05000335/LER-1979-035-03, /03L-0:on 791126,during Surveillance Test,One Channel of Refueling Water Tank Level Had Setpoint Out of Tolerance.Caused by Setpoint Drift in Channel Circuit. Setpoint Readjusted

From kanterella
(Redirected from ML17266A123)
Jump to navigation Jump to search
/03L-0:on 791126,during Surveillance Test,One Channel of Refueling Water Tank Level Had Setpoint Out of Tolerance.Caused by Setpoint Drift in Channel Circuit. Setpoint Readjusted
ML17266A123
Person / Time
Site: Saint Lucie 
Issue date: 12/26/1979
From: Shoppman M
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML17207A729 List:
References
LER-79-035-03L, LER-79-35-3L, NUDOCS 8001110653
Download: ML17266A123 (1)


LER-1979-035, /03L-0:on 791126,during Surveillance Test,One Channel of Refueling Water Tank Level Had Setpoint Out of Tolerance.Caused by Setpoint Drift in Channel Circuit. Setpoint Readjusted
Event date:
Report date:
3351979035R03 - NRC Website

text

LLS. NUCLEAR REGULATORY COMMISSION NRC FORM Sdd 12 721

~ol 1

4

- CON'T

~o LICENSEE EVENT REPORT I

I Qi IPLEASE PRINT OA TYPE Al.LAEOUIREO INPORMATIONI CONTROL SLOCKI I

9 I LICL'4$$$ COOE 2S 24 LICLVSE TYtS 40 Sl ~T 44 0

0 I

I I

I 1

l 1

4 Qs LIC$44$ $ NUMSER 4~

L d

0 5

0 0

0 I 3 3 I 5 2

1 1

2 6

7 9

8 1

2 2 I 6 7

9 Q 9

$0 4l QOCKET NUMSER 44 49 EVENT 0*TE 44 1$

AEtOATOATS SO EVENT OESCAIPTION ANO PAOBAELE CONSEQUENCES Qlo Durin a surveillance test one of four channels (Channel C) of Refueling Water. Tank Level in the Engineered Safeguards Actuation System was found with a setpoint slightly out of tolerance.

The other three re'dundant

~08 were within s ecification.

Also; by procedure, the channels are set conservativel b

about 1 inch and would have actua ed a

RAS signal prior to reaching the actual setpoin't.

This is the fourth occur-rence of this t e

See LERs 335-77-32 77-48 and 78-1 1

4

~09 Water Tank level circuit.

Immediate corrective action was to readjust SYSTEM C*VSE

CAUSE

COMt.

VALVE CQQE CQQE SUSCQOE CCMtONENT CQOE SVSCQOS SUSCQQE uuuO Lu44 LuO~iB LQQ LU44 4

9 Io ll I2 IS 1$

19 20 SEQUENTIAL OCCIIRAENCE REPORT REVISIQN Lc RIAO EVENT YEAR REPORT NO.

COQE TYtE

~

No.

O'EPORT ~~ ~ ~~

I ~J LQJ+

~L LJ U0

'2 I 24 21 2$

29

$0 SI 22 ACTION FUTURE Et t EC i SHUTOOWN ATTACHMENT 4tR04 tRIMECQMt.

CCIMto44ENT TAIIEN ACTION CN tLANT METIIQO HOVR$

22 SV4MITTEO FOAM SUS.

SUttLIER 44ANUFACTVAER M44 M44

~z44 0

0 LNJ44 LNJ0 ~4 ~18 0

JS 24 41 42 44 41 CAUSE OESCRIPTION ANO CORRECTIVE ACTIONS Q22 o

The cause a 'ars to have been set oint drift of Channel C

Refuelin the Chan e

4 1

4 9

FACILITY.

MSQ METHOQ Ot STATUS R tQWEA OTHER STATVS Q OISCQVERY IZZ LEIS ILUllnlQ~ LHJ44 2

4 9

'IO 12 12 4444 ACTIVITY CONTL4T AEI.EASEO Ot AEI.EASE AMOUNTOP ACTIVITYQSS Cra ~O ~QSS 2

4 9

10 II 44 44 tEASONNEL EXtOSUAES

~ir ~00 0 Qv~ZQm NA 4

II I2 IS

~EASONNE L INJURIES CiE ~0"'o o 0" NA LCSS Ot CR OAMAQE 0 FACILITYQ42

~EOESCRIPTIO44

~9

~ZQ2 NA 2

4 4 'o WSLIC'TY KH LKQ44 'A NAAIEoF PAEPAREA M. A. Scho man OISCOVEAY QESCAItTIQN QS2 LOCATIONOF REI,EA$$ QSE NRC USE ONI.Y PI4oNE 305-552-3802 800111E 40