ML17266A123: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML17266A123
| number = ML17266A123
| issue date = 12/26/1979
| issue date = 12/26/1979
| title = LER 79-035/03L-0:on 791126,During Surveillance Test,One Channel of Refueling Water Tank Level Had Setpoint Out of Tolerance.Caused by Setpoint Drift in Channel Circuit. Setpoint Readjusted
| title = LER 79-035/03L-0:on 791126,during Surveillance Test,One Channel of Refueling Water Tank Level Had Setpoint Out of Tolerance.Caused by Setpoint Drift in Channel Circuit. Setpoint Readjusted
| author name = SHOPPMAN M A
| author name = SHOPPMAN M A
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.

Revision as of 01:44, 27 February 2018

LER 79-035/03L-0:on 791126,during Surveillance Test,One Channel of Refueling Water Tank Level Had Setpoint Out of Tolerance.Caused by Setpoint Drift in Channel Circuit. Setpoint Readjusted
ML17266A123
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 12/26/1979
From: SHOPPMAN M A
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML17207A729 List:
References
LER-79-035-03L, LER-79-35-3L, NUDOCS 8001110653
Download: ML17266A123 (1)