ML17207A787

From kanterella
Jump to navigation Jump to search
Forwards LER 79-036/03L-0
Date released: 01/25/2018 Download: ML17207A787


LER 79-036/03L-0:on 791203,while Operating at Full Power, Control Room Operator Discovered Mb Linear Power Range Channel High Voltage Was Lower than Other Three Channels. Caused by Failed +15 Volt Power Supply.Supply Replaced
ML17266A139
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 01/02/1980
From: Schoppman M
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML17266A139 (2)
Forwards LER 79-036/03L-0
ML17207A786
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 01/02/1980
From: Schmidt A
FLORIDA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML17207A786 (1)