ML17266A139: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML17266A139
| number = ML17266A139
| issue date = 01/02/1980
| issue date = 01/02/1980
| title = LER 79-036/03L-0:on 791203,While Operating at Full Power, Control Room Operator Discovered Mb Linear Power Range Channel High Voltage Was Lower than Other Three Channels. Caused by Failed +15 Volt Power Supply.Supply Replaced
| title = LER 79-036/03L-0:on 791203,while Operating at Full Power, Control Room Operator Discovered Mb Linear Power Range Channel High Voltage Was Lower than Other Three Channels. Caused by Failed +15 Volt Power Supply.Supply Replaced
| author name = SCHOPPMAN M A
| author name = SCHOPPMAN M A
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.

Revision as of 01:44, 27 February 2018

LER 79-036/03L-0:on 791203,while Operating at Full Power, Control Room Operator Discovered Mb Linear Power Range Channel High Voltage Was Lower than Other Three Channels. Caused by Failed +15 Volt Power Supply.Supply Replaced
ML17266A139
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 01/02/1980
From: SCHOPPMAN M A
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML17207A787 List:
References
LER-79-036-03L-01, LER-79-36-3L-1, NUDOCS 8002040535
Download: ML17266A139 (2)