester PC Card (Al08), verify that the top four LED's (light emitting diodes) are lighted.
On the Tester PC Card (Al08), verify that the top four LED's (light emitting diodes) are lighted.
I & C
I & C
* 001
* 001  


.x SALEM GENERATING STATION                   NUMBER -    lPD-18 .1. 008
.x.
* PERFORMANCE DEPARTMENT (I & C)
SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
TEST PROCEDURE REV.NO.
TEST PROCEDURE NUMBER -
DATE
lPD-18.1. 008 REV.NO.  
                                                                ~l~~~~~~~
~l~~~~~~~
PAGE 5/24/82 11   OF   50 TITLE       SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A
DATE 5/24/82 PAGE 11 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A  


==8.0 Instructions==
==8.0 Instructions==
(Continued)                                     Initial 8.11.3   Depress the test pushbutton. Verify that the continuity lamp and the top four LEDS on Al08 extinguish.
(Continued) 8.11.3 8.11.4 8.11.5 Depress the test pushbutton.
8.11.4    Release the TEST pushbutton. Verify that the continuity lamp and the top four LEDS on Al08 light.
Verify that the continuity lamp and the top four LEDS on Al08 extinguish.
8.11.5    On the Logic Test Panel, place the Input Error Inhibit switch to the Inhibit   position.~~~-
Release the TEST pushbutton.
8.11.6   Place the MULTIPLEXER TEST switch to the A & B position.
Verify that the continuity lamp and the top four LEDS on Al08 light.
8.11.7    Place the BLOCKING FUNCTION TEST switch to the BLOCKS NOT INHIBITED position.
On the Logic Test Panel, place the Input Initial Error Inhibit switch to the Inhibit position.~~~-
8.11.8    Depress and release the TEST pushbutton.
8.11.6 8.11.7 8.11.8 Place the MULTIPLEXER TEST switch to the A & B position.
8.11.8.1 Verify that the amber testing lamp lights.
Place the BLOCKING FUNCTION TEST switch to the BLOCKS NOT INHIBITED position.
8.11.8.2 In approximately 1.6 seconds, verify that this lamp extinguishes.
Depress and release the TEST pushbutton.
8.11.8.3 Verify that the GOOD lamp lights.
8.11.8.1 Verify that the amber testing lamp lights.
I & C -001
8.11.8.2 In approximately 1.6 seconds, verify that this lamp extinguishes.
8.11.8.3 Verify that the GOOD lamp lights.
I & C -001  


.x
.x NUMBER -
* NUMBER -   lPD-18 .1. 008 SALEM GENERATING STATION REV.NO. _1:::.-~~~~~~-
lPD-18.1. 008 SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
PERFORMANCE DEPARTMENT (I & C)
REV.NO.
DATE      _5~/_2_4~/_8_2~~~~
_1:::.-~~~~~~-
TEST PROCEDURE                                   PAGE 12     OF 50 TITLE       SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A
DATE
_5~/_2_4~/_8_2~~~~
TEST PROCEDURE PAGE 12 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A  


==8.0 Instructions==
==8.0 Instructions==
(Continued)                                       Initial 8.11."8.4   In approximately 1.6 seconds, verify
(Continued) 8.11."8.4 In approximately 1.6 seconds, verify  
                                          .that the good lamp extinguishes and repeatedly blinks on and off for
.that the good lamp extinguishes and repeatedly blinks on and off for 8.11. 9 8.11.10
* these periods.
* these periods.
8 .11. 9    Place the BLOCKING FUNCTION TEST switch to the INHIBIT BLOCKS position.
Place the BLOCKING FUNCTION TEST switch to the INHIBIT BLOCKS position.
8.11.10      Depress and release the Test pushbutton.
Depress and release the Test pushbutton.
8.11.10.1 Verify that the AMBER TESTING lamp LIGHTS.
8.11.10.1 Verify that the AMBER TESTING lamp LIGHTS.
8.11.10.2 Verify that the red BAD lamp lights.
8.11.10.2 Verify that the red BAD lamp lights.
8 .11. 11   Place the MULTIPLEXER TEST switch to INHIBIT.
8.11. 11 Place the MULTIPLEXER TEST switch to INHIBIT.
8.12 Verify Reactor Trip Breaker A is CLOSED (if Reactor Trip Breaker is open have the Control Operator CLOSE Reactor Trip Breaker A) 8.13 Verify the following High Radiation ALARM Lights on panel lRPl are OFF.
8.12 Verify Reactor Trip Breaker A is CLOSED (if Reactor Trip Breaker is open have the Control Operator CLOSE Reactor Trip Breaker A) 8.13 Verify the following High Radiation ALARM Lights on panel lRPl are OFF.
8.13.1       lR-llA Containment or Vent Particulate I & C - 001
8.13.1 lR-llA Containment or Vent Particulate Initial I & C - 001  


x SALEM GENERATING STATION                                                                                                               NUMBER-     lPD-18.1.008 REV.NO.   ~l~~~~~~-
x SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C).
PERFORMANCE DEPARTMENT (I & C) .
NUMBER-lPD-18.1.008 REV.NO.  
                                                                                                                                                  . DATE       5/24/82 TEST PROCEDURE                                                                                                           PAGE 13   OF 50 TITLE                                           SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A
~l~~~~~~-
. DATE 5/24/82 TEST PROCEDURE PAGE 13 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A  


==8.0 Instructions==
==8.0 Instructions==
(Continued)                                                             Initial 8.13.2                                   1R-12A Containment or Vent Gas Effluent.
(Continued) 8.13.2 8.13.3 1R-12A Containment or Vent Gas Effluent.
8.13.3                                  1R-12B Containment or Vent Gas Effluent (Iodine) .
1R-12B Containment or Vent Gas Effluent (Iodine).
8 .14 If any high RADIATION ALARM. is present in Steps 8.13.1 through 8.13.3, lift the field lead on terminal TB-506-2.
8.14 If any high RADIATION ALARM. is present in Steps 8.13.1 through 8.13.3, lift the field lead on terminal TB-506-2.
8 .15 Perform the fo-llowing for LOGIC and PERMISSIVE testing.                                 Record results on TABLE I ..
8.15 Perform the fo-llowing for LOGIC and PERMISSIVE testing.
WARNING:                                 If a malfunction within the logics is detected, the red BAD LAMP will come on at the instant of detection and remain on.                             It is then necessary to refer to Section 6.3 of the *solid State Protection System Manual to troubleshoot and define the cause.
Record results on TABLE I..
8.15.1                                   Verify the following switches are in the positions indicated.
WARNING:
8.15.1.1 *Logic A                                                 OFF 8.15.1.2                               Logic B                     24 I & C
If a malfunction within the logics is detected, the red BAD LAMP will come on at the instant of detection and remain on.
* 001
It is then necessary to refer to Section 6.3 of the *solid State Protection System Manual to troubleshoot and define the cause.
      ** .*-_-*.<"*~:**-* ... *,**.-.>-:.*:::*,.._...*~-***-*T .--~.- ....~--- .... ~-:-- ~,_ ""**:-* _.,... ............. ,, *.. -** ** **
8.15.1 Verify the following switches are in the positions indicated.
8.15.1.1 *Logic A OFF 8.15.1.2 Logic B 24 I & C
* 001  
**.*-_-*.<"*~:**-*... *,**.-.>-:.*:::*,.._...*~-***-*T.--~.-.... ~---.... ~-:--
~,_ ""**:-* _.,................,, *.. -** ** **
Initial


x SALEM GENERATING STATION                     NUMBER -     lPD-18 .1. 008 REV. NO.      1 PERFORMANCE DEPARTMENT (I & C)
x SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
DATE          5/24/82 TEST PROCEDURE                                                  *so PAGE   14   OF TITLE       SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A
TEST PROCEDURE NUMBER -
 
REV. NO.
==8.0 Instructions==
DATE lPD-18.1. 008 1
(Continued)                                     Initial 8.15.1.3     Logic c       24 8.15.1.4     Logic D       24 8 .15 .1. 5 Permissives   OFF
5/24/82 PAGE 14 OF *so TITLE 8.0 SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A Instructions:
* 8.15.2 8.15.1.6    Memories      OFF Place Logic A switch to position "l" and verify that Function Logic Lamp 2/3 lights.
(Continued) 8.15.1.3 Logic c 24 8.15.1.4 Logic D 24 8.15.1. 5 Permissives OFF 8.15.1.6 Memories OFF 8.15.2 8.15.3 8.15.4 8.15.5 Place Logic A switch to position "l" and verify that Function Logic Lamp 2/3 lights.
8.15.3      Depress and release the TEST pushbutton.
Depress and release the TEST pushbutton.
The amber testing lamp will LIGHT.     After all combinations of logics are tested, the Amber TESTING Lamp should extinguish and the Green GOOD Lamp should light.     The GOOD Lamp will extinguish the next time the TEST pushbutton is depressed.
The amber testing lamp will LIGHT.
8.15.4      Place the Blocking Function Test Switch to the opposite position and repeat Steps 8.15.2 and 8.15.3.
After all combinations of logics are tested, the Amber TESTING Lamp should extinguish and the Green GOOD Lamp should light.
8.15.5      Using Table I, perform Step 8.15.2 through 8.15.4 for the positions of the logic and permissive switches as listed.
The GOOD Lamp will extinguish the next time the TEST pushbutton is depressed.
I & C - 001
Place the Blocking Function Test Switch to the opposite position and repeat Steps 8.15.2 and 8.15.3.
 
Using Table I, perform Step 8.15.2 through 8.15.4 for the positions of the logic and permissive switches as listed.
x SAL        NERATING STATION NUMBER -      lPD-18 .1. 008 PERFORMANCE DEPARTMENT (I & C)                                    REV. NO. 1 TEST PROCEDUflE                                            DATE          5/24/82
I & C - 001 Initial
~1                                                                              PAGE  15  - OF 50 1
1    TITLE          SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                            FUNCTION LOGIC          BLOCKING FUNCTION TEST SWITCH PER-                                                                      BLOCKS LOGIC    LOGIC    LOGIC  LOGIC  MIS-        TEST                                            INHIBIT        NOT A        B      c      D    SIVE      FUNCTION                    REQUIRED    ACTUAL    BLOCKS INHIBITED OFF      24      24    24    OFF  OFF                                                        (GOOD OR BAD) 1      24      24    24    OFF  LOSS OF FLOW, LOOP 1                2/3 2      24      24    24    OFF  LOSS OF FLOW, LOOP 2                2/3 3      24      24      24  OFF  LOSS OF  FLOW~  LOOP 3              2/3 I
4      24 -    24      24  OFF  LOSS OF FLOW, LOOP 4                2/3 5      24      24      24  OFF  LOSS OF FLOW,. RCP                  2/4 6      24      24      24  OFF  PRESSURIZER, LOW PRESSURE TRIP      2/4


x SAL       ERATING STATION                                         NUMBER -     lPD-18 .1. 008             ..
~
PERFORMANCE DEPARTMENT (I & Ct                                      REV. NO. 1
1 ;
:l
1 1 x
=---
SAL NERATING STATION PERFORMANCE DEPARTMENT (I & C)
.*1 TEST PROCEDUHE                                               DATE'       5/24/82 PAGE 16   OF 50 TITLE         SOLID STATE PROTECTION* SYSTEM FUNCTIONAL TEST TRAIN A
TEST PROCEDUflE NUMBER -
*;i
lPD-18.1. 008 REV. NO.
  ~
1 DATE 5/24/82 PAGE 15
T                                                              TABL:E I i;
- OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC PER-LOGIC LOGIC LOGIC LOGIC MIS-TEST A
'i LOGIC & PERMISSIVES FUNCTION SELECTORS                                               FUNCTION LOGIC        BLOCKING FUNCTION TEST SWITCH PER..-                                                                     BLOCKS
B c
    ;    LOGIC   LOGIC   LOGIC LOGIC MIS-         TEST                                            INHIBIT        NOT i
D SIVE FUNCTION REQUIRED ACTUAL OFF 24 24 24 OFF OFF 1
      !      A       B       C     D
24 24 24 OFF LOSS OF FLOW, LOOP 1 2/3 2
* SIVE       FUNCTION                    REQUIRED    ACTUAL    BLOCKS . INHIBITED 7     24       24     24   OFF   PRESSURIZER, HIGH PRESSURE TRIP     2/4 8    24      24    24    OFF    PRESSURIZER, HIGH WATER LEVEL       2/3 TRIP 9    24      24      24  OFF    LOW FEEDWATER FLOW, LOOP 1         1/2 10    24      24      24  OFF    LOW FEEDWATER .FLOW, LOOP 1         1/2 11      24      24      24  OFF    LOW FEEDWATER FLOW, LOOP 2         1/2 12    24      24      24  OFF    LOW FEEDWATER FLOW, LOOP 2         1/2
24 24 24 OFF LOSS OF FLOW, LOOP 2 2/3 3
24 24 24 OFF LOSS OF FLOW~ LOOP 3 2/3 I
4 24 -
24 24 OFF LOSS OF FLOW, LOOP 4 2/3 5
24 24 24 OFF LOSS OF FLOW,. RCP 2/4 6
24 24 24 OFF PRESSURIZER, LOW PRESSURE TRIP 2/4 BLOCKING FUNCTION TEST SWITCH BLOCKS INHIBIT NOT BLOCKS INHIBITED (GOOD OR BAD)
:l  
=---.*1,
i *;
~ T i
'i i
x SAL ERATING STATION PERFORMANCE DEPARTMENT (I & Ct TEST PROCEDUHE NUMBER -
lPD-18.1. 008 REV. NO.
DATE' 1
5/24/82 PAGE 16 OF 50 TITLE SOLID STATE PROTECTION* SYSTEM FUNCTIONAL TEST TRAIN A FUNCTION SELECTORS PER..-
LOGIC LOGIC LOGIC LOGIC MIS-A B
C D
* SIVE 7
24 24 24 OFF 8
24 24 24 OFF 9
24 24 24 OFF 10 24 24 24 OFF 11 24 24 24 OFF 12 24 24 24 OFF TABL:E I LOGIC & PERMISSIVES TEST FUNCTION PRESSURIZER, HIGH PRESSURE TRIP PRESSURIZER, HIGH WATER LEVEL TRIP LOW FEEDWATER FLOW, LOOP 1 LOW FEEDWATER.FLOW, LOOP 1 LOW FEEDWATER FLOW, LOOP 2 LOW FEEDWATER FLOW, LOOP 2 FUNCTION LOGIC REQUIRED ACTUAL 2/4 2/3 1/2 1/2 1/2 1/2 BLOCKING FUNCTION TEST SWITCH BLOCKS INHIBIT NOT BLOCKS. INHIBITED


x SAL       ERA TING ST A TION                                     NUMBER~       lPD-18 .1. 008 PERFORMANCE DEPARTMENT (I & C)                                    REV. NO.     1 TEST PROCEDURE                                            DATE         5/24/82 PAGE   17   OF 50
'.i x
'.i  TITLE         SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                             FUNCTION LOGIC        BLOCKING FUNCTION TEST SWITCH PER-                                                                   BLOCKS LOGIC   LOGIC   LOGIC   LOGIC MIS-       TEST                                            INHIBIT      NOT A       B       C         D SIVE     FUNCTION                    REQUIRED    ACTUAL    BLOCKS INHIBITED 13     24     24       24 OFF LOW FEEDWATER FLOW, LOOP 3          1/2 14     24     24       24 OFF LOW FEEDWATER FLOW, LOOP 3          1/2 15     24     24         24 OFF LOW FEEDWATER FLOW, LOOP 4          1/2 16     24     24         24 OFF LOW FEEDWATER FLOW, LOOP 4          1/2 17     24     24         24 OFF OIL PRESSURE SWITCHES REACTOR      2/3 TRIP 18     24     24         24 OFF STOP VALVES GENERATOR TRIP          2/2 19     24     24         24 OFF STOP VALVES GENERATOR TRIP         2/2
SAL ERA TING ST A TION PERFORMANCE DEPARTMENT (I & C)
TEST PROCEDURE NUMBER~
lPD-18.1. 008 REV. NO.
1 DATE 5/24/82 PAGE 17 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A FUNCTION SELECTORS PER-LOGIC LOGIC LOGIC LOGIC MIS-A B
C D
SIVE 13 24 24 24 OFF 14 24 24 24 OFF 15 24 24 24 OFF 16 24 24 24 OFF 17 24 24 24 OFF 18 24 24 24 OFF 19 24 24 24 OFF TABLE I LOGIC & PERMISSIVES LOW TEST FUNCTION FEEDWATER LOW FEEDWATER LOW FEEDWATER LOW FEEDWATER OIL PRESSURE TRIP FLOW, LOOP 3 FLOW, LOOP 3 FLOW, LOOP 4 FLOW, LOOP 4 SWITCHES REACTOR STOP VALVES GENERATOR TRIP STOP VALVES GENERATOR TRIP FUNCTION LOGIC REQUIRED ACTUAL 1/2 1/2 1/2 1/2 2/3 2/2 2/2 BLOCKING FUNCTION TEST SWITCH BLOCKS INHIBIT NOT BLOCKS INHIBITED


x SAL       NERA TING ST ATION NUMBER -     lPD-18 .1. 008 PERFORMANCE DEPARTMENT (I & C)
x SAL NERA TING ST A TION PERFORMANCE DEPARTMENT (I & C)
REV. NO. 1 TEST PROCEDUBE DATE         5/24/82 PAGE 18   OF   50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                             FUNCTION LOGIC         BLOCKING FUNCTION TEST SWITCH PER-                                                                   BLOCKS
TEST PROCEDUBE NUMBER -
.,      LOGIC                                                                                         INHIBIT      NOT LOGIC   LOGIC   LOGIC MIS-       TEST A       B       c       D   SIVE     FUNCTION                   REQUIRED     ACTUAL     BLOCKS INHIBITED 20     24       24       24   OFF STOP VALVES REACTOR TRIP           2/2 21     24       24       24 *OFF SOURCE RANGE ,TRIP                 2/2 22     24       24       24 OFF SOURCE RANGE TRIP                   2/2 23     24       24       24 OFF FEED THRU TO-LOGIC B 23       1     24       24 OFF INTERMEDIATE RANGE TRIP             2/2 23       2     24       24 OFF INTERMEDIATE RANGE TRIP             2/2 23       3     24       24 OFF POWER RANGE, LOW SETPOINT TRIP     2/4
lPD-18.1. 008 REV. NO.
1 DATE 5/24/82 PAGE 18 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC PER-LOGIC LOGIC LOGIC LOGIC MIS-TEST A
B c
D SIVE FUNCTION REQUIRED ACTUAL 20 24 24 24 OFF STOP VALVES REACTOR TRIP 2/2 21 24 24 24  
*OFF SOURCE RANGE,TRIP 2/2 22 24 24 24 OFF SOURCE RANGE TRIP 2/2 23 24 24 24 OFF FEED THRU TO-LOGIC B 23 1
24 24 OFF INTERMEDIATE RANGE TRIP 2/2 23 2
24 24 OFF INTERMEDIATE RANGE TRIP 2/2 23 3
24 24 OFF POWER RANGE, LOW SETPOINT TRIP 2/4 BLOCKING FUNCTION TEST SWITCH BLOCKS INHIBIT NOT BLOCKS INHIBITED


x SAL     NERATING STATION                                       NUMBER -      lPD-18 .1. 008 PERFORMANCE DEPARTMENT (I & C)                                   R.EV. NO.      1 TEST PROCEDURE                                             DATE          5/24/82 PAGE  19    OF  50 TITLE         SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                             FUNCTION LOGIC        BLOCKING FUNCTION TEST SWITCH PER-                                                                     BLOCKS.
... '. x SAL NERATING STATION PERFORMANCE DEPARTMENT (I & C)
* LOGIC   LOGIC   LOGIC LOGIC MIS-         TEST                                              INHIBIT      NOT A       B       c     1'   SIVE       FUNCTION                    REQUIRED    ACTUAL    BLOCKS INHIBITED 23     4     24     24   OFF /POWER RANGE, HIGH SETPOINT TRIP       2/4 23      5      24    24  *OFF  OVERTEMPERATURE DELTA T TRIP         2/4 23      6      24      24  OFF  OVERPOWER DELTA T TRIP               2/4 23      7      24      24  OFF  RCP UNDERVOLTAGE TRIP               2/4 23      8      24      24  OFF  RCP UNDERVOLTAGE TRIP               1/2 23      9      24      24  OFF  RCP UNDERVOLTAGE, TURB. FEED         1(2 PUMP
TEST PROCEDURE TITLE SOLID STATE PROTECTION FUNCTION SELECTORS PER-
* LOGIC LOGIC LOGIC LOGIC MIS-A B
c 1'
SIVE 23 4
24 24 OFF 23 5
24 24
*OFF 23 6
24 24 OFF 23 7
24 24 OFF 23 8
24 24 OFF 23 9
24 24 OFF SYSTEM FUNCTIONAL TEST TABLE I NUMBER -
R.EV. NO.
DATE lPD-18.1. 008 1
5/24/82 PAGE 19 OF 50 TRAIN A LOGIC & PERMISSIVES FUNCTION LOGIC TEST FUNCTION REQUIRED ACTUAL
/POWER RANGE, HIGH SETPOINT TRIP 2/4 OVERTEMPERATURE DELTA T TRIP 2/4 OVERPOWER DELTA T TRIP 2/4 RCP UNDERVOLTAGE TRIP 2/4 RCP UNDERVOLTAGE TRIP 1/2 RCP UNDERVOLTAGE, TURB. FEED 1(2 PUMP BLOCKING FUNCTION TEST SWITCH BLOCKS.
INHIBIT NOT BLOCKS INHIBITED


x SA       NEAATING STATION                                       NUMBER -     lPD-18 .1. 008 PERFORMANCE DEPARTMENT (I &    C,                                REV. NO.     1 TEST PROCEDURE                                            DATE         5/24/82 PAGE   20   OF 50 TITLE         SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES
x  
*.:'          FUNCTION SELECTORS                                             FUNCTION LOGIC         BLOCKING FUNCTION TEST SWITCH PER-                                                                   BLOCKS
*i,
*i,
)
)        LOGIC   LOGIC   LOGIC LOGIC   MIS-       TEST                                             INHIBIT      NOT A       B       c     D     SIVE     FUNCTION                   REQUIRED     ACTUAL   BLOCKS INHIBITED 23     10     24     24     OFF RCP UNDERVOLTAGE, TURB. FEED       2/4 PUMP 23     11     24     24     OFF LOW STEAMLINE PRESSURE             2/4 23     12     24     24   OFF HIGH STEAMLINE FLOW, LOOP 1         1/2 23     13     24     24   OFF HIGH STEAMLINE FLOW, LOOP 2         1/2 23     14     24     24   OFF HIGH STEAMLINE FLOW, LOOP 3         1/2 23     15     24     24   OFF HIGH STEAMLINE FLOW., LOOP 4       1/2
SA NEAATING STATION PERFORMANCE DEPARTMENT (I & C, TEST PROCEDURE NUMBER -
lPD-18.1. 008 REV. NO.
1 DATE 5/24/82 PAGE 20 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC PER-LOGIC LOGIC LOGIC LOGIC MIS-TEST A
B c
D SIVE FUNCTION REQUIRED ACTUAL 23 10 24 24 OFF RCP UNDERVOLTAGE, TURB. FEED 2/4 PUMP 23 11 24 24 OFF LOW STEAMLINE PRESSURE 2/4 23 12 24 24 OFF HIGH STEAMLINE FLOW, LOOP 1 1/2 23 13 24 24 OFF HIGH STEAMLINE FLOW, LOOP 2 1/2 23 14 24 24 OFF HIGH STEAMLINE FLOW, LOOP 3 1/2 23 15 24 24 OFF HIGH STEAMLINE FLOW., LOOP 4 1/2 BLOCKING FUNCTION TEST SWITCH INHIBIT BLOCKS BLOCKS NOT INHIBITED


x*
x*
SAL       NE RATING ST A TION NUMBER-     lPD-18.1.008
SAL NE RATING ST A TION NUMBER-lPD-18.1.008  
-***~-*-
-***~-*-
PERFORMANCE DEPARTMENT (I & C)
PERFORMANCE DEPARTMENT (I & C)
REV. NO. 1 TEST PROCEDURE DATE       5/24/82 PAGE 21   OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                             FUNCTION LOGIC      BLOCKING FUNCTION TEST SWITCH PER-                                                                BLOCKS LOGIC   LOGIC   LOGIC     LOGIC MIS-        TEST                                          INHIBIT      NOT A       B       c         D   SIVE      FUNCTION                  REQUIRED    ACTUAL,  BLOCKS INHIBITED 23     16     24       24   OFF  STEAMLINE ISOLATION                2/4 23     17*     24         24 *OFF HIGH CONTAINMENT PRESSURE,         2/3 SAFETY INJECTION 23    18      24        24  OFF HI-HI CONTAINMENT PRESSURE,       2/4 SPRAY ACTUATION 23    19      24        24  OFF HI-HI CONTAINMENT PRESSURE,       2/4 SPRAY ACTUATION 23    20      24        24  OFF HI-HI CONTAINMENT PRESSURE,       2/4 STEAM STOP VALVES
REV. NO.
1 TEST PROCEDURE DATE 5/24/82 PAGE 21 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A FUNCTION SELECTORS LOGIC LOGIC LOGIC LOGIC A
B c
D 23 16 24 24 23 17*
24 24 23 18 24 24 23 19 24 24 23 20 24 24 TABLE I LOGIC & PERMISSIVES PER-MIS-TEST SIVE FUNCTION OFF STEAMLINE ISOLATION
*OFF HIGH CONTAINMENT PRESSURE, SAFETY INJECTION OFF HI-HI CONTAINMENT PRESSURE, SPRAY ACTUATION OFF HI-HI CONTAINMENT PRESSURE, SPRAY ACTUATION OFF HI-HI CONTAINMENT PRESSURE, STEAM STOP VALVES FUNCTION LOGIC REQUIRED
: ACTUAL, 2/4 2/3 2/4 2/4 2/4 BLOCKING FUNCTION TEST SWITCH BLOCKS INHIBIT NOT BLOCKS INHIBITED


x SALE       ERATING STATION PERFORMANCE DEPARTMENT (I & C)
x SALE ERATING STATION NUMBER -
NUMBER -
lPD-18.1.008
: e.
PERFORMANCE DEPARTMENT (I & C)
REV. NO.
REV. NO.
lPD-18.1.008 1
1 TEST PROCEDURE DATE 5/24/82 PAGE 22 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER-BLOCKS LOGIC LOGIC LOGIC LOGIC MIS-TEST INHIBIT NOT A
e.
B c
TEST PROCEDURE                                           DATE         5/24/82 PAGE   22   OF 50 TITLE         SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                             FUNCTION LOGIC       BLOCKING FUNCTION TEST SWITCH PER-                                                                   BLOCKS LOGIC   LOGIC   LOGIC LOGIC MIS-       TEST                                           INHIBIT     NOT A       B       c     D   SIVE     FUNCTION                   REQUIRED     ACTUAL   BLOCKS INHIBITED 23     21     24     24   OFF HI-HI CONTAINMENT PRESSURE,         2/4 PHASE B ISOLATION 23     22     24     24   OFF SAFETY INJECTION, PHASE A         . 1/1 ISOLATION 23     23     24   - 24   OFF SAFETY INJECTION, CONTAINMENT       1/2 VENTILATION ISOLATION 23     24     24     24   OFF FEED THRU TO LOGIC C 23     24       1     24   OFF STEAMLINE DIFFERENTIAL             2/3 PRESSURE, LOOP l
D SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED 23 21 24 24 OFF HI-HI CONTAINMENT PRESSURE, 2/4 PHASE B ISOLATION 23 22 24 24 OFF SAFETY INJECTION, PHASE A  
. 1/1 ISOLATION 23 23 24  
- 24 OFF SAFETY INJECTION, CONTAINMENT 1/2 VENTILATION ISOLATION 23 24 24 24 OFF FEED THRU TO LOGIC C 23 24 1
24 OFF STEAMLINE DIFFERENTIAL 2/3 PRESSURE, LOOP l  


x SAL       NERATING ST A TION PERFORMANCE DEPARTMENT (I & C)
x J 1.
j SAL NERATING ST A TION PERFORMANCE DEPARTMENT (I & C)
TEST PROCEDUHE NUMBER -
TEST PROCEDUHE NUMBER -
                                                                        ~EV.
lPD-18.1. 008  
DATE NO.
~EV. NO.
lPD-18 .1. 008 1
DATE 1
5/24/82
5/24/82  
                                                                                . PAGE   23   OF 50 J
. PAGE 23 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS  
1.
. FUNCTION LOGIC PER-LOGIC LOGIC LOGIC LOGIC MIS-TEST A
j    TITLE         SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                             . FUNCTION LOGIC         BLOCKING FUNCTION TEST SWITCH PER-                                                                     BLOCKS LOGIC   LOGIC   LOGIC     LOGIC MIS-       TEST                                             INHIBIT        NOT A       B       c         D   SIVE     FUNCTION                     REQUIRED     ACTUAL   BLOCKS INHIBITED 23     24       2       24   OFF STEAMLINE DIFFERENTIAL               2/3 PRESSURE, LOOP 2 23     24       3       24   OFF STEAMLINE DIFFERENTIAL               2/3 PRESSURE, LOOP 3 23     24       4     ,. 24   OFF STEAMLINE DIFFERENTIAL               2/3 PRESSURE, LOOP 4 23     24       5       24   OFF   PRESSURIZER PRESSURE               2/3 23     24       6       24   OFF   PRESSURIZER .PRESSURE             2/3 23     24       7       24   OFF   PRESSURIZER PRESSURE               2/3
B c
D SIVE FUNCTION REQUIRED ACTUAL 23 24 2
24 OFF STEAMLINE DIFFERENTIAL 2/3 PRESSURE, LOOP 2 23 24 3
24 OFF STEAMLINE DIFFERENTIAL 2/3 PRESSURE, LOOP 3 23 24 4  
,. 24 OFF STEAMLINE DIFFERENTIAL 2/3 PRESSURE, LOOP 4 23 24 5
24 OFF PRESSURIZER PRESSURE 2/3 23 24 6
24 OFF PRESSURIZER.PRESSURE 2/3 23 24 7
24 OFF PRESSURIZER PRESSURE 2/3 BLOCKING FUNCTION TEST SWITCH BLOCKS INHIBIT NOT BLOCKS INHIBITED


x SAL       NERATING STATION                                       NUMBER_     lPD-18 .1. 008 PERFORMANCE DEPARTMENT (I & C)                                  REV. NO. 1
x  
-~          TEST PROCEDURE DATE         5/24/82 PAGE 24   OF 50 TITLE         SOLID STATE P~OTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                             FUNCTION LOGIC        BLOCKING FUNCTION TEST SWITCH PER-                                                                   BLOCKS LOGIC   LOGIC   LOGIC   LOGIC MIS-       TEST                                            INHIBIT      NOT A       B     C       D   SIVE     FUNCTION                    REQUIRED    ACTUAL  BLOCKS INHIBITED 23     24       8     24   OFF STEAM GENERATOR LO-LO WATER        2/3 LEVEL LOOP 1 23     24       9     24   OFF STEAM GENERATOR LO-LO WATER LEVEL LOOP 2 23     24     10     24   OFF STEAM GENERATOR LO-LO WATER        2/3 LEVEL LOOP 3 23     24     11     24   OFF STEAM GENERATOR LO-LO WATER        2/3 LEVEL LOOP 4 23    24      12      24    OFF  STEAM GENERATOR LO-LO WATER       1/4 LEVEL TRIP
-~
SAL NERATING STATION PERFORMANCE DEPARTMENT (I & C)
TEST PROCEDURE NUMBER_
lPD-18.1. 008 REV. NO.
1 DATE 5/24/82 PAGE 24 OF 50 TITLE SOLID STATE P~OTECTION SYSTEM FUNCTIONAL TEST TRAIN A FUNCTION SELECTORS PER-LOGIC LOGIC LOGIC LOGIC MIS-A B
C D
SIVE 23 24 8
24 OFF 23 24 9
24 OFF 23 24 10 24 OFF 23 24 11 24 OFF 23 24 12 24 OFF TABLE I LOGIC & PERMISSIVES TEST FUNCTION STEAM GENERATOR LEVEL LOOP 1 STEAM GENERATOR LEVEL LOOP 2 STEAM GENERATOR LEVEL LOOP 3 STEAM GENERATOR LEVEL LOOP 4 STEAM GENERATOR LEVEL TRIP LO-LO WATER LO-LO WATER LO-LO WATER LO-LO WATER LO-LO WATER FUNCTION LOGIC REQUIRED ACTUAL 2/3 2/3 2/3 1/4 BLOCKING FUNCTION TEST SWITCH BLOCKS INHIBIT NOT BLOCKS INHIBITED


x SAL         ERA TING ST A TION                                                   NUMBER -     lPD-18 .1. 008 PERFORMANCE DEPARTMENT (I & C)                                                  REV. NO. 1
x  
* TEST PROCEDURE                                                          DATE         5/24/82 PAGE   25   OF 50 TITLE           SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                                           FUNCTION LOGIC         BLOCKING FUNCTION
.J
*'**''                                                                                                                  TEST SWITCH
\\
.J PER-                                                                                 BLOCKS LOGIC     LOGIC   LOGIC   LOGIC MIS-       TEST                                                         INHIBIT      NOT
i
    \
*~
i        A        B       c         D SIVE     FUNCTION                                 REQUIRED   ACTUAL   BLOCKS INHIBITED
SAL ERA TING ST A TION PERFORMANCE DEPARTMENT (I & C)
                                                                /,,..:_,
TEST PROCEDURE NUMBER -
                                                                , I
lPD-18.1. 008 REV. NO.
    *~
1 DATE 5/24/82 PAGE 25 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC PER-LOGIC LOGIC LOGIC LOGIC MIS-TEST A
23     24     13       24 OFF STEAM GENERA( 10R/LO-LO WATER
B c
                                                              '        ......... _ _.. I 1/4 LEVEL, MOTO:i.-..>.r'EED PUMP 23     24     14       24 OFF STEAM GENERATOR LO-LO WATER                       2/4 LEVEL, TURBINE FEED PUMP 23     24     15       24 OFF STEAM GENERATOR HI-HI LEVEL,                     2/3 GENERATOR 1 23     24     16       24 OFF STEAM GENERATOR HI-HI LEVEL,                     2/3 GENERATOR 2
D SIVE FUNCTION REQUIRED ACTUAL  
            . 23     24     17       24 OFF STEAM GENER.Z\TOR HI-HI LEVEL,                   2/3 GENERATOR 3
/,,..:_,  
, I 23 24 13 24 OFF STEAM GENERA( 10R/LO-LO WATER 1/4
......... _ _.. I LEVEL, MOTO:i.-..>.r'EED PUMP 23 24 14 24 OFF STEAM GENERATOR LO-LO WATER 2/4 LEVEL, TURBINE FEED PUMP 23 24 15 24 OFF STEAM GENERATOR HI-HI LEVEL, 2/3 GENERATOR 1 23 24 16 24 OFF STEAM GENERATOR HI-HI LEVEL, 2/3 GENERATOR 2  
. 23 24 17 24 OFF STEAM GENER.Z\\TOR HI-HI LEVEL, 2/3 GENERATOR 3 BLOCKING FUNCTION TEST SWITCH BLOCKS INHIBIT NOT BLOCKS INHIBITED


x SALE*     ERA TING STATION PERFORMANCE DEPARTMENT (I & C)
SALE*
TEST PROCEDURE NUMBER -
ERA TING STATION NUMBER -
lPD-18.1. 008
* x PERFORMANCE DEPARTMENT (I & C)
REV. NO.
REV. NO.
DATE lPD-18 .1. 008 1
1 TEST PROCEDURE DATE 5/24/82 PAGE 26 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER-BLOCKS LOGIC LOGIC LOGIC LOGIC MIS-TEST INHIBIT NOT A
5/24/82 PAGE   26   OF 50 TITLE         SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                             FUNCTION LOGIC         BLOCKING FUNCTION TEST SWITCH PER-                                                                     BLOCKS LOGIC   LOGIC   LOGIC LOGIC MIS-       TEST                                             INHIBIT     NOT A       B       c       D   SIVE     FUNCTION                   'REQUIRED     ACTUAL   BLOCKS INHIBITED 23     24     18     24   OFF STEAM GENERATOR HI-HI LEVEL,       2/3 GENERATOR 4 23     24     19     24   OFF LOW TAVG                           2/4 23     24     20     24   OFF TAVG AND REACTOR TRIPPED           2/2 23     24     21     24   OFF UV DIODES AND OUTPUT               1/4 23     24     22     24   OFF SAFETY INJECTION DIODES & OUTPPT 1/4 23     24     23     24   OFF UV DIODES AND OUTPUT               1/4
B c
D SIVE FUNCTION  
'REQUIRED ACTUAL BLOCKS INHIBITED 23 24 18 24 OFF STEAM GENERATOR HI-HI LEVEL, 2/3 GENERATOR 4 23 24 19 24 OFF LOW TAVG 2/4 23 24 20 24 OFF TAVG AND REACTOR TRIPPED 2/2 23 24 21 24 OFF UV DIODES AND OUTPUT 1/4 23 24 22 24 OFF SAFETY INJECTION DIODES & OUTPPT 1/4 23 24 23 24 OFF UV DIODES AND OUTPUT 1/4  


x SALE       ERA TING ST A TION PERFORMANCE DEPARTMENT (I & C)
x SALE ERA TING ST A TION PERFORMANCE DEPARTMENT (I & C)
TEST PROCEDURE NUMBER -
TEST PROCEDURE NUMBER -
REV. NO.
lPD-18.1. 008 REV. NO.
DATE lPD-18 .1. 008 1
1 DATE 5/24/82 PAGE 27 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES FUNCTION SELEC'l'ORS FUNCTION LOGIC PE'R-LOGIC LOGIC LOGIC LOGIC MIS-
5/24/82 PAGE   27   OF   50 TITLE         SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES FUNCTION SELEC'l'ORS                                             FUNCTION LOGIC         BLOCKING FUNCTION TEST SWITCH PE'R-                                                                     BLOCKS LOGIC   LOGIC   LOGIC   LOGIC MIS-         .TEST                                             INHIBIT        NOT A       B       c         D SIVE       FUNCTION                     REQUIRED     ACTUAL     BLOCKS INHIBITED 23     24     24       24 OFF   FEED THRU TO LOGIC D 23     24     24         1 OFF   SAFETY INJECTION DIODES & OUTPUT 1/3 23     24     24         2 OFF   UV DIODES AND OUTPUT                 1/4 23     24     24         3 OFF   UV DIODES AND OUTPUT                 1/4 23     24     24         4 OFF   UV DIODES AND OUTPUT                 1/4 23     24     24         5 OFF   UV DIODES AND .OUTPUT               1/4 23     24     24         6 OFF   UV DIODES AND OUTPUT                 1/4}}
.TEST A
B c
D SIVE FUNCTION REQUIRED ACTUAL 23 24 24 24 OFF FEED THRU TO LOGIC D 23 24 24 1
OFF SAFETY INJECTION DIODES & OUTPUT 1/3 23 24 24 2
OFF UV DIODES AND OUTPUT 1/4 23 24 24 3
OFF UV DIODES AND OUTPUT 1/4 23 24 24 4
OFF UV DIODES AND OUTPUT 1/4 23 24 24 5
OFF UV DIODES AND.OUTPUT 1/4 23 24 24 6
OFF UV DIODES AND OUTPUT 1/4 BLOCKING FUNCTION TEST SWITCH BLOCKS INHIBIT NOT BLOCKS INHIBITED}}

Latest revision as of 04:45, 6 January 2025

Rev 1 to safety-related, Solid State Protection Sys Functional Test Train a
ML18087A735
Person / Time
Site: Salem  
Issue date: 03/12/1983
From:
Public Service Enterprise Group
To:
Shared Package
ML18087A720 List:
References
1PD-18.1.008, NUDOCS 8303160568
Download: ML18087A735 (32)


Text

",)

NOTE: PRESS HARD YOU ARE MAKING FIVE (5) COPIES ADMINISTRATIVE PROCEDURE 3 ON-THE-SPOT CHANGE CHANGE TYPE:

~

PERMANENT (GREENJ D *TEMPORARY ORANGE

  • EXPIRES:

ALL ON-THE-SPOT CHAl'IGES TO BE CONSIDERED FOR APPLICABILITY TO BOTH UNITS.

[29 UNIT 1 UNIT 2 PROCEDURENO.~-\\~\\:>

____ t:> __ -____

,~s~*~'~*~[)~o..;;;._CC>=-----~

PRocEDURENo........... P.........,~=--~'~B~,~'-*~O~a~o""'-~~-

REV. NO. _ _._ __ CHANGE No._L/_._* __

REV. NO. __

._l* __ CHANGE N0. __ 1~-

PROPOSED CHANGE:

r~':)e., \\O Q-~ \\e.'f'- c.\\..o1

~~;\\'.'

cv-X>

{\\~

~

REASON FOR CHANGE:

'o..-..._.p..¥.,t,-s ~ ** b0

~Pt<;s b~e...... ~c.t-s

\\-e.~~~!V~ 0 ~

~~\\'r-c'}(...

\\ ~ \\JC~

\\o. C\\.?<r~~~

~\\'\\,)

~~\\'fC'J- *

\\\\t'~ r.f...c.~~ d e> v....\\:-.

ACTION TAKEN FOR OTHER UNIT:

'5~~

f\\1'-<a.....

'f\\C.. \\I...~~

\\S "1-o r '1"1\\~L.. )

If\\\\\\

AUTHORIZATION:

    • SUPERVISOR IN CHARGE 4/~-JA--

CUTY SENIOR $..;:rsUPERVISOR

fe/¢.1 CATE OR SHIFT SUPERVISOR
    • SIGNATURE ALSO VERIFIES THAT APPLICABILITY TO BOTH UNITS HAS BEEN CONSIDERED.

ACCEPT ABLE:

YES NO IZJ D DD DD MEETING NO.

~'.....------., _

POST CHANGE-REVIEW/APPROVAL o{i)ircdlz_

CEPARTMENT HEAD SQAE SORC (CHAIRMANJ GENERJ'.L MANAGER* SALEM OPERATIONS RETURN COMPLETED OR REJECTED FORM TO DEPARTMENT REQUESTING CHANGE.

FOLLOW-UP TO REJECTED ON-THE*SPOT CHANGE

.8303160568 8303i4-~--

ACTION TAKEN:

\\..:.--

~DR ADOCK 05000~b~

PERFORMED, BY:

SIGNATURE RETURN TO DEPARTMENT HEAD FOR ROUTING THROUGH POST CHANGE-REVIEW/APPROVAL CYCLE.

FORMAP.3-1 I

~ATE DATE DATE DATE DATE REV, 12

'\\

NOTE: PRESS HARD YOU ARE MAKING FIVE (5) COPIES

~,.--...... ~~~~~~~~~~~-~~~~~~~-~~--~~-~~~-~~~---~~~~-~~~-~~-~~~~~

CHANGE TYPE:

.,,.. ADMINISTRATIVE PROCEDURE 3 ON*THE*SPOT CHANGE 5(:1 PERMANENT(GREEN) D *TEMPORARY ORANGE PRocEDURE TITLE SS/}s pc.,oJCT1DrJkk yg:;;;:,=

  • EXPIRES:

ALL ON*THE-SPOT CHANGES TO BE CONSIDERED FOR APPLICABILITY TO BOTH UNITS.

0 'UNIT I 12(] UNIT 2 PROCEDURENO.~~/_P_D;;;._-__._/~8'°'--'-,/'--,=0~C)~'8=--~----~

PROCEDURENO.~_.Z

__ 'f' __ D_-__

J~g_,_J_,_~-~--~----------

REV. No. __

, ___ CHANGE No._3 REV. NO. __

/:--- CHANGE N0._3 PROPOSED CHANGE:

{J 1-)-C, E tf 7 - //

11-4 J4

  • 0. 2. 51. /f

~Al 9 g-77Zri-//f/

Tx!J'f-1 IV ~

  • REASON FOR CHANGE:

ACTION TAKEN FOR OTHER UNIT:

AUTHORIZATION:

OR SHIFT SUPERVISOR

    • SIGNATURE AL.SO VERIFIES THAT APPL.ICABIL.ITY TO BOTH UNITS HAS BEEN CONSIDERED.

ACCEPTABLE:

POST CHANGE-REVIEW/APPROVAL YES NO Q~

/~~<AD SORC (CHAIRMAN)

MEETJNG NO.

?1 r---..

RETURN COMPL.ETED OR REJECTED FORM TO DEPARTMENT REQUESTING CHANGE.

FOLLOW-UP TO REJECTED ON-THE-SPOT CHANGE ACTION TAKEN:

PERFORMED BY:

SIGNATURE RETURN TO DEPARTMENT HEAD FOR ROUTING THR-:JUGH POST CHANGE-REVIEW/APPROVAL. CYCL.E.

AP.3 FORM AP-3-1 DATE I

DATE Jz.)2.L-/!L 7

DNfE DATE REV. 1Z

NOTE: PRESS HARD YOU ARE MAKING FIVE (5) COPIES ADMINISTRATIVE PROCEDURE 3 ON-THE-SPOT CHANGE NGE TYPE:

PERMANENTD (GREEN)

PROCEDURE TITLE *.:;, ')

  • f -,; *
  • EXPIRES:

ALL ON-THE-SPOT CHANGES TO BE CONSIDERED !"OR APPLICABILITY TO BOTH UNITS.

  • TEMPORARY (ORANGE)

~UNIT!

I)( I UNIT 2 PROCEDURENO.~~~'--r~\\)~--\\_~_-_,_,_._c_c_'_~_*~~~~ REV. NO.---- CHANGE N0. __ 2-PROCEDURENO._~_-::t_V_-_*\\.>_-_\\_~_._\\_,~U~l~'-5_' ___ ~

REV. NO. ____ CHANGE NO.

PROPOSED CHANGE:

~~'.\\'t!....

°3~'.)

?.~~ ~\\~~-

5 ""* 5

\\"") \\2

\\',..,.'I

,I

'"*..,,\\:'II~

P l\\w -~

\\'":>

\\ ~'\\' ~s

\\'~,...::'...\\....- * 1c:: r*, \\. ~ \\ ~ '1 \\')~ *.:_i,*>i

..:.;t.,,..,,. <:..... \\-t ~ \\-

t5 C; \\.

.¥-. ~v\\)

\\J' -,Q e J

\\c:_ lei.)'\\

I

  • ~ ~\\(; )

~

\\o{..)J... '

\\I... ~ c"~ )

\\(. I..;> (; '-\\ '

~ "-'

REASON FOR CHANGE:

ACTION TAKEN FOR OTHER UNIT:

s;; ~""' -<-

\\\\1..:d ""\\....*\\\\

\\e.\\'f>.'\\~.

R-: \\ 1"c *--

\\l,:ii,~~\\...

AUTHOR I Z AT 10 N:

. d d d.e_-4:-

  • suPERVISOR IN CHARGE
    • SIGNATURE AL.SO VERIFIES THAT APPL.ICABILITY TO BOTH UNITS HAS BEE CONSIDERED.

ACCEPTABLE:

POST CHANGE-REVIEW/APPROVAL YES NO 00 WD ltZT1N cyJ I I

N

\\

RETURN COMPL.ETED OR REJECTED FORM TO DEPARTMENT REQUESTING CHANGE.

FOLLOW-UP TO REJECTED ON-THE-SPOT CHANGE ACTION TAKEN:

PERFORMED BY:

SIGNATURE

\\ l'.l DATE DATE I

RETURN TO O.. ARTMENT HEAO *OR ROUT<NG THROUGH *OH CHANGE-REVOEWIA.. ROVAC CYCLE-

  • .* *-** -*-.~'t"-*.-:**~**,.. **o.~11";",".*~-.--:-:---**,::*~~.. ~:.-;"*::~--=-*;*:~* ---.*--;-

.r ""* *-***-*

FORM*AP-3-t REV. 9

NOTE: PRESS HARD YOU ARE MAKING FIVE (5) COPIES ADMINISTRATIVE PROCEDURE 3 CHANGE TYPE:

ON-THE-SPOT CHANGE

[$] p~:~:::tT D

_P_R_O_C_E_D_U_R_E_T_l_T_L_E--s--. --~-.*

-P,.....-.s-,--~-\\1.-bl_<" __ \\-.,-.u-.... '-,p..-\\_--\\-"f'_..S._\\-____

\\_'("_A_j_N __ B_~ *EXP IR ES:

  • TEMPORARY (ORANGE)

ALL. ON-THE-SPOT CHANGES TO BE CONSIDERED !="OR APPL.ICABIL.ITY TO BOTH UNITS.

~UNIT 1

(ZJ UNIT 2 PROCEDURE NO. _

__,_\\.... PD-=-_-_\\;...;B::;...._' _\\_,_o_o __ s ______ "REV. NO. _

__._t __ CHANGE NO. _

_,\\ __

~nr:. - \\<l, \\ \\ ()0 co

\\

\\

PROCEDURE NO. _......;;;;....;;;.,£U"--"~-"'""'-..!2=-"'--..;....;'-__.;_........;;______ REV. NO.----- CHANGE NO*---'--

PROPOSED CHANGE: ~

~~'"'- 30,,,

Q.~~~~ o~~\\

~1"1' B.~\\.\\\\ ) -s,~,.sJ

8. a.\\.\\ ) ta. ;l..\\,°i REASON FOR CHANGE:

ACTION TAKEN FOR OTHER UNIT:

co.a..\\.\\'\\'

'8. a...\\ ' \\'()

~

OR SHi-FT SUPERVISOR

    • SIGNATURE AL.SO VERIFIES THAT APPL.ICABIL.ITY TO BOTH UNITS HAS BEEN CONSIDERED.

ACCEPTABLE:

YES NO 1~10 rno MEETING No.frZ13 DD I 21 POST CHANGE-REVIEW/APPROVAL

t;K SQAE

~me RETURN COMPL.ETED OR REJECTED FORM TO DEPARTMENT REQUESTING CHANGE.

FOL.LOW-UP TO REJECTED ON-THE-SPOT CHANGE ACTION TAKEN:

PERFORMED BY:

SIGNATURE RETURN TO DEPARTMENT HEAD FOR ROUTING THROUGH POST CHANGE-REVIEW/APPROVAL. CYCL.E.

f-2-fz:-

DATE FORM AP-3-1 REV. 9

PROCEDURE:

REMARKS:

SALEM NUCLEAR GENERATING STATION PUBLIC SERVICE ELECTRIC & GAS COMPANY ELECTRIC GENERATION DEPARTMENT PROCEDURE APPROVAL COVER SHEET SAFETY RELATED lPD-18.1.008 -

SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST -

TRAIN A REV. 1 -

General Revision to incorporate On-The-Spot-Changes.

REV SUBMITTED EED APPROVED QA REVIEWED SORC REVIEWED STA. SUPT.

APPROVED 0

82-\\2:>

1

-. -- *:....... "":'........... ~,....--:"**:"'";"*"**"-

."'1~""';.,,..*.-.."':*":".*,..,.-,..... _*~....... ~**-*****-;-...............

x NUMBER -

REV. NO.

DATE lPD-18.1. 008 1

5/24/82 SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE PAGE 1

OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A

1.0 Purpose

1.1 The purpose of this procedure is to verify the operability _

of Solid State Protection System Train A.

1.2 To satisfy the train surveillance requirement of the technical specifications.

2.0

References:

2.1 Solid State Protection System Manual.

2.2 Wiring Diagrams:

203688, 222885, 224305 I & C - 001

    • .. *.. *-*..,*-:***-......... :... ~~***.-.... -.-.*.- :................... :~*---:*;-~-....~:"'.,..,.,_;;-"'--**--*--... *-****.-
  • ,*~**:*..
  • ~***.-.*.*... -~.,...

x SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

REV. NO.

DATE lPD-18.1. 008 1

5/24/82 PAGE 2

OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A

3.0 Precautions

3.1 Test conditions must be applied to only Train A.

A reactor t~ip will occur if both trains have a general warning condition.

Therefore, it is extremely important that the doors to only one train at a time are open, to preclude the introduction of test c6nditions into both trains.

3.2 Test conditions may be applied to one train using its built-in testers, while tne opp0site train is used to maintain the plant protection and provide data to the demultiplexers.

If in the process of testing, mal-functions are detected, they can be isolated by care-fully following the procedures in Section 6 of th~

Solid State Protection Manual.

3.3 This procedure must be completed in the sequence given to insure successful completion.

I & C - 001

.* x SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

REV. NO.

DATE lPD-18.1.008 1

5/24/82 PAGE 3

OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A 4.0 Limitations and Actions:

4.1 If, at any time during the performance of this test, there is any reason to suspect_ that the test equipment being used may not be performing properly, a comparison check shall be performed with a similar device or the device shall be checked*for calibration against a standard.

This shall be done prior to taking any 4.2 other corrective action.

If, during the performance of this test, the "As Found" data does no~ meet the requirements of the specified accuracy, the Job Supervisor shall be notified immediately and PD-14.1.001 shall be performed.

4. 3 If, during the _.,performance of this procedur~, the required status indication cannot be obtained, the Job Supervisor shall be notified immediately.

Exceptions to the required indication, due to plant conditions at the time of the test, may be made by the' Job Supervisor.

Any exceptions of this nature must be indicated and explained in the Remarks section of this procedure.

4.4 An entry will be made in the Remarks section of this procedure indicating any deficiency and the corrective action taken.

I & C - 001

,.-.,.. *._,. __.... _. *. __._.,.....,.,~,..~'

        • - **..,,. ___,.. ____ _....,..._ ****r-****..,*

,X I & C - 001 SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

lPD-18.1. 008 REV.NO.

____:l ______ _

DATE 5/24/82 PAGE 4

OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A 5.0 Test Equipment:

Device Name PD No.

Recal. Date Fluke (2)

Stop Watch

    • .-**:-~**:.**-~r"*~- *.

.-*..-~*.**~-*

.. x SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

REV. NO.

DATE lPD-18.1.008 1

5/24/82 PAGE 5

OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A

6.0 Prerequisites

6.1 The individual assigned to perform this procedure is qualified to do so in accordance with Solid State Protection System Qualification Card 2.6.

Supervisor 6.2 The Senior ~hift Supervisor/Shift Supervisor* has granted permission to perform this procedure.

Senior Shift Supervisor/Shift Supervisor Date/Time 6.3 The Control Operator is aware of all of the alarms

.and indications that will result from the performance of this procedure.

Control Operator I & C - 001

,X SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

REV. NO.

DATE lPD-18.1. 008 1

5/24/82 PAGE 6

OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A 7.0 System Line-up:

7.1 The following conditions must be established and/or verified by the Control Operator.

7.1.1 7.1. 2 Reactor Trip Bypass Breaker B is open and in the Racked Out position.

Safeguard actions which are being blocked by virtue of having been Reset from the Control Bezel will be re-initiated at the completion of this test if the necessary logic signal is present.

The Safeguard actions involved are:

1.

Containment Spray

2.

Phase A Isolation

3.

Phase B Isolation

4.

Feedwater Isolation

5.

Containment Ventilation Isolation from Safety Injection signal Control Operator I & C - 001

  • * * * *. '/' ".'*' *.- ' -

-~*---*"\\,.,..-...-,*.**"":'*<"--=*****...-.".;;.*-"?"'"""..._-.,.. **;** *. '-~-* ~...... -.*r * ~ **' *. * -,,. *..,......

  • .*.. ~*.. -..... -,........

x SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

lPD-18.1. 008 REV. NO.

--=l'--------

DATE 5/24/82 PAGE _7..:..___ OF 5 O TITLE

.SOI.ID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A

8.0 Instructions

8.1 Measure and record the following instrument Bus Voltages (Required llT + 10 VAC).

8.1.l Bus #1 TB-110 - 11 & 12 8.1.2 Bus #2 TB-210 -

11 & 12 8.1.3-Bus #3 TB-310 -

11 & 12 8.1. 4 Bus #4 TB-410 -

11 & 12 VAC VAC VAC VAC 8.1. 5 Bus #1 TB-654 -

1 & 12 VAC 8.2 Open the front doors of Train A Logic Bay and Train A Output Relay Bay.

8.3 On the Logic Tester* Panel, verify and record the following Power Supply Voltages 8.3.l

+48VDC #1 Required 48.7 + 0.2 VDC As Found As Left 8.3.2

+48VDC #2 Required 48.7 + 0.2 VDC As Found As Left I & C - 001

.x SALEM GENERATIN.G STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER-lPD-18.1.008 REV.NO.

__;;l ______ _

DATE 5/24/82 PAGE _8 __ OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A

8.0 Instructions

(Continued) 8.3.3

+15VDC #1 Required 15.7 + 0.2 VDC As Found As Left 8.3.4

+~5VDC #2 Required 15.7 + 0.2 VDC As Found As Left 8.4 Verify the following Solid State Protection System General Warnings Lamps are Off.

8.4.1 General Warning Lamp - Train A 8.4.2 General Warning.Lamp -

Train B 8.5 Depress the following General Warning Lamps and verify the Lamp Lights, and then remains OFF.

8.5.1 General Warning Lamp - Train A 8.5.2 General Warning Lamp -

Train B 1 & r.. nn1 Initial

.x SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER_

lPD-18.1. 008 REV.NO.

_1 _______ _

DATE 5/24/82 PAGE 9 OF 50

-=----

TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A

8.0 Instructions

(Continued) 8.6 On the Logic Test Panel, following indicators will 8.6.1 Testing 8.6.2 Bad 8.6.3 Good 8.6.4 Continuity 8.6.5 Memory Set 8.6.6 1/1 8.6.7 1/2

8. 6. 8 1/3
8. 6. 9 1/4 8.6.10 2/2 8.6.11 2/3 8.6.12 2/4 I & C - 001 verify light that each of the by depressing it.

Initial

~x SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

REV. NO.

DATE lPD-18.1. 008 1

5/24/82 PAGE 10 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A

8.0 Instructions

(Continued) 8.7 Record UV Coil Voltage Meter Reading.

Required 43 VDC ~ 2 VDC Initial (when shutdown 0 VDC + 2 VDC)

As Found

'\\

(

c:1.;: \\.;.',.,,.. i.:.1-

-t~.,-. 't.i.-.:;,... t-~~ -:.-

'~.., \\-r"-::"; \\i;,\\!..... ~*'('~

'?\\1t::-

,-~*::.*..... !_~. (:_._\\*' Pt J

,:J

/

8.8 O~~~~'~_.::b~~p~~{*~:la~ d..T"e~*t P*~~e 1

~

1

<~l~~e' the Mode Selector Switch in the Test position.

8.9 Verify the Operate Lamp is not lighted.

8.10 Verify the General Warning Lamp is lighted.

8.11 Verify the operation of the Semi-Automatic Tester.

Self-check as follows:

-NOTE-Steps 8.11.6 through 8.11.11 will result in continuous alarms in the Control Room if there are any tripped inputs to the SSPS.

8.11.1 8.11. 2 Verify that the continuity lamp is lighted.

On the Tester PC Card (Al08), verify that the top four LED's (light emitting diodes) are lighted.

I & C

  • 001

.x.

SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

lPD-18.1. 008 REV.NO.

~l~~~~~~~

DATE 5/24/82 PAGE 11 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A

8.0 Instructions

(Continued) 8.11.3 8.11.4 8.11.5 Depress the test pushbutton.

Verify that the continuity lamp and the top four LEDS on Al08 extinguish.

Release the TEST pushbutton.

Verify that the continuity lamp and the top four LEDS on Al08 light.

On the Logic Test Panel, place the Input Initial Error Inhibit switch to the Inhibit position.~~~-

8.11.6 8.11.7 8.11.8 Place the MULTIPLEXER TEST switch to the A & B position.

Place the BLOCKING FUNCTION TEST switch to the BLOCKS NOT INHIBITED position.

Depress and release the TEST pushbutton.

8.11.8.1 Verify that the amber testing lamp lights.

8.11.8.2 In approximately 1.6 seconds, verify that this lamp extinguishes.

8.11.8.3 Verify that the GOOD lamp lights.

I & C -001

.x NUMBER -

lPD-18.1. 008 SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

REV.NO.

_1:::.-~~~~~~-

DATE

_5~/_2_4~/_8_2~~~~

TEST PROCEDURE PAGE 12 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A

8.0 Instructions

(Continued) 8.11."8.4 In approximately 1.6 seconds, verify

.that the good lamp extinguishes and repeatedly blinks on and off for 8.11. 9 8.11.10

  • these periods.

Place the BLOCKING FUNCTION TEST switch to the INHIBIT BLOCKS position.

Depress and release the Test pushbutton.

8.11.10.1 Verify that the AMBER TESTING lamp LIGHTS.

8.11.10.2 Verify that the red BAD lamp lights.

8.11. 11 Place the MULTIPLEXER TEST switch to INHIBIT.

8.12 Verify Reactor Trip Breaker A is CLOSED (if Reactor Trip Breaker is open have the Control Operator CLOSE Reactor Trip Breaker A) 8.13 Verify the following High Radiation ALARM Lights on panel lRPl are OFF.

8.13.1 lR-llA Containment or Vent Particulate Initial I & C - 001

x SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C).

NUMBER-lPD-18.1.008 REV.NO.

~l~~~~~~-

. DATE 5/24/82 TEST PROCEDURE PAGE 13 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A

8.0 Instructions

(Continued) 8.13.2 8.13.3 1R-12A Containment or Vent Gas Effluent.

1R-12B Containment or Vent Gas Effluent (Iodine).

8.14 If any high RADIATION ALARM. is present in Steps 8.13.1 through 8.13.3, lift the field lead on terminal TB-506-2.

8.15 Perform the fo-llowing for LOGIC and PERMISSIVE testing.

Record results on TABLE I..

WARNING:

If a malfunction within the logics is detected, the red BAD LAMP will come on at the instant of detection and remain on.

It is then necessary to refer to Section 6.3 of the *solid State Protection System Manual to troubleshoot and define the cause.

8.15.1 Verify the following switches are in the positions indicated.

8.15.1.1 *Logic A OFF 8.15.1.2 Logic B 24 I & C

  • 001
    • .*-_-*.<"*~:**-*... *,**.-.>-:.*:::*,.._...*~-***-*T.--~.-.... ~---.... ~-:--

~,_ ""**:-* _.,................,, *.. -** ** **

Initial

x SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

REV. NO.

DATE lPD-18.1. 008 1

5/24/82 PAGE 14 OF *so TITLE 8.0 SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A Instructions:

(Continued) 8.15.1.3 Logic c 24 8.15.1.4 Logic D 24 8.15.1. 5 Permissives OFF 8.15.1.6 Memories OFF 8.15.2 8.15.3 8.15.4 8.15.5 Place Logic A switch to position "l" and verify that Function Logic Lamp 2/3 lights.

Depress and release the TEST pushbutton.

The amber testing lamp will LIGHT.

After all combinations of logics are tested, the Amber TESTING Lamp should extinguish and the Green GOOD Lamp should light.

The GOOD Lamp will extinguish the next time the TEST pushbutton is depressed.

Place the Blocking Function Test Switch to the opposite position and repeat Steps 8.15.2 and 8.15.3.

Using Table I, perform Step 8.15.2 through 8.15.4 for the positions of the logic and permissive switches as listed.

I & C - 001 Initial

~

1 ;

1 1 x

SAL NERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDUflE NUMBER -

lPD-18.1. 008 REV. NO.

1 DATE 5/24/82 PAGE 15

- OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC PER-LOGIC LOGIC LOGIC LOGIC MIS-TEST A

B c

D SIVE FUNCTION REQUIRED ACTUAL OFF 24 24 24 OFF OFF 1

24 24 24 OFF LOSS OF FLOW, LOOP 1 2/3 2

24 24 24 OFF LOSS OF FLOW, LOOP 2 2/3 3

24 24 24 OFF LOSS OF FLOW~ LOOP 3 2/3 I

4 24 -

24 24 OFF LOSS OF FLOW, LOOP 4 2/3 5

24 24 24 OFF LOSS OF FLOW,. RCP 2/4 6

24 24 24 OFF PRESSURIZER, LOW PRESSURE TRIP 2/4 BLOCKING FUNCTION TEST SWITCH BLOCKS INHIBIT NOT BLOCKS INHIBITED (GOOD OR BAD)

l

=---.*1,

i *;

~ T i

'i i

x SAL ERATING STATION PERFORMANCE DEPARTMENT (I & Ct TEST PROCEDUHE NUMBER -

lPD-18.1. 008 REV. NO.

DATE' 1

5/24/82 PAGE 16 OF 50 TITLE SOLID STATE PROTECTION* SYSTEM FUNCTIONAL TEST TRAIN A FUNCTION SELECTORS PER..-

LOGIC LOGIC LOGIC LOGIC MIS-A B

C D

  • SIVE 7

24 24 24 OFF 8

24 24 24 OFF 9

24 24 24 OFF 10 24 24 24 OFF 11 24 24 24 OFF 12 24 24 24 OFF TABL:E I LOGIC & PERMISSIVES TEST FUNCTION PRESSURIZER, HIGH PRESSURE TRIP PRESSURIZER, HIGH WATER LEVEL TRIP LOW FEEDWATER FLOW, LOOP 1 LOW FEEDWATER.FLOW, LOOP 1 LOW FEEDWATER FLOW, LOOP 2 LOW FEEDWATER FLOW, LOOP 2 FUNCTION LOGIC REQUIRED ACTUAL 2/4 2/3 1/2 1/2 1/2 1/2 BLOCKING FUNCTION TEST SWITCH BLOCKS INHIBIT NOT BLOCKS. INHIBITED

'.i x

SAL ERA TING ST A TION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER~

lPD-18.1. 008 REV. NO.

1 DATE 5/24/82 PAGE 17 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A FUNCTION SELECTORS PER-LOGIC LOGIC LOGIC LOGIC MIS-A B

C D

SIVE 13 24 24 24 OFF 14 24 24 24 OFF 15 24 24 24 OFF 16 24 24 24 OFF 17 24 24 24 OFF 18 24 24 24 OFF 19 24 24 24 OFF TABLE I LOGIC & PERMISSIVES LOW TEST FUNCTION FEEDWATER LOW FEEDWATER LOW FEEDWATER LOW FEEDWATER OIL PRESSURE TRIP FLOW, LOOP 3 FLOW, LOOP 3 FLOW, LOOP 4 FLOW, LOOP 4 SWITCHES REACTOR STOP VALVES GENERATOR TRIP STOP VALVES GENERATOR TRIP FUNCTION LOGIC REQUIRED ACTUAL 1/2 1/2 1/2 1/2 2/3 2/2 2/2 BLOCKING FUNCTION TEST SWITCH BLOCKS INHIBIT NOT BLOCKS INHIBITED

x SAL NERA TING ST A TION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDUBE NUMBER -

lPD-18.1. 008 REV. NO.

1 DATE 5/24/82 PAGE 18 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC PER-LOGIC LOGIC LOGIC LOGIC MIS-TEST A

B c

D SIVE FUNCTION REQUIRED ACTUAL 20 24 24 24 OFF STOP VALVES REACTOR TRIP 2/2 21 24 24 24

  • OFF SOURCE RANGE,TRIP 2/2 22 24 24 24 OFF SOURCE RANGE TRIP 2/2 23 24 24 24 OFF FEED THRU TO-LOGIC B 23 1

24 24 OFF INTERMEDIATE RANGE TRIP 2/2 23 2

24 24 OFF INTERMEDIATE RANGE TRIP 2/2 23 3

24 24 OFF POWER RANGE, LOW SETPOINT TRIP 2/4 BLOCKING FUNCTION TEST SWITCH BLOCKS INHIBIT NOT BLOCKS INHIBITED

... '. x SAL NERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE TITLE SOLID STATE PROTECTION FUNCTION SELECTORS PER-

  • LOGIC LOGIC LOGIC LOGIC MIS-A B

c 1'

SIVE 23 4

24 24 OFF 23 5

24 24

  • OFF 23 6

24 24 OFF 23 7

24 24 OFF 23 8

24 24 OFF 23 9

24 24 OFF SYSTEM FUNCTIONAL TEST TABLE I NUMBER -

R.EV. NO.

DATE lPD-18.1. 008 1

5/24/82 PAGE 19 OF 50 TRAIN A LOGIC & PERMISSIVES FUNCTION LOGIC TEST FUNCTION REQUIRED ACTUAL

/POWER RANGE, HIGH SETPOINT TRIP 2/4 OVERTEMPERATURE DELTA T TRIP 2/4 OVERPOWER DELTA T TRIP 2/4 RCP UNDERVOLTAGE TRIP 2/4 RCP UNDERVOLTAGE TRIP 1/2 RCP UNDERVOLTAGE, TURB. FEED 1(2 PUMP BLOCKING FUNCTION TEST SWITCH BLOCKS.

INHIBIT NOT BLOCKS INHIBITED

x

  • i,

)

SA NEAATING STATION PERFORMANCE DEPARTMENT (I & C, TEST PROCEDURE NUMBER -

lPD-18.1. 008 REV. NO.

1 DATE 5/24/82 PAGE 20 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC PER-LOGIC LOGIC LOGIC LOGIC MIS-TEST A

B c

D SIVE FUNCTION REQUIRED ACTUAL 23 10 24 24 OFF RCP UNDERVOLTAGE, TURB. FEED 2/4 PUMP 23 11 24 24 OFF LOW STEAMLINE PRESSURE 2/4 23 12 24 24 OFF HIGH STEAMLINE FLOW, LOOP 1 1/2 23 13 24 24 OFF HIGH STEAMLINE FLOW, LOOP 2 1/2 23 14 24 24 OFF HIGH STEAMLINE FLOW, LOOP 3 1/2 23 15 24 24 OFF HIGH STEAMLINE FLOW., LOOP 4 1/2 BLOCKING FUNCTION TEST SWITCH INHIBIT BLOCKS BLOCKS NOT INHIBITED

x*

SAL NE RATING ST A TION NUMBER-lPD-18.1.008

-***~-*-

PERFORMANCE DEPARTMENT (I & C)

REV. NO.

1 TEST PROCEDURE DATE 5/24/82 PAGE 21 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A FUNCTION SELECTORS LOGIC LOGIC LOGIC LOGIC A

B c

D 23 16 24 24 23 17*

24 24 23 18 24 24 23 19 24 24 23 20 24 24 TABLE I LOGIC & PERMISSIVES PER-MIS-TEST SIVE FUNCTION OFF STEAMLINE ISOLATION

  • OFF HIGH CONTAINMENT PRESSURE, SAFETY INJECTION OFF HI-HI CONTAINMENT PRESSURE, SPRAY ACTUATION OFF HI-HI CONTAINMENT PRESSURE, SPRAY ACTUATION OFF HI-HI CONTAINMENT PRESSURE, STEAM STOP VALVES FUNCTION LOGIC REQUIRED
ACTUAL, 2/4 2/3 2/4 2/4 2/4 BLOCKING FUNCTION TEST SWITCH BLOCKS INHIBIT NOT BLOCKS INHIBITED

x SALE ERATING STATION NUMBER -

lPD-18.1.008

e.

PERFORMANCE DEPARTMENT (I & C)

REV. NO.

1 TEST PROCEDURE DATE 5/24/82 PAGE 22 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER-BLOCKS LOGIC LOGIC LOGIC LOGIC MIS-TEST INHIBIT NOT A

B c

D SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED 23 21 24 24 OFF HI-HI CONTAINMENT PRESSURE, 2/4 PHASE B ISOLATION 23 22 24 24 OFF SAFETY INJECTION, PHASE A

. 1/1 ISOLATION 23 23 24

- 24 OFF SAFETY INJECTION, CONTAINMENT 1/2 VENTILATION ISOLATION 23 24 24 24 OFF FEED THRU TO LOGIC C 23 24 1

24 OFF STEAMLINE DIFFERENTIAL 2/3 PRESSURE, LOOP l

x J 1.

j SAL NERATING ST A TION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDUHE NUMBER -

lPD-18.1. 008

~EV. NO.

DATE 1

5/24/82

. PAGE 23 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS

. FUNCTION LOGIC PER-LOGIC LOGIC LOGIC LOGIC MIS-TEST A

B c

D SIVE FUNCTION REQUIRED ACTUAL 23 24 2

24 OFF STEAMLINE DIFFERENTIAL 2/3 PRESSURE, LOOP 2 23 24 3

24 OFF STEAMLINE DIFFERENTIAL 2/3 PRESSURE, LOOP 3 23 24 4

,. 24 OFF STEAMLINE DIFFERENTIAL 2/3 PRESSURE, LOOP 4 23 24 5

24 OFF PRESSURIZER PRESSURE 2/3 23 24 6

24 OFF PRESSURIZER.PRESSURE 2/3 23 24 7

24 OFF PRESSURIZER PRESSURE 2/3 BLOCKING FUNCTION TEST SWITCH BLOCKS INHIBIT NOT BLOCKS INHIBITED

x

-~

SAL NERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER_

lPD-18.1. 008 REV. NO.

1 DATE 5/24/82 PAGE 24 OF 50 TITLE SOLID STATE P~OTECTION SYSTEM FUNCTIONAL TEST TRAIN A FUNCTION SELECTORS PER-LOGIC LOGIC LOGIC LOGIC MIS-A B

C D

SIVE 23 24 8

24 OFF 23 24 9

24 OFF 23 24 10 24 OFF 23 24 11 24 OFF 23 24 12 24 OFF TABLE I LOGIC & PERMISSIVES TEST FUNCTION STEAM GENERATOR LEVEL LOOP 1 STEAM GENERATOR LEVEL LOOP 2 STEAM GENERATOR LEVEL LOOP 3 STEAM GENERATOR LEVEL LOOP 4 STEAM GENERATOR LEVEL TRIP LO-LO WATER LO-LO WATER LO-LO WATER LO-LO WATER LO-LO WATER FUNCTION LOGIC REQUIRED ACTUAL 2/3 2/3 2/3 1/4 BLOCKING FUNCTION TEST SWITCH BLOCKS INHIBIT NOT BLOCKS INHIBITED

x

.J

\\

i

  • ~

SAL ERA TING ST A TION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

lPD-18.1. 008 REV. NO.

1 DATE 5/24/82 PAGE 25 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC PER-LOGIC LOGIC LOGIC LOGIC MIS-TEST A

B c

D SIVE FUNCTION REQUIRED ACTUAL

/,,..:_,

, I 23 24 13 24 OFF STEAM GENERA( 10R/LO-LO WATER 1/4

......... _ _.. I LEVEL, MOTO:i.-..>.r'EED PUMP 23 24 14 24 OFF STEAM GENERATOR LO-LO WATER 2/4 LEVEL, TURBINE FEED PUMP 23 24 15 24 OFF STEAM GENERATOR HI-HI LEVEL, 2/3 GENERATOR 1 23 24 16 24 OFF STEAM GENERATOR HI-HI LEVEL, 2/3 GENERATOR 2

. 23 24 17 24 OFF STEAM GENER.Z\\TOR HI-HI LEVEL, 2/3 GENERATOR 3 BLOCKING FUNCTION TEST SWITCH BLOCKS INHIBIT NOT BLOCKS INHIBITED

SALE*

ERA TING STATION NUMBER -

lPD-18.1. 008

  • x PERFORMANCE DEPARTMENT (I & C)

REV. NO.

1 TEST PROCEDURE DATE 5/24/82 PAGE 26 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER-BLOCKS LOGIC LOGIC LOGIC LOGIC MIS-TEST INHIBIT NOT A

B c

D SIVE FUNCTION

'REQUIRED ACTUAL BLOCKS INHIBITED 23 24 18 24 OFF STEAM GENERATOR HI-HI LEVEL, 2/3 GENERATOR 4 23 24 19 24 OFF LOW TAVG 2/4 23 24 20 24 OFF TAVG AND REACTOR TRIPPED 2/2 23 24 21 24 OFF UV DIODES AND OUTPUT 1/4 23 24 22 24 OFF SAFETY INJECTION DIODES & OUTPPT 1/4 23 24 23 24 OFF UV DIODES AND OUTPUT 1/4

x SALE ERA TING ST A TION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

lPD-18.1. 008 REV. NO.

1 DATE 5/24/82 PAGE 27 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN A TABLE I LOGIC & PERMISSIVES FUNCTION SELEC'l'ORS FUNCTION LOGIC PE'R-LOGIC LOGIC LOGIC LOGIC MIS-

.TEST A

B c

D SIVE FUNCTION REQUIRED ACTUAL 23 24 24 24 OFF FEED THRU TO LOGIC D 23 24 24 1

OFF SAFETY INJECTION DIODES & OUTPUT 1/3 23 24 24 2

OFF UV DIODES AND OUTPUT 1/4 23 24 24 3

OFF UV DIODES AND OUTPUT 1/4 23 24 24 4

OFF UV DIODES AND OUTPUT 1/4 23 24 24 5

OFF UV DIODES AND.OUTPUT 1/4 23 24 24 6

OFF UV DIODES AND OUTPUT 1/4 BLOCKING FUNCTION TEST SWITCH BLOCKS INHIBIT NOT BLOCKS INHIBITED