ML17252B482: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 14: Line 14:
| document type = Letter, Licensee Event Report (LER)
| document type = Letter, Licensee Event Report (LER)
| page count = 3
| page count = 3
| revision = 0
}}
}}

Revision as of 05:21, 26 February 2018

LER 76-062-00 for Dresden, Units 2 and 3 Re Upon Completion of Routine Diesel Generator Surveillance Testing, Control Switch Was Placed in the Stop Position, Generator Output Subsequently Became Erratic, Generator Voltage Began Oscillating.
ML17252B482
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 10/29/1976
From: Stephenson B B
Commonwealth Edison Co
To: Keppler J G
NRC/RGN-III
References
BBS LTR 76-757 LER 76-062-00
Download: ML17252B482 (3)