ML20065N740: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20065N740
| number = ML20065N740
| issue date = 04/11/1994
| issue date = 04/11/1994
| title = Forwards Catawba Unit 2,Cycle 7 Reload TS Bases Section 3/4.9.1, Boron Concentration, Inadvertently Omitted from 940324 Ltr
| title = Forwards Catawba Unit 2,Cycle 7 Reload TS Bases Section 3/4.9.1, Boron Concentration, Inadvertently Omitted from
| author name = Rehn D
| author name = Rehn D
| author affiliation = DUKE POWER CO.
| author affiliation = DUKE POWER CO.
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 9404280062
| document report number = NUDOCS 9404280062
| title reference date = 03-24-1994
| package number = ML20065N743
| package number = ML20065N743
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE

Latest revision as of 17:51, 31 May 2023

Forwards Catawba Unit 2,Cycle 7 Reload TS Bases Section 3/4.9.1, Boron Concentration, Inadvertently Omitted from
ML20065N740
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 04/11/1994
From: Rehn D
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20065N743 List:
References
NUDOCS 9404280062
Download: ML20065N740 (3)


Text

_ _ _ . -

ll l g D:ike Power Company ,

D. L Rmy ,

  • Catawba Nuclear Generation Depanment Vice President 4800 ConcordRoad (803)&1)3205 Office York, SC29745 (803)L113426 Fax

\ DUKEPOWER April 11,1994 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Subject:

Catawba Nuclear Station Docket Nos. 50-413 and 50-414

' Technical Specification Amendment Unit 2 Cycle 7 Reload Supplement

Reference:

Letter from Duke Power Company to NRC, dated March 24, 1994 The reference letter submitted the Catawba Unit 2 Cycle 7 reload Technical Specification (TS) changes. In the reference, the change to the Bases section for TS 3/4.9.1, Boron )

Concentration (boron concentration during refueling operations) was inadvertently omitted. J l

Accordingly, please find marked-up page B 3/4 9-1 which changes the boron concentration for Unit 2 to 2175 ppm (identical to the Unit i value). The conclusions of the No Significant Hazards Consideration Analysis contained in the reference contmue to remam i valid.

l Pursuant to 10 CFR 50.91 (b)(1), the appropriate South Carolina official is being provided a copy of this amendment request supplement.

Very truly ouri, ,

Of D. L. Rehn Attachments UR/

00$$ o$8$l,Q n,m a, m m e PDR fh \

l

U.S. Nuclear Regulatory Commission

. April 11,1994 Page 2 xc:

'S.D. Ebneter, Regional Administrator Region II R.J. Freudenberger, Senior Resident Inspector h R.E. Martin, NRC Project Manager

( ONRR Heyward Shealy, Chief Bureau of Radiological Health, SC j American Nuclear Insurers -

l M&M Nuclear Consultants l' INPO Records Center i

i

. - , , . .. - -- _ . . , - ~ - , - . .

Y

U.Si Nuclear Regulatory Commission April 11,1994 Page 3 '

D. L. Rehn, being duly sworn, states that he is Vice President, Catawba Nuclear Station';

that he is authorized on the part of said company to _ sign and file with the Nuclear -

Regulatory Conunission this; revision to : the Catawba Nuclear Station Technical -

Specifications, Appendix A to License Nos. NPF-35 and NPF-52; and that all statements -

and matters set forth therein are tnie and correct to the best of his knowledge, oc 1 D. L. Rehn Subscribed and sworn to before me this lith day of April,1994.

Y&tM4u Ylbu ..

N/ary Pubiic [/.

4 My commission expires:

hlov af, c; Loco

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _